Number of Documents: 116
|
|
|
Type:
RESPONSE
|
Filing Date:
December 26, 2007
|
Filed By:
Utility Consumers' Action Network
|
|
Description:
to SDG&E Company's Comments on ALJ Ruling Seeking Further Information regarding
UCAN's Intervenor Compensation Request.
|
|
|
Type:
RESPONSE
|
Filing Date:
December 14, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
To the Administrative Law Judge's Ruling Seeking Further Information Regarding
Utility Consumer's Action Network Intervenor Compensation Request.
|
|
|
Type:
RULING
|
Filing Date:
November 20, 2007
|
Filed By:
ALJ/GAMSON/CPUC
|
|
Description:
Seeking Further Information Regarding Utility Consumers' Action Network
Intervenor Compensation Request. San Diego Gas & Electric Company's response
due by December 14, 2007, and Utility Consumers' Action Network's reply due no
later than December 28, 2007.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
October 2, 2007
|
Filed By:
ALJ/HECHT/CPUC
|
|
Description:
Opinion on Petition for Modification of Decision 07-04-043. Opening comments,
which shall not exceed 15 pages, are due no later than October 22, 2007. Reply
comments are due five days after opening comments are filed.
|
|
|
Type:
RESPONSE
|
Filing Date:
August 20, 2007
|
Filed By:
DRA/ANGELOPULO/CPUC
|
|
Description:
in support of the Petition of San Diego Gas & Electric Company for Modification
of Decision Number 07-04-043.
|
|
|
Type:
NOTICE
|
Filing Date:
August 14, 2007
|
Filed By:
CALJ/MINKIN/CPUC
|
|
Description:
of Co-Assignment. Administrative Law Judge Jessica T. Hecht is being
co-assigned to Application 05-03-015.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
August 3, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
of Decision 07-04-043.
|
|
|
Type:
REQUEST
|
Filing Date:
April 26, 2007
|
Filed By:
Utility Consumers' Action Network
|
|
Description:
for Award of Compensation.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 10, 2007
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
On April 5, 2007, Lad Lorenz, Vice President-Regulatory Affairs, San Diego Gas
& Electric Company (SDG&E), met with Cmmr. Grueneich in San Francisco. Also
present were Nilgun Atamturk, advisor to Cmmr. Grueneich; and Ted Reguly,
Director-Advanced Metering Infrastructure (AMI) Project, and Billy Blattner,
CPUC Relations Manager, for SDG&E. Lorenz expressed SDG&E's strong support for
the AMI settlement and proposed decision (PD) adopting it and suggested that
the PD be modified to order SDG&E to file appropriate advice letters. Lorenz
recommended that the avoided cost and demand response benefit estimates used
for analytical purposes in the PD not be precedential. Blattner subsequently
sent electronically written materials (attached to the notice) to advisor
Atamturk.
|
|
|
Type:
COMMENTS
|
Filing Date:
April 2, 2007
|
Filed By:
Utility Consumers' Action Network
|
|
Description:
Reply; on the Proposed Decision of ALJ Gamson.
|
|
|
Type:
COMMENTS
|
Filing Date:
April 2, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; on the Proposed Decision of ALJ Gamson.
|
|
|
Type:
COMMENTS
|
Filing Date:
April 2, 2007
|
Filed By:
DRA/ANGELOPULO/CPUC
|
|
Description:
Reply; on the Proposed Decision of ALJ Gamson.
|
|
|
Type:
COMMENTS
|
Filing Date:
April 2, 2007
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on the Proposed Decision of ALJ Gamson.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 28, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
on the Proposed Decision of ALJ Gamson.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 28, 2007
|
Filed By:
Utility Consumers' Action Network
|
|
Description:
on Proposed Decision of ALJ Gamson.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 28, 2007
|
Filed By:
DRA/ANGELOPULO/CPUC
|
|
Description:
on the Proposed Decision of ALJ Gamson.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 16, 2007
|
Filed By:
DRA/ANGELOPULO/CPUC
|
|
Description:
On March 13, 2007, Robert Kinosian, policy advisor for the Division of
Ratepayer Advocates (DRA), met with Pres. Peevey in San Francisco. Also present
was Andy Schwartz, advisor to Pres. Peevey. Written materials (attached to the
notice) were used. Kinosian discussed the additional benefits obtained in
DRA's settlement with San Diego Gas & Electric Company (SDG&E) in comparison to
SDG&E's original proposal.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
March 8, 2007
|
Filed By:
ALJ/GAMSON/CPUC
|
|
Description:
Opinion Approving Settlement on SDG&E Advanced Metering Infrastructrure
Project. Opening Comments, which shall not exceed 15 pages, are due no later
than March 28, 2007. Reply Comments are due five (5) days after Opening
Comments are due.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 21, 2007
|
Filed By:
Silicon Valley Leadership Group
eMeter Corporation
|
|
Description:
in Support of Joint Motion for Adoption of Settlement Agreement.
