Number of Documents: 144
|
|
|
Type:
RESPONSE
|
Filing Date:
May 3, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Navajo Nation's Application for Rehearing of Decision 04-03-037.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
April 16, 2004
|
Filed By:
NAVAJO NATION
|
|
Description:
for D04-03-037.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 10, 2004
|
Filed By:
ORA/CAGEN/PUC
|
|
Description:
on draft decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 9, 2004
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
on proposed decision approving FERC decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 9, 2004
|
Filed By:
NAVAJO NATION
|
|
Description:
on proposed decision adopting FERC's changes to the Mountainview Power Purchase
Agreement.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 9, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on ALJ Draft Decision adopting FERC's changes to the Mountainview Power
Purchase Agreement approved in D.03-15-059.
|
|
|
Type:
DRAFT DECISION
|
Filing Date:
March 1, 2004
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Adopting FERC's changes to the Mountainview Power Purchase Agreement, etc.
Comments are due March 9, 2004; no reply comments will be accepted.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 1, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On February 25, 2004, Ann P. Cohn, Associate General Counsel of Southern
California Edison Company, had a telephone conversation with Julie Fitch,
advisor to Pres. Peevey. ALJ Carol Brown also participated in the
communication. Cohn informed the Commission that the Federal Energy Regulatory
Commission has issued its decision on the Mountainview application.
|
|
|
Type:
REQUEST
|
Filing Date:
February 23, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
For An Award Of Compensation
|
|
|
Type:
RESPONSE
|
Filing Date:
February 6, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to various Applications for Rehearing of Decision 03-12-059.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
January 22, 2004
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
ORA/CAGEN/PUC
|
|
Description:
[of D03-12-059].
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
January 22, 2004
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
of D03-12-059.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
January 22, 2004
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
CALIFORNIA MANUFACTURERS AND TECHNOLOGY ASSOCIATION
|
|
Description:
of D03-12-059.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
January 21, 2004
|
Filed By:
NAVAJO NATION
|
|
Description:
of D03-12-059.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 15, 2003
|
Filed By:
NAVAJO NATION
|
|
Description:
reply; on the proposed decision of ALJ Brown and alternate of Cmmr. Lynch.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 15, 2003
|
Filed By:
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
reply; on the proposed decision of ALJ Brown.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
December 15, 2003
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
reply; on alternate of Cmmr. Lynch.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 15, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on the Proposed Decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 15, 2003
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
PUBLIC VERSION. Reply comments on the proposed decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 15, 2003
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
CONFIDENTIAL VERSION. SUBJECT TO PROTECTIVE ORDER. Reply comments on the
proposed decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 15, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; to the Lynch Alternate Proposed Decision in [Edison's] Mountainview
Application.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 12, 2003
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
On December 10, 2003, Douglas Kerner, attorney for Independent Energy Producers
Association (IEP), met with Cmmr. Lynch in San Francisco. Also present were
Aaron Johnson, advisor to Cmmr. Lynch, and Steven Kelly, Policy Director of
IEP. IEP stated its position and concerns with respect to Cmmr. Lynch's
alternate. IEP expressed its primary view that utility procurement should
occur through an open, transparent and competitive process, irrespective of the
payment or cost recovery structure of the project resultant from that process.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 12, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
LATE FILED. On December 2, 2003, Mike Hoover, Director, Regulatory Affairs,
Southern California Edison Company (SCE), met with David Gamson, advisor to
Cmmr. Brown, in San Francisco. Hoover reiterated SCE's position that
ratebasing Mountainview was not a viable option going forward and that the
Commission should adopt SCE's proposed power purchase agreement.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 12, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On December 9, 2003, Bruce Foster, Vice President, Regulatory Operations,
Southern California Edison Company (SCE), met with Cmmr. Lynch in San
Francisco. Also present were Aaron Johnson, advisor to Cmmr. Lynch, and Ann
Cohn, Associate General Counsel, Gary Schoonyan, Director, and Tom Burhenn,
Manager, Regulatory Operations, SCE. SCE representatives expressed its support
for the proposed decision (PD) over the alternate. SCE representatives stated
that it was unable and unwilling to acquire Mountainview as a directly-owned
