All Documents For
Proceeding R0705025
Date Filed: May 24, 2007

Number of Documents: 200

Type: MISCELLANEOUS FILING Filing Date: December 30, 2008
Filed By:
Southern California Edison Company
Description: nomination of working group representatives

Type: MISCELLANEOUS FILING Filing Date: December 30, 2008
Filed By:
San Diego Gas and Electric Company
Description: working group nominations

Type: MISCELLANEOUS FILING Filing Date: December 29, 2008
Filed By:
CAlifornians for Renewable Energy
Description: nominations for working group representatives

Type: COMMENTS Filing Date: December 29, 2008
Filed By:
Alliance for Retail Energy Markets
California Alliance for Competitive Energy Solutions
Description: on the proposed working group nominations of CAlifornians for Renewable Energy

Type: REHEARING REQUEST Filing Date: December 23, 2008
Filed By:
CAlifornians for Renewable Energy
Description: of Decision 08-11-056.

Type: MISCELLANEOUS FILING Filing Date: December 23, 2008
Filed By:
Pacific Gas and Electric Company
Description: Nomination of Working Group representatives.

Type: RULING Filing Date: December 19, 2008
Filed By:
ALJ/PULSIFER/CPUC
Description: Revising Schedule for Comments on Decision 08-11-056 Implementation Measures. The due dates for comments on all other matters set forth in the December 17, 2008, ruling are hereby revised as follows: The due date for opening comments is extended from December 30, 2008, to January 14, 2009. The due date for reply comments is extended from January 13, 2009, to January 28, 2009.

Type: RULING Filing Date: December 17, 2008
Filed By:
CMMR/PEEVEY/CPUC
Description: soliciting comments on implementation measures; opening comments are due by 12/30/08 and reply comments are due by 1/13/09.

Type: EXPARTE Filing Date: November 24, 2008
Filed By:
Southern California Edison Company
Description: Southern California Edison Company noticed an oral ex parte communication with Matthew Deal, advisor to President Peevey, on November 19 and 20, 2008.

Type: RULING Filing Date: November 21, 2008
Filed By:
ALJ/PULSIFER/CPUC
Description: Granting Motions of Independent Energy Producers Association and California Peaker.

Type: EXPARTE Filing Date: November 18, 2008
Filed By:
Southern California Edison Company
Description: Southern California Edison Company noticed an oral ex parte communication with Matthew Deal, advisor to Commissioner Peevey, on November 14, 2008.

Type: EXPARTE Filing Date: November 18, 2008
Filed By:
Alliance for Retail Energy Markets
Description: Alliance for Retail Energy Markets noticed an oral ex parte communication with Matthew Deal, advisor to Commissioner Peevey and Robert Kinosian, advisor to Commissioner Bohn, on November 13, 2008.

Type: EXPARTE Filing Date: November 18, 2008
Filed By:
CalPeak Power, LLC
Calpine Energy Services, L.P.
Fresno Cogeneration Partners, LP
Gilroy Energy Center, LLC
Wellhead Power Gates, LLC
Wellhead Power Panoche, LLC
Description: Calpine Energy Services, LP, Gilroy Energy Center, LLC, Fresno Cogeneration Partners, LP, Wellhead Power Panoche, LLC, Wellhead Power Gates, LLC; and CalPeak Power, LLC noticed an oral ex parte communication with Robert Kinosian, advisor to Commissioner Bohn, on November 14, 2008.

Type: EXPARTE Filing Date: November 18, 2008
Filed By:
Alliance for Retail Energy Markets
Description: Alliance for Retail Energy Markets noticed an oral ex parte communication with Paul Phillips, advisor to Commissioner Simon, on November 14, 2008.

Type: EXPARTE Filing Date: November 12, 2008
Filed By:
DRA/PAULL/CPUC
Description: Division of Ratepayer Advocates noticed an oral and written ex parte communication with Paul Phillips, advisor to Commissioner Simon, on November 5, 2008.

Type: EXPARTE Filing Date: November 12, 2008
Filed By:
DRA/PAULL/CPUC
Description: Division of Ratepayer Advocates noticed an oral and written ex parte communication with Andrew Campbell, advisor to Commissioner Chong, on November 7, 2008.

Type: EXPARTE Filing Date: November 7, 2008
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Pacific Gas and Electric Company, noticed an oral ex parte communication with Matthew Deal, advisor to Commissioner Peevey, on November 4, 2008.

Type: COMMENTS Filing Date: November 3, 2008
Filed By:
Southern California Edison Company
Description: Reply; on Proposed Decision Authorizing Measures to Facilitate Removal of Department of Water Resources from the Role of Supplying Electric Power.

