Number of Documents: 126
|
|
|
Type:
EXPARTE
|
Filing Date:
December 19, 2007
|
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
|
|
Description:
SUMMARY: EnerNOC, Inc., EnergyConnect, Inc., and Comverge, Inc., noticed oral
communication with Matthew Deal, advisor to Pres. Peevey, on December 14, 2007.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 19, 2007
|
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
|
|
Description:
SUMMARY: EnerNOC, Inc., EnergyConnect, Inc., and Comverge, Inc., noticed oral
communication with Theresa Cho, Chief of Staff, on December 14, 2007.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 19, 2007
|
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
|
|
Description:
SUMMARY: EnerNOC, Inc., EnergyConnect, Inc., and Comverge, Inc., noticed oral
communication with Robert Kinosian, advisor to Cmmr. Bohn, on December 14, 2007.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 17, 2007
|
Filed By:
Comverge, Inc.
EnerNoc, Inc.
EnergyConnect, Inc.
|
|
Description:
Reply; on the Alternate Decision of Commission President Peevey.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 17, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; on Alternate Proposed Decision of Commission President Peevey.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 10, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
on Alternate Proposed Decision of Commission President Peevey.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 10, 2007
|
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
|
|
Description:
on the Alternate Decision of Commission President Peevey.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 4, 2007
|
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
|
|
Description:
SUMMARY: On November 29, 2007, Sara Steck Myers, attorney for the EnerNOC,
Inc., EnergyConnect, Inc., and Comverge, Inc. (collectively, Joint Parties) met
with Andrew Campbell, advisor to Cmmr. Chong in San Francisco. Also present was
Richard H. Counihan, Senior Director Market Development for EnerNOC, Inc. Myers
stated that the Joint Parties had reviewed Pres. Peevey's Alternate Decision to
the Proposed Decision of ALJ Yacknin on the Joint Parties' Petition to Modify
Decision (D.) 06-11-049 and Application to Modify Resolution E-4079. Myers
indicated that the Joint Parties continued to strongly support the Proposed
Decision's modification of Resolution E-4079 adopting the Joint Parties'
recommended definition of "hard-to-reach" customers to be targeted by Pacific
Gas and Electric Company's (PG&E's) Business Energy Coalition (BEC) program and
did not support the Alternate Decision's changes to that definition. Counihan
stated that, in particular, the change by the Alternate Decision to the
Proposed Decision's definition of "hard-to-reach" customers to substitute the
term "participate," defined as recommended by PG&E, for the term "enroll,"
rendered the definition vague and dependent on information known only to one
party (PG&E). Mr. Counihan stated that the term "enroll" created a "bright
line" in defining "hard-to-reach" customers (either the customer enrolled in a
demand response program or it did not), which would allow customers,
aggregators, and the utility to have an equal understanding of and ability to
confirm BEC program customer eligibility. Contact Person: Sara Steck Myers;
telephone: (415) 387-1904; e-mail: ssmyers@att.net.
|
|
|
Type:
ALTERNATE
|
Filing Date:
November 19, 2007
|
Filed By:
CMMR/PEEVEY/CPUC
|
|
Description:
Opinion Modifying Resolution E-4079 and D.06-11-049. Opening comments, which
shall not exceed 15 pages, are due no later than December 9, 2007. Reply
comments are due 5 days after opening comments are filed.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 22, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On October 17, 2007 Sidney Dietz, Chief, Regulatory Relations of Pacific Gas
and Electric Company (PG&E) met with Matthew Deal, advisor to Pres. Peevey in
San Francisco. Also present were Andrew Campbell, advisor to Cmmr. Chong; Steve
McCarty, Director, Demand-Side Management of PG&E; and John Phillips, Executive
Director of The Energy Coalition. Dietz explained that the Business Energy
Coalition demand response program (BEC) is an important part of PG&E¿s Demand
Response portfolio. Phillips described the BEC program operations and McCarty
explained that most of the customers on the Demand Bidding Program (DBP) tariff
do not reduce electric demand during DBP program events.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 18, 2007
|
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
|
|
Description:
SUMMARY: On October 15, 2007 Sara Steck Myers, attorney for EnerNOC, Inc.,
EnergyConnect, Inc., and Comverge, Inc. (Joint Parties), met with Jaclyn Marks,
advisor to Cmmr. Simon in San Francisco. Also present at the meeting was
Richard H. Counihan, Senior Director Corporate Development for EnerNOC, Inc.
