Number of Documents: 407
|
|
|
Type:
COMMENTS
|
Filing Date:
January 10, 2011
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
REPLY; TO COMMENTS ON THE PROPOSED DECISION MODIFYING D.06-10-050 REGARDING
AUTHORIZATION FOR REIMBURSEMENT OF CONSULTANT COSTS
|
|
|
Type:
COMMENTS
|
Filing Date:
January 3, 2011
|
Filed By:
Southern California Edison Company
|
|
Description:
on the Proposed Decision modifying D.06-10-050 regarding authorization for
reimbursement of consultant costs.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
December 14, 2010
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Decision modifying D.06-10-050 regarding authorization for reimbursement of
consultant costs. Opening comments, which shall not exceed 15 pages, are due no
later than January 3, 2011. Reply comments, which shall not exceed 5 pages, are
due 5 days after the last day for filing opening comments.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 28, 2009
|
Filed By:
Sustainable Conservation
|
|
Description:
Sustainable Conservation noticed an oral ex parte communication with
Commissioner Bohn and his Advisor Lindsay Brown on August 26, 2009.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 24, 2009
|
Filed By:
Sustainable Conservation
|
|
Description:
Reply; on Commissioner Bohn's alternate filed on 7/29/09.
|
|
|
Type:
NOTICE
|
Filing Date:
August 24, 2009
|
Filed By:
Sustainable Conservation
|
|
Description:
Late-Filed; of a GRANTED ex parte meeting.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 18, 2009
|
Filed By:
Sustainable Conservation
|
|
Description:
Opening; on Commissioner Bohn's alternate filed on 7/29/09.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 18, 2009
|
Filed By:
Southern California Edison Company
|
|
Description:
Opening; on Commissioner Bohn's alternate filed on 7/29/09.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 18, 2009
|
Filed By:
The Utility Reform Network
|
|
Description:
Opening; on Commissioner Bohn's alternate filed on 7/29/09.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 10, 2009
|
Filed By:
The Utility Reform Network
|
|
Description:
LATE FILED: The Utility Reform Network (TURN) noticed an oral ex parte
communication with Commissioner Simon on August 3, 2009.
|
|
|
Type:
ALTERNATE
|
Filing Date:
July 29, 2009
|
Filed By:
CMMR/BOHN/CPUC
|
|
Description:
Proposed Alternate Decision of Commissioner Bohn denying intervenor
compensation to Sustainable Conservation for substantial contributions to
Decision 07-07-027. Opening comments, which shall not exceed 15 pages, are due
no later than August 18, 2009. Reply comments, which shall not exceed 5 pages,
are due five days after filing of opening comments.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 29, 2009
|
Filed By:
Sustainable Conservation
|
|
Description:
Opening; on the ALJ Division's proposed decision filed 6/9/09.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 29, 2009
|
Filed By:
The Utility Reform Network
|
|
Description:
Opening; on the ALJ Division's proposed decision filed 6/9/09.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
June 9, 2009
|
Filed By:
ALJ DIVISION/CPUC
|
|
Description:
Decision granting intervenor compensation to Sustainable Conservation for
substantial contributions to Decision 07-07-027. Opening comments, which shall
not exceed 15 pages, are due no later than June 29, 2009. Reply comments, which
shall not exceed 5 pages, are due no later than five days after the last day
for filing comments.
|
|
|
Type:
RULING
|
Filing Date:
May 22, 2009
|
Filed By:
ALJ/SIMON/CPUC
|
|
Description:
denying requests (of Sierra Pacific Power Company and PacifiCorp) for RPS
compliance template revisions.
|
|
|
Type:
REQUEST
|
Filing Date:
February 23, 2009
|
Filed By:
Sustainable Conservation
|
|
Description:
Amendment to Intervenor Compensation; for contributions to D.08-02-010 and
Resolution E-4137
|
|
|
Type:
REQUEST
|
Filing Date:
October 15, 2008
|
Filed By:
Sustainable Conservation
|
|
Description:
for intervenor compensation for substantial contribution to D07-07-027.
|
|
|
Type:
REQUEST
|
Filing Date:
October 15, 2008
|
Filed By:
Sustainable Conservation
|
|
Description:
for intervenor compensation for contributions to D08-02-010 and Res. E-4137.
|
|
|
Type:
MOTION
|
Filing Date:
August 15, 2008
|
Filed By:
Pacificorp
Sierra Pacific Power Company
|
|
Description:
Joint; for Review of RPS Compliance Template Revisions pursuan to March 12,
2007 ALJ Ruling.
|
|
|
Type:
RULING
|
Filing Date:
August 12, 2008
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Granting Motions to File Under Seal, Memorializing Party Status Ruling, and
Directing Notification regarding pending motions
|
|
|
Type:
RULING
|
Filing Date:
August 12, 2008
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Regarding Revised Schedule for 2009 RPS Procurement Plans.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 14, 2008
|
Filed By:
The Utility Reform Network
|
|
Description:
Reply; on the Amended Scoping Memo regarding Phase 2 and the expansion of the
feed-in tariff.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 14, 2008
|
Filed By:
Green Power Institute
|
|
Description:
Reply; on Phase 2 Tariff Issues for RPS Generators.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 14, 2008
|
Filed By:
California Farm Bureau Federation
Sustainable Conservation
|
|
Description:
Reply;
|
|
|
Type:
COMMENTS
|
Filing Date:
July 14, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; on the amended Scoping Memo and Ruling of Assigned Commissioner
regarding Phase 2 of tariff and standard contract implementation for RPS
generators
|
|
|
Type:
COMMENTS
|
Filing Date:
July 14, 2008
|
Filed By:
Sierra Pacific Power Company
|
|
Description:
Reply; on the amended Scoping Memo and Ruling of Assigned Commissioner
regarding Phase 2 of tariff and standard contract implementation for RPS
generators
|
|
|
Type:
COMMENTS
|
Filing Date:
July 14, 2008
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
Reply; to comments on issues regarding Phase 2 of tariff and standard contract
implementation for RPS generators
|
|
|
Type:
COMMENTS
|
Filing Date:
July 14, 2008
|
Filed By:
GreenVolts
Recurrent Energy, Inc.
Solar Alliance
The California Solar Energy Industries Association
The Vote Solar Initiative
|
|
Description:
Reply; on the issues regarding Phase 2 of tariff and standard contract
implementation for RPS generators
|
|
|
Type:
COMMENTS
|
Filing Date:
July 14, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; on issues specified in the amended Scoping Memo and Ruling of Assigned
Commissioner regarding Phase 2 of tariff and standard contract implementation
for RPS generators
|
|
|
Type:
COMMENTS
|
Filing Date:
July 11, 2008
|
Filed By:
GreenVolts
Solar Alliance
The California Solar Energy Industries Association
|
|
Description:
in support of the opening comments of the Vote Solar Initiative and Recurrent
Energy, Inc. on the issues regarding Phase 2 of tariff and standard contract
implementation for RPS generators
|
|
|
Type:
MOTION
|
Filing Date:
July 10, 2008
|
Filed By:
GreenVolts
|
|
Description:
for party status
|
|
|
Type:
MOTION
|
Filing Date:
July 10, 2008
|
Filed By:
Solar Alliance
|
|
Description:
for party status
|
|
|
Type:
MOTION
|
Filing Date:
July 10, 2008
|
Filed By:
The California Solar Energy Industries Association
|
|
Description:
for party status
|
|
|
Type:
COMMENTS
|
Filing Date:
July 9, 2008
|
Filed By:
Recurrent Energy, Inc.
The Vote Solar Initiative
|
|
Description:
Opening; on the issues regarding Phase 2 of tariff and standard contract
implementation for RPS generators
|
|
|
Type:
COMMENTS
|
Filing Date:
July 3, 2008
|
Filed By:
DRA/OBIORA/CPUC
|
|
Description:
to the Amended Scoping Memo and Ruling of Assigned Commissioner regarding Phase
2 of tariff and standard contract implementation for RPS generators
|
|
|
Type:
COMMENTS
|
Filing Date:
July 3, 2008
|
Filed By:
California Farm Bureau Federation
Sustainable Conservation
|
|
Description:
on June 5, 2008, Amended Scoping Memo and Ruling.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 3, 2008
|
Filed By:
Green Power Institute
|
|
Description:
on Phase 2 tariff issues for RPS generators.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 3, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Opening; on issues specified in Amended Scoping Memo and Ruling of Assigned
Commissioner regarding Phase 2 of tariff and standard contract implementation
for RPS generators
|
|
|
Type:
COMMENTS
|
Filing Date:
July 3, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
Opening; on the Amended Scoping Memo and Ruling of Assigned Commissioner
regarding Phase 2 of tariff and standard contract implementation for RPS
generators
|
|
|
Type:
COMMENTS
|
Filing Date:
July 3, 2008
|
Filed By:
Sierra Pacific Power Company
|
|
Description:
on the Amended Scoping Memo and Ruling of Assigned Commissioner regarding Phase
2 of tariff and standard contract implementation for RPS generators
|
|
|
Type:
COMMENTS
|
Filing Date:
July 3, 2008
|
Filed By:
Independent Energy Producers Association
|
|
Description:
Opening; on issues regarding Phase 2 of tariff and standard contract
implementation for RPS generators
|
|
|
Type:
COMMENTS
|
Filing Date:
July 3, 2008
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
on issues regarding Phase 2 of tariff and standard contract implementation for
RPS generators
|
|
|
Type:
COMMENTS
|
Filing Date:
July 3, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
regarding Phase 2 of tariff and standard contract implementation for RPS
generators
|
|
|
Type:
COMMENTS
|
Filing Date:
July 3, 2008
|
Filed By:
PacifiCorp
|
|
Description:
Opening; regarding Phase 2 of tariff and standard contract implementation for
RPS generators
|
|
|
Type:
SCOPING RULING
|
Filing Date:
June 20, 2008
|
Filed By:
CMMR/PEEVEY/CPUC
|
|
Description:
Amended; of Assigned Commissioner regarding 2009 renewables portfolio standard
procurement plans. (Schedule set forth in Attachment C)
|
|
|
Type:
SCOPING RULING
|
Filing Date:
June 5, 2008
|
Filed By:
CMMR/PEEVEY/CPUC
|
|
Description:
Amended Scoping Memo and Ruling of Assigned Commissioner Regarding Phase 2 of
Tariff and Standard Contract Implementation for RPS Generators. The scope and
schedule are as set forth.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 22, 2008
|
Filed By:
Sierra Pacific Power Company
|
|
Description:
Sierra Pacific Power Company noticed oral and written ex parte communications
with Theresa Cho, advisor to Commissioner Grueneich, and Jane Whang, advisor to
Commission Chong on May 19, 2008.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
May 20, 2008
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Revised Proposed Decision Denying Intervenor Compensation Claim of Sustainable
Conservation. Pursuant to Rule 14.6, the comment period is reduced. Comments
on the revised proposed decision must be filed within 3 days of its mailing,
and no reply comments will be accepted.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 29, 2008
|
Filed By:
Sustainable Conservation
|
|
Description:
Sustainable Conservation noticed an oral ex parte communications with Andrew
Schwartz, advisor to President Peevey on April 28, 2008.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 29, 2008
|
Filed By:
Sustainable Conservation
|
|
Description:
Late Filed. Sustainable Conservation noticed an oral ex parte communication
with Phyllis White, advisor to Commissioner Simon on April 22, 2008.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 29, 2008
|
Filed By:
Sustainable Conservation
|
|
Description:
. Sustainable Conservation noticed an oral ex parte communication with Theresa
Cho, advisor to Commissioner Grueneich on April 22, 2008.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 29, 2008
|
Filed By:
Sustainable Conservation
|
|
Description:
Sustainable Conservation noticed an oral ex parte communication with Robert
Kinosian, advisor to Commissioner Bohn on April 28, 2008.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 29, 2008
|
Filed By:
Sustainable Conservation
|
|
Description:
Late Filed. Sustainable Conservation noticed oral and written ex parte
communications with Andrew Schwartz, advisor to President Peevey on April 23,
2008.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 29, 2008
|
Filed By:
Sustainable Conservation
|
|
Description:
Late Filed. Sustainable Conservation noticed oral and written ex parte
communications with Joe Como, advisor to Commissioner Chong on April 22, 2008.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 17, 2008
|
Filed By:
Sierra Pacific Power Company
|
|
Description:
The Sierra Pacific Power Company noticed oral and written ex parte
communications with Commissioner Simon; Robert Mason, advisor to Commissioner
Simon; Nancy Ryan, Matthew Deal and Andrew Schwartz, advisors to President
Peevey; Robert Kinosian and Stephen St. Marie, advisors to Commissioner Bohn on
April 15, 2008.
