Type: REPORT Filing Date: November 13, 2006
Filed By:
Southern California Edison Company
Description: Filing in compliance with O.P.13 of Decision 05-11-009.

Type: COMPLIANCE FILING Filing Date: July 6, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: in compliance with Ordering Paragraph 14 of D05-11-009: Completed Research Report.

Type: COMPLIANCE FILING Filing Date: June 9, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Refrigerant Based Energy Storage for Air Conditionng Report per O.P. 13 of Decision 05-11-009.

Type: REPORT Filing Date: May 25, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Completed Research Report Not Previously Filed in Accordance with Ordering Paragraph 14 of D05-11-009.

Type: COMPLIANCE FILING Filing Date: May 9, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: (Pursuant to O.P.13 of Decision 05-11-009) - Evaluation of 2005 statewide large nonresidential day-ahead and reliability demand response program report.

Type: COMPLIANCE FILING Filing Date: May 2, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: (Per D.05-11-009, O.P. 13)

Type: COMPLIANCE FILING Filing Date: April 24, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: (pursuant to O.P.13 of D.05-11-009).

Type: AMENDMENT Filing Date: April 18, 2006
Filed By:
THE UTILITY REFORM NETWORK
Description: 2nd; to Request for Compensation.

Type: COMPLIANCE FILING Filing Date: April 10, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: per O.P.13 of D.05-11-009 (Demand Response Research Reports).

Type: AMENDMENT Filing Date: March 22, 2006
Filed By:
THE UTILITY REFORM NETWORK
Description: to Request for Compensation for Substantial Contribution to Phase 2 Rulings and Decisions.

Type: COMPLIANCE FILING Filing Date: February 24, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Per Decision 05-11-009, O.P. 13. - Air conditioner cycling summer discount program evaluation study.

Type: REQUEST Filing Date: January 20, 2006
Filed By:
THE UTILITY REFORM NETWORK
Description: for compensation for substantial contribution to Phase 2 rulings and decisions.

Type: COMPLIANCE FILING Filing Date: December 1, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: in compliance with D05-11-009: Filing of a List of Completed Researh Reports and Completed Researh Reports Not Previously Filed.

Type: COMPLIANCE FILING Filing Date: December 1, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: per O.P 13 of D.05-11-009.

Type: COMPLIANCE FILING Filing Date: November 21, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Report on interruptible load programs, rotating outage activities, and demand response programs (for October 2005).

Type: COMMENTS Filing Date: November 14, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on Draft Decision of ALJ Cooke.

Type: COMMENTS Filing Date: November 14, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: reply; on the draft decision.

Type: COMMENTS Filing Date: November 8, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: on the proposed decision closing the Rulemaking.

Type: COMMENTS Filing Date: November 8, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the draft decision of ALJ Cooke closing this Rulemaking.

Type: COMMENTS Filing Date: November 8, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on Draft Decision of ALJ Cooke.

Type: COMMENTS Filing Date: November 8, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Draft Decision closing Rulemaking and identifying future activities related to Demand Response.

Type: COMPLIANCE FILING Filing Date: October 31, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of Completed Research Report entitled "Impact Evaluation of the California Statewide Pricing Pilot." [Report may be downloaded at www.energy.ca.gov/demandresponse/documents/index.html ]

Type: COMPLIANCE FILING Filing Date: October 31, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Final Report + Program Impact Evaluation + Post SPP Rate Choice Assessment Research.

Type: COMPLIANCE FILING Filing Date: October 31, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Residential Automated Demand Response System (ADRS) Pilot Economic Analysis Report.

Type: MOTION Filing Date: October 27, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: for authorization to continue to operate 2005 demand response programs for first three months of 2006.

Type: COMPLIANCE FILING Filing Date: October 21, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Report on interruptible load programs, rotating outage activities, and demand response programs for September 2005.

Type: DRAFT DECISION Filing Date: October 19, 2005
Filed By:
ALJ/COOKE/PUC
Description: Comments are due November 8, 2005; reply comments - 5 days after comments are filed.

Type: MOTION Filing Date: October 6, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: for Authorization to continue to operate 2005 Demand Response Programs in the First Quarter of 2006 pending a Final Decision on (this) Application.

Type: EXPARTE Filing Date: October 5, 2005
Filed By:
USCL CORPORATION
Description: On October 1, 2005, Tom D. Tamarkin, President of USCL Corporation, sent an email with four documents attached to ALJ Cooke. On the same day of October 1, 2005, Tamarkin sent the same documents to Cmmrs. Kennedy and Peevey, via Federal Express, to deliver on October 3, 2005. Copies of the written materials and the text of the email are attached to the notice.