asset until the customer base stability and cost recovery issues had been
addressed. SCE representatives explained that there were negative consequences
to SCE and its customers if Mountainview was not acquired through a Federal
Energy Regulatory Commission (FERC)-jurisdictional affiliate. Responding to a
concern over FERC making changes to the power purchase agreement, SCE
representatives noted that the PD prevents SCE from executing the contract if
FERC makes changes that affect rates without getting Commission approval of the
changes.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
December 11, 2003
|
Filed By:
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
of Cmmr. Lynch.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
December 11, 2003
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
|
|
Description:
of Cmmr. Lynch.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 11, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on the Alternate Proposed Decision of Commissioner Lynch.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 11, 2003
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
on the Alternate Proposed Decision of Commissioner Lynch.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
December 11, 2003
|
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
|
|
Description:
of Cmmr. Lynch.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 11, 2003
|
Filed By:
NAVAJO NATION
|
|
Description:
On December 8, 2003, Mark Fogelman of Steefel, Levitt & Weiss, P.C., attorneys
for the Navajo Nation, met with Cmmr. Kennedy in San Francisco. Also present
were Ross LaJeunesse, advisor to Cmmr. Peevey, and Christine Hammond of
Steefel, Levitt & Weiss, P.C. Fogelman stated that, among the many legal
errors, is the proposed decision's (PD) failure to include a comparative
analysis between Mountainview and other feasible energy alternatives, such as
the Mohave Generating Station, in violation of Public Utilities Code Section
1001, the California Environmental Quality Act, and the Public Utility Holding
Company Act. Fogelman noted that undisputed record evidence shows that Mohave
is more cost-effective than Mountainview. Fogelman also communicated the
Navajo Nation's concern that Southern California Edison Company's (SCE)
Mountainview Application would prejudice the future of the Mohave Generating
Station. In view of the likelihood that the final decision will be overturned
on appeal if the PD remains unchanged, Fogelman recommended that the Commission
keep the proceeding open.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
December 11, 2003
|
Filed By:
NAVAJO NATION
|
|
Description:
of Cmmr. Lynch.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
December 11, 2003
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
of Cmmr. Lynch.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 11, 2003
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; [on the proposed decision of ALJ Brown.]
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
December 11, 2003
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
of Cmmr. Lynch.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2003
|
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
|
|
Description:
on the proposed decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2003
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
in opposition to the proposed decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2003
|
Filed By:
ORA/CAGEN/PUC
|
|
Description:
on the proposed decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2003
|
Filed By:
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
[on the proposed decision of ALJ Brown.]
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2003
|
Filed By:
NAVAJO NATION
|
|
Description:
on the proposed decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2003
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
|
|
Description:
[on the proposed decision of ALJ Brown.]
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2003
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
opening; on the proposed decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2003
|
Filed By:
SEQUOIA GENERATING COMPANY
|
|
Description:
on the proposed decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2003
|
Filed By:
SILICON VALLEY MANUFACTURING GROUP
|
|
Description:
[on the proposed decision].
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on the Proposed Decision (PUBLIC VERSION).
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2003
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
on the Proposed Decision of ALJ Brown.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 8, 2003
|
Filed By:
NAVAJO NATION
|
|
Description:
On December 3, 2003, Mark Fogelman of Steefel, Levitt & Weiss, P.C., attorneys
for the Navajo Nation, met with Cmmr. Lynch in San Francisco. Also present was
Christine Hammond of Steefel, Levitt & Weiss, P.C. Fogelman stated that, among
the many legal errors, are the proposed decision's (PD) failure to include a
comparative analysis between Mountainview and other feasible energy
alternatives, such as the Mohave Generating Station, in violation of Public
Utilities Code Section 1001, the California Environmental Quality Act, and the
Ashbacker Doctrine. Fogelman noted that undisputed record evidence shows that
Mohave is more cost-effective than Mountainview. Fogelman also communicated
the Navajo Nation's concern that Southern California Edison Company's
Mountainview Application would prejudice the future of the Mohave Generating
Station.
