|
Commissioner Assigned: Michael R. Peevey on December 20, 2005
ALJ Assigned: Mark S. Wetzell on December 20, 2005
|
Filer Requested Category:
Ratesetting
Preliminary Category:
Ratesetting
Commission Designated Category:
Ratesetting
|
Filed By:
CPUC
|
|
|
DOCUMENTS
Number of Documents: 429
(only the most current 100 are displayed)
Display all documents for this proceeding
|
Type:
RULING
|
Filing Date:
August 6, 2008
|
Filed By:
ALJ/WETZELL/CPUC
|
|
Description:
ALJ's Ruling regarding Track 2 of Phase 2
|
Type:
REPLY
|
Filing Date:
July 28, 2008
|
Filed By:
DRA/Hook/CPUC
|
|
Description:
to Response of the California Forward Capacity Market Advocates e al., to Bilateral Trading Group Motion to Supplement the Record.
|
Type:
RESPONSE
|
Filing Date:
July 18, 2008
|
Filed By:
California Forward Capacity Market Advocates
Constellation Energy Commodities Group
Constellation NewEnergy, Inc.
Dynegy Morro Bay, LLC
Dynegy Moss Landing, LLC
Dynegy Oakland, LLC
Dynegy South Bay LLC
Mirant California, Inc.
|
|
Description:
to Bilateral Trading Group Motion to Supplement the Record.
|
Type:
MOTION
|
Filing Date:
July 3, 2008
|
Filed By:
DRA/HOOK/CPUC
|
|
Description:
to Supplement the Record.
|
Type:
SCOPING RULING
|
Filing Date:
June 17, 2008
|
Filed By:
CMMR/PEEVEY/CPUC
|
|
Description:
Amended; of Assigned Commissioner for Phase 2. The timetable for Phase 2 of this proceeding is revised as set forth. A hearing is not needed in Phase 2.
|
Type:
EXPARTE
|
Filing Date:
May 22, 2008
|
Filed By:
Sierra Pacific Power Company
|
|
Description:
Sierra Pacific Power Company noticed oral and written ex parte communications with Theresa Cho, advisor to Commissioner Grueneich, and Jane Whang, advisor to Commission Chong on May 19, 2008.
|
Type:
MOTION
|
Filing Date:
May 21, 2008
|
Filed By:
California Forward Market Capacity Advocates
Constellation Energy Commodities Group, Inc.
Dynegy Morrow Bay, LLC
Mirant California, LLC
|
|
Description:
to supplement the record.
|
Type:
EXPARTE
|
Filing Date:
May 19, 2008
|
Filed By:
Independent Energy Producers Association
|
|
Description:
The Independent Energy Producers Association noticed oral and written ex parte communications with Nancy Ryan and Matthew Deal, advisors to President Peevey on May 14, 2008.
|
Type:
MOTION
|
Filing Date:
May 6, 2008
|
Filed By:
DRA/HOOK/CPUC
|
|
Description:
to Supplement the Record.
|
Type:
EXPARTE
|
Filing Date:
April 17, 2008
|
Filed By:
Sierra Pacific Power Company
|
|
Description:
The Sierra Pacific Power Company noticed oral and written ex parte communications with Commissioner Simon; Robert Mason, advisor to Commissioner Simon; Nancy Ryan, Matthew Deal and Andrew Schwartz, advisors to President Peevey; Robert Kinosian and Stephen St. Marie, advisors to Commissioner Bohn on April 15, 2008.
|
Type:
EXPARTE
|
Filing Date:
April 9, 2008
|
Filed By:
Bilateral Trading Group
|
|
Description:
The Bilateral Trading Group noticed oral and written ex parte communications with Nancy Ryan and Matthew Deal, advisors to President Peevey, and Andy Campbell, advisor to Commissioner Chong on April 4, 2008.
|
Type:
RULING
|
Filing Date:
April 7, 2008
|
Filed By:
ALJ/WETZELL/CPUC
|
|
Description:
Confirming Ruling by E-Mail.
|
Type:
EXPARTE
|
Filing Date:
April 3, 2008
|
Filed By:
The Utility Reform Network
|
|
Description:
The Utility Reform Network noticed an oral ex parte communication with Matthew Deal, advisor to President Peevey; Andy Campbell and Joseph Como, advisors to Commissioner Chong; Robert Kinosian, advisor to Commissioner Bohn; Robert Mason III, advisor to Commission Simon on March 28, 2008.
