Safety & Reliability Branch
Utilities Safety Section
2003 Electric Safety Report

Promoting system reliability and safety for the general public.


July 2004
505 Van Ness Avenue 515 "L" Street, Suite 1119 320 West 4th Street, Suite 500
San Francisco, CA 94102 Sacramento, CA 95814 Los Angeles, CA 90013

TABLE OF CONTENTS
Page No.
Memorandum 1
I. Introduction 2
B. CPUC's Responsibilities 2
1. General Order 95 2
2. General Order 128 3
3. General Order 165 3
4. Incident Investigation & Customer Complaints 4
II. Utility Companies Under the Jurisdiction of the CPUC
A. Power Companies 5
1. SCE 5
2. PG&E 5
3. SDG&E 5
4. Other Investor Owned Companies 6
5. Electric Cooperatives 6
6. Municipalities 6
B. Communication Companies 7
1. SBC 7
2. Verizon 7
3. Others 7
C. Cable Television 8
1. Adelphia 8
2. Charter Communications 8
3. Comcast 8
4. Cox Cable 8
III. Annual Electric Report 9
A. General Order 95 Inspections 9
1. Utility Data 11
2. USS Inspection Statistics 14
B. General Order 128 15
1. Utility Data 16
2. USS Inspection Statistics 18
C. General Order 165 19
Page No.
D. Electric Incidents & Customer Complaints 20
1. Overhead Equipment 22
2. Underground Equipment 26
IV. Additional Information 29
A. Publications 29
1. How to Order 29
2. G.O. 95, 128, and 165 29

Page No.
Table 1. Summary of each Utility's Overhead Equipment 11
Figure 1. Miles of Overhead Transmission & Distribution Lines in California by Utility 11
Figure 2. Percentage of Overhead Transmission Lines in California by Utility 12
Figure 3. Percentage of Overhead Distribution Lines in California by Utility 12
Figure 4. Percentage of poles in California by Utility 13
Figure 5. Number of California Customers served by each Utility 13
Table 2. Summary of the G.O. 95 Inspections Conducted 14
Table 3. Tabulation of G.O. 95 Inspection Data 14
Table 4. Summary of G.O. 95 Violations Incurred by the Utility Companies 14
Table 5. Summary of the Utility Company's Underground Equipment 16
Figure 6. Miles of Underground Transmission & Distribution Lines in California
by Utility 16
Figure 7. Percentage of Underground Transmission Lines in California by Utility 17
Figure 8. Percentage of Underground Distribution Lines in California by Utility 17
Figure 9. Percentage of Surface Mounted and Underground in California by Utility 17
Table 6. Summary of the G.O. 128 Inspections Conducted 18
Table 7. Tabulation of G.O. 128 Inspection Data 18
Table 8. Summary of G.O. 128 Violations Incurred by the Utility Companies 18
Page No.
Table 9. Summary of Incident Investigations & Customer Complaints for USS 21
Table 10. Tabulation of Incident Investigation Data 21
Table 11. Summary of Leading Causes of Overhead Incidents reported to the CPUC
Relating G.O. 95 22
Figure 10. Graph of the Leading Causes of Overhead Incidents reported to the CPUC
Relating G.O. 95 23
Figure 11. Percentage of Overhead Incidents Resulting in Fatalities 24
Figure 12. Percentage of Overhead Incidents Resulting in Injuries 24
Figure 13. Percentage of Overhead Incidents Resulting in Damage 25
Figure 14. Percentage of Overhead Incidents Resulting in Media Attention 25
Table 12. Summary of Leading Causes of Underground Incidents Relating to
G.O. 128 26
Figure 15. Graph of Leading Causes of Underground Incidents Relating to
G.O. 128 26
Figure 16. Percentage of Underground Incidents Resulting in Injuries 27
Figure 17. Percentage of Underground Incidents Resulting in Damage 27
Figure 18. Percentage of Underground Incidents Resulting in Media Attention 28

