Commissioner Assigned: Rachelle B. Chong on January 31, 2007
ALJ Assigned: Jessica T. Hecht on January 31, 2007
ALJ Assigned: Timothy J. Sullivan on July 10, 2008
|
Filer Requested Category:
Preliminary Category:
Ratesetting
Commission Designated Category:
|
Filed By:
CPUC-PG&E, SDG&E, EDISON
|
|
|
DOCUMENTS
Number of Documents: 188
(only the most current 100 are displayed)
Display all documents for this proceeding
|
Type:
COMMENTS
|
Filing Date:
November 19, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; concerning Cost Effectiveness Questions presented in ALJ's 10/17/08 Rulings.
|
Type:
COMMENTS
|
Filing Date:
November 19, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; on Demand Response Cost-Effectiveness Methodologies
|
Type:
COMMENTS
|
Filing Date:
November 12, 2008
|
Filed By:
CPower, Inc.
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
|
|
Description:
on the IOUs' additional responses on measuring demand response cost effectiveness
|
Type:
RESPONSE
|
Filing Date:
November 12, 2008
|
Filed By:
California Large Energy Consumers Association
|
|
Description:
ro ALJ's Ruling Requiring Additional Information on Demand Response Cost-Effectiveness Methodologies.
|
Type:
COMMENTS
|
Filing Date:
November 12, 2008
|
Filed By:
Transphase Company
|
|
Description:
on Utility Responses to Cost-Effectiveness Questions
Presented in ALJ's October 17, 2008 Ruling"
|
Type:
MOTION
|
Filing Date:
November 3, 2008
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
for Leave to File Responses to ALJ Ruling One Day Late; Responses Attached (On 11/3/08, by Email message, ALJ Hecht granted the Motion and ordered the Responses filed. MMN)
|
Type:
RESPONSE
|
Filing Date:
November 3, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
to Energy Division DR-02 dated October 31, 2008.
|
Type:
RESPONSE
|
Filing Date:
October 31, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to ALJ's Ruling Requiring Additional Information on Demand Response Cost-Effectiveness Methodologies.
|
Type:
RULING
|
Filing Date:
October 17, 2008
|
Filed By:
ALJ/HECHT/CPUC
|
|
Description:
Requiring Additional Information on Demand Response Cost-Effectiveness Methodologies. Investor-owned utilities (IOUs) shall file responses to the questions and issues contained in Attachment A by October 31, 2008. Parties may file comments on the IOUs' filings by November 12, 2008. Parties may file reply comments by November 19, 2008.
|
Type:
EXPARTE
|
Filing Date:
September 19, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
Southern California Edison Company noticed oral and written ex parte communications with Stephen St. Marie and Robert Kinosian, advisors to Commissioner Bohn, on September 16, 2008.
|
Type:
NOTICE
|
Filing Date:
September 18, 2008
|
Filed By:
The Utility Reform Network
|
|
Description:
Amended; Notice of Intent to Claim Intervenor Compensation
|
Type:
EXPARTE
|
Filing Date:
September 17, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
Southern California Edison Company notices oral and written ex parte communications with Matthew Deal, advisor to President Peevey, on September 12, 2008.
|
Type:
STATEMENT
|
Filing Date:
August 18, 2008
|
Filed By:
DRA/SALVACION/CPUC
|
|
Description:
Prehearing Conference;
|
Type:
STATEMENT
|
Filing Date:
August 15, 2008
|
Filed By:
California Manufacturers & Technology Association
|
|
Description:
Prehearng Conference; in Phase 3 of Rulemaking 07-01-041
|
Type:
STATEMENT
|
Filing Date:
August 15, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
Prehearing Conference;
|
Type:
STATEMENT
|
Filing Date:
August 15, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Prehearing Conference; in response to the July 18, 2008 Assigned Commissioner's and Administrative Law Judge's amended scoping memo and ruling.
|
Type:
STATEMENT
|
Filing Date:
August 15, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Prehearing Conference;
|
Type:
STATEMENT
|
Filing Date:
August 15, 2008
|
Filed By:
Western Power Trading Forum
|
|
Description:
Prehearing Conference;
|
Type:
STATEMENT
|
Filing Date:
August 15, 2008
|
Filed By:
California Independent System Operator Corporation
|
|
Description:
Phase 3 Prehearing Conference;
|
Type:
REPORT
|
Filing Date:
August 15, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Initial Load Impact Evaluation Plans for PG&E-Specified Demand Response Programs for 2008.
