Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number2831G
Advice Letter Filed04-MAY-07
Suspension Begin Date25-MAY-07
Suspension End Date21-SEP-07
Projected Date of Disposition19-JAN-08
GroundsAdvice letter requires staff review

Utility NamePacific Pipeline System LLC (U-0018)
Advice Letter Number31
Advice Letter Filed25-JUN-07
Suspension Begin Date26-JUN-07
Suspension End Date23-OCT-07
Projected Date of Disposition20-FEB-08
GroundsSection 851 Advice Letter requires a Commission Resolution

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3080E
Advice Letter Filed06-JUL-07
Suspension Begin Date09-JUL-07
Suspension End Date05-NOV-07
Projected Date of Disposition04-MAR-08
GroundsSection 851 Advice Letter requires a Commission Resolution

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3156E
Advice Letter Filed15-NOV-07
Suspension Begin Date16-NOV-07
Suspension End Date14-MAR-08
Projected Date of Disposition12-JUL-08
GroundsSection 851 Advice Letter requires a Commission Resolution

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3188E
Advice Letter Filed31-DEC-07
Suspension Begin Date31-JAN-08
Suspension End Date29-MAY-08
Projected Date of Disposition26-SEP-08
GroundsSection 455 Hearing is Required - A Commission resolution may be required to address the advice letter.

Utility NamePacificorp (U-0901)
Advice Letter Number363E
Advice Letter Filed07-JUL-08
Suspension Begin Date10-NOV-08
Suspension End Date06-MAY-09
Projected Date of Disposition03-SEP-09
GroundsAdvice letter requires staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3343E
Advice Letter Filed23-SEP-08
Suspension Begin Date01-OCT-08
Suspension End Date28-JAN-09
Projected Date of Disposition28-MAY-09
GroundsResolution Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2311E
Advice Letter Filed20-JAN-09
Suspension Begin Date23-FEB-09
Suspension End Date22-JUN-09
Projected Date of Disposition20-OCT-09
GroundsProtested

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3524E
Advice Letter Filed16-SEP-09
Suspension Begin Date16-OCT-09
Suspension End Date12-FEB-10
Projected Date of Disposition12-JUN-10
GroundsSection 455 Hearing is Required - A Commission resolution is required to address the advice letter.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3052G
Advice Letter Filed09-OCT-09
Suspension Begin Date10-OCT-09
Suspension End Date08-FEB-10
Projected Date of Disposition08-JUN-10
GroundsSection 851 AL requires a Commission Resolution.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2150E
Advice Letter Filed05-MAR-10
Suspension Begin Date29-MAR-10
Suspension End Date26-JUL-10
Projected Date of Disposition23-NOV-10
GroundsAdditional time required for review. Protests have raised both policy and legal issues (regarding appropriate tier of AL) which Energy Division needs to review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3680E
Advice Letter Filed02-JUN-10
Suspension Begin Date02-JUL-10
Suspension End Date29-OCT-10
Projected Date of Disposition26-FEB-11
GroundsSection 455 Hearing is required-A Commission resolution is required to address the advice letter.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3137G|3704E
Advice Letter Filed12-JUL-10
Suspension Begin Date03-AUG-10
Suspension End Date30-NOV-10
Projected Date of Disposition30-MAR-11
GroundsAL requires staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3141G|3708E
Advice Letter Filed23-JUL-10
Suspension Begin Date23-DEC-10
Suspension End Date21-APR-11
Projected Date of Disposition19-AUG-11
GroundsAL 3141G|3708E-A requires staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3715E
Advice Letter Filed12-AUG-10
Suspension Begin Date10-SEP-10
Suspension End Date07-JAN-11
Projected Date of Disposition07-MAY-11
Groundssection 455 Hearing is required - a Commission resolution may be required to address the advice letter.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3170G|3763E
Advice Letter Filed22-NOV-10
Suspension Begin Date23-DEC-10
Suspension End Date21-APR-11
Projected Date of Disposition19-AUG-11
GroundsAL 3170G|3763E-A requires staff review.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number1991G
Advice Letter Filed22-NOV-10
Suspension Begin Date21-DEC-10
Suspension End Date19-APR-11
Projected Date of Disposition17-AUG-11
GroundsAL requires staff review.

