DOCUMENTS
Number of Documents: 111
(only the most current 100 are displayed)
Display all documents for this proceeding
|
Type:
REHEARING REQUEST
|
Filing Date:
December 6, 2007
|
Filed By:
The Greenlining Institute
|
|
Description:
Application for rehearing of Decision 07-11-013.
|
Type:
COMMENTS
|
Filing Date:
October 9, 2007
|
Filed By:
Aglet Consumer Alliance
|
|
Description:
On Proposed Decision of ALJ Kenney.
|
Type:
PROPOSED DECISION
|
Filing Date:
September 18, 2007
|
Filed By:
ALJ/KENNEY/CPUC
|
|
Description:
Opinion Granting Intervenor Compensation to Aglet Consumer Alliance and the Alliance for Nuclear Responsibility for Substantial Contributions to Decision 07-03-044. Opening comments, which shall not exceed 15 pages, are due no later than October 8, 2007. Reply comments are due five days after opening comments are filed.
|
Type:
REQUEST
|
Filing Date:
July 30, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
for an award of compensation for substantial contribution to Decision 07-05-058.
|
Type:
REPORT
|
Filing Date:
June 13, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
regarding Company Airplane Chargeback Procedures.
|
Type:
RULING
|
Filing Date:
May 31, 2007
|
Filed By:
ALJ/KENNEY/CPUC
|
|
Description:
Administrative Law Judge's Ruling Granting Permission to File a Request for Intervenor Compensation, subject to the two (2) ordering paragraphs.
|
Type:
MOTION
|
Filing Date:
May 29, 2007
|
Filed By:
THE ALLIANCE FOR NUCLEAR RESPONSIBILITY
|
|
Description:
to Late-File Request for Award of Compensation for Substantial Contribution to Decision 07-03-044; ATTACHED - Request.
|
Type:
REQUEST
|
Filing Date:
May 21, 2007
|
Filed By:
Aglet Consumer Alliance
|
|
Description:
for Award of Compensation.
|
Type:
REQUEST
|
Filing Date:
May 21, 2007
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
for an award of compensation for substantial contributions to Decision No. 07-03-044.
|
Type:
REQUEST
|
Filing Date:
May 17, 2007
|
Filed By:
The Greenlining Institute
|
|
Description:
for an Award of Compensation for Contributions to Decision 07-03-044.
|
Type:
REQUEST
|
Filing Date:
May 14, 2007
|
Filed By:
Disability Rights Advocates
|
|
Description:
for Award of Intervenor Compensation.
|
Type:
RESPONSE
|
Filing Date:
May 4, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to Applications of Rehearing of Decision 07-03-044 by TURN and Aglet Consumer Alliance.
|
Type:
RESPONSE
|
Filing Date:
April 24, 2007
|
Filed By:
California Farm Bureau Federation
Coalition of California Utility Employees
DRA/TUDISCO/CPUC
Pacific Gas and Electric Company
The Greenlining Institute
The Utility Reform Network
|
|
Description:
to Inquiry of ALJ Timothy Kenney.
|
Type:
RULING
|
Filing Date:
April 23, 2007
|
Filed By:
ALJ/KENNEY/CPUC
|
|
Description:
ALJ's Ruling Admitting Two Exhibits into the Evidentiary Record.
|
Type:
REHEARING REQUEST
|
Filing Date:
April 20, 2007
|
Filed By:
Aglet Consumer Alliance
|
|
Description:
Application for Rehearing of Decision 07-03-044.
|
Type:
REHEARING REQUEST
|
Filing Date:
April 20, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
Application for Rehearing of Decision 07-03-044.
|
Type:
RULING
|
Filing Date:
April 4, 2007
|
Filed By:
ALJ/KENNEY/CPUC
|
|
Description:
granting a joint motion to shorten the time for responding to the (1) Joint Motion and (2) A Settlement Agreement. Responses to the Motion Shortening Time shall be filed and served by April 9, 2007. Comments on the April 3, 2007 Motion for Approval of Settlement Agreement shall be filed and served by April 18, 2007; Reply Comments shall be filed and served by April 23, 2007.