Type: REPLY Filing Date: September 23, 2005
Filed By:
USCL CORPORATION
Description: to PG&E's response to motion to add minimum functionality requirement.

Type: RESPONSE Filing Date: September 21, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Motion of USCL Corp.

Type: COMPLIANCE FILING Filing Date: September 21, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Report on interruptible load programs, rotating outage activities, and demand response programs for August 2005.

Type: RESPONSE Filing Date: September 20, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to USCL Motion to Add Minimum Functionality Requirement

Type: EXPARTE Filing Date: September 9, 2005
Filed By:
USCL CORPORATION
Description: On September 6, 2005, Brian Cragg, counsel for USCL Corporation (USCL), spoke by telephone with Julie Fitch, advisor to Cmmr. Peevey. Cragg stated that USCL was filing a petition to intervene and a motion requesting the Commission to add another functionality requirement to the six advanced metering infrastructure functions currently identified in this proceeding. Cragg described how the motion asked the Commission to require installation of a universal, nonproprietary, interactive interface in the customer meter and how such an interface would greatly enhance the Commission's program.

Type: CERTIFICATE OF SERVICE Filing Date: September 7, 2005
Filed By:
USCL CORPORATION
Description: Amended; (of Petition to Intervene; and Motion to Add Minimum Functionality Requirement, filed 9/6/05.)

Type: PETITION Filing Date: September 6, 2005
Filed By:
USCL CORPORATION
Description: to intervene. (Per ALJ Cooke - Responses should be filed no later than 09/22/05. MMN)

Type: MOTION Filing Date: September 6, 2005
Filed By:
USCL CORPORATION
Description: to Add Minimum Functionality Requirement. (Per ALJ Cooke - Responses should be filed no later than 09/22/05. MMN)

Type: COMPLIANCE FILING Filing Date: August 22, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Report on interruptible load programs, rotating outage activities, and demand response programs for July 2005.

Type: COMPLIANCE FILING Filing Date: July 21, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Report on interruptible load programs, rotating outage activities, and demand response programs for June 2005.

Type: COMMENTS Filing Date: July 5, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Joint; on Draft Opinion dated June 14, 2005.

Type: COMPLIANCE FILING Filing Date: June 21, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Report on interruptible load programs, rotating outage activities, and demand response programs for May 2005.

Type: EXPARTE Filing Date: June 17, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On June 15, 2005, Bill Stock, Director, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Peter Hanson, advisor to Cmmr. Brown, in San Francisco. Also present were Jana Corey, Director, AMI Initiative, and Michael Wiebe, Consultant, for PG&E. Written material (attached to the notice) was used. PG&E representatives asked that the Commission continue to resolve issues and proceedings associated with AMI in order to keep the project on a timely schedule.

Type: RULING Filing Date: June 14, 2005
Filed By:
ALJ/COOKE/PUC
Description: Opinion adopting an incremental budget for the statewide pricing pilot, advanced demand response system, and information display pilot. Comments are due July 4, 2005; and reply comments - 5 days after comments are filed.

Type: EXPARTE Filing Date: June 10, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On June 7, 2005, Bruce C. Foster of Southern California Edison Company (Edison) met with Brian Prusnek, advisor to Cmmr. Kennedy, in San Francisco. Also present were Julie Fitch, advisor to Cmmr. Peevey, David Gamson, advisor to Cmmr. Brown, Aaron Johnson, advisor to Cmmr. Grueneich, and Stephen St. Marie, advisor to Cmmr. Bohn, and Michael R. Hoover, Lynda Ziegler, Gene E. Rodrigues, Mark Wallenrod, Jennifer Hasbrouck and Don Arambula, for Edison. Written materials (attached to the notice) were used. Edison's representatives presented an overview of Edison's application for approval of demand response programs, goals and budgets for 2006-2008, filed June 1, 2005, and Edison's application for approval of 2006-2008 energy efficiency program plans and public goods charge and procurement funding requests, filed June 2, 2005.

Type: COMPLIANCE FILING Filing Date: May 20, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Report on interruptible load programs, rotating outage activities, and demand response programs for April 2005.

Type: RULING Filing Date: April 29, 2005
Filed By:
ALJ/COOKE/PUC
Description: Grants SDG&E's January 15, 2005 motion for protective order and motion to file under seal and PG&E's March 15, 2005 motion to file under seal, as set forth.

Type: COMPLIANCE FILING Filing Date: April 21, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Report on interruptible load programs, rotating outage activities, and demand response programs for March 2005.

