Number of Documents: 175
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
July 13, 2006
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY
|
|
Description:
of D06-06-025.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
April 17, 2006
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY
|
|
Description:
of D06-04-018.
|
|
|
Type:
OPPOSITION
|
Filing Date:
April 19, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to WEM's third supplemental request for compensation.
|
|
|
Type:
SUPPLEMENT
|
Filing Date:
April 1, 2005
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
Third; to Request for Compensation.
|
|
|
Type:
REPLY
|
Filing Date:
December 2, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
CORRECTED; to the response of PG&E to request for award of intervenor
compensation.
|
|
|
Type:
REPLY
|
Filing Date:
December 1, 2004
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
to PG&E's opposition to request for compensation.
|
|
|
Type:
REPLY
|
Filing Date:
December 1, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
to the response of PG&E to Request for Award of Intervenor Compensation.
|
|
|
Type:
OPPOSITION
|
Filing Date:
November 16, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to request for an award of compensation to the 280 Corridor Concerned Citizens.
|
|
|
Type:
OPPOSITION
|
Filing Date:
November 16, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to WEM's request for compensation.
|
|
|
Type:
RULING
|
Filing Date:
November 10, 2004
|
Filed By:
ALJ/THORSON/PUC
|
|
Description:
Grants the motions of Women's Energy Matters both filed on October 27, 2004, to
the extent set forth.
|
|
|
Type:
NOTICE
|
Filing Date:
November 1, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
in response to Ordering Paragraph 14 of D04-08-046.
|
|
|
Type:
SUPPLEMENT
|
Filing Date:
November 1, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
to request for award of intervenor compensation.
|
|
|
Type:
SUPPLEMENTAL
|
Filing Date:
November 1, 2004
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
information for request for compensation.
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
October 29, 2004
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY
|
|
Description:
Correction of request for award of comepnsation.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
October 27, 2004
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
motion for protective order regarding personal financial information.
|
|
|
Type:
SUPPLEMENTAL
|
Filing Date:
October 27, 2004
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
PUBLIC VERSION; information for request for compensation.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
October 27, 2004
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
for leave to file confidential materials under seal; confidential materials
attached and filed under seal.
|
|
|
Type:
REQUEST
|
Filing Date:
October 22, 2004
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
for Compensation.
|
|
|
Type:
REQUEST
|
Filing Date:
October 22, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
for Award of Intervenor Compensation.
|
|
|
Type:
REQUEST
|
Filing Date:
October 7, 2004
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY
|
|
Description:
for Award of Compensation; supporting Declaration.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 24, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
LATE FILED. On August 18, 2004, Edward W. O'Neill, outside counsel for the 280
Corridor Concerned Citizens (280 Citizens), met with Darwin Farrar, advisor to
Cmmr. Lynch, and Steven Weissman, advisor to Cmmr. Wood, in two separate
meetings in San Francisco. O'Neill discussed the proposed decision (PD) of ALJ
TerKeurst and alternate decision (AD) of Pres. Peevey. O'Neill summarized the
remaining concerns of 280 Citizens with the 1B Hybrid Route that would be
approved by both the PD and AD and urged adoption of the West of Skyline
Boulevard Compromise modification. O'Neill explained the progress 280 Citizens
has made resolving issues concerning the feasibility of the West of Skyline
Boulevard Compromise.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 24, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
LATE FILED. On August 17, 2004, Edward W. O'Neill, outside counsel for the 280
Corridor Concerned Citizens (280 Citizens), spoke with Julie Fitch, advisor to
Pres. Peevey, by conference call. Roosevelt Grant, advisor to Pres. Peevey, and
David Gamson, advisor to Cmmr. Brown, also participated in the telephone
conference. O'Neill discussed the proposed decision of ALJ TerKeurst and
alternate decision of Pres. Peevey. O'Neill explained the progress 280
Citizens has made resolving issues concerning the feasibility of the West of
Skyline Boulevard Compromise modification to the 1B Hybrid Route that 280
Citizens has advocated. O'Neill also explained that 280 Citizens has supported
solutions to the reliability needs of San Francisco and the desire of Hunter
Point residents to shut down the Hunters Point Power Plant that can be
implemented without adversely affecting residential neighborhoods or the
environment and stated that the West of Skyline Boulevard Compromise could meet
all of these objectives without affecting the date for final completion of the
project.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 13, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
[CORRECTED] on ALJ's ruling proposing to reopen the record regarding National
Park Service mitgation proposals.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 12, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on Ruling proposing to reopen the record regarding Nat'l. Park Service
mitigation proposals.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 12, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
On August 12, 2004, Edward O'Neill, counsel to 280 Corridor Concerned Citizens
(280 Citizens), sent a letter (copy attached to the notice) by facsimile and
mail to Pres. Peevey, Cmmr. Lynch, Cmmr. Brown, Cmmr. Wood, and Cmmr. Kennedy.
