Daily Calendar Search Form Appearance Form
| Word Document PDF Document |
California Public Utilities Commission
Daily Calendar
Table of Contents
REGULAR COMMISSION BUSINESS MEETINGS
COMMISSION RATESETTING DELIBERATIVE MEETINGS
(Not Open to the Public)
PUBLIC MEETINGS & WORKSHOP NOTICES
NOTICE OF DRAFT RESOLUTIONS
(Pursuant to PU Code § 311(g))
PETITIONS FOR MODIFICATION AND APPLICATIONS FOR REHEARING
PROPOSED DECISIONS * ALTERNATES * PRESIDING OFFICER'S DECISIONS * ARBITRATOR'S REPORTS
ADVICE LETTER SUSPENSIONS (Pursuant to M-4801, 04/19/01)
MISCELLANEOUS TRANSPORTATION ITEMS
Filings with Consumer Protection and Safety Division
TABLE OF SUBMISSION DATES FOR THE PRECEDING TWO WEEKS
Public Utilities Commission of the State of California
Paul Clanon, Executive Director
Headquarters |
Southern California Office |
505 Van Ness Avenue |
320 West 4th Street, Suite 500 |
San Francisco, CA 94102 |
Los Angeles, CA 90013 |
(415) 703-2782 |
(213) 576-7000 |
Website:
http://www.cpuc.ca.gov
Calendar Archive:
http://www.cpuc.ca.gov/daily_calendar_archive/
Daily Calendar
· Commission Meetings
· Notices
· Public Meetings and Workshops
· Notice of Draft Resolutions (PU Code § 311(g))
· New Filings
· Petitions for Modification and Applications for Rehearing
· Proposed Decisions/Alternates/Presiding Officer's Decisions/Arbitrator's Reports
· Advice Letter Filings
· Miscellaneous Transportation Items
· Miscellaneous Communications Matters
· Table of Submission Dates for the Preceding Two Weeks
· Changes to Hearing Calendar
· Hearings
· Notice of All-Party Meetings (PU Code §1701.3(c))
· Notice of Ex Parte Communications
The Commission Daily Calendar will not be published on March 31, 2008 due to a state legal holiday.
|
The Commission's policy is to schedule hearings (meetings, workshops, etc.) in locations that are accessible to people with disabilities. | |
The CPUC encourages all Californians to participate in its meetings, hearings, workshops, and proceedings. We try to hold our public meetings only in places that are wheelchair accessible and which can accommodate specialized equipment and other services useful to people with disabilities. Please see the notice of the meeting you wish to attend for more specifics. If you plan to attend and need specialized accommodations for a particular meeting that are not listed in the notice, request them from the Public Advisor's Office at least three business days in advance of the meeting. Contact the Public Advisor's Office by any one of the following: | ||
Email:
public.advisor@cpuc.ca.gov |
FAX: 415-355-5404 (Attn.: Public Advisor) | |
April 10, 2008 |
10:00 am |
San Francisco |
April 24, 2008 |
10:00 am |
San Francisco |
May 15, 2008 |
10:00 am |
San Francisco |
Ratesetting Deliberative Meeting dates are reserved as noted but will only be held if there are ratesetting matters to be considered.
April 7, 2008 |
1:30 pm |
San Francisco |
April 21, 2008 |
1:30 pm |
San Francisco |
May 12, 2008 |
1:30 pm |
San Francisco |
NONE
Energy Division Advice Letter Disposition Change
As of June 25, 2007, the Energy Division of the CPUC will send utilities notices of the disposition of Advice Letters by electronic means rather than by hard copy in the regular mail, and will no longer be returning hard copies of approved tariff pages to the utilities. More information: http://www.cpuc.ca.gov/static/documents/energyaldispositionchange.pdf.
San Diego Office Closes
The Commission's San Diego Office will be closing permanently effective June 22, 2007 and will no longer be able to accept hand delivered filings. Documents may be filed electronically on the Commission's website at http://www.cpuc.ca.gov/static/efiling.htm. In the event that you wish to file your document in hard copy, rather than electronically, documents should be taken directly to the Commission's lobby or mailed to the Commission's Docket Office in San Francisco, 505 Van Ness Avenue, San Francisco, California 94102. Only hand-delivered documents will be accepted by the Los Angeles office, 320 West 4th Street, Suite 500, Los Angeles.
Starting May 24, 2004, the Central Files Office will be open for business from 8 a.m. to 12 noon only.
To purchase Commission documents, there is a charge of 20 cents a printed page (postage prepaid) with a minimum purchase of $2.00.
The auditorium, hearing rooms and training room at the headquarters of the California Public Utilities Commission, located at 505 Van Ness Avenue, San Francisco, are available for rent. Further information about requirements and fees can be obtained by contacting Colette Kondo at (415) 703-1401.
