DOCUMENTS
Number of Documents: 141
(only the most current 100 are displayed)
Display all documents for this proceeding
|
Type:
REQUEST
|
Filing Date:
February 13, 2007
|
Filed By:
The Utility Reform Network c/o Hayley Goodson
|
|
Description:
for Award of Compensation.
|
Type:
RESPONSE
|
Filing Date:
January 31, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
to Application for Rehearing of Decision 06-12-013.
|
Type:
REHEARING REQUEST
|
Filing Date:
January 16, 2007
|
Filed By:
DRA/Diana Lee/CPUC
The Utility Reform Network
|
|
Description:
Application for Rehearing of Decision 06-12-013.
|
Type:
COMMENTS
|
Filing Date:
December 11, 2006
|
Filed By:
County Of Los Angeles
Government Partners
South Bay Cities Council of Governments
University of California
|
|
Description:
Reply; on Proposed Decision of ALJ Gamson.
|
Type:
COMMENTS
|
Filing Date:
December 11, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; on the Proposed Order Approving Petition for Modification of Decision 05-09-043 with Modifications.
|
Type:
COMMENTS
|
Filing Date:
December 11, 2006
|
Filed By:
DRA/LEE/CPUC
The Utility Reform Network
|
|
Description:
Reply; on the Palm Desert Proposed Decision of ALJ Gamson.
|
Type:
COMMENTS
|
Filing Date:
December 4, 2006
|
Filed By:
The Energy Coalition
|
|
Description:
ON ALJ GAMSON'S PROPOSED DECISION APPROVING SOUTHERN CALIFORNIA EDISON COMPANY PETITION FOR MODIFICATION OF D05-09-043, WITH MODIFICATIONS.
|
Type:
COMMENTS
|
Filing Date:
December 4, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
ON THE PROPOSED ORDER APPROVING PETITION FOR MODIFICATION OF D05-09-043, WITH MODIFICATIONS.
|
Type:
COMMENTS
|
Filing Date:
December 4, 2006
|
Filed By:
Southern California Gas Company
|
|
Description:
TO THE PROPOSED DECISION OF ALJ GAMSON ON SOUTHERN CALIFORNIA EDISON COMPANY'S PETITION FOR MODIFICATION OF D05-09-043.
|
Type:
COMMENTS
|
Filing Date:
December 4, 2006
|
Filed By:
DRA/LEE/PUC
THE UTILITY REFORM NETWORK
|
|
Description:
on the Palm Desert Proposed Decision of ALJ Gamson.
|
Type:
PROPOSED DECISION
|
Filing Date:
November 14, 2006
|
Filed By:
ALJ/Gamson/CPUC
|
|
Description:
Comments are due December 4, 2006; reply comments - five days after comments are filed.
|
Type:
COMMENTS
|
Filing Date:
September 29, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; on the Utilities Compliance Submittals.
|
Type:
COMMENTS
|
Filing Date:
September 29, 2006
|
Filed By:
DRA/Lee/CPUC
|
|
Description:
Reply; on the Utilities Proposed Energy Efficiency Performance Based Incentive Mechanism.
|
Type:
REPLY
|
Filing Date:
September 29, 2006
|
Filed By:
PACFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to Comments of the Division of Ratepayer Advocates and TURN on the Utilities Compliance Submittals.
|
Type:
COMMENTS
|
Filing Date:
September 26, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; on the August 21, 2006 ALJ Ruling seeking further information.
|
Type:
COMMENTS
|
Filing Date:
September 25, 2006
|
Filed By:
DRA/LEE/CPUC
THE UTILITY REFORM NETWORK
|
|
Description:
on the Utilities' Compliance Submittals.
|
Type:
RESPONSE
|
Filing Date:
September 19, 2006
|
Filed By:
Government Partners
|
|
Description:
to Response of Southern California Edison Company to ALJ Ruling seeking Further Information.
|
Type:
RESPONSE
|
Filing Date:
September 19, 2006
|
Filed By:
DRA/LEE/PUC
THE UTILITY REFORM NETWORK
|
|
Description:
to Edison's response to ALJ Gamson's questions and amendment to reviously filed DRA/TURN Joint Response to Petition for Modification.