Myers stated that the Joint Parties greatly appreciated the action taken by ALJ
Yacknin to issue a timely Proposed Decision (PD) on the Joint Parties' Petition
to Modify D.06-11-049 and Application to Modify Resolution E-4079. Myers noted
that the initial PD modified Resolution E-4079 to adopt the Joint Parties'
originally proposed definition of "hard-to-reach" customers to be targeted by
Pacific Gas and Electric Company's (PG&E's) Business Energy Coalition (BEC)
program. Myers stated that the PD was appropriately revised and clarified in
response to comments and reply comments filed by the Joint Parties and PG&E,
including making a single change to the adopted definition to substitute the
term "enroll" for the word "participate." Counihan stated that the Joint
Parties fully supported the PD as revised. Counihan further noted that the PD
did not adopt all of the requests made by the Joint Parties, but had ensured a
fair outcome on the issues, consistent with Commission directives regarding the
BEC program. Contact Person: Sara Steck Myers, telephone: (415) 387-1904;
e-mail: ssmyers@att.net.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 18, 2007
|
Filed By:
Comverge, Inc
EnerNOC, Inc.
EnergyConnect, Inc.
|
|
Description:
SUMMARY: On October 15, 2007 Sara Steck Myers, attorney for EnerNOC, Inc.,
EnergyConnect, Inc., and Comverge, Inc. (Joint Parties), met with Stephen St.
Marie and Robert Kinosian, advisors to Cmmr. Bohn in San Francisco. Also
present at the meeting was Richard H. Counihan, Senior Director Corporate
Development for EnerNOC, Inc. Myers stated that the Joint Parties greatly
appreciated the action taken by ALJ Yacknin to issue a timely Proposed Decision
(PD) on the Joint Parties' Petition to Modify D.06-11-049 and Application to
Modify Resolution E-4079. Myers noted that the initial PD modified Resolution
E-4079 to adopt the Joint Parties' originally proposed definition of
"hard-to-reach" customers to be targeted by Pacific Gas and Electric Company's
(PG&E's) Business Energy Coalition (BEC) program. Myers stated that the PD was
appropriately revised and clarified in response to comments and reply comments
filed by the Joint Parties and PG&E, including making a single change to the
adopted definition to substitute the term "enroll" for the word "participate."
Counihan stated that the Joint Parties fully supported the PD as revised.
Counihan further noted that the PD did not adopt all of the requests made by
the Joint Parties, but had ensured a fair outcome on the issues, consistent
with Commission directives regarding the BEC program. Contact Person: Sara
Steck Myers, telephone: (415) 387-1904; e-mail: ssmyers@att.net.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 12, 2007
|
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
|
|
Description:
SUMMARY: On October 9, 2007 Sara Steck Myers, attorney for EnerNOC, Inc.,
EnergyConnect, Inc., and Comverge, Inc., (Joint Parties) met with Matthew Deal,
advisor to Pres. Peevey in San Francisco. Also present were Richard H.
Counihan, Senior Director Corporate Development for EnerNOC, Inc.; Rich
Quattrini, Western Region Vice President for EnergyConnect, Inc.; and Dr. Eric
Woychik, Executive Consultant for Comverge, Inc. Myers stated that the initial
Proposed Decision modified Resolution E-4079 to adopt the Joint Parties'
originally proposed definition of "hard-to-reach" customers to be targeted by
Pacific Gas and Electric Company's (PG&E's) Business Energy Coalition (BEC)
program. Myers further stated that the Proposed Decision was appropriately
revised and clarified in response to comments and reply comments filed by the
Joint Parties and PG&E, including making a single change to the adopted
definition to substitute the term "enroll" for the word "participate." Counihan
noted that the Proposed Decision did not adopt all of the requests made by the
Joint Parties, but had ensured a fair outcome on the issues, consistent with
Commission directives regarding the BEC program. Contact Person: Sara Steck
Myers, telephone: (415) 387-1904; email: ssmyers@att.net
|
|
|
Type:
EXPARTE
|
Filing Date:
October 2, 2007
|
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
|
|
Description:
SUMMARY: On September 27, 2007 Sara Steck Myers, attorney for EnerNOC, Inc.,
EnergyConnect, Inc., and Comverge, Inc., (Joint Parties), met with Andrew
Campbell, advisor to Cmmr. Chong in San Francisco. Also present were Richard H.
