Type: REPORT Filing Date: April 1, 2008
Filed By:
Pacific Gas and Electric Company
Description: Line extension data collection filing in compliance with Decision 04-05-055.

Type: REPORT Filing Date: April 1, 2008
Filed By:
Pacific Gas and Electric Company
Description: Mapping Improvement Project Phase 2 (MIP2) Fifth Annual Report in Compliance with Decision 04-05-055.

Type: REPORT Filing Date: April 1, 2008
Filed By:
Pacific Gas and Electric Company
Description: Website Improvement Report in Compliance with Decision 04-05-055.

Type: REQUEST Filing Date: December 5, 2007
Filed By:
The Utility Reform Network
Description: Amendment to Request for an Award of Compensation for Substantial Contribution to Decision 07-09-041 and Resolution G-3372 (PG&E Billing and Collection Practices).

Type: REQUEST Filing Date: November 21, 2007
Filed By:
The Utility Reform Network
Description: For An Award of Compensation for Substantial Contribution to Decision 07-09-041 and Resolution G-3372.

Type: REPORT Filing Date: May 4, 2007
Filed By:
Pacific Gas and Electric Company
Description: Supplemental Line Extension Data Collection Filing in compliance with Decision 04-05-055.

Type: RULING Filing Date: April 26, 2007
Filed By:
CMMR/PEEVEY/CPUC
Description: modifying schedule of oral argument.

Type: RULING Filing Date: April 12, 2007
Filed By:
CMMR/PEEVEY/CPUC
Description: Setting Oral Argument.

Type: RESPONSE Filing Date: April 6, 2007
Filed By:
CPSD/FOSS/CPUC
Description: to PG&E's Appeal of the Presiding Officer's Decision.

Type: RESPONSE Filing Date: April 6, 2007
Filed By:
Pacific Gas and Electric Company
Description: to Appeals of CPSD and the South San Joaquin Irrigation District.

Type: RESPONSE Filing Date: April 6, 2007
Filed By:
The Utility Reform Network
Description: to the Appeal of PG&E of the Presiding Officer's Decision.

Type: RESPONSE Filing Date: April 6, 2007
Filed By:
The Utility Reform Network
Description: to Motions of CPSD and PG&E for Oral Argument.

Type: RESPONSE Filing Date: April 5, 2007
Filed By:
Pacific Gas and Electric Company
Description: in opposition to the motion of the South San Joaquin Irrigation District to reopen record.

Type: REPORT Filing Date: April 2, 2007
Filed By:
Pacific Gas and Electric Company
Description: Mapping Improvement Project Phase 2 (MIP2) Fourth Annual Report in Compliance with Decision 04-05-055.

Type: REPORT Filing Date: April 2, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Line Extension Data Collection Filing in compliance with Decision 04-05-055.

Type: REPORT Filing Date: March 28, 2007
Filed By:
Pacific Gas and Electric Company
Description: Website Improvement; in compliance with Decision 04-05-055.

Type: MOTION Filing Date: March 26, 2007
Filed By:
Pacific Gas and Electric Company
Description: in the Billing and Collection Investigation Requesting Oral Argument.

Type: MOTION Filing Date: March 23, 2007
Filed By:
CPSD/FOSS/CPUC
Description: for Oral Argument with Points and Authorities.

Type: APPEAL Filing Date: March 22, 2007
Filed By:
CONSUMER PROTECTION AND SAFETY DIVISION - FOSS
Description: of the Decision of the Presiding Officer.

Type: APPEAL Filing Date: March 22, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of the Decision of the Presiding Officer in the Billing and Collection Investigation.

Type: APPEAL Filing Date: March 22, 2007
Filed By:
South San Joaquin Irrigation District
Description: of the Presiding Officer's Decision.

Type: MOTION Filing Date: March 21, 2007
Filed By:
South San Joaquin Irrigation District
Description: to Set Aside Submission and Reopen the Record for the Taking of Additional Evidence.

Type: PROPOSED DECISION Filing Date: February 20, 2007
Filed By:
ALJ/YACKNIN/CPUC
Description: Presiding Officer's Decision. Any party may file an Appeal within 30 days of the date of issuance of this decision. Any Commissioner may file a Request for Review within 30 days of the date of issuance. Any party may file a Response to an Appeal or Request for Review no later than 15 days after the date the Appeal or Request for Review was filed.

Type: AMENDMENT Filing Date: January 10, 2007
Filed By:
The Utility Reform Network
Description: to Opening Brief in the Billing and Collections Phase of I.03-01-012. (Table of Authorities added as Attachment A).

Type: AMENDMENT Filing Date: January 10, 2007
Filed By:
The Utility Reform Network
Description: to Reply Brief in the Billing and Collections Phase of I.03-01-012. (Table of Authorities added as Attachment A).

Type: TRANSCRIPT Filing Date: December 26, 2006
Filed By:
REPORTING DIVISION
Description: Submitted; Volume 48.

Type: RULING Filing Date: November 20, 2006
Filed By:
ALJ/Yacknin/CPUC
Description: SETTING ASIDE SUBMISSION TO TAKE ORAL ARGUMENT.

Type: NOTICE Filing Date: October 31, 2006
Filed By:
ALJ/MINKIN/CPUC
Description: O F R E A S S I G N M E N T.

Type: RESPONSE Filing Date: August 25, 2006
Filed By:
CPSD/FOSS/CPUC
Description: Reply to PG&E's August 15, 2006, Motion to Strike.

Type: MOTION Filing Date: August 15, 2006
Filed By:
Pacific Gas and Electric Company
Description: to Strike Portions of the Reply Brief of CPSD.

Type: BRIEF Filing Date: July 28, 2006
Filed By:
CPSD/FOSS/CPUC
Description: Reply; to the Opening Brief of PG&E in the Billing and Collection Investigation.