|
Type:
REPORT
|
Filing Date:
August 15, 2008
|
Filed By:
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
Initial Load Impact Evaluation Plans for Statewide Demand Response Programs for 2008.
|
Type:
STATEMENT
|
Filing Date:
August 15, 2008
|
Filed By:
California Large Energy Consumers Association
|
|
Description:
Prehearing Conference; in Phase 3 of Rulemaking 07-01-041.
|
Type:
REPORT
|
Filing Date:
August 15, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
Initial Load Impact Evaluation Plans on Utility-Specified Demand Response Programs for 2008.
|
Type:
REPORT
|
Filing Date:
August 15, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Initial Load Impact Evaluation Plans on Demand Response Activities for 2008.
|
Type:
STATEMENT
|
Filing Date:
August 15, 2008
|
Filed By:
The Utility Reform Network
|
|
Description:
Prehearing Conference;
|
Type:
RESPONSE
|
Filing Date:
July 30, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Amended; to ALJ July 16, 2008 Ruling, Attachments A and B.
|
Type:
COMMENTS
|
Filing Date:
July 29, 2008
|
Filed By:
DRA/SALVACION/CPUC
|
|
Description:
(in Response to 7/16/08 ALJ Ruling).
|
Type:
RESPONSE
|
Filing Date:
July 29, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to ALJ July 16, 2008 Ruling, Attachment A.
|
Type:
COMMENTS
|
Filing Date:
July 29, 2008
|
Filed By:
California Large Energy Consumers Association
|
|
Description:
Pre-Workshop;
|
Type:
COMMENTS
|
Filing Date:
July 29, 2008
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
Pre-Workshop; on Avoided Cost Calculations.
|
Type:
COMMENTS
|
Filing Date:
July 29, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
on ALJ's Ruling setting workshops on specific issues related to cost-effectiveness.
|
Type:
RESPONSE
|
Filing Date:
July 29, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
to ALJ's Ruling setting workshops on specific issues related to cost-effectiveness.
|
Type:
RESPONSE
|
Filing Date:
July 29, 2008
|
Filed By:
TRANSPHASE
|
|
Description:
to Cost-Effectiveness Questions presented in ALJ's July 16, 2008 Ruling.
|
Type:
SCOPING RULING
|
Filing Date:
July 18, 2008
|
Filed By:
ALJ/SULLIVAN/CPUC
CMMR/CHONG/CPUC
|
|
Description:
Assigned Commissioner's and Administrative Law Judge's Amended Scoping Memo and Ruling. The Category for Phase 3 is ratesetting and Limited Hearings may be necessary. Administrative Law Judge Timothy J. Sullivan is the presiding officer for Phase 3. The Scope of Phase 3 is as set forth in Section 3 of this Ruling. The Preliminary Schedule is as set forth in Section 4 of this Ruling. Parties should serve all filings as set forth in Section 5 of this Ruling.
|
Type:
RULING
|
Filing Date:
July 16, 2008
|
Filed By:
ALJ/HECHT/CPUC
|
|
Description:
setting workshops on specific issues related to cost-effectiveness. IOUs shall file responses by July 29, 2008. Parties may file responses by July 29, 2008.
|
Type:
EXPARTE
|
Filing Date:
July 16, 2008
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
The Alliance for Retail Energy noticed an oral ex parte communication with Joseph Como, advisor to Commissioner Chong, on July 11, 2008.
|
Type:
NOTICE
|
Filing Date:
July 10, 2008
|
Filed By:
CALJ/MINKIN/CPUC
|
|
Description:
of Assignment.
|
Type:
MOTION
|
Filing Date:
July 10, 2008
|
Filed By:
California Manufacturers & Technology Association
|
|
Description:
for leave to file comments out-of-time
|
Type:
COMMENTS
|
Filing Date:
July 10, 2008
|
Filed By:
California Manufacturers & Technology Association
|
|
Description:
on the California Independent System Operator's response to ALJ Ruling requesting information on emergency-triggered demand response
|
Type:
COMMENTS
|
Filing Date:
July 9, 2008
|
Filed By:
Comverge, Inc.
