Number of Documents: 211
|
|
|
Type:
DRAFT DECISION
|
Filing Date:
May 17, 2005
|
Filed By:
ALJ/BARNETT/PUC
|
|
Description:
Opinion Granting the Petition of PG&E to Modify D04-02-057. Comments are due
June 6, 2005, and reply comments - 5 days after comments are filed.
|
|
|
Type:
NOTICE
|
Filing Date:
October 12, 2004
|
Filed By:
LATINO ISSUES FORUM
|
|
Description:
of change of address.
|
|
|
Type:
RESPONSE
|
Filing Date:
July 2, 2004
|
Filed By:
MOUNTAIN UTILITIES
|
|
Description:
to Request for an Award of Compensation to TURN.
|
|
|
Type:
REQUEST
|
Filing Date:
June 4, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
for an award of compensation for substantial contributions to D02-04-026,
D04-02-057, and D04-04-020.
|
|
|
Type:
RESPONSE
|
Filing Date:
June 1, 2004
|
Filed By:
MOUNTAIN UTILITIES
|
|
Description:
to request of Latino Issues Forum for intervenor compensation.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
May 10, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
of D04-02-057.
|
|
|
Type:
REQUEST
|
Filing Date:
April 30, 2004
|
Filed By:
LATINO ISSUES FORUM
|
|
Description:
for intervenor compensation for substantial contribution to D04-02-057.
|
|
|
Type:
DRAFT DECISION
|
Filing Date:
April 6, 2004
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
granting petition to modify D04-02-057. Comments are due April 16, 2004; NO
reply comments will be accepted.
|
|
|
Type:
RESPONSE
|
Filing Date:
March 15, 2004
|
Filed By:
ORA/ANGELOPULO/PUC
THE UTILITY REFORM NETWORK
|
|
Description:
joint; to the application for rehearing of D04-02-057 by SDG&E.
|
|
|
Type:
RULING
|
Filing Date:
March 9, 2004
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Shortens time to respond to application for rehearing of D04-02-057: responses
are due March 15, 2004.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
March 8, 2004
|
Filed By:
PACIFICORP
|
|
Description:
of D04-02-057.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
March 8, 2004
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
of D04-02-057 Final Opinion on Phase 2 Issues.
|
|
|
Type:
EXPARTE
|
Filing Date:
February 18, 2004
|
Filed By:
PACIFICORP
|
|
Description:
On February 16, 2004, PacifiCorp sent a letter (copy attached to the notice) to
Cmmr. Peevey. Copies of the letter were also sent to Cmmrs. Kennedy, Lynch,
Wood and Brown and to ALJ TerKeurst.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 16, 2003
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
On December 11, 2003, Lee Schavrien, Vice President of Regulatory Affairs, San
Diego Gas & Electric Company (SDG&E) and Southern California Gas Company
(together, the Sempra Energy Utilities (SEU)), met with Ross LaJeuness, advisor
to Cmmr. Kennedy, in San Francisco. Schavrien stated that SDG&E interprets AB
1 to apply to SDG&E's commodity rate. Schavrien explained that the proposed
decision (PD) would move away from cost causation and could increase cost
shifting for ten to twenty years. Schavrien added that conclusions in the PD
about prior rate changes are outside the scope of this proceeding and that
affected customers were not properly noticed that such changes would be
considered.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 5, 2003
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
On December 3,2003, Lee Schavrien, Vice President of Regulatory Affairs, San
Diego Gas & Electric Company (SDG&E) and Southern California Gas Company
(together, the Sempra Energy Utilities (SEU)), met with Aaron Johnson, advisor
to Cmmr. Lynch, in San Francisco. Also present was Billy Blattner, SEU CPUC
Relations Manager. Schavrien stated that SDG&E interprets AB 1 to apply to
SDG&E's commodity rate. Schavrien explained that the proposed decision (PD)
would move away from cost causation and could increase cost shifting for up to
twenty years. Blattner added that conclusions in the PD about prior rate
changes are outside the scope of this proceeding and that affected customers
were not properly noticed that such changes would be considered.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 1, 2003
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
On November 24,2003, Lee Schavrien, Vice President of Regulatory Affairs, San
Diego Gas & Electric Company (SDG&E) and Southern California Gas Company
(together, the Sempra Energy Utilities (SEU)), met with Julie Fitch, advisor to
Pres. Peevey, in San Francisco. Also present was Billy Blattner, SEU CPUC
Relations Manager. Schavrien stated that SDG&E interprets AB 1 to apply to
SDG&E's commodity rate. Schavrien explained that the proposed decision (PD)
would move away from cost causation and could increase cost shifting for ten to
twenty years. Blattner added that conclusions in the PD about prior rate
changes are outside the scope of this proceeding and that affected customers
were not properly noticed that such changes would be considered.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 13, 2003
|
Filed By:
ORA/ANGELOPULO/PUC
|
|
Description:
reply; on the proposed Phase 2 decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 13, 2003
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; on baseline Phase 2 proposed decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 13, 2003
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
reply; on the proposed decision in Phase 2.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 13, 2003
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
reply; on ALJ's proposed decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 13, 2003
|
Filed By:
LATINO ISSUES FORUM
THE GREENLINING INSTITUTE
|
|
Description:
reply; on the proposed final opinion on Phase 2 baseline issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 13, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
reply; on Phase 2 proposed decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 6, 2003
|
Filed By:
ORA/ANGELOPULO/PUC
|
|
Description:
on the proposed Phase 2 decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 6, 2003
|
Filed By:
LATINO ISSUES FORUM
THE GREENLINING INSTITUTE
|
|
Description:
opening; on the draft opinion on Phase 2 baseline issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 6, 2003
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on the proposed decision in Phase 2.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 6, 2003
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on the proposed decision in Phase 2.
