Proceeding A0506008
Date Filed: June 1, 2005
Status: Closed


Documents    Decisions    Main Index

LIST
Filer Requested Category: Ratesetting
Preliminary Category: Ratesetting
Commission Designated Category: Ratesetting
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E)

DOCUMENTS
Number of Documents: 126 (only the most current 100 are displayed)
Display all documents for this proceeding

Type: EXPARTE

Filing Date: December 19, 2007
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
Description: SUMMARY: EnerNOC, Inc., EnergyConnect, Inc., and Comverge, Inc., noticed oral communication with Matthew Deal, advisor to Pres. Peevey, on December 14, 2007.

Type: EXPARTE

Filing Date: December 19, 2007
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
Description: SUMMARY: EnerNOC, Inc., EnergyConnect, Inc., and Comverge, Inc., noticed oral communication with Theresa Cho, Chief of Staff, on December 14, 2007.

Type: EXPARTE

Filing Date: December 19, 2007
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
Description: SUMMARY: EnerNOC, Inc., EnergyConnect, Inc., and Comverge, Inc., noticed oral communication with Robert Kinosian, advisor to Cmmr. Bohn, on December 14, 2007.

Type: COMMENTS

Filing Date: December 17, 2007
Filed By:
Comverge, Inc.
EnerNoc, Inc.
EnergyConnect, Inc.
Description: Reply; on the Alternate Decision of Commission President Peevey.

Type: COMMENTS

Filing Date: December 17, 2007
Filed By:
Pacific Gas and Electric Company
Description: Reply; on Alternate Proposed Decision of Commission President Peevey.

Type: COMMENTS

Filing Date: December 10, 2007
Filed By:
Pacific Gas and Electric Company
Description: on Alternate Proposed Decision of Commission President Peevey.

Type: COMMENTS

Filing Date: December 10, 2007
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
Description: on the Alternate Decision of Commission President Peevey.

Type: EXPARTE

Filing Date: December 4, 2007
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
Description: SUMMARY: On November 29, 2007, Sara Steck Myers, attorney for the EnerNOC, Inc., EnergyConnect, Inc., and Comverge, Inc. (collectively, Joint Parties) met with Andrew Campbell, advisor to Cmmr. Chong in San Francisco. Also present was Richard H. Counihan, Senior Director Market Development for EnerNOC, Inc. Myers stated that the Joint Parties had reviewed Pres. Peevey's Alternate Decision to the Proposed Decision of ALJ Yacknin on the Joint Parties' Petition to Modify Decision (D.) 06-11-049 and Application to Modify Resolution E-4079. Myers indicated that the Joint Parties continued to strongly support the Proposed Decision's modification of Resolution E-4079 adopting the Joint Parties' recommended definition of "hard-to-reach" customers to be targeted by Pacific Gas and Electric Company's (PG&E's) Business Energy Coalition (BEC) program and did not support the Alternate Decision's changes to that definition. Counihan stated that, in particular, the change by the Alternate Decision to the Proposed Decision'

Type: ALTERNATE

Filing Date: November 19, 2007
Filed By:
CMMR/PEEVEY/CPUC
Description: Opinion Modifying Resolution E-4079 and D.06-11-049. Opening comments, which shall not exceed 15 pages, are due no later than December 9, 2007. Reply comments are due 5 days after opening comments are filed.

Type: EXPARTE

Filing Date: October 22, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On October 17, 2007 Sidney Dietz, Chief, Regulatory Relations of Pacific Gas and Electric Company (PG&E) met with Matthew Deal, advisor to Pres. Peevey in San Francisco. Also present were Andrew Campbell, advisor to Cmmr. Chong; Steve McCarty, Director, Demand-Side Management of PG&E; and John Phillips, Executive Director of The Energy Coalition. Dietz explained that the Business Energy Coalition demand response program (BEC) is an important part of PG&E¿s Demand Response portfolio. Phillips described the BEC program operations and McCarty explained that most of the customers on the Demand Bidding Program (DBP) tariff do not reduce electric demand during DBP program events.