Type: COMMENTS Filing Date: November 3, 2008
Filed By:
Indpendent Energy Producers Association
Description: Reply; (on the Proposed Decision of ALJ Pulsifer)

Type: COMMENTS Filing Date: November 3, 2008
Filed By:
Pacific Gas and Electric Company
Description: Reply; on Proposed Decision in Phase II(a)(1)

Type: COMMENTS Filing Date: November 3, 2008
Filed By:
Reliant Energy, Inc.
Description: Reply; on Proposed Decision of ALJ Pulsifer.

Type: COMMENTS Filing Date: November 3, 2008
Filed By:
CAlifornians for Renewable Energy
Description: Reply; on Proposed Decision

Type: COMMENTS Filing Date: November 3, 2008
Filed By:
Alliance for Retail Energy Markets
California Alliance for Competitive Energy Solutions
Description: Reply; on Proposed Decision of ALJ Pulsifer.

Type: MOTION Filing Date: November 3, 2008
Filed By:
Independent Energy Producers Association
Description: to Become a Party.

Type: EXPARTE Filing Date: November 3, 2008
Filed By:
CalPeak Power, LLC
Calpine Energy Services, L.P.
Fresno Cogeneration Partners, LP
Gilroy Energy Center, LLC
Wellhad Power Panoche, LLC
Wellhead Power Gates, LLC
Description: Calpine Energy Services, L.P. and Gilroy Energy Center, LLC, Fresno Cogeneration Partners, LP, Wellhead Power Panoche, LLC, and Wellhead Power Gates, LLC; and CalPeak Power, LLC (collectively the "California Peakers") noticed an oral ex parte communication with Matthew Deal, advisor to President Peevey, on October 29, 2008.

Type: COMMENTS Filing Date: November 3, 2008
Filed By:
DRA/PAULL/CPUC
Description: Reply; on Proposed Decision.

Type: COMMENTS Filing Date: November 3, 2008
Filed By:
The Utility Reform Network
Description: Reply; on Proposed Decision of ALJ Pulsifer.

Type: COMMENTS Filing Date: November 3, 2008
Filed By:
San Diego Gas & Electric Company
Description: Reply; to Opening Comments on Proposed Decision

Type: COMMENTS Filing Date: October 31, 2008
Filed By:
Consumer Federation of California
Description: Reply; on Proposed Decision authorizing Measures to Facilitate Removal of DWR from the Role of Supplying Electric Power.

Type: COMMENTS Filing Date: October 28, 2008
Filed By:
Southern California Edison Company
Description: Opening; on Proposed Decision Authorizing Measures to Facilitate Removal of Department of Water Resources from the Role of Supplying Electric Power. (Late Filing authorized by ALJ Pulsifer Email dated 10/28/08. MMN)

Type: COMMENTS Filing Date: October 27, 2008
Filed By:
CAlifornians for Renewable Energy, Inc.
Description: Opening; on proposed decision.

Type: COMMENTS Filing Date: October 27, 2008
Filed By:
Consumer Federation of California
Description: Opening; on proposed decision.

Type: COMMENTS Filing Date: October 27, 2008
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on Proposed Decision in Phase II(a)(1)

Type: COMMENTS Filing Date: October 27, 2008
Filed By:
Reliant Energy, Inc.
Description: on Proposed Decision of ALJ Pulsifer

Type: COMMENTS Filing Date: October 27, 2008
Filed By:
CalPeak Power, LLC
Calpine Energy Services, L.P.
Fresno Cogeneration Partners, LP
Gilroy Energy Center, LLC
Wellhad Power Panoche, LLC
Wellhead Power Gates, LLC
Description: Comments of the California Peakers on Proposed Decision Authorizing Measures to Facilitate Removal of Department of Water Resources from the Role of Supplying Electric Power.

Type: COMMENTS Filing Date: October 27, 2008
Filed By:
The Utility Reform Network
Description: on the proposed decision of ALJ Pulsifer

Type: COMMENTS Filing Date: October 27, 2008
Filed By:
DRA/PAULL/CPUC
Description: on the Proposed Decision Authorizing Measures to Facilitate Removal of Department of Water Resources from the Role of Supplying Electric Power

Type: COMMENTS Filing Date: October 27, 2008
Filed By:
Alliance for Retail Energy Markets
California Alliance for Competitive Energy Solutions
Description: on the Proposed Decision of ALJ Pulsifer

Type: MOTION Filing Date: October 27, 2008
Filed By:
CalPeak Power, LLC
Calpine Energy Services
Fresno Cogeneration Partners, LP
Gilroy Energy Center, LLC
Wellhead Power Gates, LLC
Wellhead Power Panoche, LLC
Description: for Party Status of the California Peakers

Type: COMMENTS Filing Date: October 27, 2008
Filed By:
PacifiCorp
Description: on the Proposed Decision Authorizing Measures to Facilitate Removal of Department of Water Resources from the Role of Supplying Power.