|
|
|
Type:
RULING
|
Filing Date:
February 16, 2007
|
Filed By:
ALJ/GAMSON/CPUC
|
|
Description:
The Settling Parties to the February 9, 2007 settlement shall provide answers
in writing to the questions in this Ruling by February 23, 2007 to the Service
List. Evidentiary Hearing scheduled for February 27, 2007 10 am.
|
|
|
Type:
RULING
|
Filing Date:
February 13, 2007
|
Filed By:
ALJ/GAMSON/CPUC
|
|
Description:
Shortening Comment Period on Motion for Settlement. The Joint Motion of SDG&E,
DRA and UCAN to shorten the comment period on the settlement filed February 9,
2007 is granted. Comments on the Motion for Settlement are due on February 20,
2007.
|
|
|
Type:
MOTION
|
Filing Date:
February 9, 2007
|
Filed By:
DRA/APPLING/CPUC
SAN DIEGO GAS & ELECTRIC COMPANY
UTILITY CONSUMERS' ACTION NETWORK
|
|
Description:
Joint; for adoption of Settlement Agreement.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
February 9, 2007
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
to File Confidential Information Under Seal, namely, confidential portions of
the Joint Settlement Agreement.
|
|
|
Type:
RULING
|
Filing Date:
January 26, 2007
|
Filed By:
ALJ/GAMSON/CPUC
|
|
Description:
granting SDG&E's request for an extension of the deadline for proposing a
settlement under Rule 12.1(a). Any Rule 12 settlement shall be proposed no
later than February 9, 2007.
|
|
|
Type:
RECALENDARED
|
Filing Date:
January 17, 2007
|
Filed By:
DOCKET/ALJ/PUC
|
|
Description:
This ex parte was originally filed on 1/11/07 and originally appeared on the
1/16/07 Daily Calendar. The docket number was inadvertently omitted.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 16, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
to the Ruling of ALJ Gamson.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 16, 2007
|
Filed By:
DRA/ANGELOPULO/CPUC
|
|
Description:
on the response of SDG&E to the Ruling of ALJ Gamson.
|
|
|
Type:
EXPARTE
|
Filing Date:
January 12, 2007
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
On January 9, 2007, Anne Smith, Senior Vice President-Customer Service, San
Diego Gas & Electric Company (SDG&E), met with Andy Schwartz, advisor to
President Peevey in San Francisco. Also present were Lad Lorenz, Vice
President-Regulatory Affairs, Ted Reguly, Director-Advanced Metering
Infrastructure (AMI), and Billy Blattner, CPUC Relations Manager, for SDG&E.
Written material (attached to the notice) was used. Smith stated that SDG&E's
AMI case supports state policy goals and is cost-effective. Smith explained
that differences over the analysis timeframe do not substantially impact the
net present value. Smith further explained that $85/kW is a reasonable
estimate for the carrying cost of a peaker plant.
|
|
|
Type:
EXPARTE
|
Filing Date:
January 12, 2007
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
On January 9, 2007, Anne Smith, Senior Vice President-Customer Service, San
Diego Gas & Electric Company (SDG&E), met with Stephen St. Marie, advisor to
Cmmr. Bohn in San Francisco. Also present were Lad Lorenz, Vice
President-Regulatory Affairs, Ted Reguly, Director-Advanced Metering
Infrastructure (AMI), and Billy Blattner, CPUC Relations Manager, for SDG&E.
Written material (attached to the notice) was used. Smith stated that SDG&E's
AMI case supports state policy goals and is cost-effective. Smith explained
that differences over the analysis timeframe do not substantially impact the
net present value. Smith further explained that $85/kW is a reasonable
estimate for the carrying cost of a peaker plant.
|
|
|
Type:
EXPARTE
|
Filing Date:
January 12, 2007
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
On January 9, 2007, Anne Smith, Senior Vice President-Customer Service, San
Diego Gas & Electric Company (SDG&E), met with Lynn Carew, Chief of Staff to
Cmmr. Chong in San Francisco. Also present were Lad Lorenz, Vice
President-Regulatory Affairs, Ted Reguly, Director-Advanced Metering
Infrastructure (AMI), and Billy Blattner, CPUC Relations Manager, for SDG&E.