|
Type:
NOTICE
|
Filing Date:
September 19, 2006
|
Filed By:
CALJ/MINKIN/PUC
|
|
Description:
of co-assignment.
|
Type:
MOTION
|
Filing Date:
September 5, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
to File a Late Response to the Aug 21, 2006 ALJ's Ruling seeking Further Information.
|
Type:
RESPONSE
|
Filing Date:
September 5, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
to the Aug 21, 2006 ALJ Ruling seeking Further Information. (Late filing authorized by ALJ Dave Gamson).
|
Type:
RULING
|
Filing Date:
August 21, 2006
|
Filed By:
ALJ/GAMSON/CPUC
|
|
Description:
Seeking Further Information. Southern California Edison Company (SCE) shall respond to the questions in this Ruling no later than Sept 1, 2006. Parties may respond to SCE's filing no later than Sept 15, 2006.
|
Type:
REPLY
|
Filing Date:
August 7, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
to the Joint Response of DRA and TURN to the Petition for Modification of Decision 05-09-043, Interim Opinion.
|
Type:
RESPONSE
|
Filing Date:
July 26, 2006
|
Filed By:
DRA/LEE/PUC
THE UTILITY REFORM NETWORK
|
|
Description:
to Edison's Petition for Modification of D05-09-043.
|
Type:
RESPONSE
|
Filing Date:
July 24, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to Edison's Petition for Modification of D05-09-043.
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
June 26, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
of Decision 05-09-043.
|
Type:
EXPARTE
|
Filing Date:
April 3, 2006
|
Filed By:
LOCAL GOVERNMENT ENERGY COALITION
|
|
Description:
On March 29, 2006, Jody London, Consultant to the Local Government Energy Coalition (LGEC), met with Lynn Carew, advisor to Cmmr. Chong, in San Francisco. Also present were Andrew Campbell, advisor to Cmmr. Chong, Neal DeSnoo, Energy Officer, City of Berkeley, Howard Choy, Energy Division Manager, County of Los Angeles, and Mary Tucker, Supervising Environmental Services Specialist, City of San Jose. Written material (attached to the notice) was used. LGEC representatives described ways in which energy efficiency partnerships between utilities and local governments could be strengthened in the short- and medium-term, and identified areas for Commission involvement in strengthening the partnerships.
|
Type:
EXPARTE
|
Filing Date:
April 3, 2006
|
Filed By:
LOCAL GOVERNMENT ENERGY COALITION
|
|
Description:
On March 30, 2006, Jody London, Consultant to the Local Government Energy Coalition (LGEC), met with Stephen St. Marie, advisor to Cmmr. Bohn, Belinda Gatti, advisor to Cmmr. Brown, and Rami Kahlon, advisor to Cmmr. Peevey, in three separate meetings in San Francisco. Also present were Dan Bruinsma, Program Manager, and Mary Tucker, Supervising Environmental Services Specialist, for the City of San Jose. At the meeting with Stephen St. Marie also present were Robert Lane, advisor to Cmmr. Bohn, Jerry Lahr, Energy Manager, Association of Bay Area Governments, Cal Broomhead, Resource Efficiency Program Manager, City and County of San Francisco, and Nora Hernandez, Energy Division Supervisor, County of Los Angeles; and at the meetings with Belinda Gatti and Rami Kahlon - Ann Kelly, Senior Energy Specialist, City and County of San Francisco. Written material (attached to the notice) was used. LGEC representatives described ways in which energy efficiency partnerships between utilities and local governments could
|
Type:
EXPARTE
|
Filing Date:
March 29, 2006
|
Filed By:
LOCAL GOVERNMENT ENERGY COALITION
|
|
Description:
On March 24, 2006, Jody London, Consultant to the Local Government Energy Coalition (LGEC), contacted ALJ Gottstein by telephone. London informed the Commission that members of the LGEC were requesting meetings with the Commissioners and their staff to discuss energy efficiency partnerships.