Utility NameSouthern California Gas Company (U-0904)
Advice Letter Number4177G
Advice Letter Filed30-NOV-10
Suspension Begin Date31-DEC-10
Suspension End Date29-APR-11
Projected Date of Disposition27-AUG-11
GroundsAdvice letter requries staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3795E
Advice Letter Filed26-JAN-11
Suspension Begin Date27-MAY-11
Suspension End Date23-NOV-11
Projected Date of Disposition22-MAR-12
GroundsFor further suspension starting 5/27/11 which is the start of the second suspension up to Nov. 23, 2011 for a period of 180 days.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2548E
Advice Letter Filed31-JAN-11
Suspension Begin Date15-JUN-11
Suspension End Date12-DEC-11
Projected Date of Disposition10-APR-12
GroundsAdvice Letter Requires Staff Review

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2563E
Advice Letter Filed21-MAR-11
Suspension Begin Date15-APR-11
Suspension End Date12-AUG-11
Projected Date of Disposition10-DEC-11
GroundsResolution Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3822E
Advice Letter Filed30-MAR-11
Suspension Begin Date11-MAY-11
Suspension End Date07-SEP-11
Projected Date of Disposition05-JAN-12
GroundsResolution is required, AL requests a Commission Order, AL requires Staff Review

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2568E
Advice Letter Filed30-MAR-11
Suspension Begin Date20-APR-11
Suspension End Date17-AUG-11
Projected Date of Disposition15-DEC-11
GroundsA Commission Resolution is required to dispose of the advice letter.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2247E
Advice Letter Filed19-APR-11
Suspension Begin Date14-SEP-11
Suspension End Date12-MAR-12
Projected Date of Disposition10-JUL-12
GroundsA Commission Resolution is required to dispose of the advice letter, it requests a Commission order and requires a staff review.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2576E
Advice Letter Filed22-APR-11
Suspension Begin Date20-SEP-11
Suspension End Date19-MAR-12
Projected Date of Disposition17-JUL-12
GroundsAdvice letter requires staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3837E
Advice Letter Filed03-MAY-11
Suspension Begin Date02-AUG-11
Suspension End Date29-NOV-11
Projected Date of Disposition28-MAR-12
GroundsA Commission resolution is required to dispose of the advice letter, the advice letter requests a commission order and it requires staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3208G
Advice Letter Filed27-MAY-11
Suspension Begin Date04-NOV-11
Suspension End Date02-MAY-12
Projected Date of Disposition30-AUG-12
GroundsAdditional Information Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3847E
Advice Letter Filed27-MAY-11
Suspension Begin Date02-AUG-11
Suspension End Date29-NOV-11
Projected Date of Disposition28-MAR-12
GroundsA Commission resolution is required to dispose of the advice letter, the advice letter requests a Commission order and it requires staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3854E
Advice Letter Filed02-JUN-11
Suspension Begin Date02-AUG-11
Suspension End Date29-NOV-11
Projected Date of Disposition28-MAR-12
GroundsA Commission resolution is required to dispose of the advice letter, the advice letter requests a Commission order and it requires staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3862E
Advice Letter Filed16-JUN-11
Suspension Begin Date02-AUG-11
Suspension End Date29-NOV-11
Projected Date of Disposition28-MAR-12
GroundsA Commission resolution is required to dispose of the advice letter, the advice letter requests a Commission order and it requries staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3864E
Advice Letter Filed17-JUN-11
Suspension Begin Date20-JUL-11
Suspension End Date16-NOV-11
Projected Date of Disposition15-MAR-12
GroundsA Commission Resolution is required to dispose of the advice letter, the advice letter requests aCommission Order and it reuqires staff review.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2262E
Advice Letter Filed17-JUN-11
Suspension Begin Date20-JUL-11
Suspension End Date16-NOV-11
Projected Date of Disposition15-MAR-12
GroundsA Commission Resolution is required to dispose the advice letter, the advice letter requests a Commission Order and it requires staff review.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2593E
Advice Letter Filed17-JUN-11
Suspension Begin Date20-JUL-11
Suspension End Date16-NOV-11
Projected Date of Disposition15-MAR-12
GroundsA Commission Resolution is required to dispose of the advice letter, the advice letter requests a Commission Order and it requires staff review.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2268E
Advice Letter Filed06-JUL-11
Suspension Begin Date27-JUL-11
Suspension End Date23-NOV-11
Projected Date of Disposition22-MAR-12
GroundsA Commission Resolution is required to dispose of the advice letter, the advice letter requests a Commission Order and it requires a staff review.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2285E
Advice Letter Filed09-SEP-11
Suspension Begin Date10-OCT-11
Suspension End Date06-FEB-12
Projected Date of Disposition05-JUN-12
GroundsSection 455 Hearing is required - A Commission resolution is required to address thte advice letter.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3902E
Advice Letter Filed12-SEP-11
Suspension Begin Date07-OCT-11
Suspension End Date03-FEB-12
Projected Date of Disposition02-JUN-12
GroundsAdvice letter requires staff review.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2286E
Advice Letter Filed12-SEP-11
Suspension Begin Date07-OCT-11
Suspension End Date03-FEB-12
Projected Date of Disposition02-JUN-12
GroundsAdvice letter requires staff review.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2625E
Advice Letter Filed12-SEP-11
Suspension Begin Date07-OCT-11
Suspension End Date03-FEB-12
Projected Date of Disposition02-JUN-12
GroundsAdvice letter requires staff review.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2292E
Advice Letter Filed23-SEP-11
Suspension Begin Date24-OCT-11
Suspension End Date20-FEB-12
Projected Date of Disposition19-JUN-12
GroundsSection 455 Hearing is requried-A Commission resolution may be required to address the advice letter.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3911E
Advice Letter Filed26-SEP-11
Suspension Begin Date07-OCT-11
Suspension End Date03-FEB-12
Projected Date of Disposition02-JUN-12
GroundsAdvice letter requries staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3910E
Advice Letter Filed26-SEP-11
Suspension Begin Date07-OCT-11
Suspension End Date03-FEB-12
Projected Date of Disposition02-JUN-12
GroundsAdvice letter requries staff review.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2633E
Advice Letter Filed30-SEP-11
Suspension Begin Date06-JAN-12
Suspension End Date04-MAY-12
Projected Date of Disposition01-SEP-12
GroundsAdvice letter requires staff review.