Counihan, Senior Director Corporate Development for EnerNOC, Inc.; Rich
Quattrini, Western Region Vice President for EnergyConnect, Inc.; Carlos
Lamas-Babbini, Program Manager for Comverge, Inc., and Eric Woychik, Executive
Consultant for Comverge, Inc. Myers stated that the Joint Parties appreciated
ALJ Yacknin issuing a timely Proposed Decision (PD) on the Joint Parties'
Petition to Modify Decision 06-11-049 and Application to Modify Resolution
E-4079. Myers further stated that the Joint Parties supported the PD's
modification of Resolution E-4079 to adopt the Joint Parties' proposed
definition of "hard-to-reach" customers to be targeted by Pacific Gas and
Electric Company's (PG&E's) Business Energy Coalition (BEC) program. Counihan
indicated that the changes to the definition of "hard-to-reach" proposed by
PG&E in its Opening Comments on the Proposed Decision should be rejected.
Quattrini also urged that the PD be modified to adopt the changes recommended
by the Joint Parties' in their Opening Comments. Contact Person: Sara Steck
Myers, telephone: (415) 387-1904; e-mail: ssmyers@att.net.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 2, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On September 27, 2007 Sidney Dietz, Manager, Regulatory Relations of Pacific
Gas and Electric Company (PG&E) met with Andrew Campbell, advisor to Cmmr.
Chong in San Francisco. Dietz stated that PG&E supports the approach of the
Proposed Decision (PD) to eligibility of customers for the Business Energy
Coalition tariff. Dietz explained that the BEC program is an important part of
PG&E's Demand Response portfolio and that it is aimed at hard-to-reach
customers. Dietz also stated that the hard-to-reach customers should include
customers who have enrolled in a demand response program, but have never
reduced electric usage during a demand response event.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 1, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; On Proposed Decision of ALJ Yacknin.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 1, 2007
|
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
|
|
Description:
Reply; to Comments of Pacific Gas and Electric Company on the Proposed Decision
of ALJ Yacknin.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 24, 2007
|
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
|
|
Description:
On Proposed Decision of ALJ Yacknin.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 24, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Opening; On Proposed Decision of ALJ Yacknin.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
September 4, 2007
|
Filed By:
ALJ/YACKNIN/CPUC
|
|
Description:
Opinion Modifying Resolution E-4079. Opening comments, which shall not exceed
15 pages, are due no later than September 24, 2007. Reply comments are due
five days after opening comments are filed.
|
|
|
Type:
MOTION
|
Filing Date:
September 4, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
To Withdraw Motion For Leave to File Confidential Version of Protest of Pacific
Gas and Electric Company to Application of Enernoc, Inc., EnergyConnect, and
Comverge to Modify Resolution E-4079 Under Seal.
|
|
|
Type:
REPLY
|
Filing Date:
August 24, 2007
|
Filed By:
Comverge, Inc.
EnerNOC, Inc.
EnergyConnect, Inc.
|
|
Description:
to Responses to Petition for Modification of D.06-11-049 and Application for
Modification of Resolution E-4079 and to Protest to Application for
Modification of Resolution E-4079.
|
|
|
Type:
PROTEST
|
Filing Date:
August 20, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to Application 07-07-022 (PUBLIC VERSION).
|
|
|
Type:
LAW & MOTION
|
Filing Date:
August 20, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Motion to File Under Seal Confidential Version of Protest to Application
07-07-022.
|
|
|
Type:
MOTION
|
Filing Date:
August 20, 2007
|
Filed By:
The Energy Coalition
|
|
Description:
for party status.
|
|
|
Type:
RESPONSE
|
Filing Date:
August 20, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
To Petition to Modify Resolution E-4079 and Decision 06-11-049.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 15, 2007
|
Filed By:
Energy Curtailment Specialist, Inc.
|
|
Description:
on Joint Petitioners to Modify Resolution E-4079 and Decision (D.) 06-11-049 By
Energy Curtailment Specialists, Inc.
|
|
|
Type:
NOTICE
|
Filing Date:
July 30, 2007
|
Filed By:
CALJ/MINKIN/CPUC
|
|
Description:
of Co-Assignment.
|
|
|
Type:
RULING
|
Filing Date:
July 30, 2007
|
Filed By:
ALJ/YACKNIN/CPUC
|
|
Description:
Consolidating Proceedings and Denying Motion to Shorten Time. The Proceedings
are consolidated. The motion for Order Shortening Time to Respond and for an
Expedited Decision is denied. The time for filing a protest to A.07-07-022
and/or a response to the petition to modify D.06-11-049 is no later than 30
days from July 19, 2007, the date the petition and application were filed.
|
|
|
Type:
RESPONSE
|
Filing Date:
July 26, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Opposition to Motion for Order Shortening Time to Respond to Petition for
Modification of Decision 06-11-049.
|
|
|
Type:
MOTION
|
Filing Date:
July 19, 2007
|
Filed By:
COMVERGE, INC.