Type: RULING Filing Date: October 20, 2008
Filed By:
ALJ/PULSIFER/CPUC
Description: Granting Motion of CalPeak Power, LLC for Party Status.

Type: MOTION Filing Date: October 14, 2008
Filed By:
CalPeak Power, LLC
Description: for party status

Type: PROPOSED DECISION Filing Date: October 7, 2008
Filed By:
ALJ/PULSIFER/CPUC
Description: Decision Authorizing Measures to Facilitate Removal of Department of Water Resources from the Role of Supplying Electric Power. Opening comments, which shall not exceed 15 pages, are due October 27, 2008. Reply comments,which shall not exceed 5 pages, are due 5 days after the last day for filing comments.

Type: RULING Filing Date: October 6, 2008
Filed By:
ALJ/PULSIFER/CPUC
Description: Granting Motion for Party Status of GWF Energy, LLC

Type: EXPARTE Filing Date: October 1, 2008
Filed By:
DRA/PAULL/CPUC
Description: The Division of Ratepayer Advocates noticed oral and written ex parte communications with Matthew Deal, advisor to Commissioner Peevey, on September 29, 2008.

Type: EXPARTE Filing Date: September 30, 2008
Filed By:
DRA/PAULL/CPUC
Description: The Division of Ratepayer Advocates noticed oral and written ex parte communications with Theresa Cho, advisor to Commissioner Grueneich, on September 29, 2008.

Type: EXPARTE Filing Date: September 29, 2008
Filed By:
DRA/PAULL/CPUC
Description: The Division of Ratepayer Advocates noticed oral and written ex parte communications with Paul Phillips, advisor to Commissioner Simon, on September 24, 2008.

Type: EXPARTE Filing Date: September 23, 2008
Filed By:
DRA/PAULL/CPUC
Description: The Division of Ratepayer Advocates noticed oral and written ex parte communications with Joseph Como and Andrew Campbell, advisors to Commissioner Chong, on September 18, 2008.

Type: EXPARTE Filing Date: September 23, 2008
Filed By:
DRA/PAULL/CPUC
Description: The Division of Ratepayer Advocates noticed oral and written ex parte communications with Robert Kinosian, advisor to Commissioner Bohn, on September 19, 2008.

Type: EXPARTE Filing Date: September 17, 2008
Filed By:
Southern California Edison Company
Description: Southern California Edison Company noticed oral and written ex parte communications with Matthew Deal, advisor to President Peevey, on September 12, 2008.

Type: COMMENTS Filing Date: September 8, 2008
Filed By:
San Diego Gas & Electric Company
Description: Reply; to the final summary comments in Phase II(a)(1)

Type: COMMENTS Filing Date: September 8, 2008
Filed By:
CAlifornians for Renewable Energy
Description: Reply; to summary comments

Type: COMMENTS Filing Date: September 8, 2008
Filed By:
The Utility Reform Network
Description: Summary Reply Comments in Phase II(a)(1)

Type: COMMENTS Filing Date: September 8, 2008
Filed By:
Alliance for Retail Energy Markets
California Alliance for Competitive Energy Solutions
Description: Summary Reply;

Type: COMMENTS Filing Date: September 8, 2008
Filed By:
Pacific Gas and Electric Company
Description: Reply round; to Summary Comments Regarding DWR Contract Novation and/or Assignment.

Type: COMMENTS Filing Date: September 8, 2008
Filed By:
Reliant Energy, Inc.
Description: Final reply; on the novation of DWR power purchase contracts

Type: COMMENTS Filing Date: September 8, 2008
Filed By:
Consumer Federation of California
Description: Summary Reply Comments regarding Phase II(a)(1) issues

Type: COMMENTS Filing Date: September 8, 2008
Filed By:
DRA/DORMAN/PAULL/CPUC
Description: Reply; on remaining issues in Phase II (A)(1)

Type: RULING Filing Date: September 4, 2008
Filed By:
ALJ/PULSIFER/CPUC
Description: Denying Motion for Evidentiary Hearings

Type: RESPONSE Filing Date: August 29, 2008
Filed By:
Alliance for Retail Energy Markets
California Alliance for Competitive Energy Solutions
Description: to DRA Motion for Evidentiary Hearings on Costs and Benefits.