|
Type:
COMMENTS
|
Filing Date:
March 28, 2008
|
Filed By:
California Independent System Operator Corporation
|
|
Description:
on Staff Recommendations on Capacity Market Structure (late-filed authorized by ALJ Wetzell per email ruling dated March 27, 2008).
|
Type:
COMMENTS
|
Filing Date:
March 14, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; On the Commission Energy Division Staff Report Entitled Recommendations on Capacity Market Structure.
|
Type:
COMMENTS
|
Filing Date:
March 14, 2008
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
Reply; To Comments on Track 2 Staff Report.
|
Type:
COMMENTS
|
Filing Date:
March 14, 2008
|
Filed By:
Independent Energy Producers Association
|
|
Description:
Reply; On the Staff Recommendation on Capacity Market Structure.
|
Type:
COMMENTS
|
Filing Date:
March 14, 2008
|
Filed By:
The Utility Reform Network
|
|
Description:
Reply; On the Staff Report on Phase 2; Track 2 Issues.
|
Type:
COMMENTS
|
Filing Date:
March 14, 2008
|
Filed By:
Calpine Corporation
|
|
Description:
Reply; On Staff Recommendations on Capacity Market Structure.
|
Type:
COMMENTS
|
Filing Date:
March 14, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; on Staff Report Providing Recommendations on Capacity Market Structure.
|
Type:
COMMENTS
|
Filing Date:
March 14, 2008
|
Filed By:
Dynegy Morro Bay LLC
Dynegy Moss Landing LLC
Dynegy Oakland LLC
Dynegy South Bay LLC
|
|
Description:
Reply; (filing authorized by ALJ Wetzell per email ruling dated March 26, 2008).
|
Type:
COMMENTS
|
Filing Date:
March 14, 2008
|
Filed By:
AES Southland LLC
California Forward Capacity Market Advocates
Calpine Corporation
Complete Energy Holdings, LLC
Constellation Energy Commodities Group
Constellation NewEnergy, Inc.
Dynegy Morro Bay LLC
Dynegy Moss Landing, LLC
Dynegy Oakland, LLC
Dynegy South Bay, LLC
Independent Energy Producers Association
Mirant California, Inc.
San Diego Gas & Electric Company
Sempra Global
|
|
Description:
Joint Reply; on Staff Recommendations on Capacity Market Structure: A Report on the August 2007 Workshops in collaboration with the CAISO.
|
Type:
COMMENTS
|
Filing Date:
March 14, 2008
|
Filed By:
Aglet Consumer Alliance
|
|
Description:
Reply; on Staff Report on Track 2 Issues.
|
Type:
COMMENTS
|
Filing Date:
March 14, 2008
|
Filed By:
Constellation Energy Commodities Group, Inc.
Constellation NewEnergy, Inc.
|
|
Description:
Reply; On Staff Recommendations on Capacity Market Structure: A Report on The August 2007 Workshops in Collaboration With the CAISO.
|
Type:
COMMENTS
|
Filing Date:
March 14, 2008
|
Filed By:
California Independent System Operator Corporation
|
|
Description:
Reply; On Staff Recommendations on Capacity Market Structure.
|
Type:
COMMENTS
|
Filing Date:
March 14, 2008
|
Filed By:
DRA/PAULL/CPUC
|
|
Description:
Reply; On Staff Report on Phase 2/Track 2 Issues.
|
Type:
RULING
|
Filing Date:
March 7, 2008
|
Filed By:
ALJ/WETZELL/CPUC
|
|
Description:
on Requests for Party Status.
|
Type:
COMMENTS
|
Filing Date:
February 29, 2008
|
Filed By:
FPL Energy
NRG Energy
Reliant Energy
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
On Staff Report Providing Recommendations on Capacity Market Structure.
|
Type:
COMMENTS
|
Filing Date:
February 29, 2008
|
Filed By:
Calpine Corporation
|
|
Description:
On Staff Recommendations on Capacity Market Structure.
|
Type:
COMMENTS
|
Filing Date:
February 29, 2008
|
Filed By:
Western Power Trading Forum
|
|
Description:
On the Phase Two Track Staff Report.
|
Type:
COMMENTS
|
Filing Date:
February 29, 2008
|
Filed By:
Independent Energy Producers Association
|
|
Description:
On the Staff Recommendation on Capacity Market Structure.
|
Type:
COMMENTS
|
Filing Date:
February 29, 2008
|
Filed By:
Sempra Global
|
|
Description:
On Staff Report.