Utility NameSouthern California Gas Company (U-0904)
Advice Letter Number4282G
Advice Letter Filed30-SEP-11
Suspension Begin Date02-NOV-11
Suspension End Date29-FEB-12
Projected Date of Disposition28-JUN-12
GroundsAdvice letter requires staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3917E
Advice Letter Filed03-OCT-11
Suspension Begin Date03-NOV-11
Suspension End Date01-MAR-12
Projected Date of Disposition29-JUN-12
GroundsA Commission resolution is requried to dispose of the advice letter and it requires staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3921E
Advice Letter Filed06-OCT-11
Suspension Begin Date06-NOV-11
Suspension End Date05-MAR-12
Projected Date of Disposition03-JUL-12
GroundsA Commission resolution is required to dispose of the advice letter and it requires a staff review.

Utility NameCalifornia Pacific Electric Company (U-0933)
Advice Letter Number9E
Advice Letter Filed11-OCT-11
Suspension Begin Date10-NOV-11
Suspension End Date08-MAR-12
Projected Date of Disposition06-JUL-12
GroundsAdvice letter requires staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3246G
Advice Letter Filed11-OCT-11
Suspension Begin Date01-NOV-11
Suspension End Date28-FEB-12
Projected Date of Disposition27-JUN-12
GroundsAdvice letter requires staff review.

Utility NameCalifornia Pacific Electric Company (U-0933)
Advice Letter Number11E
Advice Letter Filed20-OCT-11
Suspension Begin Date20-NOV-11
Suspension End Date19-MAR-12
Projected Date of Disposition17-JUL-12
GroundsSection 455 Hearing is required - A Commission resolution is required to address the advice letter