Type: BRIEF Filing Date: July 28, 2006
Filed By:
THE UTILITY REFORM NETWORK
Description: Reply; in the billing and collections phase of I 03-01-012; pursuant to schedule established by ALJ Halligan.

Type: BRIEF Filing Date: July 28, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Reply; in the billing and collection investigation

Type: BRIEF Filing Date: July 28, 2006
Filed By:
SO. SAN JOAQUIN IRRIGATION DISTRICT
Description: Reply; pursuant to the revised procedural schedule adopted by ALJ Halligan.

Type: BRIEF Filing Date: July 7, 2006
Filed By:
CPUC/CPSD/FOSS
Description: Opening; regarding PG&E Billing and Collection Practices.

Type: BRIEF Filing Date: July 7, 2006
Filed By:
THE UTILITY REFORM NETWORK
Description: opening; in the billing & collections phase of I03-01-012.

Type: BRIEF Filing Date: July 7, 2006
Filed By:
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
Description: opening.

Type: BRIEF Filing Date: July 7, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: opening; in the billing and collection investigation.

Type: RULING Filing Date: July 3, 2006
Filed By:
ALJ/Halligan/CPUC
Description: ENTERING EXHIBITS INTO THE EVIDENTIARY RECORD.

Type: TRANSCRIPT Filing Date: June 5, 2006
Filed By:
REPORTING DIVISION
Description: Submitted; Volume 47.

Type: RULING Filing Date: May 16, 2006
Filed By:
ALJ/HALLIGAN/PUC
Description: on Request to Submit Surrebutal Testimony.

Type: MOTION Filing Date: May 10, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to strike portions of the rebuttal testimony of the CPSD.

Type: RESPONSE Filing Date: April 25, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Motion to Strike Portions of Testimony.

Type: MOTION Filing Date: April 10, 2006
Filed By:
CPSD/FOSS/PUC
Description: to strike portions of PG&E's testimony relating to Southern California Edison.

Type: COMPLIANCE FILING Filing Date: April 3, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: in compliance with D04-05-055: Mapping Improvement Project Phase 2 Third Annual Report.

Type: COMPLIANCE FILING Filing Date: April 3, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: in compliance with D04-05-055: Line Extension Data Collection Filing.

Type: COMPLIANCE FILING Filing Date: April 3, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: in compliance with D04-05-055: Website improvement report.

Type: RESPONSE Filing Date: March 6, 2006
Filed By:
CPSD/FOSS/PUC
Description: to PG&E's motion to strike.

Type: RESPONSE Filing Date: March 6, 2006
Filed By:
THE UTILITY REFORM NETWORK
Description: to the motion of PG&E to strike portions of the prepared testimony of the CPSD and TURN.

Type: MOTION Filing Date: February 17, 2006
Filed By:
PACIFIC GAS AND ELECTRIC CO.
Description: To Strike Portions of the Prepared Testimony of CPSD and TURN

Type: RULING Filing Date: February 16, 2006
Filed By:
ALJ/HALLIGAN/PUC
Description: Revises a schedule for the proceeding, as follows: May 15, 2006 - prehearing conference; May 24th - evidentiary hearings, 7/7/6 - concurrent opening briefs filed, 7/28 - concurrent reply briefs filed; 9/26/6 - presiding officer's decision.

Type: EXPARTE Filing Date: December 19, 2005
Filed By:
ORA/TUDISCO/PUC
Description: On December 14, 2005, Dana Appling, Director of the Office of Ratepayer Advocates (ORA), met with Pres. Peevey in San Francisco. Also present were Marc Pocta, Program Manager, and Harvey Morris, Assistant General Counsel, for the ORA. Morris stated that ORA is requesting the Commission adopt the proposed decision of ALJ Halligan. Morris explained that the alternate decision which grants PG&E a rate increase for pension contributions effective January 2006 is inconsistent with the terms of the last general rate case (GRC) settlement and four-year GRC cycle. Pocta expressed the concerns that the alternate adopts PG&E's opinion as the funding status of PG&E's pension trust without allowing other parties to express their views. Pocta noted that the appropriate level of funding is a complex policy matter that should be considered in the GRC. Pocta noted that PG&E has addressed pension funding for 2007-2009 in its current GRC.

Type: EXPARTE Filing Date: December 15, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On December 12, 2005, Jennifer Dowdell, Chief, Regulatory Relations, Pacific Gas and Electric Company, had a telephone conversation with David Gamson, advisor to Cmmr. Brown. Dowdell clarified that funding a 2006 pension contribution in 2006 rates subject to refund would result in lower costs to customers than if the Commission approved contributions for all years as part of the 2007 general rate case.

Type: EXPARTE Filing Date: December 14, 2005
Filed By:
ORA/TUDISCO/PUC
Description: On December 12, 2005, Marc Pocta, Program Manager of the Office of Ratepayer Advocates (ORA), met with Stephen St. Marie, advisor to Cmmr. Bohn, in San Francisco. Also present was Laura Tudisco, Staff Counsel, for the ORA. Tudisco stated that ORA is urging the Commission to adopt the proposed decision of ALJ Halligan and not to adopt the alternate decision which grants Pacific Gas and Electric Company (PG&E) rate increase for pension contributions in violation of basic due process protections. Pocta expressed his concerns that the alternate adopts PG&E's opinions as to the funding status of PG&E's pension trust without allowing other parties to express their views. Pocta and Appling noted that the appropriate level of funding is a complex policy matter that should be considered in the general rate case.