|
|
|
Type:
MOTION
|
Filing Date:
December 8, 2003
|
Filed By:
CALIFORNIA SMALL BUSINESS ASSOCIATION
CALIFORNIA SMALL BUSINESS ROUNDTABLE
|
|
Description:
for leave to intervene; comments on the proposed decision of ALJ Brown attached.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2003
|
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
|
|
Description:
on the proposed decision of ALJ Brown.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 4, 2003
|
Filed By:
NAVAJO NATION
|
|
Description:
On December 1, 2003, Mark Fogelman of Steefel, Levitt & Weiss, P.C., attorneys
for the Navajo Nation, met with Pres. Peevey in San Francisco. Also present
were Julie Fitch, advisor to Pres. Peevey, and Christine Hammond of Steefel,
Levitt & Weiss, P.C. Fogelman stated that, among the many legal errors, are
the proposed decision's (PD) failure to include a comparative analysis between
Mountainview and other feasible energy alternatives, such as the Mohave
Generating Station, in violation of Public Utilities Code Section 1001, the
California Environmental Quality Act, and the Ashbacker Doctrine. Fogelman
noted that undisputed record evidence shows that Mohave is more cost-effective
than Mountainview. Fogelman also communicated the Navajo Nation's concern that
Southern California Edison Company's (SCE) Mountainview Application not be
allowed to 'leapfrog' SCE's Mohave application (A02-05-046). In view of the
likelihood that the final decision will be overturned on appeal if the PD
remains unchanged, Fogelman recommended that the Commission keep the proceeding
open.
|
|
|
Type:
ALTERNATE
|
Filing Date:
December 4, 2003
|
Filed By:
CMMR/LYNCH/PUC
|
|
Description:
Opinion granting in part and denying in part Southern California Edison
Company's application. Comments are due December 11, 2003, reply comments - 5
days after comments are filed.
|
|
|
Type:
NOTICE
|
Filing Date:
December 3, 2003
|
Filed By:
ALJ/MINKIN/PUC
|
|
Description:
of final oral argument.
|
|
|
Type:
NOTICE
|
Filing Date:
December 3, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
of Grant of Request for Ex Parte Meeting.
|
|
|
Type:
NOTICE
|
Filing Date:
November 26, 2003
|
Filed By:
NAVAJO NATION
|
|
Description:
olf grant of request for ex parte meeting.
|
|
|
Type:
NOTICE
|
Filing Date:
November 26, 2003
|
Filed By:
NAVAJO NATION
|
|
Description:
of grant of request for ex parte meeting.
|
|
|
Type:
RULING
|
Filing Date:
November 20, 2003
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Grants TURN's motion to accept late-filed notice of intent to claim
compensation. Finds that TURN is eligible to claim compensation.
|
|
|
Type:
RULING
|
Filing Date:
November 20, 2003
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Clarifies that comments to the proposed decision of ALJ Brown issued November
18, 2003, may be filed 20 days after the mail date, and reply comments - 5 days
thereafter.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
November 18, 2003
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Opinion granting Edison's application to acquire Mountainview Power Company,
LLC (MVL) as a wholly owned subsidiary and to enter into a power purchase
agreement with MVL. Comments are due by December 8, 2003; reply comments - 5
days after comments are filed.
|
|
|
Type:
RESPONSE
|
Filing Date:
November 14, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Motion of Nevada Hydro Company et al. for intervention and comments.
|
|
|
Type:
BRIEF
|
Filing Date:
November 6, 2003
|
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
|
|
Description:
[opening].
|
|
|
Type:
BRIEF
|
Filing Date:
November 6, 2003
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
concurrent, opening.
|
|
|
Type:
BRIEF
|
Filing Date:
November 6, 2003
|
Filed By:
ORA/CAGEN/OBIORA/PUC
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
November 6, 2003
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
concurrent opening: PUBLIC VERSION WITH REDACTIONS. Confidential Version
Subject to Protective Order in A03-07-032 Filed Under Seal.
|
|
|
Type:
BRIEF
|
Filing Date:
November 6, 2003
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
concurrent.