The letter responds to two ex parte letters dated August 5, 2004 from Richard
Raushenbush, Pacific Gas and Electric Company's counsel, regarding the West of
Skyline Boulevard Compromise modification to the 1B Hybrid Route and EMF
mitigation measures.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 12, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
on the submission of the National Park Service and the U.S. Fish and Wildlife
Service.
|
|
|
Type:
PETITION
|
Filing Date:
August 11, 2004
|
Filed By:
SAN BRUNO MOUNTAIN COALITION
|
|
Description:
to intervene.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 10, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On August 5, 2004, Richard Raushenbush, Attorney for Pacific Gas and Electric
Company, sent, via facsimile, two letters (copies attached to the notice) to
Cmmrs. Peevey, Wood, Lynch, Brown, and Kennedy. The letters responded to the
two July 29, 2004, letters to the Commissioners from Mark Church, President of
the San Mateo Board of Supervisors.
|
|
|
Type:
RULING
|
Filing Date:
August 9, 2004
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Proposes to reopen the record re. National Park Service Mitigation Proposals.
Parties may file no later than August 12, 2004, any objections to receipt into
the record of the documents set forth. Parties may file, not later than August
12, 2004, any comments on the mitigation proposals.
|
|
|
Type:
RESPONSE
|
Filing Date:
August 6, 2004
|
Filed By:
NATIONAL PARK SERVICE
U.S. FISH AND WILDLIFE SERVICE
|
|
Description:
to Aug 3, 2004 ALJ TerKeurst Ruling.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 5, 2004
|
Filed By:
COUNTY OF SAN MAETO
|
|
Description:
LATE FILED. On July 30, 2004, the Board of Supervisors of the County of San
Mateo mailed two letters (attached to the notice) to Cmmrs. Peevey, Lynch,
Brown, Kennedy, and Wood. The letters relate to information that was submitted
by parties in their comments on the proposed decision and alternate proposed
decision in late June and July 2004.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 4, 2004
|
Filed By:
CITY OF SAN BRUNO
|
|
Description:
On August 2, 2004, Sky Woodruff, legal counsel for the City of San Bruno, sent
a letter (copy attached to the notice) to Cmmrs. Peevey, Wood, Lynch, Kennedy,
and Brown. The letter concerns the proposed and alternate decisions and the
280 Corridor Concerned Citizens' so-called West of Skyline Boulevard Compromise.
|
|
|
Type:
RULING
|
Filing Date:
August 3, 2004
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Directs the National Park Service and the U.S. Fish and Wildlife Service to
report the ex parte communications; and to file a Petition to Intervene and
Motion to Late File Comments on the Proposed Decision and Alternate Decision,
not later than August 6, 2004. Parties may file replies no later than 5 days
after such a filing is made.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 28, 2004
|
Filed By:
SAN BRUNO MOUNTAIN WATCH
|
|
Description:
On July 23, 2004, Philip Batchelder, Executive Director of San Bruno Mountain
Watch, met with Cmmr. Lynch in San Francisco. Also present were Darwin Farrar,
advisor to Cmmr. Lynch, Anita Garcia, legal intern, and Jake Sigg, Conservation
Chair of the California Native Plant Societyżs Yerba Buena Chapter, Doug
Allshouse, President of the Friends of San Bruno Mountain, and Francisco Da
Costa, Executive Director of Environmental Justice Advocacy. Batchelder, Sigg
and Allshouse discussed the San Bruno Mountain (Mountain) Conservation Plan as
it relates to the `Mountain Alternative' (Alternative) of the Project.