|
Type:
RULING
|
Filing Date:
March 7, 2006
|
Filed By:
ALJ/GOTTSTEIN/PUC
|
|
Description:
Grants a motion of PG&E to bifurcate its 2006-2008 energy efficiency portfolio compliance filing. Directs PG&E to file the supplemental compliance filing on April 14, 2006, consistent with the procedures set forth in D05-01-055, Ordering Paragraph 9.
|
Type:
REPLY
|
Filing Date:
March 3, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to WEM's and CCSF's comments on PG&E's motion to bifurcate.
|
Type:
RESPONSE
|
Filing Date:
February 27, 2006
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
to PG&E's motion to bifurcate.
|
Type:
RESPONSE
|
Filing Date:
February 22, 2006
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
to the motion by PG&E to bifurcate its 2006-2008 energy efficiency portfolio compliance filing.
|
Type:
MOTION
|
Filing Date:
February 17, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
seeking an expedited ALJ ruling bifurcating its 2006-2008 energy efficiency portfolio compliance filing ordered in D05-09-043.
|
Type:
RESPONSE
|
Filing Date:
February 17, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Request for Compensation of Women's Energy Matters.
|
Type:
RESPONSE
|
Filing Date:
February 16, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to WEM's request for compensation.
|
Type:
REQUEST
|
Filing Date:
January 20, 2006
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
for compensation.
|
Type:
MOTION
|
Filing Date:
November 29, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
for Corrections to Interim Opinion.
|
Type:
REQUEST
|
Filing Date:
November 23, 2005
|
Filed By:
CENTER FOR SMALL BUSINESS AND THE ENVIRNMENT
|
|
Description:
for an award of compensation for substantial contribution to D.05-09-043.
|
Type:
REQUEST
|
Filing Date:
November 18, 2005
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
for award of intervenor compensation.
|
Type:
COMMENTS
|
Filing Date:
November 14, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; on the draft decision of ALJ Gottstein on the evaluation, etc.
|
Type:
COMMENTS
|
Filing Date:
November 14, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on the Phase 2 Draft Decision of ALJ Gottstein re 2006-2008 EM&V Funding.
|
Type:
RULING
|
Filing Date:
November 10, 2005
|
Filed By:
ALJ/GOTTSTEIN/PUC
|
|
Description:
Finds Women's Energy Matters eligible to claim intervenor compensation.
|
Type:
RULING
|
Filing Date:
November 10, 2005
|
Filed By:
ALJ/GOTTSTEIN/PUC
|
|
Description:
Finds the Center for Small Business and the Environment eligible to claim intervenor compensation.
|
Type:
RULING
|
Filing Date:
November 10, 2005
|
Filed By:
ALJ/GOTTSTEIN/PUC
|
|
Description:
Finds NRDC and TURN eligible to cliam intervenor compensation.
|
Type:
RULING
|
Filing Date:
November 10, 2005
|
Filed By:
ALJ/GOTTSTEIN/PUC
|
|
Description:
Format Requirements for Electronic Spreadsheets.
|
Type:
COMMENTS
|
Filing Date:
November 8, 2005
|
Filed By:
ORA/TUDISCO/PUC
|
|
Description:
on the draft decision on evaluation, measurement and verification funding for the 2006-2008 program cycle.
|
Type:
COMMENTS
|
Filing Date:
November 8, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on the draft decision of ALJ Gottstein on the Evaluation, Measurement and Verification Funding for the 2006-2008 Program Cycle and related issues.
|
Type:
COMMENTS
|
Filing Date:
November 8, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
on Draft Interim Opinion.
|
Type:
COMMENTS
|
Filing Date:
November 7, 2005
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
on the draft decision on EM&V Funding.
|
Type:
REPORT
|
Filing Date:
November 1, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
joint; summarizing workshops on avoided costs inputs and the E3 calculator.
|
Type:
DRAFT DECISION
|
Filing Date:
October 19, 2005
|
Filed By:
ALJ/GOTTSTEIN/PUC
|
|
Description:
Interim Opinion: Evaluation, Measurement and Verification Funding for the 2006-2008 Program Cycle and Related Issues. Comments are due November 8, 2005; reply comments - 5 days after comments are filed.