This annual report of Electric Safety presents an account of various activities carried out under the California Public Utilities Commission's (CPUC) electric safety program for the 2003 calendar year.
The CPUC has been entrusted with the safety jurisdiction over all electric and communication overhead and underground facilities in the state of California by Legislative mandate. It is responsible for enforcing safety regulations, inspecting and investigating all work affected by the statutes, and making necessary additions and changes to regulations for promoting the safety of utility employees and the general public. In addition, these standards promote improved reliability of electric service to the residents of California. The electric safety program consists of the administration of General Orders (G.O.) 95, 128, 165, and Public Utilities Code, Sections 315, 768, 8026 through 8038, and 8051 through 8057.
The State of California has the nation's largest electric and communication system. Therefore, it is important to maintain an adequate level of inspections and oversight to ensure that these systems are designed, constructed, operated, and maintained properly in accordance with the regulations for systems reliability and safety of the utility employees and the general public. The CPUC's Utilities Safety Section (USS) implements the safety program by carrying out accident investigations, follow up investigations, compliance inspections, review of utilities' reports and records, construction inspections, and special studies. This is especially important with an aging system.
Acknowledgment
Jadwindar Singh, Utilities Engineer, under the general direction of Zee Wong, Chief of the Consumer Protection & Safety Division's Safety & Reliability Branch, prepared this report. We acknowledge the assistance provided by USS staff, the utilities, and other agencies in furnishing the data necessary for this report. 
A. PURPOSE OF REPORT
The purpose of this report is to document administration of General Order (G.O.) 95,
"Rules of Overhead Electric Line Construction"; G.O. 128, "Rules for Construction of Underground Electric Supply and Communication Systems"; and G.O. 165, "Inspection Cycles for Electric Distribution Facilities" for the calendar 2003 year as reported by utility companies and as accomplished by the USS staff. It also provides general information on utility companies and statistical data on incidents and investigations related to electric facilities and other safety activities during 2003.
B. CPUC's RESPONSIBILITIES
The CPUC is granted the authority to inspect, make further additions or changes as deemed necessary for the purpose of system reliability, safety to employees and the general public under the Public Utilities (PU) Code Section 8037. Inspections and investigations are performed by USS staff to enforce G.O. 95, 128, and 165 regulations. An overview of each general order is listed below.
1. General Order 95
G.O. 95, "Rules for Overhead Electric Line Construction", became effective July 1, 1942. Changes are noted in the order that reflect development of new materials and standards for line construction and changing operational practices. The latest edition is dated 1998.
The purpose of these rules is to formulate, for the State of California, uniform requirements for overhead electrical line construction. The application of these requirements will provide adequate service and secure safety to persons engaged in the construction, maintenance, operation or use of overhead electrical lines and to the general public.
The Commission also has the jurisdiction to regulate safety of cable and telephone corporations (PU Code Section 215.5 and 234). Inspection of CATV and telephone facilities has been integrated with the field inspection program conducted on electric and telephone pole facilities.
2. General Order 128
G.O. 128, "Rules for Construction of Underground Electric Supply and Communications Systems", became effective December 12, 1967. The latest edition was issued in 1998.
The purpose of these rules is to formulate, for the State of California, uniform requirements for underground electrical supply and communication systems. The application of these requirements will provide adequate service and secure safety to all persons engaged in the construction, maintenance, operation or use of underground electric systems (including telephone and cable), and to the general public.
3. General Order 165
G.O. 165, "Inspection Cycles for Electric Distribution Facilities", became effective March 31, 1997 and it is the latest edition.
The purpose of this general order is to establish minimum inspection cycles requirements for electric distribution facilities addressing the utilities' inspections (including maximum allowable inspection cycle lengths), condition rating, scheduling and performance of corrective action, record keeping, and reporting in order to ensure safe and high quality electrical service.
G.O. 165 also implements the provisions of PU Code Section 364, which the California Legislature adopted when it enacted Assembly Bill 1890, Chapter 854, Statutes of 1996.
4. Incident Investigation & Customer Complaints
In addition to enforcing the above general orders, USS staff conducts investigations of reportable incidents from the utility companies. Section 315 of the Public Utilities Code provides that the Commission shall investigate the cause of accidents occurring upon the property of any utility.
Reportable incidents, as updated in CPUC Decision (D.)98-07-097, Appendix B, are those which: "(a) result in fatality or personal injury rising to the level of in-patient hospitalization and attributable or allegedly attributable to utility owned facilities; (b) are the subject of significant public attention or media coverage and are attributable or allegedly attributable to utility facilities; (c) involve or allegedly involve trees or other vegetation in the vicinity of power lines and result in fire and/or personal injury whether or not in-patient hospitalization is required." Incidents involving damage to property of the utility or others estimated to exceed $20,000 that are attributable or allegedly attributable to utility owned facilities are investigated as well.
The USS staff also handles all safety related customer complaints pertaining to G.O. 95, 128, and 165. This may range from answering a telephone inquiry or correspondence, to conducting a formal investigation.