|
|
|
Type:
COMMENTS
|
Filing Date:
April 14, 2008
|
Filed By:
Sustainable Conservation
|
|
Description:
on the proposed decision of ALJ Mattson denying intervenor compensation claim
|
|
|
Type:
MOTION
|
Filing Date:
April 14, 2008
|
Filed By:
Sustainable Conservation
|
|
Description:
to Augment Record and for Finding of Significant Financial Hardship.
|
|
|
Type:
REPORT
|
Filing Date:
April 11, 2008
|
Filed By:
Golden State Water Company
|
|
Description:
Renewable Portfolio Standard Compliance;
|
|
|
Type:
LAW & MOTION
|
Filing Date:
April 4, 2008
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY (U902E)
|
|
Description:
San Diego Gas & Electric Company (U902E) Amended Appendix D 2008 RPS Plan
pursuant to ALJ Burton Mattson¿s Ruling on SDG&E¿s Motions regarding Seal of
August 2007 Compliance Report and Amended 2008 RPS Plan, dated March 26, 2008.
|
|
|
Type:
REPORT
|
Filing Date:
April 4, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Amended Appendix D 2008 RPS Plan.
|
|
|
Type:
COMMENTS
|
Filing Date:
April 1, 2008
|
Filed By:
California Farm Bureau Federation
Green Power Institute
Sustainable Conservation
|
|
Description:
Reply; on the interim opinion compiling standard terms and conditions.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
March 26, 2008
|
Filed By:
Sempra Energy Solutions, LLC
|
|
Description:
Motion for Confidential Treatment of 2008 Semi-Annual Compliance Report
pursuant to the California Renewables Portfolio Standard.
|
|
|
Type:
RULING
|
Filing Date:
March 26, 2008
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
ALJ's Ruling on (a) SDG&E's motions regarding seal of August 2007 compliance
report and amended 2008 RPS plan plus (b) possible content of future motions.
This ruling is effective five days from the date of issuance.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
March 26, 2008
|
Filed By:
PRAXAIR PLAINFIELD, INC.
|
|
Description:
Motion to File Under Seal Confidential Version of 2008 Semi-Annual Compliance
Report pursuant to the California Renewables Portfolio Standard and
Confidential Supporting Declaration.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
March 26, 2008
|
Filed By:
3PHASES RENEWABLES, LLC
|
|
Description:
Motion for Confidential Treatment of 2008 Semi-Annual Compliance Report
pursuant to the California Renewables Portfolio Standard.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
March 26, 2008
|
Filed By:
APS Energy Services, Inc.
|
|
Description:
Motion for Confidential Treatment of 2008 Semi-Annual Compliance Report
pursuant to the California Renewables Portfolio Standard.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
March 26, 2008
|
Filed By:
Strategic Energy, LLC
|
|
Description:
Motion for Confidential Treatment of 2008 Semi-Annual Compliance Report
pursuant to the California Renewables Portfolio Standard.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
March 26, 2008
|
Filed By:
Commerce Energy, Inc.
|
|
Description:
Motion for Confidential Treatment of 2008 Semi-Annual Compliance Report
pursuant to the California Renewables Portfolio Standard.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 25, 2008
|
Filed By:
California Farm Bureau Federation
Green Power Institute
Inland Empire Utilities Agency
Sustainable Conservation
|
|
Description:
on the interim opinion compiling standard terms and conditions.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
March 25, 2008
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Opinion Denying Intervenor Compensation Claim of Sustainable Conservation.
Opening Comments which shall not exceed 15 pages are due April 14, 2008; Reply
Comments are due 5 days after Opening Comments are due.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 25, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Opening; on the proposed decision compiling standard terms and conditions.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 25, 2008
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
on the proposed decision of ALJ Mattson.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
March 5, 2008
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Interim Opinion Compiling Standard Terms and Conditions. Opening comments,
which shall not exceed 15 pages, are due no later than March 25, 2008. Reply
comments are due 5 days after opening comments are filed.
|
|
|
Type:
REPORT
|
Filing Date:
March 3, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Amendment #2 to 2008 Renewables Portfolio Standard Plan Submitted in Compliance
With D.08-02-008 Ordering Paragraph 2.
|
|
|
Type:
REPORT
|
Filing Date:
March 3, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
(Amended) 2008 Renewables Portfolio Standard Plan of Pacific Gas and Electric
Company Submitted in Compliance With D.08-02-008 Ordering Paragraph 2.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
February 29, 2008
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Motion to File Under Seal Unredacted Version of Amended 2008 Renewable
Procurement Plan.
|
|
|
Type:
REPORT
|
Filing Date:
February 29, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
Amended 2008 RSP Procurement Plan (per Decision 08-02-008).
|
|
|
Type:
REPORT
|
Filing Date:
February 29, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
(REDACTED PUBLIC VERSION) Amended 2008 Renewable Procurement Plan. (The
Confidential Version along with a Motion to File Under Seal was paper-filed as
of Feb 29, 2008. MMN)
|
|
|
Type:
REQUEST
|
Filing Date:
February 21, 2008
|
Filed By:
Sustainable Conservation
|
|
Description:
Amendment to Intervenor Compensation Claim (filed on 9/24/2007).
|
|
|
Type:
MOTION
|
Filing Date:
February 8, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
for leave to file under seal the unredacted version of its renewable portfolio
standard compliance report.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 5, 2008
|
Filed By:
Green Power Institute
|
|
Description:
Reply; On the Proposed Decision of ALJ Mattson.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 5, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; To the Proposed Decision Conditionally Accepting Procurement Palns for
2008 RPS.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 5, 2008
|
Filed By:
Independent Energy Producers Association
|
|
Description:
Reply; On the Proposed Decision of ALJ Mattson.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 5, 2008
|
Filed By:
California Wind Energy Association
|
|
Description:
Reply; On the Proposed Decision Conditionally Accepting Procurement Plans for
2008 RPS Solicitations.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 5, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; On Proposed Decision Conditionally Accepting Procurement Plans for 2008
RPS Solicitations.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 5, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; On the Proposed Decision Regarding 2008 Procurement Plans For the
Renewables Portfolio Standard.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 31, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
to the Proposed Decision conditionally accepting Procurement Plans for 2008 RPS.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 31, 2008
|
Filed By:
Green Power Institute
|
|
Description:
on the Proposed Decision of ALJ Mattson.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 31, 2008
|
Filed By:
Mountain Utilities
|
|
Description:
on the Proposed Decision of ALJ Mattson.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 31, 2008
|
Filed By:
Independent Energy Producers Association
|
|
Description:
on the Proposed Decision of ALJ Mattson.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 31, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Opening; on the Proposed Decision regarding 2008 Procurement Plans for the
Renewables Portfolio Standard.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 31, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
on Proposed Decision conditionally accepting Procurement Plans for 2008 RPS
Solicitations.
|
|
|
Type:
RULING
|
Filing Date:
January 25, 2008
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Partially Granting Motions to File Certain Material Under Seal. Motions listed
in Attachment A are granted, except for the September 12, 2007 motion of SDG&E.
|
|
|
Type:
RULING
|
Filing Date:
January 18, 2008
|
Filed By:
CMMR/PEEVEY/CPUC
|
|
Description:
Assigned Commissioner's Ruling approving 2008 Transmission Ranking Cost Reports.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
January 11, 2008
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Opinion Conditionally Accepting Procurement Plans for 2008 RPS Solicitations.
Opening comments, which shall not exceed 15 pages, are due no later than
January 31, 2008. Reply comments are due five days after opening comments are
filed.
|
|
|
Type:
REPLY
|
Filing Date:
December 31, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
to Response of Sustainable Conservation and Inland Empire Utilities Agency to
Motion to Stay Effectiveness of Decision 07-07-027.
|
|
|
Type:
RESPONSE
|
Filing Date:
December 21, 2007
|
Filed By:
Inland Empire Utilities Agency
Sustainable Conservation
|
|
Description:
to Motion of SCE to Stay Decision 07-07-027.
|
|
|
Type:
RESPONSE
|
Filing Date:
December 12, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to Motion of SCE to Stay the Effectiveness of Decision 07-07-027.
|
|
|
Type:
MOTION
|
Filing Date:
December 6, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
to stay the effectiveness of Decision 07-07-027 and to shorten time to respond
to motion.
|
|
|
Type:
EXPARTE
|
Filing Date:
November 13, 2007
|
Filed By:
Golden State Water Company
|
|
Description:
SUMMARY: On November 8, 2007, Keith Switzer, Vice-President of Golden State
Water Company (GSWC) met with Andrew Schwartz, advisor to Pres. Peevey in San
Francisco. Also present were Tracey Drabant, Energy Resource Manager of Bear
Valley Electric Service (BVES), Rod Larson, consultant to BVES, and David
Morse, consultant to BVES. Written material (attached to the notice) were used.