March 28, 2008 |
California Public Utilities Commission |
Parties to the Renewable Portfolio Standard (RPS) proceedings, Rulemaking (R.) 06-02-012 and R.06-05-027, will be discussing proposals to update the market price referent (MPR) methodology, inputs and assumptions. A workshop agenda will be circulated prior to the workshop. Presentations and discussions will address issues raised by parties in pre-workshop comments. The second day of the workshop is optional; Staff will make a determination based on the scope and complexity of pre-workshop comments. Please refer to the February 8, 2008 Ruling for additional information (link below).
http://docs.cpuc.ca.gov/efile/RULINGS/78630.pdf
Contact: Sean Simon at (415) 703-3791 or
svn@cpuc.ca.gov.
California Relay Service RFP Work Group (TADDAC & CRSAC) |
DDTP Office |
Members of the Telecommunications Access for the Deaf and Disabled Administrative Committee and the California Relay Service Advisory Committee will hold this meeting as a CRS RFP Work Group to address the following:
PUBLIC MEETING AGENDA
I. Welcome and Introduction of Members; II. Approval of Agenda; III. Review of Any Outstanding Action Items; IV. Editors Will Update and Answer Questions from Work Group; V. Review All Completed Topic Commentaries Written by Work Group Members; VI. Public Input; VII. Discussion of Final Steps to Prepare Report for Submission; and VIII. Vote on Commentaries.
ENVIRONMENTAL NOTICE: People with environmental illness or multiple chemical sensitivities must reduce their exposure to attend this meeting. Please refrain from wearing perfumes or scents to DDTP meetings.
If you are a member of the public who needs communication assistance and plan to attend any this meeting notify Larena Burno 5 days prior to the meeting date to
larena@ddtp.org.
ASSISTIVE REQUESTS: DDTP provides the following communication assistance at all Administrative Committee meetings: ASL Interpreting, Real-Time Captioning, and Assistive Listening Devices. If you require any other communication assistance, please describe it in detail when notifying us so that we may ensure accessibility.
April 1, 2008 |
California Public Utilities Commission |
This is a public workshop for interested parties to the Long Term Procurement Plan proceeding. The workshop will be facilitated by Energy Division staff.
Pursuant to D.07-12-052, Energy Division staff developed Independent Evaluator and Request for Offer report templates that were distributed to the R.06-02-013 service list by Administrative Law Judge Brown in a January 28th ruling. Energy Division received comments on the templates from several parties, and the purpose of this workshop is to clarify and expand upon some of the recommendations in these comments prior to revising the draft templates.
Energy Division staff will provide an agenda to parties on the service list for R.06-12-013 prior to start of the workshop. Please contact Melissa Semcer at (415) 703-1925 or
unc@cpuc.ca.gov for more information on the workshop.
Telecommunications Access for the Deaf and Disabled Administrative Committee |
DDTP Office |
The Telecommunications Access for the Deaf and Disabled Administrative Committee will hold this meeting to address the following:
PUBLIC MEETING AGENDA
I. Welcome and Introduction of Members; II. Minutes of the March 5, 2008 TADDAC Meeting; III. Approval of Agenda;
IV. Administrative Business, A. Report from CPUC Staff, B. Report from CCAF Staff, and C. Report from the Chair;
V. Public Input; VI. Unfinished Business and A. Review of Budget "Must Haves" for FY 2007-2008; VII. New Business,
A. EPAC Report and Recommendations, B. CRSAC Report and Recommendations, C. Report and Recommendations from TADDAC/CRSAC Work, D. Goals and Objectives for 2008-2009, E. Budget "Must Haves" for FY 2009-2010, and
F. Member Reports.
ENVIRONMENTAL NOTICE
People with environmental illness or multiple chemical sensitivities must reduce their exposure to attend this meeting. Please refrain from wearing perfumes or scents to DDTP meetings.
If you are a member of the public who needs communication assistance and plan to attend any this meeting notify Larena Burno 5 days prior to the meeting date to
larena@ddtp.org.
ASSISTIVE REQUESTS
DDTP provides the following communication assistance at all Administrative Committee meetings: ASL Interpreting, Real-Time Captioning, and Assistive Listening Devices. If you require any other communication assistance, please describe it in detail when notifying us so that we may ensure accessibility.
April 3, 2008 |
AT&T Building |
AT&T is hosting a two-day public technical conference to allow parties to discuss proposed revisions to General Order
(GO) 95 to add uniform guidelines for pole-top antenna installations. Parties will be able to present their views on disputed issues and to provide technical support for their positions. Parties should use their best efforts to distribute Technical Conference materials to the service list a week in advance of the Technical Conference. The Technical Conference will be conducted and managed by the parties, and the current GO 95/128 Rules Committee Chairman (Samuel Stonerock) will serve as facilitator. For more information about the Technical Conference, please contact Samuel Stonerock at Southern California Edison Company
(samuel.stonerock@sce.com or 1-909-421-6476), Pat Geoffrey at Pacific Gas and Electric Company
(pjg3@pge.com), or Ray Fugere at the Commission
(rgf@cpuc.ca.gov or 1-213-576-7015).
April 4, 2008 |
California Water General Office |
Working Group (WG) 2 will hold its first meeting to review the proposed water quality sections of General Order 103, the Rules Governing Water Service Including Minimum Standards for Design and Construction.
For additional information about the meeting, please contact Tarrah Henrie at
THenrie@calwater.com or 209-547-7931.