Type: EXPARTE Filing Date: December 13, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On December 9, 2005, Brian Cherry, Director, Regulatory Relations, Pacific Gas and Electric Company (PG&E), sent by e-mail a letter (attached to the notice) to Cmmrs. Peevey, Brown, Grueneich, Kennedy and Bohn. Copy of the letter was also e-mailed to Nilgun Atamturk and Aaron Johnson, advisors to Cmmr. Grueneich, Karl Bemesderfer and Brian Prusnek, advisors to Cmmr. Kennedy, David Gamson, Advisor to Cmmr. Brown, Rami Kahlon, advisor to Cmmr. Peevey, and Stephen St. Marie, advisor to Cmmr. Bohn. The letter concerned PG&E's petition to modify D04-05-055 on pension contributions.

Type: EXPARTE Filing Date: December 12, 2005
Filed By:
ORA/TUDISCO/PUC
Description: On December 9, 2005, Dana Appling, Director of the Office of Ratepayer Advocates (ORA), met with Aaron Johnson, advisor to Cmmr. Grueneich, in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, and Mark Pocta, Program Manager, and Laura Tudisco, Staff Counsel, for the ORA. Tudisco stated that ORA is urging the Commission to adopt the proposed decision of ALJ Halligan and not to adopt the alternate decision which grants Pacific Gas and Electric Company (PG&E) rate increase for pension contributions in violation of basic due process protections. Pocta and Appling expressed their concerns that the alternate adopts PG&E's opinions as to the funding status of PG&E's pension trust without allowing other parties to express their views. Pocta and Appling noted that the appropriate level of funding is a complex policy matter that should be considered in the general rate case.

Type: EXPARTE Filing Date: December 12, 2005
Filed By:
ORA/TUDISCO/PUC
Description: On December 7, 2005, Dana Appling, Director of the Office of Ratepayer Advocates, wrote a letter (attached to the notice) to Cmmrs. Peevey, Kennedy, Brown, Grueneich, and Bohn. The letter asks the Commission to adopt the proposed decision of ALJ Halligan that denies the petition for modification of Pacific Gas and Electric Company relating to pension contributions.

Type: COMMENTS Filing Date: December 12, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on Draft Decision regarding pension contributions.

Type: COMMENTS Filing Date: December 12, 2005
Filed By:
ORA/TUDISCO/PUC
Description: reply; on the proposed decision of ALJ Halligan and the proposed alternate of Cmmr. Peevey on the petition to modify D04-05-055 regarding pension contributions.

Type: COMMENTS Filing Date: December 5, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on Draft Decision regarding pension contributions.

Type: COMMENTS Filing Date: December 5, 2005
Filed By:
ORA/TUDISCO/PUC
Description: on the Proposed Decision of ALJ Halligan and the Proposed Alternate of Cmmr. Peevey on the petition to modify D04-05-055 re pension contributions.

Type: RULING Filing Date: November 17, 2005
Filed By:
ALJ/HALLIGAN/PUC
Description: Grants the November 7, 2005 Motion of TURN for approval of a nondisclosure and protective agreement.

Type: DRAFT DECISION Filing Date: November 15, 2005
Filed By:
ALJ/HALLIGAN/PUC
Description: Comments are due December 4, 2005; reply comments - 5 days after comments are filed.

Type: ALTERNATE Filing Date: November 15, 2005
Filed By:
CMMR/PEEVEY/PUC
Description: Comments are due December 4, 2005; reply comments - 5 days after comments are filed.

Type: LAW & MOTION Filing Date: November 7, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: for approval of a nondisclosure and protective agreement.

Type: EXPARTE Filing Date: October 18, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On October 13, 2005, Brian Cherry, Director, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Pres. Peevey in San Francisco. Also present were Julie Fitch, advisor to Pres. Peevey, and Dan Richard, Senior Vice President, Governmental and Regulatory Relations, PG&E, and Peter Corippo, Director, Investments and Benefit Finance, PG&E Corporation. Cherry discussed PG&E's petition for modification of the 2003 General Rate Case and explained that PG&E was seeking to modify the 2003 GRC to allow PG&E to file an application for a pension showing in 2006. Richard stated that the Commission specifically allowed PG&E to seek this authority in the last GRC due to changed circumstances and that the pension plan would continue to remain below funding levels over the next five years without a contribution.

Type: PETITION FOR MODIFICATION Filing Date: October 14, 2005
Filed By:
GREENLINING INSTITUTE
Description: of D05-08-028.

Type: EXPARTE Filing Date: October 6, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On October 3, 2005, Brian Cherry, Director, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Robert Lane, advisor to Cmmr. Bohn, and Aaron Johnson, advisor to Cmmr. Grueneich, in two separate meetings in San Francisco. At the meeting with Robert Lane also present was Stephen St. Marie, advisor to Cmmr. Bohn. Jennifer Dowdell, Manager, Regulatory Relations, PG&E, also attended the meetings. Written materials (attached to the notice) were used. Cherry indicated that unlike its status at the time of the 2003 General Rate Case (GRC) decision, PG&E's pension was currently underfunded and that all PG&E was requesting in its Petition for Modification was an opportunity to make a showing in support of a 2006 pension contribution. Dowdell clarified that to begin pension contributions in 2006 would result in lower costs to customers than if the Commission waited to approve contributions in the 2007 GRC.

Type: EXPARTE Filing Date: September 30, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On September 27, 2005, Brian Cherry, Director, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Karl Bemesderfer, advisor to Cmmr. Kennedy, in San Francisco. Also present was Jennifer Dowdell, Manager, Regulatory Relations, PG&E. Written materials (attached to the notice) were used. Cherry indicated that unlike its status at the time of the 2003 General Rate Case (GRC) decision, PG&E's pension was currently underfunded and that all PG&E was requesting in its Petition for Modification was an opportunity to make a showing in support of a 2006 pension contribution. Dowdell clarified that to begin pension contributions in 2006 would result in lower costs to customers than if the Commission waited to approve contributions in the 2007 GRC.

Type: RULING Filing Date: August 26, 2005
Filed By:
ALJ/HALLIGAN/PUC
Description: on Notices of Intent to Claim Intervenor Compensation. Finds that the Greenlining Institute and TURN are eligible for an award of intervenor compensation.