|
|
|
Type:
MOTION
|
Filing Date:
November 6, 2003
|
Filed By:
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
|
|
Description:
to intervene; comments on proposed decision in Phase 2 attached.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 6, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
opening; on phase 2 proposed decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 6, 2003
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
on proposed decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 6, 2003
|
Filed By:
PACIFICORP
|
|
Description:
on the proposed decision of ALJ TerKeurst.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 5, 2003
|
Filed By:
AVISTA UTILITIES
|
|
Description:
on the Proposed Decision.
|
|
|
Type:
EXPARTE
|
Filing Date:
November 5, 2003
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
On October 31, 2003, Lee Schavrien, Vice President of Regulatory Affairs, San
Diego Gas & Electric Company (SDG&E), met with David Gamson, advisor to Cmmr.
Brown, in San Francisco. Also present was Billy Blattner, CPUC Relations
Manager of SDG&E. Schavrien stated that SDG&E interprets AB 1X to apply to
SDG&E's commodity rate. Schavrien explained that the proposed decision (PD)
would move away from cost causation and could increase cost shifting for ten to
twenty years. Blattner added that conclusions in the PD about prior rate
changes are outside the scope of this proceeding and that affected customers
were not properly noticed that such changes would be considered.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 3, 2003
|
Filed By:
MOUNTAIN UTILITIES
|
|
Description:
on Proposed Decision of ALJ Terkeurst.
|
|
|
Type:
RULING
|
Filing Date:
October 28, 2003
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Extends deadlines for comments on proposed decision, issued October 10, 2003.
Comments are due November 6, and reply comments - November 13, 2003.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
October 10, 2003
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Final Opinion on Phase 2 Issues. Comments are due by October 30, 2003; reply
comments - 5 days after comments are filed. [On 10/29/03, ALJ TerKeurst
extended the deadline for Comments to 11/06/03; for Reply Comments to 11/13/03.
MN]
|
|
|
Type:
RULING
|
Filing Date:
September 25, 2003
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Receives Exhibits and submits the record.
|
|
|
Type:
RESPONSE
|
Filing Date:
September 17, 2003
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to ALJ's ruling of September 12, 2003.
|
|
|
Type:
NOTICE
|
Filing Date:
September 17, 2003
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
Notification relative to ALJ Ruling setting aside submssion for receipt of
additional information.
|
|
|
Type:
RULING
|
Filing Date:
September 12, 2003
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Submission of the Phase 2 record is set aside and Phase 2 proceeding is
reopened; verification of attached tables shall be filed and served no later
than noon on Sept 17, 2003; any party objecting shall file and serve an
objection no later than noon on Sept 24, 2003.
|
|
|
Type:
BRIEF
|
Filing Date:
May 21, 2003
|
Filed By:
THE REGIONAL COUNCIL OF RURAL COUNTIES
|
|
Description:
Supplemental Reply; on ALJ Terkeurst Ruling Setting Aside Submission and
Requiring Additional Information.
|
|
|
Type:
BRIEF
|
Filing Date:
May 13, 2003
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
Supplemental; on effect of PROACT Settlement on the Baseline Proceeding.
|
|
|
Type:
BRIEF
|
Filing Date:
May 13, 2003
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
Supplemental; on ALJ Terkeurst Ruling Setting Aside Submission and Requiring
Additional Information.
|
|
|
Type:
BRIEF
|
Filing Date:
May 9, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Supplemental.
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
May 6, 2003
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Filing and service of the A.03-01-019 settlement agreement pursuant to ALJ
Ruling.
|
|
|
Type:
RULING
|
Filing Date:
May 2, 2003
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
setting aside submission and requiring additional information; Edison should
file Settlement Agreement by May 6, 2003; SCE and other parties should file
supplemental briefs by May 13, 2003, as set forth; supplemental reply briefs
should be filed by May 20, 2003.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 13, 2003
|
Filed By:
UTILITY REFORM NETWORK
|
|
Description:
THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON
March 6, 2003, AND APPEARED IN THE CALENDAR OF March12, 2003. On March 5,
2002, Nettie Hoge of The Utility Reform Network (TURN), met with Cmmr. Kennedy
in San Francisco. Also present were Michel Florio, Matthew Freedman, Marcel
Hawiger, and Mindy Spatt, for TURN. A chart (attached to the notice) showing
the relative rate increases for each customer class was used. Freedman and
Florio noted the absence of any residential rate decreases in Southern
California Edisons (SCE) application for the establishment of post-PROACT
rates. Freedman and Florio urged the Commission to support rate relief for
SCEs residential customers proportional to the rate increases they received in
2001 and expressed concerns about the increases that would be experienced by
some residential customers under SCEs proposed elimination of tiers 4 and 5.
Freedman also expressed concerns that the Commission may require the revenue
reductions associated with changes to residential baseline allowances to be
added exclusively to the responsibility of the residential class. Freedman
argued that this outcome would be unfair in light of the current allocation of
undercollections associated with direct access exit fees to all customer
classes.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 6, 2003
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
AUGMENTATION REQUIRED. On March 5, 2002, Nettie Hoge of The Utility Reform
Network (TURN), met with Cmmr. Kennedy in San Francisco. Also present were
Michel Florio, Matthew Freedman, Marcel Hawiger, and Mindy Spatt, for TURN. A
chart showing the relative rate increases for each customer class was used.
