Commissioner Assigned: Nancy Ryan on February 5, 2010
ALJ Assigned: Timothy J. Sullivan on December 22, 2008
|
Filer Requested Category:
Preliminary Category:
Quasi-legislative
Commission Designated Category:
Quasi-legislative
|
Filed By:
CPUC
|
|
|
DOCUMENTS
Number of Documents: 147
(only the most current 100 are displayed)
Display all documents for this proceeding
|
Type:
RULING
|
Filing Date:
February 8, 2010
|
Filed By:
ALJ/SULLIVAN/CPUC
CMMR/RYAN/CPUC
|
|
Description:
Assigned Commissioner and Administrative Law Judge's Joint Ruling Amending Scoping Memo and Inviting Comments on Proposed Policies and Findings pertaining to the Smart Grid. The scope of this proceeding is amended to include those issues set by Senate Bill (SB) 17 (Padilla) for resolution by this Commission. The schedule set forth herein is adopted, and may be changed by the Administrative Law Judge if needed. Parties shall file comments and replies to the issues and questions listed above. Opening comments are due March 5, 2010.Workshop 1 will be held on March 10, 2010 at the Commission Courtroom; Workshop 2 will also be held at the Commission Courtroom on March 11-12, 2010. Reply comments may be filed no later than April 1, 2010, and may both respond to opening comments and address issues raised in the workshops. The deadline for resolution of this proceeding is extended to August 8, 2011.
|
Type:
MOTION
|
Filing Date:
February 1, 2010
|
Filed By:
Mountain Utilities
|
|
Description:
to be dismissed from Rulemaking
|
Type:
MOTION
|
Filing Date:
February 1, 2010
|
Filed By:
Bear Valley Electric Service, a Division of Golden State Water Company
|
|
Description:
for dismissal from Rulemaking 08-12-009
|
Type:
MOTION
|
Filing Date:
February 1, 2010
|
Filed By:
PacifiCorp
|
|
Description:
for exemption from SB 17 and dismissal from further obligation under this proceeding
|
Type:
MOTION
|
Filing Date:
February 1, 2010
|
Filed By:
Sierra Pacific Power Company
|
|
Description:
for dismissal from R.08-12-009 pursuant to Decision 09-12-046
|
Type:
NOTICE
|
Filing Date:
January 28, 2010
|
Filed By:
Southern California Edison Company
|
|
Description:
of Smart Grid Federal Stimulus Funding Award, Pursuant to Ordering Paragraph 1 snd Section 3.2 of D. 09-09-029
|
Type:
COMMENTS
|
Filing Date:
December 14, 2009
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; on Proposed Decision of Commissioner Chong adopting policies and findings pursuant to the smart grid policies established by the Energy Information and Security Act of 2007.
|
Type:
COMMENTS
|
Filing Date:
December 14, 2009
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; concerning Proposed Decision.
|
Type:
COMMENTS
|
Filing Date:
December 9, 2009
|
Filed By:
Google Inc.