|
Type:
MOTION
|
Filing Date:
April 3, 2007
|
Filed By:
California Farm Bureau Federation
Coalition of California Utility Employees
DRA/APPLING/CPUC
Pacific Gas and Electric Company
The Greenlining Institute
The Utility Reform Network
|
|
Description:
for Approval of Settlement Agreement.
|
Type:
MOTION
|
Filing Date:
April 3, 2007
|
Filed By:
California Farm Bureau Federation
Coalition of California Utility Employees
DRA/TUDISCO/CPUC
Pacific Gas and Electric Company
The Greenlining Institute
The Utility Reform Network
|
|
Description:
for Order Shortening Time to Respond to April 3, 2007 Motion for Approval of Settlement Agreement.
|
Type:
EXPARTE
|
Filing Date:
March 16, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On March 13, 2007, Brian Cherry, President, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Andy Campbell, advisor to Cmmr. Chong in San Francisco. Written materials (attached to the notice) were used. Also present were Dinyar Mistry, Vice President, State Regulation, and Jane Yura, Manager, Operation Revenue Requirements, of PG&E. Mistry stated that PG&E supported the alternate decision of Cmmr. Bohn. Minstry also stated that the settlement was in the best interest of customers and was a reasonable compromise. Cherry added that modifying the settlement was a zero-sum game and represented a real decrease in revenue requirements to fund business operations.
|
Type:
EXPARTE
|
Filing Date:
March 16, 2007
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
On March 14, 2007, Matthew Freedman, counsel for The Utility Reform Network (TURN), met with Pres. Peevey in San Francisco. Also present were Pete Arth, advisor to Pres. Peevey, and Mike Florio, counsel for TURN. Written materials (attached to the notice) were used. Representatives of TURN explained Cmmr. Bohn Alternate Decision does not fairly address the issues raised by TURN and Aglet and urged support of a revised version of the ALJ Proposed Decision. The representatives stated that the Commission should not encourage utilities to pursue a 'divide and conquer' strategy with intervenors representing the interest of customers. The representative also stated that the Alternate would resolve several key issues in a manner contrary to the decision recently adopted for Southern California Edison.
|
Type:
EXPARTE
|
Filing Date:
March 16, 2007
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
On March 14, 2007, Hayley Goodson, counsel for The Utility Reform Network, sent an electronic note (copy attached to the notice) to Karen Shea, advisor to Cmmr. Simon.
|
Type:
EXPARTE
|
Filing Date:
March 15, 2007
|
Filed By:
DRA/TUDISCO/CPUC
|
|
Description:
SUMMARY: On March 12, 2007, Robert Pocta, Program Manager, Division of Ratepayer Advocates, sent an electronic note (copy attached to the notice) to Karen Shea, advisor to Cmmr. Simon. Contact person: Sue Muniz, telephone: (415) 703-1858; e-mail: sam@cpuc.ca.gov
|
Type:
EXPARTE
|
Filing Date:
March 13, 2007
|
Filed By:
DRA/Tudisco/CPUC
|
|
Description:
SUMMARY: On March 8, 2007, Dana Appling, Director, Division of Ratepayer Advocates (DRA), had a video conference call in San Francisco with Pres. Peevey in Los Angeles. Also present in San Francisco and participated in the conversation were Rami Kahlon, advisor to Pres. Peevey; and R. Mark Pocta, Program Manager, Clayton Tang, Program and Project Supervisor, of DRA. Representatives of Pacific Gas and Electric Company, namely: Dinyar B. Mistry, Vice President of State Regulation, Brian Cherry, Vice President of Regulatory Relations and Jane Yura, Director, PG&E General Rate Case were also present and participated. Written materials (attached to the notice) were used. DRA representatives stated that DRA recommended the Commission adopt the Settlement Agreement as set forth in the Alternate Proposed Decision of Cmmr. Bohn. DRA representatives noted specific items of benefits to ratepayers in the Settlement Agreement and stated that the settlement should be viewed as a fair compromise of litigation positions.