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3251G|3934E
Advice Letter Filed27-OCT-11
Suspension Begin Date28-NOV-11
Suspension End Date26-MAR-12
Projected Date of Disposition24-JUL-12
GroundsAdvice letter requires staff review.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2297E
Advice Letter Filed27-OCT-11
Suspension Begin Date28-NOV-11
Suspension End Date26-MAR-12
Projected Date of Disposition24-JUL-12
GroundsAdvice letter requires staff review.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2644E
Advice Letter Filed27-OCT-11
Suspension Begin Date26-NOV-11
Suspension End Date26-MAR-12
Projected Date of Disposition24-JUL-12
GroundsAdvice letter requires staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3935E
Advice Letter Filed31-OCT-11
Suspension Begin Date30-DEC-11
Suspension End Date27-APR-12
Projected Date of Disposition25-AUG-12
GroundsAdvice letter requires staff review-audit period to be extended.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2299E
Advice Letter Filed31-OCT-11
Suspension Begin Date30-DEC-11
Suspension End Date27-APR-12
Projected Date of Disposition25-AUG-12
GroundsAdvice letter requires staff review-audit period to be extended.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2646E
Advice Letter Filed31-OCT-11
Suspension Begin Date30-DEC-11
Suspension End Date27-APR-12
Projected Date of Disposition25-AUG-12
GroundsAdvice letter requires staff review-audit period to be extended.

Utility NameSouthern California Gas Company (U-0904)
Advice Letter Number4291G
Advice Letter Filed03-NOV-11
Suspension Begin Date29-NOV-11
Suspension End Date27-MAR-12
Projected Date of Disposition25-JUL-12
GroundsAdvice letter requires staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3943E
Advice Letter Filed10-NOV-11
Suspension Begin Date06-DEC-11
Suspension End Date03-APR-12
Projected Date of Disposition01-AUG-12
GroundsAdvice letter requires staff review.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2301E
Advice Letter Filed10-NOV-11
Suspension Begin Date06-DEC-11
Suspension End Date03-APR-12
Projected Date of Disposition01-AUG-12
GroundsAdvice letter requires staff review.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2653E
Advice Letter Filed10-NOV-11
Suspension Begin Date06-DEC-11
Suspension End Date03-APR-12
Projected Date of Disposition01-AUG-12
GroundsAdvice letter requires staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3949E
Advice Letter Filed16-NOV-11
Suspension Begin Date17-NOV-11
Suspension End Date15-MAR-12
Projected Date of Disposition13-JUL-12
GroundsA Commission Resolution is required to dispose of the Advice Letter.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3951E
Advice Letter Filed18-NOV-11
Suspension Begin Date18-DEC-11
Suspension End Date16-APR-12
Projected Date of Disposition14-AUG-12
GroundsAdvice letter requires staff review.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2659E
Advice Letter Filed23-NOV-11
Suspension Begin Date20-DEC-11
Suspension End Date17-APR-12
Projected Date of Disposition15-AUG-12
GroundsAdvice letter requires staff review.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2309E
Advice Letter Filed02-DEC-11
Suspension Begin Date03-DEC-11
Suspension End Date02-APR-12
Projected Date of Disposition31-JUL-12
GroundsA Commission Resolution is requried to dispose of the advice letter, it requests a Commission order and it requires staff review.

Utility NameCalifornia Pacific Electric Company (U-0933)
Advice Letter Number14E
Advice Letter Filed16-DEC-11
Suspension Begin Date13-JAN-12
Suspension End Date11-MAY-12
Projected Date of Disposition08-SEP-12
GroundsAdvice letter requries staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3971E
Advice Letter Filed16-DEC-11
Suspension Begin Date13-JAN-12
Suspension End Date11-MAY-12
Projected Date of Disposition08-SEP-12
GroundsAdvice letter requries staff review.