|
|
Description:
ON THE PROPOSED DECISION OF COMMISSIONER CHONG
|
Type:
COMMENTS
|
Filing Date:
December 7, 2009
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
OPENING; ON PROPOSED DECISION ADOPTING SMART GRID POLICIES AND FINDINGS UNDER ENERGY INFORMATION AND SECURITY ACT OF 2007
|
Type:
COMMENTS
|
Filing Date:
December 7, 2009
|
Filed By:
DRA/SALVACION/CPUC
|
|
Description:
Opening; ON THE NOVEMBER 17, 2009 PROPOSED DECISION ADOPTING POLICIES AND FINDINGS PURSUANT TO THE SMART GRID POLICIES ESTABLISHED BY THE ENERGY INFORMATION AND SECURITY ACT OF 2007
|
Type:
COMMENTS
|
Filing Date:
December 7, 2009
|
Filed By:
The Utility Reform Network
|
|
Description:
Opening; ON THE PROPOSED DECISION OF COMMISSIONER CHONG CONCERNING EISA POLICIES
|
Type:
COMMENTS
|
Filing Date:
December 7, 2009
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Opening; CONCERNING PROPOSED DECISION
|
Type:
COMMENTS
|
Filing Date:
December 7, 2009
|
Filed By:
Consumer Federation of California
|
|
Description:
Opening; ON THE PROPOSED DECISION OF COMMISSIONER CHONG "ADOPTING POLICIES AND FINDINGS PURSUANT TO THE SMART GRID POLICIES ESTABLISHED BY THE ENERGY INFORMATION AND SECURITY ACT OF 2007"
|
Type:
COMMENTS
|
Filing Date:
December 7, 2009
|
Filed By:
Center for Energy Efficiency and Renewable Technologies
|
|
Description:
Opening; ON PROPOSED DECISION OF COMMISSIONER CHONG
|
Type:
COMMENTS
|
Filing Date:
December 7, 2009
|
Filed By:
PACIFICORP
|
|
Description:
Opening; REGARDING COMMISSIONER CHONG'S PROPOSED DECISION ON SMART GRID POLICIES
|
Type:
COMMENTS
|
Filing Date:
December 7, 2009
|
Filed By:
California Independent System Operator Corporation
|
|
Description:
Opening; On The Assigned Commissioner's Proposed Decision Adopting Policies And Findings Pursuant To The Smart Grid Policies Established By The Energy Information [sic] And Security Act Of 2007
|
Type:
COMMENTS
|
Filing Date:
December 7, 2009
|
Filed By:
Tendril Networks, Inc.
|
|
Description:
Opening; ON THE PROPOSED DECISION
|
Type:
COMMENTS
|
Filing Date:
December 7, 2009
|
Filed By:
CAlifornians for Renewable Energy, Inc. (CARE)
|
|
Description:
Opening; ON PROPOSED DECISION ADOPTING POLICIES AND FINDINGS PURSUANT TO THE SMART GRID POLICIES ESTABLISHED BY THE ENERGY INFORMATION AND SECURITY ACT OF 2007 (EISA)
|
Type:
COMMENTS
|
Filing Date:
December 7, 2009
|
Filed By:
Sierra Pacific Power Company
|
|
Description:
Opening; ON THE PROPOSED DECISION OF COMMISSIONER CHONG ADOPTING POLICIES AND FINDINGS PURSUANT TO THE SMART GRID POLICIES ESTABLISHED BY THE ENERGY INFORMATION AND SECURITY ACT OF 2007
|
Type:
NOTICE
|
Filing Date:
December 1, 2009
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
FOR REPORTING DEPARTMENT OF ENERGY NOTIFICATION OF SELECTION FOR SMART GRID DEMONSTRATION PROGRAM
|
Type:
RULING
|
Filing Date:
November 25, 2009
|
Filed By:
ALJ/SULLIVAN/CPUC
|
|
Description:
(regarding October 7, 2009 Motion of Pacific Gas and Electric Company for Leave to File Confidential Materials under Seal)
|
Type:
PROPOSED DECISION
|
Filing Date:
November 17, 2009
|
Filed By:
CMMR/CHONG/CPUC
|
|
Description:
DECISION ADOPTING POLICIES AND FINDINGS PURSUANT TO THE SMART GRID POLICIES ESTABLISHED BY THE ENERGY INFORMATION AND SECURITY ACT OF 2007. Opening comments, which shall not exceed 15 pages, are due December 7, 2009. Reply comments,which shall not exceed 5 pages, are due 5 days after the last day for filing comments.
|
Type:
MOTION
|
Filing Date:
November 4, 2009
|
Filed By:
Tendril Networks, Inc.
|
|
Description:
requesting party status.
|
Type:
COMMENTS
|
Filing Date:
November 4, 2009
|
Filed By:
Tendril Networks, Inc.
|
|
Description:
in response to the 9/28/2009 Ruling (late-filed authorized by ALJ Sullivan per e-mail of 11/4/2009).