The CPUC has been granted the authority by the Legislature to adopt and enforce G.O. 95, 128, and 165 requirements on investor owned utilities and municipalities. There are a number of investor owned power and communication utility companies providing service in California as well as utilities operated by municipalities and cooperatives.
A. POWER COMPANIES
1. Southern California Edison Company

Edison International's largest subsidiary is Southern California Edison Company (SCE). SCE provides service to more than 4.6 million customers in a 50,000 square mile area. SCE serves portions or all of California's central and southern counties.
2. Pacific Gas and Electric

Pacific Gas and Electric (PG&E) is one of the largest investor-owned companies in the U.S. They provide electric service to about 5.2 million customers in California. Their service area spans 70,000 square miles, including portions or all of 49 counties out of California's 58 counties.
3. San Diego Gas and Electric

San Diego Gas and Electric (SDG&E) became a Sempra Energy company in 1998. They provide electric service for 1.3 million customers in San Diego and portions of southern Orange County. Their service area covers a total of 4,100 square miles in over 25 cities.
4. Other Investor Owned Companies

These companies also provide electric service to the people of California:
· Bear Valley Electric · Sierra Pacific Power Company
· Mountain Utilities (formerly · PacifiCorp
Kirkwood Gas & Electric)
5. Electric Cooperatives

These electric co-operatives provide service to certain California customers:
· Surprise Valley Electrification Corp. · Anza Electric Cooperative
· Plumas-Sierra Rural Elect. Coop · Valley Electric Association, Inc.
6. Municipalities

These California municipalities provide electric service to their customers.
· Alameda · Anaheim
· Azusa · Banning
· Biggs · Burbank
· Colton · Glendale
· Gridley · Healdsburg
· Imperial Irrigation District · Lassen Municipal Utility District
· Lodi · Lompoc
· Los Angeles · Modesto Irrigation District
· Needles · Northern Cal. Power Agency
· Oroville-Wyandotte Irrigation District · Palo Alto
· Pasadena · Redding
· Riverside · Roseville
· Sacramento Municipal Utility District · San Francisco
· Santa Clara · Shasta Lake
· Southern Cal. Public Power Authority · Tri-Dam Project
· Trinity County · Truckee Donner Public
Utility District
· Turlock Irrigation District · Ukiah
· Vernon
B. COMMUNICATION COMPANIES
1. SBC (Southwestern Bell Telephone Co.)
SBC (previously Pacific Bell) has a total of 17.9 million access lines including residential, commercial, and others. The telephone service area covers approximately 51,000 square miles in California.
2. Verizon
![]()
In mid 2000, GTE formally changed their name to Verizon. Verizon provides telecommunication services in the states of California, Nevada and Arizona.
3. Others

There are many smaller telephone companies in California under the jurisdiction of the CPUC. These companies have overhead equipment that is inspected by the USS for compliance with G.O. 95.
C. CABLE TELEVISION
There are many cable television companies serving California cities. They range from local companies serving one city to larger companies that may serve several cities. A majority of the cable television companies are members of the California Cable Television Association (CCTA). CCTA represents over 250 cable television systems that provide cable television service to over 6 million California homes. The major cable television companies serving California are:
1. Adelphia
![]()
2. Charter Communications
3. Comcast Corporation
Formerly AT&T Broadband, Comcast is the nation's largest cable company with 21.5 million subscribers.
4. Cox Cable