|
Type:
COMMENTS
|
Filing Date:
February 29, 2008
|
Filed By:
Mirant California, LLC
Mirant Delta, LLC
Mirant Potrero, LLC
|
|
Description:
Opening; On the Staff Report on Track 2 Issues.
|
Type:
COMMENTS
|
Filing Date:
February 29, 2008
|
Filed By:
Aglet Consumer Alliance
|
|
Description:
On Staff Report on Track 2 Issues.
|
Type:
MOTION
|
Filing Date:
February 29, 2008
|
Filed By:
Kinder Morgan Energy Partners, L.P.
|
|
Description:
For Party Status.
|
Type:
COMMENTS
|
Filing Date:
February 29, 2008
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
On Track 2 Staff Report.
|
Type:
COMMENTS
|
Filing Date:
February 29, 2008
|
Filed By:
Kinder Morgan Energy Partners, L.P.
|
|
Description:
(on Staff Report).
|
Type:
COMMENTS
|
Filing Date:
February 29, 2008
|
Filed By:
Ice Energy, Inc.
|
|
Description:
(on Staff Report).
|
Type:
COMMENTS
|
Filing Date:
February 29, 2008
|
Filed By:
BILATERAL TRADING GROUP
|
|
Description:
(on Staff Recommendations on Capacity Market Structure).
|
Type:
MOTION
|
Filing Date:
February 29, 2008
|
Filed By:
Complete Energy Holdings LLC
|
|
Description:
to intervene.
|
Type:
COMMENTS
|
Filing Date:
February 29, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
On the Commission Energy Division Staff Report Entitled Recommendations on Capacity Market Structure.
|
Type:
COMMENTS
|
Filing Date:
February 29, 2008
|
Filed By:
Coalition of California Utility Employees
|
|
Description:
On Staff Recommendations on Capacity Market Structure.
|
Type:
MOTION
|
Filing Date:
February 29, 2008
|
Filed By:
Ice Energy, Inc.
|
|
Description:
For Party Status.
|
Type:
COMMENTS
|
Filing Date:
February 29, 2008
|
Filed By:
Complete Energy Holdings LLC
|
|
Description:
Regarding Staff Recommendations on Capacity Market Structure.
|
Type:
COMMENTS
|
Filing Date:
February 29, 2008
|
Filed By:
Constellation Energy Commodities Group, Inc.
Constellation NewEnergy, Inc.
|
|
Description:
On Staff Recommendations on Capacity Market Structure: A Report on the August 2007 Workshops In Collaboration with the CAISO.
|
Type:
COMMENTS
|
Filing Date:
February 29, 2008
|
Filed By:
California Municipal Utilities Association
|
|
Description:
To Staff Recommendations on Capacity Market Structure.
|
Type:
RULING
|
Filing Date:
February 19, 2008
|
Filed By:
ALJ/WETZELL/CPUC
|
|
Description:
Confirming E-Mail Notice.The Motion of Pacific Gas and Electric Company to revise the comment schedule is granted.
Phase 2/Track 2 comments are due February 29, 2008 and replies are due March 14, 2008.
|
Type:
MOTION
|
Filing Date:
February 13, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to revise comment schedule on January 18, 2008 Energy Division Staff Report.
|
Type:
RULING
|
Filing Date:
February 4, 2008
|
Filed By:
ALJ/WETZELL/CPUC
|
|
Description:
ALJ's Ruling regarding comments on Staff Report on Track 2 issues.
|
Type:
RULING
|
Filing Date:
January 18, 2008
|
Filed By:
ALJ/WETZELL/CPUC
|
|
Description:
ALJ's Ruling regarding availability of Staff Report, revising the schedule for Phase 2/Track 2, and dismissing motion to revise the comment schedule. Comments on Staff Report are due 2/15/08; reply comments due 2/29/08.
|
Type:
EXPARTE
|
Filing Date:
December 14, 2007
|
Filed By:
RELIANT ENERGY
|
|
Description:
SUMMARY: Reliant Energy noticed oral communication with Nancy Ryan, Chief of Staff, on December 11, 2007.
|
Type:
REPORT
|
Filing Date:
December 12, 2007
|
Filed By:
APS Energy Services
Alliance for Retail Energy Markets
California Electricity Oversight Board
California Large Energy Consumers Association
Calpine Corporation
Constellation Energy Commodities Group, Inc.
Constellation Newenergy, Inc.
Coral Power, L.L.C.