ENERGYCONNECT, INC.
ENERNOC, INC.
|
|
Description:
for Order Shortening Time to Respond and Expdited Decision on Joint Petition
for Modification of Decision 06-11-049.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
July 19, 2007
|
Filed By:
COMVERGE, INC.
ENERGYCONNECT, INC.
ENERNOC, INC.
|
|
Description:
Joint Petition for Modification of Decision 06-11-049 and Request for Expedited
Treatment.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
May 14, 2007
|
Filed By:
ALJ/MALCOLM/CPUC
|
|
Description:
Opinion Addressing Requests for Intervenor Compensation to Aglet Consumer
Alliance and San Francisco Community Power for Substantial Contributions to
Decision 06-11-049. Opening comments, which shall not exceed 15 pages, are due
no later than June 3, 2007. Reply comments are due five days after opening
comments are filed.
|
|
|
Type:
RESPONSE
|
Filing Date:
March 15, 2007
|
Filed By:
SAN FRANCISCO COMMUNITY POWER
|
|
Description:
to Proposed Decision Denying SF Power Request for Compensation.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 15, 2007
|
Filed By:
AGLET CONSUMER ALLIANCE
|
|
Description:
on Proposed Decision of ALJ Malcolm.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
March 13, 2007
|
Filed By:
ALJ/MALCOLM/CPUC
|
|
Description:
Opinion Granting Intervenor Compensation to Aglet Consumer Alliance, The
Utility Reform Network, and San Francisco Community Power for Substantial
Contributions to Decision 06-03-024. As noted in ALJ Malcolm's e-mail note of
March 7, 2007, parties to the proceeding may
file opening comments on the
proposed decision by March 15, 2007 and reply comments by March 20, 2007.
|
|
|
Type:
RESPONSE
|
Filing Date:
March 8, 2007
|
Filed By:
SAN FRANCISCO COMMUNITY POWER
|
|
Description:
Proposal in Response to August 9 and August 22, 2006 Assigned Commissioner's
Rulings and Proposals for Enhancements to Demand Response Programs.
|
|
|
Type:
AMENDMENT
|
Filing Date:
February 1, 2007
|
Filed By:
SAN FRANCISCO COMMUNITY POWER
|
|
Description:
to Request for Compensation.
|
|
|
Type:
REQUEST
|
Filing Date:
January 19, 2007
|
Filed By:
AGLET CONSUMER ALLIANCE
|
|
Description:
for Award of Compensation.
|
|
|
Type:
REQUEST
|
Filing Date:
December 29, 2006
|
Filed By:
SAN FRANCISCO COMMUNITY POWER
|
|
Description:
for intervenor compensation.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
December 22, 2006
|
Filed By:
ALJ/MALCOLM/CPUC
|
|
Description:
Order correcting errors in Decision 06-11-049. Opening comments, which shall
not exceed 15 pages, are due no later than January 11, 2007. Reply comments are
due 5 days after the filing of Opening comments.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 27, 2006
|
Filed By:
DRA/Salvacion/CPUC
|
|
Description:
Reply; on the Proposed Decision of Commissioner Chong.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 27, 2006
|
Filed By:
EnerNOC, Inc.
|
|
Description:
Reply; on the Proposed Decision of Commissioner Chong.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 27, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; on Draft Order Adopting Changes to 2007 Demand esponse Programs.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 27, 2006
|
Filed By:
DRA/SALVACION/CPUC
|
|
Description:
Reply; to Joint Motion for Approval of the Statewide Water Agency Pilot Program.
|
|
|
Type:
REPLY
|
Filing Date:
November 27, 2006
|
Filed By:
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
JOINT; TO RESPONSES [of ACWA and DRA] ON THE STATEWIDE WATER AGENCY PILOT
PROGRAM.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 27, 2006
|
Filed By:
The Utility Reform Network
|
|
Description:
Reply; on the Proposed Decision Adopting Changes to 2007 Demand Response
Programs.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 27, 2006
|
Filed By:
WATER AND ENERGY CONSULTING
|
|
Description:
Reply; on Proposed Decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 27, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
REPLY; ON THE PROPOSED DECISION OF CMMR. CHONG
REGARDING CHANGES TO 2007
UTILITY DEMAND RESPONSE
PROGRAMS.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 27, 2006
|
Filed By:
Ice Energy, Inc.