|
Type:
COMMENTS
|
Filing Date:
November 2, 2009
|
Filed By:
Consumer Federation of California
|
|
Description:
REPLY; ON THE JOINT RULING INVITING COMMENTS ON PROPOSED POLICIES AND FINDINGS PERTAINING TO THE SMART GRID POLICIES ESTABLISHED BY THE ENERGY
INFORMATION AND SECURITY ACT OF 2007
|
Type:
COMMENTS
|
Filing Date:
November 2, 2009
|
Filed By:
DRA/SALVACION/CPUC
|
|
Description:
REPLY; ON THE SEPTEMBER 28, 2009 RULING ON SMART GRID POLICIES
|
Type:
COMMENTS
|
Filing Date:
November 2, 2009
|
Filed By:
Southern California Edison Company
|
|
Description:
REPLY; ON ASSIGNED COMMISSIONER AND ADMINISTRATIVE LAW JUDGE'S JOINT RULING INVITING COMMENTS ON PROPOSED POLICIES AND FINDINGS
PERTAINING TO THE SMART GRID POLICIES ESTABLISHED BY THE ENERGY INFORMATION AND SECURITY ACT OF 2007
|
Type:
COMMENTS
|
Filing Date:
November 2, 2009
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
REPLY; ON ASSIGNED COMMISSIONER'S AND ADMINISTRATIVE LAW JUDGE'S RULING INVITING COMMENTS ON PROPOSED SMART GRID POLICIES AND FINDINGS UNDER ENERGY INFORMATION AND SECURITY ACT OF 2007
|
Type:
COMMENTS
|
Filing Date:
November 2, 2009
|
Filed By:
North America Power Partners LLC
|
|
Description:
Reply; on Assigned Commissioner and ALJ's Ruling on Smart Grid Policies.
|
Type:
MOTION
|
Filing Date:
November 2, 2009
|
Filed By:
North America Power Partners LLC
|
|
Description:
TO BECOME A PARTY
|
Type:
COMMENTS
|
Filing Date:
November 2, 2009
|
Filed By:
The Utility Reform Network
|
|
Description:
REPLY; ON PROPOSED POLICIES AND FINDINGS PERTAINING TO THE SMART GRID POLICIES ESTABLISHED BY THE ENERGY INFORMATION AND SECURITY ACT OF 2007
|
Type:
NOTICE
|
Filing Date:
October 30, 2009
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
FOR REPORTING DEPARTMENT OF ENERGY SELECTION FOR SMART GRID INVESTMENT GRANT
|
Type:
RESPONSE
|
Filing Date:
October 29, 2009
|
Filed By:
Southern California Edison Company
|
|
Description:
to the application for rehearing of Decision 09-09-029 of the Consumer Federation of California
|
Type:
COMMENTS
|
Filing Date:
October 26, 2009
|
Filed By:
Sam's West, Inc.
Wal-Mart Stores, Inc.
|
|
Description:
on Assigned Commissioner and Administrative Law Judge's Joint Ruling inviting comments on proposed policies and findings pertaining to the smart grid policies established by the Energy Information and Security Act of 2007.
|
Type:
COMMENTS
|
Filing Date:
October 26, 2009
|
Filed By:
Mountain Utilities
|
|
Description:
Opening; in response to the Assigned Commissioner and Administrative Law Judge's Joint Ruling inviting comments on proposed policies and findings pertaining to the smart grid policies established by the Energy Information and Security Act of 2007.
|
Type:
COMMENTS
|
Filing Date:
October 26, 2009
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Opening; on Assigned Commissioner and Administrative Law Judge's ruling inviting comments on proposed smart grid policies and findings under Energy Information and Security Act of 2007.
|
Type:
COMMENTS
|
Filing Date:
October 26, 2009
|
Filed By:
Southern California Edison Company
|
|
Description:
on Assigned Commissioner and Administrative Law Judge's Joint Ruling inviting comments on proposed policies and findings pertaining to the smart grid policies established by the Energy Information and Security Act of 2007.
|
Type:
COMMENTS
|
Filing Date:
October 26, 2009
|
Filed By:
California Large Energy Consumers Association
|
|
Description:
in response to Assigned Commissioner's Ruling inviting comments on proposed policies and findings.
|
Type:
COMMENTS
|
Filing Date:
October 26, 2009
|
Filed By:
Center for Energy Efficiency and Renewable Technologies
|
|
Description:
Opening; ON ASSIGNED COMMISSIONER AND ADMINISTRATIVE LAW JUDGE'S JOINT RULING
|
Type:
COMMENTS
|
Filing Date:
October 26, 2009
|
Filed By:
Google Inc.