|
Type:
EXPARTE
|
Filing Date:
March 13, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On March 8, 2007, Brian Cherry, Vice President, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Pres. Peevey in San Francisco. Also present were Rami Kahlon, advisor to Pres. Peevey; and Tom Bottorff, Senior Vice President, Regulatory Relations, Dinyar Mistry, Vice President, State Regulation, and Jane Yura, Manager, Operation Revenue Requirements, of PG&E. Dana Appling from the Division of Ratepayer Advocates was also present. Written material (attached to the notice) was used. Bottorff stated that PG&E supported the alternate decision of Cmmr. Bohn. Bottorff further stated that the settlement parties negotiated in good faith and that the settlement was a reasonable compromise. Cherry added that modifying the settlement represented a real decrease in revenue requirements to fund business operations.
|
Type:
EXPARTE
|
Filing Date:
March 13, 2007
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
On March 9, 2007, Matthew Freedman, counsel for The Utility Reform Network (TURN), met with Pamela Nataloni, advisor to Cmmr. Simon in San Francisco. Also present were Karen Shea, advisor to Cmmr. Simon; and Hayley Goodson, counsel for TURN. Written Materials (attached to the notice) were used. Representatives of TURN explained Cmmr. Bohn Alternate Decision does not fairly address the issues raised by TURN and Aglet and urged Cmmr. Simon to support a revised version of the ALJ Proposed Decision. The representatives stated that the Commission should not encourage utilities to pursue a 'divide and conquer' strategy with intervenors representing the interest of customers. The representative also stated that the Alternate would resolve several key issues in a manner contrary to the decision recently adopted for Southern California Edison. Subsequent to the meeting, Goodson sent an electronic note (copy attached to the notice) to advisor Shea.
|
Type:
REPLY
|
Filing Date:
March 12, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
to other parties Comments on Proposed Decision.
|
Type:
COMMENTS
|
Filing Date:
March 12, 2007
|
Filed By:
Merced Irrigation District
Modesto Irrigation District
|
|
Description:
Reply; regarding Proposed Opinion of ALJ Kenney and on the Alternate Draft Opinion of Commissioner Bohn.
|
Type:
COMMENTS
|
Filing Date:
March 12, 2007
|
Filed By:
DRA/TUDISCO/CPUC
|
|
Description:
Reply;
|
Type:
COMMENTS
|
Filing Date:
March 12, 2007
|
Filed By:
The Greenlining Institute
|
|
Description:
Reply; on the Proposed Decision of ALJ Kenney and on the Alternate Proposed Decision of Commissioner Bohn.
|
Type:
REPLY
|
Filing Date:
March 12, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to Comments on the Proposed Decision of ALJ Kenney and on the Alternate Proposed Decision of Commissioner Bohn.
|
Type:
COMMENTS
|
Filing Date:
March 12, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
Reply; on the Alternate Proposed Decision of Commissioner Bohn.
|
Type:
COMMENTS
|
Filing Date:
March 12, 2007
|
Filed By:
AGLET CONSUMER ALLIANCE
|
|
Description:
Reply;on Proposed Decision of ALJ Kenney
|
Type:
COMMENTS
|
Filing Date:
March 12, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
Reply; on the Proposed Decision of ALJ Kenney.