Type: REPLY Filing Date: August 22, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Responses to Petition to Modify D04-05-055 Regarding Pension Contributions.

Type: RESPONSE Filing Date: August 12, 2005
Filed By:
ORA/TUDISCO/PUC
Description: to the petition to modify D04-05-055 regarding pension contributions.

Type: RESPONSE Filing Date: August 12, 2005
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: to Petition of PG&E to Modify D04-05-005 Regarding Pension.

Type: RULING Filing Date: August 11, 2005
Filed By:
ALJ HALLIGAN/PUC
Description: Joint Motion of PG&E and CPSD for an Extension of Time is granted. Evidentiary hearings will begin on 04/24/06 instead of 04/17/06. (The new schedule is set forth in the Ruling)

Type: RESPONSE Filing Date: July 27, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: in support of the joint motion of PG&E and CPSD for an extension of the existing schedule in the Commission's billing investigation.

Type: MOTION Filing Date: July 15, 2005
Filed By:
CPSD/REIGER/PUC
PACIFIC GAS AND ELECTRIC COMPANY
Description: joint; for an extension of the existing schedule in the Commission's Billing Investigation.

Type: PETITION FOR MODIFICATION Filing Date: July 13, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of D04-05-055 regarding penison contributions.

Type: REPORT Filing Date: July 1, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Pursuant to D04-05-055.

Type: MOTION Filing Date: June 16, 2005
Filed By:
CPSD/REIGER/PUC
Description: to withdraw a motion for an order compelling responses to data requests.

Type: SCOPING RULING Filing Date: May 26, 2005
Filed By:
CMMR/PEEVEY/PUC
Description: Concerns Phase II of I03-01-012. Determines that the appropriate category for this proceeding is adjudicatory. Sets prehearing conference for January 5, 2006, and evidentiary hearings - for January 9, 2006. Final decision should issue approximately on June 1, 2006.

Type: RESPONSE Filing Date: May 20, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to CPSD's motion for an order compelling responses to data requests.

Type: LAW & MOTION Filing Date: May 13, 2005
Filed By:
CPSD/REIGER/PUC
Description: motion for an order compelling responses to data requests.

Type: NOTICE Filing Date: April 20, 2005
Filed By:
GREENLINING INSTITUTE
Description: of intent to seek compensation [in the billing and collection phase of the proceeding].

Type: NOTICE Filing Date: April 15, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: of intent to claim compensation [in the billing and collections phase].

Type: COMPLIANCE FILING Filing Date: April 1, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: in compliance with D04-05-055: Mapping Improvement Project Phase 2 (MIP2) Second Annual Report.

Type: COMPLIANCE FILING Filing Date: March 24, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: in compliance with D04-05-055: Website Improvement Report.

Type: PREHEARING CONFERENCE STATEMENT Filing Date: March 15, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: [in accordance with the Feb. 25, 2005 ruling].

Type: PREHEARING CONFERENCE STATEMENT Filing Date: March 15, 2005
Filed By:
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
Description: [in accordance with the Feb. 25, 2005 ruling].

Type: PREHEARING CONFERENCE STATEMENT Filing Date: March 15, 2005
Filed By:
CPSD/REIGER/PUC
Description: [in accordance with the Feb. 25, 2005 ruling].

Type: PREHEARING CONFERENCE STATEMENT Filing Date: March 15, 2005
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: [in accordance with the Feb. 25, 2005 ruling].

Type: PREHEARING CONFERENCE STATEMENT Filing Date: March 15, 2005
Filed By:
GREENLINING INSTITUTE
Description: for the March 22, 2005 prehearing conference.

Type: PREHEARING CONFERENCE STATEMENT Filing Date: March 15, 2005
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: [in accordance with the Feb. 25, 2005 ruling].

Type: PREHEARING CONFERENCE STATEMENT Filing Date: March 15, 2005
Filed By:
ORA/TUDISCO/PUC
Description: [in accordance with the Feb. 25, 2005 ruling].

Type: PREHEARING CONFERENCE STATEMENT Filing Date: March 15, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: [pusuant to the February 25, 2005 ruling].

Type: RULING Filing Date: March 14, 2005
Filed By:
ALJ/TRP/PUC
Description: directing the Docket Office to retitle PG&E's submitted document.

Type: MOTION Filing Date: March 7, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: for Clarification of Assigned Commissioner's Ruling.

Type: RULING Filing Date: February 25, 2005
Filed By:
CMMR/PEEVEY/PUC
Description: Grants the November 9, 2004 motion of TURN for an investigation into PG&E's billing and collection practices. The investigation will be conducted in I03-01-012. Sets a prehearing conference for March 22, 2005. Prehearing conference statements should be filed by March 15, 2005.

Type: REPORT Filing Date: February 4, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on Delayed and Estimated Bills From 2000 through 2004.

Type: REPORT Filing Date: January 28, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Line Extension Data Collection Report.

Type: REPLY Filing Date: January 20, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: to PG&E's response to the motion for an investigation.

Type: RESPONSE Filing Date: January 18, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to San Francisco's Motion Regarding December 20, 2003 Electric Outage.

Type: REQUEST Filing Date: January 6, 2005
Filed By:
AGLET CONSUMER ALLIANCE
Description: for Award of Compensation.

Type: REQUEST Filing Date: January 3, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: for compensation for substantial contributions to D04-05-055 and D04-10-034.

Type: RESPONSE Filing Date: December 30, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to motion of TURN for an investigation into billing and collection practices.

Type: MOTION Filing Date: December 20, 2004
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: requesting procedures to ensure implementation of CPSD recommendations and to determine appropriate fines and penalties.

