Proceeding I0509005
Date Filed: September 8, 2005
Status: Closed


Documents    Decisions    Main Index

Filer Requested Category:
Preliminary Category: Ratesetting
Commission Designated Category: Quasi-legislative
Filed By:
CPUC - EDISON, PG&E, SDG&E

DOCUMENTS
Number of Documents: 89

Type: PROPOSED DECISION

Filing Date: May 8, 2007
Filed By:
CMMR/GRUENEICH/CPUC
Description: Opinion Closing the Docket. Opening Comments, which shall not exceed 15 pages, are due no later than May 28, 2007. Reply Comments are due 5 days after Opening Comments are filed.

Type: NOTICE

Filing Date: December 7, 2006
Filed By:
CALJ/MINKIN/CPUC
Description: OF REASSIGNMENT.

Type: LAW & MOTION

Filing Date: August 29, 2006
Filed By:
San Diego Gas & Electric Company
Description: Motion for Leave to Maintain Under Seal the Confidential Status of Unredacted Attachment A (Confidential Renewable Portfolio Information) to the Response to Assigned Commissioner's Ruling regarding Transmission Status Reports filed Aug 18, 2006.

Type: COMMENTS

Filing Date: August 18, 2006
Filed By:
Southern California Edison Company
Description: on Reforming Transmission Ranking Cost Reports in Accord with the Assigned Commissioner's Ruling of July 13, 2006.

Type: COMMENTS

Filing Date: August 18, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: in response to Assigned Commissioner's Ruling dated July 13, 2006

Type: COMMENTS

Filing Date: August 18, 2006
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: on Assigned Commissioner's Ruling on next steps in facilitating construction of transmission facilities to advance California's Renewable Portfolio Standard goals.l

Type: RESPONSE

Filing Date: August 18, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: (PUBLIC VERSION) to Assigned Commissioner's ruling regarding Transmission Status Reports.

Type: COMMENTS

Filing Date: August 18, 2006
Filed By:
CEERT
Description: on the Assigned Commissioner's Ruling

Type: COMMENTS

Filing Date: August 18, 2006
Filed By:
GREEN POWER INSTITUTE
Description: On Phase II Issues

Type: REPORT

Filing Date: August 14, 2006
Filed By:
Southern California Edison Company
Description: UPDATED TRANSMISSION STATUS REPORT [in accordance with the Ruling of July 13, 2006].

Type: REPORT

Filing Date: August 11, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Updated Transmission Status Report; pursuant to the July 13, 2006 Assigned Commissionner's Ruling

Type: RULING

Filing Date: July 13, 2006
Filed By:
CMMR/GRUENEICH/PUC
Description: Invites parties to comment on the issues set forth; comments are due August 8, 2006. Orders IOUs to file transmission status reports, by August 12, 2006.

Type: COMMENTS

Filing Date: May 22, 2006
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: reply; on the draft decision of ALJ Halligan.

Type: COMMENTS

Filing Date: May 22, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; on the Draft Decision of ALJ Halligan.

Type: COMMENTS

Filing Date: May 15, 2006
Filed By:
DRA/DEANGELIS/PUC
Description: on Draft Decision of ALJ Halligan.

Type: COMMENTS

Filing Date: May 15, 2006
Filed By:
PPM ENERGY, INC.
Description: on proposed decision to implement the cost recovery provisions, etc.

Type: COMMENTS

Filing Date: May 15, 2006
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on the draft decision.

Type: COMMENTS

Filing Date: May 15, 2006
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
Description: joint; on the draft decision of ALJ Halligan.

Type: COMMENTS

Filing Date: May 15, 2006
Filed By:
VULCAN POWER COMPANY
Description: on Draft Decision of ALJ Halligan.

Type: COMMENTS

Filing Date: May 15, 2006
Filed By:
STIRLING ENERGY SYSTEMS INC.
Description: Opening (on Draft Decision of ALJ Halligan).

Type: COMMENTS

Filing Date: May 15, 2006
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: on opinion on procedures to implement the cost recovery provisions, etc.

Type: COMMENTS

Filing Date: May 10, 2006
Filed By:
DRA/DEANGELIS/PUC
Description: on Second Report of the Tehachapi Collaborative Study Group.