Type: RULING Filing Date: April 18, 2005
Filed By:
ALJ/COOKE/PUC
CMMR/PEEVEY/PUC
Description: on the budget for the statewide pricing pilot, advanced demand response system, and information display pilot.

Type: EXPARTE Filing Date: April 13, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On April 11, 2005, Karen Tomcala, Vice President of Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Cmmr. Kennedy in San Francisco. Also present were Robert Bemesderfer, advisor to Cmmr. Kennedy, and Tom King, Executive Vice President, Tom Bottorff, Senior Vice President, Customer Service and Revenue, Jana Corey, Director, AMI Initiative, and Michael Wiebe, Consultant, for PG&E. Bottorff stated that PG&E's business case has been updated and is considerably stronger that the one filed last October. Bottorff stated that the case is so strong that nearly 80 percent of the costs are now being offset by operational savings. Bottoff explained the significance of the much-improved business case and stated that AMI has been successfully deployed in more than 20 utility service areas nationwide. Bottorff also described PG&E's request for the Commission approval to launch an initial deployment for an AMI project at a cost of $49 million.

Type: COMPLIANCE FILING Filing Date: March 21, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Report on interruptible load programs, rotating outage activities, and demand response programs for Feb 2005.

Type: EXPARTE Filing Date: March 18, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On March 15, 2005, Karen Tomcala, Vice President of Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Pres. Peevey in San Francisco. Also present were Julie Fitch, advisor to Pres. Peevey, and Tom Bottorff, Senior Vice President, Customer Service and Revenue, Jana Cory, Director, AMI Initiative, and Michael Wiebe, Consultant, for PG&E. Bottorff stated that PG&E's business case has been updated and is considerably stronger than the one filed last October. Bottorff also reported on the status of PG&E's Request for Proposals on AMI. Bottorff also described PG&E's request for the Commission approval to launch an initial deployment for an AMI project at a cost of $49 million.

Type: REQUEST Filing Date: March 15, 2005
Filed By:
SAN FRANCISCO COMMUNITY POWER
Description: for Compensation.

Type: BRIEF Filing Date: March 15, 2005
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
Description: Initial; concerning implementation of critical peak pricing.

Type: LAW & MOTION Filing Date: March 15, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: for Leave to File Confidential Material Under Seal; Confidential Materials Attached and Filed Under Seal, namely, Unredacted Version of Updated Preliminary AMI Business Case Analysis.

Type: COMPLIANCE FILING Filing Date: March 15, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Updated Preliminary AMI Business Case Analysis (PUBLIC VERSION).

Type: EXPARTE Filing Date: February 23, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: THIS IS A CORRECTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON FEBRUARY 2, 2005, AND APPEARED IN THE CALENDAR OF FEBRUARY 4, 2005. On January 27, 2005, Brian Cherry, Director of Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Julie Fitch, advisor to Cmmr. Peevey, in San Francisco. Also present were Jana Cory, Director, AMI Initiative, and Susan Dowling, Manager, ETS, for PG&E. A document titled - Preliminary AMI Timing Estimate' (attached to the notice) was used. Cory discussed PG&E's proposed AMI pre-deployment schedule, the product evaluation process and the steps PG&E is taking to evaluate due diligence. Dowling discussed the project budget and the recording of costs in the AMDRA account.

Type: COMPLIANCE FILING Filing Date: February 22, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Report on Interruptible Load Programs, Rotating Outage Activities and Demand Response Programs for January 2005.

Type: RESPONSE Filing Date: February 18, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to SDG&E's motion for clarification.

Type: COMPLIANCE FILING Filing Date: February 15, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: [in compliance with D04-11-034, Ordering Paragraph 3] Cost Effectiveness Analysis of the Demand Reserve Partnership Program.

Type: COMPLIANCE FILING Filing Date: February 15, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Comments on Proposed Management Agreement between PG&E and the California Consumer Power and Conservation Financing Authority in connection with the Demand Response Partnership Program.

Type: MOTION Filing Date: February 11, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: for Clarification of Decision 05-01-056.

Type: MISCELLANEOUS FILING Filing Date: February 11, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Corrections to January 12, 2005 Supplemental Filing (PUBLIC VERSION).

Type: COMPLIANCE FILING Filing Date: February 11, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
Description: Budget Request concerning 2005 Statewide Pricing Pilot for Residential and small Commercial Customers.

Type: LAW & MOTION Filing Date: February 11, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Motion for Protective Order; Confidential Materials Attached and Filed Under Seal, namely, Attachment 1 to the Corrections to January 12, 2005 Supplemental Filing, filed concurrently herewith.