Division of Ratepayer Advocates
Energy Users Forum
J. Aron & Company
Mirant California, LLC
Mirant Delta, LLC
Mirant Potrero, LLC
Pacific Gas and Electric Company
Strategic Energy, L.L.C.
The Utility Reform Network
Western Power Trading Forum
|
|
Description:
Amended Proposal for a standardized Resource Adequacy contract and associated resource obligations (filing authorized by ALJ Wetzell per oral ruling made on December 12, 2007).
|
Type:
RULING
|
Filing Date:
November 19, 2007
|
Filed By:
CMMR/PEEVEY/CPUC
|
|
Description:
Assigned Commissioner's Ruling Regarding Planning Reserve Margin Issues.
|
Type:
REPORT
|
Filing Date:
November 16, 2007
|
Filed By:
APS Energy Services
Alliance for Retail Energy Markets
Calpine Corporation
Constellation Energy Commodities Group, Inc.
Constellation Newenergy, Inc.
Coral Power, L.L.C.
Energy Users Forum
J. Aron & Company
Mirant California, LLC
Mirant Delta, LLC
Mirant Potrero, LLC
Pacific Gas and Electric Company
Strategic Energy, L.L.C.
Western Power Trading Forum
|
|
Description:
(Concensus proposal to Standardize Resource Adequacy contracts).
|
Type:
COMMENTS
|
Filing Date:
November 14, 2007
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
On the Bilateral Trading Group Motion to Revise Comment Schedule for Phase 2/Track 2 Issues.
|
Type:
RESPONSE
|
Filing Date:
November 13, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
To Motion of Bilateral Trading Group To Revise Comment Schedule for Phase 2/Track 2 Issues.
|
Type:
EXPARTE
|
Filing Date:
November 13, 2007
|
Filed By:
NRG Energy
|
|
Description:
SUMMARY: On November 7, 2007 Steve Hoffman, President, Western Region of NRG Energy Inc. (NRG) met with Matthew Deal, advisor to Pres. Peevey in San Francisco. Also present were Andrew Schwartz, advisor to Pres. Peevey; G. Alan Comnes, Director, Regulatory and Government Affairs of NRG. Hoffmann provided an update of NRG's generation development projects both in California and in other parts of the U.S. NRG discussed that it has an active Application for Certification ("AFC") pending for its Carlsbad Energy Center and a Petition to Amend its AFC for the repowering project at its El Segundo site. Both repowering projects no longer rely on the use of ocean water for cooling, have high efficiencies that further the state's carbon reduction goals, and provide reliability attributes such as quick start and ramping that are needed by the California ISO. Hoffmann advocated for a realistic forward assessment of the State's capacity needs and a timely processing of pending utility RFOs for new generation resources. H
|
Type:
EXPARTE
|
Filing Date:
November 13, 2007
|
Filed By:
THE BILATERAL TRADING GROUP
|
|
Description:
On November 7, 2007 Mike Florio of The Utility Reform Network (TURN) met with Matthew Deal, advisor to Pres. Peevey in San Francisco. Also present were Andrew Schwartz, advisor to Pres. Peevey; Jaclyn Marks, advisor to Cmmr. Simon; Robert Kinosian, advisor to Cmmr. Bohn; Andrew Campbell, advisor to Cmmr. Chong; Barbara Barkovich of the California Large Energy Consumers Association (CLECA); Jennifer Chamberlin of Strategic Energy; Brett Franklin of the Electricity Oversight Board; Aaron Johnson, Deputy Director of the Division of Ratepayer Advocates (DRA); Fred Mobasheri of Electric Power Group, consultant for DRA; and Karin Paull and Charlyn Hook of DRA. Written materials (attached to the notice) were used. Bilateral Trading Group (BTG) representatives highlighted the need for limited improvements in the short-term, including the development of a standardized, tradable capacity product, and the implementation of an electronic bulletin board to facilitate trading. BTG stressed the importance of maintaining st
|
Type:
EXPARTE
|
Filing Date:
November 13, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On November 9, 2007 Trina Horner, Chief, Regulatory Relations for Pacific Gas and Electric Company (PG&E) met with Jaclyn Marks, advisor to Cmmr. Simon in San Francisco. Also present were Bob Mason, advisor to Cmmr. Simon; and Todd Strauss, Senior Director, Energy Policy, Planning and Analysis for PG&E. Written materials (attached to the notice) were used. Horner provided an overview of PG&E's recommended plan to procure up to 2,300 MW of dispatchable and operationally flexible resources for the current plan period, and the assumptions PG&E used to arrive at its recommended plan. Strauss described PG&E's assessment of the reliability risks associated with the various procurement plan choices before the Commission and summarized the parties various proposals for changing the current Resource Adequacy (RA) program.
