Type: PROPOSED DECISION Filing Date: November 18, 2008
Filed By:
ALJ/FUKUTOME/CPUC
Description: Decision Granting Intervenor Compensation to the Utility Reform Network and Vote Solar Initiative for Substantial Contribution to Decision 07-09-004 and Denying Compensation to Agricultural Energy Consumers Association. Opening comments, which shall not exceed 15 pages, are due December 8, 2008. Reply comments,which shall not exceed 5 pages, are due 5 days after the last day for filing comments

Type: REQUEST Filing Date: September 30, 2008
Filed By:
The Utility Reform Network
Description: for intervenor compensation for contributions to D08-07-045.

Type: COMMENTS Filing Date: July 7, 2008
Filed By:
San Diego Gas & Electric Company
Description: Reply;

Type: COMMENTS Filing Date: July 7, 2008
Filed By:
The Utility Reform Network
Description: Reply; on the proposed decision of Commissioner Chong.

Type: COMMENTS Filing Date: July 7, 2008
Filed By:
Pacific Gas and Electric Company
Description: Reply; on proposed decision of Commissioner Chong.

Type: COMMENTS Filing Date: July 7, 2008
Filed By:
Southern California Edison Company
Description: Reply; regarding the proposed decision of Commissioner Chong adopting dynamic pricing timetable and rate design guidance for Pacific Gas and Electric Company

Type: COMMENTS Filing Date: June 30, 2008
Filed By:
California Large Energy Consumer Association
Description: on the proposed decision of Commissioner Chong on dynamic pricing issues

Type: COMMENTS Filing Date: June 30, 2008
Filed By:
Ice Energy, Inc.
Description: (on proposed decision)

Type: COMMENTS Filing Date: June 30, 2008
Filed By:
Energy Producers and Users Coalition
Description: on Cmmr. Chong's proposed decision adopting dynamic pricing timetable and rate design guidance for PG&E

Type: COMMENTS Filing Date: June 30, 2008
Filed By:
DRA/ANGELOPULO/CPUC
Description: on the decision adopting dynamic pricing timetable and rate design guidance for Pacific Gas and Electric Company

Type: COMMENTS Filing Date: June 30, 2008
Filed By:
California Manufacturers and Technology Association
Description: on proposed decision adopting dynamic pricing timetable and rate design guidance

Type: COMMENTS Filing Date: June 30, 2008
Filed By:
The Utility Reform Network
Description: on the proposed decision of Commissioner Chong

Type: COMMENTS Filing Date: June 30, 2008
Filed By:
Pacific Gas and Electric Company
Description: on proposed decision of Commissioner Chong

Type: COMMENTS Filing Date: June 30, 2008
Filed By:
San Diego Gas & Electric Company
Description: Opening; on Commissioner Chong's proposed decision

Type: COMMENTS Filing Date: June 30, 2008
Filed By:
THE BUILDING OWNERS AND MANAGERS ASSOCIATIONS
Description: on the proposed decision of Commissioner Chong Adopting Dynamic Pricing Timetable and Rate Design Guidance for PG&E.

Type: PROPOSED DECISION Filing Date: June 10, 2008
Filed By:
CMMR/CHONG/CPUC
Description: Decision adopting dynamic pricing timetable and rate design guidance for Pacific Gas and Electric Company. Opening comments, which shall not exceed 15 pages, are due no later than June 30, 2008. Reply comments are due 5 days after opening comments are filed.

Type: COMMENTS Filing Date: March 21, 2008
Filed By:
Pacific Gas and Electric Company
Description: Post workshop; on straw critical peak pricing presentation.

Type: COMMENTS Filing Date: March 21, 2008
Filed By:
San Diego Gas & Electric Company
Description: on the March7, 2008 Workshop

Type: COMMENTS Filing Date: March 21, 2008
Filed By:
Kinder Morgan Energy Partners, L.P.
Description: Post-Workshop;

Type: COMMENTS Filing Date: March 21, 2008
Filed By:
Energy Producers and Users Coalition
Description: of the Energy Producers and Users Coalition

Type: COMMENTS Filing Date: March 21, 2008
Filed By:
THE BUILDING OWNERS AND MANAGERS ASSOCIATION OF SAN FRANCISCO, GREATER LOS ANGELES, ORANGE COUNTY AN
Description: on Dynamic Pricing Workshop Review of Straw CPP Rates for Large Customers

Type: COMMENTS Filing Date: March 21, 2008
Filed By:
California Large Energy Consumers Association
Description:

Type: RULING Filing Date: March 10, 2008
Filed By:
ALJ/Fukutome/CPUC
Description: Granting Motions for Party Status.

Type: COMMENTS Filing Date: February 28, 2008
Filed By:
San Diego Gas & Electric Company
Description: on the Assigned Commissioner's Ruling requesting comments on Draft Timetable and Rate Guidance and Updating Schedule.