Type: MISCELLANEOUS FILING Filing Date: February 4, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Proposed Management Services Agreement Between PG&E and the California Consumer Power and Conservation Financing Authority in connection with the demard reserves partnership program [in accordance with D04-11-034, Ordering Paragraph 2].

Type: EXPARTE Filing Date: February 2, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: LATE FILED. On January 27, 2005, Brian Cherry, Director of Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Julie Fitch, advisor to Cmmr. Peevey, in San Francisco. Also present were Jana Cory, Director, AMI Initiative, and Susan Dowling, Manager, ETS, for PG&E. Written material (attached to the notice) was used. Cory discussed PG&E's proposed AMI pre-deployment schedule, the product evaluation process and the steps PG&E is taking to evaluate due diligence. Dowling discussed the project budget and the recording of costs in the AMDRA account.

Type: COMMENTS Filing Date: January 25, 2005
Filed By:
CALIFORNIA FARM BUREAU FEDERATION
Description: REPLY;

Type: COMMENTS Filing Date: January 24, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on Draft Decision approving demand response programs for 2005.

Type: COMMENTS Filing Date: January 24, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on December 28, 2004 draft decision adopting 2005 demand response programs.

Type: REPLY Filing Date: January 24, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to Comments on Draft Decision.

Type: COMMENTS Filing Date: January 24, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply

Type: COMPLIANCE FILING Filing Date: January 21, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Monthly Report on Demand Response Programs.

Type: COMMENTS Filing Date: January 19, 2005
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
Description: on Proposed Decision of ALJ Cooke.

Type: COMMENTS Filing Date: January 19, 2005
Filed By:
THE ENERGY COALITION
Description: Reply; on Draft Decision.

Type: EXPARTE Filing Date: January 18, 2005
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
Description: On January 12, 2005, William Booth for California Manufacturers & Technology Association met with David Gamson, advisor to Cmmr. Brown, and Pres. Peevey in two separate meetings in San Francisco. Julie Fitch, advisor to Pres. Peevey, participated in the meeting with Pres. Peevey. Also present was Keith McCrea for California Large Energy Consumers Association. Booth and McCrea discussed the assigned commissioner¿s ruling issued on December 8, 2004. Booth and McCrea expressed their concerns about the need for mandatory CPP programs for the upcoming summer and explained that many of the largest customers engaged in manufacturing and process industries were not in a position to shift load. Booth stated that any proposal to terminate the interruptible program would be detrimental to maintaining system reliability. McCrea emphasized that the largest customers over 500kW tended to have flatter loads and that demand response programs would be directed at customer classes which drive the peak.

Type: COMMENTS Filing Date: January 18, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: on draft decision approving demand response program for 2005.

Type: COMMENTS Filing Date: January 18, 2005
Filed By:
ENVIRONMENTAL DEFENSE
NATURAL RESOURCES DEFENSE COUNCIL
Description: on the draft opinion approving 2005 demand response goals, programs and budgets.

Type: COMMENTS Filing Date: January 18, 2005
Filed By:
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
Description: on Draft Decision.

Type: COMMENTS Filing Date: January 18, 2005
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: opening; on the draft decision of Cmmr. Peevey and ALJ Cooke approving 2005 demand response goals, programs and budgets.

Type: COMMENTS Filing Date: January 18, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the draft decision.

Type: COMMENTS Filing Date: January 18, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on Draft Decision of Cmmr Peevey and ALJ Cooke.

Type: COMMENTS Filing Date: January 18, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on December 28, 2004 draft decision adopting 2005 demand response programs.

Type: COMMENTS Filing Date: January 14, 2005
Filed By:
SAN FRANCISCO COMMUNITY POWER
Description: on the draft decision of Cmmr. Peevey and ALJ Cooke.

Type: SUPPLEMENTAL Filing Date: January 12, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Supplemental Preliminary Business Case Filing [pursuant to the November 24, 2004 ruling].

Type: LAW & MOTION Filing Date: January 12, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: for protective order; confidential materials attached and filed under seal, namely, Appendices A and B to the Advanced Metering Infrastructure Business Case Supplemental Filing, filed concurrently herewith.

Type: COMPLIANCE FILING Filing Date: January 12, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Revised Preliminary Analysis of Advanced Metering Infrastructure Business Case.

Type: COMPLIANCE FILING Filing Date: January 12, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Advanced Metering Infrastructure Business Case Supplemental Filing (PUBLIC VERSION).

Type: REPORT Filing Date: January 11, 2005
Filed By:
ENERGY/CHAN/PUC
Description: Final; Working Group 2 demand response program evaluation - program year 2004.