|
Type:
COMMENTS
|
Filing Date:
October 17, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
on Draft Protocols for the EMV of Energy Efficiency, the 2005 California Energy Efficiency Evaluation Protocols.
|
Type:
COMMENTS
|
Filing Date:
October 3, 2005
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
re EM&V Plans & Budgets.
|
Type:
REPLY
|
Filing Date:
September 23, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
to Comments on the Joint Staff's recommendations for EM&V plans and budgets for the 2006-08 energy efficiency program cycle
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on Joint Staff's recommendations for EM&V plans and budgets for the 2006-08 energy efficiency program cycle
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; on Joint Staff's recommendations for EM&V Plans and Budgets for the 2006-2008 energy efficinecy program cycle.
|
Type:
EXPARTE
|
Filing Date:
September 19, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On September 14, 2005, Sidney Dietz, Manager, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Stephen St. Marie, advisor to Cmmr. Bohn, in San Francisco. Dietz expressed PG&E's support of the proposed decision. Dietz suggested that the old definition of peak be kept in place until a new definition is arrived at by all parties. Dietz suggested that starting the 2006-2008 energy efficiency programs early, in 2005, would help customers cope with high winter gas prices.
|
Type:
COMMENTS
|
Filing Date:
September 16, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on ALJ's Ruling [of August 30, 2005] requesting comments on proposed evaluation, measurement and verification plans and budgets for 2006-2008 program cycle.
|
Type:
COMMENTS
|
Filing Date:
September 16, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on joint Staff's recommendations for EM&V plans and budgets for the 2006-2008 energy efficiency program cycle.
|
Type:
COMMENTS
|
Filing Date:
September 16, 2005
|
Filed By:
ORA/TUDISCO/OBIORA/PUC
|
|
Description:
on proposed evaluation, measurement and verification plans and budgets for 2006-2008 program cycle.
|
Type:
COMMENTS
|
Filing Date:
September 16, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on joint staff's proposed EMV plans & budgets for 2006-2008 Program cycle.
|
Type:
COMMENTS
|
Filing Date:
September 16, 2005
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
on the proposed EM&V plans and budgets for the 2006-2008 cycle.
|
Type:
EXPARTE
|
Filing Date:
September 15, 2005
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON SEPTEMBER 13, 2005, AND APPEARED IN THE CALENDAR OF SEPTEMBER 16, 2005. On September 12, 2005, Devra Wang, Staff Scientists at the Natural Resources Defense Council (NRDC) met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present was Audrey Chang, Staff Scientist at NRDC. A copy of NRDC's opening comments on the draft decision (DD) filed on September 6, 2005, was used. Wang noted that Commission approval of the DD would launch a historic energy efficiency effort in California. Wang and Chang discussed the advisory group process that the utilities used in developing their applications, and the Case Management Statement process. Wang and Chang further discussed what portion of the portfolio is being put out to competitive bid. Wang noted that one of the primary sources of disagreement among parties is the definition of peak savings, and urged the Commission to adopt an interim definition of peak. Finally, Wang urged
|
Type:
EXPARTE
|
Filing Date:
September 15, 2005
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
On September 14, 2005, Devra Wang, Staff Scientists at the Natural Resources Defense Council (NRDC) met with Julie Fitch, advisor to Pres. Peevey, and Steve St. Marie, advisor to Cmmr. Bohn, in two separate meetings in San Francisco. A copy of NRDC's opening comments on the draft decision (DD) filed on September 6, 2005, was used. Wang noted that Commission approval of the DD would launch a historic energy efficiency effort in California. Wang discussed the advisory group process that the utilities used in developing their applications, and the Case Management Statement process. Wang further discussed what portion of the portfolio is being put out to competitive bid. Wang noted that one of the primary sources of disagreement among parties is the definition of peak savings, and urged the Commission to adopt an interim definition of peak. Finally, Wang urged the Commission to adopt the draft decision on September 22nd.