|
|
Description:
Opening; ON PROPOSED POLICIES AND FINDINGS
PERTAINING TO THE SMART GRID POLICIES ESTABLISHED BY THE ENERGY INFORMATION AND SECURITY ACT OF 2007
|
Type:
COMMENTS
|
Filing Date:
October 26, 2009
|
Filed By:
PacifiCorp
|
|
Description:
Opening; TO ASSIGNED COMMISSIONER AND
ADMINISTRATIVE LAW JUDGE'S RULING INVITING COMMENTS ON PROPOSED POLICIES AND FINDINGS PERTAINING TO THE SMART GRID POLICIES ESTABLISHED BY THE ENERGY INFORMATION AND SECURITY ACT OF 2007, ISSUED SEPTEMBER 28, 2009
|
Type:
COMMENTS
|
Filing Date:
October 26, 2009
|
Filed By:
The Utility Reform Network
|
|
Description:
on proposed policies and findings pertaining to the smart grid policies established by the Energy Information and Security Act of 2007.
|
Type:
COMMENTS
|
Filing Date:
October 26, 2009
|
Filed By:
Consumer Federation of Calilfornia
|
|
Description:
Opening; TO JOINT RULING INVITING COMMENTS ON PROPOSED POLICIES AND FINDINGS PERTAINING TO THE SMART GRID POLICIES ESTABLISHED BY THE ENERGY INFORMATION AND SECURITY ACT OF 2007
|
Type:
COMMENTS
|
Filing Date:
October 26, 2009
|
Filed By:
Consumer Federation of California
The Utility Reform Network
|
|
Description:
Opening; ON PROPOSED POLICIES AND FINDINGS PERTAINING TO THE EISA STANDARD REGARDING CUSTOMER AND THIRD PARTY ACCESS TO PRIVATE USAGE INFORMATION
|
Type:
COMMENTS
|
Filing Date:
October 26, 2009
|
Filed By:
CAlifornians for Renewable Energy
|
|
Description:
on the Assigned Commissioner and ALJ's Joint ruling inviting comments on proposed policies and findings pertaining to the smart grid policies established by the Energy Information and Security Act of 2007.
|
Type:
COMMENTS
|
Filing Date:
October 26, 2009
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Opening; CONCERNING RULING ON PROPOSED POLICIES AND FINDINGS PERTAINING TO THE SMART GRID
ALLEN
|
Type:
COMMENTS
|
Filing Date:
October 26, 2009
|
Filed By:
Bear Valley Electric Service
Mountain Utilities
PacifiCorp
Sierra Pacific Power Company
|
|
Description:
Opening; to Joint Ruling inviting comments on proposed policies and findings pertaining to the smart grid policies established by the Energy Information and Security Act of 2007.
|
Type:
COMMENTS
|
Filing Date:
October 26, 2009
|
Filed By:
DRA/SALVACION/CPUC
|
|
Description:
OPENING; ON THE SEPTEMBER 28, 2009 RULING ON SMART GRID POLICIES
|
Type:
COMMENTS
|
Filing Date:
October 26, 2009
|
Filed By:
Sierra Pacific Power Company
|
|
Description:
Opening; to Assigned Commissioner and Administrative Law Judge's Joint Ruling inviting comments on proposed policies and findings pertaining to the smart grid policies established by the Energy Information and Security Act of 2007.
|
Type:
REHEARING REQUEST
|
Filing Date:
October 14, 2009
|
Filed By:
Consumer Federation of California
|
|
Description:
Application for rehearing of Decision 09-09-029.
|
Type:
NOTICE
|
Filing Date:
October 9, 2009
|
Filed By:
Southern California Edison Company
|
|
Description:
pursuant to Ordering Paragraph 1 and Section 3.2 of D.09-09-029
|
Type:
LAW & MOTION
|
Filing Date:
October 7, 2009
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY (U39E)
|
|
Description:
Motion to File Under Seal pursuant to Ordering Paragraph 1 and Section 3.2 of Decision 09-09-029 a copy of an Application submitted to the U.S. Department of Energy (DOE) requesting Funding for a Compressed Air Energy Storage Project under the DOE Smart Grid Demonstration Program.