Type: PETITION

Filing Date: May 4, 2006
Filed By:
PACIFICORP
Description: to intervene.

Type: DRAFT DECISION

Filing Date: April 25, 2006
Filed By:
ALJ/HALLIGAN/PUC
Description: Opinion on Procedures to Implement the Cost Recovery Provisions of Public Utilities Code Section 399.25. Comments are due May 15, 2006; reply comments - 5 days after comments are filed.

Type: COMPLIANCE FILING

Filing Date: April 19, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Second Report of the Tehachapi Collaborative Study Group.

Type: NOTICE

Filing Date: April 19, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of Availability of Second Report of the Tehachapi Collaborative Study Group.

Type: RULING

Filing Date: March 6, 2006
Filed By:
ALJ/HALLIGAN/PUC
Description: Finds that Community Environmental Council, Green Power Institute and TURN are eligible for compensation.

Type: BRIEF

Filing Date: February 17, 2006
Filed By:
TURN
Description: Reply; on Cost Recovery Principles for Renewable Transmission Subject to Section 399.5 of the Public Utilities Code; pursuant to Assigned Commr. Grueneich's Scoping Memo of December 22, 2005.

Type: BRIEF

Filing Date: February 17, 2006
Filed By:
IEPA
Description: Reply; on Cost Allocation Issues; pursuant to Assigned Commr. Grueneich's Scoping Memo of December 22, 2005.

Type: BRIEF

Filing Date: February 17, 2006
Filed By:
CAISO
PACIFIC GAS AND ELECTRIC CO.
SCE
SDG&E
Description: Joint Reply and Recommendation; on Cost Recovery Issues; pursuant to Assigned Commr. Grueneich's Scoping Memo of December 22, 2005.

Type: BRIEF

Filing Date: February 17, 2006
Filed By:
CEERT
Description: Reply; on Cost Recovery Issues; pursuant to Assigned Commr. Grueneich's Scoping Memo of December 22, 2005.

Type: BRIEF

Filing Date: February 17, 2006
Filed By:
CALIFORNIA WIND ENERGY ASSOC.
Description: Reply; on Transmission Cost Recovery Issues; pursuant to Assigned Commr. Grueneich's Scoping Memo of December 22, 2005.

Type: COMMENTS

Filing Date: February 17, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; re: Dec 21, 2005 Assigned Commissioner's Scoping Memo and Ruling.

Type: BRIEF

Filing Date: February 17, 2006
Filed By:
VULCAN POWER COMPANY
Description: Reply

Type: BRIEF

Filing Date: February 17, 2006
Filed By:
STIRLING ENERGY SYSTEMS INC.
Description: Reply

Type: MOTION

Filing Date: February 6, 2006
Filed By:
CALIFORNIA DEPARTMENT OF WATER RESOURCES STATE WATER PROJECT
Description: to Intervene.

Type: BRIEF

Filing Date: January 27, 2006
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: Opening; on cost recovery issues; pursuant to Assigned Commissioner's Scoping Memo and Ruling, dated December 21, 2005.

Type: BRIEF

Filing Date: January 27, 2006
Filed By:
CEERT
Description: Opening; on cost recovery issues; pursuant to Assigned Commissioner's Scoping Memo and Ruling, dated December 21, 2005.

Type: BRIEF

Filing Date: January 27, 2006
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: opening; on Cost Recovery Issues.

Type: BRIEF

Filing Date: January 27, 2006
Filed By:
GREEN POWER INSTITUTE
Description: Opening; on Transmission Cost Recovery Issues.

Type: BRIEF

Filing Date: January 27, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: opening; on cost recovery issues.

Type: BRIEF

Filing Date: January 27, 2006
Filed By:
STIRLING ENERGY SYSTEMS INC.
Description: Opening

Type: BRIEF

Filing Date: January 27, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Opening; on Cost Recovery

Type: BRIEF

Filing Date: January 27, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Opening; per the December 21, 2005 ACR.

Type: COMMENTS

Filing Date: January 27, 2006
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: in response to the Scoping Memo and Ruling.

Type: BRIEF

Filing Date: January 27, 2006
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: opening; on transmission cost recovery issues.