|
|
Description:
REPLY; ON THE PROPOSED DECISION OF CMMR. CHONG REGARDING CHANGES TO 2007
UTILITY DEMAND RESPONSE PROGRAMS.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 27, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
REPLY; ON [proposed] ORDER ADOPTING CHANGES TO 2007 UTILITY DEMAND RESPONSE
PROGRAMS.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 21, 2006
|
Filed By:
WATER & ENERGY CONSULTING
|
|
Description:
Opening; on the Proposed Decision.(Filing approved by ALJ Malcolm.)
|
|
|
Type:
COMMENTS
|
Filing Date:
November 20, 2006
|
Filed By:
Silicon Valley Leadership Group
|
|
Description:
ON PROPOSED DECISION OF CMMR. CHONG.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 20, 2006
|
Filed By:
EnerNOC, Inc.
|
|
Description:
on the Proposed Decision of Commissioner Chong on Order Adopting Changes to
2007 and 2008 Utility Demand Response Programs.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 20, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
ON DRAFT ORDER ADOPTING CHANGES TO 2007 UTILITY DEMAND RESPONSE PROGRAMS.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 20, 2006
|
Filed By:
DRA/Salvacion/CPUC
|
|
Description:
ON THE PROPOSED DECISION OF COMMISSIONER CHONG.
|
|
|
Type:
RESPONSE
|
Filing Date:
November 20, 2006
|
Filed By:
DRA/SALVACION/CPUC
|
|
Description:
TO THE JOINT MOTION OF PACIFIC GAS & ELECRIC COMPANY, SAN DIEGO GAS & ELECRIC
COMPANY AND SOUTHERN CALIFORNIA EDISON FOR APPROVAL OF THE STATEWIDE WATER
AGENCY PILOT PROGRAM.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 20, 2006
|
Filed By:
California Large Energy Consumers Association
California Manufacturers & Technology Association
|
|
Description:
ON THE PROPOSED DECISION ON AUGMENTED UTILITY DEMAND RESPONSE PROGRAMS FOR 2007.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 20, 2006
|
Filed By:
Ice Energy, Inc.
|
|
Description:
on the Proposed Decision of Commissioner Chong regarding changes to 2007
Utility Demand Response Programs.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 20, 2006
|
Filed By:
Ice Energy, Inc.
|
|
Description:
Amended; (Attachment B to Comments formerly omitted)
|
|
|
Type:
COMMENTS
|
Filing Date:
November 20, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
ON ORDER ADOPTING CHANGES TO 2007 UTILITY DEMAND RESPONSE PROGRAMS.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 20, 2006
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
on the October 30, 2006, Proposed Decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 20, 2006
|
Filed By:
AGLET CONSUMER ALLIANCE
|
|
Description:
on Proposed Decision of Cmmr. Chong.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 20, 2006
|
Filed By:
ALOHA SYSTEMS, INCORPORATED
|
|
Description:
Opening;on the Proposed Decision of Commissioner Chong on Order Adopting
Changes to 2007 Utility Demand Response Programs
|
|
|
Type:
COMMENTS
|
Filing Date:
November 20, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
on the Proposed Decision of Commissioner Chong regarding changes to 2007
Utility Demand Response Programs.
|
|
|
Type:
RESPONSE
|
Filing Date:
November 16, 2006
|
Filed By:
ASSOCIATION OF WATER AGENCIES
|
|
Description:
to Utilities' Joint Motion filed Nov 3, 2006.
|
|
|
Type:
MOTION
|
Filing Date:
November 3, 2006
|
Filed By:
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
Joint; for Approval of the Statewide Water Agency Pilot Program.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
October 30, 2006
|
Filed By:
CMMR/Chong/CPUC
|
|
Description:
Comments are due November 19, 2006; reply comments - five days after comments
are filed.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 16, 2006
|
Filed By:
Ice Energy Inc.
|
|
Description:
SUMMARY: On Thursday, October 12, 2006, Frank Ramirez of Ice Energy, Inc. (Ice
Energy) met with Cmmr. Peevey in San Francisco. Also present were Andrew
Campbell, advisor to Cmmr. Chong, Nilgun Atamturk, advisor to Cmmr. Grueneich,
Sean Gallagher, Director of the Energy Division, and other participants.