Type: EXPARTE Filing Date: December 31, 2004
Filed By:
SAN FRANCISCO COMMUNITY POWER
Description: LATE FILED. On December 23, 2004, Steven Moss, Executive Director of San Francisco Community Power (SF Power), sent to ALJ Cooke comments, via email (copies attached to the notice). The comments related to Pacific Gas and Electric Company's (PG&E) `Proposal Concerning Working Group 2 Programs and Related Issues'. SF Power noted that the utility does not provide sufficient details to fully comment on its proposal. SF Power noted that SF Power is currently implementing energy efficiency, demand-response, and renewable programs in the City. Moss indicated that it is unclear how PG&E is defining `cooperative'. SF Power explained that there are conflicting state and federal statutes relating to what constitutes a cooperative structure, which makes it difficult for large number of parties to participate in `traditional' cooperative arrangements. Moss also stated that, by willfully ignoring SF Power's current activities, PG&E seems to be using this initiative both to obtain load shifts, and to disrupt the operations of an existing, community-based and the CPUC-funded entity. SF Power commented that, in this respect, it would seem as if PG&E should be required to follow similar `affiliate' rules as those proposed for energy efficiency measures.

Type: MOTION Filing Date: December 30, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: to intervene.

Type: MOTION Filing Date: December 30, 2004
Filed By:
ENERGY PRODUCERS AND USERS COALITION
Description: to intervene.

Type: DRAFT DECISION Filing Date: December 28, 2004
Filed By:
ALJ/COOKE/PUC
CMMR/PEEVEY/PUC
Description: Opinion approving 2005 demand response goals, programs and budgets. Comments are due January 17, 2005; reply comments - 5 days after comments are filed.

Type: COMPLIANCE FILING Filing Date: December 21, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Monthly Report on Demand Response Programs.

Type: COMMENTS Filing Date: December 15, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; to TURN's comments on 20/20 program proposals.

Type: REPLY Filing Date: December 15, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to Comments of TURN.

Type: RULING Filing Date: December 8, 2004
Filed By:
ALJ/COOKE/PUC
CMMR/PEEVEY/PUC
Description: Directs the filing of rate design proposals for large customers. Applications should be filed by January 20, 2005.

Type: COMMENTS Filing Date: December 8, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: on utility 20/20 program proposals for 2005.

Type: RESPONSE Filing Date: December 1, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to November 5, 2004 ruling: 20/20 program proposal.

Type: SUPPLEMENT Filing Date: December 1, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to additional demand response program proposals for 2005.

Type: MISCELLANEOUS FILING Filing Date: December 1, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Proposal for a 20/20 Incentive Program for Residential and Small Commercial Customers who enroll in Power Pledge for Summer 2005.

Type: MISCELLANEOUS FILING Filing Date: November 30, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Term Sheet Between PG&E and the California Power Authority [pursuant to D04-11-034].

Type: RULING Filing Date: November 24, 2004
Filed By:
ALJ/COOKE/PUC
CMMR/PEEVEY/PUC
Description: Calls for a technical conference, delays filing date of utility advanced metering infrastructure applications to March 15, 2005, and directs the filing of rate design proposals for large customers by January 12, 2005.

Type: MISCELLANEOUS FILING Filing Date: November 23, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Errata to Response filed October 15, 2004. [Filed per authorization from ALJ Cooke.]

Type: COMMENTS Filing Date: November 22, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: on additional demand response programs proposed for 2005-2008 [pursuant to November 5, 2004 ruling].

Type: COMPLIANCE FILING Filing Date: November 22, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Monthly Report on Demand Response Programs.

Type: RESPONSE Filing Date: November 18, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to PG&E Motion for extension of time to file advanced metering infrastructure application.

Type: COMMENTS Filing Date: November 16, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on utility demand response programs proposed for 2005-2008.

Type: COMMENTS Filing Date: November 16, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; regarding summer 2005 demand response proposals.

Type: COMMENTS Filing Date: November 16, 2004
Filed By:
SILICON VALLEY MANUFACTURING GROUP
Description: reply; on proposal of PG&E concerning working group 2 programs and related issues.

Type: REPLY Filing Date: November 16, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to Comments on its Oct 15, 2004 and Oct 29, 2004 Demand Response Program Proposals.

Type: COMMENTS Filing Date: November 16, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on demand response programs proposals for 2005-2008.

Type: MOTION Filing Date: November 15, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: for extension of time to file advanced metering infrastructure application.

Type: RESPONSE Filing Date: November 15, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to November 5, 2004 assigned commissioner's ruling: Additional Demand Response Program Proposals.