BVES addressed the value of tradable renewable energy credits in helping small
load serving entities to achieve compliance. BVES described its unique
situation, its options, and its strategy for pursuing the renewable energy
program. BVES noted that the company has a $77/Mwhr cap in its Purchase Power
Adjustment Clause. BVES representatives stated the company will need
authorization from the Commission to modify the cap if renewable resources
contracts have prices in excess of this cap. Contact Person: Denise E. Lynch;
telephone: (916) 788-1022; email: denise@ddecuir.com.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 29, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; Regarding the Late-Filed Comments of the Center for Biological Diversity
and the Sierra Club on San Diego Gas & Electric Company's 2008 Draft Renewable
Procurement Plan.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 22, 2007
|
Filed By:
Center for Biological Diversity
Sierra Club
|
|
Description:
On the San Diego Gas & Electric Company 2008 Draft Renewable Procurement Plan.
|
|
|
Type:
RULING
|
Filing Date:
October 18, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
ALJ's Ruling (a) granting motion of Center for Biological Diversity and Sierra
Club to become parties and file comments late and (b) set date for reply
comments.
|
|
|
Type:
MOTION
|
Filing Date:
October 12, 2007
|
Filed By:
Center for Biological Diversity
Sierra Club
|
|
Description:
to Become Parties and File Comments on SDG&E 2008 Draft Renewable Procurement
Plan.
|
|
|
Type:
REQUEST
|
Filing Date:
September 24, 2007
|
Filed By:
Sustainable Conservation
|
|
Description:
for intervenor compensation.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 14, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; Regarding 2008 Draft Renewable Procurement Plan.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 14, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; On 2008 RPS Procurement.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 14, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; To Comments of the Division of Ratepayer Advocates and Green Power
Institute.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
September 12, 2007
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to File Under Seal the Confidential and Proprietary Portions of 2007 Compliance
Report consistent with the CEC Procurement Verification Report pursuant to the
California RPS .
|
|
|
Type:
REPORT
|
Filing Date:
September 12, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
(PUBLIC VERSION) Compliance Filing: Update to Renewable Portfolio Standard
Compliance Report.
|
|
|
Type:
REPORT
|
Filing Date:
September 12, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
(PUBLIC & CONFIDENTIAL VERSIONS) Renewables Portfolio Standard
Post-Verification Compliance Report. (Confidential Version filed Under Seal per
Motion filed 8/1/07.MMN)
|
|
|
Type:
REPORT
|
Filing Date:
September 12, 2007
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
(PUBLIC VERSION) RPS Compliance Report in accordance with D.06-10-050 for the
years 2004 and 2005.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
September 12, 2007
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Motion to File Under Seal Confidential Version of Renewable Portfolio Standard
Compliance Report.
|
|
|
Type:
RESPONSE
|
Filing Date:
September 11, 2007
|
Filed By:
Green Power Institute
|
|
Description:
To Applications for Rehearing of Decision D.07-07-027.
|
|
|
Type:
RESPONSE
|
Filing Date:
September 10, 2007
|
Filed By:
Sustainable Conservation
|
|
Description:
to Applications for Rehearing of Decision 07-07-027.
|
|
|
Type:
REPORT
|
Filing Date:
September 10, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Transmission Ranking Cost Report For Renewable Portfolio Standard Procurement.
|
|
|
Type:
RESPONSE
|
Filing Date:
September 10, 2007
|
Filed By:
Center for Energy Efficiency and Renewable Technologies
|
|
Description:
to the Application of Southern California Edison Company for Rehearing of
Decision 07-07-027.
|
|
|
Type:
REPORT
|
Filing Date:
September 7, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
Transmission Ranking Cost Report of Southern California Edison Company For
Renewable Portfolio Standard Procurement.
|
|
|
Type:
REPORT
|
Filing Date:
September 7, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Transmission Ranking Cost; for Renewables Portfolio Standard Procurement.
|
|
|
Type:
REPORT
|
Filing Date:
September 6, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
September 6, 2007 Revised Draft of 2008 Renewables Portfolio Standard
Solicitation Protocol.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 30, 2007
|
Filed By:
Green Power Institute
|
|
Description:
On the 2008 IOU RPS Procurement Plans.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
August 27, 2007
|
Filed By:
Center for Energy Efficiency and Renewable Technologies
|
|
Description:
Application for Rehearing of Decision 07-07-027.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
August 24, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
Application for Rehearing of Decision 07-07-027, adopting tariffs and standard
contracts for water, wastewater and other customers.
|
|
|
Type:
RULING
|
Filing Date:
August 23, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
ALJ's Ruling with Further Revised Schedule.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 21, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; To Comments Regarding Further Implementation of Tariffs and Standard
Contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 20, 2007
|
Filed By:
DRA/ANGELOPULO/CPUC
|
|
Description:
Opening; on the 2008 Renewable Procurement Plans.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 16, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Regarding Further Implementation of AB 1969 Tariffs/Standard Contracts for
Small Customers.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 16, 2007
|
Filed By:
California Farm Bureau Federation
Green Power Institute
Inland Empire Utilities Agency
RCM International
Sustainable Conservation
|
|
Description:
(relating to the implementation of tariffs and standard contracts for small
customers.)
|
|
|
Type:
COMMENTS
|
Filing Date:
August 16, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
To Administrative Law Judge's Ruling on Development of Issues and Schedule
Regarding Further Implementation of Tariff's/Standards Contracts for Small
Customers.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
August 10, 2007
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Motion to File Under Seal Unredacted Version of Attachments to the Second
Amendment to 2008 Draft Renewable Procurement Plan.
|
|
|
Type:
REPORT
|
Filing Date:
August 10, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
Amendment to 2008 RPS Procurement Plan.
|
|
|
Type:
REPORT
|
Filing Date:
August 10, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Amendment No.1 to the 2008 Renewable Energy Procurement Plan and Draft
Solicitation Protocol and Response to the Assigned Commissioner August 31, 2007
Ruling regarding 2008 RPS Plans and 2010 RPS Goals.
|
|
|
Type:
REPORT
|
Filing Date:
August 10, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
(PUBLIC VERSION) Second Amendment to 2008 Draft Renewable Procurement Plan.
|
|
|
Type:
REPORT
|
Filing Date:
August 8, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Amendment to 2008 Draft Renewable Procurement Plan.
|
|
|
Type:
RULING
|
Filing Date:
August 7, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
ALJ's Ruling with Further Revised Schedule and Granting of Motion of Mountain
Utilities.
|
|
|
Type:
MOTION
|
Filing Date:
August 2, 2007
|
Filed By:
Mountain Utilities
|
|
Description:
to accept late-filed report.
|
|
|
Type:
REPORT
|
Filing Date:
August 2, 2007
|
Filed By:
Mountain Utilities
|
|
Description:
Renewables Portfolio Standard Compliance Report (late-filed authorized by ALJ
Mattson per email ruling dated August 3, 2007)
|
|
|
Type:
LAW & MOTION
|
Filing Date:
August 1, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Motion to File Under Seal Confidential Version of its Renewables Portfolio
Standard Periodic Compliance Report consistent with the Confidentiality
Protections of Decision 06-06-066.
|
|
|
Type:
REPORT
|
Filing Date:
August 1, 2007
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
(PUBLIC VERSION) 2007 Compliance Filing Reporting Performance pursuant to the
California Renewables Portfolio Standard.
|
|
|
Type:
REPORT
|
Filing Date:
August 1, 2007
|
Filed By:
Golden State Water Company
|
|
Description:
Compliance.
|
|
|
Type:
REPORT
|
Filing Date:
August 1, 2007
|
Filed By:
PacifiCorp
|
|
Description:
August 1, 2007 Compliance; Reporting Performance Pursuant to the California
Renewables Portfolio Standard.
|
|
|
Type:
REPORT
|
Filing Date:
August 1, 2007
|
Filed By:
Sierra Pacific Power Company (U 903 E)
|
|
Description:
Compliance Filing of August 1, 20078, Pursuant to Administrative Law Judge's
Ruling Adopting Standardized Reporting Format, Setting Scheduled for Filing
Updated Reports and Addressing Subsequent Process, Issued on March 12, 2007.
|
|
|
Type:
REPORT
|
Filing Date:
August 1, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
2008 RPS Procurement Plan.
|
|
|
Type:
REPORT
|
Filing Date:
August 1, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
2008 Draft Renewable Procurement Plan [Redacted, Public Version].
|
|
|
Type:
REPORT
|
Filing Date:
August 1, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
(PUBLIC VERSION) 2008 Renewable Energy Procurement Plan and Draft Solicitation
Protocol.
|
|
|
Type:
REPORT
|
Filing Date:
August 1, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
(PUBLIC VERSION) Renewables Portfolio Standard Periodic Compliance Report.
|
|
|
Type:
RULING
|
Filing Date:
August 1, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
on Development of Issues and Schedule Regarding Further Implementation of
Tariffs/Standard Contracts for Small Customers. Comments shall be filed and
served within 15 days of the date of this ruling. Reply comments shall be
filed and served within five days of the date of comments.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
August 1, 2007
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to File Under Seal Confidential Portions of 2007 Compliance Filing Reporting
Performance pursuant to the California Renewables Portfolio Standard.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
August 1, 2007
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY (U902)
|
|
Description:
Motion to File Under Seal Confidential Appendix D to the 2008 Draft Renewable
Procurement Plan (Public Version Electronically Filed (#7142) on 8/1/07).
|
|
|
Type:
LAW & MOTION
|
Filing Date:
August 1, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to File Under Seal Confidential Electric Procurement Information and Data
consistent with the Confidentiality Portections of Decision 06-06-066.
|
|
|
Type:
RULING
|
Filing Date:
July 31, 2007
|
Filed By:
CMMR/PEEVEY/CPUC
|
|
Description:
Assigned Commissioner's Ruling Regarding 2008 Renewables Portfolio Standard
(RPS) Plans and 2010 RPS Goals.