Written materials (attached to the notice) were used. Ice Energy discussed its
Comments and a letter from Frederick E. Harris, Assistant Vice Chancellor of
the California Community Colleges System Office to Steve Larson, Executive
Director, dated October 11, 2006. Ice Energy's representatives urged the
Commission to approve the integrated demand response proposal based on air
conditioning thermal storage technology that is described in Ice Energy's
September 15, 2006, comments. Ice Energy also stated that the Commission should
seriously consider approving the type of air conditioning thermal storage
demand response program proposed by the California Community College System.
Contact person: Michelle Dangott; telephone (818) 961-3003; email:
mdangott@energyattorney.com
|
|
|
Type:
RESPONSE
|
Filing Date:
September 29, 2006
|
Filed By:
ASSOCIATION OF CALIFORNIA WATER AGENCIES/WATER & ENERGY CONSULTING
|
|
Description:
Proposals in Response to Cmmr. Peevey's Ruling on Demand Response.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 25, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Post Workshop Reply; on issues raised during the CPUC Workshop held on Sept 6,
2006 regarding Utility Proposals to Augment 2007 Demand Response Programs.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 22, 2006
|
Filed By:
Silicon Valley Leadership Group
|
|
Description:
ON ASSIGNED COMMISSIONER'S RULING REQUIRING UTILITY PROPOSALS TO AUGMENT 2007
DEMAND RESPONSE PROGRAMS.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 22, 2006
|
Filed By:
Southern Califonia Edison Company
|
|
Description:
Post Workshop Reply
|
|
|
Type:
COMMENTS
|
Filing Date:
September 22, 2006
|
Filed By:
CAISO
|
|
Description:
Reply; on Utility Proposals to Augment their Demand Response Programs for 2007
and 2008.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 22, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; [in response to Cmmr. Peevey's August 9 and August 22, 2006 rulings].
|
|
|
Type:
COMMENTS
|
Filing Date:
September 22, 2006
|
Filed By:
ENERNOC, INC.
|
|
Description:
Reply; in Response to Assigned Commissioner's Ruling requiring Utility
Proposals to Augmemt 2007 and 2008 Demand Response Programs and the resulting
Utility Proposals.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 22, 2006
|
Filed By:
Aglet Consumer Alliance
|
|
Description:
Reply; on Utility Proposals to Augment 2007 Demand Response Programs.
|
|
|
Type:
NOTICE
|
Filing Date:
September 22, 2006
|
Filed By:
CALJ/MINKIN/PUC
|
|
Description:
of removal from the calendar.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 22, 2006
|
Filed By:
WATER AGENCY (WATER & ENERGY CONSULTING)
|
|
Description:
reply.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 20, 2006
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
amended; on the utility proposals to augment 2007 demand response programs and
budgets.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 15, 2006
|
Filed By:
Silicon Valley Leadership Group
|
|
Description:
ON RULING [August 9, 2006] REQUIRING UTILITY PROPOSALS TO AUGMENT 2007 DEMAND
RESPONSE PROGRAMS.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 15, 2006
|
Filed By:
Aglet Consumer Alliance
|
|
Description:
on Utility Proposals to Augment 2007 Demand Response Programs.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 15, 2006
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on the utility proposal to augment 2007 demand response programs and budgets
|
|
|
Type:
COMMENTS
|
Filing Date:
September 15, 2006
|
Filed By:
ENERNOC, INC.
|
|
Description:
in response to Assigned Commissioner's Ruling requiring utility proposals to
augment 2007 and 2008 demand response programs and the resulting utility
proposals.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 15, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
Post-Workshop.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 15, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Post-Workshop; on issues raised during the CPUC Workshop held on Sept 6, 2006
regarding utility proposals to augment 2007 Demand Response Programs.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 15, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
IN RESPONSE TO ALJ MALCOLM'S REQUEST ON SEPTEMBER 7, 2006.
|
|
|
Type:
MOTION
|
Filing Date:
September 15, 2006
|
Filed By:
Energy Users Forum
|
|
Description:
TO INTERVENE; COMMENTS ON PROPOSALS TO AUGMENT 2007 DEMAND RESPONSE PROGRAMS
attached.
|
|
|
Type:
MOTION
|
Filing Date:
September 15, 2006
|
Filed By:
ICE ENERGY, INC.
|
|
Description:
to Intervene and to File Comments; ATTACHED - COMMENTS on ACR requiring Utility
Proposals to Augment 2007 Demand Response Programs.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 14, 2006
|
Filed By:
EnergyConnect, Inc.