April 04, 2008 |
California Public Utilities Commission |
The purpose of this workshop is to (1) present the consultant's report to parties, (2) provide parties with the opportunity to ask clarifying questions, and (3) present the ED staff recommendation for a goal setting framework and cumulative numerical goals for the State's IOUs. ALJ Gamson's Ruling dated 03/24/08 in R06-04-010 provides further description and additional information about the topics to be addressed at this workshop. For questions about this workshop, please contact Michael Wheeler at mmw@cpuc.ca.gov or (415) 703-5147.
April 04, 2008 |
California Public Utilities Commission |
MEETING DESCRIPTION: 1. Introduction; 2. Public Comments; 3. Review and Approval of Previous Meeting Minutes; 4. Review of SB 909 Letter to the Commission - program that provides 100% installation charge discount on advanced services; 5. Document Preparation for Recommendation: DSL, Bundling of Services, FCC Telemedicine Program, 3rd Party Administrator, and Broadband - definition and access (speed with assumption of intranet); 6. CTF Tariff Detariffing;
7. Assessment of CTF-eligible Services Offered to Schools and Libraries; 8. Marketing Outreach RFP status; 9. Conflict of Interest Status; 10. Announcements; and 11. Future Meeting Date and Time.
Questions regarding this CTF-AC meeting should be directed to Fe N. Lazaro, Communications Division at (415) 703-2627 or
MAILTO:fnl@cpuc.ca.govfnl@cpuc.ca.gov.
April 7, 2008 |
California Public Utilities Commission - San Francisco Office |
AGENDA
1. Introduction; 2. Approval of minutes; 3. Legal Liaison report on conflict of interest and other legal developments;
4. Marketing program development; 5. Call Center RFP; 6. Break; 7. Public comments; 8. Communications Division Liaison report; 9. Fiscal Report; 10. Pending changes of Regulations and Legislations; 11. ULTS-AC Annual Report status; 12. AC vacancy update; 13. Future meeting date and location; and 14. Adjournment.
Equipment Program Advisory Committee (EPAC) |
Deaf & Disabled Telecommunications Program Offices |
The EPAC of the Deaf and Disabled Telecommunications Program will hold a meeting to address the following:
PUBLIC MEETING AGENDA
I. Administrative Business, A. Introductions, B. Agenda Modification and Approval, C. Review of Minutes from the March Meeting, and D. Review of Action List Items; II. EPAC Business, A. Report from the Chair and B. Discussion of Emergency Evacuation; III. Other Business: Member Reports; IV. CPUC Update; V. Public Input; VI. CCAF Staff Reports; VII. Product Demonstration Update; VIII. Mobility Impaired Community Seat Interviews; IX. Must-Have List/Goals & Objectives List;
X. Plan for the CPUC Resolution T-17089; XI. Suggested Items for Next Month's Agenda and Review of Action Items; and XII. Future Meetings and Locations.
ENVIRONMENTAL REMINDER: People with environmental illness or multiple-chemical sensitivity must reduce their exposure in order to attend this meeting. Please refrain from wearing perfumes or scents to DDTP meetings.
DOCUMENT PREPARATION: All documents reviewed by EPAC must be available in a Braille format. Therefore, when submitting documents for the EPAC binder, please send a copy, in an electronic format, to
larena@ddtp.org for brailing prior to the meeting. Handouts should also be made available in an electronic format.
April 17, 2008 |
Victoria Gardens Cultural Center |
The California Solar Initiative (CSI) Program Forum serves as a venue for public stakeholders to identify and discuss top priority issues related to the administration and implementation of the CPUC's portion of the CSI program and suggest consensus-based revisions to the CSI Program Handbook. Each Program Forum is held quarterly and hosted in turns by the three Program Administrators as a supplement to the PUC decision making process. NOTE: the CSI Program Forums DO NOT cover the California Energy Commission's New Homes Solar Partnership. The quarterly California Solar Initiative Public Forum is a free event open to the general public. Link to directions: http://www.vgculturalcenter.com/contact.htm.
May 8, 2008 |
Junipero Serra State Office Building |
The workshop in the above-entitled matter will be held before Administrative Law Judges Kenneth L. Koss.
The ALJ Division has prepared Resolution ALJ-213, Appeal GO 156 2007 2 for the April 10, 2008 Commission Agenda. This Resolution finds the decision on Appeal of Clearinghouse Determination of Status Under General Order 156.
This Resolution has this Decision on Appeal of Clearinghouse Determination of Status Under General Order (GO) 156. Administrative Law Judge Victor D. Ryerson heard this matter in San Francisco on October 24, 2007. The hearing concluded, and the matter was submitted, on that date. The proposed Resolution sustains the appeal and finds S&S Tool & Supply, Inc., to be an eligible woman-owned business enterprise under GO 156.
Any comments should be directed to ALJ Ryerson at vdr@cpuc.ca.gov
http://docs.cpuc.ca.gov/PUBLISHED/COMMENT_RESOLUTION/79560.htm
The ALJ Division has prepared Resolution ALJ-214, Appeal GO 156 2007 1 for the April 10, 2008 Commission Agenda.