Written material (attached to the notice) was used. Smith stated that SDG&E's
AMI case supports state policy goals and is cost-effective. Smith explained
that differences over the analysis timeframe do not substantially impact the
net present value. Smith further explained that $85/kW is a reasonable
estimate for the carrying cost of a peaker plant.
|
|
|
Type:
EXPARTE
|
Filing Date:
January 11, 2007
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
On January 8, 2007, Anne Smith, Senior Vice President-Customer Service, San
Diego Gas & Electric Company (SDG&E), met with Cmmr. Grueneich in San
Francisco. Also present were Nilgun Atamturk, advisor to Cmmr. Grueneich; and
Lad Lorenz, Vice President-Regulatory Affairs, Ted Reguly, Director-Advanced
Metering Infrastructure (AMI), and Billy Blattner, CPUC Relations Manager, for
SDG&E. Written material (attached to the notice) was used. Smith stated that
SDG&E's AMI case supports state policy goals and is cost-effective. Smith
explained that differences over the analysis timeframe do not substantially
impact the net present value. Smith further explained that $85/kW is a
reasonable estimate for the carrying cost of a peaker plant.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 4, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
to the Ruling of ALJ Gamson (dated Dec 15, 2006).
|
|
|
Type:
RULING
|
Filing Date:
December 15, 2006
|
Filed By:
ALJ/GAMSON/CPUC
|
|
Description:
REOPENING THE RECORD AND REQUESTING FURTHER INFORMATION REGARDING SDG&E'S AMI
PROPOSAL. SDG&E shall provide information set forth to the service list by
January 2, 2007. Parties, including SDG&E, may comment by January 9, 2007.
SDG&E's information and parties' comments will become part of the record.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 12, 2006
|
Filed By:
DRA/PAULL/PUC
|
|
Description:
On December 8, 2006, Robert Kinosian of the Division of Ratepayer Advocates
(DRA), met with Nilgun Atamturk, advisor to Cmmr. Grueneich, in San Francisco.
Written material (attached to the notice) was used. Also present was Ted Geilen
of the DRA. Kinosian and Geilen explained that San Diego Gas & Electric
Company's (SDG&E) proposal is not cost effective, and that DRA's recommendation
to the Commission is that instead of approving it, the Commission should
authorize a new phase that would consider whether an AMI proposal similar to
the one being prepared by Southern California Edison (to be filed in June 2007)
might be cost-effective for SDG&E.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 4, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
ON THE PROPOSED DECISION OF ALJ GAMSON.
|
|
|
Type:
RESPONSE
|
Filing Date:
November 21, 2006
|
Filed By:
DRA/ANGELOPULO/CPUC
|
|
Description:
Opposition to SDG&E Motion to Strike.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
November 14, 2006
|
Filed By:
ALJ/Gamson/CPUC
|
|
Description:
OPINION REGARDING SAN DIEGO GAS & ELECTRIC COMPANY'S
PETITION FOR MODIFICATION
OF DECISION (D.) 05-08-018. Comments are due December 4, 2006; reply comments -
five days after comments are filed.
|
|
|
Type:
BRIEF
|
Filing Date:
November 13, 2006
|
Filed By:
Utility Consumers' Action Network
|
|
Description:
REPLY.
|
|
|
Type:
BRIEF
|
Filing Date:
November 13, 2006
|
Filed By:
DRA/ANGELOPULO/CPUC
|
|
Description:
Reply;
|
|
|
Type:
BRIEF
|
Filing Date:
November 13, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply;
|
|
|
Type:
MOTION
|
Filing Date:
November 6, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
to Strike.
|
|
|
Type:
REPLY
|
Filing Date:
November 3, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
TO DRA'S OPPOSITION TO PETITION TO MODIFY D05-08-018 APPROVING SETTLEMENT ON
PRE-DEPLOYMENT COSTS.
|
|
|
Type:
BRIEF
|
Filing Date:
October 27, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
OPENING.
|
|
|
Type:
BRIEF
|
Filing Date:
October 27, 2006
|
Filed By:
DRA/PAULL/ANGELOPULO/PUC
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
October 27, 2006
|
Filed By:
Utility Consumers' Action Network
|
|
Description:
Opening
|
|
|
Type:
EXPARTE
|
Filing Date:
October 26, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
On October 24, 2005, Ed Fong, Customer Operations Director, San Diego Gas &
Electric Company (SDG&E), met with Nilgun Atamturk, advisor to Cmmr. Grueneich,
in San Francisco. Also present were Stephen St. Marie, advisor to Cmmr. Bohn,
Moises Chavez and Michael Rossauer of the Energy Division, David Hungerford of
the California Energy Commission, and Kathe Cordova, Regulatory Case Manager,
Beth Rolls Mathewson, Stakeholder Contact Manager, and Bill Blattner, CPUC
Relations Manager, for SDG&E. Written material (attached to the notice) was
used. Blattner stated that SDG&E's AMI case is aligned with the State demand
response policy goals articulated in the Energy Action Plan II. Cordova
described the deployment schedule and the need for rollover pre-deployment and
bridge funding. Cordova explained that SDG&E's case is cost-effective for all
customers and includes significant demand response benefits. Fong explained the
open-architecture and other technology requirements. Fong also explained that
the exemplary residential rate structure provides incentives, not penalties,
and is AB 1X compliant.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 26, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
On October 23, 2005, Ed Fong, Customer Operations Director, San Diego Gas &
Electric Company (SDG&E), met with Lynn Carew, advisor to Cmmr. Chong, in San
Francisco. Also present were Andrew Campbell, advisor to Cmmr. Chong, and Kathe
Cordova, Regulatory Case Manager, Beth Rolls Mathewson, Stakeholder Contact
Manager, and Bill Blattner, CPUC Relations Manager, for SDG&E. Written material
(attached to the notice) was used. Blattner stated that SDG&E's AMI case is
aligned with the State demand response policy goals articulated in the Energy
Action Plan II. Cordova described the deployment schedule and the need for
rollover pre-deployment and bridge funding. Cordova explained that SDG&E's case
is cost-effective for all customers and includes significant demand response
benefits. Fong explained the open-architecture and other technology
requirements. Fong also explained that the exemplary residential rate structure
provides incentives, not penalties, and is AB 1X compliant.