|
|
Description:
on Utility Proposals for Enhancements to Demand Response Programs.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 14, 2006
|
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS AND TECHNOLOGY ASSOCIATION
|
|
Description:
on utility filings to augment 2007 demand response programs.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 8, 2006
|
Filed By:
ENERNOC, INC.
|
|
Description:
On September 5, 2006, David Brewster of EnerNOC, Inc. (EnerNOC), met with Lynn
Carew, advisor to Cmmr. Chong, in San Francisco. Also present were Andrew
Campbell, advisor to Cmmr. Chong, Scott McGaraghan of EnerNOC, and Rick
Counihan of Ecos Consulting. Written material (attached to the notice) was
used. EnerNOC representatives discussed the value that demand response
aggregators can bring to helping California meet its demand response targets.
EnerNOC urged the Commission to adopt the Capacity Bidding Programs as proposed
to be modified in comments by demand response aggregators; to open the
utilities' Base Interruptible Programs to aggregator participation, and to
extend the Clean Gen Program from San Diego Gas & Electric Company to Southern
California Edison Company and Pacific Gas and Electric Company. EnerNOC also
supported the utilities' proposals to increase the Technical Incentives to $250
per kW.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 8, 2006
|
Filed By:
ENERNOC, INC.
|
|
Description:
On September 6, 2006, David Brewster of EnerNOC, Inc. (EnerNOC), met with Pres.
Peevey in San Francisco. Also present were Nancy Ryan, advisor to Pres. Peevey,
Scott McGaraghan of EnerNOC, and Rick Counihan of Ecos Consulting. Written
material (attached to the notice) was used. EnerNOC representatives discussed
the role that demand response aggregators can play in facilitating demand
response programs in California. EnerNOC recommended that the Commission order
the utilities to open the Base Interruptible Programs to third party
aggregators and extend the Clean Gen program to Southern California Edison
Company and Pacific Gas and Electric Company.
|
|
|
Type:
NOTICE
|
Filing Date:
September 6, 2006
|
Filed By:
CALJ/MINKIN/PUC
|
|
Description:
of Reassignment.
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
August 30, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
ASSESSMENT OF DEMAND RESPONSE PROGRAM PERFORMANCE DURING JULY 2006 AND
PROPOSALS TO
AUGMENT ITS DEMAND RESPONSE PROGRAMS FOR 2007 AND 2008 [in
response to the August 9th ruling].
|
|
|
Type:
RESPONSE
|
Filing Date:
August 30, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
TO AUGUST 9, 2006 AND AUGUST 22, 2006 ASSIGNED
COMMISSIONER'S RULINGS AND
PROPOSALS FOR ENHANCEMENTS TO DEMAND RESPONSE PROGRAMS.
|
|
|
Type:
RULING
|
Filing Date:
August 22, 2006
|
Filed By:
CMMR/PEEVEY/CPUC
|
|
Description:
Assigned Commissioner's Ruling Augmenting August 6, 2006 Ruling requiring
Utility Proposals to Augment 2007 Demand Response Programs.
|
|
|
Type:
RULING
|
Filing Date:
August 9, 2006
|
Filed By:
CMMR/PEEVEY/CPUC
|
|
Description:
Assigned Commissioner's Ruling requiring Utility Proposals to Augment 2007
Demand Response Programs.
|
|
|
Type:
REQUEST
|
Filing Date:
May 15, 2006
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
for compensation for substantial contribution to D06-03-024.
|
|
|
Type:
REQUEST
|
Filing Date:
May 15, 2006
|
Filed By:
AGLET CONSUMER ALLIANCE
|
|
Description:
for Award of Compensation.
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
May 8, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Demand Response Report + Process Evaluation, pursuant to D.05-11-009.