This Resolution Granting the Appeal of Beci Electric Company pursuant to General Order 156.
Decision on appeal of Clearinghouse determination of status under General Order (GO) 156. The proposed Resolution sustains the appeal and finds Beci Electric Company to be an eligible woman-owned business enterprise under GO 156.
Any comments should be directed to ALJ Prestidge at tom@cpuc.ca.gov.
http://docs.cpuc.ca.gov/PUBLISHED/COMMENT_RESOLUTION/79810.htm
NOTICE OF RESOLUTION ADOPTING A RAILROAD CARRIER CITATION
PROGRAM FOR ENFORCING COMPLIANCE WITH GENERAL ORDERS AND
OTHER REQUIREMENTS INCLUDING PROCEDURES FOR APPEAL OF CITATIONS
ISSUED TO RAILROAD CARRIERS AND OPPORTUNITY TO COMMENT
Draft Resolution ROSB-002 adopts a Railroad Carrier Citation Program for enforcing compliance with Commission General Orders and other requirements including procedures for appeal of citations issued to Railroad Carriers.
Draft Resolution ROSB-002 will be on the agenda at the Commission's May 15, 2008, meeting. The Commission may then vote on the resolution or it may postpone a vote until later. The Commission may adopt all or part of ROSB-002, amend or modify it, or set it aside and prepare a different resolution.
On March 20, 2008, the draft resolution was circulated to the Resolution ROSB-002 service list, pursuant to California Public Utilities Code § 311(g) and Rule 14.2(c)(2) of the Commission's Rules of Practice and Procedure. Interested parties may review the draft resolution and service list at the "Currently Open for Comment" section of the Commission's Internet site at www.cpuc.ca.gov.
Interested parties may file comments on the draft resolution. (Rule 14.5.) The original and two copies must be filed with CPSD by May 1, 2008, at the address set forth below. Commenters must also serve comments on the service list. Commenters may send copies of comments by electronic mail to the email address below. Comments shall focus on factual, legal or technical error in the draft resolution. Parties may view comments at the Commission's San Francisco Office or at the "Currently Open for Comment" section of the Commission's Internet site at www.cpuc.ca.gov.
An original and two copies of the comments, with a certificate of service, should be submitted to:
Richard W. Clark, Director
Consumer Protection and Safety Division
California Public Utilities Commission
505 Van Ness Avenue
San Francisco, CA 94102
Telephone: (415) 703-2349
Email:
rwc@cpuc.ca.gov
The Communications Division has prepared Resolution T-17142 for the April 24, 2008, Commission Agenda. This resolution reduces the CTF surcharge rate from 0.130% to 0.079% effective June 1, 2008 until further revised by the Commission. The Communications Division emailed the Notice of Availability letter for this resolution to parties in accordance with PU Code Section 311(g)(1).
Any questions or comments should be directed to:
Adam Clark
Communications Division
California Public Utilities Commission
505 Van Ness Avenue
San Francisco, CA 94102 or (415) 703-5212
http://docs.cpuc.ca.gov/WORD_PDF/COMMENT_RESOLUTION/80555.DOC
(To review the resolution, please click on the Proposed Decision and Resolution link, type T17142 in the Document Title box, and then click search.)
3/27/08 |
A08-03-015 - Application of Southern California Edison Company (U338E) for authority to Implement and Recover in Rates the Cost of its Proposed Solar Photovoltaic (PV) Program. |
NONE
NONE
NONE
2/19/08 |
Communications 37 & 37A |
LEVEL 3 COMMUNICATIONS (U-5941). Initial suspension on the following grounds: advice letters require additional staff review and additional information from carrier. Note: initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
2/19/08 |
Communications 49 |
BROADWING COMMUNICATIONS, LLC (U-5525). Initial suspension on the following grounds: advice letter requires additional staff review and additional information from carrier. Note: initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
3/14/08 |
A.07-07-001 - In the Matter of the Application of CALIFORNIA WATER SERVICE COMPANY (U 60 W), a corporation, for an order authorizing it to increase rates charged for water service in its Chico District by $6,380,400 or 49.1% in July 2008, $1,651,100 or 8.5% in July 2009, and by $1,651,100 or 7.9% in July 2010; in its East Los Angeles District by $7,193,200 or 36.5% in July 2008, $2,034,800 or 7.6% in July 2009, and by $2,034,800 or 7.0% in July 2010; in its Livermore District by $3,960,900 or 31.2% in July 2008, $942,200 or 5.6% in July 2009, and by $942,200 or 5.4% in July 2010; in its Los Altos-Suburban District by $5,172,500 or 30.5% in July 2008, $1,189,100 or 5.4% in July 2009, and by $1,189,100 or 5.1% in July 2010; in its Mid-Peninsula District by $5,435,100 or 23.7% in July 2008, $1,634,200 or 5.8% in July 2009, and by $1,634,200 or 5.5% in July 2010; in its Salinas District by $5,119,700 or 29.8% in July 2008, $3,636,900 or 16.3% in July 2009, and by $2,271,300 or 8.7% in July 2010; in its Stockton District by $7,474,600 or 29.0% in July 2008, $1,422,400 or 4.3% in July 2009, and by $1,422,400 or 4.1% in July 2010; and in its Visalia District by $3,651,907 or 28.4% in July 2008, $3,546,440 or 21.3% in July 2009, and by $3,620,482 or 17.6% in July 2010. |