III. ANNUAL ELECTRIC REPORT
The USS is entrusted to enforce the provisions of General Orders 95, 128, and 165. To do so, the USS conducts periodic inspection of both overhead and underground electric, communication and cable lines throughout the state. This involves both field inspection and document audit. Furthermore, the USS investigates accidents involving overhead and underground electric and communication lines as mandated by Public Utilities Code Section 315, to determine utilities' compliance with the General Orders. This section contains information and statistical data on the various electric related activities conducted by the USS during 2003.
A. GENERAL ORDER 95 INSPECTIONS
In 2003, USS staff engineers conducted G.O. 95 field inspections of overhead lines with utilities representatives' participation. The field inspections provide evidence on the quality of a utility's workmanship and maintenance programs. Staff engineers inspect many miles of pole lines and document G.O. 95 violations found during the inspection.
The field inspections are conducted over a three-day period. The visual survey is conducted on the first day and the actual inspections are conducted on the remaining two days. Typically, two staff engineers will use the first day of inspection to identify a specific area for the detailed inspections. They will do this by conducting a visual survey of two communities/cities that appears to have numerous G.O. 95 violations. The staff engineers will also contact the utility companies to request information such as circuit maps prior to conducting the visual survey.
During the detailed field inspection, the staff engineers record the violations found on the overhead electric system, which includes poles, conductors, and all overhead equipment. We request the power, communication, and cable utilities to participate in these inspections. This expedites correction, as their personnel are also recording these violations.
In 2003, USS personnel were divided into two units where each unit was assigned specific counties to conduct G.O. 95 inspections in California. The following lists the counties each unit covered.
Northern Unit: Alpine, Alameda, Amador, Butte, Calaveras, Colusa, Contra Costa, Del Norte, El Dorado, Glenn, Humboldt, Lake, Lassen, Marin, Mendocino, Mariposa, Merced, Modoc, Monterey, Napa, Nevada, Placer, Plumas, Sacramento, San Benito, San Francisco, San Joaquin, San Luis Obispo, San Mateo, Santa Clara, Santa Cruz, Shasta, Sierra, Siskiyou, Solano, Sonoma, Stanislaus, Sutter, Tehama, Trinity, Yolo, Yuba, plus portions of Fresno, Inyo, Kern, Kings, Madera, Mono, Santa Barbara, Tulare and Tuolumne that are served by Pacific Gas and Electric.
Southern Unit: Imperial, Los Angeles, Orange, Riverside, San Diego, San Bernardino, Ventura, plus portions of Fresno, Inyo, Kern, Kings, Madera, Mono, Santa Barbara, Tulare and Tuolumne that are served by Southern California Edison and/or Los Angeles Department of Water and Power.
1. Utility Data
Utilities |
Total Miles of Overhead Lines |
Transmission Lines (miles) |
Distribution Lines (miles) |
Number of Poles | ||||||
PG&E |
116,170 |
18,488 |
97,682 |
2,274,980 |
||||||
SCE |
72,800 |
12,300 |
60,500 |
1,500,000 | ||||||
SDG&E |
8,602 |
1,741 |
6,861 |
232,163 | ||||||
PacifiCorp |
3,061 |
741 |
2,320 |
66,907 | ||||||
Sierra Pacific |
1,128 |
380 |
748 |
22,853 | ||||||
Bear Valley |
202 |
29 |
173 |
8,100 | ||||||
Mountain |
0 |
0 |
0 |
0 | ||||||
Grand Total |
201,963 |
33,679 |
168,284 |
4,105,003 | ||||||
Table 1. Summary of each Utility's Overhead Equipment.
Figure 1. Miles of Overhead Transmission and Distribution Lines in California by Utility.
Figure 2.
Percentage of Overhead Transmission Lines in California by Utility.