|
|
|
Type:
RESPONSE
|
Filing Date:
October 24, 2006
|
Filed By:
DRA/ANGELOPULO/CPUC
|
|
Description:
Opposition to SDG&E's Petition to Modify Decision 05-08-018.
|
|
|
Type:
TRANSCRIPT
|
Filing Date:
October 10, 2006
|
Filed By:
REPORTING DIVISION
|
|
Description:
Submitted; Volume 7.
|
|
|
Type:
MOTION
|
Filing Date:
September 19, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
for an Order Limiting Access to Prepared Testimony.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
September 1, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
of Decision 05-08-018 approving Settlement of Pre-Deployment Costs.
|
|
|
Type:
RULING
|
Filing Date:
August 14, 2006
|
Filed By:
ALJ/GAMSON/CPUC
CMMR/GRUENEICH/CPUC
|
|
Description:
Assigned Commissioner and Administrative Law Judge Ruling regarding
participation of the California Energy Commission.
|
|
|
Type:
NOTICE
|
Filing Date:
August 9, 2006
|
Filed By:
CALJ/MINKIN/PUC
|
|
Description:
resetting date of prehearing conference.
|
|
|
Type:
RESPONSE
|
Filing Date:
July 26, 2006
|
Filed By:
THE UTILITY CONSUMERS ACTION NETWORK
|
|
Description:
to SDG&E Motion for Protective Order.
|
|
|
Type:
RULING
|
Filing Date:
July 21, 2006
|
Filed By:
ALJ/Gamson/PUC
|
|
Description:
Modifeis the procedural schedule in response to the July 18th motion by the DRA
and UCAN. Sets a prehearing conference for September 14, 2006.
|
|
|
Type:
RESPONSE
|
Filing Date:
July 20, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
to UCAN + DRA Motion to Modify the Procedural Schedule.
|
|
|
Type:
MOTION
|
Filing Date:
July 18, 2006
|
Filed By:
DRA/ANGELOPULO/CPUC
Utility Consumers' Action Network
|
|
Description:
to Modify the Procedural Schedule.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
July 12, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Motion for Protective Order (No envelopes accompanied the Motion. MMN).
|
|
|
Type:
RULING
|
Filing Date:
July 5, 2006
|
Filed By:
ALJ/GAMSON/CPUC
|
|
Description:
Denies SDG&E's June 9, 2006 motion for leave to propose a critical peak pricing
rate. Extends the 18-month deadline for resolution of the proceeding. Grants
the motions of the City of San Diego and Silicon Valley Leadership Group to
intervene.
|
|
|
Type:
MOTION
|
Filing Date:
June 26, 2006
|
Filed By:
SILICON VALLEY LEADERSHIP GROUP
|
|
Description:
to intervene relative to critical peak pricing rate proposals.
|
|
|
Type:
RESPONSE
|
Filing Date:
June 26, 2006
|
Filed By:
SILICON VALLEY LEADERSHIP GROUP
|
|
Description:
to Motion of SDG&E for leave to propose a critical peak pricing rate.
|
|
|
Type:
RESPONSE
|
Filing Date:
June 23, 2006
|
Filed By:
CPUC/DRA/ANGELOPULO
|
|
Description:
THE DIVISION OF RATEPAYER ADVOCATES' RESPONSE TO THE MOTION OF SAN DIEGO GAS &
ELECTRIC COMPANY FOR LEAVE TO PROPOSE A CRITICAL PEAK PRICING RATE.
|
|
|
Type:
RESPONSE
|
Filing Date:
June 16, 2006
|
Filed By:
CITY OF SAN DIEGO
|
|
Description:
to Motion of SDG&E for Leave to Propose a Critical Peak Pricing Rate.