Type: COMMENTS Filing Date: February 28, 2008
Filed By:
The Utility Reform Network
Description: On the Draft Timetable and Rate Guidance.

Type: MOTION Filing Date: February 28, 2008
Filed By:
Wal-Mart Stores, Inc.
Description: For Party Status.

Type: COMMENTS Filing Date: February 28, 2008
Filed By:
Ice Energy, Inc.
Description: (In accordance with Assigned Commissioner Rachelle B. Chong's Ruling Requesting Comments on Draft Timetable and Rate Guidance and Updating Schedule ("Ruling") issued January 23, 2008, and Administrative Law Judge, David K. Fukutome's Ruling Revising the Procedural Schedule, issued February 6, 2008).

Type: MOTION Filing Date: February 28, 2008
Filed By:
Kinder Morgan Energy Partners, L.P.
Description: for Party Status.

Type: COMMENTS Filing Date: February 28, 2008
Filed By:
Southern California Edison Company
Description: on draft timetable and rate guidance regarding Dynamic Pricing, per Commissioner Chong's Ruling dated January 23, 2008.

Type: COMMENTS Filing Date: February 28, 2008
Filed By:
BUILDING OWNERS AND MANAGERS ASSOCIATIONS OF SAN FRANCISCO, OF GREATER LOS ANGELES, OF ORANGE COUNTY
Description: on Assigned Commissioner Ruling Requesting Comments On Draft Timetable and Rate Guidance and Updating Schedule.

Type: COMMENTS Filing Date: February 28, 2008
Filed By:
Wal-Mart Stores, Inc.
Description: (per Rulings dated 1/23/08 and 2/6/08).

Type: COMMENTS Filing Date: February 28, 2008
Filed By:
Kinder Morgan Energy Partners, L.P.
Description: (per Rulings dated 1/23/08 and 2/6/08).

Type: COMMENTS Filing Date: February 28, 2008
Filed By:
DRA/ANGELOPULO/CPUC
Description: In Response to the Assigned Commissioner's Ruling on Dynamic Pricing Issues.

Type: COMMENTS Filing Date: February 28, 2008
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the January 23, 2008 Assigned Commissioner Ruling On Draft Timetable and Rate Guidance and Updating Schedule.

Type: COMMENTS Filing Date: February 28, 2008
Filed By:
California Manufacturers and Technology Association
Description: on draft timetable and rate guidance, per Assigned Commissioner's Ruling dated January 23, 2008.

Type: COMMENTS Filing Date: February 28, 2008
Filed By:
Energy Producers and Users Coalition
Description: (pursuant to the Assigned Commissioner's Ruling (ACR), as modified by the Administrative Law Judge's (ALJ) February 6, 2008 ruling on schedule).

Type: COMMENTS Filing Date: February 28, 2008
Filed By:
California Large Energy Consumers Association
Description: On Draft Proposals Contained in the Assigned Commissioner's Ruling on Draft Timetable and Rate Guidance and Updating Schedule.

Type: RULING Filing Date: February 6, 2008
Filed By:
ALJ/FUKUTOME/CPUC
Description: revising the procedural schedule.

Type: RULING Filing Date: January 23, 2008
Filed By:
CMMR/CHONG/CPUC
Description: Requesting Comments on Draft Timetable and Rate Guidance and Updating Schedule. Draft timetable and revised schedule set forth in Attachments A and B. Comments to be submitted by February 14, 2008.

Type: COMMENTS Filing Date: December 11, 2007
Filed By:
San Diego Gas & Electric Company
Description: on the November 2007 Workshop described in the August 22, 2007 Supplemental Scoping Memo and Assigned Commissioner's Ruling updating Issues List, Schedule, and Categorization.

Type: COMMENTS Filing Date: December 11, 2007
Filed By:
California Farm Bureau Federation
Description: on the November 5-6 Dynamic Pricing Workshop.

Type: COMMENTS Filing Date: December 11, 2007
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Post-Workshp; regarding dynamic pricing.

Type: COMMENTS Filing Date: December 11, 2007
Filed By:
DRA/ANGELOPULO/CPUC
Description: Post-Workshop; in response to the Assigned Commissioner's Ruling on dynamic pricing issues.

Type: COMMENTS Filing Date: December 11, 2007
Filed By:
Pacific Gas and Electric Company
Description: on the Dynamic Pricing Workshops held on November 5-6, 2007.

Type: COMMENTS Filing Date: December 11, 2007
Filed By:
California Manufacturers and Technology Association
Energy Producers and Users Coalition
Description: Post-Workshop;

Type: COMMENTS Filing Date: December 11, 2007
Filed By:
California Large Energy Consumers Association
Description: Post Workshop; on dynamic pricing issues.