Type: RESPONSE Filing Date: August 27, 2008
Filed By:
Reliant Energy, Inc.
Description: to DRA Motion for Evidentiary Hearings on Costs and Benefits

Type: COMMENTS Filing Date: August 25, 2008
Filed By:
San Diego Gas and Electric Company
Description: Opening round of final summary comments in Phase II(a)(1).

Type: COMMENTS Filing Date: August 25, 2008
Filed By:
CAlifornians for Renewable Energy (CARE)
Description: Opening round of final summary comments.

Type: COMMENTS Filing Date: August 25, 2008
Filed By:
Pacific Gas and Electric Company
Description: Opening round of summary comments regarding DWR contract novation and/or assignment.

Type: COMMENTS Filing Date: August 25, 2008
Filed By:
Consumer Federation of California
Description: Opening summary comments regarding Phase II(a)(1) issues.

Type: COMMENTS Filing Date: August 25, 2008
Filed By:
Reliant Energy, Inc.
Description: Opening round of summary comments on the novation of DWR power purchase contracts.

Type: COMMENTS Filing Date: August 25, 2008
Filed By:
PAULL/DRA/CPUC
Description: Opening round of comments on remaining issues in Phase II(A)(1).

Type: MOTION Filing Date: August 25, 2008
Filed By:
GWF Energy, LLC
Description: for Party Status.

Type: COMMENTS Filing Date: August 25, 2008
Filed By:
Alliance for Retail Energy Markets
California Alliance for Competitive Energy Solutions
Description: Opening round of final summary comments.

Type: COMMENTS Filing Date: August 25, 2008
Filed By:
The Utility Reform Network
Description: Opening round of final summary comments in Phase II(a)(1).

Type: COMMENTS Filing Date: August 25, 2008
Filed By:
Southern California Edison Company
Description: Opening round of final summary comments.

Type: RULING Filing Date: August 22, 2008
Filed By:
ALJ/PULSIFER/CPUC
Description: Denying Motion to Dismiss by Californians for Renewable Energy, Inc.

Type: RULING Filing Date: August 22, 2008
Filed By:
ALJ/PULSIFER/CPUC
Description: Denying Motion for Evidentiary Hearings.

Type: RESPONSE Filing Date: August 21, 2008
Filed By:
Reliant Energy, Inc.
Description: to PG&E's Request for Evidentiary Hearings regarding Cost Allocation.

Type: MOTION Filing Date: August 21, 2008
Filed By:
DRA/PAULL/CPUC
Description: for Evidentiary Hearings on Costs and Benefits

Type: RESPONSE Filing Date: August 21, 2008
Filed By:
Alliance for Retail Energy Markets
California Alliance for Competitive Energy Solutions
Description: to PG&E's Request foran Evidentiary Hearing

Type: RESPONSE Filing Date: August 20, 2008
Filed By:
San Diego Gas and Electric Company
Southern California Edison Company
Description: Joint; to motion for evidentiary hearing

Type: COMMENTS Filing Date: August 18, 2008
Filed By:
San Diego Gas and Electric Company
Description: Reply; on the net costs/benefits of expediting DWR's removal as a supplier of power

Type: COMMENTS Filing Date: August 18, 2008
Filed By:
Reliant Energy, Inc.
Description: Reply; on the net benefits of the accelerated removal of DWR from its role of power supplier.

Type: COMMENTS Filing Date: August 18, 2008
Filed By:
Consumer Federation of CA
Description: Reply; Concerning the Costs and Benefits of Removing DWR from its Role as Power Supplier.

Type: COMMENTS Filing Date: August 18, 2008
Filed By:
Southern California Edison Company
Description: Reply; regarding net costs/benefits of DWR contract novation.

Type: COMMENTS Filing Date: August 18, 2008
Filed By:
The California Large Energy Consumers Association
Description: Reply; on net costs or benefits of DWR contract novation/assignment

Type: COMMENTS Filing Date: August 18, 2008
Filed By:
Pacific Gas and Electric Company
Description: Reply; on net cost/benefit analysis regarding DWR contract novation and/or assignment

Type: COMMENTS Filing Date: August 18, 2008
Filed By:
DRA/PAULL/CPUC
Description: Reply; on net costs/benefits of DWR contract novation.

Type: COMMENTS Filing Date: August 18, 2008
Filed By:
Alliance for Retail Energy Markets
California Alliance for Competitive Energy Solutions
Description: Reply; regarding the net costs/benefits of expediting DWR's removal as a supplier of power.