|
|
|
Type:
REQUEST
|
Filing Date:
November 6, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISAON COMPANY
|
|
Description:
for the Commission to Take Official Notice.
|
|
|
Type:
MOTION
|
Filing Date:
November 6, 2003
|
Filed By:
ELSINORE VALLEY MUNICIPAL WATER DISTRICT
NEVADA HYDRO COMPANY, INC.
|
|
Description:
to intervene and comments on Edison's plants to purchase the Mountainview Power
facility.
|
|
|
Type:
BRIEF
|
Filing Date:
November 6, 2003
|
Filed By:
SOUTHERN CALIFORNIA EIDSON COMPANY
|
|
Description:
[Confidential Version] in support its application.
|
|
|
Type:
BRIEF
|
Filing Date:
November 6, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
in support of [this] Application. (PUBLIC VERSION).
|
|
|
Type:
BRIEF
|
Filing Date:
November 6, 2003
|
Filed By:
SEQUOIA GENERATING COMPANY, LLC
|
|
Description:
post-hearing.
|
|
|
Type:
BRIEF
|
Filing Date:
November 6, 2003
|
Filed By:
NAVAJO NATION
|
|
Description:
concurrent.
|
|
|
Type:
BRIEF
|
Filing Date:
November 6, 2003
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
|
|
Description:
[opening].
|
|
|
Type:
BRIEF
|
Filing Date:
November 6, 2003
|
Filed By:
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
[opening].
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
November 3, 2003
|
Filed By:
NAVAJO NATION
|
|
Description:
transcript corrections.
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
October 24, 2003
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
Declaration of R. Thomas Beach.
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
October 24, 2003
|
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION.
|
|
Description:
Declaration of Dr. Barbara R. Barkovich.
|
|
|
Type:
OPPOSITION
|
Filing Date:
October 21, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to motion of Energy Producers Coalition for an order compelling the production
of a non-redacted version of the application, testimony, and workpapers.
|
|
|
Type:
RESPONSE
|
Filing Date:
October 21, 2003
|
Filed By:
SEQUOIA GENERATING COMPANY, LLC
|
|
Description:
in opposition to Motion of the Energy Producers and Users Coalition for an
order compelling the production of a non-redacted version of the Application,
testimony, and workpapers.
|
|
|
Type:
RESPONSE
|
Filing Date:
October 21, 2003
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
to ALJ's request for comments on motions to compel confidential data.
|
|
|
Type:
RESPONSE
|
Filing Date:
October 21, 2003
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
to ALJ Brown's inquiry re protective order.
|
|
|
Type:
RESPONSE
|
Filing Date:
October 21, 2003
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
to Motions of Independent Energy Producers and Energy Producers and Users
Coalition to Compel Production of Unredacted Application, Testimony and
Workpapers.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
October 14, 2003
|
Filed By:
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
for an order compelling the production of a non-redacted version of the
application, testimony and workpapers.
|
|
|
Type:
MOTION
|
Filing Date:
October 10, 2003
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
for acceptance of a late-filed notice of intent to claim compensation; notice
of intent attached.
|
|
|
Type:
RULING
|
Filing Date:
September 25, 2003
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Clarifies Scoping Memo.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 19, 2003
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
On September 19, 2003, Douglas Kerner, attorney for Independent Energy
Producers Association, sent a letter (attached to the notice) to Cmmr. Kennedy.
Copies of the letter were also sent to Cmmrs. Peevey, Brown, Lynch and Wood,
and Brian Prusnek and Ross LaJeunesse, advisors to Cmmr. Kennedy. The letter
provided information related to the Commission's future oversight of Southern
California Edison's proposal to develop the Mountainview power plant.