Type: COMMENTS Filing Date: December 11, 2007
Filed By:
THE BUILDING OWNERS AND MANAGERS ASSOCIATIONS OF SAN FRANCISCO, GREATER LOS ANGELES, ET AL.
Description: on Dynamic Pricing Workshop on November 5 and 6, 2007.

Type: COMMENTS Filing Date: December 11, 2007
Filed By:
California Rice Millers
Description: Post-Workshop;

Type: MOTION Filing Date: December 11, 2007
Filed By:
The Utility Reform Network
Description: Conditional; for Evidentiary Hearings and Post-Workshop Comments.

Type: AMENDMENT Filing Date: November 16, 2007
Filed By:
The Utility Reform Network
Description: to Request for An Award of Compensation for Substantial Contribution to Decision 07-09-004.

Type: REQUEST Filing Date: November 6, 2007
Filed By:
The Utility Reform Network
Description: For An Award of Compensation for Substantial Contribution to Decision 07-09-004.

Type: REQUEST Filing Date: November 6, 2007
Filed By:
Vote Solar Initiative
Description: For An Award of Compensation.

Type: REQUEST Filing Date: November 2, 2007
Filed By:
Agricultural Energy Consumers Association
Description: For an Award of Compensation for Substantial Contribution to D.07-09-004.

Type: RECALENDARED Filing Date: October 25, 2007
Filed By:
DOCKET/ALJ/PUC
Description: The petition for modification of D07-09-004 by PG&E and California City-County Streetlight Association originally appeared on October 24, 2007 Daily Calendar. The proceeding number has been added.

Type: PETITION FOR MODIFICATION Filing Date: October 22, 2007
Filed By:
CALIFORNIA CITY-COUNTY STREETLIGHT ASSOCIAITION
PACIFIC GAS AND ELECTRIC COMPANY
Description: of Decision 07-09-004.

Type: COMMENTS Filing Date: October 19, 2007
Filed By:
Califormia Manufacturers and Technology Association
Description: Reply; (in response to the comments filed by PG&E, SCE, and CMTA).

Type: COMMENTS Filing Date: October 19, 2007
Filed By:
California Large Energy Consumers Association
Description: Reply; On Dynamic Pricing Issues.

Type: COMMENTS Filing Date: October 19, 2007
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; Regarding the Supplemental Scoping Memo and Assigned Commissioner's Ruling Updating Issues List, Schedule, and Categorization.

Type: COMMENTS Filing Date: October 19, 2007
Filed By:
The Utility Reform Network
Description: Reply; On Dynamic Pricing Rate Issues.

Type: COMMENTS Filing Date: October 19, 2007
Filed By:
DRA/ANGELOPULO/CPUC
Description: Reply; In Response to the Assigned Commissioner's August 22, 2007 Ruling Requesting Comments on Dynamic Pricing Issues.

Type: COMMENTS Filing Date: October 19, 2007
Filed By:
San Diego Gas & Electric Company
Description: Reply; to the Comments on the Rate Design Issues Described In the August 22, 2007 Supplemental Scoping Memo and Assigned Commissioner's Ruling Updating Issues List, Schedule, and Categorization.

Type: COMMENTS Filing Date: October 19, 2007
Filed By:
Pacific Gas and Electric Company
Description: Reply; On the Supplemental Scoping Memo and Assigned Commissioner Ruling Updating Issues List, Schedule, and Categorization.

Type: COMMENTS Filing Date: October 19, 2007
Filed By:
THE BUILDING OWNERS AND MANAGERS ASSOCIATIONS OF SAN FRANCISCO, GREATER LOS ANGELES, ET AL.
Description: Reply; on Supplemental Scoping Memo and Assigned Commissioner's Ruling updating issues list, schedule, and categorization.

Type: COMMENTS Filing Date: October 5, 2007
Filed By:
Ice Energy, Inc.
Description: on rate design issues.

Type: COMMENTS Filing Date: October 5, 2007
Filed By:
California Large Energy Consumers Association
Description: Opening; On Dynamic Pricing Issues Raised in Assigned Commissioner's Ruling of August 22, 2007.

Type: COMMENTS Filing Date: October 5, 2007
Filed By:
Southern California Edison Company
Description: on the Supplemental Scoping Memo and Assigned Commissioner's Ruling updating Issues List, Schedule, and Categorization.

Type: COMMENTS Filing Date: October 5, 2007
Filed By:
Pacific Gas and Electric Company
Description: on Questions raised in the August 22, 2007, Supplemental Scoping Memo and Assigned Commissioner's Ruling.

Type: COMMENTS Filing Date: October 5, 2007
Filed By:
California Manufacturers and Technology Association
Description: (in response to issues listed in the August 22, 2007 Assigned Commissioner's Ruling)

Type: COMMENTS Filing Date: October 5, 2007
Filed By:
The Utility Reform Network
Description: on Dynamic Pricing Rate Design Issues.