Type: COMMENTS Filing Date: August 18, 2008
Filed By:
The Utility Reform Network
Description: Reply; on the costs and benefits of contract transfer

Type: REQUEST Filing Date: August 14, 2008
Filed By:
Pacific Gas and Electric Company
Description: for Evidentiary Hearings regarding Cost Allocation.

Type: RESPONSE Filing Date: August 11, 2008
Filed By:
CAliforniansa for Renewable Energy
Description: to Cost Allocation Comments.

Type: COMMENTS Filing Date: August 11, 2008
Filed By:
Reliant Energy, Inc.
Description: Reply; on Cost Allocation Principles.

Type: COMMENTS Filing Date: August 11, 2008
Filed By:
The Utility Reform Network
Description: Reply; on Inter-Utility Cost Allocation issues.

Type: COMMENTS Filing Date: August 11, 2008
Filed By:
San Diego Gas & Electric Company
Description: Reply; to the Inter-Utility Cost Allocation Proposals.

Type: COMMENTS Filing Date: August 11, 2008
Filed By:
Pacific Gas and Electric Company
Description: Reply; on Cost Allocation Proposals regarding DWR Contract Novation and/or Assignment.

Type: COMMENTS Filing Date: August 11, 2008
Filed By:
Alliance for Retail Energy Markets
California Alliance for Competitive Energy Solutions
Description: Reply; regarding Inter-Utility Allocation Issues.

Type: COMMENTS Filing Date: August 11, 2008
Filed By:
The California Large Energy Consumers Association
Description: Reply; on Cost Allocation for Assigned or Novated DWR Contracts.

Type: RESPONSE Filing Date: August 11, 2008
Filed By:
Southern California Edison Company
Description: to Inter-Utility Cost Allocation Proposals.

Type: COMMENTS Filing Date: August 11, 2008
Filed By:
DRA/PAULL/CPUC
Description: Reply; on Inter-Utility Cost Allocation Issues.

Type: COMMENTS Filing Date: August 4, 2008
Filed By:
Reliant Energy, Inc.
Description: on the Net Benefits of the Accelerated Removal of DWR from its Role of Power Supplier.

Type: COMMENTS Filing Date: August 4, 2008
Filed By:
Pacific Gas and Electric Company
Description: regarding Net Costs/Benefits of DWR Contract Novaton.

Type: COMMENTS Filing Date: August 4, 2008
Filed By:
Southern California Edison Company
Description: on the ALJ's Ruling to Complete the Record in Phase II(a)(1).

Type: COMMENTS Filing Date: August 4, 2008
Filed By:
Consumer Federation of California
Description: concerning the Costs and Benefits of Removing DWR from its Role as Power Supplier.

Type: COMMENTS Filing Date: August 4, 2008
Filed By:
DRA/PAULL/CPUC
Description: Opening; on Net Costs or Benefits to Retail Customers of accelerating DWR's Removal as a Supplier of Power.

Type: COMMENTS Filing Date: August 4, 2008
Filed By:
Alliance for Retail Energy Markets
California Alliance for Competitive Energy Solutions
Description: regarding the Net Costs/Benefits of Expediting DWR's Removal as a Supplier of Power

Type: COMMENTS Filing Date: August 4, 2008
Filed By:
San Diego Gas & Electric Company
Description: concerning Net Costs/Benefits of DWR Contract Novaton.

Type: COMMENTS Filing Date: August 4, 2008
Filed By:
The Utility Reform Network
Description: Opening; on the Costs and Benefits of Contract Transfer.

Type: RULING Filing Date: July 31, 2008
Filed By:
ALJ/PULSIFER/CPUC
Description: Revising Schedule for Phase II (a)(2).

Type: REPLY Filing Date: July 31, 2008
Filed By:
CAlifornians for Renewable Energy
Description: to Opposition Response to Motion to Dismiss.

Type: COMMENTS Filing Date: July 29, 2008
Filed By:
CAlifornians for Renewable Energy
Description: for Cost Allocation. (Late Filing authorized by ALJ Pulsifer)

Type: COMMENTS Filing Date: July 28, 2008
Filed By:
DRA/PAULL/CPUC
Description: on inter-utility cost allocation issues

Type: COMMENTS Filing Date: July 28, 2008
Filed By:
San Diego Gas & Electric Company
Description: on ALJ's Ruling to complete the record in Phase II(a)(1)

Type: COMMENTS Filing Date: July 28, 2008
Filed By:
California Manufactureres & Technology Association
The California Large Energy Consumers Association
Description: on cost allocation for assigned or novated DWR contracts

Type: MISCELLANEOUS FILING Filing Date: July 28, 2008
Filed By:
Pacific Gas and Electric Company
Description: Cost Allocation Proposals regarding DWR Contract Novation and/or Assignment.