|
|
|
Type:
MOTION
|
Filing Date:
June 16, 2006
|
Filed By:
CITY OF SAN DIEGO
|
|
Description:
to Intervene (relative to Critical Peak Pricing Rate Proposals).
|
|
|
Type:
RULING
|
Filing Date:
June 14, 2006
|
Filed By:
ALJ/GAMSON/CPUC
|
|
Description:
GIVING CALIFORNIA ENERGY COMMISSION PARTY STATUS AND GRANTING MOTION TO
INTERVENE OF CELLNET TECHNOLOGIES, INC.
|
|
|
Type:
MOTION
|
Filing Date:
June 9, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
for Leave to Propose a Critical Peak Pricing Rate.
|
|
|
Type:
MOTION
|
Filing Date:
May 24, 2006
|
Filed By:
CELLNET TECHNOLOGY, INC.
|
|
Description:
for full party status; entry of appearance
|
|
|
Type:
RULING
|
Filing Date:
May 19, 2006
|
Filed By:
ALJ/GAMSON/PUC
|
|
Description:
Grants the April 28, 2006 motion to modify the schedule. Adopts the following
new schedule: evidentiary hearing - 9/25/6; concurrent briefs - 10/27/6; reply
briefs - 11/10/6; final decision - February 2007. SDG&E may file a petition to
modfiy D05-08-018 to extend bridge funding authorized no later than September
1, 2006.
|
|
|
Type:
RESPONSE
|
Filing Date:
May 15, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
to Motion for Modification of the Procedural Schedule.
|
|
|
Type:
NOTICE
|
Filing Date:
May 5, 2006
|
Filed By:
CALJ/MINKIN/PUC
|
|
Description:
of reassignment.
|
|
|
Type:
MOTION
|
Filing Date:
April 28, 2006
|
Filed By:
DRA/ANGELOPULO/PUC
TURN
UCAN
|
|
Description:
for modification of the procedural schedule
|
|
|
Type:
EXPARTE
|
Filing Date:
March 20, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
On March 15, 2006, Lad Lorenz, Vice President-Regulatory Affairs, San Diego Gas
& Electric Company (SDG&E), met with Nancy Ryan, advisor to Pres. Peevey, in
San Francisco. Also present were Nilgun Atamturk, advisor to Cmmr. Grueneich,
July Fitch, Director of the Division of Strategic Planning, Sean Gallagher,
Director of the Energy Division, and Billy Blattner, CPUC Relations Manager,
and Ed Fong, Director of Customer Operations, for SDG&E. Written material
(attached to the notice) was used. Lorenz stated that SDG&E is going forward
with its Advanced Metering Infrastructure (AMI) case. Fong explained that
SDG&E's current AMI schedule and Request for Proposals does not include
Broadband over Powerlines (BPL) technology for AMI communications. Fong stated
that SDG&E may propose to incorporate BPL at a later date. Fong added that a
substantial part of SDG&E's AMI business case relies on demand response
benefits and that the avoided capacity costs should reflect an appropriate
proxy for the SDG&E system and should not be determined in other proceedings.
|
|
|
Type:
EXPARTE
|
Filing Date:
January 30, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
On January 25, 2006, Billy Blattner, CPUC Relations Manager, San Diego Gas &
Electric Company (SDG&E), met with Aaron Johnson, advisor to Cmmr. Grueneich,
at Peet's Coffee, 601 Van Ness Avenue, in San Francisco. Blattner urged the
Commission to approve SDG&E's Critical Peak Pricing (CPP) settlement by March
2, 2006. Blattner stated that the Energy Action Plan and Commission decisions
support moving to dynamic pricing and that the settlement maintains positive
momentum toward that goal. Blattner added that SDG&E has committed to obtaining
consent from customers before switching them to the default CPP tariff.
Blattner recommended that subsequent SPP issues be addressed in the Advanced
Metering Infrastructure docket.
|
|
|
Type:
EXPARTE
|
Filing Date:
January 25, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
On January 24, 2006, Lad Lorenz, Vice President-Regulatory Affairs, San Diego
Gas & Electric Company (SDG&E) met with Nancy Ryan, advisors to Cmmr. Peevey,
in San Francisco. Also present were Rami Kahlon, advisor to Cmmr. Peevey, Julie
Fitch, Director of Strategic Planning Division, and Billy Blattner, CPUC
Relations Manager, Mark Gaines, Director-Customer Programs, and Joe Velasquez,
Director-Commercial and Industrial Services, for SDG&E. Written material
(attached to the notice) was used. Lorenz urged the Commission to approve
SDG&E's CPP settlement by March 2, 2006. Blattner stated that the Energy Action
Plan and Commission decisions support moving to dynamic pricing and that the
settlement maintains positive momentum toward that goal. Velasquez noted that
the settlement would result in modest peak demand reduction in 2006 while
providing customer protection from adverse bill impacts in the first year.