Type: EXPARTE Filing Date: December 13, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On December 8, 2004, Gordon Smith, President and Chief Executive Officer, PG&E Utility (PG&E), met with Cmmr. Peevey in San Francisco. Also present were Julie Fitch and Rami Kahlon, advisors to Pres. Peevey, and Tom Bottorff, Senior Vice-President, Customer Service and Revenue, and Karen Tomcala, Vice-President, Regulatory Relations, for PG&E. Smith emphasized that PG&E consistently operates within the CPUC's established billing policies. Bottorff discussed PG&E's transition to a new billing system resulted in higher than normal incidence of delayed bills. Bottorff noted that the number of delayed bills were now at historic lows. Tomcala stated that the proposed resolution approved PG&E's request to change its tariff prospectively, but erroneously sought to mandate additional changes retrospectively. Tomcala explained that retrospective treatment of these matters was unlawful.

Type: PETITION FOR MODIFICATION Filing Date: December 10, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of Decision 04-05-055 to extend due date for submission of Audited Data concerning Executive Compensation.

Type: EXPARTE Filing Date: December 3, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On November 30, 2004, Gordon Smith, President and Chief Executive Officer, PG&E Utility (PG&E), met with Cmmr. Kennedy in San Francisco. Also present were Brian Prusnek and Ross LaJeunesse, advisors to Cmmr. Kennedy, and Tom Bottorff, Senior Vice-President, Customer Service and Revenue, and Karen Tomcala, Vice-President, Regulatory Relations, for PG&E. Smith emphasized that PG&E consistently operates within the CPUC's established billing policies. Bottorff discussed PG&E's transition to a new billing system resulted in higher than normal incidence of delayed bills. Bottorff noted that the number of delayed bills were now at historic lows. Tomcala stated that the proposed resolution approved PG&E's request to change its tariff prospectively, but erroneously sought to mandate additional changes retrospectively. Tomcala explained that retrospective treatment of these matters was unlawful.

Type: MOTION Filing Date: November 9, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: for an investigation into PG&E's billing and collection practices.

Type: EXPARTE Filing Date: October 28, 2004
Filed By:
ORA/PELEO/PUC
Description: On October 26, 2004, Mark Pocta, Program Manager with the Office of Ratepayer Advocates (ORA), met with Brian Prusnek, advisor to Cmmr. Kennedy, in San Francisco. Pocta stated that ORA was concerned with the magnitude of the potential penalties and rewards of $41.6 million as set forth in the alternate proposed decisions of both Cmmr. Wood and Cmmr. Kennedy. Pocta stated that if the Commission intent is on adopting an incentive mechanism, he recommended that the mechanism be modified to incorporate more modest System Average Interruption Duration Index and System Average Interruption Frequency Index rewards and penalties totaling $24 million, as originally proposed by PG&E.

Type: COMMENTS ON ALTERNATE Filing Date: October 26, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on alternate of Cmmr. Kennedy in the storm/reliability phase of the 2003 GRC.

Type: EXPARTE Filing Date: October 26, 2004
Filed By:
ORA/PELEO/PUC
Description: On October 25, 2004, Mark Pocta, Program Manager of the Office of Ratepayer Advocates (ORA), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present was Raminder Kahlon, advisor to Pres. Peevey. Pocta urged the adoption of the proposed decision of ALJ Halligan. Pocta explained that ORA was especially concerned with the magnitude of the potential penalties and rewards of $41.6 million in the alternate proposed decisions (APDs) of both Cmmr. Wood and Cmmr. Kennedy. Pocta stated that if the Commission intends to adopt an incentive mechanism, ORA recommends that the mechanism be modified to incorporate more modest System Average Interruption Duration Index and System Average Interruption Frequency Index rewards and penalties totaling $24 million, as originally proposed by Pacific Gas and Electric Company, rather than $41.6 million the APDs would adopt.

Type: COMMENTS ON ALTERNATE Filing Date: October 26, 2004
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: reply; on the alternate of Cmmr. Kennedy.

Type: COMMENTS ON ALTERNATE Filing Date: October 21, 2004
Filed By:
COALITION OF CALIFORNIA UTILITY EIMPLOYEES
Description: of Cmmr. Kennedy.

Type: COMMENTS ON ALTERNATE Filing Date: October 21, 2004
Filed By:
ORA/PELEO/PUC
Description: of Cmmr. Kennedy.

Type: COMMENTS ON ALTERNATE Filing Date: October 21, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: of Cmmr. Kennedy on storm and reliability issues.

Type: COMMENTS ON ALTERNATE Filing Date: October 21, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: opening; on alternate of Cmmr. Kennedy on storm/reliability phase of the 2003 GRC.

Type: ALTERNATE Filing Date: October 14, 2004
Filed By:
CMMR/KENNEDY/PUC
Description: Interim Opinion on Storm and Reliability Issues. Comments are due October 21, 2004; reply comments - October 26, 2004.

Type: EXPARTE Filing Date: October 6, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On October 1, 2004, Erik Jacobson, Chief of Regulatory Relations of Pacific Gas and Electric Company (PG&E), met with David Gamson, advisor to Cmmr. Brown, and Brian Prusnek, advisor to Cmmr. Kennedy, in two separate meetings in San Francisco. Also present were Jeff Butler, Senior Vice President, Transmission and Distribution, Bill Blastic, Director, Electric Control Center Operations, and Jennifer Dowdell, Manager, Regulatory Relations, for PG&E. Written material (attached to the notice) was used. Butler, Blastic and Jacobson emphasized the importance of adopting reasonable benchmarks for any reliability incentive mechanism. Butler described the impact of weather on PG&E's historical SAIDI performance and stated that PG&E was committed to improve its reliability.