Freedman and Florio noted the absence of any residential rate decreases in
Southern California Edison's (SCE) application for the establishment of
post-PROACT rates. Freedman and Florio urged the Commission to support rate
relief for SCE's residential customers proportional to the rate increases they
received in 2001 and expressed concerns about the increases that would be
experienced by some residential customers under SCE's proposed elimination of
tiers 4 and 5. Freedman also expressed concerns that the Commission may
require the revenue reductions associated with changes to residential baseline
allowances to be added exclusively to the responsibility of the residential
class. Freedman argued that this outcome would be unfair in light of the
current allocation of undercollections associated with direct access exit fees
to all customer classes.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 7, 2003
|
Filed By:
EXECUTIVE COUNCIL OF HOMEOWNERS
|
|
Description:
reply; on Proposed Decision approving settlement on common area accounts
|
|
|
Type:
COMMENTS
|
Filing Date:
January 6, 2003
|
Filed By:
AGLET CONSUMER ALLIANCE
|
|
Description:
reply; on proposed decision
|
|
|
Type:
COMMENTS
|
Filing Date:
January 2, 2003
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Opening; on Proposed Decision approving settlement on common area accounts
|
|
|
Type:
COMMENTS
|
Filing Date:
December 23, 2002
|
Filed By:
ORA/ANGELOPULO/PUC
|
|
Description:
on the Proposed Decision of ALJ Terkeurst
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
December 12, 2002
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Interim opinion in Phase 2 approving settlement on common area accounts;
comments are due by January 1, 2002; reply comments - 5 days after opening
comments are filed.
|
|
|
Type:
BRIEF
|
Filing Date:
November 4, 2002
|
Filed By:
CALIFORNIA FARM BUREAU FEDERATION
|
|
Description:
Reply Brief on the allocation of shortfalls associated with baseline changes
for residential customers.
|
|
|
Type:
BRIEF
|
Filing Date:
November 4, 2002
|
Filed By:
GREENLINING INSTITUTE
LATINO ISSUES FORUM
|
|
Description:
Reply Brief in Phase II of the Baseline OIR
|
|
|
Type:
BRIEF
|
Filing Date:
November 4, 2002
|
Filed By:
REGIONAL COUNCIL OF RURAL COUNTIES
|
|
Description:
reply; on well pumping baseline allowances.
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2002
|
Filed By:
SOUTHWEST GAS CORPORATION
|
|
Description:
Reply Brief In The Baseline Allowance Rulemaking
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2002
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Phase 1 Reply Brief in the Baseline OIR
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2002
|
Filed By:
ORA/ANGELOPULO/PUC
|
|
Description:
Reply Brief in Phase 2 of the Baseline Rulemaking
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2002
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
Post-Hearing Reply Brief in Phase 2 of the Baseline Allowances Rulemaking
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2002
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
Reply Brief on proposed modifications to the Baseline Program Phase 2
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Reply Brief in Phase II of the Baseline OIR
|
|
|
Type:
BRIEF
|
Filing Date:
October 30, 2002
|
Filed By:
MOUNTAIN UTILITIES
|
|
Description:
reply; on phase 2 issues
|
|
|
Type:
BRIEF
|
Filing Date:
October 28, 2002
|
Filed By:
AGLET CONSUMER ALLIANCE
|
|
Description:
reply; on Phase 2 issues.
|
|
|
Type:
BRIEF
|
Filing Date:
October 16, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Opening Brief in Phase II of the Baseline OIR
|
|
|
Type:
BRIEF
|
Filing Date:
October 15, 2002
|
Filed By:
CALIFORNIA FARM BUREAU FEDERATION
|
|
Description:
Opening; on the allocation of shortfalls associated with baseline changes for
residential customers.
|
|
|
Type:
BRIEF
|
Filing Date:
October 15, 2002
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Phase 2 Opening; in the baseline OIR.
|
|
|
Type:
BRIEF
|
Filing Date:
October 15, 2002
|
Filed By:
SOUTHWEST GAS CORPORATION
|
|
Description:
Opening; in the Baseline Allowance Rulemaking Proceeding - Phase 2.
|
|
|
Type:
BRIEF
|
Filing Date:
October 15, 2002
|
Filed By:
WATERGATE COMMUNITY ASSOCIATION
|
|
Description:
opening; for Phase 2
|
|
|
Type:
BRIEF
|
Filing Date:
October 15, 2002
|
Filed By:
MOUNTAIN UTILITIES
|
|
Description:
opening; on phase 2 issues.
|
|
|
Type:
BRIEF
|
Filing Date:
October 15, 2002
|
Filed By:
GREENLINING INSTITUTE
LATINO ISSUES FORUM
|
|
Description:
Opening Brief in Phase II of the Baseline Proceeding
|
|
|
Type:
BRIEF
|
Filing Date:
October 15, 2002
|
Filed By:
ORA/ANGELOPULO/PUC
|
|
Description:
Opening Brief in Phase 2 of the Baseline Rulemaking
|
|
|
Type:
BRIEF
|
Filing Date:
October 15, 2002
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
Opening Brief on Proposed Modifications to the Baseline Program
|
|
|
Type:
BRIEF
|
Filing Date:
October 15, 2002
|
Filed By:
SAN DIEGO GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
Post-Hearing Opening Brief in Phase II of the Baseline Allowances Rulemaking
|
|
|
Type:
BRIEF
|
Filing Date:
October 15, 2002
|
Filed By:
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
|
|
Description:
Opening; on Phase II issues.
|
|
|
Type:
BRIEF
|
Filing Date:
October 15, 2002
|
Filed By:
REGIONAL COUNCIL OF RURAL COUNTIES
|
|
Description:
Opening; on well pumping baseline allowances.
|
|
|
Type:
BRIEF
|
Filing Date:
October 10, 2002
|
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
|
|
Description:
Opening Brief on Phase Two Issues
|
|
|
Type:
RULING
|
Filing Date:
October 10, 2002
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Rules that the transcript changes approved in this ruling are adopted for this
proceeding.