Type: EXPARTE

Filing Date: October 18, 2007
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
Description: SUMMARY: On October 15, 2007 Sara Steck Myers, attorney for EnerNOC, Inc., EnergyConnect, Inc., and Comverge, Inc. (Joint Parties), met with Jaclyn Marks, advisor to Cmmr. Simon in San Francisco. Also present at the meeting was Richard H. Counihan, Senior Director Corporate Development for EnerNOC, Inc. Myers stated that the Joint Parties greatly appreciated the action taken by ALJ Yacknin to issue a timely Proposed Decision (PD) on the Joint Parties' Petition to Modify D.06-11-049 and Application to Modify Resolution E-4079. Myers noted that the initial PD modified Resolution E-4079 to adopt the Joint Parties' originally proposed definition of "hard-to-reach" customers to be targeted by Pacific Gas and Electric Company's (PG&E's) Business Energy Coalition (BEC) program. Myers stated that the PD was appropriately revised and clarified in response to comments and reply comments filed by the Joint Parties and PG&E, including making a single change to the adopted definition to substitute the term "enroll" for t

Type: EXPARTE

Filing Date: October 18, 2007
Filed By:
Comverge, Inc
EnerNOC, Inc.
EnergyConnect, Inc.
Description: SUMMARY: On October 15, 2007 Sara Steck Myers, attorney for EnerNOC, Inc., EnergyConnect, Inc., and Comverge, Inc. (Joint Parties), met with Stephen St. Marie and Robert Kinosian, advisors to Cmmr. Bohn in San Francisco. Also present at the meeting was Richard H. Counihan, Senior Director Corporate Development for EnerNOC, Inc. Myers stated that the Joint Parties greatly appreciated the action taken by ALJ Yacknin to issue a timely Proposed Decision (PD) on the Joint Parties' Petition to Modify D.06-11-049 and Application to Modify Resolution E-4079. Myers noted that the initial PD modified Resolution E-4079 to adopt the Joint Parties' originally proposed definition of "hard-to-reach" customers to be targeted by Pacific Gas and Electric Company's (PG&E's) Business Energy Coalition (BEC) program. Myers stated that the PD was appropriately revised and clarified in response to comments and reply comments filed by the Joint Parties and PG&E, including making a single change to the adopted definition to substitut

Type: EXPARTE

Filing Date: October 12, 2007
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
Description: SUMMARY: On October 9, 2007 Sara Steck Myers, attorney for EnerNOC, Inc., EnergyConnect, Inc., and Comverge, Inc., (Joint Parties) met with Matthew Deal, advisor to Pres. Peevey in San Francisco. Also present were Richard H. Counihan, Senior Director Corporate Development for EnerNOC, Inc.; Rich Quattrini, Western Region Vice President for EnergyConnect, Inc.; and Dr. Eric Woychik, Executive Consultant for Comverge, Inc. Myers stated that the initial Proposed Decision modified Resolution E-4079 to adopt the Joint Parties' originally proposed definition of "hard-to-reach" customers to be targeted by Pacific Gas and Electric Company's (PG&E's) Business Energy Coalition (BEC) program. Myers further stated that the Proposed Decision was appropriately revised and clarified in response to comments and reply comments filed by the Joint Parties and PG&E, including making a single change to the adopted definition to substitute the term "enroll" for the word "participate." Counihan noted that the Proposed Decision did