|
Type:
EXPARTE
|
Filing Date:
September 15, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On September 12, 2005, Sidney Dietz, Manager, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Brian Prusnek, advisor to Cmmr. Kennedy, in San Francisco. Also present were Steve McCarty, Director, DSM Planning, and Duane Larson, Manager, Business Customer Service, PG&E. Dietz expressed PG&E's support of the proposed decision (PD). McCarty and Larson explained the practical and policy problems posed by the new definition of peak load found within the PD. McCarty suggested that the old definition of peak be kept in place until a new definition is arrived at by all parties. Dietz expressed support of SCE's and Sempra's suggestion to start the 2006-2008 energy efficiency programs early, in 2005.
|
Type:
EXPARTE
|
Filing Date:
September 13, 2005
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
AUGMENTATION REQUIRED. Devra Wang, Staff Scientists at the Natural Resources Defense Council (NRDC) met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present was Audrey Chang, Staff Scientist at NRDC. A copy of NRDC's opening comments on the draft decision (DD) filed on September 6, 2005, was used. Wang noted that Commission approval of the DD would launch a historic energy efficiency effort in California. Wang and Chang discussed the advisory group process that the utilities used in developing their applications, and the Case Management Statement process. Wang and Chang further discussed what portion of the portfolio is being put out to competitive bid. Wang noted that one of the primary sources of disagreement among parties is the definition of peak savings, and urged the Commission to adopt an interim definition of peak. Finally, Wang urged the Commission to adopt the DD on September 22nd.
|
Type:
COMMENTS
|
Filing Date:
September 12, 2005
|
Filed By:
ORA/TUDISCO/PUC
THE UTILITY REFORM NETWORK
|
|
Description:
reply; on the Phase 1 draft decision.
|
Type:
COMMENTS
|
Filing Date:
September 12, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; on the draft decision of ALJ Gottstein on the energy efficiency portfolio plans and program funding levels for 2006-2008 - Phase 1 issues.
|
Type:
COMMENTS
|
Filing Date:
September 12, 2005
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
reply; on the August 17, 2005 draft decision of ALJ Gottstein.
|
Type:
COMMENTS
|
Filing Date:
September 12, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on Draft Decision of ALJ Gottstein.
|
Type:
REPLY
|
Filing Date:
September 12, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
to Comments on the draft decision of ALJ Gottstein.
|
Type:
COMMENTS
|
Filing Date:
September 12, 2005
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
reply; on the draft interim opinion.
|
Type:
COMMENTS
|
Filing Date:
September 7, 2005
|
Filed By:
COUNTY OF LOS ANGELES
|
|
Description:
on Draft Decision of ALJ Gottstein.
|
Type:
COMMENTS
|
Filing Date:
September 6, 2005
|
Filed By:
ORA/TUDISCO/PUC
THE UTILITY REFORM NETWORK
|
|
Description:
on the Phase 1 Draft Decision of ALJ Gottstein.
|
Type:
COMMENTS
|
Filing Date:
September 6, 2005
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
on draft decision on energy efficiency portfolio plans.
|
Type:
COMMENTS
|
Filing Date:
September 6, 2005
|
Filed By:
CONSOL
|
|
Description:
opening; on draft interim opinion on energy efficiency portfolio plans and program funding levels for 2006-2008 - Phase 1 issues.
|
Type:
COMMENTS
|
Filing Date:
September 6, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on the draft decision of ALJ Gottstein on the energy efficiency portfolio plans and program funding levels for 2006-2008 - Phase I issues.
|
Type:
COMMENTS
|
Filing Date:
September 6, 2005
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
on the draft interim opinion on energy efficiency portfolio plans and program funding levels for 2006-2008 - Phase 1 issues.
|
Type:
COMMENTS
|
Filing Date:
September 6, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on the Phase 1 draft decision of ALJ Gottstein.
|
Type:
COMMENTS
|
Filing Date:
September 6, 2005
|
Filed By:
PROCTOR ENGINEERING GROUP, LTD.
|
|
Description:
on draft decision of ALJ Gottstein.
|
Type:
COMMENTS
|
Filing Date:
September 6, 2005
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
on the August 17, 2005 draft decision of ALJ Gottstein.