Type: COMPLIANCE FILING Filing Date: November 15, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Additional Demand Response Program Proposals for 2005 as required by ACR issued Nov 5, 2004.

Type: COMPLIANCE FILING Filing Date: November 15, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Proposal for a 20/20 Incentive Program for Commercial and Industrial Customers to address system reliability needs in Summer 2005.

Type: COMMENTS Filing Date: November 9, 2004
Filed By:
ASSOCIATION OF CALIFORNIA WATER AGENCIES
Description: on utility filings concerning working group 2 programs and related issues.

Type: COMPLIANCE FILING Filing Date: November 8, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: (PUBLIC and CONFIDENTIAL VERSIONS) Supplemental filing regarding Preliminary AMI Business Case Analysis - Appendix B.

Type: RULING Filing Date: November 5, 2004
Filed By:
CMMR/PEEVEY/PUC
Description: Directs utilities to file additional 2005 programs, budgets, and megawatt goals. Filings are due by November 15, 2004. Comments on the filings may be filed by November 22, 2004; reply comments - November 29, 2004.

Type: COMMENTS Filing Date: November 5, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: PUBLIC VERSION. (CONFIDENTIAL VERSION CONTAINS PROTECTED MATERIALS [filed under seal].) Comments on utility demand response programs proposed for 2005-2008.

Type: COMMENTS Filing Date: November 5, 2004
Filed By:
ORA/REIGER/PUC
Description: on PG&E, Edison, and SDG&E's demand response program proposals for 2005-2008 [pursuant to th June 2, 2004 ruling].

Type: RULING Filing Date: November 2, 2004
Filed By:
ALJ/COOKE/PUC
Description: Grants in part PG&E and SDG&E leave to file under seal.

Type: RULING Filing Date: October 29, 2004
Filed By:
ALJ/COOKE/PUC
CMMR/PEEVEY/PUC
Description: Continues availability of tariffs and programs under the statewide pricing pilot, as set forth.

Type: COMPLIANCE FILING Filing Date: October 29, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Filing to Propose 2005-2008 Reliability Triggered Demand Response Programs.

Type: COMPLIANCE FILING Filing Date: October 22, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: (PUBLIC VERSION) Preliminary Analysis regarding Advanced Metering Infrastructure Business Case.

Type: LAW & MOTION Filing Date: October 22, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Motion for Protective Order; Confidential Materials Attached and Filed Under Seal, namely, Appendix C to the Preliminary Analysis Regarding Advanced Metering Infrastructure Business Case filed concurrently herewith.

Type: COMPLIANCE FILING Filing Date: October 22, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Preliminary Analysis of Advanced Metering Infrastructure Business Case.

Type: COMPLIANCE FILING Filing Date: October 21, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Monthly Report on Demand Response Programs.

Type: COMPLIANCE FILING Filing Date: October 15, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Response to ALJ's Ruling approving 2004 Schedule and Plan for the Statewide Pricing Pilot Evaluation and Customer Research Activities and establishing process for evaluation of proposed 2005 Price Respondive Demand.

Type: COMPLIANCE FILING Filing Date: October 15, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Demand Response Program Proposals for 2005-2008.

Type: LAW & MOTION Filing Date: October 15, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: for protective order; confidential material attached and filed under seal, namely, Appendix B - Case Results (Cases B1-B19) to preliminary AMI business case analysis.

Type: MISCELLANEOUS FILING Filing Date: October 15, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: REDACTED. Preliminary AMI bisuness case analysis [pursuant to the July 21, 2004 ruling].

Type: COMPLIANCE FILING Filing Date: October 15, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: (PUBLIC VERSION) Proposal concerning Working Group 2 Programs and Related Issues.

Type: LAW & MOTION Filing Date: October 15, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Motion for Protective Order; Confidential Materials Attached and Filed Under Seal, namely, Appendix C to the Proposal filed concurrently herewith.

Type: MISCELLANEOUS FILING Filing Date: October 14, 2004
Filed By:
ENERGY/CHAN/PUC
Description: Working Group 2 Demand Response Program Evaluation - Process Evaluation Update.

Type: EXPARTE Filing Date: October 12, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On October 6, 2004, Karen Tomcala, Vice President of Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Cmmr. Peevey in San Francisco. Also present were Julie Fitch, advisor to Cmmr. Peevey, and Thomas Bottorff, Senior Vice President of Customer Service and Revenue, for PG&E. Tomcala and Bottorff updated the Commission on the status of PG&E's AMI business planning and also reported on the issuance of PG&E's Request for Proposals on AMI.