|
Type:
EXPARTE
|
Filing Date:
November 13, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On November 8, 2007 Trina Horner, Chief, Regulatory Relations for Pacific Gas and Electric Company (PG&E) met with Andy Campbell, advisor to Cmmr. Chong in San Francisco. Also present was Todd Strauss, Senior Director, Energy Policy, Planning and Analysis for PG&E. Written materials (attached to the notice) were used. Horner provided an overview of PG&E's recommended plan to procure up to 2,300 MW of dispatchable and operationally flexible resources for the current plan period, and the assumptions PG&E used to arrive at its recommended plan. Strauss described PG&E's assessment of the reliability risks associated with the various procurement plan choices before the Commission and summarized the parties various proposals for changing the current Resource Adequacy (RA) program.
|
Type:
EXPARTE
|
Filing Date:
November 13, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On November 7, 2007 Trina Horner, Regulatory Relations for Pacific Gas and Electric Company (PG&E) met with Matthew Deal, advisor to Pres. Peevey in San Francisco. Also present were Fong Wan, Vice President, Energy Procurement of PG&E; Brian Cherry, Vice President-Regulatory Relations of PG&E; and Todd Strauss, Senior Director, Energy Policy, Planning & Analysis of PG&E. Written materials (attached to the notice) were used. Horner provided an overview of PG&E's recommended plan to procure up to 2,300 MW of dispatchable and operationally flexible resources for the current Long Term Plan period, and the assumptions PG&E used to arrive at its recommended plan. Strauss described PG&E's assessment of the reliability risks associated with the various procurement plan choices before the Commission. Wan provided an overview of the commercial development process and uncertainties on the supply side, as well as the need to complement aggressive demand-side goals, as examples of the contingencies that PG&E believes mus
|
Type:
RESPONSE
|
Filing Date:
November 13, 2007
|
Filed By:
Constellation Energy Commodities Group, Inc.
Constellation NewEnergy, Inc.
|
|
Description:
In Support of Motion (To Revise Comment Schedule for Phase 2/Track 2 Issues).
|
Type:
RULING
|
Filing Date:
November 1, 2007
|
Filed By:
CMMR/PEEVEY/CPUC
|
|
Description:
Assigned Commissioner's Ruling Regarding the Local Capacity Requirements Study Process.
|
Type:
EXPARTE
|
Filing Date:
October 30, 2007
|
Filed By:
Calpine Corporation
|
|
Description:
SUMMARY: On October 26, 2007 Alexandre B. Makler, Vice President, Assistant General Counsel of Calpine Corporation (Calpine) met with Nancy Ryan, advisor to Pres. Peevey in San Francisco. Also present were Mathew Deal, advisor to Pres. Peevey; Linda Sherif, Senior Regulatory Counsel of Calpine; and Avis Kowalewski, Vice President, Western Regulatory Government and Regulatory Affairs of Calpine. Calpine representatives discussed the need for capacity markets in order to offer existing generation facilities an opportunity to earn adequate compensation for the services they provide to California's electric system. Calpine Representatives also discussed the current stakeholder process a develop the resource adequacy ("RA") standard product proposal and the importance of getting an RA product definition in place as soon as is reasonably possible. Contact Person: Judy Pau; telephone: (415) 276-6587.
|
Type:
MOTION
|
Filing Date:
October 29, 2007
|
Filed By:
The Bilateral Trading Group
|
|
Description:
to revise comment schedule for Phase 2/Track 2 issues.
|
Type:
EXPARTE
|
Filing Date:
October 29, 2007
|
Filed By:
DRA/HOOK/CPUC
|
|
Description:
SUMMARY: On October 29, 2007 Charlyn Hook of the Bilateral Trading Group (BTG) sent an electronic note (attached to the notice) to Pres. Peevey, Cmmr. Grueneich, Cmmr. Bohn, Cmmr. Simon, and Cmmr. Chong. Contact Person: Sue Muniz; telephone: (415) 703-1858; e-mail: sam@cpuc.ca.gov.
|
Type:
RULING
|
Filing Date:
October 25, 2007
|
Filed By:
ALJ/WETZELL/CPUC
CMMR/PEEVEY/CPUC
|
|
Description:
Assigned Commissioner's Ruling Revising the Schedule for Phase 2/Track 2 Issues.