|
|
|
Type:
SCOPING RULING
|
Filing Date:
September 16, 2003
|
Filed By:
CMMR/PEEVEY/PUC
|
|
Description:
Affirms that this is a ratesetting proceeding. Sets the following schedule:
evidentiary hearings start October 14, 2003; concurrent opening briefs - 10/31,
concurrent reply briefs - 11/7/3, final decision - 12/18/2003. Denies the
IEP's motion for consolidation.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 11, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On September 10, 2003, Bruce Foster, Vice President, Regulatory Operations,
Southern California Edison Company (SCE), sent a letter (attached to the
notice) to Brian Prusnek, advisor to Cmmr. Kennedy. Copies of the letter were
also sent to Cmmrs. Peevey, Brown, Lynch, and Wood, and to Julie Fitch, advisor
to Pres. Peevey, David Gamson and Belinda Gatti, advisors to Cmmr. Brown,
Michael Campbell and Aaron Johnson, advisors to Cmmr. Lynch, Ross LaJeunesse,
advisor to Cmmr. Kennedy, and Manuel Ramirez and Steven Weissman, advisors to
Cmmr. Wood. The letter responds to a question raised at the all-party meeting
requesting further information as to how a catastrophic even at the
Mountainview facility would be treated under SCE's proposed Power Purchase
Agreement.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 10, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On September 5, 2003, Bruce Foster, Vice President, Regulatory Operations,
Southern California Edison Company (SCE), participated in an all-party meeting
with Cmmr. Wood in San Francisco. Also present was Steven A. Weissman, advisor
to Cmmr. Wood, Gary Schoonyan, Director, SCE San Francisco office, and other
attendees listed on the attachment to the notice. Foster indicated that it was
imperative that the Commission make a decision on SCEs application by December
2003, and, in moving in that direction, issue the Scoping Memo in the very near
future. Foster indicated that the Scoping Memo needs to establish a memorandum
account and provide findings addressing the issues on the need for a Request
for Proposal and the validity of the Power Purchase Agreement structure.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 9, 2003
|
Filed By:
ORA/CAGEN/PUC
|
|
Description:
AUGMENTATION REQUIRED. On September 5, 2003, Pearlie Sobino of the Office of
Ratepayer Advocates (ORA), met with Cmmr. Wood in San Francisco. Also present
were Steve Weissman, advisor to Cmmr. Wood, Scott Logan and Robert Cagen, for
ORA, and other attendees. Written material (attached to the notice) was used.
Cagen discussed the lack of cost-effectiveness or need analysis offered by
applicants, and the inability of other parties to provide cost-effectiveness
input because of a lack of information. Cagen further discussed the affiliate
rulemaking decision and the KRCC decision prohibiting the application relief,
and that the Edison holding company was not yet formed when the KRCC contract
was executed. Cagen described the advantages of utility-owned generation and
unaffiliated generation to Mountainview. Cagen also discussed the
impracticality of the schedule Edison is seeking to impose on the
Commission.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 9, 2003
|
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
|
|
Description:
On September 5, 2003, Marc Joseph, attorney for the Coalition of California
Utility Employees (CUE), met with Cmmr. Wood in an all-party meeting in San
Francisco. Also present were Steve Weissman, advisor to Cmmr. Wood, Robert
Kinosian, advisor, Julie Fitch, advisor to Pres. Peevey, Belinda Gatti, advisor
to Cmmr. Brown, and Ross LaJeunesse, advisor to Cmmr. Kennedy, Gary Schoonyan,
Bruce Foster and Mike Hoover, for Southern California Edison Company, Mark
Fogelman and Christine Hammond, for the Navajo Nation, Don Brookhyser, for the
Cogeneration Association of California/Energy Producers and Users Coalition,
Andy Brown, for the Independent Energy Producers, Joe Karp, for the California
Cogeneration Council, Robert Cagen, for the Office of Ratepayer Advocates, Sara
Myers, for the Center for Energy Efficiency and Renewable Technologies, Jim
Conran and Maryanne McCormick, for the California Small Business Association,
Billy Blattner, for San Diego Gas & Electric Company, Matt Freedman, for The
Utility Reform Network, Terry J. Houlihan, Mark Iamonaco and Laurence E.