A.08-02-008 (TELEPHONIC - PHC) - Application of Pacific Gas and Electric Company for Review of Entries to the Energy Resource Recovery Account (ERRA) And Compliance Review of Electric Contract Administration, Economic Dispatch of Electric Resources, and Utility Retained Generation Fuel Procurement Activities for the Record Period of January 1 through December 31, 2007. (U 39 E), | |
4/11/08 |
R.07-05-025 (PHC) - Rulemaking Regarding Whether, or Subject to What Conditions, the Suspension of Direct Access May Be Lifted Consistent with Assembly Bill 1X and Decision 01-09-060, |
5/1/08 |
A.07-12-020 (PHC) - In the Matter of the Application of Southern California Edison Company (U338-E) for Authority to Make Various Electric Rate Design Changes, and |
5/8/08 |
A.06-12-005 (WS) - In the Matter of the Application of the Exposition Metro Line Construction Authority for an order authorizing the construction of a two-track at-grade crossing for the Exposition Boulevard Corridor Light Rail Transit Line across Jefferson Boulevard, Adams Boulevard, and 23rd Street, all three crossings located along Flower Street in the City of Los Angeles, County of Los Angeles, California, |
5/9/08 |
A.06-12-005 (TELEPHONIC - PHC) - In the Matter of the Application of the Exposition Metro Line Construction Authority for an order authorizing the construction of a two-track at-grade crossing for the Exposition Boulevard Corridor Light Rail Transit Line across Jefferson Boulevard, Adams Boulevard, and 23rd Street, all three crossings located along Flower Street in the City of Los Angeles, County of Los Angeles, California, |
A.07-10-012 (EH) - Application of Alisal Water Corporation dba Alco Water Service (U206W) to Issues Notes in the Principal Amount of $8,000,000 and to Execute a Related Agreement and Supplemental Security Instruments, | |
ALJ DeAngelis |
C.07-10-024 - Steven Simmons, Complainant, vs. Southern California Edison Company (U338E), Defendant, |
ALJ Barnett |
C.08-01-013 - Linda M. Fox, Complainant, vs. San Diego Gas & Electric Company (U902E), Defendant, |
Dates in parentheses following the word "also" are subject to change without notice. The assigned Commissioner's name is listed next to the proceedings as matter of record; the assigned Commissioner may not be present at the hearing.
(PHC) = Prehearing Conference |
(ECP) = Expedited Complaint Procedure |
(CA) = Closing Argument |
(EH) = Evidentiary Hearing |
(OSC) = Order to Show Cause |
(LM) = Law & Motion |
(PPH) = Public Participation Hearing |
(WS) = Workshop |
|
(IAM) = Initial Arbitration Meeting |
(FPH) = Full Panel Hearing |
(STC) = Status Conference |
(AH) = Arbitration Hearing |
(FOA) = Final Oral Argument |
(CITATION) = Appeal Hearing of Citation |
3/28/08 |
C.08-01-020 (PHC) - Wei Ping Chen, an individual, Complainant, vs. Southern California Edison Company (U338E), Defendants, and |
4/1/08 |
C.07-09-010 (EH) - Pac-West Telecomm, Inc. (U5266C), Complainant, vs. Comcast Phone of California, LLC (U5698C), Defendant, and |
4/1/08 |
C.07-10-015 (EH) - Blue Casa Communications, Inc. (U6764C), Complainant, vs. Pacific Bell Telephone Company, dba AT&T California (U1001C), Defendant, |
4/2/08 |
A.06-08-010 (TEL-PHC) - In the Matter of the Application of San Diego Gas & Electric Company (U 902-E) for a Certificate of Public Convenience and Necessity for the Sunrise Powerlink Transmission Project, |
4/2/08 |
R.08-02-007 (PHC) - Order Instituting Rulemaking to Integrate and Refine Procurement Policies Underlying Long-Term Procurement Plans, |
4/3/08 |
A.08-02-001 (PHC) - In the Matter of the Application of San Diego Gas & Electric Company (U902G) and Southern California Gas Company (U904G) for Authority to Revise Their Rates Effective January 1, 2009, in Their Biennial Cost Allocation Proceeding, |
4/3/08 |
C.08-01-012 (TELEPHONIC - PHC) - J. W. Mitchell Company, LLC, Complainant, vs. Union Pacific Railroad, Defendant, |
4/4/08 |
E-4017-0924-2 (CITATION) - In the matter of the Citation of 3 Phases Renewables, LLC pursuant to Resolution E-4017, |
4/7/08 |