Type: COMMENTS Filing Date: October 5, 2007
Filed By:
Western Power Trading Forum
Description: in response to the Assigned Commissioner's Supplemental Scoping Memo requesting Comments on Dynamic Pricing Issues.

Type: COMMENTS Filing Date: October 5, 2007
Filed By:
DRA/ ANGELOPULO/CPUC
Description: in response to the Assigned Commissioner's August 22, 2007, Ruling requesting Comments on Dynamic Pricing Issues.

Type: COMMENTS Filing Date: October 5, 2007
Filed By:
THE BUILDING OWNERS AND MANAGERS ASSOCIATIONS OF SAN FRANCISCO, GREATER LOS ANGELES, ET AL.
Description: on Supplemental Scoping Memo and Assigned Commissioner's Ruling Updating Issues List, Schedule and Categorization.

Type: COMMENTS Filing Date: October 5, 2007
Filed By:
California Rice Millers
Description: On Dynamic Pricing Rate Design Issues Pursuant to Assignd Commissioner's Ruling of August 22, 2007.

Type: COMMENTS Filing Date: October 5, 2007
Filed By:
San Diego Gas & Electric Company
Description: on the Rate Design Issues described in the August 22, 2007, Supplemental Scoping Memo and Assigned Commissioner's Ruling Updating Issues List, Schedule, and Categorization.

Type: COMMENTS Filing Date: August 27, 2007
Filed By:
Pacific Gas and Electric Company
Description: On Proposed Decision of ALJ Fukutome.

Type: COMMENTS Filing Date: August 23, 2007
Filed By:
THE BUILDING OWNERS AND MANAGERS ASSOCIATIONS
Description: on Interim Opinion Adopting Settlements on Marginal Cost, Revenue Allocation and Rate Design (Proposed Decision of ALJ Fukutome).

Type: SCOPING RULING Filing Date: August 22, 2007
Filed By:
CMMR/CHONG/CPUC
Description: Supplemental Scoping Memo and Assigned Commissioner's Ruling Updating Issues List, Schedule, and Categorization. The list of issues and schedule are as set forth. Comments on the Rate Design section are due by October 5, 2007. Reply Comments are due by October 19, 2007. This dynamic pricing phase will be recategorized as quasi-legislative upon confirmation by the Commission.

Type: EXPARTE Filing Date: August 20, 2007
Filed By:
San Diego Gas & Electric Company
Description: SUMMARY: On August 16, 2007 Lad Lorenz, Vice President for San Diego Gas and Electric Company (SDG&E) met with Andy Campbell, advisor to Cmmr. Chong in San Francisco. Also, present was Billy Blattner, CPUC Relations Manager for SDG&E. Lorenz explained SDG&E's concern that the ACR could inadvertently delay adoption of dynamic rates, which are being considered in Phase II of SDG&E's rate case. He added that it is important for SDG&E to implement dynamic rates in conjunction with the roll-out of its Advanced Metering Infrastructure in 2008. Contact Person: Trish Rickard, telephone: (415) 202-9986, email: TRickard@SempraUtilities.com.

Type: RULING Filing Date: August 15, 2007
Filed By:
ALJ/FUKUTOME/CPUC
Description: ALJ's Ruling Granting Ice Energy, Inc. Party Status and Allowing Energy Producers and Users Coalition to File Comments Late.

Type: COMMENTS Filing Date: August 15, 2007
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on the Assigned Commissioner's Ruling requesting comments on dynamic pricing issues (late-filed authorized by ALJ Fukutome per email ruling dated 8-20-2007).

Type: MOTION Filing Date: August 14, 2007
Filed By:
Energy Producers and Users Coalition
Description: To Accept Late-Filed Comments.

Type: COMMENTS Filing Date: August 14, 2007
Filed By:
Energy Producers and Users Coalition
Description: pursuant to Assigned Commissioner's Ruling dated July 31, 2007 (late-filed authorized by ALJ Fukutome's August 15, 2007 Ruling).

Type: COMMENTS Filing Date: August 13, 2007
Filed By:
California Large Energy Consumers Association
Description: On Assigned Commissioner's Ruling Requesting Comments on Dynamic Pricing Issues.

Type: COMMENTS Filing Date: August 13, 2007
Filed By:
Western Power Trading Forum
Description: On Assigned Commissioner's Ruling Requesting Comments on Dynamic Pricing Issues.

Type: COMMENTS Filing Date: August 13, 2007
Filed By:
Southern California Edison Company
Description: On the Assigned Commissioner's Ruling Requesting Comments on Dynamic Pricing Issues.

Type: MOTION Filing Date: August 13, 2007
Filed By:
Ice Energy, Inc.
Description: for Party Status.