ConsumerPowerline
EnerNOC, Inc.
EnergyConnect, Inc.
|
|
Description:
Reply; to the CAISO comments on emergency-triggered demand response
|
Type:
COMMENTS
|
Filing Date:
July 9, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply;
|
Type:
COMMENTS
|
Filing Date:
July 9, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; to comments to the California Independent System Operator on emergency-triggered demand response.
|
Type:
COMMENTS
|
Filing Date:
July 9, 2008
|
Filed By:
The California Large Energy Consumers Association
|
|
Description:
Reply; on the CAISO comments re the ALJ request for information on emergency-triggered demand response.
|
Type:
COMMENTS
|
Filing Date:
July 9, 2008
|
Filed By:
DRA/SALVACION/CPUC
|
|
Description:
Reply;
|
Type:
COMMENTS
|
Filing Date:
June 25, 2008
|
Filed By:
California Independent System Operator Corporation
|
|
Description:
re: ALJ Ruling requesting information on emergency-triggered demand response
|
Type:
RULING
|
Filing Date:
June 9, 2008
|
Filed By:
ALJ/HECHT/CPUC
|
|
Description:
requesting California Independent System Operator information on emergency-triggered demand response. CAISO is requested to file comments by 6/25/08. Parties may file replies by 7/9/08.
|
Type:
COMMENTS
|
Filing Date:
May 2, 2008
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on staff cost-effectiveness framework and related issues.
|
Type:
COMMENTS
|
Filing Date:
May 2, 2008
|
Filed By:
DRA/Salvacion/CPUC
|
|
Description:
Reply;
|
Type:
COMMENTS
|
Filing Date:
May 2, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; on staff cost-effectiveness framework and related issues.
|
Type:
COMMENTS
|
Filing Date:
May 2, 2008
|
Filed By:
California Large Energy Consumers Association
|
|
Description:
Reply; on staff cost-effectiveness framework and related issues.
|
Type:
COMMENTS
|
Filing Date:
May 2, 2008
|
Filed By:
California Independent System Operator Corporation
|
|
Description:
Reply; on ALJ Ruling regarding the cost effectiveness framework.
|
Type:
COMMENTS
|
Filing Date:
May 2, 2008
|
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
|
|
Description:
Reply; on the staff draft demand response cost effectiveness protocols.
|
Type:
COMMENTS
|
Filing Date:
May 2, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; on staff cost-effectiveness framework and related issues.
|
Type:
COMMENTS
|
Filing Date:
April 25, 2008
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on Staff Cost-Effectiveness Framework and Related Issues.
|
Type:
COMMENTS
|
Filing Date:
April 25, 2008
|
Filed By:
Kinder Morgan Energy Partners, L.P.
|
|
Description:
(in accordance with a Ruling issued April 4, 2008)
|
Type:
COMMENTS
|
Filing Date:
April 25, 2008
|
Filed By:
DRA/SALVACION/CPUC
|
|
Description:
Comments
|
Type:
COMMENTS
|
Filing Date:
April 25, 2008
|
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
|
|
Description:
|
Type:
COMMENTS
|
Filing Date:
April 25, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
on staff cost-effectiveness framework and related issues
|
Type:
COMMENTS
|
Filing Date:
April 25, 2008
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on staff cost-effectiveness framework and related issues
|
Type:
COMMENTS
|
Filing Date:
April 25, 2008
|
Filed By:
The Utility Reform Network
|
|
Description:
on staff's proposed cost-effectiveness framework
|
Type:
COMMENTS
|
Filing Date:
April 25, 2008
|
Filed By:
California Large Energy Consumers Association
|
|
Description:
on staff cost-effectiveness framework and related issues
|
Type:
COMMENTS
|
Filing Date:
April 25, 2008
|
Filed By:
Wal-Mart Stores, Inc.
|
|
Description:
(in accordance with ALJ's Ruling issued 4/4/08)
|
Type:
COMMENTS
|
Filing Date:
April 25, 2008
|
Filed By:
California Independent System Operator Corporation
|
|
Description:
on the ALJ Ruling regarding the Cost Effectiveness Framework.