|
Type:
NOTICE
|
Filing Date:
October 1, 2009
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
pursuant to Ordering Paragraph 1 and Section 3.2 of D.09-09-029
|
Type:
NOTICE
|
Filing Date:
October 1, 2009
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
of filing for reporting Department of Energy application for Smart Grid related funding
|
Type:
RULING
|
Filing Date:
September 29, 2009
|
Filed By:
ALJ/SULLIVAN/CPUC
|
|
Description:
Correcting Typographical Error in Joint Ruling of September 28, 2009.
|
Type:
RULING
|
Filing Date:
September 28, 2009
|
Filed By:
ALJ/SULLIVAN/CPUC
CMMR/CHONG/CPUC
|
|
Description:
Assigned Commissioner and Administrative Law Judge's Joint Ruling inviting comments on proposed policies and findings pertaining to the Smart Grid policies established by the Energy Information and Security Act of 2007. Parties may file comments and replies to the issues and questions identified in the ruling. Opening comments are due 10/19/2009. Reply comments are due 10/26/2009.
[***ALERT: Per ALJ Sullivan's 10/16/2009 e-mail, opening comments on this ruling will be due 10/26/2009 and reply comments due 11/2/2009. GML 10/16/2009]
|
Type:
NOTICE
|
Filing Date:
September 28, 2009
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
pursuant to O.P.1 and Section 3.2 of D.09-09-029.
|
Type:
COMMENTS
|
Filing Date:
August 17, 2009
|
Filed By:
DRA/SALVACION/CPUC
|
|
Description:
Reply; on Commissioner Chong's proposed decision filed on 7/21/09.
|
Type:
COMMENTS
|
Filing Date:
August 17, 2009
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; on Commissioner Chong's proposed decision filed on 7/21/09.
|
Type:
COMMENTS
|
Filing Date:
August 17, 2009
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; on Commissioner Chong's proposed decision filed on 7/21/09.
|
Type:
COMMENTS
|
Filing Date:
August 17, 2009
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; on Commissioner Chong's proposed decision filed on 7/21/09.
|
Type:
COMMENTS
|
Filing Date:
August 10, 2009
|
Filed By:
The Utility Reform Network
|
|
Description:
Opening; on Commissioner Chong's proposed decision filed on 7/21/09.
|
Type:
COMMENTS
|
Filing Date:
August 10, 2009
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Opening; on Commissioner Chong's proposed decision filed 7/21/09.
|
Type:
COMMENTS
|
Filing Date:
August 10, 2009
|
Filed By:
DRA/SALVACION/CPUC
|
|
Description:
Opening; on Commissioner Chong's proposed decision filed 7/21/09.
|
Type:
COMMENTS
|
Filing Date:
August 10, 2009
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Opening; on Commissioner Chong's proposed decision filed 7/21/09.
|
Type:
COMMENTS
|
Filing Date:
August 10, 2009
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Opening; on Commissioner Chong's proposed decision filed 7/21/09.
|
Type:
COMMENTS
|
Filing Date:
August 10, 2009
|
Filed By:
Consumer Federation of California
|
|
Description:
Opening; on Commissioner Chong's proposed decision filed 7/21/09.
|
Type:
PROPOSED DECISION
|
Filing Date:
July 21, 2009
|
Filed By:
CMMR/CHONG/CPUC
|
|
Description:
Decision establishing Commission Processes for Review of Projects and Investments by Investor-Owned Utilities Seeking Recovery Act Funding. Opening comments, which shall not exceed 15 pages, are due August 10, 2009. Reply comments,which shall not exceed 5 pages, are due 5 days after the last day for filing comments.
|
Type:
COMMENTS
|
Filing Date:
July 20, 2009
|
Filed By:
Golden State Water Company
|
|
Description:
Opening; on Commissioner Chong's proposed decision filed 6/29/09.