Type: EXPARTE Filing Date: August 27, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On August 24, 2004, Brian Cherry, Director of Regulatory Relations of Pacific Gas and Electric Company (PG&E), met with Brian Prusnek, advisor to Cmmr. Kennedy, in San Francisco. Also present were Bill Blastic, Director, Electric Control Center Operations, and Erik Jacobson, Chief, Regulatory Relations, for PG&E. Cherry emphasized the importance of adopting the terms of the PG&E/CUE agreement to the greatest extent possible. Blastic described the parameters of an incentive mechanism for PG&E based on the mechanism adopted by the Commission for Southern California Edison in its general rate case.

Type: RESPONSE Filing Date: August 25, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to requests of the NRDC, Aglet and the Greenlining Institute for intervenor compensation.

Type: EXPARTE Filing Date: August 9, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On August 4, 2004, Erik Jacobson, Chief, Regulatory Relations of Pacific Gas and Electric Company (PG&E), met with Cmmr. Brown, in San Francisco. Also present were David Gamson and Peter Hanson, advisors to Cmmr. Brown, and Bill Blastic, Director, Electric Control Center, PG&E. Written material (copy attached to the notice) was used. Jacobson stated that PG&E recommends that the Commission adopt the reliability incentive mechanism agreed to by PG&E and CUE. Jacobson indicated that in the event that the Commission does not provide PG&E with the incremental revenues necessary to achieve the reliability benchmarks in the PG&E/CUE joint agreement, the benchmarks should be revised. Jacobson explained the importance of having a deadband large enough to account for performance variations due to weather. Blastic stated that reliability performance statistics are not comparable across utilities. Blastic compared and contrasted alternative incentive mechanisms.

Type: REQUEST Filing Date: August 2, 2004
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: for award of intervenor compensation.

Type: SUPPLEMENT Filing Date: July 28, 2004
Filed By:
THE GREENLINING INSTITUTE
Description: to Request for Intervenor Compensation for substantial contribution to D04-05-055 and request for ruling.

Type: REQUEST Filing Date: July 26, 2004
Filed By:
GREENLINING INSTITUTE
Description: for intervenor compensation for substantial contribution to D04-05-055.

Type: EXPARTE Filing Date: July 26, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On July 21, 2004, Erik Jacobson, Chief, Regulatory Relations of Pacific Gas and Electric Company (PG&E), met with Brian Prusnek, advisor to Cmmr. Kennedy, in San Francisco. Also present was Bill Blastic, Director, Electric Control Center Operations, PG&E. Written material (attached to the notice) was used. Jacobson stated that PG&E recommends that the Commission adopt the reliability incentive mechanism agreed to by PG&E and CUE. Jacobson explained that in the event that the Commission does not provide PG&E with the incremental revenues necessary to achieve the reliability targets in PG&E/CUE joint agreement, PG&E recommends that the benchmarks be based on PG&E's average historical performance and that the deadband be large enough to account for performance variations. Blastic explained that reliability performance statistics are not comparable across utilities.

Type: EXPARTE Filing Date: July 20, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On July 20, 2004, Brian Cherry, Director, Regulatory Relations of Pacific Gas and Electric Company (PG&E), met with Brian Prusnek, advisor to Cmmr. Kennedy, in San Francisco. Written material (attached to the notice) was used. Cherry stated that PG&E was committed to improving its SAIDI and SAIFI response times, but that the revised Halligan decision and the alternate decision of Cmmr. Wood were unbalanced. Cherry stated that the Commission's recent approval of the CUE/Edison agreement should serve as a guide with regards to both SAIDI and SAIFI percentage targets and size of the dead band.

Type: RESPONSE Filing Date: July 19, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Mothers for Peace request for award of compensation for substantial contribution to D04-05-055.

Type: EXPARTE Filing Date: July 14, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On July 9, 2004, Erik Jacobson, Chief of Regulatory Relations of Pacific Gas and Electric Company (PG&E), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Written materials (copies attached to the notice) were used. Jacobson explained that PG&E is opposed to the alternate proposed decision of Cmmr. Wood because it is unbalanced.

Type: EXPARTE Filing Date: July 14, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On July 9, 2004, Erik Jacobson, Chief of Regulatory Relations of Pacific Gas and Electric Company (PG&E), met with Brian Prusnek, advisor to Cmmr. Kennedy, in San Francisco. Jacobson explained that PG&E is opposed to the alternate proposed decision of Cmmr. Wood because it is unbalanced.

Type: EXPARTE Filing Date: July 9, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On July 6, 2004, Brian Cherry, Director, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Pres. Peevey in San Francisco. Also present were Julie Fitch, advisor to Pres. Peevey, and Jeff Butler, Senior Vice President, Transmission and Distribution, Lise Jordan, Attorney, and Eric Jacobson, Chief, Regulatory Relations, for PG&E. Cherry stated that PG&E is opposed to the alternate proposed decision of Cmmr. Wood because it is unbalanced and punitive.

Type: EXPARTE Filing Date: July 7, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On July 1, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Brian Prusnek, advisor to Cmmr. Kennedy, in San Francisco. Jacobson explained that PG&E is opposed to the alternate proposed decision of Cmmr. Wood because it is unbalanced and punitive.

Type: EXPARTE Filing Date: July 7, 2004
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: On July 1, 2003, Marc Joseph, attorney for the Coalition of California Utility Employees (CUE), met with Cmmr. Peevey in San Francisco. Also present was Art Carter, representing CUE. Joseph stated that while CUE preferred the original agreement between CUE and Pacific Gas and Electric Company (PG&E), if the Commission was not interested in providing additional revenue to PG&E even for reliability improvements, the Commission should adopt the Cmmr. Wood's alternate decision.

Type: COMMENTS ON ALTERNATE Filing Date: July 6, 2004
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: reply; on the alternate of Cmmr. Wood.

Type: COMMENTS ON ALTERNATE Filing Date: July 6, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on alternate of Cmmr. Wood in the storm/reliability peformance phase.

Type: COMMENTS ON ALTERNATE Filing Date: July 6, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on the alternate of Cmmr. Wood on storm and reliability issues.