|
Type:
EXPARTE
|
Filing Date:
October 12, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
SUMMARY: On October 11, 2007 Colin E. Cushnie, Director of Regulatory Affairs for Southern California Edison Company (SCE) met with Stephen St. Marie, advisor to Cmmr. Bohn in San Francisco. Also present were Theresa Cho, advisor to Cmmr. Grueneich; Andy Campbell, advisor to Cmmr. Chong; Jaclyn Marks, advisor to Cmmr. Simon; Robert Kinosian, advisor to Cmmr. Bohn; Lad Lorenz, Vice President Regulatory Affairs for San Diego Gas & Electric Company (SDG&E); Alan Comnes, Director for NRG Energy; Mark Smith, Director for FPL Energy; and Katie Kaplan, consultant for Reliant Energy. Written materials (attached to the notice) were used. Cushnie provided a general overview of the CFCM proposal, and highlighted its advantages relative to the other Resource Adequacy design proposals before the Commission. Cushnie also rebutted the key points of opposition to the CFCM proposal. Kaplan explained why the CFCM proposal will provide needed certainty in the market, enhance reliability, and ensure the development of needed ca
|
Type:
EXPARTE
|
Filing Date:
October 4, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
SUMMARY: On October 1, 2007, Colin E. Cushnie, Director of Regulatory Affairs for Southern California Edison Company (SCE), met with Nancy Ryan, advisor to Pres. Peevey in San Francisco. Also present were Matthew Deal, advisor to Pres. Peevey; Alan Comnes, Director for NRG Energy, Mark Smith, Director for FPL Energy, and Katie Kaplan, consultant for Reliant Energy. Written materials (attached to the notice) were used. Cushnie provided a general overview of the CFCM proposal, and highlighted its advantages relative to the other Resource Adequacy design proposals before the Commission. Cushnie also rebutted the key points of opposition to the CFCM proposal. Comnes, Smith, and Kaplan separately explained why their companies supported the CFCM proposal, and provided additional input to supplement Cushnie's discussion on the design features of the CFCM proposal and why it is the preferred option for California. Contact Person: Henry Romero; telephone: (626) 302-4124; e-mail: Henry.Romero@sce.com
|
Type:
COMMENTS
|
Filing Date:
September 28, 2007
|
Filed By:
California Independent System Operator Corporation
|
|
Description:
On Supplemental Track 3 Proposals.
|
Type:
REPORT
|
Filing Date:
September 10, 2007
|
Filed By:
Mountain Utilities
|
|
Description:
Supplemental Track 3 Showing (filing authorized by ALJ Wetzell per email ruling dated August 22, 2007).
|
Type:
REPORT
|
Filing Date:
September 10, 2007
|
Filed By:
Sierra Pacific Power Company
|
|
Description:
Supplemental Proposal with respect to Resource Adequacy Requirements for small and multi-jurisdiction LSEs (filing authorized by ALJ Wetzell's email ruling of August 22, 1007).
|
Type:
REPORT
|
Filing Date:
September 10, 2007
|
Filed By:
PacifiCorp
|
|
Description:
Supplemental Track 3 Showings of PacifiCorp In Response to Administrative Law Judge's Ruling Clarifying and Further Modifying the Procedures and the Schedule for Track 3.
|
Type:
REPORT
|
Filing Date:
September 10, 2007
|
Filed By:
Plumas-Sierra Rural Electric Cooperative
|
|
Description:
Supplemental Track 3 Showing Provided By Plumas-Sierra Rural Electric Cooperative.
|
Type:
REQUEST
|
Filing Date:
August 24, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
For an Award of Compensation.
|
Type:
REQUEST
|
Filing Date:
August 24, 2007
|
Filed By:
Aglet Consumer Alliance
|
|
Description:
for Award of Compensation.
|
Type:
NOTICE
|
Filing Date:
August 22, 2007
|
Filed By:
Golden State Water Company
|
|
Description:
Supplemental Track 3 Showing.
|
Type:
REPORT
|
Filing Date:
August 3, 2007
|
Filed By:
FPL Energy Project Management
NRG Energy, Inc.
Reliant Energy, Inc.
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
(Joint Proposal for a California forward capacity market).
|
Type:
REPORT
|
Filing Date:
August 3, 2007
|
Filed By:
Constellation Energy Commodities Group, Inc.