Skinner, for Sequoia Generating Company, John Redding, for the Silicon Valley
Manufacturing Group, John Clarke and Valerie Winn, for Pacific Gas and Electric
Company. Joseph stated that Edison needs the Mountainview plant to meet its
needs in 2006 and later. Joseph also suggested that using a Federal Energy
Regulatory Commission regulated contract was second best, not as good as direct
utility ownership. Joseph noted that the legitimate reason for a `competitive
process' was to determine if the cost of the project was a good deal for
ratepayers and that that determination could be made by comparing the costs of
this project to the costs of other similar projects. Finally, Joseph noted
that CUE has a big stake in the continued operation of Mohave, but there is no
conflict between keeping Mohave open and approving the Mountainview application.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 8, 2003
|
Filed By:
ORA/CAGEN/PUC
|
|
Description:
On September 5, 2003, Pearlie Sobino of the Office of Ratepayer Advocates
(ORA), met with Brian Prusnek, advisor to Cmmr. Kennedy, in San Francisco.
Also present was Scott Logan, for ORA. Written material (attached to the
notice) was used. Logan discussed the lack of cost-effectiveness or need
analysis offered by applicants, and the inability of other parties to provide
cost-effectiveness input because of a lack of information. Logan further
discussed the affiliate rulemaking decision and the KRCC decision prohibiting
the application relief. Logan described the advantages of utility-owned
generation and unaffiliated generation to Mountainview. Sabino cited Qualified
Facility contracts as examples of the Federal Energy Regulatory Commission
jurisdictional purchased power agreements that can be terminated pursuant to
their contract provisions.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 5, 2003
|
Filed By:
ORA/CAGEN/PUC
|
|
Description:
On September 3, 2003, Pearlie Sobino of the Office of Ratepayer Advocates
(ORA), met with Michael Campbell, advisor to Cmmr. Lynch, in San Francisco.
Also present were Scott Logan and Robert Cagen, for ORA. Written material
(attached to the notice) was used. ORA representatives discussed the size and
location of the proposed project and the lack of a cost-effectiveness or need
analysis offered by applicants, and the inability of other parties to provide
cost-effectiveness input because of a lack of information. Cagen and Logan
discussed the affiliate rulemaking decision and the KRCC decision prohibiting
the application relief. Cagen discussed the advantages of utility-owned
generation and unaffiliated generation to Mountain View. Cagen also noted the
impracticality of the schedule Southern California Edison Company is seeking to
impose on parties and the Commission.
|
|
|
Type:
REPLY
|
Filing Date:
September 4, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to protests.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 3, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On August 28, 2003, Al Fohrer, Chief Executive Officer of Southern California
Edison Company (SCE), met with Cmmr. Kennedy at Hayes Street Grill in San
Francisco. Also present were Ross LaJeunesse, advisor to Cmmr. Kennedy, and
Robert Foster, President, and Bruce Foster, Vice President of Regulatory
Operations, for SCE. SCE representatives explained that SCEs application on
the Mountainview Power Project involved SCEs request for approval of a
unit-contingent, gas-tolling power contract with a wholly owned subsidiary of
SCE. SCE representatives stated that this opportunity, if approved, would
result in the acquisition of additional generation capacity at a price below
the estimated full construction cost of a comparable facility. SCE
representatives stressed the importance of timely approval of SCEs application.
|
|
|
Type:
RESPONSE
|
Filing Date:
August 29, 2003
|
Filed By:
SEQUOIA GENERATING COMPANY, LLC
|
|
Description:
in opposition to Motion of Independent Energy Producers Association.
|
|
|
Type:
BRIEF
|
Filing Date:
August 29, 2003
|
Filed By:
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
Reply;
|
|
|
Type:
BRIEF
|
Filing Date:
August 29, 2003
|
Filed By:
THE NAVAJO NATION
|
|
Description:
Reply;
|
|
|
Type:
RESPONSE
|
Filing Date:
August 29, 2003
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
to [EDISON'S] Brief in support of the conclusion that a FERC-Approved PPA
structure for Mountainview is in the public interest of ratepayers.
|
|
|
Type:
OPPOSITION
|
Filing Date:
August 29, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Motion of Independent Energy Producers Association to compel production of
an unredacted copy of the Application, Testimony and Workpapers.