A.06-08-010 (EH) - In the Matter of the Application of San Diego Gas & Electric Company (U 902-E) for a Certificate of Public Convenience and Necessity for the Sunrise Powerlink Transmission Project, |
4/8/08 |
A.08-02-008 (TELEPHONIC - PHC) - Application of Pacific Gas and Electric Company for Review of Entries to the Energy Resource Recovery Account (ERRA) And Compliance Review of Electric Contract Administration, Economic Dispatch of Electric Resources, and Utility Retained Generation Fuel Procurement Activities for the Record Period of January 1 through December 31, 2007. (U 39 E), |
4/8/08 |
A.07-12-029 (PHC) - Application of Southern California Edison Company (U338E) for Recovery of Peaker Costs, |
4/8/08 |
C.07-12-030 (PHC) - Fones4All Corporation (U6338C), Complainant, vs. Pacific Bell Telephone Company d/b/a/ AT&T California (U1001C), Defendant, and |
4/10/08 |
FC-5165 (CITATION) - In the matter of the Citation of DMK International Inc., dba New Life Charters pursuant to Resolution ALJ-187, |
4/10/08 |
A.08-01-002 (PPH) - In the Matter of the Application of Apple Valley Ranchos Water Company (U 346 W) for Authority to Increase Rates Charged for Water Service by $3,767,000 or 22.73% in 2009, $186,510 or 0.90% in 2010, and $280,000 or 1.32% in 2011, |
4/11/08 |
R.07-05-025 (PHC) - Rulemaking Regarding Whether, or Subject to What Conditions, the Suspension of Direct Access May Be Lifted Consistent with Assembly Bill 1X and Decision 01-09-060, |
4/14/08 |
A.06-08-010 (EH) - In the Matter of the Application of San Diego Gas & Electric Company (U 902-E) for a Certificate of Public Convenience and Necessity for the Sunrise Powerlink Transmission Project, |
4/14/08 |
A.07-11-011 (PPH) - Application of SOUTHERN CALIFORNIA EDISON COMPANY (U338E) for Authority to, Among Other Things, Increase Its Authorized Revenues For Electric Service in 2009, And to Reflect That Increase In Rates, and |
4/15/08 |
A.07-11-011 (PPH) - Application of SOUTHERN CALIFORNIA EDISON COMPANY (U338E) for Authority to, Among Other Things, Increase Its Authorized Revenues For Electric Service in 2009, And to Reflect That Increase In Rates, and |
4/21/08 |
A.07-04-020 (EH) - In the Matter of the Application of: PACIFIC ADVENTURE CRUISES, INCORPORATED, a California Corporation, for authority to expand the scope of its existing Certificate of Public Convenience and Necessity as a vessel common carrier to include "on-call" and scheduled service on an individual fare basis, |
4/22/08 |
R.08-03-008 (PHC) - Order Instituting Rulemaking Regarding Policies, Procedures and Rules for the California Solar Initiative, the Self-Generation Incentive Program and Other Distributed Generation Issues, |
4/23/08 |
C.08-02-006 (PHC/EH) - Wild Goose Storage, LLC, Complainant, v. Roseville Land Development Association, Defendant, |
4/28/08 |
C.07-10-017 (EH) - Pac-West Telecomm, Inc. (U5266C), Complainant, vs. Blue Casa Communications, Inc. (U6764C), Defendant, |
4/28/08 |
A.07-11-011 (PPH) - Application of SOUTHERN CALIFORNIA EDISON COMPANY (U338E) for Authority to, Among Other Things, Increase Its Authorized Revenues For Electric Service in 2009, And to Reflect That Increase In Rates, and |
4/29/08 |
A.07-11-011 (PPH) - Application of SOUTHERN CALIFORNIA EDISON COMPANY (U338E) for Authority to, Among Other Things, Increase Its Authorized Revenues For Electric Service in 2009, And to Reflect That Increase In Rates, and |
4/29/08 |
C.07-12-019 (PHC) - Pacific Bell Telephone Company, d/b/a AT&T California (U1001C), Complainant, vs. Sprint Spectrum L.P., Wireless Co., L.P. and Cox Communications PCS, L.P., jointly d/b/a Sprint PCS (U3064C), Defendant, |
4/29/08 |
C.08-03-013 (ECP) - Christopher Douglas, Complainant, vs. Pacific Gas and Electric Company (U39E), Defendant, |
4/30/08 |
C.07-10-018 (EH) - Pac-West Telecomm, Inc. (U5266C), Complainant, vs. Telscape Communications, Inc. (U6589C), Defendant, |
4/30/08 |
A.07-11-011 (PPH) - Application of SOUTHERN CALIFORNIA EDISON COMPANY (U338E) for Authority to, Among Other Things, Increase Its Authorized Revenues For Electric Service in 2009, And to Reflect That Increase In Rates, and |
5/1/08 |
C.07-10-024 (EH) - Steven Simmons, Complainant, vs. Southern California Edison Company (U338E), Defendant, |
5/1/08 |
A.07-12-020 (PHC) - In the Matter of the Application of Southern California Edison Company (U338-E) for Authority to Make Various Electric Rate Design Changes, and |
5/8/08 |
A.06-12-005 (WS) - In the Matter of the Application of the Exposition Metro Line Construction Authority for an order authorizing the construction of a two-track at-grade crossing for the Exposition Boulevard Corridor Light Rail Transit Line across Jefferson Boulevard, Adams Boulevard, and 23rd Street, all three crossings located along Flower Street in the City of Los Angeles, County of Los Angeles, California, |