Type: COMMENTS Filing Date: August 13, 2007
Filed By:
The Utility Reform Network
Description: In Response to the 7-31-07 Assigned Commissioner's Ruling on Dynamic Pricing Issues.

Type: COMMENTS Filing Date: August 13, 2007
Filed By:
Pacific Gas and Electric Company
Description: In Response to the Assigned Commissioner's Ruling Requesting Comments on Dynamic Pricing Issues.

Type: COMMENTS Filing Date: August 13, 2007
Filed By:
Ice Energy, Inc.
Description: On Assigned Commissioner's Ruling Requesting Comments on Dynamic Pricing Issues.

Type: COMMENTS Filing Date: August 13, 2007
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Description: On Assigned Commissioner's Ruling Requesting Comments on Dynamic Pricing Issues.

Type: COMMENTS Filing Date: August 13, 2007
Filed By:
DRA/ANGELOPULO/CPUC
Description: In Response to the Assigned Commissioner's Ruling Requesting Comments on Dynamic Pricing Issues.

Type: COMMENTS Filing Date: August 10, 2007
Filed By:
BUILDING OWNERS AND MANAGERS ASSOCIATION
Description: On Assigned Commissioner's Ruling Requesting Comments on Dynamic Pricing Issues.

Type: PROPOSED DECISION Filing Date: August 7, 2007
Filed By:
ALJ/FUKUTOME/CPUC
Description: Interim Opinion Adopting Settlements on Marginal Cost, Revenue Allocation, and Rate Design. Opening Comments, which shall not exceed 25 pages, are due no later than August 27, 2007. Reply Comments are due 5 days after Opening Comments are filed.

Type: RULING Filing Date: July 31, 2007
Filed By:
CMMR/CHONG/CPUC
Description: Assigned Commissioner's Ruling Requesting Comments on Dynamic Pricing Issues. Interested parties shall submit comments by August 13, 2007.

Type: COMMENTS Filing Date: May 25, 2007
Filed By:
Building Owners and Managers Associations of San Francisco and California
Description: Reply; to Comments of TURN contesting the Commercial Building Master Meter Settlement Agreement.

Type: RULING Filing Date: May 25, 2007
Filed By:
ALJ/FUKUTOME/CPUC
Description: ALJ's Ruling on Procedural Matters.

Type: COMMENTS Filing Date: May 24, 2007
Filed By:
Pacific Gas and Electric Company
Description: Reply; to Comments of The Utility Reform Network contesting the Commercial Building Master Meter Settlement Agreement.

Type: COMMENTS Filing Date: May 22, 2007
Filed By:
The Utility Reform Network
Description: contesting the Commercial Building Master Meter Settlement Agreement.

Type: RULING Filing Date: May 10, 2007
Filed By:
ALJ/FUKUTOME/CPUC
Description: ALJ's Ruling Shortening Settlement Comment Period. Comments on the proposed Small Light & Power Rate Design Settlement Agreement and Commercial Building Master Meter Settlement Agreement, dated April 27, 2007, and the proposed Agricultural Rate Design Settlement, dated May 3, 2007, shall be filed no later than May 22, 2007. Reply Comments shall be filed by May 24, 2007.

Type: RULING Filing Date: May 7, 2007
Filed By:
ALJ/FUKUTOME/CPUC
Description: Granting Limited Intervention.The April 18, 2007 Late-Filed Motion to Intervene of the City and County of San Francisco (City) is granted for the limited purpose of obtaining information related to the proposed Streetlight Rate Design Settlement dated March 16, 2007.

Type: RULING Filing Date: May 7, 2007
Filed By:
ALJ/FUKUTOME/CPUC
Description: shortening settlement comment period. Comments on the proposed agricultural rate design settlement shall be filed no later than May 24, 2007.

Type: MOTION Filing Date: May 4, 2007
Filed By:
AGRICULTURAL ENERGY CONSUMERS ASSOCIATION
CALIFORNIA FARM BUREAU FEDERATION
CALIFORNIA RICE MILLERS
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
PACIFIC GAS & ELECTRIC
Description: for Adoption of Settlement Agreement

Type: REPLY Filing Date: May 3, 2007
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: to the response of Pacific Gas and Electric Company to the late filed motion to intervene of the City and County of San Francisco

Type: RESPONSE Filing Date: May 2, 2007
Filed By:
Pacific Gas and Electric Company
Description: in opposition to Late-Filed Motion to Intervene of the City and County of San Francisco.

Type: MOTION Filing Date: April 27, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of the Settling Parties for adoption of Small Light & Power Rate Design Settlement Agreement and Commercial Building Master Meter Settlement Agreement.

Type: RULING Filing Date: April 24, 2007
Filed By:
ALJ/FUKUTOME/CPUC
Description: Revising the Procedural Schedule.