Type: COMMENTS Filing Date: July 28, 2008
Filed By:
Alliance for Retail Energy Markets
California Alliance for Competitive Energy Solutions
Description: Regarding Inter-Utility Allocation Issues

Type: MISCELLANEOUS FILING Filing Date: July 28, 2008
Filed By:
Southern California Edison Company
Description: Proposals on inter-utility cost allocation.

Type: COMMENTS Filing Date: July 28, 2008
Filed By:
The Utility Reform Network
Description: Opening; on inter-utility cost allocation issues

Type: COMMENTS Filing Date: July 28, 2008
Filed By:
Reliant Energy, Inc.
Description: on cost allocation principles.

Type: RESPONSE Filing Date: July 23, 2008
Filed By:
Alliance for Retail Energy Markets
California Alliance for Competitive Energy Solutions
Description: to the motion to dismiss by Californians for Renewable Energy, Inc.

Type: RULING Filing Date: July 21, 2008
Filed By:
ALJ/PULSIFER/CPUC
Description: ALJ's Ruling clarifying prior rulings regarding Mark-to-Market analysis.

Type: RULING Filing Date: July 18, 2008
Filed By:
ALJ/PULSIFER/CPUC
Description: ALJ's Ruling regarding schedule for providing updated Mark-to-Market analysis.

Type: RULING Filing Date: July 11, 2008
Filed By:
ALJ/PULSIFER/CPUC
Description: Regarding Eligibility to Claim Intervenor Compensation. Consumer Federation of California is found eligible to claim intervenor compensation.

Type: RULING Filing Date: July 9, 2008
Filed By:
ALJ/PULSIFER/CPUC
Description: ALJ's Ruling to complete the record in Phase II (a)(1).

Type: MOTION Filing Date: July 8, 2008
Filed By:
Californians for Renewable Energy
Description: to Dismiss.

Type: COMMENTS Filing Date: June 16, 2008
Filed By:
Consumer Federation of California
Description: Post-Workshop Reply; regarding Phase II(a)(1) issues

Type: COMMENTS Filing Date: June 16, 2008
Filed By:
Southern California Edison Company
Description: Post Workshop Reply; on novation/assignment of DWR contracts

Type: COMMENTS Filing Date: June 16, 2008
Filed By:
Reliant Energy, Inc.
Description: Reply; on the proposed novation of the power contracts held by the California Department of Water Resources

Type: COMMENTS Filing Date: June 16, 2008
Filed By:
San Diego Gas & Electric Company
Description: Post-Workshop Reply;

Type: COMMENTS Filing Date: June 16, 2008
Filed By:
DRA/PAULL/CPUC
Description: POST-WORKSHOP REPLY; REGARDING DWR CONTRACT NOVATION

Type: COMMENTS Filing Date: June 16, 2008
Filed By:
Pacific Gas and Electric Company
Description: Phase II(a)(1) Post-Workshop Reply; regarding DWR contract novation

Type: COMMENTS Filing Date: June 16, 2008
Filed By:
Alliance for Retail Energy Markets
California Alliance for Competitive Energy Solutions
Description: Reply; regarding Phase II(a)(1) issues

Type: COMMENTS Filing Date: June 16, 2008
Filed By:
California Large Energy Consumers Association
California Manufacturers & Technology Association
Description: Phase II post workshop reply;

Type: COMMENTS Filing Date: June 16, 2008
Filed By:
Californians for Renewable Energy
Description: Reply; to Post-Workshop Opening Comments.

Type: COMMENTS Filing Date: June 10, 2008
Filed By:
DRA/PAULL/CPUC
Description: Post-Workshop; (late-filed authorized by ALJ Pulsifer per email ruling dated June 10, 2008).

Type: COMMENTS Filing Date: June 9, 2008
Filed By:
Reliant Energy, Inc.
Description: on the proposed novation of the power contracts held by the California Department of Water Resources

Type: COMMENTS Filing Date: June 9, 2008
Filed By:
Southern California Edison Company
Description: Post-Workshop; on novation/assignment of DWR contracts

Type: COMMENTS Filing Date: June 9, 2008
Filed By:
Pacific Gas and Electric Company
Description: Post-Workshop; Phase II(a)(1) regarding DWR Contract Novation.