|
|
|
Type:
BRIEF
|
Filing Date:
October 9, 2002
|
Filed By:
AGLET CONSUMER ALLIANCE
|
|
Description:
Opening; on Phase 2 Issues.
|
|
|
Type:
RULING
|
Filing Date:
October 9, 2002
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Reopening the record, receiving exhibits, and submitting the record
|
|
|
Type:
MOTION
|
Filing Date:
September 25, 2002
|
Filed By:
SOUTHWEST GAS CORPORATION
|
|
Description:
to Reopen the Record to Receive Late-Filed Exhibit.
|
|
|
Type:
MOTION
|
Filing Date:
September 23, 2002
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
to reopen the record to receive late-filed exhibits.
|
|
|
Type:
RESPONSE
|
Filing Date:
September 4, 2002
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
to the motion of SDG&E and SoCal Gas to strike a portion of the rebuttal
testimony of Michel P. Florio
|
|
|
Type:
MOTION
|
Filing Date:
August 30, 2002
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
To strike a portion of the testimony of TURN
|
|
|
Type:
MOTION
|
Filing Date:
August 28, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
To Submit Late-Filed Testimony; Supplemental Rebuttal Testimony Attached
|
|
|
Type:
MOTION
|
Filing Date:
August 12, 2002
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
Motion for leave to submit supplemental late-filed testimony
|
|
|
Type:
MOTION
|
Filing Date:
August 9, 2002
|
Filed By:
GREENLINING INSTITUTE
LATINO ISSUES FORUM
|
|
Description:
Motion to request official notice
|
|
|
Type:
RESPONSE
|
Filing Date:
August 7, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to Latino Issues Forum's and Greenlining Institute's Motion to Strike
|
|
|
Type:
SUPPLEMENT
|
Filing Date:
August 2, 2002
|
Filed By:
DISABILITY RIGHTS ADVOCATES
|
|
Description:
Supplement to request for award of compensation (per ALJ Allen's 7/19/2002
Ruling)
|
|
|
Type:
MOTION
|
Filing Date:
July 23, 2002
|
Filed By:
GREENLINING INSTITUTE
LATINO ISSUES FORUM
|
|
Description:
To Strike PG&E's Reply Comments on Joint Motion For Adoption of Stipulation on
Common Area Accounts in Baseline OIR Phase 2
|
|
|
Type:
COMMENTS
|
Filing Date:
July 22, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Reply Comments on investor owned utility climate zone submissions
|
|
|
Type:
RULING
|
Filing Date:
July 19, 2002
|
Filed By:
ALJ/ALLEN/PUC
|
|
Description:
requesting additional information: Disability Rights Advocates shall file/serve
supplement by 8/2/2002; responses will not be accepted
|
|
|
Type:
SUPPLEMENT
|
Filing Date:
July 15, 2002
|
Filed By:
EXECUTIVE COUNCIL OF HOMEOWNERS
|
|
Description:
to Reply Comments on Joint Motion to Adopt Stipulation on Common Area Accounts.
|
|
|
Type:
RESPONSE
|
Filing Date:
July 10, 2002
|
Filed By:
MOUNTAIN UTILITIES
|
|
Description:
to Disability Rights Advocates' Motion for Intervenor Compensation.
|
|
|
Type:
REPORT
|
Filing Date:
July 10, 2002
|
Filed By:
DISABILITY RIGHTS ADVOCATES
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
on Resolution of new medical baseline forms.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 8, 2002
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Climate zone comments
|
|
|
Type:
COMMENTS
|
Filing Date:
July 8, 2002
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On climate zone submissions
|
|
|
Type:
COMMENTS
|
Filing Date:
July 8, 2002
|
Filed By:
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
Climate zone comments
|
|
|
Type:
RULING
|
Filing Date:
July 2, 2002
|
Filed By:
ALJ/THOMAS/PUC
|
|
Description:
revising hearing/prehearing schedule: Comments on IOU submission - 7/8/2002;
Reply comments - 7/22; Testimony - 8/1; Responsive testimony - 8/27; Discovery
& motion cut-off - 8/27; Hearings - start 9/3.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 28, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Reply Comments on Joint Motion for Adoption of Stipulation on Common Area
Accounts in Baseline OIR Phase 2
|
|
|
Type:
COMMENTS
|
Filing Date:
June 28, 2002
|
Filed By:
EXECUTIVE COUNCIL OF HOMEOWNERS
|
|
Description:
Reply Comments on Joint Motion to Adopt Stipulation on Common Area Accounts
|
|
|
Type:
OPPOSITION
|
Filing Date:
June 13, 2002
|
Filed By:
GREENLINING INSTITUTE
LATINO ISSUES FORUM
|
|
Description:
To Joint Motion For Adoption of Stipulation on Common Area Accounts
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
June 10, 2002
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
Comments on the proposed revisions to the Medical Baseline Program forms
submitted by Disability Rights Advocates
|
|
|
Type:
REQUEST
|
Filing Date:
June 10, 2002
|
Filed By:
DISABILITY RIGHTS ADVOCATES
|
|
Description:
For Award of Compensation
|
|
|
Type:
RESPONSE
|
Filing Date:
June 10, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
To DRA's Proposed Medical Baseline Forms
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
June 10, 2002
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On Disability Rights Advocates' proposal for new Medical Baseline forms
|
|
|
Type:
RESPONSE
|
Filing Date:
May 31, 2002
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
Response follow up data request of Presiding ALJ Thomas dated 5/24/2002
|
|
|
Type:
RULING
|
Filing Date:
May 24, 2002
|
Filed By:
ALJ/THOMAS/PUC
CMMR/BROWN/PUC
|
|
Description:
re legal issues, climate zone issues and updated schedule: Schedule revised as
follows: IOU's further responses on climate zones - 5/31/2002; Opening
testimony - 5/31; Comments on climate zone submission - 6/3; Reply comments (5
page limit) - 6/14; Responsive testimony - 6/21; Discovery and motion cut-off -
7/1; Hearings - starts 7/8.