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
May 4, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
(pursuant to D.05-11-009) [Automated Demand Response System Pilot + 2005 Smart
Thermostat Program Impact Evaluation]
|
|
|
Type:
REQUEST
|
Filing Date:
April 12, 2006
|
Filed By:
SAN FRANCISCO COMMUNITY POWER
|
|
Description:
for compensation.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 10, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on the Proposed Decision adopting Settlement.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 6, 2006
|
Filed By:
ENERNOC, INC.
|
|
Description:
on the proposed decision of ALJ Malcolm adopting Settlement.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 6, 2006
|
Filed By:
AGLET CONSUMER ALLIANCE
|
|
Description:
on Proposed Decision of ALJ Malcolm.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 6, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on the February 14, 2006 draft decision of ALJ Malcolm adopting settlement for
2006-2008 demand response programs.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 6, 2006
|
Filed By:
SAN FRANCISCO COMMUNITY POWER
|
|
Description:
on ALJ Malcolm's proposed decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 6, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
on the Proposed Decision adopting Settlement.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 6, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on the Proposed Decision adopting Settlement.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 6, 2006
|
Filed By:
DRA/PAULL/PUC
|
|
Description:
on the proposed decision of ALJ Malcolm.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
February 14, 2006
|
Filed By:
ALJ/MALCOLM/PUC
|
|
Description:
Adopting Settlement. Comments are due March 6, 2006; reply comments - March 10,
2006.
|
|
|
Type:
MOTION
|
Filing Date:
February 8, 2006
|
Filed By:
ENERNOC, INC.
|
|
Description:
to Intervene.
|
|
|
Type:
MOTION
|
Filing Date:
January 30, 2006
|
Filed By:
AGLET CONSUMER ALLIANCE
ASSOCIATION OF CALIFORNIA WATER AGENCIES
DRA/PAULL
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SAN FRANCISCO COMMUNITY POWER
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
|
|
Description:
for Adoption of an Amended Settlement; Amended Settlement ATTACHED.
|
|
|
Type:
RULING
|
Filing Date:
December 16, 2005
|
Filed By:
ALJ/MALCOLM/PUC
|
|
Description:
Schedules a hearing for January 17, 2006.
|
|
|
Type:
MOTION
|
Filing Date:
December 2, 2005
|
Filed By:
AGLET CONSUMER ALLIANCE
ASSOCIATION OF CALIFORNIA WATER AGENCIES
ORA/PAULL
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SAN FRANCISCO COMMUNITY POWER
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
|
|
Description:
for Adoption of Settlement; Settlement ATTACHED.
|
|
|
Type:
RULING
|
Filing Date:
November 15, 2005
|
Filed By:
ALJ/MALCOLM/PUC
|
|
Description:
Finds TURN, Aglet and SFCP eligible to claim intervenor compensation.
|
|
|
Type:
SCOPING RULING
|
Filing Date:
October 27, 2005
|
Filed By:
CMMR/PEEVEY/PUC
|
|
Description:
Confirms that this is a ratesetting matter. Schedules evidentiary hearings for
November 29 - December 5, 2005.
|
|
|
Type:
MOTION
|
Filing Date:
October 19, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
for Bridge Funding to continue 2005 Demand Response Programs.
|
|
|
Type:
PETITION
|
Filing Date:
October 5, 2005
|
Filed By:
ASSOCIATION OF CALIFORNIA WATER AGENCIES
|
|
Description:
to intervene.
|
|
|
Type:
NOTICE
|
Filing Date:
September 6, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
of intent to claim intervenor compensation.
|
|
|
Type:
NOTICE
|
Filing Date:
September 1, 2005
|
Filed By:
AGLET CONSUMER ALLIANCE
|
|
Description:
of intent to claim intervenor compensation.
|
|
|
Type:
NOTICE
|
Filing Date:
August 30, 2005
|
Filed By:
SAN FRANCISCO COMMUNITY POWER
|
|
Description:
of intent to claim compensation.
|
|
|
Type:
RULING
|
Filing Date:
July 27, 2005
|
Filed By:
ALJ/COOKE/PUC
|
|
Description:
Consolidates A05-06-006, A05-06-008, and A05-06-017. Sets the folowing
schedule: notices of intent to claim compensation - 9/6/05; evidentiary
hearings (if needed) - 10/17-20, 2005; opening brief - 11/8/05; reply brief -
11/17/05
|
|
|
Type:
RESOLUTION ALJ-176 CATEGORIZATION
|
Filing Date:
June 16, 2005
|
Filed By:
COMR/PUC
|
|
Description:
Resolution ALJ 176-3154; Ratification of preliminary determination of category
adopted.
|
|
|
Type:
APPLICATION
|
Filing Date:
June 1, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E)
|
|
Description:
for Approval of Demand Response Programs for 2006 - 2008 and Cost Recovery
Mechanism. [Ruling of July 27, 2005, consolidates A05-06-006, A05-06-008, and
A05-06-017.] [Ruling of July 30, 2007, consolidates A07-07-022 with A05-06-006,
A05-06-008 and A05-06-017.]
|