|
|
|
Type:
REQUEST
|
Filing Date:
July 30, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
For Award of Compensation For Substantial Contributions to Decisions 06-10-050,
07-03-046, 07-05-057 and for Participation in Procurement Review Groups.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 24, 2007
|
Filed By:
Inland Empire Utilities Agency
|
|
Description:
Reply; on Proposed Decisionof ALJ Mattson on AB 1969 Implementation.
|
|
|
Type:
RULING
|
Filing Date:
July 24, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
on Motion of Southern California Edison Company regarding SB 451 and official
notice of Pacific Gas and Electric Company's Small Generator Interconnection
Procedures.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 23, 2007
|
Filed By:
California Farm Bureau Federation
RCM International
Sustainable Conservation
|
|
Description:
Joint, Reply; on Proposed Decision of ALJ Mattson on AB 1969 Implementation.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 23, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; on the Proposed Decision of ALJ Mattson Adopting Tariffs and Standard
Contracts for Water, Wastewater and other Customers.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 16, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
On Proposed Decision of Administrative Law Judge Mattson.
|
|
|
Type:
RULING
|
Filing Date:
July 16, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Granting Motions to Revise Schedule. (Revised schedule is attached.)
|
|
|
Type:
COMMENTS
|
Filing Date:
July 16, 2007
|
Filed By:
Center for Energy Efficiency and Renewable Technologies
|
|
Description:
on the Proposed Decision of ALJ Mattson on RPS-Related Tariffs and Standard
Contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 16, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
to Proposed Decision of ALJ Mattson Adopting Tariffs and Standard Contracts for
Water, Wastewater and Other Customers.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 16, 2007
|
Filed By:
Sustainable Conservation
|
|
Description:
on Proposed Decison n AB 1969 Implementation.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 16, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Regarding Opinion Adopting Tariffs and Standard Contracts for Water,
Wastewater, and Other Customers to Sell Electricity Generated From RPS-Eligible
Renewable Resources to Electrical Corporations.
|
|
|
Type:
RULING
|
Filing Date:
June 28, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Granting Pacific Gas and Electric Company's May 29, 2007 Supplemental Motion
for Confidential Protection and May 29, 2007 Motion for Reconsideration.
|
|
|
Type:
RULING
|
Filing Date:
June 28, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Granting Southern California Edison Company's May 22, 2007 Motion for
Reconsideration and May 22, 2007 Supplemental Motion for Confidentiality.
|
|
|
Type:
RULING
|
Filing Date:
June 28, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Granting San Diego Gas & Electric Company's May 21, 2007 Amendment to April 3,
2007 Motion and May 22, 2007 Amendment to August 1, 2006 Motion.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
June 26, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Opinion Adopting Tariffs and Standard Contracts for Water, Wastewater and other
Customers to Sell Electricity Generated from RPS-Eligible Renewable Resources
to Electrical Corporations. Opening Comments which shall not exceed 15 pages
are due no later than July 16, 2007; Reply Comments are due 5 days after
Opening Comments are filed.
|
|
|
Type:
REPORT
|
Filing Date:
June 22, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
AB1969 Workshop Documents (Summary Matrix on Standard Terms and Conditions,
Pacificorp Comments and 250 MW Allocation).
|
|
|
Type:
SCOPING RULING
|
Filing Date:
June 15, 2007
|
Filed By:
CMMR/PEEVEY/CPUC
|
|
Description:
Amended; Regarding 2008 RPS Procurement Plans. Schedule for filing plans,
comments, reply comments, motions, and other pleadings as set forth in
Attachment B.
|
|
|
Type:
REPORT
|
Filing Date:
June 13, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
AB1969 Workshop Documents (Summary Matrix on Standard Terms and Conditions,
Pacificorp Comments and 250 MW Allocation).
|
|
|
Type:
REPORT
|
Filing Date:
June 13, 2007
|
Filed By:
PacifiCorp
|
|
Description:
Amendment to; Proposal Implementing Public Utilties Code Section 399.20 and
Other Matters (originally filed 4/11/07).
|
|
|
Type:
RULING
|
Filing Date:
June 7, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Granting Petition to Intervene of Inland Empire Utilities Agency.
|
|
|
Type:
AMENDMENT
|
Filing Date:
June 4, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to its proposal to implement Public Utilities Code §399.20 (Assembly Bill 1969)
(filing pursuant to ALJ Mattson's email Ruling of May 30, 2007)
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
May 29, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
pursuant to ALJ Ruling dated April 30, 2007.
|
|
|
Type:
RULING
|
Filing Date:
May 29, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
ALJ's Ruling on Workshop Regarding Pub. Util. Code Section 399.20 (Assembly
Bill 1969)
|
|
|
Type:
NOTICE
|
Filing Date:
May 29, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
of Availability pursuant to ALJ Ruling dated April 30, 2007.
|
|
|
Type:
MOTION
|
Filing Date:
May 29, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
for Reconsideration of ALJ Ruling dated April 30, 2007 and Request for
Continued Confidential Treatment of Documents provided under seal.
|
|
|
Type:
MOTION
|
Filing Date:
May 29, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Supplemental Motion for Confidential Protection pursuant to ALJ Ruling dated
April 30, 2007.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
May 22, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Amendment to 8/1/06 Motion for Leave to File Under Seal Unredacted Compliance
Filing regarding Achievement of 2006 RPS Annual Procurement Target and Project
Development Status.
|
|
|
Type:
REPORT
|
Filing Date:
May 22, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
(PUBLIC VERSION) 2006 Compliance Filing Reporting Performance Pursuant to the
California Renewables Portfolio Standard.
|
|
|
Type:
REPORT
|
Filing Date:
May 22, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
(PUBLIC VERSION) August 1, 2006 Renewables Portfolio Standard Compliance Filing.
|
|
|
Type:
RESPONSE
|
Filing Date:
May 22, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Compliance Filing: Unredacted Version of 2006 Renewable Portfolio Standard
Procurement Plan.
|
|
|
Type:
MOTION
|
Filing Date:
May 22, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
for Reconsideration of ALJ Ruling (4/30/07) Denying Motion for Permission to
File Data Under Seal.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
May 22, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
Supplemental Motion for Confidentiality.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
May 21, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Amendment to; Motion to File Under Seal filed 4/3/07.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 9, 2007
|
Filed By:
RCM International
Sustainable Conservation
|
|
Description:
Reply; on Assembly Bill 1969 implementation proposals.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 9, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; on proposal of Pacific Gas and Electric Company to implement Public
Utilities Code § 399.20 (Assembly Bill 1969).
|
|
|
Type:
COMMENTS
|
Filing Date:
May 9, 2007
|
Filed By:
PacifiCorp
|
|
Description:
Reply; on the implementation of Pub. Util. Code § 399.20 and other matters.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 9, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; on proposed AB 1969 contract proposals.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
May 8, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Order Modifying Decision 07-02-011 Regarding Definition of Green Attributes.
Comments must be filed within seven days of its mailing. Reply comments must
be filed within two days of the mailing date of comments.
|
|
|
Type:
RULING
|
Filing Date:
May 4, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
on SDG&E April 3, 2007 Motion to File Data Under Seal.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 2, 2007
|
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
|
|
Description:
on Proposals on Availability of section 399.20 Tariffs to Other Customers
|
|
|
Type:
MOTION
|
Filing Date:
May 2, 2007
|
Filed By:
INLAND EMPIRE UTILITIES AGENCY
|
|
Description:
to Intervene (For Party Status); ATTACHED: Comments.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 2, 2007
|
Filed By:
RCM International
Sustainable Conservation
|
|
Description:
Opening; on Assembly Bill 1969 Implementation Proposals.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 2, 2007
|
Filed By:
DRA/OBIORA/CPUC
|
|
Description:
on the Scoping Memo and Assigned Commissioner's Ruling Regarding Implementation
of Pub. Util. Code Section 399.20 (Assembly Bill 1969).
|
|
|
Type:
RULING
|
Filing Date:
April 30, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
on SDG&E Company's Motions to File Data Under Seal (related to the Commission's
Renewables Portfolio Standard Program).
|
|
|
Type:
RULING
|
Filing Date:
April 30, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
on Southern California Edison Company motions to file data under seal.
|
|
|
Type:
RULING
|
Filing Date:
April 30, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
on PG&E' Company's Motions to File Data Under Seal (related to the Commission's
Renewables Portfolio Standard Program).
|
|
|
Type:
CERTIFICATE OF SERVICE
|
Filing Date:
April 20, 2007
|
Filed By:
Bear Valley Electric Service, a Division of Golden State Water Company
|
|
Description:
of Notice for a New Rate Schedule and Associated Contract(s) Available to
Public Water and Wastewater Agencies.
|
|
|
Type:
NOTICE
|
Filing Date:
April 18, 2007
|
Filed By:
PACIFICORP
|
|
Description:
Compliance Filing. Notice of Proposal for a New Rate Schedule available to
Public Water and Wastewater Agencies
|
|
|
Type:
NOTICE
|
Filing Date:
April 18, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
of Proposed New Rate Schedule and Associated Contracts available to Public
Water and Wastewater Agencies and Certificate of Service.
|
|
|
Type:
NOTICE
|
Filing Date:
April 18, 2007
|
Filed By:
Sierra Pacific Power Company
|
|
Description:
Compliance Filing. Notice of Proposal for a New Rate Schedule available to
Public Water and Wastewater Agencies.
|
|
|
Type:
NOTICE
|
Filing Date:
April 16, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Compliance Filing: Notice of Proposal for a New Contract Available to Public
Water and Wastewater Agencies.
|
|
|
Type:
REPORT
|
Filing Date:
April 16, 2007
|
Filed By:
Bear Valley Electric Service, a Division of Golden State Water Company
|
|
Description:
Renewable Portfolio Standard Compliance Report.
|
|
|
Type:
REPORT
|
Filing Date:
April 16, 2007
|
Filed By:
PACIFICORP
|
|
Description:
March 1, 2007 - California Renewables Portfolio Standard Compliance Report.
|
|
|
Type:
REPORT
|
Filing Date:
April 16, 2007
|
Filed By:
SIERRA PACIFIC POWER COMPANY
|
|
Description:
Compliance Filing pursuant to ALJ Ruling adopting Standardized Reporting
Format, Setting Schedule for Filing Updated Reports and Addressing Subsequent
Process, issued on March 12, 2007.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 13, 2007
|
Filed By:
Bear Valley Electric Service Division of Golden State Water Company
|
|
Description:
Proposal in Response to Assigned Commissioner's Ruling Regarding Implementation
of Public utilities Code Section 399.20 (Assembly Bill 1969).