|
Type:
COMMENTS
|
Filing Date:
April 21, 2008
|
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
|
|
Description:
Reply; on proposed decision on demand response load impact protocols
|
Type:
COMMENTS
|
Filing Date:
April 21, 2008
|
Filed By:
North America Power Partners LLC
|
|
Description:
Reply; on the Proposed Decision.
|
Type:
COMMENTS
|
Filing Date:
April 21, 2008
|
Filed By:
Pacific Gas and Electric Company
SOUTHERN CALIFORNIA EDISON COMPANY
San Diego Gas & Electric Company
|
|
Description:
Reply; on ALJ proposed decision adopting protocols for estimating demand response load impacts
|
Type:
COMMENTS
|
Filing Date:
April 14, 2008
|
Filed By:
Ice Energy, Inc.
|
|
Description:
of Ice Energy, Inc.
|
Type:
COMMENTS
|
Filing Date:
April 14, 2008
|
Filed By:
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
on ALJ proposed decision adopting protocols for estimating demand response load impacts
|
Type:
COMMENTS
|
Filing Date:
April 14, 2008
|
Filed By:
California Independent System Operator Corporation
|
|
Description:
to the proposed decision adopting protocols for estimating demand response load impacts
|
Type:
COMMENTS
|
Filing Date:
April 14, 2008
|
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
|
|
Description:
on proposed decision on demand response load impact protocols
|
Type:
COMMENTS
|
Filing Date:
April 14, 2008
|
Filed By:
California Large Energy Consumers Association
|
|
Description:
on the proposed decision of ALJ Hecht on load impact protocols
|
Type:
RULING
|
Filing Date:
April 11, 2008
|
Filed By:
CMMR/CHONG/CPUC
CMMR/GRUENEICH/CPUC
|
|
Description:
Joint Assigned Commissioners' Ruling providing guidance on integrated demand-side management in 2009-2011 portfolio applications.
|
Type:
RULING
|
Filing Date:
April 4, 2008
|
Filed By:
ALJ/HECHT/CPUC
|
|
Description:
setting comment period on staff cost-effectiveness framework and related issues.
|
Type:
PROPOSED DECISION
|
Filing Date:
March 25, 2008
|
Filed By:
ALJ/HECHT/CPUC
|
|
Description:
Decision Adopting Protocols for Estimating Demand Response Load Impacts. Opening comments, which shall not exceed 15 pages, are due no later than April 14, 2008. Reply comments are due 5 days after opening comments are filed.
|
Type:
RULING
|
Filing Date:
February 27, 2008
|
Filed By:
ALJ/HECHT/CPUC
|
|
Description:
Providing Guidance on Content and Format of 2009-2011 Demand Response Activity Applications.
|
Type:
EXPARTE
|
Filing Date:
January 25, 2008
|
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
|
|
Description:
LATE FILED. SUMMARY: EnerNOC, Inc., EnergyConnect, Inc., and Comverge noticed written and oral communication with Andrew Campbell and Joseph Como, advisors to Cmmr. Chong, on January 17, 2008.
|
Type:
RULING
|
Filing Date:
January 11, 2008
|
Filed By:
ALJ/HECHT/CPUC
|
|
Description:
Granting Motion for Party Status of Consumerpowerline and Ancillary Services Coalition.
|
Type:
RULING
|
Filing Date:
December 12, 2007
|
Filed By:
ALJ/HECHT/CPUC
|
|
Description:
Granting Motion for Party Status of North America Power Partners LLC.
|
Type:
MOTION
|
Filing Date:
December 12, 2007
|
Filed By:
Ancillary Services Coalition
ConsumerPowerline
|
|
Description:
for Party Status
|
Type:
COMMENTS
|
Filing Date:
December 10, 2007
|
Filed By:
Kinder Morgan
|
|
Description:
Reply; on Assigned Commissioner's and Administrative Law Judge's Ruling Revising Phase 2 Activities and Schedule.
|
Type:
RULING
|
Filing Date:
December 10, 2007
|
Filed By:
ALJ/HECHT/CPUC
|
|
Description:
ALJ's Ruling setting workshop on content and format for 2009-2011 Demand Response activity applications.