Type: RESPONSE Filing Date: October 8, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & EECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to ALJ Ruling regarding Statewide Pricing Pilot Decommissioning and Reply to Comments of ORA on the Joint Utilities Formal Strategy to close the Statewide Pricing Pilot for Residential and Small Commercial Customers.

Type: RULING Filing Date: September 29, 2004
Filed By:
ALJ/COOKE/PUC
Description: Regarding Statewide Pricing Pilot Decommissioning. Responses to the Ruling should be filed not later than October 1, 2004. [EXTENSION GRANTED - On Sept 29, 2004, ALJ Cooke orally granted the request of PG&E to extend the Response deadline to Oct 8, 2004. MMN]

Type: COMMENTS Filing Date: September 22, 2004
Filed By:
ORA/REIGER/PUC
Description: on the joint utilities formal strategy to close the statewide pricing pilot for residential and small commercial customers. [EXTENSION GRANTED - On Sept 29, 2004, ALJ Cooke orally granted the Request of PG&E to extend the time to file Reply Comments hereto to Oct 8, 2004. MMN]

Type: COMPLIANCE FILING Filing Date: September 21, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Monthly Report on Demand Response Programs.

Type: COMPLIANCE FILING Filing Date: September 2, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Joint Utilities Formal Strategy to close the Statewide Pricing Pilot for Residential and Small Commercial customers.

Type: COMPLIANCE FILING Filing Date: August 23, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Monthly Report on Demand Response Programs.

Type: REPORT Filing Date: August 11, 2004
Filed By:
ENERGY/CHAN/PUC
Description: Working Group 2 Demand Response Program Evaluation - Nonparticipant Market Survey Report.

Type: RULING Filing Date: July 21, 2004
Filed By:
ALJ/COOKE/PUC
CMMR/PEEVEY/PUC
Description: Directs the utilities to file their preliminary analysis in this, or its successor, docket, as set forth. The filing is due October 15, 2004. The utilities shall file applications that finalize their analysis set forth, no later than December 15, 2004.

Type: COMPLIANCE FILING Filing Date: July 21, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Monthly Report on Demand Response Programs.

Type: COMPLIANCE FILING Filing Date: June 21, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Monthly Report on Demand Response Programs.

Type: RULING Filing Date: June 4, 2004
Filed By:
CMMR/PEEVEY/PUC
Description: Invites filing of Advice Letters to implement additional demand response programs in Summer 2004.

Type: RULING Filing Date: June 2, 2004
Filed By:
ALJ/COOKE/PUC
Description: approving 2004 schedule and plan for the statewide pricing pilot evaluation and customer research activities and establishing process for evaluation of proposed 2005 price responsive demand programs. Utilities shall file detailed 2005 program descriptions and budgets on October 15, 2004; comments on the proposed programs shall be filed on November 5, 2004, with reply comments filed November 16, 2004.

Type: COMPLIANCE FILING Filing Date: May 21, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Monthly Report on Demand Response Programs.

Type: EXPARTE Filing Date: May 7, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On May 4, 2004, William Stock, Chief of Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Cmmr. Peevey in San Francisco. Also present were Julie Fitch, advisor to Cmmr. Peevey, and Thomas Bottorff, Senior Vice President of Customer Service and Revenue, Karen Tomcala, Vice President of Regulatory Relations, and Anlin Ting-Mason, Vice President of Business Systems and Energy Programs, for PG&E. Bottorff stated that PG&E is continuing its business case development. Bottorff noted that the Commission should decide cost recovery issues concurrent with decisions regarding AMI deployment. Ting-Mason stated that PG&E was concerned about the capacity value as well as the additional demand reduction issues that the recent draft AMI Workshop report suggested. Tomcala highlighted the fact that the process going forward needs to be very focused so that the Commission can make a timely decision.

Type: COMMENTS Filing Date: May 5, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: on staff's recommended analysis framework for business case analysis of advanced metering infrastructure.

Type: COMMENTS Filing Date: May 5, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on draft report regarding recommended analysis framework for business case analysis of advanced metering infrastructure.

Type: COMMENTS Filing Date: May 5, 2004
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: on draft staff report on recommended framework for the business case analysis of advanced metering infrastructure.

Type: COMMENTS Filing Date: May 5, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on staff draft report - Recommended analysis framework for the business case analysis of advanced metering infrastructure.

Type: COMMENTS Filing Date: May 3, 2004
Filed By:
CALIFORNIA FARM BUREAU FEDERATION
Description: Reply; on Modifications to Utility Demand Response Programs.