Type: MOTION Filing Date: April 18, 2007
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: Late-Filed; to Intervene.

Type: RULING Filing Date: April 12, 2007
Filed By:
ALJ/FUKUTOME/CPUC
Description: on Evidentiary Hearing.

Type: REPLY Filing Date: March 27, 2007
Filed By:
Pacific Gas and Electric Company
Description: to Comments on Motion for Afoption of Marginal Cost and Revenue Allocation Settlement.

Type: RULING Filing Date: March 22, 2007
Filed By:
ALJ/FUKUTOME/CPUC
Description: Revising the Procedural Schedule.

Type: MOTION Filing Date: March 16, 2007
Filed By:
BUILDING OWNERS AND MANAGERS ASSOCIATION OF SAN FRANCISCO, GREATER LOS ANGELES, ORANGE COUNTY AND CA
CALIFORNIA CITY-COUNTY STREET LIGHT ASSOCIATION
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA LEAGUE OF FOOD PROCESSORS
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
CALIFORNIA RETAILERS ASSOCIATION
CALIFORNIA SOLAR ENERGY INDUSTRIES ASSOCIATION
COGENERATION ASSOCIATION OF CALIFORNIA
DIRECT ACCESS CUSTOMER COALITION
DRA/APPLING/CPUC
ENERGY PRODUCERS AND USERS COALITION
ENERGY USERS FORUM
FEDERAL EXECUTIVE AGENCIES
INDICATED COMMERCIAL PARTIES
PACIFIC GAS AND ELECTRIC COMPANY
PACIFIC GAS AND ELECTRIC COMPANY
PV NOW
THE UTILITY REFORM NETWORK
VOTE SOLAR
WESTERN MANUFACTURED HOUSING COMMUNITIES ASSOCIATION
Description: for Adoption of Residential Rate Design Settlement Agreement, Streetlight Rate Design Settlement Agreement and Medium and Large Light & Power Rate Design Settlement Agreement.

Type: COMMENTS Filing Date: March 12, 2007
Filed By:
Merced Irrigation District
Modesto Irrigation District
Description: regarding Motion of the Settling Parties for Adoption of Settlement Agreement on Marginal Cost and Revenue Allocation Issues.

Type: MOTION Filing Date: February 9, 2007
Filed By:
AGRICULTURAL ENERGY CONSUMERS ASSOCIATION
BUILDING OWNERS AND MANAGERS ASSOCIATION OF SAN FRANCISCO, GREATER LOS ANGELES, ORANGE COUNTY AND CA
CALIFORNIA CITY-COUNTY STREET LIGHT ASSOCIATION
CALIFORNIA FARM BUREAU FEDERATION
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA LEAGUE OF FOOD PROCESSORS
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
CALIFORNIA RETAILERS ASSOCIATION
CALIFORNIA RICE MILLERS
CALIFORNIA SOLAR ENERGY INDUSTRIES ASSOCIATION
COGENERATION ASSOCIATION OF CALIFORNIA
DIRECT ACCESS CUSTOMER COALITION
DRA/APPLING/CPUC
ENERGY PRODUCERS AND USERS COALITION
ENERGY USERS FORUM
FEDERAL EXECUTIVE AGENCIES
INDICATED COMMERCIAL PARTIES
PACIFIC GAS AND ELECTRIC COMPANY
PACIFIC GAS AND ELECTRIC COMPANY
PV NOW
THE UTILITY REFORM NETWORK
THE WESTERN MANUFACTURED HOUSING COMMUNITIES ASSOCIATION
VOTE SOLAR
Description: for Adoption of Settlement Agreement on Marginal Cost and Revenue Allocation Issues.

Type: REQUEST Filing Date: February 1, 2007
Filed By:
AGRICULTURAL ENERGY CONSUMERS ASSOCIATION
Description: for an Award of Compensation for Substantial Contribution to Decision 06-11-030.

Type: RULING Filing Date: January 9, 2007
Filed By:
ALJ/FUKUTOME/CPUC
Description: Revising the procedural schedule.

Type: RULING Filing Date: December 14, 2006
Filed By:
ALJ/FUKUTOME/CPUC
Description: Revising the Procedural Schedule.

Type: RULING Filing Date: November 9, 2006
Filed By:
ALJ/Fukutome/CPUC
Description: Revises the procedural schedule, as follows: Joint Case Management Statement and Settlement Conference Report filed 1/5/07; 2nd prehearing conference - 1/9/7; evidentiary hearing - 1/17-30/2007.

Type: PROPOSED DECISION Filing Date: October 31, 2006
Filed By:
ALJ/Fukutome/CPUC
Description: INTERIM OPINION ADOPTING AGRICULTURAL DEFINITION SETTLEMENT. Comments are due November 20, 2006; reply comments - five days after comments are filed.