Type: COMMENTS ON ALTERNATE Filing Date: July 6, 2004
Filed By:
ORA/PELEO/PUC
Description: reply; [on alternate of Cmmr. Wood].

Type: COMPLIANCE FILING Filing Date: July 2, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: in compliance with D04-05-055: [Annual] Website Improvement Report.

Type: COMPLIANCE FILING Filing Date: July 2, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: in compliance with D04-05-055: [Annual] Mapping Improvement Project Phase 2 Report.

Type: COMMENTS ON ALTERNATE Filing Date: July 1, 2004
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: of Cmmr. Wood.

Type: COMMENTS ON ALTERNATE Filing Date: July 1, 2004
Filed By:
ORA/PELEO/PUC
Description: [of Cmmr. Wood].

Type: COMMENTS ON ALTERNATE Filing Date: July 1, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of Cmmr. Wood in the storm/reliability performance Phase of the 2003 GRC.

Type: ALTERNATE Filing Date: June 24, 2004
Filed By:
CMMR/WOOD/PUC
Description: Interim opinion on storm and reliability issues. Comments are due July 1, 2004; reply comments - July 6, 2004.

Type: COMMENTS ON ALTERNATE Filing Date: May 25, 2004
Filed By:
ORA/TUDISCO/PUC
Description: reply; on the alternate of Cmmr. Brown.

Type: COMMENTS ON ALTERNATE Filing Date: May 25, 2004
Filed By:
GREENLINING INSTITUTE
Description: reply; on alternate of Cmmr. Brown.

Type: COMMENTS ON ALTERNATE Filing Date: May 25, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on Phase 1 issues [on the alternate of Cmmr. Brown].

Type: COMMENTS ON ALTERNATE Filing Date: May 20, 2004
Filed By:
ORA/GILEAU/PUC
Description: of Cmmr. Brown.

Type: COMMENTS ON ALTERNATE Filing Date: May 20, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on Phase I issues.

Type: COMMENTS ON ALTERNATE Filing Date: May 20, 2004
Filed By:
THE GREENLINING INSTITUTE
Description: of Cmmr. Brown.

Type: EXPARTE Filing Date: May 20, 2004
Filed By:
AGLET CONSUMER ALLIANCE
Description: On May 19, 2004, James Weil, Director of Aglet Consumer Alliance (Aglet), participated in a meeting with Cmmr. Lynch in San Francisco. Also present were Mike Campbell, advisor to Cmmr. Lynch, Mark Pocta of the Office of Ratepayer Advocates, Eric Jacobson, Karen Tomcala, Patrick Golden, and Bruce Smith for Pacific Gas and Electric Company (PG&E), and Robert Finkelstein for The Utility Reform Network. Weil stated that Aglet supports the distribution and generation settlements that are the subject of the alternate proposed decision of Cmmr. Brown. Weil indicated that Aglet took a lead role in litigation of attrition issues. Weil noted that Aglet estimates that the two settlements will save ratepayers approximately $213 million during the years 2004, 2005 and 2006. Weil stated that the settlements are compromises of strongly held views. Weil explained that reliance on the Consumer Price Index rather than utility-specific escalation rates to calculate attrition allowances will benefit ratepayers.

Type: COMMENTS ON ALTERNATE Filing Date: May 19, 2004
Filed By:
AGLET CONSUMER ALLIANCE
THE UTILITY REFORM NETWORK
Description: of Cmmr. Brown, on Phase I issues.

Type: EXPARTE Filing Date: May 19, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On May 19, 2004, Karen Tomcala, Vice President, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Cmmr. Lynch in San Francisco. Also present were Michael Campbell, advisor to Cmmr. Lynch, Mark Pocta, the Office of Ratepayer Advocates (ORA), Patrick Golden, Attorney, Bruce Smith, Manager, Revenue Requirements, and Erik Jacobson, Chief, Regulatory Relations, for PG&E, Bob Finkelstein, The Utility Reform Network (TURN), and James Weil, Aglet Consumer Alliance (Aglet). Written material (attached to the notice) was used. Tomcala discussed the proposed decision in PG&E's general rate case. Tomcala and Golden stated that the Distribution and Generation settlements, including the attrition floors, represent a reasonable compromise of PG&E's, TURN's, ORA's, and Aglet's litigation positions and should be approved without modification. Golden stated that the settlement was negotiated after development of a full evidentiary record and that the settlement was reasonable based on this record.

Type: EXPARTE Filing Date: May 17, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On May 12, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Manuel Ramirez, advisor to Cmmr. Wood, in San Francisco. Also present was Lise Jordan, Attorney for PG&E. Written materials (attached to the notice) were used. Jordan stated that PG&E supports the California Coalition of Utility Employees/PG&E agreement (Agreement) that is based on a careful balancing of the reliability targets, dead bands, live bands, reward/penalty limits and the incremental revenue requirement. Jordan explained the difference between the 'adequate service' standard and the more stringent reliability targets in the Agreement. Jacobson stated that anticipated reliability improvements would be small compared to the annual fluctuations in SAIDI and SAIFI indices. Jacobson urged the Commission to adopt the Agreement as a whole.

Type: ALTERNATE Filing Date: May 13, 2004
Filed By:
CMMR/BROWN/PUC
Description: Opinion: Phase 1 Issues. Comments are due May 20th; reply comments - May 25, 2004.

Type: EXPARTE Filing Date: May 10, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On May 5, 2004, Patrick Golden, Attorney, Pacific Gas and Electric Company (PG&E), sent an email (attached to the notice) to ALJ Halligan. In the email, Golden stated that during the May 4, 2004 oral argument, he noted that PG&E now reports compliance with General Order 156 goals both with and without regard to so-called 'excludable' categories. The email clarified that the Commission had not directed PG&E to report achievements both ways.