|
|
|
Type:
NOTICE
|
Filing Date:
April 11, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Compliance Filing: Notice of Proposed New Rate Schedule and Associated
Contracts Available to Public Water and Wastewater Agencies.
|
|
|
Type:
REPORT
|
Filing Date:
April 11, 2007
|
Filed By:
Mountain Utilities
|
|
Description:
Compliance Filing pursuant to Amended Scoping Memo and Ruling of Assigned
Commissioner regarding the Implementation of Public Utilities Code Section
399.20 (Assembly Bill 1969).
|
|
|
Type:
REPORT
|
Filing Date:
April 11, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Proposal to Implement Public Utilities Code Section 399.20 (Assembly Bill 1969).
|
|
|
Type:
REPORT
|
Filing Date:
April 11, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
Proposal in Response to Assigned Commissioner's Ruling Regarding Implementation
of Assembly Bill 1969.
|
|
|
Type:
REPORT
|
Filing Date:
April 11, 2007
|
Filed By:
Sierra Pacific Power Company
|
|
Description:
Proposal to Implement Provisions of Section 399.20
|
|
|
Type:
REPORT
|
Filing Date:
April 11, 2007
|
Filed By:
PacifiCorp
|
|
Description:
Proposal on the Implementation of Public Utilities Code Section 399.20 and
Other Matters.
|
|
|
Type:
REPORT
|
Filing Date:
April 11, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Proposal Concerning Implementation of Public Utilities Code Section 399.20.
|
|
|
Type:
NOTICE
|
Filing Date:
April 11, 2007
|
Filed By:
Mountain Utilities
|
|
Description:
Submission of Notice required by Amended Scoping Memo and Ruling of Assigned
Commissioner regarding Implementation pf Public Utilities Code Section 399.20
(Assembly Bill 1969).
|
|
|
Type:
RULING
|
Filing Date:
April 5, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
granting motion of RCM International to become a party.
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
April 3, 2007
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
(PUBLIC VERSION) 2006 Renewables Portfolio Standard Compliance Report
|
|
|
Type:
REPORT
|
Filing Date:
April 3, 2007
|
Filed By:
Mountain Utilities
|
|
Description:
COMPLIANCE FILING PURSUANT TO ADMINISTRATIVE LAW JUDGE'S RULING ADOPTING
STANDARDIZED REPORTING FORMAT, SETTING SCHEDULE FOR FILING UPDATED REPORTS AND
ADDRESSING SUBSEQUENT PROCESS, SSUED ON MARCH 12, 2007, AS MODIFIED BY
ADMINISTRATIVE AW JUDGE'S RULING GRANTING MOTION OF MOUNTAIN UTILITIES FOR
RECONSIDERATION AND MODIFICATION OF MARCH 12, 2007 RULING ON REPORTING FORMAT,
ISSUED MARCH 30, 2007.
|
|
|
Type:
REPORT
|
Filing Date:
April 3, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
(PUBLIC VERSION) Renewables Portfolio Standard Periodic Compliance Report.
|
|
|
Type:
REPORT
|
Filing Date:
April 3, 2007
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
(PUBLIC VERSION) Reporting Performance pursuant to the California Renewables
Portfolio Standard.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
April 3, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to File Under Seal Confidential Version of Renewables Portfolio Standard
Periodic Compliance Report consistent with Decision 06-06-066.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
April 3, 2007
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Motion to File Under Seal Confidential Version of Reporting Performance
pursuant to the California Renewables Portfolio Standard.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
April 3, 2007
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
for Permission to File Data Under Seal.
|
|
|
Type:
MOTION
|
Filing Date:
April 2, 2007
|
Filed By:
RCM INTERNATIONAL
|
|
Description:
to Become a Party.
|
|
|
Type:
RULING
|
Filing Date:
March 30, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Granting Motion of Mountain Utilities for Reconsideration and Modification of
March 12, 2007 Ruling on Reporting Format.
|
|
|
Type:
RULING
|
Filing Date:
March 12, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
adopting standardized reporting format, setting schedule for filing updated
reports and addressing subsequent process.
|
|
|
Type:
SCOPING RULING
|
Filing Date:
March 12, 2007
|
Filed By:
CMMR/PEEVEY/CPUC
|
|
Description:
Amended Scoping Memo and Ruling regarding the Implementation of Public
Utilities Code Section 399.20 (Assembly Bill 1969). A summary of important
filing dates for Comments, Reply Comments and Motions on the Proposals of each
Electrical Corporation is set forth on page 10.
|
|
|
Type:
REPORT
|
Filing Date:
March 2, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Amended 2007 Renewable Procurement Plan.
|
|
|
Type:
EXPARTE
|
Filing Date:
February 22, 2007
|
Filed By:
Central California Power
|
|
Description:
On February 16, 2007, Joseph Langenberg of Central California Power, sent an
electronic note (attached to the notice) to ALJ Mattson. Contact person: Joseph
Langenberg, telephone: (559) 917-5064; Facsimile: (559) 442-0023; email:
cpc1993@hotmail.com
|
|
|
Type:
RULING
|
Filing Date:
February 20, 2007
|
Filed By:
CMMR/PEEVEY/CPUC
|
|
Description:
extending filing date for RPS report otherwise due March 1, 2007. The filing
date shall be 15 days after the date the Commission adopts a decision on the
pending application for rehearing of Decision 06-10-050.
|
|
|
Type:
RULING
|
Filing Date:
February 8, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Granting Motion of Caithness Corporation to Become a Party and to File Comments
on the Proposed Decision.
|
|
|
Type:
EXPARTE
|
Filing Date:
February 7, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On February 2, 2007, Meredith Allen, Chief, Regulatory Relations, Pacific Gas
and Electric Company (PG&E), met with Andrew Schwartz, advisor to President
Peevey in San Francisco. Written materials (attached to the notice) were used.
Also present were Sandra Burns, Manager, Energy Procurement and Jim Shandalov,
Principal, Energy Procurement, of PG&E. Burns stated that the PD¿s changes to
the existing process for approving RPS contracts are inconsistent with the
objectives of the program and should be rejected. Shandalov stated that the
PD¿s proposed RFO schedule does not recognize the commercial realities of
negotiating long-term PPAs.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 6, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; on Proposed Decision conditionally accepting procurement plans for 2007
RPS solicitations.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 6, 2007
|
Filed By:
Green Power Institute
|
|
Description:
Reply; on the Proposed Decision of ALJ Mattson.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 6, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; on Proposed Decision conditionally accepting procurement plans for 2007
RPS solicitations.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 6, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
Reply; on the Proposed Decision of ALJ Mattson Conditionally Accepting
Procurement Plans for 2007 Renewables Portfolio Standard Solicitations.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 6, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; on the Proposed Decision of ALJ Mattson Conditionally Accepting
Procurement Plans for 2007 RPS Solicitations.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 2, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
on the Proposed Decision of ALJ Mattson Conditionally Accepting Procurement
Plans for 2007 Renewables Portfolio Standard Solicitations.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 1, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
on Draft Opinion conditionally accepting Procurement Plans for 2007 RPS
Solicitations.
|
|
|
Type:
MOTION
|
Filing Date:
February 1, 2007
|
Filed By:
CAITHNESS CORPORATION
|
|
Description:
to become a party; proposed comments attached.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 1, 2007
|
Filed By:
Green Power Institute
|
|
Description:
on the Proposed Decision of ALJ Mattson.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 1, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
on Proposed Decision Conditionally Accepting Procurement Plans for 2007 RPS
Solicitations.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 1, 2007
|
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
|
|
Description:
on the Proposed Decision conditionally accepting procurement plans for 2007 RPS
solicitations.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 1, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
on ALJ Mattson's Proposed Decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 1, 2007
|
Filed By:
Union of Concerned Scientists
|
|
Description:
Opening; on Proposed Decision of ALJ Mattson conditionally accepting
Procurement Plans for 2007 RPS Solicitations.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
January 12, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Opinion conditionally accepting procurement plans for 2007 RPS solicitations.
Opening comments, which shall not exceed 15 pages, are due no later than
February 1, 2007. Reply comments are due 5 days after the filing of Opening
comments.
|
|
|
Type:
RULING
|
Filing Date:
January 10, 2007
|
Filed By:
COM/PEEVEY/CPUC
|
|
Description:
Approving 2007 Transmission Ranking Cost Reports.
|
|
|
Type:
RULING
|
Filing Date:
January 3, 2007
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Gramts September 26, 2006 motion of PG&E to submit one day out of time its 2007
renewable energy procurement plan.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 26, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
REPLY; TO COMMENTS ON RPS COMPLIANCE REPORT.