Utility NamePacificorp (U-0901)
Advice Letter Number463E
Advice Letter Filed16-DEC-11
Suspension Begin Date13-JAN-12
Suspension End Date11-MAY-12
Projected Date of Disposition08-SEP-12
GroundsAdvice letter requries staff review.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2317E
Advice Letter Filed16-DEC-11
Suspension Begin Date13-JAN-12
Suspension End Date11-MAY-12
Projected Date of Disposition08-SEP-12
GroundsAdvice letter requires staff review.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2676E
Advice Letter Filed16-DEC-11
Suspension Begin Date13-JAN-12
Suspension End Date11-MAY-12
Projected Date of Disposition08-SEP-12
GroundsAdvice letter requries staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3975E
Advice Letter Filed21-DEC-11
Suspension Begin Date17-JAN-12
Suspension End Date15-MAY-12
Projected Date of Disposition12-SEP-12
GroundsAdvice letter requires staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3983E
Advice Letter Filed29-DEC-11
Suspension Begin Date27-JAN-12
Suspension End Date25-MAY-12
Projected Date of Disposition22-SEP-12
GroundsSection 455 Hearing is required- A Commission resolution may be required to address the advice letter.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2324E
Advice Letter Filed03-JAN-12
Suspension Begin Date31-JAN-12
Suspension End Date29-MAY-12
Projected Date of Disposition26-SEP-12
GroundsSection 455 Hearing is required-a Commission resolution may be required to address the advice leeter.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3987E
Advice Letter Filed06-JAN-12
Suspension Begin Date06-FEB-12
Suspension End Date04-JUN-12
Projected Date of Disposition02-OCT-12
GroundsSection 455 Hearing is required - A Commission resolution may be required to address the advice letter.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2325E
Advice Letter Filed06-JAN-12
Suspension Begin Date06-FEB-12
Suspension End Date04-JUN-12
Projected Date of Disposition02-OCT-12
GroundsSection 455 Hearing is required-a Commission resolution may be required to address the advice letter.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2687E
Advice Letter Filed06-JAN-12
Suspension Begin Date31-JAN-12
Suspension End Date29-MAY-12
Projected Date of Disposition26-SEP-12
GroundsResolution Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2688E
Advice Letter Filed06-JAN-12
Suspension Begin Date06-FEB-12
Suspension End Date04-JUN-12
Projected Date of Disposition02-OCT-12
GroundsProtested

Utility NameEllwood Pipeline, Inc. (U-0021)
Advice Letter Number3
Advice Letter Filed17-JAN-12
Suspension Begin Date14-FEB-12
Suspension End Date13-JUL-12
Projected Date of Disposition10-NOV-12
GroundsAdditional Time Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3989E
Advice Letter Filed17-JAN-12
Suspension Begin Date19-JAN-12
Suspension End Date17-MAY-12
Projected Date of Disposition14-SEP-12
GroundsA Commission resolutionis required to dispose of the advice letter, it requests a Commission Order and it requires a staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3999E
Advice Letter Filed30-JAN-12
Suspension Begin Date30-MAR-12
Suspension End Date27-JUL-12
Projected Date of Disposition24-NOV-12
GroundsAdvice Letter requires staff review.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2329E
Advice Letter Filed30-JAN-12
Suspension Begin Date30-MAR-12
Suspension End Date27-JUL-12
Projected Date of Disposition24-NOV-12
GroundsAdvice Letter requires staff review.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2691E
Advice Letter Filed30-JAN-12
Suspension Begin Date30-MAR-12
Suspension End Date27-JUL-12
Projected Date of Disposition24-NOV-12
GroundsAdvice Letter requires staff review.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2699E
Advice Letter Filed13-FEB-12
Suspension Begin Date13-MAR-12
Suspension End Date10-JUL-12
Projected Date of Disposition07-NOV-12
GroundsAdvice Letter requires staff review.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2704E
Advice Letter Filed24-FEB-12
Suspension Begin Date28-MAR-12
Suspension End Date25-JUL-12
Projected Date of Disposition22-NOV-12
GroundsA Commission resolution may be required to address the Advice Lretter. Advice Letter requires staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4007E
Advice Letter Filed01-MAR-12
Suspension Begin Date09-MAR-12
Suspension End Date06-JUL-12
Projected Date of Disposition03-NOV-12
GroundsResolution Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number3282G/4008E
Advice Letter Filed01-MAR-12
Suspension Begin Date28-MAR-12
Suspension End Date25-JUL-12
Projected Date of Disposition22-NOV-12
GroundsAdditional Information Needed

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2334E
Advice Letter Filed05-MAR-12
Suspension Begin Date26-MAR-12
Suspension End Date23-JUL-12
Projected Date of Disposition20-NOV-12
GroundsAdvice Letter Requires Staff Review

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2332E
Advice Letter Filed05-MAR-12
Suspension Begin Date05-APR-12
Suspension End Date02-AUG-12
Projected Date of Disposition30-NOV-12
GroundsRequires staff review and Commission Order.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4010E
Advice Letter Filed09-MAR-12
Suspension Begin Date05-APR-12
Suspension End Date02-AUG-12
Projected Date of Disposition30-NOV-12
GroundsAdvice Letter requires staff review.