|
|
|
Type:
RESPONSE
|
Filing Date:
May 24, 2002
|
Filed By:
AGLET CONSUMER ALLIANCE
|
|
Description:
To Joint Motion for Adoption of Stipulation on common Area Accounts
|
|
|
Type:
COMMENTS
|
Filing Date:
May 21, 2002
|
Filed By:
SAN DIEGO GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
To Joint Motion for Adoption of Stipulation of Common Area Accounts in Baseline
OIR Phase 2
|
|
|
Type:
MOTION
|
Filing Date:
May 14, 2002
|
Filed By:
10 MILLER PLACE HOMEOWNERS ASSOCIATION
EXECUTIVE COUNCIL OF HOMEOWNERS
ORA/ZELLER/PUC
PACIFIC GAS AND ELECTRIC COMPANY
POST INTERNATIONAL OWNERS ASSOCIATION, INC.
SILK PURSE PROPERTIES
SPINNAKER COVER ASSOCIATION
|
|
Description:
Joint Motion for Adoption of Stipulation on Common Area Accounts in Baseline
OIR Phase 2
|
|
|
Type:
MOTION
|
Filing Date:
May 14, 2002
|
Filed By:
10 MILLER PLACE HOMEWONERS ASSOCIATION
EXECUTIVE COUNCIL OF HOMEOWNERS
ORA/ZELLER/PUC
PACIFIC GAS AND ELECTRIC COMPANY
POST INTERNATIONAL OWNERS ASSOCIATION, INC.
SILK PURSE PROPERTIES
SPINNAKER COVER ASSOCIATION
|
|
Description:
Joint Motion to Shorten Time for Comment Period on Joint Motion for Adoption of
Stipulation on Common Area Accounts in Baseline OIR Phase 2
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
May 9, 2002
|
Filed By:
CALIFORNIA FOUNDATION FOR INDEPENDENT LIVING CENTERS
DISABILITY RIGHTS ADVOCATES
|
|
Description:
in compliance with Ordering Paragraph 19 of Decision 02-04-026: Proposal for
new Medical Baseline Forms
|
|
|
Type:
RESPONSE
|
Filing Date:
May 2, 2002
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
Responses to data requests of ALJ Thomas
|
|
|
Type:
RULING
|
Filing Date:
April 23, 2002
|
Filed By:
ALJ/MINKIN/PUC
|
|
Description:
shortening time to file response to San Diego Gas & Electric Company's
4/19/2002 motion and petition to modify Decision 02-04-026: file and serve no
later than noon on 4/29/2002; no reply comments will be allowed.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 22, 2002
|
Filed By:
SEMPRA ENERGY
|
|
Description:
Summary: On April 17, 2002, Lee Schavrien, Vice President of Sempra Energy
(Sempra) met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also
present were Steven Weissman, advisor to Cmmr. Wood, Aaron Johnson, advisor to
Cmmr. Lynch, Laura Krannawitter, advisor to Cmmr. Duque, Kevin Coughlan and
Julie Fitch, advisors to Cmmr. Peevey, Massis Galestan of the Energy Division;
Billy Blattner, CPUC Relations Administrator for Sempra, and Marie Savage,
Management Advisor, San Diego Gas & Electric Company (SDG&E). Written
materials (attached to the notice) were used. Schavrien described SDG&E?s
revised proposal to split its electric Climate Zone. Schavrien stated that the
revised proposal differs from the previous SDG&E climate zone proposal that was
to follow the exact California Energy Commission climate zones lines which
would cut through heavily populated neighborhoods in the southern half of San
Diego County. Schavrien explained that the proposal would put an estimated 57%
of current Zone 1 customers in the new Coastal Zone with a baseline allowance
of approximately 309 kWh and 43% in the new Inland Zone with a baseline of 359
kWh.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
April 19, 2002
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
of Decision 02-04-026
|
|
|
Type:
EXPARTE
|
Filing Date:
April 11, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On April 8, 2002, Brian Cherry, Chief of Regulatory Relations for Pacific Gas
and Electric Company (PG&E), met with David Gamson, advisor to Cmmr. Brown, in
San Francisco. Cherry stated that certain modifications should be made to
clarify the Commission's intent for updating the data in 2002. Cherry also
stated that it would be much simpler and administratively efficient if the gas
quantities were updated along with the electric quantities, including a
simultaneous revenue neutral gas adjustment.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 10, 2002
|
Filed By:
SEMPRA ENERGY CALIFORNIA UTILITIES
|
|
Description:
On April 5, 2002, Billy Blattner, CPUC Relations Administrator of Sempra Energy
(Sempra) met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also
present were Linda Serizawa and Steven Weissman, advisors to Cmmr. Wood, Aaron
Johnson, advisor to Cmmr. Lynch, Kevin Coughlan, advisor to Cmmr. Peevey, and
Lynne McGhee, advisor to Cmmr. Duque; Massis Galestan of the Energy Division;
and Rodney Winter, Regulatory Affairs Case Administrator, and Marie Savage,
Management Advisor, for San Diego Gas & Electric Company (SDG&E). Written
materials (attached to the notice) were used. Blattner explained that SDG&E
proposed splitting its Climate Zone 1 along the lines used by the California
Energy Commission (CEC). Savage noted the difficulty in assigning customers to
zones suing the CEC lines. Winter suggested that a more refined proposal be
considered in Phase II and that changes in baseline allowances, climate zones
and rates should be concurrent.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 8, 2002
|
Filed By:
SEMPRA ENERGY CALIFORNIA UTILITIES
|
|
Description:
On April 3, 2002, Billy Blattner, CPUC Relations Administrator of Sempra Energy
(Sempra) had a telephone conversation with David Gamson, advisor to Cmmr.