Type: EXPARTE

Filing Date: October 2, 2007
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
Description: SUMMARY: On September 27, 2007 Sara Steck Myers, attorney for EnerNOC, Inc., EnergyConnect, Inc., and Comverge, Inc., (Joint Parties), met with Andrew Campbell, advisor to Cmmr. Chong in San Francisco. Also present were Richard H. Counihan, Senior Director Corporate Development for EnerNOC, Inc.; Rich Quattrini, Western Region Vice President for EnergyConnect, Inc.; Carlos Lamas-Babbini, Program Manager for Comverge, Inc., and Eric Woychik, Executive Consultant for Comverge, Inc. Myers stated that the Joint Parties appreciated ALJ Yacknin issuing a timely Proposed Decision (PD) on the Joint Parties' Petition to Modify Decision 06-11-049 and Application to Modify Resolution E-4079. Myers further stated that the Joint Parties supported the PD's modification of Resolution E-4079 to adopt the Joint Parties' proposed definition of "hard-to-reach" customers to be targeted by Pacific Gas and Electric Company's (PG&E's) Business Energy Coalition (BEC) program. Counihan indicated that the changes to the definition of

Type: EXPARTE

Filing Date: October 2, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On September 27, 2007 Sidney Dietz, Manager, Regulatory Relations of Pacific Gas and Electric Company (PG&E) met with Andrew Campbell, advisor to Cmmr. Chong in San Francisco. Dietz stated that PG&E supports the approach of the Proposed Decision (PD) to eligibility of customers for the Business Energy Coalition tariff. Dietz explained that the BEC program is an important part of PG&E's Demand Response portfolio and that it is aimed at hard-to-reach customers. Dietz also stated that the hard-to-reach customers should include customers who have enrolled in a demand response program, but have never reduced electric usage during a demand response event.

Type: COMMENTS

Filing Date: October 1, 2007
Filed By:
Pacific Gas and Electric Company
Description: Reply; On Proposed Decision of ALJ Yacknin.

Type: COMMENTS

Filing Date: October 1, 2007
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
Description: Reply; to Comments of Pacific Gas and Electric Company on the Proposed Decision of ALJ Yacknin.

Type: COMMENTS

Filing Date: September 24, 2007
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
Description: On Proposed Decision of ALJ Yacknin.

Type: COMMENTS

Filing Date: September 24, 2007
Filed By:
Pacific Gas and Electric Company
Description: Opening; On Proposed Decision of ALJ Yacknin.

Type: PROPOSED DECISION

Filing Date: September 4, 2007
Filed By:
ALJ/YACKNIN/CPUC
Description: Opinion Modifying Resolution E-4079. Opening comments, which shall not exceed 15 pages, are due no later than September 24, 2007. Reply comments are due five days after opening comments are filed.

Type: MOTION

Filing Date: September 4, 2007
Filed By:
Pacific Gas and Electric Company
Description: To Withdraw Motion For Leave to File Confidential Version of Protest of Pacific Gas and Electric Company to Application of Enernoc, Inc., EnergyConnect, and Comverge to Modify Resolution E-4079 Under Seal.

Type: REPLY

Filing Date: August 24, 2007
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
Description: to Responses to Petition for Modification of D.06-11-049 and Application for Modification of Resolution E-4079 and to Protest to Application for Modification of Resolution E-4079.

Type: PROTEST

Filing Date: August 20, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Application 07-07-022 (PUBLIC VERSION).

Type: LAW & MOTION

Filing Date: August 20, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Motion to File Under Seal Confidential Version of Protest to Application 07-07-022.

Type: MOTION

Filing Date: August 20, 2007
Filed By:
The Energy Coalition
Description: for party status.

Type: RESPONSE

Filing Date: August 20, 2007
Filed By:
The Utility Reform Network
Description: To Petition to Modify Resolution E-4079 and Decision 06-11-049.

Type: COMMENTS

Filing Date: August 15, 2007
Filed By:
Energy Curtailment Specialist, Inc.
Description: on Joint Petitioners to Modify Resolution E-4079 and Decision (D.) 06-11-049 By Energy Curtailment Specialists, Inc.

Type: NOTICE

Filing Date: July 30, 2007
Filed By:
CALJ/MINKIN/CPUC
Description: of Co-Assignment.