|
Type:
COMMENTS
|
Filing Date:
July 20, 2009
|
Filed By:
Mountain Utilities
|
|
Description:
on proposed decision of Commissioner Chong (mailed 6/29/2009)
|
Type:
COMMENTS
|
Filing Date:
July 20, 2009
|
Filed By:
PacifiCorp
Sierra Pacific Power Company
|
|
Description:
Joint Opening; on Commissioner Chong's proposed decision filed 6/29/09.
|
Type:
RULING
|
Filing Date:
July 8, 2009
|
Filed By:
ALJ/SULLIVAN/CPUC
|
|
Description:
Taking Official Notice of Certain Department of Energy Publications Associated with the Recovery Act.
|
Type:
COMMENTS
|
Filing Date:
June 30, 2009
|
Filed By:
Consumer Federation of California
|
|
Description:
Reply; on the May 29, 2009 assigned commissioner's ruling.
|
Type:
PROPOSED DECISION
|
Filing Date:
June 29, 2009
|
Filed By:
CMMR/CHONG/CPUC
|
|
Description:
Decision Modifying Rulemaking 08-12-009. Opening comments, which shall not exceed 15 pages, are due no later than July 19, 2009. Reply comments, which shall not exceed 5 pages, are due no later than five days after the last day for filing comments.
|
Type:
COMMENTS
|
Filing Date:
June 29, 2009
|
Filed By:
DRA/Salvacion/CPUC
|
|
Description:
Reply; on the May 29, 2009 assigned commissioner's ruling.
|
Type:
COMMENTS
|
Filing Date:
June 29, 2009
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; on the May 29, 2009 assigned commissioner's ruling.
|
Type:
COMMENTS
|
Filing Date:
June 29, 2009
|
Filed By:
The Utility Reform Network
|
|
Description:
Reply; on the May 29, 2009 assigned commissioner's ruling.
|
Type:
COMMENTS
|
Filing Date:
June 29, 2009
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; on the May 29, 2009 assigned commissioner's ruling.
|
Type:
COMMENTS
|
Filing Date:
June 29, 2009
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; on the May 29, 2009 assigned commissioner's ruling.
|
Type:
COMMENTS
|
Filing Date:
June 24, 2009
|
Filed By:
DRA/SALVACION/CPUC
|
|
Description:
Amended; on the May 29, 2009 assigned Commissioner's ruling amending the scope and schedule of proceeding to address policy issues pertaining to Smart Grid funding appropriated in the American Recovery and Reinvestment Act of 2009
|
Type:
COMMENTS
|
Filing Date:
June 17, 2009
|
Filed By:
The Utility Reform Network
|
|
Description:
on Assigned Commissioner Ruling amending the scope and schedule of proceeding to address policy issues pertaining to Smart Grid funding appropriated in the American Recovery and Reinvestment Act of 2009 (late-filed and late-served was authorized by ALJ Sullivan).
|
Type:
COMMENTS
|
Filing Date:
June 15, 2009
|
Filed By:
Southern California Edison Company
|
|
Description:
to the assigned Commissioner's May 29, 2009 ruling amending the scope and schedule of proceeding to address policy issues pertaining to Smart Grid funding appropriated in the American Recovery and Reinvestment Act of 2009
|
Type:
COMMENTS
|
Filing Date:
June 15, 2009
|
Filed By:
California Large Energy Consumers Association
|
|
Description:
in response to the May 29, 2009 assigned Commissioner's Ruling
|
Type:
COMMENTS
|
Filing Date:
June 15, 2009
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
on assigned Commissioner's ruling amending the scope and schedule of proceeding
|
Type:
COMMENTS
|
Filing Date:
June 15, 2009
|
Filed By:
Consumer Federation of California
|
|
Description:
addressing policy issues pertaining to Smart Grid funding appropriated in the American Recovery and Reinvestment Act of 2009
|
Type:
COMMENTS
|
Filing Date:
June 15, 2009
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
on assigned Commissioner's ruling on Smart Grid ratemaking policies
|
Type:
COMMENTS
|
Filing Date:
June 15, 2009
|
Filed By:
DRA/SALVACION/CPUC
|
|
Description:
initial; on the May 29, 2009 assigned Commissioner's ruling amending the scope and schedule of proceeding to address policy issues pertaining to Smart Grid funding appropriated in the American Recovery and Reinvestment Act of 2009
|
Type:
RESPONSE
|
Filing Date:
June 12, 2009
|
Filed By:
Southern California Edison Company
|
|
Description:
to the Division of Ratepayer Advocates' Appeal of the Categorization of Rulemaking 08-12-009.