Type: COMMENTS Filing Date: August 30, 2006
Filed By:
BUILDING OWNERS AND MANAGERS ASSOCIATIONS OF SAN FRANCISCO, GREATER LOS ANGELES, ORANGE COUNTY, AND
Description: on Dynamic Rate Design and Demand Response in Response to ACR and Supplemental Scoping Memo.

Type: COMMENTS Filing Date: August 25, 2006
Filed By:
Modesto Irrigation District
Description: regarding Development of Dynamic Pricing Tariffs.

Type: COMMENTS Filing Date: August 25, 2006
Filed By:
DRA/HEIDEN/CPUC
Description: on the Assigned Commissioner's Ruling on the Strategic Work Plan for Dynamic Rate Design.

Type: COMMENTS Filing Date: August 25, 2006
Filed By:
San Diego Gas & Electric Company
Description: on the Assigned Commissioner's Ruling and Supplemental Scoping Memo.

Type: COMMENTS Filing Date: August 25, 2006
Filed By:
Southern California Edison Company
Description: in Response to Assigned Commissioner's Ruling and Supplemental Scoping Memo.

Type: COMMENTS Filing Date: August 25, 2006
Filed By:
FEDERAL EXECUTIVE AGENCIES
Description: on the Assigned Commissioner's Ruling and Supplemental Scoping Memo.

Type: COMMENTS Filing Date: August 25, 2006
Filed By:
CALIFORNIA FARM BUREAU FEDERATION
Description: on the Top Priorities and Issues associated with the Development of Dynamic Pricing Tariffs.

Type: COMMENTS Filing Date: August 25, 2006
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
Description: on the Assigned Commissioner's Ruling and Supplemental Scoping Memo.

Type: COMMENTS Filing Date: August 25, 2006
Filed By:
DIRECT ACCESS CUSTOMER COALITION
Description: on Critical Peak Pricing and other Dynamic Pricing Tariff Issues.

Type: COMMENTS Filing Date: August 25, 2006
Filed By:
WAL-MART STORES, INC.
Description: on Critical Peak Pricing and other Dynamic Pricing Tariff Issues.

Type: COMMENTS Filing Date: August 25, 2006
Filed By:
CALIFORNIA LEAGUE OF FOOD PROCESSORS
Description: on the 07/25/06 Assigned Commissioner's Ruling and Supplemental Scoping Memo.

Type: COMMENTS Filing Date: August 25, 2006
Filed By:
AGRICULTURAL ENERGY CONSUMERS ASSOCIATION
Description: Opening; on Dynamic Pricing Issues.

Type: COMMENTS Filing Date: August 25, 2006
Filed By:
ENERGY PRODUCERS AND USERS COALITION
Description: on the 07/25/06 Assigned Commissioner's Ruling and Supplemental Scoping Memo.

Type: COMMENTS Filing Date: August 24, 2006
Filed By:
Pacific Gas and Electric Company
Description: on Issues presented in Assigned Commissioner's Ruling and Supplemental Scoping Memo.

Type: MOTION Filing Date: August 8, 2006
Filed By:
AGRICULTURAL ENERGY CONSUMERS ASSOCIATION
CALIFORNIA FARM BUREAU FEDERATION
CALIFORNIA RICE MILLERS
PACIFIC GAS AND ELECTRIC COMPANY
Description: of the settling parties to adopt Agricultural Definition Settlement /attached/

Type: NOTICE Filing Date: July 26, 2006
Filed By:
AGRICULTURAL ENERGY CONSUMERS ASSOCIATION
CALIFORNIA FARM BUREAU FEDERATION
CALIFORNIA RICE MILLERS
PACIFIC GAS AND ELECTRIC COMPANY
Description: of settlement conference regarding PG&E's agriculutral applicability criteria modifications.

Type: SCOPING RULING Filing Date: July 25, 2006
Filed By:
COMMR/Chong/CPUC
Description: Supplemental; The scope of this proceeding shall be supplemented as set forth; Parties are directed to file comments as described herein by August 25, 2006; this proceeding shall remain open until PG&E files its General Rate Case Phase 2 Application.

Type: RULING Filing Date: July 18, 2006
Filed By:
ALJ/FUKUTOME/CPUC
Description: GRANTING THE MOTION TO INTERVENE OF PV NOW AND THE CALIFORNIA SOLAR ENERGY INDUSTRIES ASSOCIATION

Type: RULING Filing Date: July 10, 2006
Filed By:
ALJ/FUKUTOME/CPUC
Description: ADMINISTRATIVE LAW JUDGE'S RULING EXTENDING THE PROCEDURAL SCHEDULE FOR THE AGRICULTURAL DEFINITION ISSUE. The Schedule is as set forth.

Type: MOTION Filing Date: June 30, 2006
Filed By:
CALIFORNIA SOLAR ENERGY INDUSTRIES ASSOCIATION
PV NOW
Description: to intervene.