Type: COMMENTS Filing Date: June 9, 2008
Filed By:
San Diego Gas & Electric Company
Description: Post Workshop;

Type: COMMENTS Filing Date: June 9, 2008
Filed By:
Consumer Federation of California
Description: post-workshop; regarding Phase II(a)(1) issues

Type: COMMENTS Filing Date: June 9, 2008
Filed By:
Alliance for Retail Energy Markets
California Alliance for Competitive Energy Solutions
Description: regarding Phase II (a)(1) issues

Type: COMMENTS Filing Date: June 9, 2008
Filed By:
The Utility Reform Network
Description: Post-Workshop Opening;

Type: RULING Filing Date: June 5, 2008
Filed By:
ALJ/PULSIFER/CPUC
Description: Revising Schedule for Workshop in Phase II (a).

Type: RULING Filing Date: May 22, 2008
Filed By:
ALJ/PULSIFER/CPUC
Description: providing for responses to Notice of Intent to Claim Intervenor Compensation. Any party seeking to file a statement responding to the Natural Resources Defense Council's Notice of Intent to file intervenor compensation shall do so by May 29, 2008.

Type: RULING Filing Date: May 12, 2008
Filed By:
ALJ/PULSIFER/CPUC
Description: Providing for Responses to Notice of Intent (NOI) to Claim Intervenor Compensation. Statements responding to the NOI are due by May 19, 2008.

Type: NOTICE Filing Date: May 12, 2008
Filed By:
Natural Resources Defense Council
Description: of Intent to claim compensation.

Type: NOTICE Filing Date: May 5, 2008
Filed By:
Consumer Federation of California
Description: of Intent to Claim Intervenor Compensation.

Type: RULING Filing Date: May 2, 2008
Filed By:
ALJ/PULSIFER/CPUC
Description: Grants California Alliance for Competitive Energy Solutions' motion to withdraw its proposal, but denies its request to reschedule its workshop.

Type: RESPONSE Filing Date: May 2, 2008
Filed By:
DRA/PAULL/CPUC
Description: to Motion of California Alliance for Creative Energy Solutions to withdraw proposal and expedite procedural schedule.

Type: RESPONSE Filing Date: April 30, 2008
Filed By:
San Diego Gas & Electric Company
Description: to Motion of CACES to Withdraw Proposal for Consideration and Expedite Procedural Schedule.

Type: MOTION Filing Date: April 29, 2008
Filed By:
California Alliance for Competitive Energy Solutions
Description: to Withdraw Proposal for Consideration and Expedite Procedural Schedule.

Type: REQUEST Filing Date: April 29, 2008
Filed By:
The Utility Reform Network
Description:

Type: RULING Filing Date: April 18, 2008
Filed By:
ALJ/PULSIFER/CPUC
CMMR/PEEVEY/CPUC
Description: Setting Preliminary Schedule for Phase II. Adopts schedule, as set forth.

Type: NOTICE Filing Date: April 15, 2008
Filed By:
Californians for Renewable Energy
Description: of Intent to Claim Compensation.

Type: STATEMENT Filing Date: April 8, 2008
Filed By:
Southern California Edison Company
Description: Prehearing Conference;

Type: STATEMENT Filing Date: April 8, 2008
Filed By:
Pacific Gas and Electric Company
Description: Phase II Prehearing Conference Statement.

Type: STATEMENT Filing Date: April 8, 2008
Filed By:
Reliant Energy, Inc.
Description: Prehearing Conference

Type: STATEMENT Filing Date: April 8, 2008
Filed By:
Alliance for Retail Energy Markets
California Alliance for Competitive Energy Solutions
Description: Prehearing Conference

Type: STATEMENT Filing Date: April 8, 2008
Filed By:
THE UTILITY REFORM NETWORK
Description: Prehearing Conference

Type: STATEMENT Filing Date: April 8, 2008
Filed By:
Sierra Pacific Power Company
Description: Prehearing Conference

Type: STATEMENT Filing Date: April 8, 2008
Filed By:
San Diego Gas & Electric Company
Description: Prehearing Conference

Type: STATEMENT Filing Date: April 8, 2008
Filed By:
DRA/PAULL/CPUC
Description: Prehearing Conference

Type: RULING Filing Date: March 28, 2008
Filed By:
ALJ/PULSIFER/CPUC
CMMR/PEEVEY/CPUC
Description: Setting Prehearing Conference and Preliminary Framework for Phase II. Parties shall file PHC Statements by April 8, 2008.

Type: COMMENTS Filing Date: January 7, 2008
Filed By:
The Utility Reform Network
Description: Reply; on the Proposed Decision of Commissioner Peevey.

Type: COMMENTS Filing Date: January 7, 2008
Filed By:
Reliant Energy, Inc.
Description: Reply; on the Proposed Decision of Commissioner Peevey.