Type: REPORT

Filing Date: January 25, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: PUBLIC VERSION. Transmission Status Reports for Signed RPS Contracts and Potential RPS Resources [pursuant to the December 22, 2006 ruling].

Type: RESPONSE

Filing Date: January 25, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to Assigned Commissioner's Scoping Memo and Ruling re: Transmission Status Reports.

Type: LAW & MOTION

Filing Date: January 25, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Motion for Confidential Treatment of Unredacted Version of Renewables Portfolio Standard Transmission Status Report and for Protective Order.

Type: COMPLIANCE FILING

Filing Date: January 25, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: (PUBLIC VERSION) Renewables Portfolio Standard Transmission Status Report.

Type: LAW & MOTION

Filing Date: January 25, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: for authority to file and maintain confidential commercially sensitive, proprietary information under seal; namely, transmission status reports for signed RPS contracts and potential RPS resources, attached.

Type: SCOPING RULING

Filing Date: December 22, 2005
Filed By:
CMMR/GRUENEICH/PUC
Description: Confirms the categorization of this proceeding as quasi-legislative. IOU & CAISO Transmission status reports for signed RPS Contracts and for potential RPS resources are due January 25, 2006; opening briefs on cost recovery issues are due January 27, 2006, and reply briefs - February 17, 2006; final decision will issue in May, 2006.

Type: NOTICE

Filing Date: December 7, 2005
Filed By:
GREEN POWER INSTITUTE
Description: of intent to claim compensation.

Type: NOTICE

Filing Date: December 7, 2005
Filed By:
COMMUNITY ENVIRONMENTAL COUNCIL
Description: of Intent to Claim Compensation.

Type: NOTICE

Filing Date: December 7, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: of intent to seek compensation.

Type: COMMENTS

Filing Date: December 1, 2005
Filed By:
COMMUNITY ENVIRONMENTAL COUNCIL
Description: Comments.

Type: COMMENTS

Filing Date: November 28, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Categorization.

Type: COMMENTS

Filing Date: November 21, 2005
Filed By:
VULCAN POWER COMPANY
Description: on priority issues.

Type: RULING

Filing Date: November 21, 2005
Filed By:
ALJ/HALLIGAN/PUC
Description: Scheduling Workshops on Renewable Transmission Issues.

Type: RULING

Filing Date: November 21, 2005
Filed By:
ALJ/HALLIGAN/PUC
Description: Requesting Comments on Categorization. Comments are due November 28, 2005.

Type: COMPLIANCE FILING

Filing Date: November 16, 2005
Filed By:
CALIFORNIA ELECTRICITY OVERSIGHT BOARD
Description: Recommendations on Preliminary Scoping Memo.

Type: COMMENTS

Filing Date: November 15, 2005
Filed By:
ORA/DEANGELIS/PUC
Description: in response to Cmmr. Grueneich's request for identification of priority issues.

Type: COMMENTS

Filing Date: November 15, 2005
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: on the "Top Six" 2006 renewables transmission issues.

Type: COMMENTS

Filing Date: November 15, 2005
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: on priority issues and schedule.

Type: COMMENTS

Filing Date: November 15, 2005
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: in response to all-party hearing and prehearing conference.

Type: COMMENTS

Filing Date: November 15, 2005
Filed By:
GREEN POWER INSTITUTE
Description: on Priorities for Transmission Planning to Facilitate the Development of Renewables in California.

Type: COMPLIANCE FILING

Filing Date: November 15, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Issues for this Proceeding as requested at the All-Party Meeting.

Type: COMMENTS

Filing Date: November 15, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on O.I.I. Priorities.

Type: COMMENTS

Filing Date: November 15, 2005
Filed By:
STIRLING ENERGY SYSTEMS, INC.
Description: in Response to Cmmr Grueneich's Order to provide a List of Issues to be addressed in this proceeding.

Type: MISCELLANEOUS FILING

Filing Date: November 15, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Top Priorities in 2006 and 2007 on OII.