Brown. Blattner discussed the ALJ's proposed decision and expressed Sempra's
concern that making changes to baseline allowances without concurrent changes
in rates will result in rate instability. Blattner suggested that changes in
baseline allowances be made in other open proceedings or in Phase II of this
proceeding. Blattner added that concurrent changes in allowances and rates
would avoid undercollections and obviate the need for a balancing account.
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
April 5, 2002
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Climate Zone Proposal in Phase 1 of the Baseline Allowance Rulemaking.
|
|
|
Type:
COMMENTS
|
Filing Date:
April 3, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on proposed SDG&E climate zone split
|
|
|
Type:
EXPARTE
|
Filing Date:
March 22, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On March 19, 2002, Sabrina Chaw, Senior Regulatory Representative of Regulatory
Relations for Pacific Gas and Electric Company (PG&E), attended an all-party
meeting with Cmmr. Wood in San Francisco. Also present were Phil Quadrini,
Senior Rates Analyst, Rate Department, and Bill Stock, Chief, Regulatory
Relations, for PG&E; and other attendees listed on the sign-in sheet attached
to the notice. Chaw asked the Commission to implement baseline quantities
changes concurrently with the corresponding rate changes so that a revenue
shortfall would not occur for the utilities. Chaw emphasized that a balancing
account is not sufficient to establish a pattern of regulatory certainty to the
investment community. Chaw stated that PG&E could implement both the baseline
quantities change and the corresponding rate changes by May 1, 2002. Chaw
explained that if the Commission does not request an implementation date of May
1, 2002, PG&E asks that the Commission consider the timing of when PG&E will
install its new customer information system. Quadrini added that if the
Commission could not implement the rate changes simultaneously with the changes
in the baseline quantities, it should do so as quickly as possible in order to
avoid rate shock for customers.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 22, 2002
|
Filed By:
SEMPRA ENERGY
|
|
Description:
On March 19, 2002, David Barker, Business/Economics Consultant for Southern
California Gas Company (SoCalGas), on behalf of SoCalGas and San Diego Gas &
Electric Company (SDG&E) met with Cmmrs. Wood and Brown in San Francisco. Also
present were Linda Serizawa, advisor to Cmmr. Wood, Aaron Johnson, advisor to
Cmmr. Lynch, Kevin Coughlan and Julie Fitch, advisors to Cmmr. Peevey, and
Lynne McGhee, advisor to Cmmr. Duque; Rodney Winter, Regulatory Affairs Case
Manager, and Billy Blattner, CPUC Relations Administrator, for Sempra Energy,
and other attendees listed on the attachment to the notice. Written materials
(attached to the notice) were used. Barker explained that the Commission
should adjust baseline quantities and rates concurrently. Barker added that
baseline allowances should be set at the midpoint of the statutory range for
all the reasons enumerated in the SoCalGas and SDG&E's comments on the proposed
decision.
|
|
|
Type:
PETITION
|
Filing Date:
March 20, 2002
|
Filed By:
WATERGATE COMMUNITY ASSOCIATION
|
|
Description:
to intervene
|
|
|
Type:
EXPARTE
|
Filing Date:
March 20, 2002
|
Filed By:
UTILITY REFORM NETWORK
|
|
Description:
AUGMENTATION REQUIRED. On March 17, 2002, Matthew Freedman, attorney for The
Utility Reform Network (TURN), attended an all-party meeting with Cmmrs. Wood
and Brown in San Francisco. Also present were Lynn McGhee, advisor to Cmmr.