Type: COMMENTS Filing Date: January 7, 2008
Filed By:
Pacific Gas and Electric Company
Description: Reply; on the Proposed Decision in Phase 1.

Type: COMMENTS Filing Date: January 7, 2008
Filed By:
AT&T Services
Alliance for Retail Energy Markets
California Alliance for Competitive Energy Solutions
Constellation Energy Commodities Group, Inc.
Constellation Generation Group, LLC
Constellation NewEnergy, Inc.
Description: Reply; on the Proposed Decision of Commissioner Peevey.

Type: COMMENTS Filing Date: January 7, 2008
Filed By:
Southern California Edison Company
Description: Reply; on the Proposed Decision regarding Commission Authority to Lift the Direct Access Suspension.

Type: COMMENTS Filing Date: December 31, 2007
Filed By:
Reliant Energy, Inc.
Description: on the Proposed Decision of Commissioner Peevey.

Type: COMMENTS Filing Date: December 31, 2007
Filed By:
DRA/PAULL/CPUC
Description: on Proposed Decision regarding Commission Authority to Lift the Direct Action Suspension.

Type: COMMENTS Filing Date: December 31, 2007
Filed By:
San Diego Gas & Electric Company
Description: on the Proposed Decision regarding Commission Authority to Lift the Direct Access Suspension.

Type: COMMENTS Filing Date: December 31, 2007
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
NATURAL RESOURCES DEFENSE COUNCIL
THE UTILITY REFORM NETWORK
Description: on the Proposed Decision of Commissioner Peevey.

Type: COMMENTS Filing Date: December 31, 2007
Filed By:
Del Taco, Inc.
Los Angeles Unified School District
The County of Los Angeles
Description: on the Proposed Decision Regarding The Legal Authority of the Commission To Lift Suspension on Direct Access.

Type: COMMENTS Filing Date: December 31, 2007
Filed By:
AT&T Services
Alliance for Retail Energy Markets
California Alliance for Competitive Energy Solutions
Constellation Energy Commodities Group, Inc.
Constellation Generation Group, LLC
Constellation NewEnergy, Inc.
Description: on the Proposed Decision of Commissioner Peevey.

Type: COMMENTS Filing Date: December 28, 2007
Filed By:
Southern California Edison Company
Description: on the Draft Decision regarding Commission Authority to Lift the Direct Access Suspension.

Type: PROPOSED DECISION Filing Date: December 10, 2007
Filed By:
CMMR/PEEVEY/CPUC
Description: Opinion Regarding Commission Authority to Lift the Direct Access Suspension. Opening comments, which shall not exceed 15 pages, are due no later than December 30, 2007. Reply comments are due 5 days after opening comments are filed.

Type: RULING Filing Date: August 17, 2007
Filed By:
ALJ/PULSIFER/CPUC
Description: regarding eligibility to claim intervenor compensation. The Utility Reform Network, Californians for Renewable Energy, Inc., and Direct Access Residential Energy are found eligible to claim intervenor compensation in this proceeding.

Type: REPLY Filing Date: August 1, 2007
Filed By:
Direct Access Residential Energy
Description: to Response of Californians for Renewable Energy Regarding Dare's NOI to Claim Eligibility for Intervenor Compensation.

Type: COMMENTS Filing Date: July 24, 2007
Filed By:
Pacific Gas and Electric Company
Description: on Phase I: Legal Issues.

Type: COMMENTS Filing Date: July 24, 2007
Filed By:
Alliance for Retail Energy Markets
Description: on Phase I.

Type: COMMENTS Filing Date: July 24, 2007
Filed By:
Southern California Edison Company
Description: on the Phase I Legal Issues in Connection With Whether, When, or How Direct Access Should Be Restored.

Type: BRIEF Filing Date: July 24, 2007
Filed By:
California Alliance for Competitive Energy Solutions
Description: Opening; On the Legal Authority of the Commission to Lift the Suspension of Direct Access.

Type: BRIEF Filing Date: July 24, 2007
Filed By:
San Diego Gas & Electric Company
Description: Opening; on Phase I of the Rulemaking Regarding Lifting the Direct Access Suspension.

Type: COMMENTS Filing Date: July 24, 2007
Filed By:
Coalition of California Utility Employees
Consumer Federation of California
Division of Ratepayer Advocates
Natural Resources Defense Council
The Utility Reform Network
Description: On Phase One Legal Issues.

Type: COMMENTS Filing Date: July 24, 2007
Filed By:
Constellation Energy Commodities Group, Inc.
Constellation Generation Group, LLC
Constellation NewEnergy, Inc.
Description: Joint; regarding Phase I: Legal Authority to Lift the Direct Access Suspension.