|
|
|
Type:
BRIEF
|
Filing Date:
August 29, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; regarding issues relating to public interest of Mountainview proposal.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 29, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On August 26, 2003, Robert Foster, President of Southern California Edison
Company (SCE) met with Pres. Peevey in San Francisco. Also present were Julie
Fitch, advisor to Pres. Peevey, and A Fohrer, Chief Executive Officer, and
Bruce Foster, Vice President, Regulatory Operations, for SCE. SCE
representatives urged the Commission to diligently process in a timely, but
thoughtful and complete manner and explained that expedited review of SCEs
application was necessary in order to secure the substantial benefits presented
in the proposed transaction.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 29, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on the feasibility and usefulness of a Mountainview RFP.
|
|
|
Type:
PROTEST
|
Filing Date:
August 25, 2003
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
THE ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
to Application.
|
|
|
Type:
PROTEST
|
Filing Date:
August 25, 2003
|
Filed By:
ORA/CAGEN/PUC
|
|
Description:
to Application.
|
|
|
Type:
PROTEST
|
Filing Date:
August 25, 2003
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
to Application.
|
|
|
Type:
PROTEST
|
Filing Date:
August 25, 2003
|
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
|
|
Description:
to Application.
|
|
|
Type:
PROTEST
|
Filing Date:
August 22, 2003
|
Filed By:
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
|
|
Description:
and Comments.
|
|
|
Type:
PROTEST
|
Filing Date:
August 22, 2003
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
to Application and Response to ALJ questions regarding issues associated with
proposed transaction structure.
|
|
|
Type:
BRIEF
|
Filing Date:
August 22, 2003
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
Brief.
|
|
|
Type:
RESPONSE
|
Filing Date:
August 22, 2003
|
Filed By:
ORA/CAGEN/PUC
|
|
Description:
to public interest question.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 22, 2003
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
on jurisdictional issue.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 22, 2003
|
Filed By:
SEQUOIA GENERATING COMPANY, LLC
|
|
Description:
on schedule.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 22, 2003
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on the desirability of approving the subject power purchase agreement.
|
|
|
Type:
BRIEF
|
Filing Date:
August 22, 2003
|
Filed By:
THE NAVAJO NATION
|
|
Description:
in response to ALJ's request for Briefs made at Aug 13, 2003 PHC.
|
|
|
Type:
BRIEF
|
Filing Date:
August 22, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
in support of the conclusion that a FERC-Approved PPA Structure for Montainview
is in the public interest of ratepayers.
|
|
|
Type:
RESOLUTION ALJ-176 CATEGORIZATION
|
Filing Date:
August 21, 2003
|
Filed By:
COMR/PUC
|
|
Description:
Resolution ALJ 176-3117; Ratification of preliminary determination of category
adopted.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 21, 2003
|
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
|
|
Description:
on jurisdictional matters.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 19, 2003
|
Filed By:
SEQUOIA GENERATING COMPANY, LLC
|
|
Description:
in response to ALJ prehearing conference questions.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 19, 2003
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
in response to ALJ's questions regarding competitive market test.
|
|
|
Type:
RESPONSE
|
Filing Date:
August 19, 2003
|
Filed By:
ORA/CAGEN/PUC
|
|
Description:
to ALJ directive.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 19, 2003
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
re the use of a competitive bid process.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 19, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on the feasibility of a mountainview RFP and alternative means for gathering
cost benchmark information.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
August 19, 2003
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
for an order compelling production of an unredacted copy of the application,
testimony and workpapers.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 19, 2003
|
Filed By:
ALLIANCE FOR RETAIN ENERGY MARKETS
WESTERN POWER TRADING FORUM
|
|
Description:
re the need for a competitive solicitation to test the conomic viability of the
Edison Mountainview project.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 19, 2003
|
Filed By:
SEMPRA ENERGY RESOURCES
|
|
Description:
Comments.
|
|
|
Type:
RESPONSE
|
Filing Date:
August 19, 2003
|
Filed By:
NAVAJO NATION
|
|
Description:
re request for proposals.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 19, 2003
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
on potential competitive bid solicitation.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 18, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON
August 11, 2003, AND APPEARED IN THE CALENDAR OF August 15, 2003. On August 7,
2003, Robert Foster, President of Southern California Edison Company (SCE) had
a telephone conversation with Pres. Peevey. Also participating in the
telephone call were ALJ Brown and Julie Fitch, advisor to Pres. Peevey. Foster
discussed the judicial responsibilities of the Commission and the Federal
Energy Regulatory Commission (FERC) with regard to the Power Purchase
Agreement. Foster explained that the proposed power purchase agreement, which
SCE seeks the Commission approval of in this proceeding, will be a
FERC-jurisdictional contract.