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
December 22, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
(PUBLIC VERSION) 2006 Renewables Portfolio Standard Short List Report.
|
|
|
Type:
MOTION
|
Filing Date:
December 22, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
FOR LEAVE TO FILE REPLY TO TURN'S RESPONSE TO
APPLICATION FOR REHEARING OF
D06-10-050.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
December 22, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Motion for Confidential Protection of Appendix A and Appendix B of (its) 2006
Renewables Portfolio Standard Shortlist Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 20, 2006
|
Filed By:
PACIFICORP
|
|
Description:
REPLY; ON RENEWABLES PORTFOLIO STANDARD DRAFT REPORTING AND COMPLIANCE
SPREADSHEET.
|
|
|
Type:
REQUEST
|
Filing Date:
December 20, 2006
|
Filed By:
Green Power Institute
|
|
Description:
FOR AN AWARD OF COMPENSATION FOR SUBSTANTIAL CONTRIBUTIONS TO D06-10-050.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 20, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
ON THE DRAFT RPS COMPLIANCE REPORT. [Pursuant to Ordering Paragraph 4 of
D06-10-050.]
|
|
|
Type:
COMMENTS
|
Filing Date:
December 20, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
REPLY; ON THE DRAFT RPS REPORTING AND COMPLIANCE SPREADSHEET.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2006
|
Filed By:
PACIFICORP
|
|
Description:
ON RENEWABLES PORTFOLIO STANDARD DRAFT REPORTING AND COMPLIANCE SPREADSHEET
|
|
|
Type:
STATEMENT
|
Filing Date:
December 13, 2006
|
Filed By:
Sierra Pacific Power Company
|
|
Description:
on Consensus Proposal for a Standardized RPS Compliance Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2006
|
Filed By:
Green Power Institute
|
|
Description:
on the Draft RPS Reporting and Compliance Spreadsheet.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2006
|
Filed By:
Mountain Utililties
|
|
Description:
on the RPS Reporting and Compliance Spreadsheet Workshop sponsored by the
Energy Division on Nov 29, 2006.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2006
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
on the Draft IO RPS Compliance Spreadsheet.
|
|
|
Type:
RESPONSE
|
Filing Date:
December 7, 2006
|
Filed By:
Central California Power
|
|
Description:
TO SDG&E'S RESPONSE FOR FURTHER INFORMATION REGARDING 2007 PROCUREMENT PLANS.
|
|
|
Type:
RESPONSE
|
Filing Date:
December 7, 2006
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
IN SUPPORT OF EDISON'S APPLICATION FOR REHEARING OF D06-10-050.
|
|
|
Type:
RESPONSE
|
Filing Date:
December 7, 2006
|
Filed By:
The Utility Reform Network
|
|
Description:
TO THE APPLICATION FOR REHEARING OF D06-10-050 BY
EDISON.
|
|
|
Type:
RESPONSE
|
Filing Date:
December 6, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
TO REQUEST FOR FURTHER INFORMATION REGARDING 2007 RPS PROCUREMENT PLAN.
|
|
|
Type:
RULING
|
Filing Date:
December 6, 2006
|
Filed By:
ALJ/Mattson/CPUC
|
|
Description:
GRANTING MOTION FOR RECONSIDERATION OF VERIFICATION REQUIREMENT AND ALSO
ADDRESSING RECORD. In the case of a corporation, verification may be in
the
form of an affidavit under penalty of perjury and adopted by an employee or
agent at the manger level or above, as set forth.
|
|
|
Type:
RESPONSE
|
Filing Date:
December 5, 2006
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
IN SUPPORT OF THE JOINT MOTION FOR RECONSIDERATION OF REQUIREMENT FOR
OFFICER-LEVEL VERIFICATION OF FILINGS.
|
|
|
Type:
RESPONSE
|
Filing Date:
November 27, 2006
|
Filed By:
CENTRAL CALIFORNIA POWER
|
|
Description:
to PG&E's response to ALJ's ruling requiring further information for 2007
procurement plans.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
November 22, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
Application for Rehearing of Decision 06-10-050.
|
|
|
Type:
REPORT
|
Filing Date:
November 22, 2006
|
Filed By:
Pacific Gas and Electric company
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
Consensus Proposal for a Standardized RPS Compliance Report.
|
|
|
Type:
MOTION
|
Filing Date:
November 21, 2006
|
Filed By:
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
JOINT; FOR RECONSIDERATION OF REQUIREMENT FOR OFFICER-LEVEL VERIFICATION OF ALL
FILINGS IN THIS DOCKET.
|
|
|
Type:
RESPONSE
|
Filing Date:
November 21, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
to Request for Further Information regarding 2007 RPS Procurement Plan.
|
|
|
Type:
RESPONSE
|
Filing Date:
November 21, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to ALJ Ruling Requesting Further Information for 2007 Procurement Plans.
|
|
|
Type:
NOTICE
|
Filing Date:
November 15, 2006
|
Filed By:
ALJ/Minkin/CPUC
|
|
Description:
O F C O - A S S I G N M E N T.
|
|
|
Type:
RULING
|
Filing Date:
November 9, 2006
|
Filed By:
ALJ/Mattson/CPUC
|
|
Description:
REQUESTING FURTHER INFORMATION FOR 2007 PROCUREMENT PLANS. PG&E, Edison, and
SDG&E shall each file a document, as set forth, within 12 days of the date of
this ruling (11/21/06). Parties may file and serve comments within nine days of
the date each IOU files the document, and reply comments within five days of
the date comments are filed.
|
|
|
Type:
RULING
|
Filing Date:
November 9, 2006
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
GRANTING MOTION OF SIERRA PACIFIC POWER COMPANY TO MODIFY SERVICE LIST.
|
|
|
Type:
REPORT
|
Filing Date:
November 8, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
TRANSMISSION RANKING COST REPORT FOR RENEWABLE PORTFOLIO STANDARD PROCUREMENT.
|
|
|
Type:
REPORT
|
Filing Date:
November 8, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
TRANSMISSION RANKING COST REPORT FOR RENEWABLE PORTFOLIO STANDARD PROCUREMENT
[pursuant to Rulings of August 21 and September 14, 2006].
|
|
|
Type:
REPORT
|
Filing Date:
November 8, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
TRANSMISSION RANKING COST REPORT FOR RENEWABLE PORTFOLIO STANDARD PROCUREMENT.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 3, 2006
|
Filed By:
CALIFORNIA FARM BUREAU FEDERATION
|
|
Description:
Reply; on the Policy Issues raised in Attachment A of the Scoping Memo and
Ruling of the Assigned Commissioner.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 3, 2006
|
Filed By:
Sustainable Conservation
|
|
Description:
Reply; on Policy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 3, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; on Scoping Memo Policy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 3, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; on Comments by Division of Ratepayer Advocates on the Investor Owned
Utilities Reports for Evaluation Methods and Selection Processes.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 3, 2006
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
Reply; on the Issues Raised in Attachment A to the Scoping Memo.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 3, 2006
|
Filed By:
Union of Concerned Scientists
|
|
Description:
Reply; in response to the Scoping Memo and Ruling of Assigned Commissioner.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 3, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; concerning seven Policy Issues
|
|
|
Type:
COMMENTS
|
Filing Date:
November 3, 2006
|
Filed By:
The Utility Reform Network
|
|
Description:
on the Procurement Plan of SDG&E.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 3, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; on the Policy Issues raised in Attachment A of the Scoping Memo and
Ruling of Assigned Commissioner.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 3, 2006
|
Filed By:
The Utility Reform Network
|
|
Description:
Reply; on the Scoping Memo and Ruling of Assigned Commissioner.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 3, 2006
|
Filed By:
CEERT
|
|
Description:
Reply; on Policy Issues identified in Attachment A of the Scoping Memo and
Ruling of Assigned Commissioner issued on August 21, 2006.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 3, 2006
|
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
|
|
Description:
Reply; in response to the Scoping Memo and Ruling of Assigned Commissioner
filed August 21, 2006.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 3, 2006
|
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
CALIFORNIA FORESTRY ASSOCIATION
GREEN POWER INSTITUTE
|
|
Description:
joint; reply; on the biomass issues in Attachment A of the Scoping Memo and
Ruling.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 3, 2006
|
Filed By:
GREEN POWER INSTITUTE
|
|
Description:
reply; on the issues in Attachment A of the scoping memo and ruling.
|
|
|
Type:
MOTION
|
Filing Date:
November 2, 2006
|
Filed By:
Sierra Pacific Power Company
|
|
Description:
to Modify Service List.
|
|
|
Type:
RULING
|
Filing Date:
October 30, 2006
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
finds TURN, UCS, GPI and Aglet eligible to claim intervenor compensation.
Sustainable Conservation is not found eligible at this time, but may include
further information in a subsequent pleading or later claim for compensation.
|
|
|
Type:
RULING
|
Filing Date:
October 25, 2006
|
Filed By:
ALJ/Mattson/CPUC
|
|
Description:
GRANTING MOTIONS TO INTERVENE AND REFILE COMMENTS. Grants motions to intervene
of Sustainabel Conservation, CFA, RCRC and Farm Bureau. Grants motions of
Sustainable Conservation and Sterling Energy to refile their October 13th
comments.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 23, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; regarding Comments filed on Renewables Portfolio Standard Program
Procurement Plans.
|
|
|
Type:
MOTION
|
Filing Date:
October 23, 2006
|
Filed By:
Regional Council of Rural Counties
|
|
Description:
TO INTERVENE; COMMENTS ON SCOPING MEMO ATTACHED.
|
|
|
Type:
MOTION
|
Filing Date:
October 23, 2006
|
Filed By:
CALIFORNIA FARM BUREAU FEDERATION
|
|
Description:
to Become a Party.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 23, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; to 2007 Renewables Portfolio Standard Procurement Plan.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 23, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; on 2007 RPS Procurement Plan.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 23, 2006
|
Filed By:
DRA/Obiora/CPUC
|
|
Description:
Reply; on the Scoping Memo and Assigned Commissioner's Ruling.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 20, 2006
|
Filed By:
Union of Concerned Scientists
|
|
Description:
SUMMARY: On October 18, 2006, John Galloway of the Union of Concerned
Scientists (UCS) met with Stephen St. Marie, advisor to Cmmr. Bohn, in San
Francisco. Galloway expressed UCS's support for the proposed decision and its
principles to streamline reporting and compliance in the Renewables Portfolio
Standard Program.
Contact person: John Galloway at (510) 843-1872; e-mail:
jgalloway@ucsusa.org
|
|
|
Type:
EXPARTE
|
Filing Date:
October 20, 2006
|
Filed By:
Mountain Utilites
|
|
Description:
SUMMARY: On October 18, 2006, John Jensen, President of the Mountain Utilities
(MU), met with Cmmr. Bohn in San Francisco. Also present were Stephen St Marie,
advisor to Cmmr. Bohn, and John Dutcher, Vice President Regulatory Affairs, for
MU. Written materials (attached to the notice) were used. MU discussed the ALJ
Mattson's proposed decision (PD). MU stated that the PD, if amended to address
SB 107, should provide a limited exemption for MU as an electric micro-utility
until the Commission addresses flexible rules related to insufficient
transmission. Contact person: John Dutcher at (707) 426-4003; email address:
Ralf1241a@cs.com
|
|
|
Type:
MOTION
|
Filing Date:
October 18, 2006
|
Filed By:
Stirling Energy Systems, Inc.
|
|
Description:
to Refile Comments. ATTACHED - Revised Comments on Scoping Memo and Ruling of
Assigned Commissioner.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 16, 2006
|
Filed By:
DRA/OBIORA/PUC
|
|
Description:
on the renewables portfolio standard program procurement plans of Edison, PG&E,
and SDG&E.
|
|
|
Type:
MOTION
|
Filing Date:
October 16, 2006
|
Filed By:
Sustainable Conservation
|
|
Description:
to Refile Comments: ATTACHED - Revised Comment on Policy Issues..