|
Type:
RESPONSE
|
Filing Date:
June 12, 2009
|
Filed By:
California Independent System Operator
|
|
Description:
to Division of Ratepayer Advocates' Appeal of Categorization.
|
Type:
RESPONSE
|
Filing Date:
June 12, 2009
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to Division of Ratepayer Advocates' Appeal of Categorization.
|
Type:
RESPONSE
|
Filing Date:
June 11, 2009
|
Filed By:
Consumer Federation of California
|
|
Description:
to Appeal of Categorization filed by DRA.
|
Type:
APPEAL CATEGORIZATION
|
Filing Date:
June 8, 2009
|
Filed By:
DRA/THOMAS/CPUC
|
|
Description:
Appeal of Categorization of Rulemaking 08-12-009.
|
Type:
RULING
|
Filing Date:
May 29, 2009
|
Filed By:
CMMR/CHONG/CPUC
|
|
Description:
amending the scope and schedule of proceeding to address policy issues pertaining to Smart Grid funding appropriated in the American Recovery and Reinvestment Act of 2009. The scope of the proceeding is amended as set forth in the ruling. The schedule for issues related to the Recovery Act is set forth in the ruling.
|
Type:
RULING
|
Filing Date:
May 13, 2009
|
Filed By:
ALJ/SULLIVAN/CPUC
|
|
Description:
regarding Notices of Intent to Claim Compensation. California for Renewable Energy, Inc., Consumer Federation of California, Green Power Institute, and The Utility Reform Network are found eligible for compensation in this proceeding. Community Environment Council is a customer and has timely filed its Notice of Intent, but has not established that its participation will cause significant financial hardship.
|
Type:
SCOPING RULING
|
Filing Date:
May 1, 2009
|
Filed By:
CMMR/CHONG/CPUC
|
|
Description:
of the Assigned Commissioner. The final categorization of this proceeding is quasi-legislative. Hearings are not required. The scope and schedule of this proceeding are as set forth. The request of Bear Valley Electric Service, PacifiCorp, Sierra Pacific Power Company and Mountain Utilities to no longer be respondents to this proceeding is deemed a petition to modify R.08-12-009. Responses to the petition are due June 1, 2009. Replies to the responses are permitted and due June 11, 2009.
|
Type:
NOTICE
|
Filing Date:
April 27, 2009
|
Filed By:
Green Power Institute
|
|
Description:
of Intent to Claim Compensation
|
Type:
NOTICE
|
Filing Date:
April 24, 2009
|
Filed By:
The Utility Reform Network
|
|
Description:
of Intent to Claim Intervenor Compensation
|
Type:
NOTICE
|
Filing Date:
April 21, 2009
|
Filed By:
CAlifornians for Renewable Energy
|
|
Description:
of Intent to Claim Compensation
|
Type:
NOTICE
|
Filing Date:
April 16, 2009
|
Filed By:
Consumer Federation of California
|
|
Description:
Notice of Intent to Claim Intervenor Compensation
|
DECISIONS
Number of Decisions: 4
|
Decision Number:
D0912046
|
Rendered Date:
December 17, 2009
Effective Date:
December 17, 2009
|
|
Description:
Adopts policies and findings pursuant to the Smart Grid policies established by the Energy Information and Security Act of 2007. Commissioner Grueneich reserves the right to file a concurrence.
|
Decision Number:
D0909029
|
Rendered Date:
September 10, 2009
Effective Date:
September 10, 2009
|
|
Description:
Establishes Commission processes for review of projects and investments by Investor-Owned Utilities seeking Recovery Act funding.
|
Decision Number:
D0907039
|
Rendered Date:
July 30, 2009
Effective Date:
July 30, 2009
|
|
Description:
Modifies Rulemaking 08-12-009.
|
Decision Number:
D0906043
|
Rendered Date:
June 18, 2009
Effective Date:
June 18, 2009
|
|
Description:
Denies appeal of categorization.
|