Type: EXPARTE

Filing Date: November 10, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On November 7, 2005, David Kraska, Attorney, Pacific Gas and Electric Company (PG&E), met with Cmmr. Grueneich in an all-party meeting in San Francisco. Also present were Nilgun Atamturk, advisor to Cmmr. Grueneich, Fong Wan, Vice President, Power Contracts and Electric Resource Development, and Meredith Allen, Chief, Regulatory Relations, for PG&E, and other attendees listed on the attachment to the notice. Kraska stated that PG&E will be submitting its annual Transmission Assessment and Expansion Plan to the California Independent System Operator in mid-December, which will include a list of projects to be studied that have the potential to access renewable resource areas and promote reliability.

Type: PREHEARING CONFERENCE STATEMENT

Filing Date: November 7, 2005
Filed By:
VULCAN POWER COMPANY
Description: (Per 101/8/05 ALJ Ruling).

Type: PREHEARING CONFERENCE STATEMENT

Filing Date: November 2, 2005
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: [pursuant to the October 18, 2005 ruling].

Type: COMMENTS

Filing Date: October 25, 2005
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: preliminary [on the OII].

Type: COMMENTS

Filing Date: October 25, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on the OII.

Type: COMMENTS

Filing Date: October 25, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: reply.

Type: COMMENTS

Filing Date: October 25, 2005
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: reply; on preliminary scoping memo.

Type: RULING

Filing Date: October 18, 2005
Filed By:
ALJ/HALLIGAN/PUC
Description: Sets a prehearing conference for November 7, 2005. Reply comments to comments to the OII can be filed by October 25, 2005. Prehearing conference statements are due November 2, 2005.

Type: EXPARTE

Filing Date: October 17, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On October 12, 2005, Eric Eisenman, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Aaron Johnson, advisor to Cmmr. Grueneich, in San Francisco. Also present were Kevin Dasso, Senior Director, Engineering and Planning, and Meredith Allen, Chief, Regulatory Relations, PG&E. Written material (attached to the notice) was used. Dasso stated that the Commission should take a broad look at where transmission investments for renewable resources should be made, and not focus just on the Tehachapi area. Dasso presented a map of the northwestern states and western Canada and requested that the Commission consider the transmission investments that would be required to import power from these areas.

Type: COMMENTS

Filing Date: October 11, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on (this) OII.

Type: COMPLIANCE FILING

Filing Date: October 4, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Report of the Imperial Valley Study Group.

Type: COMMENTS

Filing Date: September 30, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on scope and issues.

Type: COMMENTS

Filing Date: September 30, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on OII.

Type: COMMENTS

Filing Date: September 30, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on Preliminary Scope and Issues.

Type: COMMENTS

Filing Date: September 30, 2005
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: on Preliminary Scoping Memo.

Type: COMMENTS

Filing Date: September 30, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on (this) OII.

Type: COMMENTS

Filing Date: September 28, 2005
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: on OII preliminary scope and issues.

Type: PETITION

Filing Date: September 26, 2005
Filed By:
COMMUNITY ENVIRONMENTAL COUNCIL
Description: to Intervene.

Type: COMMISSION INVESTIGATION

Filing Date: September 8, 2005
Filed By:
CPUC - EDISON, PG&E, SDG&E
Description: Order Instituting Investigation to facilitate proactive development of transmission infrastructure to access renewable energy resources for California. [MAILED 9/12/2005]. This proceeding will be coordinated as needed with R04-04-026, I00-11-001, and A04-12-007/A04-12-008. Comments are due within 20 days of issuance of this investigation. SCE and SDG&E shall file reports, as set forth. Parites may file initial comments within 21 days after it is filed; and reply comments - within 10 days after initial comments are due.

DECISIONS
Number of Decisions: 3

Decision Number: D0706005

Rendered Date: June 7, 2007
Effective Date: June 7, 2007
Description: Closes the docket.

Decision Number: D0606034

Rendered Date: June 15, 2006
Effective Date: June 15, 2006
Description: Interim Opinion. Evaluates and adopts specific policies and procedures to implement the cost recovery provisions of Public Utilities Code Section 399.25.

Decision Number: D0512034

Rendered Date: December 15, 2005
Effective Date: December 15, 2005
Description: Interim Opinion. Investigation 05-09-005 is categorized as quasi-legislative.