Type: RULING Filing Date: June 28, 2006
Filed By:
ALJ/FUKUTOME/CPUC
Description: Finds Vote Solar eligible for compensation in this proceeding.

Type: RULING Filing Date: June 21, 2006
Filed By:
ALJ/FUKUTOME/CPUC
Description: Determines that AECA and TURN are eligible for compensation in this proceeding.

Type: RULING Filing Date: June 21, 2006
Filed By:
ALJ/FUKUTOME/CPUC
Description: GRANTING MOTION OF THE VOTE SOLAR INITIATIVE FOR PROTECTIVE ORDER REGARDING PERSONAL FINANCIAL INFORMATION

Type: RULING Filing Date: June 16, 2006
Filed By:
ALJ/FUKUTOME/CPUC
Description: ADMINISTRATIVE LAW JUDGE¿S RULING GRANTING THE MOTION TO INTERVENE OF THE VOTE SOLAR INITIATIVE

Type: LAW & MOTION Filing Date: June 9, 2006
Filed By:
VOTE SOLAR INITIATIVE
Description: motion for protective order regarding personal financial information of Michael Meyers and Catharine Sutker.

Type: MOTION Filing Date: June 6, 2006
Filed By:
VOTE SOLAR INITIATIVE
Description: to intervene.

Type: NOTICE Filing Date: June 2, 2006
Filed By:
VOTE SOLAR INITIATIVE
Description: of intent to cliam intervenor compensation.

Type: NOTICE Filing Date: May 26, 2006
Filed By:
THE UTILITY REFORM NETWORK
Description: of intent to claim compensation.

Type: NOTICE Filing Date: May 26, 2006
Filed By:
AGRICULTURAL ENERGY CONSUMERS ASSOCIATION
Description: of Intent to Claim Compensation.

Type: SCOPING RULING Filing Date: May 25, 2006
Filed By:
CMMR/CHONG/PUC
Description: Confirms that this is a ratesetting proceeding. Sets the following schedule: evidentiary hearing on agricultural definition issue - 8/21/6; opening briefs - 9/6; reply briefs - 9/13/6; joint case management statement & settlement conference report - 11/28/6; 2nd prehearing conference - 11/29/6; evidentiary hearing - 12/4/6; final decision on agricultural definition - 12/14/6; opening briefs - 1/12/7; reply briefs - 1/26/7; final decision - 4/26/7.

Type: PREHEARING CONFERENCE STATEMENT Filing Date: April 25, 2006
Filed By:
WESTERN MANUFACTURED HOUSING COMMUNITY ASSOCIATION
Description: [in accordance with the April 14, 2006 ruling].

Type: PREHEARING CONFERENCE STATEMENT Filing Date: April 25, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: [in accordance with the April 14, 2006 ruling].

Type: PREHEARING CONFERENCE STATEMENT Filing Date: April 25, 2006
Filed By:
ADM RICE, INC.
AMERICAN COMMODITY COMPANY, LLC
CALIFORNIA FAMILY FOODS
CONNELL RICE & SUGAR COMPANY
FAR WEST RICE, INC.
GOLD RIVER MILLS, LLC
GREAT WESTERN GROWERS
LUNDBERG FAMILY FARMS
PGP INTERNATIONAL
RIVERBEND RICE MILL, INC.
WILLIAMS RICE MILLING COMPANY
Description: of California Rice Millers [in accordance with the April 14, 2006 ruling].

Type: PREHEARING CONFERENCE STATEMENT Filing Date: April 25, 2006
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: [in accordance with the April 14, 2006 ruling].

Type: PREHEARING CONFERENCE STATEMENT Filing Date: April 24, 2006
Filed By:
CALIFORNIA LEAGUE OF FOOD PROCESSORS
Description: (Per 04/14/06 ALJ Ruling.)

Type: REPLY Filing Date: April 17, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Protest of DRA.

Type: RULING Filing Date: April 14, 2006
Filed By:
ALJ/FUKUTOME/PUC
Description: Sets a prehearing conference for May 3, 2006; Prehearing Conference Statements are due by April 25, 2006.

Type: PROTEST Filing Date: March 27, 2006
Filed By:
DRA/HEIDEN/PUC
Description: [to the application].

Type: RESOLUTION ALJ-176 CATEGORIZATION Filing Date: March 15, 2006
Filed By:
COMR/CPUC
Description: Resolution ALJ 176-3169; Ratification of preliminary determination of category adopted.

Type: APPLICATION Filing Date: March 2, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY (U39M)
Description: to revise its Electric Marginal Costs, Revenue Allocation, and Rate Design.

Top of Page   
  Back to Top of Page
2000 State of California. Gray Davis, Governor. Conditions of Use | Privacy Policy | E-mail Webmaster