Velasquez added that SDG&E has committed to obtaining consent from customers
before switching them to the default CPP tariff. Blattner recommended that
subsequent CPP issues be addressed in the Advanced Metering Infrastructure
docket.
|
|
|
Type:
EXPARTE
|
Filing Date:
January 23, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
LATE FILED. On January 12, 2006, Kelly M. Morton, attorney for San Diego Gas &
Electric Company (SDG&E), telephoned ALJ Cooke. During the telephone
conversation, Morton provided the Commission with confirmation regarding data
previously submitted by SDG&E and discussed a potential overlap between
A05-01-017 and A05-03-015.
|
|
|
Type:
RULING
|
Filing Date:
November 18, 2005
|
Filed By:
ALJ/COOKE/PUC
|
|
Description:
Modifies the schedule in response to the October 20, 2005 motion by SDG&E to
modify the schedule, as follows: evidentiary hearing - 7/10/6; opening briefs -
8/22/6; reply briefs - 9/5/6; final decision - December 2006.
|
|
|
Type:
RESPONSE
|
Filing Date:
November 3, 2005
|
Filed By:
UTILITY CONSUMERS' ACTION NETWORK
|
|
Description:
to SDG&E's Motion for Modification of the Procedural Schedule.
|
|
|
Type:
RESPONSE
|
Filing Date:
November 2, 2005
|
Filed By:
ORA/ANGELOPULO/PUC
|
|
Description:
to the motion of SDG&E for modification of the procedural schedule.
|
|
|
Type:
RESPONSE
|
Filing Date:
November 1, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
to SDG&E's motion for modification of the procedural schedule.
|
|
|
Type:
MOTION
|
Filing Date:
October 20, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
for Modification of the Procedural Schedule.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 18, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
On October 13, 2005, Lad Lorenz, Vice President-Regulatory Affairs, San Diego
Gas & Electric Company (SDG&E), met with Julie Fitch, advisor to Pres. Peevey,
in San Francisco. Also present were Billy Blattner, CPUC Relations Manager, Ted
Reguly, AMI Program Office Director, Ed Fong, Customer Operations Direction,
and Kathe Hunter Cordova, Regulatory Case Manager, for SDG&E. Written material
(attached to the notice) was used. Blattner stated that SDG&E plans to file a
motion requesting that the procedural schedule be modified. Reguly explained
that SDG&E will be issuing a request for proposals for AMI solutions and that
the new information will be useful in updating the costs and benefits of
SDG&E's case-in-chief. Fong elaborated that the October 7th supplemental filing
relies on the original 2004 case-in-chief cost and benefit data and analysis of
this data should be considered in light of the fact that the data will be
updated. Fong added that SDG&E will also provide a proposal for a new voluntary
residential dynamic rate and an update of the associated demand response
impacts and benefits.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 18, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
On October 17, 2005, Billy Blattner, CPUC Relations Manager, San Diego Gas &
Electric Company (SDG&E), met with Aaron Johnson, advisor to Cmmr. Grueneich,
at the San Diego Association of Governments offices in San Diego. Written
material (attached to the notice) was used. Blattner stated that SDG&E plans to
file a motion requesting that the procedural schedule be modified. Blattner
explained that SDG&E will be issuing a request for proposals for AMI solutions
and that the new information will be useful in updating the costs and benefits
of SDG&E's case-in-chief. Blattner noted that the October 7th supplemental
filing relies on the original 2004 case-in-chief cost and benefit data and
analysis of this data should be considered in light of the fact that the data
will be updated.
|
|
|
Type:
REQUEST
|
Filing Date:
October 11, 2005
|
Filed By:
UTILITY CONSUMERS ACTION NETWORK
|
|
Description:
for Award of Compensation.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 22, 2005
|
Filed By:
CALIFORNIA CONSUMER EMPOWERMENT ALLIANCE
|
|
Description:
on the draft decision approving settlement on pre-deployment costs.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 15, 2005
|
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
THE UTILITY REFORM NETWORK
|
|
Description:
on the draft decision adopting settlement on pre-deployment costs.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 15, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
on the Draft Decision of ALJ Cooke.
|
|
|
Type:
DRAFT DECISION
|
Filing Date:
July 26, 2005
|
Filed By:
ALJ/COOKE/PUC
|
|
Description:
Decision approving settlement on pre-deployment costs. Comments are due August
15, 2005; reply comments - 5 days after comments are filed.
|
|
|
Type:
RULING
|
Filing Date:
July 26, 2005
|
Filed By:
ALJ/COOKE/PUC
|
|
Description:
Modifies a schedule, as follows: evidentiary hearings - 1/30-2/10/06; opening
briefs/request for final oral argument - 3/8/6; reply briefs - 3/17/6; decision
- July 2006.