|
Type:
COMMENTS
|
Filing Date:
December 10, 2007
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; On Energy Division's Proposed Goals and Milestones for Demand Response.
|
Type:
COMMENTS
|
Filing Date:
December 10, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; On Assigned Commissioner's And ALJ Ruling Revising Phase 2 Activities and Schedule.
|
Type:
COMMENTS
|
Filing Date:
December 10, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; On Additional Issues for Further Comment Pursuant to the October 15, 2007 Administrative Law Judge Ruling.
|
Type:
COMMENTS
|
Filing Date:
December 10, 2007
|
Filed By:
California Independent System Operator Corporation
|
|
Description:
Reply; On Goals, Pursuant to Assigned Commissioner's And Administrative Law Judge's Ruling Revising Phase 2 Activities and Schedule.
|
Type:
COMMENTS
|
Filing Date:
December 10, 2007
|
Filed By:
Ice Energy, Inc.
|
|
Description:
Reply; On Assigned Commissioner's and Administrative Law Judge's Ruling Revising Phase 2 Activities and Schedule.
|
Type:
COMMENTS
|
Filing Date:
December 10, 2007
|
Filed By:
South San Joaquin Irrigation District
|
|
Description:
Reply; on Energy Division's Proposed Demand Response Goals.
|
Type:
COMMENTS
|
Filing Date:
December 10, 2007
|
Filed By:
North American Power Partners LLC
|
|
Description:
Reply;
|
Type:
COMMENTS
|
Filing Date:
December 10, 2007
|
Filed By:
California Large Energy Consumers Association
|
|
Description:
Reply; On 2009-2011 Demand Response Goals.
|
Type:
COMMENTS
|
Filing Date:
December 7, 2007
|
Filed By:
California Independent System Operator Corporation
|
|
Description:
Reply; Regarding Additional Cost-Effectiveness Issues For Phase 1.
|
Type:
COMMENTS
|
Filing Date:
December 7, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; Concerning ALJ Ruling Setting Forth Additional Issues for Further Comment on Demand Response Cost Effectiveness Analysis.
|
Type:
COMMENTS
|
Filing Date:
December 7, 2007
|
Filed By:
North American Power Partners LLC
|
|
Description:
Reply.
|
Type:
COMMENTS
|
Filing Date:
December 7, 2007
|
Filed By:
Comverge, Inc.
EnerNOC, Inc.
Energy Connect, Inc.
|
|
Description:
Reply; On the Energy Division's Proposed Demand Response Goals and Milestones.
|
Type:
MOTION
|
Filing Date:
December 7, 2007
|
Filed By:
North American Power Partners LLC
|
|
Description:
to become a party.
|
Type:
COMMENTS
|
Filing Date:
December 7, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; On Additional Issues for Further Comment Pursuant to the October 15, 2007 Administrative Law Judge Ruling.
|
Type:
COMMENTS
|
Filing Date:
December 7, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; (pursuant to Administrative Law Judge (ALJ) Hecht's October 15, 2007 Ruling).
|
Type:
COMMENTS
|
Filing Date:
November 26, 2007
|
Filed By:
Ice Energy, Inc.
|
|
Description:
on Assigned Commissioner's and ALJ's Ruling revising Phase 2 Activities and Schedule.
|
Type:
COMMENTS
|
Filing Date:
November 26, 2007
|
Filed By:
Kinder Morgan
|
|
Description:
on Assigned Commissioner's and ALJ's Ruling revising Phase 2 Activities and Schedule.
|
Type:
COMMENTS
|
Filing Date:
November 26, 2007
|
Filed By:
Wal-Mart Stores, Inc.
|
|
Description:
on Assigned Commissioner's and ALJ's Ruling revising Phase 2 Activities and Schedule.
|
Type:
COMMENTS
|
Filing Date:
November 26, 2007
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on Energy Division's Proposed Goals and Milestones for Demand Response.
|
DECISIONS
Number of Decisions: 1
|
Decision Number:
D0804050
|
Rendered Date:
April 24, 2008
Effective Date:
April 24, 2008
|
|
Description:
Adopts protocols for estimating demand response load impacts.
|