Type: RULING

Filing Date: July 30, 2007
Filed By:
ALJ/YACKNIN/CPUC
Description: Consolidating Proceedings and Denying Motion to Shorten Time. The Proceedings are consolidated. The motion for Order Shortening Time to Respond and for an Expedited Decision is denied. The time for filing a protest to A.07-07-022 and/or a response to the petition to modify D.06-11-049 is no later than 30 days from July 19, 2007, the date the petition and application were filed.

Type: RESPONSE

Filing Date: July 26, 2007
Filed By:
Pacific Gas and Electric Company
Description: Opposition to Motion for Order Shortening Time to Respond to Petition for Modification of Decision 06-11-049.

Type: MOTION

Filing Date: July 19, 2007
Filed By:
COMVERGE, INC.
ENERGYCONNECT, INC.
ENERNOC, INC.
Description: for Order Shortening Time to Respond and Expdited Decision on Joint Petition for Modification of Decision 06-11-049.

Type: PETITION FOR MODIFICATION

Filing Date: July 19, 2007
Filed By:
COMVERGE, INC.
ENERGYCONNECT, INC.
ENERNOC, INC.
Description: Joint Petition for Modification of Decision 06-11-049 and Request for Expedited Treatment.

Type: PROPOSED DECISION

Filing Date: May 14, 2007
Filed By:
ALJ/MALCOLM/CPUC
Description: Opinion Addressing Requests for Intervenor Compensation to Aglet Consumer Alliance and San Francisco Community Power for Substantial Contributions to Decision 06-11-049. Opening comments, which shall not exceed 15 pages, are due no later than June 3, 2007. Reply comments are due five days after opening comments are filed.

Type: RESPONSE

Filing Date: March 15, 2007
Filed By:
SAN FRANCISCO COMMUNITY POWER
Description: to Proposed Decision Denying SF Power Request for Compensation.

Type: COMMENTS

Filing Date: March 15, 2007
Filed By:
AGLET CONSUMER ALLIANCE
Description: on Proposed Decision of ALJ Malcolm.

Type: PROPOSED DECISION

Filing Date: March 13, 2007
Filed By:
ALJ/MALCOLM/CPUC
Description: Opinion Granting Intervenor Compensation to Aglet Consumer Alliance, The Utility Reform Network, and San Francisco Community Power for Substantial Contributions to Decision 06-03-024. As noted in ALJ Malcolm's e-mail note of March 7, 2007, parties to the proceeding may file opening comments on the proposed decision by March 15, 2007 and reply comments by March 20, 2007.

Type: RESPONSE

Filing Date: March 8, 2007
Filed By:
SAN FRANCISCO COMMUNITY POWER
Description: Proposal in Response to August 9 and August 22, 2006 Assigned Commissioner's Rulings and Proposals for Enhancements to Demand Response Programs.

Type: AMENDMENT

Filing Date: February 1, 2007
Filed By:
SAN FRANCISCO COMMUNITY POWER
Description: to Request for Compensation.

Type: REQUEST

Filing Date: January 19, 2007
Filed By:
AGLET CONSUMER ALLIANCE
Description: for Award of Compensation.

Type: REQUEST

Filing Date: December 29, 2006
Filed By:
SAN FRANCISCO COMMUNITY POWER
Description: for intervenor compensation.

Type: PROPOSED DECISION

Filing Date: December 22, 2006
Filed By:
ALJ/MALCOLM/CPUC
Description: Order correcting errors in Decision 06-11-049. Opening comments, which shall not exceed 15 pages, are due no later than January 11, 2007. Reply comments are due 5 days after the filing of Opening comments.

Type: COMMENTS

Filing Date: November 27, 2006
Filed By:
DRA/Salvacion/CPUC
Description: Reply; on the Proposed Decision of Commissioner Chong.

Type: COMMENTS

Filing Date: November 27, 2006
Filed By:
EnerNOC, Inc.
Description: Reply; on the Proposed Decision of Commissioner Chong.

Type: COMMENTS

Filing Date: November 27, 2006
Filed By:
Southern California Edison Company
Description: Reply; on Draft Order Adopting Changes to 2007 Demand esponse Programs.