|
|
|
Type:
COMMENTS
|
Filing Date:
October 16, 2006
|
Filed By:
The Utility Reform Network
|
|
Description:
on the Procurement Plan of SDG&E.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 16, 2006
|
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
|
|
Description:
on 2007 procurement plans and solicitation materials.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 13, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
on Scoping Memo Policy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 13, 2006
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
opening; on issues identified in Appendix A of the August 21st Scoping Memo and
Ruling.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 13, 2006
|
Filed By:
DRA/Obiora/CPUC
|
|
Description:
on IOU Reports for Evaluation Methods and Selection Processes in the RPS
Program.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 13, 2006
|
Filed By:
California Forestry Association
|
|
Description:
in response to August 21, 2006, scoping memo and ruling of assigned
Commissioner [issue 5.1].
|
|
|
Type:
COMMENTS
|
Filing Date:
October 13, 2006
|
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
|
|
Description:
on Scoping Memo and Ruling of Assigned Commissioner.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 13, 2006
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
on Scoping Memo and Ruling of assigned Commissioner.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 13, 2006
|
Filed By:
Sustainable Conservation
|
|
Description:
ON POLICY ISSUES [pursuant to August 21st and September 14th, 2006, rulings].
|
|
|
Type:
COMMENTS
|
Filing Date:
October 13, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
to Seven Policy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 13, 2006
|
Filed By:
Stirling Energy Systems, Inc.
|
|
Description:
on Scoping Memo and Ruling of Assigned Commissioner.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 13, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Opening; on the Policy Issues raised in Attachment A of the Scoping Memo and
Ruling of Assigned Commissioner.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 13, 2006
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
on the Issues Raised in Attachment A to the Scoping Memo.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 13, 2006
|
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
|
|
Description:
in response to the Scoping Memo and Ruling of Assigned Commissioner filed
August 21, 2006.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 13, 2006
|
Filed By:
GREEN POWER INSTITUTE
|
|
Description:
on the issues in Attachment A of the Scoping Memo and Ruling of Assigned
Commissioner.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 13, 2006
|
Filed By:
CITY OF CORONA DEPT. WATER & POWER
|
|
Description:
on policy issues related to implementation and administration.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 13, 2006
|
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
CALIFORNIA FORESTRY ASSOCIATIOIN
GREEN POWER INSTITUTE
|
|
Description:
Joint; on the Biomass Issues in Attachment A of the Scoping Memo and Ruling of
Assigned Commissioner.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 13, 2006
|
Filed By:
CalpinePowerAmerica-CA, LLC
|
|
Description:
on Policy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 13, 2006
|
Filed By:
Union of Concerned Scientists
|
|
Description:
in Response to the Scoping Memo and Ruling of Assigned Commissioner.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 12, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
LATE FILED. On October 5, 2006, Bruce Foster of Southern California Edison
Company (Edison) met with Cmmr. Bohn in San Francisco. Also present were Robert
Lane and Stephen St. Marie, advisors to Cmmr. Bohn, and Michael Hoover of
Edison. Written material (attached to the notice) was used. Edison
representatives described the necessary changes to the proposed decision of ALJ
Mattson for it to be consistent with the RPS legislation and for it to be
reasonable in terms of the calculation of any penalties for RPS non compliance.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 12, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON
OCTOBER 4, 2006, AND APPEARED IN THE CALENDAR OF OCTOBER 11, 2006. On September
29, 2006, Brian Cherry, Vice President, Regulatory Relations, Pacific Gas and
Electric Company (PG&E), met with Lynn Carew, advisor to Cmmr. Chong, and
Belinda Gatti, advisor to Cmmr. Brown, in two separate meetings in San
Francisco. At the meeting with Lynn Carew also present were Andrew Campbell,
advisor to Cmmr. Chong, and Sidney Dietz, Manager, PG&E. Meredith Allen, Chief,
Regulatory Relations, PG&E, participated in each of the meetings. Written
material, containing confidential information, was used: a redacted version of
the written material is attached to the notice; and the confidential version is
submitted under seal with the motion for leave to file under seal. Cherry
stated that the proposed decision's (PD) methodology is inconsistent with the
RPS Legislation. Allen stated that the PD's methodology does not focus on new
generation, a key policy objective of the RPS.
|
|
|
Type:
RULING
|
Filing Date:
October 11, 2006
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
REGARDING REQUIREMENT THAT ONLY LARGE IOUs MUST FILE DRAFT 2007 RPS PROCUREMENT
PLANS.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 10, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; ON THE PROPOSED DECISION OF ALJ MATTSON ON REPORTING AND COMPLIANCE
METHODOLOGY FOR THE RENEWABLES PORTFOLIO STANDARD PROGRAM.
|
|
|
Type:
NOTICE
|
Filing Date:
October 10, 2006
|
Filed By:
SUSTAINABLE CONSERVATION
|
|
Description:
of intent to claim intervenor compensation.
|
|
|
Type:
MOTION
|
Filing Date:
October 10, 2006
|
Filed By:
California Forestry Association
|
|
Description:
for leave to intervene.
|
|
|
Type:
MOTION
|
Filing Date:
October 10, 2006
|
Filed By:
Sustainable Conservation
|
|
Description:
TO INTERVENE.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
October 10, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
for leave to file confidential materials under seal; confidential materials
attached and filed under seal, namely, three slides from PG&E's slide
presentation: "RPS Program: Penalties or Progress? - October 4, 2006".
|
|
|
Type:
EXPARTE
|
Filing Date:
October 10, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On October 4, 2006, Brian Cherry, Vice President, Regulatory Relations, Pacific
Gas and Electric Company (PG&E), met with Nancy Ryan, advisor to Pres. Peevey,
in San Francisco. Also present were Sean Gallagher, Director of the Energy
Division, and Fong Wan, Vice President, Electric Procurement, and Meredith
Allen, Chief, Regulatory Relations, for PG&E. Written material, containing
confidential information, was used: a redacted version of the written material
is attached to the notice; and the confidential version is submitted under seal
with the motion for leave to file under seal. Cherry stated that the proposed
decision's (PD) methodology is inconsistent with the RPS Legislation. Wan
stated that the PD's methodology does not focus on new generation, a key policy
objective of the RPS.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 10, 2006
|
Filed By:
Mountain Utilities
|
|
Description:
REPLY; ON THE PROPOSED DECISION OF ALJ MATTSON ON THE REPORTING AND COMPLIANCE
METHODOLOGY FOR THE RENEWABLES PORTFOLIO STANDARD PROGRAM.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 10, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
REPLY; ON PROPOSED DECISION.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 10, 2006
|
Filed By:
GREEN POWER INSTITUTE
|
|
Description:
reply; on the proposed decision of ALJ Mattson.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 10, 2006
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
reply; on the proposed decision of ALJ Mattson on the reporting and compliance
methodology for the renewables portfolio standard program.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 10, 2006
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
Reply; on Proposed Decision of ALJ Mattson on Reporting and Compliance
Methodology for Renewables Portfolio Standard Progra.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 10, 2006
|
Filed By:
Union of Concerned Scientists
|
|
Description:
REPLY; ON THE PROPOSED DECISION OF ALJ MATTSON ON THE REPORTING AND COMPLIANCE
METHODOLOGY FOR THE RENEWABLES PORTFOLIO STANDARD PROGRAM.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 6, 2006
|
Filed By:
Pilot Power Group, Inc.
|
|
Description:
ON POLICY ISSUES IDENTIFIED IN SCOPING MEMO [of 8/21/6].
|
|
|
Type:
RULING
|
Filing Date:
October 5, 2006
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
granting Motion of California Biomass Energy Alliance to Intervene.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 4, 2006
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on the proposed decision of ALJ Mattson on the reporting and compliance
methodology for the renewables portfolio standard program.
|
|
|
Type:
REPORT
|
Filing Date:
October 4, 2006
|
Filed By:
BEAR VALLEY ELECTRIC SERVICE, A DIVISION OF GOLDEN STATE WATER COMPANY
|
|
Description:
preliminary; on evaluation criteria and selection process [purusant to the
August 21, 2006, ruling].
|
|
|
Type:
LAW & MOTION
|
Filing Date:
October 4, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
for leave to file confidential materials under seal; confidential materials
attached and filed under seal, namely, two slides from PG&E's slide
presentation: "RPS Program: Penalties or Progress".
|
|
|
Type:
EXPARTE
|
Filing Date:
October 4, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
AUGMENTATION REQUIRED. On September 29, 2006, Brian Cherry, Vice President,
Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Lynn
Carew, advisor to Cmmr. Chong, and Belinda Gatti, advisor to Cmmr. Brown, in
two separate meetings. At the meeting with Lynn Carew also present were Andrew
Campbell, advisor to Cmmr. Chong, and Sidney Dietz, Manager, PG&E. Meredith
Allen, Chief, Regulatory Relations, PG&E, participated in each of the meetings.
Written material, containing confidential information, was used: a redacted
version of the written material is attached to the notice; and the confidential
version is submitted under seal with the motion for leave to file under seal.
Cherry stated that the proposed decision's (PD) methodology is inconsistent
with the RPS Legislation. Allen stated that the PD's methodology does not focus
on new generation, a key policy objective of the RPS.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 4, 2006
|
Filed By:
GREEN POWER INSTITUTE
|
|
Description:
on the Proposed Decision of ALJ Mattson.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 4, 2006
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
on the Proposed Decision of ALJ Mattson on Reporting and Compliance Methodology
for RPS Program.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 4, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
on Proposed Decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 4, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
on Proposed Decision concerning Reporting and Compliance Methodology.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 4, 2006
|
Filed By:
DRA/Obiora/CPUC
|
|
Description:
on the Proposed Decision on Reporting and Compliance Methodology for RPS
Program.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 4, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Opening; on the Proposed Decision of ALJ Mattson on Reporting and Compliance
Methodology for the RPS Program.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 4, 2006
|
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
|
|
Description:
on the proposed decision of ALJ Mattson.
|
|
|
Type:
REPORT
|
Filing Date:
October 2, 2006
|
Filed By:
Mountain Utilities
|
|
Description:
ON EVALUATION CRITERIA AND SELECTION PROCESS [Pursuant to the August 21, 2006,
and September 14, 2006, rulings].
|
|
|
Type:
EXPARTE
|
Filing Date:
September 29, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
AUGMENTATION REQUIRED. On September 26, 2006, Brian Cherry, Vice President,
Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Cmmr.