Duque, Kevin Coughlan and Julie Fitch, advisors to Cmmr. Peevey, Aaron Johnson,
advisor to Cmmr. Lynch, and representatives from all the major California
utilities. Freedman urged the Commission to adopt the proposed decision with
certain modifications. Freedman stated that the primary modification involves
excluding the use of 2001 data from the updating of residential baseline
allowances. Freedman also urged the Commission to set the baselines at the
maximum amount permitted by statute. Furthermore, Freedman disputed Southern
California Edison Company's contention that its federal court settlement with
the Commission prohibits the Commission from changing baseline quantities
absent a concurrent change in rates to eliminate any temporary revenue
shortfall.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 18, 2002
|
Filed By:
ORA/ZELLER/PUC
|
|
Description:
Reply Comments on the Proposed Phase 1 Decision
|
|
|
Type:
COMMENTS
|
Filing Date:
March 18, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Reply Comments on Proposed Decision of ALJ regarding Phase 1 issues
|
|
|
Type:
COMMENTS
|
Filing Date:
March 18, 2002
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on Proposed Decision in Phase 1
|
|
|
Type:
COMMENTS
|
Filing Date:
March 18, 2002
|
Filed By:
SAN DIEGO GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
Joint Reply; on ALJ Thomas' Proposed Decision dated February 19, 2002 on
baseline allowances for residential usage of gas and electricity.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 15, 2002
|
Filed By:
MOUNTAIN UTILITIES
|
|
Description:
Reply Comments re Proposed Decision of ALJ Interim Opinion regarding Phase 1
Issues
|
|
|
Type:
COMMENTS
|
Filing Date:
March 15, 2002
|
Filed By:
DISABILITY RIGHTS ADVOCATES
|
|
Description:
Reply Comments on Proposed Decision of ALJ: Interim Opinion regarding Phase 1
issues
|
|
|
Type:
BRIEF
|
Filing Date:
March 15, 2002
|
Filed By:
REGIONAL COUNCIL OF RURAL COUNTIES
|
|
Description:
Reply Legal Brief
|
|
|
Type:
SUPPLEMENT
|
Filing Date:
March 15, 2002
|
Filed By:
DISABILITY RIGHTS ADVOCATES
|
|
Description:
to Notice of Intent to Claim Compensation; Itemization of Planned Expenses;
pursuant to ALJ Thomas' Ruling of March 7, 2002
|
|
|
Type:
BRIEF
|
Filing Date:
March 15, 2002
|
Filed By:
ORA/ZELLER/PUC
|
|
Description:
Reply Brief on the Commission's ability to consider changes in the baseline
program
|
|
|
Type:
BRIEF
|
Filing Date:
March 15, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Reply; on legal bars to certain potential baseline Phase 2 proposals
|
|
|
Type:
BRIEF
|
Filing Date:
March 15, 2002
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
Reply; Phase 2 on legal issues related to the baseline program
|
|
|
Type:
BRIEF
|
Filing Date:
March 15, 2002
|
Filed By:
GREENLINING INSTITUTE
LATINO ISSUES FORUM
|
|
Description:
Responsive; regarding legal constraints to changing the baseline status quo
|
|
|
Type:
MOTION
|
Filing Date:
March 15, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Requesting Official Notice of Document
|
|
|
Type:
BRIEF
|
Filing Date:
March 15, 2002
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
Reply Brief in the baseline allowances rulemaking
|
|
|
Type:
RESPONSE
|
Filing Date:
March 15, 2002
|
Filed By:
EXECUTIVE COUNCIL OF HOMEOWNERS
|
|
Description:
to PG&E's Opening Brief
|
|
|
Type:
BRIEF
|
Filing Date:
March 15, 2002
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Responsive legal brief on preliminary issues
|
|
|
Type:
NOTICE
|
Filing Date:
March 14, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
of Grant of Request for Ex Parte Meeting
|
|
|
Type:
BRIEF
|
Filing Date:
March 12, 2002
|
Filed By:
AGLET CONSUMER ALLIANCE
|
|
Description:
Responsive legal brief; pursuant to the schedule for Phase 2
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Opening comments on Proposed Decision of ALJ regarding Phase 1 issues
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2002
|
Filed By:
ORA/ZELLER/PUC
|
|
Description:
Comments on the Proposed Phase 1 Decision
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2002
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
Joint Comments on ALJ Sarah Thomas' Proposed Decision, dated February 19, 2002
on baseline allowances for residential usage of gas and electricity
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2002
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Opening Comments on Phase 1 Proposed Decision
|
|
|
Type:
MOTION
|
Filing Date:
March 11, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Requesting Official Notice of Documents
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2002
|
Filed By:
DISABILITY RIGHTS ADVOCATES
|
|
Description:
Comments on Proposed Decision of ALJ: Interim Opinion regarding Phase 1 issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2002
|
Filed By:
MOUNTAIN UTILITIES
|
|
Description:
Re Proposed Decision of ALJ Interim Opinion regarding Phase 1 Issues
|
|
|
Type:
COMMENTS
|
Filing Date:
March 8, 2002
|
Filed By:
PACIFICORP
|
|
Description:
on Proposed Decision of ALJ Thomas
|
|
|
Type:
RULING
|
Filing Date:
March 7, 2002
|
Filed By:
ALJ/THOMAS/PUC
|
|
Description:
regarding Notices of Intent to claim compensation
|
|
|
Type:
BRIEF
|
Filing Date:
March 1, 2002
|
Filed By:
ORA/ZELLER/PUC
|
|
Description:
Opening Brief on the Commission's ability to consider changes in the baseline
program
|
|
|
Type:
BRIEF
|
Filing Date:
March 1, 2002
|
Filed By:
GREENLINING INSTITUTE
LATINO ISSUES FORUM
|
|
Description:
Opening Brief regarding statutory authority to change the baseline status quo.
|
|
|
Type:
BRIEF
|
Filing Date:
March 1, 2002
|
Filed By:
REGIONAL COUNCIL OF RURAL COUNTIES
|
|
Description:
Legal Brief on threshold issues - Can the Commission include other variables in
baseline determination
|
|
|
Type:
BRIEF
|
Filing Date:
March 1, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Opening Brief on legal bars to certain potential baseline Phase 2 proposals
|
|
|
Type:
BRIEF
|
Filing Date:
March 1, 2002
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
Opening Brief in the Baseline Allowances Rulemaking
|
|
|
Type:
NOTICE
|
Filing Date:
March 1, 2002
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
of Availability [of documents listed in REQUEST FOR OFFICIAL NOTICE OF
DOCUMENTS].
|
|
|
Type:
REQUEST
|
Filing Date:
March 1, 2002
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
for Official Notice of Documents: ATTACHED: (1) Legislative Intent Service,
Legislative History of California [Public Utilities] Code section 739, dated
August 1, 1989, vols 1 through 3 (2) CPUC Report to the Legislature per AB2764:
Findings and Recommendations regarding the Baseline Program dated July 8, 1987
- Vol 4.
|
|
|
Type:
BRIEF
|
Filing Date:
March 1, 2002
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Opening.