|
Type:
EXPARTE
|
Filing Date:
March 7, 2007
|
Filed By:
DRA/TUDISCO/CPUC
|
|
Description:
SUMMARY: On March 5, 2007, Aaron Johnson, Deputy Director, Division of Ratepayer Advocates (DRA), met with Karen Shea, advisor to Cmmr. Simon in San Francisco. Also present were Pam Nataloni, advisor to Cmmr. Simon; and R. Mark Pocta, Program Manager, Clayton Tang, Program and Project Supervisor, of DRA. Representatives of Pacific Gas and Electric Company, namely: Dinyar B. Mistry, Vice President of State Regulation, Brian Cherry, Vice President of Regulatory Relations and Jane Yura, Director, PG&E General Rate Case were also present. DRA representatives stated that DRA recommended the Commission adopt the Settlement Agreement as set forth in the Alternate Proposed Decision of Cmmr. Bohn. DRA representatives noted specific items of benefits to ratepayers in the Settlement Agreement and stated that the settlement should be viewed as a fair compromise of litigation positions. Contact person: Sue Muniz, telephone: (415) 703-1858; email: sam@cpuc.ca.gov
|
Type:
COMMENTS
|
Filing Date:
March 6, 2007
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
Opening; on the Alternate Decision of Commissioner Bohn (late-filed authorized by ALJ Kenney per email ruling of March 12, 2007).
|
Type:
COMMENTS
|
Filing Date:
March 6, 2007
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
Opening; on the Proposed Decision of ALJ Kenney (late-filed authorized by ALJ Kenney per email ruling of March 12, 2007).
|
Type:
COMMENTS
|
Filing Date:
March 5, 2007
|
Filed By:
DRA/Tudisco/CPUC
|
|
Description:
on the ALJ Kenney Proposed Decision and on the Alternate Proposed Decision of Commissioner Bohn.
|
Type:
COMMENTS
|
Filing Date:
March 5, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
on the ALJ Kenney Proposed Decision and on the Alternate Proposed Decision of Commissioner Bohn.
|
Type:
COMMENTS
|
Filing Date:
March 5, 2007
|
Filed By:
Disability Rights Advocates
|
|
Description:
regarding the Proposed Decision of ALJ Kenney.
|
Type:
COMMENTS
|
Filing Date:
March 5, 2007
|
Filed By:
The Greenlining Institute
|
|
Description:
on the Proposed Decision of ALJ Kenney and on the Alternate Proposed Decision of Assigned Commissioner Bohn.
|
Type:
COMMENTS
|
Filing Date:
March 5, 2007
|
Filed By:
Disability Rights Advocates
|
|
Description:
regarding the Alternate Proposed Decision of Commissioner Bohn.
|
Type:
COMMENTS
|
Filing Date:
March 2, 2007
|
Filed By:
AGLET CONSUMER ALLIANCE
|
|
Description:
on Proposed Decision of ALJ Kenney
|
Type:
RULING
|
Filing Date:
February 27, 2007
|
Filed By:
ALJ/KENNEY/CPUC
|
|
Description:
Admitting Exhibit ALJ-1 into the Evidentiary Record Under Seal.
|
Type:
RULING
|
Filing Date:
February 20, 2007
|
Filed By:
ALJ/KENNEY/CPUC
|
|
Description:
setting final oral argument before the Commission.
|
Type:
RULING
|
Filing Date:
February 14, 2007
|
Filed By:
ALJ/KENNEY/CPUC
|
|
Description:
granting request for an extension of time to file pleadings in Phase 2. A settlement agreement regarding front counter issues shall be filed no later than April 16, 2007. Comments and reply comments regarding the settlement agreement shall be filed no later than April 23 and 30, 2007 respectively.
|
Type:
PROPOSED DECISION
|
Filing Date:
February 13, 2007
|
Filed By:
ALJ/KENNEY/CPUC
|
|
Description:
Opinion Authorizing PG&E General Rate Case Revenue Requirement for 2007 - 2010. Opening Comments which shall not exceed 25 pages are due no later than March 5, 2007; Reply Comments are due 5 days after Opening Comments are filed.
|
Type:
ALTERNATE
|
Filing Date:
February 13, 2007
|
Filed By:
COMMR/BOHN/CPUC
|
|
Description:
Alternate Proposed Decision of Commissioner Bohn. Opinion Authorizing PG&E General Rate Case Revenue Requirement for 2007 - 2010. Opening Comments which shall not exceed 25 pages are due no later than March 5, 2007; Reply Comments are due 5 days after Opening Comments are filed.