Bohn. Also present were Stephen St. Marie, advisor to Cmmr. Bohn, and Fong Wan,
Vice President, Electric Procurement, and Meredith Allen, Chief, Regulatory
Relations, for PG&E. Written material, containing confidential information, was
used: a redacted version of the written material is attached to the notice; and
the confidential version is submitted under seal with the motion for leave to
file under seal. Cherry stated that the proposed decision's (PD) methodology is
inconsistent with the RPS Legislation. Wan stated that the PD's methodology
does not focus on new generation, a key policy objective of the RPS.
|
|
|
Type:
REPORT
|
Filing Date:
September 29, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
on RPS Evaluation Criteria and Selection Process.
|
|
|
Type:
REPORT
|
Filing Date:
September 29, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
of its RPS Evaluation and Selection Criteria in compliance with Aug 21, 2006
Ruling of Assigned Commissioner.
|
|
|
Type:
REPORT
|
Filing Date:
September 29, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
on Project Evaluation and Selection Process.
|
|
|
Type:
REPORT
|
Filing Date:
September 29, 2006
|
Filed By:
Sierra Pacific Power Company
|
|
Description:
Filing on Evaluation Criteria and Selection Process. (Verification filed
separately)
|
|
|
Type:
REPORT
|
Filing Date:
September 29, 2006
|
Filed By:
City of Corona Department of Water and Power
|
|
Description:
on Evaluation Criteria and Selection Process.
|
|
|
Type:
REPORT
|
Filing Date:
September 29, 2006
|
Filed By:
Occidental Power Services, Inc.
|
|
Description:
on Evaluation and Criteria Selection Process.
|
|
|
Type:
REPORT
|
Filing Date:
September 29, 2006
|
Filed By:
CalpinePowerAmerica-CA, LLC
|
|
Description:
PRELIMINARY; REGARDING EVALUATION CRITERIA AND SELECTION PROCESS [Pursuant to
the August 21, 2006, and September 14, 2006, Rulings].
|
|
|
Type:
REPORT
|
Filing Date:
September 29, 2006
|
Filed By:
Pilot Power Group, Inc.
|
|
Description:
ON EVALUATION CRITERIA AND SELECTION PROCESS.
|
|
|
Type:
REPORT
|
Filing Date:
September 29, 2006
|
Filed By:
APS ENERGY SERVICES
COMMERCE ENERGY
CONSTELLATION NEWENERGY
SEMPRA ENERGY SOLUTIONS
STRATEGIC ENERGY
|
|
Description:
Joint Preliminary; on Bid Evaluation Criteria and Selection Process.
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
September 29, 2006
|
Filed By:
Sierra Pacific Power Company
|
|
Description:
Verification accompanying Filing on Evaluation Crieria and Selection Process.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
September 29, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
motion for leave to file confidential materials unders seal; confidential
materials attached and filed under seal, namely, two slides from slide
presentation: "RPS Program: Penalties or Progress".
|
|
|
Type:
MOTION
|
Filing Date:
September 28, 2006
|
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
|
|
Description:
for Leave to Intervene.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 26, 2006
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
REPLY; ON WHETHER ELECTRIC SERVICE PROVIDERS SHOULD BE REQUIRED TO FILE RPS
PROCUREMENT PLANS.
|
|
|
Type:
MOTION
|
Filing Date:
September 26, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to Submit One Day Out of Time 2007 Renewable Energy Procurement Plan (Attached).
|
|
|
Type:
LAW & MOTION
|
Filing Date:
September 26, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
for confidentiality protection of Electric Procurement Data (2007 Renewables
Portfolio Standard Plan).
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
September 25, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
(PUBLIC VERSION) 2007 Renewables Portfolio Standard Procurement Plan.
|
|
|
Type:
NOTICE
|
Filing Date:
September 25, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
of Availability of 2007 RPS Bid Solicitation Materials
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
September 25, 2006
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
Verification to Comments on whether Electric Service Providers should be
required to file RPS Procurement Plans (filed 09/21/06).
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
September 25, 2006
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
2007 RENEWABLE PROCUREMENT PLAN and Draft Request for Offers for 2007.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
September 25, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
For Permission to File Data Under Seal.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 21, 2006
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
regarding the filing of draft 2007 RPS procurement plans by community choice
aggregators.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 21, 2006
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
ON WHETHER ELECTRIC SERVICE PROVIDERS SHOULD BE
REQUIRED TO FILE RPS
PROCUREMENT PLANS [pursuant to the September 14th ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
September 21, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
REGARDING FILING OF DRAFT 2007 RPS PROCUREMENT PLANS [pursuant to September
14th ruling].
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
September 14, 2006
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
Opening Comments, which shall not exceed 15 pages, are due no later than
October 4, 2006; Reply Comments are due 5 days thereafter.
|
|
|
Type:
RULING
|
Filing Date:
September 14, 2006
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
on Filing of Draft 2007 RPS Procurement Plans and Revised Schedule.(The Revised
Schedule is set forth in Attachment A).
|
|
|
Type:
SCOPING RULING
|
Filing Date:
August 21, 2006
|
Filed By:
CMMR/PEEVEY/CPUC
|
|
Description:
Scoping Memo and Ruling of Assigned Commissioner. ALJ Burton W. Mattson is the
Principal Hearing Officer. The Categorization is Ratesetting. Hearing is
necessary. Issues and schedules are as set forth. All filed documents shall be
verified.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 15, 2006
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
On August 10, 2006, Stacy Aguayo of APS Energy Services, representing the
Alliance for Retail Energy Markets (AReM), met with Andrew Campbell, advisor to
Cmmr. Chong, Belinda Gatti, advisor to Cmmr. Brown, Robert Lane and Lindsay
Brown, advisors to Cmmr. Bohn, Nancy Ryan, advisor to Pres. Peevey, Julie
Fitch, Director of Strategic Planning Division, Andrew Schwartz of the Division
of Strategic Planning, and Bill Chen of Constellation NewEnergy, and Gregory
Klatt of Douglass & Liddell, representing AReM. AReM representatives voiced
concern about the timing of the Commission's implementation of the Renewables
Portfolio Standard (RPS) for electric service providers (ESPs). AReM
representatives expressed the need for interim guidance from the Commission
regarding the manner in which ESPs are to participate in the RPS program,
particularly for 2006, in the event that formal decisions resolving pending
matters relating to ESP compliance are not adopted very soon. AReM
representatives reiterated the need for the Commission to address issues
relating to the use of unbundled Renewable Energy Credits.
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
August 1, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
(PUBLIC VERSION) Compliance Filing regarding Achievement of 2006 Renewable
Portfolio Standard Annual Procurement Target and Project Development Status.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
August 1, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
motion for confidentiality protection of electric procurement data.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
August 1, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
Motion for Protective Order and for Permission to File Data Under Seal.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
August 1, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
for Leave to File Confidential Material Under Seal; Confidential Materials
Attached and Filed Under Seal, namely, Unredacted Version of its Compliance
Filing regarding Achievement of 2006 Renewable Portfolio Standard Annual
Procurement Target and Project Development Status, filed concurrently herewith.
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
August 1, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
(PUBLIC VERSION) August 1, 2006 Renewables Portfolio Standard Compliance Filing.
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
August 1, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
REDACTED PUBLIC VERSION. August 1, 2006 compliance filing reporting progress
toward achievement of annual procurmeent target for renewable generation
pursuant to renewable portfolio standard.
|
|
|
Type:
NOTICE
|
Filing Date:
July 24, 2006
|
Filed By:
UNION OF CONCERNED SCIENTISTS
|
|
Description:
of intent to claim intervenor compensation.
|
|
|
Type:
NOTICE
|
Filing Date:
July 24, 2006
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
of intent to seek compensation.
|
|
|
Type:
NOTICE
|
Filing Date:
July 21, 2006
|
Filed By:
THE GREEN POWER INSTITUTE
|
|
Description:
of Intent to Claim Compensation.
|
|
|
Type:
NOTICE
|
Filing Date:
July 21, 2006
|
Filed By:
AGLET CONSUMER ALLIANCE
|
|
Description:
of Intent to Claim Intervenor Compensation.
|
|
|
Type:
MOTION
|
Filing Date:
July 20, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Amended Motion for Authority to File and Maintain Confidential Commercially
Sensitive, Proprietary Information Under Seal and for Protective Order;
Confidential Materials Attached and Filed Under Seal, namely, the Unredacted
Version of its 2006 Short-Term Renewable Procurement Plan, filed 07/10/06.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
July 14, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Motion for Confidentiality Protection of Electric Procurement Data.
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
July 13, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Amended and Further Amended 2006 Renewables Portfolio Standard Solicitation
Documents.
|
|
|
Type:
RULING
|
Filing Date:
July 12, 2006
|
Filed By:
ALJ/MATTSON/CPUC
|
|
Description:
REGARDING FILING OF INTERVENOR COMPENSATION REQUESTS. The requests, if filed,
should be filed by July 25, 2006.
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
July 10, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
(REDACTED VERSION) Further Amended 2006 Short-Term Renewable Procurement Plan.
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
July 10, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Amended 2006 Renewables Portfolio Standard Procurement Plan (ATTACHED -
REDLINED VERSIONS)
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
June 26, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Supplement to Further Submission of 2006 Renewables Portfolio Standard
Solicitation Documents.
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
June 23, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Further Submission of 2006 Renewables Portfolio Standard Solicitation Documents.
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
June 20, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
(per 05/25/06 OIR).
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
June 20, 2006
|
Filed By:
UNION OF CONCERNED SCIENTISTS
|
|
Description:
[for the June 22nd prehearing conference].
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
June 20, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
[for the June 22nd prehearing conference].
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
June 20, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
(per 05/25/06 OIR).
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
June 9, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
in compliance with D06-05-039: 2006 Renewables Portfolio Standard Solicitation
Documents.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 5, 2006
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
CITY AND COUNTY OF SAN FRANCISCO
WESTERN POWER TRADING FORUM
|
|
Description:
on (this) OIR.
|
|
|
Type:
COMMISSION RULEMAKING
|
Filing Date:
May 25, 2006
|
Filed By:
CPUC - ELECTRICAL ENTITIES
|
|
Description:
Order Instituting Rulemaking to continue implementation and administration of
California Renewables Portfolio Standard program. [MAILED 5/26/6] Preliminarily
determines that this is a ratesetting proceeding. Sets the following schedule:
response to OIR - June 5, 2006; Prehearing Conference Statements filed - June
20, 2006; prehearing conference - 6/22/6
|