5/9/08 |
A.06-12-005 (TELEPHONIC - PHC) - In the Matter of the Application of the Exposition Metro Line Construction Authority for an order authorizing the construction of a two-track at-grade crossing for the Exposition Boulevard Corridor Light Rail Transit Line across Jefferson Boulevard, Adams Boulevard, and 23rd Street, all three crossings located along Flower Street in the City of Los Angeles, County of Los Angeles, California, |
5/12/08 |
I.07-06-020 (EH) - Order Instituting Investigation into the water and service quality of Alco Water Company (Alco), |
5/12/08 |
A.08-01-002 (EH) - In the Matter of the Application of Apple Valley Ranchos Water Company (U 346 W) for Authority to Increase Rates Charged for Water Service by $3,767,000 or 22.73% in 2009, $186,510 or 0.90% in 2010, and $280,000 or 1.32% in 2011, |
5/19/08 |
R.07-12-001 (EH) - Order Instituting Rulemaking to Establish Uniform Construction Standards for Pole-Top Antennas, |
5/23/08 |
A.07-12-027 (EH) - In the Matter of the Application of Leonard James Hearn, Regional Relocations, LLC (File No: MTR-190415) for a Household Goods Carrier Permit, |
5/28/08 |
A.07-08-017 (EH) - In the Matter of the Application of SAN GABRIEL VALLEY WATER COMPANY (U337W) for approval of Implementation by its Fontana Water Company Division of the Commission's Water Action Plan objectives, including a request to utilize existing Facilities Fees revenues, for such purposes or in the alternative, for authority to increase rates not to exceed $882,200 or 2.0%, |
5/29/08 |
A.07-11-011 (EH) - Application of SOUTHERN CALIFORNIA EDISON COMPANY (U338E) for Authority to, Among Other Things, Increase Its Authorized Revenues For Electric Service in 2009, And to Reflect That Increase In Rates, and |
6/2/08 |
A.07-11-011 (EH) - Application of SOUTHERN CALIFORNIA EDISON COMPANY (U338E) for Authority to, Among Other Things, Increase Its Authorized Revenues For Electric Service in 2009, And to Reflect That Increase In Rates, and |
6/2/08 |
C.07-08-033 (EH) - Utility Consumer's Action Network (UCAN), Complainant, vs. AT&T Mobility LLC dba New Cingular Wireless PCS, LLC, fka Cingular Wireless and related entities collectively, "AT&T" (U 3060 C), Defendant, |
6/3/08 |
A.07-10-012 (EH) - Application of Alisal Water Corporation dba Alco Water Service (U206W) to Issues Notes in the Principal Amount of $8,000,000 and to Execute a Related Agreement and Supplemental Security Instruments, |
6/24/08 |
A.07-12-021 (EH) - Application of Pacific Gas and Electric Company for Authorization to Enter into Long-Term Natural Gas Transportation Arrangements with Ruby Pipeline, for Cost Recovery in PG&E's Gas and Electric Rates and Nonbypassable Surcharges, and for Approval of Affiliate Transaction. (U39G and U39E), |
7/11/08 |
A.07-12-022 (PPH) - In the Matter of the Application of Southwest Gas Corporation for Authority to Change Rates and Charges for Gas Service effective January 1, 2009 (U905G), |
7/14/08 |
C.07-06-025 (EH) - SAN JOAQUIN VALLEY POWER AUTHORITY, Complainant, vs. PACIFIC GAS AND ELECTRIC COMPANY, Defendant, |
7/21/08 |
A.07-10-003 (EH) - In the Matter of the Application of Bigredwire.com, Inc. for Registration as an Interexchange Carrier Telephone Corporation Pursuant to the Provisions of Public Utilities Code Section 1013, |
7/21/08 |
A.07-12-006 (EH) - Joint Application of San Diego Gas & Electric Company (U902G), Southern California Gas Company (U904G) and Pacific Gas and Electric Company (U39G) to Reallocate the Costs of Natural Gas Public Purpose Programs and Other Mandated Social Programs Among Customer Classes, |
8/4/08 |
A.07-12-009 (EH) - Application of PACIFIC GAS AND ELECTRIC COMPANY for Authority to Increase Revenue Requirements to Recover the Costs to Upgrade its SmartMeterTM Program (U 39 E), |
8/18/08 |
A.07-12-022 (EH) - In the Matter of the Application of Southwest Gas Corporation for Authority to Change Rates and Charges for Gas Service effective January 1, 2009 (U905G), |
10/6/08 |
A.07-11-011 (EH) - Application of SOUTHERN CALIFORNIA EDISON COMPANY (U338E) for Authority to, Among Other Things, Increase Its Authorized Revenues For Electric Service in 2009, And to Reflect That Increase In Rates, and |
NONE
Copies of tendered notices are available in the Central Files Office for review and/or reproduction under existing procedures, except that notices which are filed electronically can be viewed on the Commission's website. They are both available from the filing party who is under the obligation to provide copies of the notice without delay.