|
Type:
EXPARTE
|
Filing Date:
January 24, 2007
|
Filed By:
DRA/TUDISCO/CPUC
Pacific Gas and Electric Company
|
|
Description:
On January 22, 2007, Dinyar B. Mistry, Vice President of State Regulation, Pacific Gas and Electric Company, and Director of the Division of Ratepayer Advocates, Dana Appling sent a letter (copy attached to the notice) to Stephen St. Marie, advisor to Cmmr. Bohn, Cmmr. Bohn, President Peevey, Cmmr. Grueneich and Cmmr. Chong.
|
Type:
EXPARTE
|
Filing Date:
December 15, 2006
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
On December 13, 2006, Matthew Freedman of The Utility Reform Network (TURN), met with Stephen St. Marie, advisor to Cmmr. Bohn, in San Francisco. Also present were Robert Finkelstein and Marcel Hawiger of TURN. Written materials (attached to the notice) were used. Freedman and Finkelstein explained that approval of the settlement presented by Pacific Gas and Electric Company would represent a 'travesty of procedural justice' because of the process by which PG&E chose to pursue settlement negotiations. Freedman and Finkelstein noted that the settlement placed an extremely low value on the litigations positions advocated by TURN and urged the Commission to modify the settlement. Freedman, Finkelstein, and Hawiger reviewed major proposals advocated by TURN that were not incorporated into the final settlement.
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
November 16, 2006
|
Filed By:
DRA/JARJOURA/PUC
|
|
Description:
Certificate of Compliance.
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
November 16, 2006
|
Filed By:
ENERGY/WILSON/PUC
|
|
Description:
Certificate of Compliance.
|
Type:
RULING
|
Filing Date:
October 6, 2006
|
Filed By:
ALJ/KENNEY/CPUC
|
|
Description:
REGARDING REQUESTS FOR AN ORAL ARGUMENT, AND AN EVIDENTIARY HEARING ON THE SETTLEMENT AGREEMENT.
|
Type:
REPLY
|
Filing Date:
October 5, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
to the Comments of TURN on the Settlement.
|
Type:
COMMENTS
|
Filing Date:
October 5, 2006
|
Filed By:
CALIFORNIA FARM BUREAU FEDERATION
COALITION OF CALIFORNIA UTILITY EMPLOYEES
DISABILITY RIGHTS ADVOCATES
DRA/TUDISCO/PUC
MERCED IRRIGATION DISTRICT
PACIFIC GAS AND ELECTRIC COMPANY
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
WESTERN MANUFACTURED HOUSING COMMUNITY ASSOCIATION
|
|
Description:
Reply; in response to the comments opposing the settlmeent agreement and accompanying motion filed August 21, 2006.
|
Type:
OPPOSITION
|
Filing Date:
September 25, 2006
|
Filed By:
ALLIANCE FOR NUCLEAR RESPONSIBILITY
SIERRA CLUB
|
|
Description:
to the motion of PG&E, et al. for approval of the settlement agreement.
|
Type:
RESPONSE
|
Filing Date:
September 21, 2006
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
to the settlement motion of PG&E, Division of Ratepayer Advocates, and other parties.
|
Type:
COMMENTS
|
Filing Date:
September 20, 2006
|
Filed By:
AGLET CONSUMER ALLIANCE
|
|
Description:
Contesting Settlement.
|
Type:
BRIEF
|
Filing Date:
August 28, 2006
|
Filed By:
GREENLINING INSTITUTE
|
|
Description:
reply.
|
Type:
RESPONSE
|
Filing Date:
August 21, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to the Opening Brief of the Greenlining Institute (Per ALJ Kenney's 08/07/06 Ruling).
|
Type:
MOTION
|
Filing Date:
August 21, 2006
|
Filed By:
CALIFORNIA FARM BUREAU FEDERATION
COALITION OF CALIFORNIA UTILITY EMPLOYEES
DISABILITY RIGHTS ADVOCATES
DRA/TUDISCO/PUC
MERCED IRRIGATION DISTRICT
MODESTO IRRIGATION DISTRICT
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
SOUTHERN CALIFORNIA EDISON COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
WESTERN MANUFACTURED HOUSING COMMUNITIES ASSOCIATION
|
|
Description:
for Approval of Settlement Agreement.