|
Type:
COMMENTS
|
Filing Date:
September 6, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
on Interim Opinion: Energy Efficiency Portfolio Plans and Program Funding Levels for 2006-2008 - Phase 1 Issues
|
Type:
COMMENTS
|
Filing Date:
September 6, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on Interim Opinion: Energy Efficiency Portfolio Plans and Program Funding Levels for 2006-2008 - Phase 1 Issues
|
Type:
RULING
|
Filing Date:
August 30, 2005
|
Filed By:
ALJ/GOTTSTEIN/PUC
|
|
Description:
Opening comments on Joint Staff's recommendations for EM&V plans and budgets for the 2006-08 energy efficiency program cycle are due September 16, 2005; reply comments - September 23, 2005. Comments should be served to the service list in this and in the R01-08-028 proceedings.
|
Type:
EXPARTE
|
Filing Date:
August 30, 2005
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
On August 29, 2005, Devra Wang, Staff Scientists at the natural Resources Defense Council (NRDC) met with Brian Prusnek, advisor to Cmmr. Kennedy, at the Delessio Market in San Francisco. Also present was Audrey Chang, Staff Scientists at NRDC. Wang commended ALJ Gottstein and Cmmr. Kennedy for a well-crafted draft decision (DD). Wang urged the Commission to include explicit authorization for program implementers to `count¿ energy savings associated with water efficiency in the final decision. Wang further urged the Commission to clarify the discussion of rate and bill impacts in the DD. Finally, Wang and Chang noted that the utilities have been slower to address statewide consistency issues than other issues.
|
Type:
EXPARTE
|
Filing Date:
August 25, 2005
|
Filed By:
CONSOL
|
|
Description:
On August 22, 2005, Mike Hodgson, President of ConSol, met with David Gamson, advisor to Cmmr. Brown, Brain Prusnek, advisor to Cmmr. Kennedy, and Julie Fitch, advisor to Pres. Peevey, in three separate meetings in San Francisco. Also present were Nancy Kirshner-Rodriguez, Manager of ConSol's Consulting Department, and Kari Dohn of GCG Rose & Kindel. At the meeting with Brian Prusnek also present was James Hall, an intern in Cmmr. Kennedy's office. Written materials (attached to the notice) were used. Hodgson gave a brief summary of ConSol's involvement in the residential new construction market as it pertains to energy efficient homes. ConSol also summarized ConSol's position in its recent set of Reply Comments filed on July 20, 2005 in this proceeding
|
Type:
DRAFT DECISION
|
Filing Date:
August 17, 2005
|
Filed By:
ALJ/GOTTSTEIN/PUC
|
|
Description:
Interim Opinion: Energy Efficiency Portfolio Plans and Program Funding Levels for 2006-2008 - Phase 1 Issues. Comments are due September 6, 2005; reply comments - 5 days after comments are filed.
|
Type:
NOTICE
|
Filing Date:
July 29, 2005
|
Filed By:
CENTER FOR SMALL BUSINESS AND THE ENVIRONMENT
SMALL BUSINESS CALIFORNIA
SMALL BUSINESS NETWORK OF SAN FRANCISCO
|
|
Description:
of intent to claim compensation.
|
Type:
AMENDMENT
|
Filing Date:
July 26, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
to Joint IOU Case Management Statement Regarding Energy Efficiency Applications for 2006-2008 Programs and Budgets [filed July 18, 2005].
|
Type:
NOTICE
|
Filing Date:
July 22, 2005
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
of intent to claim compensation.
|
Type:
NOTICE
|
Filing Date:
July 22, 2005
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
of intent to claim compensation.
|
Type:
COMMENTS
|
Filing Date:
July 21, 2005
|
Filed By:
ORA/TUDISCO/PUC
THE UTILITY REFORM NETWORK
|
|
Description:
reply; joint in part by TURN.
|
Type:
COMMENTS
|
Filing Date:
July 21, 2005
|
Filed By:
CENTER FOR SMALL BUSINESS AND THE ENVIRONMENT
SAN FRANCISCO SMALL BUSINESS NETWORK
SMALL BUSINESS CALIFORNIA
|
|
Description:
on joint IOU case management statement regarding the energy efficiency applications.
|
Type:
COMMENTS
|
Filing Date:
July 21, 2005
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
reply; on the energy efficiency programs applications.