Type: EXPARTE Filing Date: May 7, 2004
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON MAY 3, 2004, AND APPEARED IN THE CALENDAR OF MAY 10, 2004. On April 29, 2003, Marc Joseph, attorney for the Coalition of California Utility Employees (CUE), participated in an all-party meeting with Cmmr. Wood in San Francisco. Also present were Manuel Ramirez and Steven Weissman, advisors to Cmmr. Wood, Mark Pocta for the Office of Ratepayer Advocates, Karen Tomcala, Patrick Golden and Lise Jordan for Pacific Gas and Electric Company (PG&E), Bob Gnaizda for the Greenlining Institute, James Weil for Aglet Consumer Alliance, Matt Freedman for The Utility Reform Network, and Diane Fellman for the Diablo Canyon Independent Safety Committee. Written material (attached to the notice) was used. Joseph stated that the proposed decision (PD) on storm and reliability issues should be modified to establish the standard of reasonable performance at the levels that the PD calculated based on the reliability improvements being funded in the general rate case, rather than at historic performance levels. Joseph also stated that PG&E should be given performance incentives analogous to those for Southern California Edison Company and San Diego Gas & Electric Company, but that according to the PD, no additional revenue was required for PG&E to be able to improve its performance.

Type: EXPARTE Filing Date: May 5, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: LATE FILED. On April 29, 2004, Karen Tomcala, Vice President, Regulatory Relations, Pacific Gas and Electric Company (PG&E), participated in an all-party meeting with Cmmr. Wood in San Francisco. Also present were Manuel Ramirez, advisor to Cmmr. Wood, Patrick Golden and Lise Jordan, Attorneys, for PG&E, and other participants. Written material (attached to the notice) was used. Tomcala stated that the Distribution and Generation settlements in PG&E's general rate case, including the attrition floors, should be approved without modification to preserve the balance of settlement parties' interests. Jordan explained PG&E's opposition to the penalty only reliability benchmarks proposed by the Coalition of California Utility Employees and The Utility Reform Network.

Type: REPLY Filing Date: May 3, 2004
Filed By:
AGLET CONSUMER ALLIANCE
THE UTILITY REFORM NETWORK
Description: to Comments on Proposed Decision of ALJ Halligan on Phase 1 issues.

Type: COMMENTS Filing Date: May 3, 2004
Filed By:
DIABLO CANYON INDEPENDENT SAFETY COMMITTEE
Description: reply; on the proposed decision of ALJ Halligan.

Type: COMMENTS Filing Date: May 3, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on the proposed decision on Phase 1 issues.

Type: COMMENTS Filing Date: May 3, 2004
Filed By:
ORA/TUDISCO/PUC
Description: reply; to comments on ALJ Halligan's proposed decision on Phase I issues.

Type: EXPARTE Filing Date: May 3, 2004
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: AUGMENTATION REQUIRED. On April 29, 2003, Marc Joseph, attorney for the Coalition of California Utility Employees (CUE), participated in an all-party meeting with Cmmr. Wood. Also present were Manuel Ramirez and Steven Weissman, advisors to Cmmr. Wood, Mark Pocta for the Office of Ratepayer Advocates, Karen Tomcala, Patrick Golden and Lise Jordan for Pacific Gas and Electric Company (PG&E), Bob Gnaizda for the Greenlining Institute, James Weil for Aglet Consumer Alliance, Matt Freedman for The Utility Reform Network, and Diane Fellman for the Diablo Canyon Independent Safety Committee. Written material (attached to the notice) was used. Joseph stated that the proposed decision (PD) on storm and reliability issues should be modified to establish the standard of reasonable performance at the levels that the PD calculated based on the reliability improvements being funded in the general rate case, rather than at historic performance levels. Joseph also stated that PG&E should be given performance incentives analogous to those for Southern California Edison Company and San Diego Gas & Electric Company, but that according to the PD, no additional revenue was required for PG&E to be able to improve its performance.

Type: EXPARTE Filing Date: May 3, 2004
Filed By:
ORA/GILEAU/PUC
Description: On April 29, 2004, Mark Pocta, Program Manager, the Office of Ratepayer Advocates (ORA), met with Cmmr. Wood in an all-party meeting in San Francisco. Also present were Manuel Ramirez and Steven Weissman, advisors to Cmmr. Wood, Laura Tudisco, Staff Counsel for ORA, Karen Tomcala, Vice President Regulatory Relations, and Patrick Golden and Lise Jordan, Attorneys, for Pacific Gas and Electric Company (PG&E), James Weil of Aglet Consumer Alliance, Matthew Freedman of The Utility Reform Network, and Marc Joseph of the Coalition of California Utility Employees. Pocta stated that ORA supported the proposed decision (PD) of ALJ in PG&E 2003 General Rate Case except with respect to the elimination of the floors for attrition. Pocta indicated that ORA supported the PD's treatment of the pension contribution issue. ORA recommended that the PD be revised to adopt the attrition mechanism floors as set forth in the settlement. Pocta explained that the PD's elimination of the attrition floors disregards the fact that the CPI-based mechanism negotiated by the parties results in attrition increases substantially less than compared to the traditional methodology proposed by PG&E, and supported by ORA.

Type: EXPARTE Filing Date: May 3, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On April 28, 2004, Brian Cherry, Director of Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with David Gamson, advisor to Cmmr. Brown, and Julie Fitch, advisor to Cmmr. Peevey, in two separate meetings in San Francisco. Written materials (attached to the notice) were used. Cherry discussed the proposed decision (PD) of ALJ Halligan. Cherry stated that the PD failed to include a reasonable pension contribution for PG&E's CPUC authorized rate case. Cherry stated that PG&E ratepayers would not be at risk of paying for a funded status of more than 100% and that any excess above 100% would be returned to ratepayers.

Type: COMMENTS Filing Date: May 3, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on the storm/reliability performance phase.