Constellation Generation Group, LLC
Constellation NewEnergy, Inc.
|
|
Description:
New and updated proposals regarding Track 2 issues.
|
Type:
REPORT
|
Filing Date:
August 3, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Proposals for the Next Generation of Resource Adequacy of PG&E: The Composite Approach & Multi-Year Bilateral Resource Adequacy.
|
Type:
REPORT
|
Filing Date:
August 3, 2007
|
Filed By:
Aglet Consumer Alliance
|
|
Description:
Updated Proposal on Track 2 Issues.
|
Type:
EXPARTE
|
Filing Date:
July 31, 2007
|
Filed By:
Bilateral Trading Group
|
|
Description:
SUMMARY: On July 26, 2007, Jennifer Chamberlin of Strategic Energy, member of the Bilateral Trading Group (BTG) met with Matthew Deal, advisor to Pres. Peevey in San Francisco. Also present were Stephen St. Marie, advisor to Cmmr. Bohn; Jaclyn Marks, advisor to Cmmr. Simon; Curtis Kebler of the J. Aron Company, member of the BTG; Brett Franklin of the Electricity Oversight Board, member of the BTG; and Karen Paull and Charlyn Hook of DRA. Written materials (attached to the notice) were used. BTG discussed issues relating to the April 25, 2007 Workshop on Phase 2 Track 2 Proposals to include the gradual transition from the current RA program to a market based on forward, energy-based bilateral contracts, and the use of an electronic bulletin board to facilitate liquidity and price transparency in transactions. BTG explained how its proposal would provide the right price signals for demand response programs; the importance of maintaining state jurisdiction; and why it is opposed to a centralized capacity marke
|
Type:
REPLY
|
Filing Date:
July 26, 2007
|
Filed By:
Constellation Energy Commodities Group, Inc.
Constellation Generation Group, LLC
Constellation NewEnergy, Inc.
Mirant California, LLC
Mirant Delta, LLC
Mirant Potrero, LLC
Reliant Energy, Inc.
|
|
Description:
to Responses to Motion to Supplement the Record.
|
Type:
EXPARTE
|
Filing Date:
July 24, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
SUMMARY: On July 19, 2007, Trina Horner, Chief, Regulatory Relations of Pacific Gas and Electric Company (PG&E), met with Nancy Ryan, advisor to Pres. Peevey in San Francisco. Also present from PG&E were Todd Strauss, Senior Director; Joe Lawlor, Manager; Arthur Haubenstock, counsel; and present from the Energy Division were Sean Gallagher, Director; Robert Strauss, Supervisor, Procurement and Resource Adequacy; Karen Shea, Regulatory Analyst, and Donald Brooks, Regulatory Analyst. Written materials (attached to the notice) were used. Horner summarized PG&E goals in evaluating capacity market options in Phase 2, Track 2 of the Resource Adequacy proceeding, which focus on reliability, fair cost, allocation and reasonable costs, instead of a particular market structure outcome. Contact Person: Lavina Tam, telephone: (415) 973-6107, email: lst3@pge.com.
|
Type:
RULING
|
Filing Date:
July 20, 2007
|
Filed By:
ALJ/WETZELL/CPUC
|
|
Description:
on Motion of California Forward Capacity Market Advocates to File a New Proposal. New and updated proposals regarding Track 2 issues may be filed on August 3, 2007.
|
Type:
EXPARTE
|
Filing Date:
July 20, 2007
|
Filed By:
Reliant Energy, Inc.
|
|
Description:
On July 17, 2007, Robert Ott, Vice-President, Origination for Reliant Energy, Inc. (Reliant) met with Mathew Deal, advisor to Pres. Peevey in two separate meetings in San Francisco. Also present at both meeting was Katie Kaplan, consultant for Reliant. Kaplan spoke about the benefits of a forward centralized capacity market and how such market could serve to meet the State's energy goals. Contact Person: Melinda LaJaunie, telephone: (415) 392-7900, email: mlajaunie@goodinmacbride.com.
|
Type:
RESPONSE
|
Filing Date:
July 17, 2007
|
Filed By:
DRA/HOOK/CPUC
|
|
Description:
to the Motion (Reply Comments) of California Forward Capacity Market Advocates (filing authorized by ALJ Wetzell per email ruling dated July 13, 2007).
|
Type:
RESPONSE
|
Filing Date:
July 17, 2007
|
Filed By:
Aglet Consumer Alliance
|
|
Description:
to Motion (Reply Comments) of California Forward Capacity Market Advocates (filing authorized by ALJ Wetzell per email ruling dated July 13, 2007).
|
Type:
RESPONSE
|
Filing Date:
July 17, 2007
|
Filed By:
Alliance for Retail Energy Markets
Constellation Energy Commodities Group, Inc.