|
|
|
Type:
RULING
|
Filing Date:
July 20, 2005
|
Filed By:
ALJ/COOKE/PUC
|
|
Description:
Finds UCAN and TURN eligible to claim compensation.
|
|
|
Type:
NOTICE
|
Filing Date:
July 15, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
of intent to claim compensation.
|
|
|
Type:
OPPOSITION
|
Filing Date:
July 15, 2005
|
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
THE UTILITY REFORM NETWORK
|
|
Description:
to the Motion of SDG&E, et al. for Approval of Settlement Agreement.
|
|
|
Type:
SUPPLEMENT
|
Filing Date:
July 8, 2005
|
Filed By:
CALIFORNIA CONSUMER EMPOWERMENT ALLIANCE
HUNT TECHNOLOGIES, INC.
ORA/PAULL/PUC
SAN DIEGO GAS & ELECTRIC COMPANY
THE UTILITY CONSUMERS ACTION NETWORK
|
|
Description:
to Motion for Approval of Settlement Agreement re: Pre-Deployment Funding and
related issues.
|
|
|
Type:
NOTICE
|
Filing Date:
July 8, 2005
|
Filed By:
THE UTILITY CONSUMERS ACTION NETWORK
|
|
Description:
of Intent to Claim Compensation.
|
|
|
Type:
SCOPING RULING
|
Filing Date:
July 1, 2005
|
Filed By:
CMMR/GRUENEICH/PUC
|
|
Description:
Confirms that this is a ratesetting proceeding. Notices of intent to claim
compensation should be filed not later than July 15, 2005. Sets evidentiary
hearing for July 10-24, 2006; opening briefs - 8/22/6; reply briefs - 9/5/6;
decision - December 2006 [as modified by the Ruling of July 26, 2005; as
modified by the Ruling of November 18, 2005]].
|
|
|
Type:
MOTION
|
Filing Date:
July 1, 2005
|
Filed By:
CALIFORNIA CONSUMER EMPOWERMENT ALLIANCE
HUNT TECHNOLOGIES, INC.
ORA/PAULL/PUC
SAN DIEGO GAS & ELECTRIC COMPANY
THE UTILITY CONSUMERS' ACTION NETWORK
|
|
Description:
for Approval of Settlement Agreement re: Pre-Deployment Funding and related
issues.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 30, 2005
|
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
|
|
Description:
June 27, 2005, Marc Joseph, attorney for the Coalition of California Utility
Employees (CUE), participated in a telephone conversation with Aaron Johnson,
advisor to Cmmr. Grueneich. Joseph explained the reason for the different
position of CUE in the Pacific Gas and Electric Company (PG&E) and San Diego
Gas & Electric Company (SDG&E) AMI proceedings. Joseph noted that PG&E has
presented a case showing that AMI would be cost effective and had agreed to
measures to protect utility employees that would be adversely affected. SDG&E
has done neither.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 30, 2005
|
Filed By:
UTILITY REFORM NETWORK
|
|
Description:
On June 30, 2005, Nina Suetake of The Utility Reform Network, sent an email
(attached to the notice) to ALJ Cooke. The email note concerned a marginal
capacity cost value for San Diego Gas & Electric Company AMI scenario analysis.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 24, 2005
|
Filed By:
ORA/PAULL/PUC
|
|
Description:
LATE FILED. On June 16, 2005, Dana Appling, Director of the Office of
Ratepayer Advocates (ORA), met with Cmmr. Grueneich in San Francisco. Also
present were Aaron Johnson, advisor to Cmmr. Grueneich, and Christopher Blunt
and Robert Kinosian, Regulatory Analysts, James Scarff and Karen Paull,
counsel, for ORA. Scarff and Kinosian observed that in response to the May 9
ruling, San Diego Gas & Electric Company (SDG&E) had scaled back significantly
the scope of work and had reduced its request for pre-deployment finding from
$50.3 million to no more than $9.3 million. ORA also noted that SDG&E's plan
appeared to acknowledge realistically the risks and uncertainties associated
with AMI deployment, and the proposal includes evaluation pointes and
"off-ramps" that seem prudent to ORA. Kinosian summarized the provisions of the
proposed settlement, and indicated that ORA supported it in principle. On Phase
2 issues, ORA suggested that for purposes of developing a useful record on
demand response benefits, parties should be advised that only demand response
scenarios consistent with AB1X would be considered.
|
|
|
Type:
RULING
|
Filing Date:
June 21, 2005
|
Filed By:
ALJ/COOKE/PUC
|
|
Description:
Grants SDG&E's motion for leave to file documents under seal, filed on March
30, 2005.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 16, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
On June 13, 2005, Lad Lorenz, Vice President-Regulatory Affairs, San Diego Gas
& Electric Company (SDG&E), met with Cmmr. Grueneich at Oliveto Café and
Restaurant in Oakland. Also present were Debra Reed, President and Chief
Operational Officer, and Anne Smith, Senior Vice President of Consumer
Services, for SDG&E. Reed and Smith reiterated SDG&E's support for AMI but
cautioned that the cost effectiveness cannot be justified solely on the basis
of operational benefits and instead is also dependent upon demand response
savings.