|
Type:
MOTION
|
Filing Date:
August 11, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Requesting Order Making New Revenue Requirements for Gas and Electric Service Effective January 1, 2007.
|
Type:
RULING
|
Filing Date:
August 7, 2006
|
Filed By:
ALJ/KENNEY/CPUC
|
|
Description:
Adopts a revised procedural schedule for the remainder of Phase 1, as follows: PG&E-DRA settlement filed - 8/16/06; opening briefs re: Greenlining issues filed - 8/21/6, reply briefs - earlier of (i) 9/6 or (ii) 2 weeks after Greenlining's opening briefs; requests for oral argument, combined opening briefs re all GRC issues (except Greenlining's issues) and Opposition to the Settlement filed - 9/20/6 (there is no need for PG&E and DRA to file an opening brief); requests for evidentiary hearing re: the Settlement filed - 9/27/6; reply briefs, responses to requests for a settlemlent hearing filed - 10/5.
|
Type:
BRIEF
|
Filing Date:
August 7, 2006
|
Filed By:
GREENLINING INSTITUTE
|
|
Description:
opening.
|
Type:
RULING
|
Filing Date:
July 27, 2006
|
Filed By:
ALJ/KENNEY/CPUC
|
|
Description:
Granting Motion for Transcript Corrections.
|
Type:
RULING
|
Filing Date:
July 27, 2006
|
Filed By:
ALJ/KENNEY/CPUC
|
|
Description:
Admitting Exhibit PG&E-79-A into the Evidentiary Record.
|
Type:
RULING
|
Filing Date:
July 24, 2006
|
Filed By:
ALJ/KENNEY/PUC
|
|
Description:
Amends the procedural schedule, as follows: opening briefs/requests for oral argument will be filed August 3, 2006; reply briefs - August 17, 2006.
|
Type:
RULING
|
Filing Date:
July 21, 2006
|
Filed By:
ALJ/KENNEY/CPUC
|
|
Description:
Admitting Exhibit PG&E-79 into the Evidentiary Record.
|
Type:
RULING
|
Filing Date:
July 21, 2006
|
Filed By:
ALJ/KENNEY/CPUC
|
|
Description:
Admitting Exhibit PG&E-78 into the Evidentiary Record.
|
Type:
RULING
|
Filing Date:
June 30, 2006
|
Filed By:
ALJ/KENNEY/CPUC
|
|
Description:
ADMINISTRATIVE LAW JUDGE'S RULING ADOPTING REVISED CONFIDENTIAL MODELING PROCEDURES. Attachments 1 and 2 to this ruling supersede the assigned Administrative Law Judge's Ruling issued on June 21, 2006.
|
Type:
RULING
|
Filing Date:
June 21, 2006
|
Filed By:
ALJ/KENNEY/CPUC
|
|
Description:
ADOPTING CONFIDENTIAL MODELING PROCEDURES.
|
Type:
RULING
|
Filing Date:
June 9, 2006
|
Filed By:
CMMR/BOHN/PUC
|
|
Description:
Clarifying Scoping Memo. Addresses the Greenlining's motion of May 25, 2006, as set forth.
|
Type:
REPLY
|
Filing Date:
June 2, 2006
|
Filed By:
GEENLINING INSTITUTE
|
|
Description:
to PG&E's response to the expedited motion of the Greenlining for a full Commission decision on the inclusion of philanthropy, nuclear and solar energy testimony.