Constellation Generation Group, LLC
Constellation NewEnergy, Inc.
|
|
Description:
to the Motion (Reply Comments) of California Forward Capacity Market Advocates (filing authorized by ALJ Wetzell per email ruling of July 13, 2007).
|
Type:
RESPONSE
|
Filing Date:
July 17, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to Motion (Reply Comments) of California Forward Capacity Market Advocates to file new proposal (filing authorized by ALJ Wetzell per email ruling of July 13, 2007).
|
Type:
RESPONSE
|
Filing Date:
July 16, 2007
|
Filed By:
Independent Energy Producers Association
|
|
Description:
To Motion of Mirant California, LLC, Mirant Delta, LLC, Mirant Potrero, LLC, Constellation Energy Commodities Group, Inc., Constellation Newenergy Inc., Constellation Generation Group, LLC and Reliant Energy, Inc. to Supplement the Record.
|
Type:
RESPONSE
|
Filing Date:
July 16, 2007
|
Filed By:
DRA/HOOK/CPUC
|
|
Description:
to the Motion of Mirant California et al to Supplement the Record.
|
Type:
RESPONSE
|
Filing Date:
July 16, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to Motion of Mirant California et.al. to Supplement the Record.
|
Type:
COMMENTS
|
Filing Date:
July 13, 2007
|
Filed By:
Aglet Consumer Alliance
|
|
Description:
Reply; on Track 2 Proposals.
|
Type:
COMMENTS
|
Filing Date:
July 13, 2007
|
Filed By:
FPL Energy Project Management
NRG Energy, Inc.
Reliant Energy, Inc.
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
Reply; (on the) Track 2 Resource Adequacy Pre-Workshop.
|
Type:
COMMENTS
|
Filing Date:
July 13, 2007
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
Pre-Workshop Reply; on Track 2 Issues for Resource Adequacy.
|
Type:
COMMENTS
|
Filing Date:
July 13, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; Pre-Workshop.
|
Type:
COMMENTS
|
Filing Date:
July 13, 2007
|
Filed By:
DRA/PAULL/CPUC
|
|
Description:
Pre-Workshop Reply; on Resource Adequacy Phase 2, Track 2 issues.
|
Type:
COMMENTS
|
Filing Date:
July 13, 2007
|
Filed By:
Constellation Energy Commodities Group, Inc.
Constellation Generation Group, LLC
Constellation NewEnergy, Inc.
|
|
Description:
Pre-Workshop Reply; on Track 2 Proposals.
|
Type:
CERTIFICATE OF SERVICE
|
Filing Date:
July 9, 2007
|
Filed By:
BAUTISTA/PROCESS OFFICE/CPUC
|
|
Description:
(in compliance with O.P.4 of Ruling dated July 5, 2007).
|
DECISIONS
Number of Decisions: 6
|
Decision Number:
D0804034
|
Rendered Date:
April 10, 2008
Effective Date:
April 10, 2008
|
|
Description:
Grants intervenor compensation to Aglet Consumer Alliance and The Utility Reform Network for their substantial contributions to Decision 07-06-029.
|
Decision Number:
D0706029
|
Rendered Date:
June 21, 2007
Effective Date:
June 21, 2007
|
|
Description:
Adopts local procurement obligations for 2008 that are applicable to Commission-jurisdictional electric load-serving entities.
|
Decision Number:
D0706045
|
Rendered Date:
June 21, 2007
Effective Date:
June 21, 2007
|
|
Description:
Modifies Decision 07-03-011, and denies rehearing of Decision, as modified.
|
Decision Number:
D0703011
|
Rendered Date:
March 1, 2007
Effective Date:
March 1, 2007
|
|
Description:
Grants intervenor compensation to The Utility Reform Network and Aglet Consumer Alliance for substantial contributions to Decisions 06-06-064 and 06-07-031.
|
Decision Number:
D0607031
|
Rendered Date:
July 20, 2006
Effective Date:
July 20, 2006
|
|
Description:
Modifies and clarifies the Commission's Resource Adequacy Requirements program as set forth.
|
Decision Number:
D0606064
|
Rendered Date:
June 29, 2006
Effective Date:
June 29, 2006
|
|
Description:
Establishes the Local Resource Adequacy Requirements program as set forth.
|