Figure 3.
Percentage of Overhead Distribution Lines in California by Utility.

Figure 4.
Percentage of poles in California by Utility.


Figure 5. Number of California Customers served by each Utility.
2. USS Inspection Statistics
For the 2003 Year |
Total |
Number of Inspections |
26 |
Number of Inspection Days |
79 |
Number of Personnel Days |
144 |
Number of Poles Inspected |
3383 |
Total Number of Violations Cited (See Table 4 for a summary.) |
6625 |
Table 2. Summary of the G.O. 95 Inspections Conducted
For the 2003 Year |
Figures |
Average Number of Inspection Days Per Week |
1.52 |
Average Number of Personnel Days Per Inspection Week |
2.77 |
Average Number of Violations Cited Per Inspection Day |
83.9 |
Average Number of Poles Inspected Per Inspection Day |
42.82 |
Average Number of Violations Per Pole |
1.96 |
Table 3. Tabulation of G.O. 95 Inspection Data
Utility Company |
Number of G.O. 95 Inspections |
Total G.O. 95 Violations |
Average Number of Violations Per Inspection |
PG&E |
11 |
649 |
59 |
SCE |
7 |
496 |
70.9 |
SDG&E |
2 |
63 |
31.5 |
Municipalities/Others |
6 |
669 |
111.5 |
SBC |
21 |
2045 |
97.4 |
Comcast |
11 |
883 |
80.3 |
Adelphia |
8 |
549 |
68.6 |
Verizon |
5 |
547 |
109.4 |
Other Cable TV |
11 |
724 |
65.8 |
Table 4. Summary of G.O. 95 Violations Incurred by the Utility Companies
B. GENERAL ORDER 128 INSPECTIONS

One staff engineer or inspector usually conducts General Order 128 underground facility inspections. The inspection areas are selected similar to G.O. 95 inspections. The staff engineer will also spend time reviewing the records required by G.O. 128 for an auditable and consistent program of inspection. The inspection lasts three days and usually occurs in one utility operating district. G.O. 128 inspections are conducted only with the electric utilities because communication utilities have fewer hazards associated with their facilities. However, if the staff engineer finds any problems with the communication facilities, he will notify the communication company to correct the problems.
The G.O. 128 inspector joins a qualified utility lineman who opens the equipment enclosures containing live or energized equipment. The live equipment may be contained inside an underground vault, a walk-in vault, or a subsurface enclosure such as a padmount. The inspector records notes about the violations and prepares a formal report afterwards. The report details the violations and directs the utilities to correct them. The records are maintained similar to G.O. 95 inspections.
1. Utility Data
Utilities |
Total Miles of Underground Lines |
Transmission Lines (miles) |
Distribution Lines (miles) |
Surface Mounted Structures |
Underground Structures |
PG&E |
24,411 |
124 |
24,287 |
111,648 |
285,084 |
SCE |
36,080 |
280 |
35,800 |
131,600 |
207,970 |
SDG&E |
8,980 |
64 |
8,916 |
91,383 |
41,776 |
PacifiCorp |
508 |
0 |
508 |
5087 |
229 |
Sierra Pacific |
160 |
0 |
160 |
* |
* |
Bear Valley |
52.6 |
0.6 |
52 |
600 |
10 |
Mountain |
15 |
0 |
15 |
150 |
24 |
Grand Total |
70,207 |
469 |
69,738 |
340,468 |
535,093 |
Table 5. Summary of the Utility Company's Underground Equipment. "*" Denotes statistic unavailable.

Figure 6. Miles of Underground Transmission and Distribution Lines in California by Utility.
Figure 6B.
Percentage of Surface Mounted Each Utility Co. Has in California.
Figure 6C.
Percentage of Underground Structures Each Utility Co. Has in California.