|
|
|
Type:
RESPONSE
|
Filing Date:
August 12, 2003
|
Filed By:
SEQUOIA GENERATING COMPANY, LLC
|
|
Description:
in opposition to IEP's motion for consolidation.
|
|
|
Type:
RESPONSE
|
Filing Date:
August 12, 2003
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
in support of the Motion to Compel of California Large Energy Consumers
Association.
|
|
|
Type:
RESPONSE
|
Filing Date:
August 12, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Motion of C.L.E.C.A. for an Order compelling the Production of a
non-redacted version of the Application Testimony and workpapers.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
August 11, 2003
|
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
|
|
Description:
for an Order compelling the production of a non-redacted version of the
Application, testimony and workpapers.
|
|
|
Type:
MOTION
|
Filing Date:
August 11, 2003
|
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
|
|
Description:
for an Order Shortening Time [ to respond to CLECA Motion to Compel].
|
|
|
Type:
RESPONSE
|
Filing Date:
August 11, 2003
|
Filed By:
CALIFORNIA SMALL BUSINESS ASSOCIATION
CALIFORNIA SMALL BUSINESS ROUNDTABLE
|
|
Description:
to the IEP's motion for consolidation with GPOIR.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 11, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
AUGMENTATION REQUIRED. On August 7, 2003, Robert Foster, President of Southern
California Edison Company had a telephone conversation with Pres. Peevey. Also
participating in the telephone call were ALJ Brown and Julie Fitch, advisor to
Pres. Peevey. Foster discussed the judicial responsibilities of the Commission
and the Federal Regulatory Commission with regard to the Power Purchase
Agreement.
|
|
|
Type:
OPPOSITION
|
Filing Date:
August 11, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Motion of Independent Energy Producers Association to Consolidate [this
Application] with R.01-10-024.
|
|
|
Type:
PROTEST
|
Filing Date:
August 8, 2003
|
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
|
|
Description:
to Application.
|
|
|
Type:
RULING
|
Filing Date:
August 1, 2003
|
Filed By:
AJL/MINKIN/PUC
|
|
Description:
Sets a prehearing conference for August 13, 2003. Directs Edison to file and
serve supplemental support for its position. Denies Edison's request fo
shorten the protest period.
|
|
|
Type:
RULING
|
Filing Date:
August 1, 2003
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Grants, in part, Edison's motion for leave to file confidential information
under seal, as set forth. Denies Edison's rquest for an order shortening time
to respond to its motion.
|
|
|
Type:
RESPONSE
|
Filing Date:
July 31, 2003
|
Filed By:
SEQUOIA GENERATING COMPANY, LLC
|
|
Description:
in Support of Application and Request for Expedited Procedural Schedule.
|
|
|
Type:
RESPONSE
|
Filing Date:
July 28, 2003
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
in opposition to [Edison's] Request for Expedited Protest Period and adoption
of Protective Order.
|
|
|
Type:
MOTION
|
Filing Date:
July 28, 2003
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
for Consolidation.
|
|
|
Type:
APPLICATION
|
Filing Date:
July 21, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
for Approval of a Power Purchase Agreement under PUHCA Section 32(k) between
the Utility and a wholly owned Subsidiary and for Authority to Recover the
Costs of such Power Purchase Agreement in Rates. (PUBLIC VERSION).
|
|
|
Type:
NOTICE
|
Filing Date:
July 21, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
of Availability of Application and Mountainview Testimony.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
July 21, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
for Leave to File Confidential Material Under Seal; and for Protective Order;
Confidential Material Attached and Filed Under Seal, namely, Unredacted
Versions of Application and Exhibit SCE-1 and Appendix A.
|
|
|
Type:
MOTION
|
Filing Date:
July 21, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
for Approval of a Memorandum Account to Track Option.
|