|
Type:
RULING
|
Filing Date:
May 31, 2006
|
Filed By:
ALJ/Kenney/CPUC
|
|
Description:
ADMINISTRATIVE LAW JUDGE'S RULING
DENYING AGLET CONSUMER ALLIANCE'S
MOTION TO STRIKE REBUTTAL TESTIMONY
|
Type:
RULING
|
Filing Date:
May 31, 2006
|
Filed By:
ALJ/Kenney/CPUC
|
|
Description:
ADMINISTRATIVE LAW JUDGE'S RULING REMOVING
FROM THIS PROCEEDING ALL ISSUES REGARDING
PACIFIC GAS AND ELECTRIC COMPANY'S LATE PAYMENT FEE
|
Type:
RULING
|
Filing Date:
May 30, 2006
|
Filed By:
ALJ/KENNEY/PUC
|
|
Description:
Grants the May 26, 2006 PG&E, et al.'s motion to defer issues.
|
Type:
COMMENTS
|
Filing Date:
May 30, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
regarding the Greenlining Institute's supplemental comments in support of its motion to compel testimony from CEO Darbee.
|
Type:
MOTION
|
Filing Date:
May 25, 2006
|
Filed By:
GREENLINING INSTITUTE
|
|
Description:
for a full Commission decision on the inlcusion of philanthropy, nuclear and solar energy testimony.
|
Type:
COMMENTS
|
Filing Date:
May 25, 2006
|
Filed By:
GREENLINING INSTITUTE
|
|
Description:
in support of the Greenlining Institute's motion to compel testimony from CEO Darbee.
|
Type:
RULING
|
Filing Date:
May 24, 2006
|
Filed By:
ALJ/KENNEY/PUC
|
|
Description:
Denies the Greenlining Institute's motion to compel testimony from the Chief Executive Officer.
|
Type:
MOTION
|
Filing Date:
May 24, 2006
|
Filed By:
AGLET CONSUMER ALLIANCE
|
|
Description:
to Strike Rebuttal Testimony.
|
Type:
OPPOSITION
|
Filing Date:
May 23, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to the Greenlining Institute's motion for the issuance of a subpoena to compel the appearance of PG&E Corp's CEO.
|
Type:
RULING
|
Filing Date:
May 22, 2006
|
Filed By:
ALJ/KENNEY/PUC
|
|
Description:
Grants in part and denies in part PG&E's motion to strike portions of Greenlining Institute's testimony.
|
Type:
REPLY
|
Filing Date:
May 17, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
comments in support of the motion to strike testimony.
|
Type:
RULING
|
Filing Date:
May 17, 2006
|
Filed By:
ALJ/KENNEY/PUC
|
|
Description:
Admitting Exhibit 5 into the Evidentiary Record.
|
Type:
PROPOSED DECISION
|
Filing Date:
May 16, 2006
|
Filed By:
ALJ/KENNEY/PUC
|
|
Description:
Opinion authorizing PG&E to recover contribtuions to its employee pension plan. Comments are due June 5, 2006; reply comments - 5 days after comments are filed.
|
Type:
RULING
|
Filing Date:
May 16, 2006
|
Filed By:
ALJ/KENNEY/PUC
|
|
Description:
Grants the motion to intervene filed by SDG&E and Edison on May 11, 2006.
|
Type:
RULING
|
Filing Date:
May 15, 2006
|
Filed By:
ALJ/KENNEY/PUC
|
|
Description:
Grants the motion to intervene filed by Edison on May 9, 2006, as set forth.
|
Type:
MOTION
|
Filing Date:
May 11, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
to Intervene.
|
Type:
NOTICE
|
Filing Date:
May 9, 2006
|
Filed By:
CALJ/MINKIN/PUC
|
|
Description:
of removal of assignment.
|
Type:
MOTION
|
Filing Date:
May 9, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to strike testimony.
|
Type:
MOTION
|
Filing Date:
May 9, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Intervene.
|
Type:
RULING
|
Filing Date:
April 25, 2006
|
Filed By:
ALJ/KENNEY/PUC
|
|
Description:
Grants the Motion to Intervene filed by Delta Wetlands on April 7, 2006, as set forth.
|
Type:
RULING
|
Filing Date:
April 21, 2006
|
Filed By:
ALJ/KENNEY/PUC
|
|
Description:
Amends a ruling issued on April 18, 2006, regarding the motion to compel filed by TURN.