2. USS Inspection Statistics
For the 2003 Year |
Total |
Number of Inspections |
14 |
Number of Inspection Days |
56 |
Number of Personnel Days Used |
80 |
Number of Structures Inspected |
739 |
Number of Violations Cited (See Table 8 for a summary) |
571 |
Table 6. Summary of the G.O. 128 Inspections Conducted
For the 2003 Year |
Figures |
Average Number of Inspection Days Per Week |
1.08 |
Average Number of Personnel Days Per Inspection Week |
1.54 |
Average Number of Structures Inspected Per Inspection Day |
13.2 |
Average Number of Violations Cited Per Inspection Day |
10.2 |
Average Number of Violations Per Structure Inspected |
0.77 |
Table 7. Tabulation of G.O. 128 Inspection Data
Utility Company |
Number of G.O. 128 Inspections |
Total G.O. 128 Violations |
Average Number of Violations Per Inspection |
PG&E |
10 |
226 |
22.6 |
SCE |
1 |
90 |
90 |
SDG&E |
0 |
- |
- |
Municipalities/Others |
3 |
255 |
85 |
Table 8. Summary of G.O. 128 Violations Incurred by the Utility Companies
C. GENERAL ORDER 165 INSPECTIONS
General Order 165 became effective on March 31, 1997 for Pacific Gas & Electric, PacifiCorp, SDG&E, Sierra Pacific Power Company, and Southern California Edison. This General Order establishes minimum requirements for electric distribution facilities, regarding inspection (including maximum allowable inspection cycle lengths) scheduling and performance of corrective action, condition rating, record keeping, and reporting. The requirements of this order are in addition to the requirements of G.O. 95 and G.O.128 to maintain a safe and reliable electric system. These inspections are part of our regularly scheduled G.O. 95 and G.O. 128 inspections.
D. ELECTRIC INCIDENTS & CUSTOMER COMPLAINTS
The USS staff receives and investigates reportable electric incidents from regulated utility companies. Per Appendix B of D98-07-097, reportable incidents are those which (a) result in fatality or personal injury rising to the level of in-patient hospitalization and attributable or allegedly attributable to utility owned facilities; (b) are the subject of significant public attention or media coverage and are attributable or allegedly attributable to utility facilities, (c) involve or allegedly involve trees or other vegetation in the vicinity of power lines and result in fire and/or personal injury whether or not in-patient hospitalization is required. Incidents involving damage to property of the utility or others estimated to exceed $20,000 that are attributable or allegedly attributable to utility owned facilities are investigated as well.
The electric utility companies are required to provide notice to the designated USS staff, via the USS Incident 1-800 number, within two hours of an incident. The notice shall identify the time and date of the incident, the time and date of notice to the Commission, the location of the incident, casualties which resulted from the incident, identification of casualties and property damage, and the name and telephone number of a utility contact person.
The designated USS staff is called the On-Call Engineer (OCE). The OCE is responsible for receiving reportable incidents from the utility companies and he or she is available to do so 24 hours per day. Each staff engineer assumes the OCE duties for an entire week several times per year. The OCE or a staff engineer may investigate incidents at any hour, including weekends. If it is determined that a G.O. violation was involved, staff prepares a report and recommends action against the utility.
In addition, the USS maintains a database of outages and accidents to note trends. If there is significant trending, the staff will investigate and work with utilities to correct the problem. The database has been very useful in noting trends about a manufacturer defect, lack of tree trimming, or lack of preventive maintenance. The Commission has initiated Order Instituting Investigations (OIIs) based on the results of USS's investigations. USS staff also handles customer complaints relating to G.O. 95 and 128 safety issues. In addition to investigating incidents reported by the utility companies, USS investigates customer complaints involving alleged violations of the General Orders.
For the 2003 Year |
Total |
Number of Incidents Reported |
268 |
Incidents Involving Overhead Equipment |
233 |
Incidents Involving Underground Equipment |
35 |
Number of Incidents Investigated |
268 |
Number of USS Engineers** (not including management) |
18 |
Table 9. Summary of Incident Investigations & Customer Complaints for the USS.
** Average taken since the number of engineers varied throughout the 2003 year.
For the 2003 Year |
Figures |
Average Number of Incidents Reported Per Month |
22.33 |
Percentage of Incidents Reported Involving Overhead Equipment |
86.94% |
Percentage of Incidents Reported Involving Underground Equipment |
13.06% |
Average Number of Incidents Investigated Per Month |
22.33 |
Percentage of Incidents Investigated Per Incidents Reported |
100% |
Average Number of Incidents Investigated Per USS Engineer |
14.88 |
Average Number of Incidents Reported Per OCE Week |
5.15 |
Average Number of OCE Weeks Per USS Engineer |
2.89 |
Table 10. Tabulation of Incident Investigation Data.
1. Overhead Equipment
The following table is a summary of leading causes of incidents in 2003 relating to overhead equipment:
Electric Incident Causes |
Fatalities |
Injuries |
Damage |
Media Attention |
Aircraft |
1 |
2 |
1 |
1 |
Animal |
0 |
0 |
1 |
2 |
Booms/Cranes |
0 |
1 |
0 |
2 |
Fire |
0 |
0 |
2 |
3 |
Insulator Failure |
0 |
0 |
0 |
1 |
Irrigation Pipe |
0 |
0 |
0 |
0 |
Ladder |
1 |
1 |
0 |
0 |
Line Failure |
0 |
0 |
1 |
6 |
Metal Object |
0 |
5 |
0 |
0 |
Natural Cause |
0 |
0 |
1 |
1 |
Other Causes * |
1 |
10 |
3 |
9 |
Splice Failure |
0 |
0 |
1 |
0 |
Unknown |
0 |
0 |
2 |
3 |
Vegetation |
1 |
6 |
7 |
2 |
Vehicle |
0 |
4 |
3 |
2 |
Working Overhead |
2 |
15 |
0 |
0 |
Grand Total |
6 |
44 |
50 |
34 |
Table 11. Summary of Leading Causes of Overhead Incidents reported to the CPUC Relating G.O. 95.
Note: Some incidents were reported under multiple criteria.
* "Other Causes" includes events such trespassing, suicide, & vandalism.
Figure 10. Graph of the Leading Causes of Overhead Incidents reported to the CPUC Relating G.O. 95.