Type: COMMENTS

Filing Date: November 27, 2006
Filed By:
DRA/SALVACION/CPUC
Description: Reply; to Joint Motion for Approval of the Statewide Water Agency Pilot Program.

Type: REPLY

Filing Date: November 27, 2006
Filed By:
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
Description: JOINT; TO RESPONSES [of ACWA and DRA] ON THE STATEWIDE WATER AGENCY PILOT PROGRAM.

Type: COMMENTS

Filing Date: November 27, 2006
Filed By:
The Utility Reform Network
Description: Reply; on the Proposed Decision Adopting Changes to 2007 Demand Response Programs.

Type: COMMENTS

Filing Date: November 27, 2006
Filed By:
WATER AND ENERGY CONSULTING
Description: Reply; on Proposed Decision.

Type: COMMENTS

Filing Date: November 27, 2006
Filed By:
Pacific Gas and Electric Company
Description: REPLY; ON THE PROPOSED DECISION OF CMMR. CHONG REGARDING CHANGES TO 2007 UTILITY DEMAND RESPONSE PROGRAMS.

Type: COMMENTS

Filing Date: November 27, 2006
Filed By:
Ice Energy, Inc.
Description: REPLY; ON THE PROPOSED DECISION OF CMMR. CHONG REGARDING CHANGES TO 2007 UTILITY DEMAND RESPONSE PROGRAMS.

Type: COMMENTS

Filing Date: November 27, 2006
Filed By:
San Diego Gas & Electric Company
Description: REPLY; ON [proposed] ORDER ADOPTING CHANGES TO 2007 UTILITY DEMAND RESPONSE PROGRAMS.

Type: COMMENTS

Filing Date: November 21, 2006
Filed By:
WATER & ENERGY CONSULTING
Description: Opening; on the Proposed Decision.(Filing approved by ALJ Malcolm.)

Type: COMMENTS

Filing Date: November 20, 2006
Filed By:
Silicon Valley Leadership Group
Description: ON PROPOSED DECISION OF CMMR. CHONG.

Type: COMMENTS

Filing Date: November 20, 2006
Filed By:
EnerNOC, Inc.
Description: on the Proposed Decision of Commissioner Chong on Order Adopting Changes to 2007 and 2008 Utility Demand Response Programs.

Type: COMMENTS

Filing Date: November 20, 2006
Filed By:
Southern California Edison Company
Description: ON DRAFT ORDER ADOPTING CHANGES TO 2007 UTILITY DEMAND RESPONSE PROGRAMS.

Type: COMMENTS

Filing Date: November 20, 2006
Filed By:
DRA/Salvacion/CPUC
Description: ON THE PROPOSED DECISION OF COMMISSIONER CHONG.

Type: RESPONSE

Filing Date: November 20, 2006
Filed By:
DRA/SALVACION/CPUC
Description: TO THE JOINT MOTION OF PACIFIC GAS & ELECRIC COMPANY, SAN DIEGO GAS & ELECRIC COMPANY AND SOUTHERN CALIFORNIA EDISON FOR APPROVAL OF THE STATEWIDE WATER AGENCY PILOT PROGRAM.

Type: COMMENTS

Filing Date: November 20, 2006
Filed By:
California Large Energy Consumers Association
California Manufacturers & Technology Association
Description: ON THE PROPOSED DECISION ON AUGMENTED UTILITY DEMAND RESPONSE PROGRAMS FOR 2007.

Type: COMMENTS

Filing Date: November 20, 2006
Filed By:
Ice Energy, Inc.
Description: on the Proposed Decision of Commissioner Chong regarding changes to 2007 Utility Demand Response Programs.

Type: COMMENTS

Filing Date: November 20, 2006
Filed By:
Ice Energy, Inc.
Description: Amended; (Attachment B to Comments formerly omitted)

Type: COMMENTS

Filing Date: November 20, 2006
Filed By:
San Diego Gas & Electric Company
Description: ON ORDER ADOPTING CHANGES TO 2007 UTILITY DEMAND RESPONSE PROGRAMS.