Type: RULING Filing Date: May 3, 2004
Filed By:
CMMR/PEEVEY/PUC
Description: Clarifies direction to utilities to implement the demand reserve partnership.

Type: COMMENTS Filing Date: April 30, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on utility demand response targets.

Type: COMMENTS Filing Date: April 30, 2004
Filed By:
ORA/REIGER/PUC
Description: reply; to the comments re modifications to demand response programs for 2004 and new programs for 2005, and working group 2 demand response program evaluation filed April 8, 2004.

Type: REPLY Filing Date: April 30, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Comments of parties regarding its plan to achieve Demand Response Goals for 2004 and 2005.

Type: COMMENTS Filing Date: April 30, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; re PG&E's proposed modifications to demand response programs for 2004 and new programs for 2005.

Type: COMMENTS Filing Date: April 30, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; on Comments addressing utility plans to achieve demand response goals.

Type: COMMENTS Filing Date: April 30, 2004
Filed By:
ENVIRONMENTAL DEFENSE
NATURAL RESOURCES DEFENSE COUNCIL
Description: reply; on utility plans to achieve demand response goals.

Type: COMMENTS Filing Date: April 29, 2004
Filed By:
CALIFORNIA CONSUMER EMPOWERMENT ALLIANCE
Description: reply; on March 31 plans proposing working group 2 program modifications [pursuant to February 25, 2004 ruling].

Type: MISCELLANEOUS FILING Filing Date: April 28, 2004
Filed By:
ENERGY/KANESHIRO/PUC
Description: Errata to Working Group 2 Demand Response Program Evaluation filed April 13, 2004. [Filed per instructions from ALJ Cooke].

Type: MOTION Filing Date: April 22, 2004
Filed By:
CALIFORNIA CONSUMER EMPOWERMENT ALLIANCE
Description: for acceptance of late-filed comments [on March 31 Plans Proposing Working Group 2 Program Modifications]; comments attached.

Type: COMMENTS Filing Date: April 21, 2004
Filed By:
ORA/REIGER/PUC
Description: regarding modifications to demand response programs for 2004, etc. [pursuant to the February 25, 2004 ruling].

Type: COMMENTS Filing Date: April 21, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: on utility demand response targets.

Type: COMMENTS Filing Date: April 21, 2004
Filed By:
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
Description: on utility plans to achieve demand response goals.

Type: COMMENTS Filing Date: April 21, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the Plan of PG&E and SDG&E to achieve Demand Response Goals for 2004 and 2005.

Type: COMMENTS Filing Date: April 21, 2004
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
Description: on the March 31, 2004 utility filings re modifications to demand response programs for 2004 and new programs for 2005.

Type: COMPLIANCE FILING Filing Date: April 21, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Monthly Report on demand Response programs.

Type: REPORT Filing Date: April 20, 2004
Filed By:
CALIFORNIA ENERGY COMMISSION
ENERGY/CHAVEZ/PUC
Description: [mailed 4/14/04]. DRAFT. Recommended analysis framework for the business case analysis of advanced metering infrastructure.

Type: REPORT Filing Date: April 13, 2004
Filed By:
ENERGY/KANESHIRO/PUC
Description: Working Group 2 Demand Response Program Evaluation.

Type: REPLY Filing Date: April 9, 2004
Filed By:
ORA/REIGER/CPUC
Description: To the Comments of Parties on the ALJ's Ruling Seeking Input on Real-Time Pricing Design Issues

Type: COMMENTS Filing Date: April 9, 2004
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
Description: Reply Comments on the March 15, 2004 ALJ Ruling Seeking Input on Real-Time Pricing Design Issues

Type: COMMENTS Filing Date: April 9, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Reply Comments in Response to ALJ's Ruling Seeking Input on Real-Time Pricing Design Issues

Type: COMMENTS Filing Date: April 9, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply;

Type: COMMENTS Filing Date: April 9, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply;

Type: MISCELLANEOUS FILING Filing Date: April 1, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: [pursuant to the November 24, 2003, and February 25, 2004, rulings] Plan regarding modifications to demand response programs for 2004 and new programs for 2005.

Type: COMMENTS Filing Date: April 1, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: in response to ALJ 's ruling seeking input on real time pricing.

Type: COMMENTS Filing Date: April 1, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Opening; in response to ALJ Ruling seeking input on real-time pricing design issues.

Type: MISCELLANEOUS FILING Filing Date: April 1, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Plan to achieve demand response goals.

Type: COMMENTS Filing Date: April 1, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Opening; regarding the demand response targets adopted in R.03-06-032.