Figure 11. Percentage of Overhead Incidents Resulting in Fatalities.

Figure 12. Percentage of Overhead Incidents Resulting in Injuries.

Figure 13. Percentage of Overhead Incidents Resulting in Damage.

Figure 14. Percentage of Overhead Incidents Resulting in Media Attention.
2. Underground Equipment
The following table is a summary of leading causes of incidents in 2003 relating to underground equipment.
Electric Incident Causes |
Fatalities |
Injuries |
Damage |
Media Attention |
Dig In |
0 |
1 |
9 |
1 |
Switch Malfunction |
0 |
1 |
1 |
2 |
Transformer Malfunction |
0 |
2 |
1 |
4 |
Underground Cable Failure |
0 |
1 |
0 |
13 |
Underground Splice Failure |
0 |
0 |
0 |
2 |
Working Underground |
0 |
3 |
1 |
0 |
Grand Total |
0 |
8 |
12 |
20 |
Table 12. Summary of Leading Causes of Underground Incidents Relating to G.O. 128.

Figure 15. Graph of Leading Causes of Underground Incidents Relating to G.O. 128.

Figure 16. Percentage of Underground Incidents Resulting in Injuries.

Figure 17. Percentage of Underground Incidents Resulting in Damage.
Figure 18. Percentage of Underground Incidents Resulting in Media Attention.
IV. ADDITIONAL INFORMATION

![]()
A. PUBLICATIONS
Copies of G.O. 95, 128, and 165 are available to the general public for purchase from the CPUC.
![]()

1. How to Order


2. G.O. 95, 128, and 165
G.O. 95: "Rules for Overhead Line Construction" book is available for purchase at
$20.00 each.
G.O. 128: "Rules for Construction of Underground Electric Supply and Communication Systems" book is available for purchase at $5.00 each.
G.O. 165: "Inspection Cycles for Electric Distribution Facilities", the first copy of the G.O. leaflet is free with additional copies at $0.50 each.