Type: COMMENTS

Filing Date: November 20, 2006
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: on the October 30, 2006, Proposed Decision.

Type: COMMENTS

Filing Date: November 20, 2006
Filed By:
AGLET CONSUMER ALLIANCE
Description: on Proposed Decision of Cmmr. Chong.

Type: COMMENTS

Filing Date: November 20, 2006
Filed By:
ALOHA SYSTEMS, INCORPORATED
Description: Opening;on the Proposed Decision of Commissioner Chong on Order Adopting Changes to 2007 Utility Demand Response Programs

Type: COMMENTS

Filing Date: November 20, 2006
Filed By:
Pacific Gas and Electric Company
Description: on the Proposed Decision of Commissioner Chong regarding changes to 2007 Utility Demand Response Programs.

Type: RESPONSE

Filing Date: November 16, 2006
Filed By:
ASSOCIATION OF WATER AGENCIES
Description: to Utilities' Joint Motion filed Nov 3, 2006.

Type: MOTION

Filing Date: November 3, 2006
Filed By:
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
Description: Joint; for Approval of the Statewide Water Agency Pilot Program.

Type: PROPOSED DECISION

Filing Date: October 30, 2006
Filed By:
CMMR/Chong/CPUC
Description: Comments are due November 19, 2006; reply comments - five days after comments are filed.

Type: EXPARTE

Filing Date: October 16, 2006
Filed By:
Ice Energy Inc.
Description: SUMMARY: On Thursday, October 12, 2006, Frank Ramirez of Ice Energy, Inc. (Ice Energy) met with Cmmr. Peevey in San Francisco. Also present were Andrew Campbell, advisor to Cmmr. Chong, Nilgun Atamturk, advisor to Cmmr. Grueneich, Sean Gallagher, Director of the Energy Division, and other participants. Written materials (attached to the notice) were used. Ice Energy discussed its Comments and a letter from Frederick E. Harris, Assistant Vice Chancellor of the California Community Colleges System Office to Steve Larson, Executive Director, dated October 11, 2006. Ice Energy's representatives urged the Commission to approve the integrated demand response proposal based on air conditioning thermal storage technology that is described in Ice Energy's September 15, 2006, comments. Ice Energy also stated that the Commission should seriously consider approving the type of air conditioning thermal storage demand response program proposed by the California Community College System. Contact person: Michelle Dangott

Type: RESPONSE

Filing Date: September 29, 2006
Filed By:
ASSOCIATION OF CALIFORNIA WATER AGENCIES/WATER & ENERGY CONSULTING
Description: Proposals in Response to Cmmr. Peevey's Ruling on Demand Response.

Type: COMMENTS

Filing Date: September 25, 2006
Filed By:
San Diego Gas & Electric Company
Description: Post Workshop Reply; on issues raised during the CPUC Workshop held on Sept 6, 2006 regarding Utility Proposals to Augment 2007 Demand Response Programs.

Type: COMMENTS

Filing Date: September 22, 2006
Filed By:
Silicon Valley Leadership Group
Description: ON ASSIGNED COMMISSIONER'S RULING REQUIRING UTILITY PROPOSALS TO AUGMENT 2007 DEMAND RESPONSE PROGRAMS.

Type: COMMENTS

Filing Date: September 22, 2006
Filed By:
Southern Califonia Edison Company
Description: Post Workshop Reply

Type: COMMENTS

Filing Date: September 22, 2006
Filed By:
CAISO
Description: Reply; on Utility Proposals to Augment their Demand Response Programs for 2007 and 2008.

Type: COMMENTS

Filing Date: September 22, 2006
Filed By:
Pacific Gas and Electric Company
Description: Reply; [in response to Cmmr. Peevey's August 9 and August 22, 2006 rulings].