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
June 13, 2005
|
Filed By:
ORA/SCARFF/PUC
|
|
Description:
[in response to May 9, 2005 ruling.]
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
June 10, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
per 5/9/05 ACR.
|
|
|
Type:
MOTION
|
Filing Date:
May 24, 2005
|
Filed By:
HUNT TECHNOLOGIES, INC.
|
|
Description:
for full party status and entry of appearance.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 16, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
On May 12, 2005, Lad Lorenz, Vice President-Regulatory Affairs, San Diego Gas &
Electric Company (SDG&E), met with Aaron Johnson, advisor to Cmmr. Brown, in
San Francisco. Also present were Peter Hanson, advisor to Cmmr. Brown, and
Billy Blattner, CPUC Relations Manager, Ed Fong, Director-Advanced Metering
Infrastructure (AMI), and Chris Bing, Regulatory Case Administrator, for SDG&E.
Written material (attached to the notice) was used. Fong described SDG&E's
proposal to fully deploy AMI by 2010 and explained that SDG&E's proposal
projects net present value of benefits of $48 million, meets the functional
criteria reiterated in the recent Assigned Commissioner's Ruling (ACR) and
contains off-ramps should costs, benefits or implementation differ
significantly from expectations. Fong and Lorenz explained that SDG&E's
business case depends in substantial part on demand response benefits and may
not be justified on operational benefits to the extent suggested in the ACR.
|
|
|
Type:
RULING
|
Filing Date:
May 9, 2005
|
Filed By:
CMMR/GRUENEICH/PUC
|
|
Description:
Laying Out Approach to the Case, Scheduling a Prehearing Conference (PHC) and
Other Procedural Matters. Sets the following schedule: June 15, 2005 - PHC for
functionality phase; 6/16 - evidentiary hearing on functionality, etc.; 7/11/05
- opening brief; 7/18/5 - reply brief; 9/6/5 - evidentiary hearing on case in
chief; 10/7/5 - opening brief; 10/24/5 - reply brief; February 2006 - decision.
|
|
|
Type:
RESPONSE
|
Filing Date:
May 5, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
to Protests of ORA,TURN, CUE and UCAN.
|
|
|
Type:
RESPONSE
|
Filing Date:
May 2, 2005
|
Filed By:
CALIFORNIA CONSUMER EMPOWERMENT ALLIANCE
|
|
Description:
to the Application.
|
|
|
Type:
PROTEST
|
Filing Date:
April 22, 2005
|
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
THE UTILITY REFORM NETWORK
|
|
Description:
to Application.
|
|
|
Type:
PROTEST
|
Filing Date:
April 22, 2005
|
Filed By:
ORA/SCARFF/PUC
|
|
Description:
to Application.
|
|
|
Type:
PROTEST
|
Filing Date:
April 22, 2005
|
Filed By:
UTILITY CONSUMERS ACTION NETWORK
|
|
Description:
to Application.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 15, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
April 12, 2005, Marcel Hawiger, staff attorney with The Utility Reform Network,
sent an email (attached to the notice) to ALJ Cooke.
|
|
|
Type:
RESOLUTION ALJ-176 CATEGORIZATION
|
Filing Date:
April 7, 2005
|
Filed By:
COMR/PUC
|
|
Description:
Resolution ALJ 176-3150; Ratification of preliminary determination of category
adopted.
|
|
|
Type:
AMENDED APPLICATION
|
Filing Date:
March 30, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
(Public Version). The Amendment consists of additional testimony and revised
direct testimonies. The text and exhibits of the Amended Application supersede
the original filing of March 15, 2005.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
March 30, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Motion for Protective Order; Confidential Materials Attached and Filed Under
Seal, namely, Revised Appendices A and B (Chapter 6) and Revised Appendix C
(Chapter 13) and Attachment B, Tables B-2 and B-3 (Chapter 16) of the Amended
Application filed concurrently herewith.
|
|
|
Type:
APPLICATION
|
Filing Date:
March 15, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Application of San Diego Gas & Electric Company (U-902-E) for Adoption of an
Advanced Metering Infrastructure Deployment Scenario and Associated Cost
Recovery and Rate Design (Public Version).
|
|
|
Type:
LAW & MOTION
|
Filing Date:
March 15, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
for Protective Order; Confidential Materials Attached and Filed Under Seal,
namely, Appendices A and B (Chapter 6) and Appendix C (Chapter 13) to the
Application filed concurrently herewith.
|