Proceeding # and Caption |
Filed Date |
Filer |
Decisionmaker / Advisor |
A06-08-010 - San Diego Gas & Electric Company, for a Certificate of Public Convenience and Necessity for the Sunrise Powerlink Transmission Project. |
2/27/08 |
City of Santee |
Andy Campbell, advisor to Commissioner Chong |
A06-08-010 - San Diego Gas & Electric Company, for a Certificate of Public Convenience and Necessity for the Sunrise Powerlink Transmission Project. |
2/29/08 |
City of Santee |
Commissioner Grueneich and Traci Bone, advisor to Commissioner Grueneich |
Proceeding # and Caption |
Filed Date |
Filer |
Decisionmaker / Advisor |
A06-08-026 - Southern California Gas Company, San Diego Gas & Electric Company, and Southern California Edison Company |
3/7/08 |
Division of Ratepayer Advocates (Robert Pocta and Diana Lee) and Southern California Generation Coalition |
Jack Stoddard, advisor to President Michael Peevey |
Proceeding # and Caption |
Filed Date |
Filer |
Decisionmaker / Advisor |
A07-11-011 - Application of SOUTHERN CALIFORNIA EDISON COMPANY |
3/7/08 |
Greenlining Institute |
President Peevey and Administrative Law Judge DeAngelis |
Proceeding # and Caption |
Filed Date |
Filer |
Decisionmaker / Advisor |
R93-04-003 - Commission order instituting rulemaking on Commission's own motion to govern open access to bottleneck services and establish a framework for network architecture development of dominant carrier networks |
3/17/08 |
California Association of Competitive Telecommunications Companies |
Lester Wong, advisor to President Peevey |
Proceeding # and Caption |
Filed Date |
Filer |
Decisionmaker / Advisor |
R03-08-018 - Order Instituting Rulemaking to review policies concerning intrastate carrier access charges. |
3/17/08 |
California Association of Competitive Telecommunications Companies |
Lester Wong, advisor to President Peevey |
Proceeding # and Caption |
Filed Date |
Filer |
Decisionmaker / Advisor |
R03-08-018 - Order Instituting Rulemaking to review policies concerning intrastate carrier access charges. |
3/17/08 |
California Association of Competitive Telecommunications Companies |
Robert Mason, advisor to Commissioner Simon |
Proceeding # and Caption |
Filed Date |
Filer |
Decisionmaker / Advisor |
A06-02-028 - Petition for Arbitration of a Compensation Agreement with Cingular Wireless pursuant to 47 C.F.R. Section 20.11(e), And Related Matters: |
3/17/08 |
Omnipoint Communications, doing business as T-Mobile USA and New Cingular Wireless, LLC, doing business as AT&T Mobility |
Robert Haga, advisor to Commissioner Chong |
Proceeding # and Caption |
Filed Date |
Filer |
Decisionmaker / Advisor |
A07-10-013 - Southern California Edison Company's (U 338-E) Application for Approval of Additional Demand Response Resource Purchase Agreements. |
3/17/08 |
EnerNOC, Inc. |
Office of Commissioner Simon, Office of Commissioner Grueneich, Office of Commissioner Bohn, and Matthew Deal, advisor to President Peevey |
Proceeding # and Caption |
Filed Date |
Filer |
Decisionmaker / Advisor |
A06-12-025 - Application of California Water Service Company (Applicant) (U-60-W), a California corporation, requesting an order from the California Public Utilities Commission authorizing Applicant to increase water rates to fully fund its retiree healthcare plan commonly referred to as a 'Postretirement Benefits other than Pension' plan and to adopt a change in accounting as proposed by Applicant for ratemaking. |
3/18/08 |
Division of Ratepayer Advocates - Lee |
Robert Mason, advisor to Commissioner Simon |
Proceeding # and Caption |
Filed Date |
Filer |
Decisionmaker / Advisor |
A06-08-026 - Southern California Gas Company, San Diego Gas & Electric Company, and Southern California Edison Company |
3/19/08 |
Southern California Gas Company and San Diego Gas & Electric Company |
Jack Stoddard, advisor to President Michael Peevey |
Proceeding # and Caption |
Filed Date |
Filer |
Decisionmaker / Advisor |
A08-02-001 - In the Matter of the Application of San Diego Gas & Electric Company (U 902 G) and Southern California Gas Company (U 904 G) for Authority to Revise Their Rates Effective January 1, 2009, in Their Biennial Cost Allocation Proceeding. |
3/19/08 |
Southern California Gas Company and San Diego Gas & Electric Company |
Jack Stoddard, advisor to President Michael Peevey |
Proceeding # and Caption |
Filed Date |
Filer |
Decisionmaker / Advisor |
A07-02-023 - California-American Water Company, for an Interest Rate of 8.33% for Allowance for Funds Used During Construction (AFUDC) for its San Clemente Dam Memorandum. |
3/20/08 |
California-American Water Company |
Lester Wong, advisor to President Peevey |