Type: COMMENTS

Filing Date: September 22, 2006
Filed By:
ENERNOC, INC.
Description: Reply; in Response to Assigned Commissioner's Ruling requiring Utility Proposals to Augmemt 2007 and 2008 Demand Response Programs and the resulting Utility Proposals.

Type: COMMENTS

Filing Date: September 22, 2006
Filed By:
Aglet Consumer Alliance
Description: Reply; on Utility Proposals to Augment 2007 Demand Response Programs.

Type: NOTICE

Filing Date: September 22, 2006
Filed By:
CALJ/MINKIN/PUC
Description: of removal from the calendar.

Type: COMMENTS

Filing Date: September 22, 2006
Filed By:
WATER AGENCY (WATER & ENERGY CONSULTING)
Description: reply.

Type: COMMENTS

Filing Date: September 20, 2006
Filed By:
THE UTILITY REFORM NETWORK
Description: amended; on the utility proposals to augment 2007 demand response programs and budgets.

Type: COMMENTS

Filing Date: September 15, 2006
Filed By:
Silicon Valley Leadership Group
Description: ON RULING [August 9, 2006] REQUIRING UTILITY PROPOSALS TO AUGMENT 2007 DEMAND RESPONSE PROGRAMS.

Type: COMMENTS

Filing Date: September 15, 2006
Filed By:
Aglet Consumer Alliance
Description: on Utility Proposals to Augment 2007 Demand Response Programs.

Type: COMMENTS

Filing Date: September 15, 2006
Filed By:
THE UTILITY REFORM NETWORK
Description: on the utility proposal to augment 2007 demand response programs and budgets

Type: COMMENTS

Filing Date: September 15, 2006
Filed By:
ENERNOC, INC.
Description: in response to Assigned Commissioner's Ruling requiring utility proposals to augment 2007 and 2008 demand response programs and the resulting utility proposals.

Type: COMMENTS

Filing Date: September 15, 2006
Filed By:
Southern California Edison Company
Description: Post-Workshop.

Type: COMMENTS

Filing Date: September 15, 2006
Filed By:
San Diego Gas & Electric Company
Description: Post-Workshop; on issues raised during the CPUC Workshop held on Sept 6, 2006 regarding utility proposals to augment 2007 Demand Response Programs.

Type: COMMENTS

Filing Date: September 15, 2006
Filed By:
Pacific Gas and Electric Company
Description: IN RESPONSE TO ALJ MALCOLM'S REQUEST ON SEPTEMBER 7, 2006.

Type: MOTION

Filing Date: September 15, 2006
Filed By:
Energy Users Forum
Description: TO INTERVENE; COMMENTS ON PROPOSALS TO AUGMENT 2007 DEMAND RESPONSE PROGRAMS attached.

Type: MOTION

Filing Date: September 15, 2006
Filed By:
ICE ENERGY, INC.
Description: to Intervene and to File Comments; ATTACHED - COMMENTS on ACR requiring Utility Proposals to Augment 2007 Demand Response Programs.

Type: COMMENTS

Filing Date: September 14, 2006
Filed By:
EnergyConnect, Inc.
Description: on Utility Proposals for Enhancements to Demand Response Programs.

Type: COMMENTS

Filing Date: September 14, 2006
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS AND TECHNOLOGY ASSOCIATION
Description: on utility filings to augment 2007 demand response programs.

Type: EXPARTE

Filing Date: September 8, 2006
Filed By:
ENERNOC, INC.
Description: On September 5, 2006, David Brewster of EnerNOC, Inc. (EnerNOC), met with Lynn Carew, advisor to Cmmr. Chong, in San Francisco. Also present were Andrew Campbell, advisor to Cmmr. Chong, Scott McGaraghan of EnerNOC, and Rick Counihan of Ecos Consulting. Written material (attached to the notice) was used. EnerNOC representatives discussed the value that demand response aggregators can bring to helping California meet its demand response targets. EnerNOC urged the Commission to adopt the Capacity Bidding Programs as proposed to be modified in comments by demand response aggregators; to open the utilities' Base Interruptible Programs to aggregator participation, and to extend the Clean Gen Program from San Diego Gas & Electric Company to Southern California Edison Company and Pacific Gas and Electric Company. EnerNOC also supported the utilities' proposals to increase the Technical Incentives to $250 per kW.