|
Type:
COMMENTS
|
Filing Date:
July 21, 2005
|
Filed By:
CONSOL
|
|
Description:
reply; on the applications.
|
Type:
COMMENTS
|
Filing Date:
July 21, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
Joint, Reply;
|
Type:
COMMENTS
|
Filing Date:
July 21, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on TecMarket Works.
|
Type:
RESPONSE
|
Filing Date:
July 21, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
to Joint Staff Comments on Codes and Standards Program Energy Savings Assessment.
|
Type:
COMMENTS
|
Filing Date:
July 21, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
Joint; re: California 2006-2008 Energy Efficiency Portfolio Final Report prepared by TecMarket Works.
|
DECISIONS
Number of Decisions: 11
|
Decision Number:
D0801024
|
Rendered Date:
January 14, 2008
Effective Date:
January 14, 2008
|
|
Description:
Corrects an error in Decision 07-12-040.
|
Decision Number:
D0712040
|
Rendered Date:
December 20, 2007
Effective Date:
December 20, 2007
|
|
Description:
Grants intervenor compensation to The Utility Reform Network for substantial contributions to Decision (D) 05-09-043, D05-11-011, and D06-12-013. These proceedings are closed.
|
Decision Number:
D0710016
|
Rendered Date:
October 4, 2007
Effective Date:
October 4, 2007
|
|
Description:
Modifies Decision 06-12-013, and denies rehearing of the decision, as modified.
|
Decision Number:
D0705017
|
Rendered Date:
May 3, 2007
Effective Date:
May 3, 2007
|
|
Description:
Grants intervenor compensation to Center for Small Business and the Environment for substantial contributions to Decision (D.) 04-09-060, D.05-01-055, D.05-04-051, and denies its petition to modify D.06-02-028.
|
Decision Number:
D0612013
|
Rendered Date:
December 14, 2006
Effective Date:
December 14, 2006
|
|
Description:
Approves, with modifications, Southern California Edison Company's petition for modification of Decision 05-09-043. These proceedings are closed.
|
Decision Number:
D0608009
|
Rendered Date:
August 24, 2006
Effective Date:
August 24, 2006
|
|
Description:
Denies request of Women's Energy Matters for intervenor compensation.
|
Decision Number:
D0604064
|
Rendered Date:
April 27, 2006
Effective Date:
April 27, 2006
|
|
Description:
Adopts needed corrections and clarifications to the text and attachments to Decision 05-09-043, that were identified subsequent to the issuance of that decision.
|
Decision Number:
D0604028
|
Rendered Date:
April 13, 2006
Effective Date:
April 13, 2006
|
|
Description:
Awards the Center for Small Business and the Environment $37,210.71 in compensation for its substantial contribution to D05-09-043.
|
Decision Number:
D0604005
|
Rendered Date:
April 13, 2006
Effective Date:
April 13, 2006
|
|
Description:
Grants intervenor compensation to the Natural Resources Defense Council, for its substantial contribution to Decision 05-09-043. (Commissioner Dian M. Grueneich recused herself
from this agenda item and was not part of the quorum in its consideration.)
|
Decision Number:
D0511011
|
Rendered Date:
November 18, 2005
Effective Date:
November 18, 2005
|
|
Description:
Interim Opinion. Authorizes an overall funding level of $162,794,829 for energy efficiency evaluation, measurement and verification activities over the 2006-2008 program cycle. This represents approximately 7.6% of total portfolio funding we have authorized for this program cycle, including the program funding levels adopted in Decision 05-09-043 for Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, and Southern California Gas Company, collectively referred to as the investor-owned utilities, or IOUs. (Comr. Grueneich recused herself from this agenda item and was not part of the quorum in its consideration.)
|
Decision Number:
D0509043
|
Rendered Date:
September 22, 2005
Effective Date:
September 22, 2005
|
|
Description:
Interim Opinion. Authorizes 2006-2008 energy efficiency portfolio plans and funding levels for PG&E, SDG&E, SCE, and SoCalGas. (Comr. Grueneich recused herself from this agenda item and was not part of the quorum in its consideration.)
|