|
|
|
Type:
BRIEF
|
Filing Date:
March 1, 2002
|
Filed By:
SOUTHWEST GAS CORPORATION
|
|
Description:
Opening Brief In The Baseline Allowance Rulemaking Proceeding - Phase 2
|
|
|
Type:
NOTICE
|
Filing Date:
February 28, 2002
|
Filed By:
GREENLINING INSTITUTE
LATINO ISSUES FORUM
|
|
Description:
of intent to seek compensation
|
|
|
Type:
SCOPING RULING
|
Filing Date:
February 26, 2002
|
Filed By:
ALJ/THOMAS/PUC
CMMR/BROWN/PUC
|
|
Description:
for Phase 2 of proceeding. Sets the scope and the following schedule: Opening
briefs - 3/1/2002; Responsive briefs - 3/15; Opening testimony - 5/17;
Responsive testimony - 6/14; Discovery and motion cut-off date - 7/1; Hearings
- July 8, 9, 10, 15-19. Adopts official service list.
|
|
|
Type:
EXPARTE
|
Filing Date:
February 26, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On February 19, 2002, Gail Slocum, Attorney for Pacific Gas and Electric
Company (PG&E), participated in a teleconference call to ALJ Thomas. Also
participating in the conference were Keith Coyne, Team Leader, and Philip
Quadrini, Rates Analyst, for PG&E, Paul Kerkporian for the Executive Council
Homeowners, and Sean Casey for the Office of Ratepayer Advocates (ORA). Slocum
stated that PG&E is drafting a stipulation that will allow an option for
affected residential multi-family common area accounts to take service on
commercial rates. Slocum stated that since the five-tiered surcharge was
implemented, high use common-area customers have been concerned about
inordinate increases in their energy bills. Slocum explained that if all
common-area accounts were required to switch to commercial rates, the approach
would harm the majority of these accounts because most of them have such small
energy use and are not currently receiving the residential surcharge. Slocum
stated that ORA filed testimony, which PG&E supports, proposing that
common-area customers be afforded the option of switching to commercial rate
schedules. Slocum also stated that the Commission might consider this
stipulation for earlier adoption it if wishes to expedite the resolution of
this issue and provide much needed relief to these customers.
|
|
|
Type:
EXPARTE
|
Filing Date:
February 21, 2002
|
Filed By:
EXECUTIVE COUNCIL OF HOMEOWNERS
|
|
Description:
On February 19, 2002, Paul Kerkorian, Executive Council of Homeowners (ECHO),
had a telephone communication with ALJ Sarah Tomas. Also participating in the
telephone conversation were Sean Casey of the Office of Ratepayer Advocates
(ORA) and Gail Slocum and Phil Quadrini of Pacific Gas and Electric Company.
Kerkorian stated that ECHO favors ORA's proposal relating to common area
accounts, but that ORA's proposal is only a partial solution for common area
customers
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
February 19, 2002
|
Filed By:
ALJ/PUC
|
|
Description:
[Interim Opinion Regarding Phase 1 Issues] mailed 2/19/2002 (Comments are due
by 3/11/2002; reply comments due 5 days after comments are filed. Opening
comments shall not exceed 15 pages.)
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
January 28, 2002
|
Filed By:
SOUTHWEST GAS CORPORATION
|
|
Description:
In accordance with the ALJ's January 11, 2002 Ruling
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
January 28, 2002
|
Filed By:
PACIFICORP
|
|
Description:
In accordance with the January 11, 2002 Ruling Assigned ALJ Thomas
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
January 25, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
in Baseline OIR, Phase 2
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
January 25, 2002
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
in Phase Two
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
January 25, 2002
|
Filed By:
SOUTHERN CALIFORNIA WATER COMPANY
|
|
Description:
Pursuant to ALJ Thomas' January 11, 2002 Ruling
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
January 25, 2002
|
Filed By:
GREENLINING INSTITUTE
LATINO ISSUES FORUM
|
|
Description:
Pursuant to ALJ Thomas' Ruling of January 11, 2002
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
January 25, 2002
|
Filed By:
ORA/ZELLER/PUC
|
|
Description:
Pursuant to ALJ Thomas' Ruling of January 11, 2002
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
January 25, 2002
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
In Phase 2 of the Baseline OIR; pursuant to ALJ's Ruling of January 11, 2002
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
January 25, 2002
|
Filed By:
SAN DIEGO GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
In accordance with ALJ Thomas' Ruling of January 11, 2002
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
January 25, 2002
|
Filed By:
MOUNTAIN UTILITIES
|
|
Description:
and request for exemption from or limitation of participation in Phase 2 of
R01-05-047
|
|
|
Type:
RULING
|
Filing Date:
January 11, 2002
|
Filed By:
ALJ/THOMAS/PUC
|
|
Description:
setting prehearing conference on 1/31/2002; PHC statements due by 1/25/2002.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 24, 2001
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On December 18, 2001, Sabrina Chaw, Senior Regulatory Representative of Pacific
Gas and Electric Company (PG&E), met with David Gamson, advisor to Cmmr. Brown,
in San Francisco. Also present were Gail Slocum, Attorney, Keith Coyne, Team
Leader, and Phil Quadrini, Senior Rates Analyst, PG&E. Written material
(attached to the notice) was used. Slocum noted that, pursuant to D01-05-064,
PG&E implemented a three-sent surcharge by applying a five-tiered surcharge
equally to all residential rate schedules. Slocum noted that the five-tier
structure, used only to bill the residential surcharge, has affected
multi-family building common-area accounts with high monthly use. Slocum
stated that prior to a 1992 decision, PG&E's poly-phase service common-area
accounts were on commercial rates; however, D92-04-063 ordered PG&E to switch
these accounts from commercial to residential schedules. Slocum noted that
since the five-tiered surcharge was implemented, many high use-common-area
customers have been concerned about increased energy bills. Slocum discussed
possible approaches to address this problem.
|
|
|