Utility NameGill Ranch Storage, LLC (U-0914)
Advice Letter Number4G
Advice Letter Filed12-MAR-12
Suspension Begin Date11-APR-12
Suspension End Date08-AUG-12
Projected Date of Disposition06-DEC-12
GroundsResolution Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4012E
Advice Letter Filed12-MAR-12
Suspension Begin Date13-APR-12
Suspension End Date10-AUG-12
Projected Date of Disposition08-DEC-12
GroundsResolution Needed

Utility NamePacificorp (U-0901)
Advice Letter Number470E
Advice Letter Filed12-MAR-12
Suspension Begin Date13-APR-12
Suspension End Date10-AUG-12
Projected Date of Disposition08-DEC-12
GroundsResolution Needed

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2336E
Advice Letter Filed12-MAR-12
Suspension Begin Date13-APR-12
Suspension End Date10-AUG-12
Projected Date of Disposition08-DEC-12
GroundsResolution Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2709E
Advice Letter Filed12-MAR-12
Suspension Begin Date13-APR-12
Suspension End Date10-AUG-12
Projected Date of Disposition08-DEC-12
GroundsResolution Needed

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2710E
Advice Letter Filed15-MAR-12
Suspension Begin Date13-APR-12
Suspension End Date10-AUG-12
Projected Date of Disposition08-DEC-12
GroundsAdvice Letter requires staff review.

Utility NameGolden State Water Company (U-0913)
Advice Letter Number265E
Advice Letter Filed16-MAR-12
Suspension Begin Date13-APR-12
Suspension End Date10-AUG-12
Projected Date of Disposition08-DEC-12
GroundsResolution Needed

Utility NameCalifornia Pacific Electric Company (U-0933)
Advice Letter Number15E
Advice Letter Filed19-MAR-12
Suspension Begin Date13-APR-12
Suspension End Date10-AUG-12
Projected Date of Disposition08-DEC-12
GroundsResolution Needed

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4017E
Advice Letter Filed26-MAR-12
Suspension Begin Date26-APR-12
Suspension End Date23-AUG-12
Projected Date of Disposition21-DEC-12
GroundsAdvice Letter requires staff review.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2342E/2101G
Advice Letter Filed30-MAR-12
Suspension Begin Date30-APR-12
Suspension End Date27-AUG-12
Projected Date of Disposition25-DEC-12
GroundsSection 455 Hearing is required.

Utility NameSouthern California Gas Company (U-0904)
Advice Letter Number4353G
Advice Letter Filed30-MAR-12
Suspension Begin Date25-APR-12
Suspension End Date22-AUG-12
Projected Date of Disposition20-DEC-12
GroundsAL requires staff review.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2713E
Advice Letter Filed02-APR-12
Suspension Begin Date16-APR-12
Suspension End Date13-AUG-12
Projected Date of Disposition11-DEC-12
GroundsAdvice Letter requires staff review.

Utility NamePacific Gas & Electric Company (U-0039)
Advice Letter Number4026E
Advice Letter Filed11-APR-12
Suspension Begin Date16-APR-12
Suspension End Date13-AUG-12
Projected Date of Disposition11-DEC-12
GroundsAdvice Letter requires staff review.

Utility NameSanta Fe Pacific Pipelines Ltd Partners (U-0009)
Advice Letter Number29PLC
Advice Letter Filed12-APR-12
Suspension Begin Date23-APR-12
Suspension End Date20-AUG-12
Projected Date of Disposition18-DEC-12
GroundsAdvice Letter requires staff review.

Utility NameSan Diego Gas & Electric Company (U-0902)
Advice Letter Number2344E
Advice Letter Filed13-APR-12
Suspension Begin Date11-MAY-12
Suspension End Date07-SEP-12
Projected Date of Disposition05-JAN-13
GroundsResolution is required to dispose of the AL.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2716E
Advice Letter Filed13-APR-12
Suspension Begin Date20-APR-12
Suspension End Date17-AUG-12
Projected Date of Disposition15-DEC-12
GroundsResolution Needed

Utility NameSouthern California Gas Company (U-0904)
Advice Letter Number4358G
Advice Letter Filed17-APR-12
Suspension Begin Date11-MAY-12
Suspension End Date07-SEP-12
Projected Date of Disposition05-JAN-13
GroundsAdvice Letter requires staff review.

Utility NameSouthern California Edison Company (U-0338)
Advice Letter Number2717E
Advice Letter Filed23-APR-12
Suspension Begin Date17-MAY-12
Suspension End Date13-SEP-12
Projected Date of Disposition11-JAN-13
GroundsResolution is required to dispose of the AL.