Type: EXPARTE

Filing Date: September 8, 2006
Filed By:
ENERNOC, INC.
Description: On September 6, 2006, David Brewster of EnerNOC, Inc. (EnerNOC), met with Pres. Peevey in San Francisco. Also present were Nancy Ryan, advisor to Pres. Peevey, Scott McGaraghan of EnerNOC, and Rick Counihan of Ecos Consulting. Written material (attached to the notice) was used. EnerNOC representatives discussed the role that demand response aggregators can play in facilitating demand response programs in California. EnerNOC recommended that the Commission order the utilities to open the Base Interruptible Programs to third party aggregators and extend the Clean Gen program to Southern California Edison Company and Pacific Gas and Electric Company.

Type: NOTICE

Filing Date: September 6, 2006
Filed By:
CALJ/MINKIN/PUC
Description: of Reassignment.

Type: MISCELLANEOUS FILING

Filing Date: August 30, 2006
Filed By:
Southern California Edison Company
Description: ASSESSMENT OF DEMAND RESPONSE PROGRAM PERFORMANCE DURING JULY 2006 AND PROPOSALS TO AUGMENT ITS DEMAND RESPONSE PROGRAMS FOR 2007 AND 2008 [in response to the August 9th ruling].

Type: RESPONSE

Filing Date: August 30, 2006
Filed By:
Pacific Gas and Electric Company
Description: TO AUGUST 9, 2006 AND AUGUST 22, 2006 ASSIGNED COMMISSIONER'S RULINGS AND PROPOSALS FOR ENHANCEMENTS TO DEMAND RESPONSE PROGRAMS.

Type: RULING

Filing Date: August 22, 2006
Filed By:
CMMR/PEEVEY/CPUC
Description: Assigned Commissioner's Ruling Augmenting August 6, 2006 Ruling requiring Utility Proposals to Augment 2007 Demand Response Programs.

Type: RULING

Filing Date: August 9, 2006
Filed By:
CMMR/PEEVEY/CPUC
Description: Assigned Commissioner's Ruling requiring Utility Proposals to Augment 2007 Demand Response Programs.

Type: REQUEST

Filing Date: May 15, 2006
Filed By:
THE UTILITY REFORM NETWORK
Description: for compensation for substantial contribution to D06-03-024.

Type: REQUEST

Filing Date: May 15, 2006
Filed By:
AGLET CONSUMER ALLIANCE
Description: for Award of Compensation.

DECISIONS
Number of Decisions: 6

Decision Number: D0712048

Rendered Date: December 20, 2007
Effective Date: December 20, 2007
Description: Modifies Resolution E-4079 and Decision 06-11-049 as set forth. These four proceedings are closed.

Decision Number: D0706023

Rendered Date: June 21, 2007
Effective Date: June 21, 2007
Description: Denies requests for intervenor compensation for substantial contributions to Decision 06-11-049 filed by Aglet Consumer Alliance and San Francisco Community Power. These proceeding are closed.

Decision Number: D0704010

Rendered Date: April 12, 2007
Effective Date: April 12, 2007
Description: Grants intervenor compensation to Aglet Consumer Alliance, The Utility Reform Network, and San Francisco Community Power for substantial contributions to Decision 06-03-024.

Decision Number: D0701026

Rendered Date: January 25, 2007
Effective Date: January 25, 2007
Description: Corrects errors in Decision 06-11-049. These proceedings are closed.

Decision Number: D0611049

Rendered Date: November 30, 2006
Effective Date: November 30, 2006
Description: Adopts changes to 2007 utility demand response programs.

Decision Number: D0603024

Rendered Date: March 15, 2006
Effective Date: March 15, 2006
Description: Adopts settlement as set forth.