|
Type:
RULING
|
Filing Date:
April 18, 2006
|
Filed By:
ALJ/KENNEY/PUC
|
|
Description:
Grants in part and denies in part TURN's motion to compel PG&E to respond to data requests, filed on April 5, 2006.
|
Type:
RULING
|
Filing Date:
April 17, 2006
|
Filed By:
ALJ/KENNEY/PUC
|
|
Description:
Denies DRA's motion for PG&E to show cause.
|
Type:
RULING
|
Filing Date:
April 11, 2006
|
Filed By:
ALJ/KENNEY/PUC
|
|
Description:
Grants Motion to Intervene filed by Gas Transmission Northwest Corporation.
|
Type:
REPLY
|
Filing Date:
April 11, 2006
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
to the response of PG&E to TURN's motion to compel responses to data requests.
|
Type:
OPPOSITION
|
Filing Date:
April 10, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to Motion of TURN to compel responses to data requests regarding legal costs.
|
Type:
LAW & MOTION
|
Filing Date:
April 5, 2006
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
Motion to Compel Responses to Data Requests.
|
DECISIONS
Number of Decisions: 10
|
Decision Number:
D0801044
|
Rendered Date:
January 31, 2008
Effective Date:
January 31, 2008
|
|
Description:
Denies rehearing of Decision 07-11-013. These proceedings are closed
|
Decision Number:
D0712026
|
Rendered Date:
December 20, 2007
Effective Date:
December 20, 2007
|
|
Description:
Grants intervenor compensation to The Utility Reform Network for substantial contributions to Decision (D) 06-06-014, D07-03-044, and D07-05-058.
|
Decision Number:
D0711018
|
Rendered Date:
November 1, 2007
Effective Date:
November 1, 2007
|
|
Description:
Denies rehearing of Decision 07-03-044.
|
Decision Number:
D0711013
|
Rendered Date:
November 1, 2007
Effective Date:
November 1, 2007
|
|
Description:
Grants intervenor compensation to the Greenlining Institute for substantial contributions to Decision (D.) 07-03-044 and D.07-05-058.
|
Decision Number:
D0710022
|
Rendered Date:
October 18, 2007
Effective Date:
October 18, 2007
|
|
Description:
Grants intervenor compensation to Aglet Consumer Alliance and the Alliance for Nuclear Responsibility for substantial contributions to Decision 07-03-044.
|
Decision Number:
D0706040
|
Rendered Date:
June 21, 2007
Effective Date:
June 21, 2007
|
|
Description:
Awards intervenor compensation to Disability Rights Advocates for its substantial contributions to Decision 07-03-044.
|
Decision Number:
D0705058
|
Rendered Date:
May 24, 2007
Effective Date:
May 24, 2007
|
|
Description:
Adopt a settlement agreement regarding the closure of nine front counters.
|
Decision Number:
D0703044
|
Rendered Date:
March 15, 2007
Effective Date:
March 15, 2007
|
|
Description:
Authorizes Pacific Gas and Electric Company's general rate case revenue requirement for 2007-2010. (Comr. Simon will file a concurrence.)
|
Decision Number:
D0610033
|
Rendered Date:
October 19, 2006
Effective Date:
October 19, 2006
|
|
Description:
Interim Opinion. Authorizes PG&E to recover its general rate case revenue requirement effective on January 1, 2007. (Commissioner Dian M. Grueneich, being necessarily absent, did not participate.)
|
Decision Number:
D0606014
|
Rendered Date:
June 15, 2006
Effective Date:
June 15, 2006
|
|
Description:
Adopts an uncontested settlement agreement that authorizes Pacific Gas and Electric Company (PG&E) to recover contributions to its employee pension plan during 2006-2009. Also, declines to adopt the proposal by The Utility Reform Network to allow PG&E to place up to 50% of its Pension trust's equity investments in securities issued by the utility companies that PG&E used to support its requested return on equity of 11.50% in Application 05-05-006. Closes Application (A.) 05-12-021, but A.05-12-002 and Investigation 06-03-003 remain open to address all remaining general rate case issues.
|