Allshouse, Sigg and Batchelder described the Alternative's likely impacts to
rare species' habitat and the mitigations for the damage. Allshouse, Sigg, and
Batchelder described the poor state of the PG&E transmission lines on the
Mountain, including the corridor to which the new 230kV line would be
collocated under the Alternative. However, Allshouse, Sigg, Batchelder, and Da
Costa acknowledged the substantial public health concerns over electromagnetic
fields and all agreed to the benefits of a further study of the Alterative. Da
Costa asserted that such a study should include a thorough examination of the
proposal's potential impacts to archeological and sacred sites. Batchelder
suggested that the study would benefit from a review of PG&E past mitigation
efforts for damaging projects on the Mountain. Batchelder encouraged an
examination of the feasibility of routing the transmission line through a
directional bore at the base of the Mountain.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 23, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
On July 21, 2004, Laura Lighthouse, representative of 280 Corridor Concerned
Citizens, sent an e-mail (copy attached to the notice) to Julie Fitch, advisor
to Pres. Peevey, David Gamson, advisor to Cmmr. Brown, Manuel Ramirez, advisor
to Cmmr. Wood, Darwin Farrar, advisor to Cmmr. Lynch, Ross LaJeunesse, advisor
to Cmmr. Kennedy, and Harriett Burt, Public Advisor. In her e-mail Lighthouse
explained that the West of Skyline Boulevard Compromise would eliminate
construction delays and improve the watershed lands east of I-280.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 16, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
On July 7, 2004, Edward W. O'Neill, outside counsel for 280 Corridor Concerned
Citizens (280 Citizens), met with Ross LaJeunesse, advisor to Cmmr. Kennedy, in
San Francisco. Written materials that are part of the record in this
proceeding were used. O'Neill summarized the concerns of 280 Citizens with
regard to Pacific Gas and Electric Company's proposed project, the 1B
Alternative route and the 1B Hybrid route. O'Neill explained that the proposed
decision (PD) and alternate decision (AD) address many of the concerned raised
by 280 Citizens regarding adverse impacts on residential areas, but do not
address the potentially significant impacts on residents of the Loma Vista and
Skyview neighborhoods in Burlingame. O'Neill stated that the 1B Hybrid route
that both the PD and AD would adopt could easily be modified to address the
remaining impacts on residents by adoption of the West of Skyline Boulevard
Compromise modification to the 1B Hybrid. OżNeill noted that throughout this
proceeding, 280 Citizens has sought solutions to meet the reliability needs of
San Francisco and the desire of Hunters Point residents to shut down the
Hunters Point Power Plant without adversely affecting residential neighborhood
or the environment of the Peninsula. O'Neill explained that the Commission has
ample legal authority to require the collocation and undergrounding of both the
existing 60kV and new 230 kV lines in this area and urged the Commission to
support the PD with the West of Skyline Boulevard Compromise modification.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 16, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
LATE FILED. On July 7, 2004, Edward W. O'Neill, outside counsel for 280
Corridor Concerned Citizens (280 Citizens), met with Ross LaJeunesse, advisor
to Cmmr. Kennedy, in San Francisco. Written materials that are part of the
record in this proceeding were used. O'Neill summarized the concerns of 280
Citizens with regard to Pacific Gas and Electric Company's proposed project,
the 1B Alternative route and the 1B Hybrid route. O'Neill explained that the
proposed decision (PD) and alternate decision (AD) address many of the
concerned raised by 280 Citizens regarding adverse impacts on residential
areas, but do not address the potentially significant impacts on residents of
the Loma Vista and Skyview neighborhoods in Burlingame. O'Neill stated that
the 1B Hybrid route that both the PD and AD would adopt could easily be
modified to address the remaining impacts on residents by adoption of the West
of Skyline Boulevard Compromise modification to the 1B Hybrid. O'Neill noted
that throughout this proceeding, 280 Citizens has sought solutions to meet the
reliability needs of San Francisco and the desire of Hunters Point residents to
shut down the Hunters Point Power Plant without adversely affecting residential
neighborhood or the environment of the Peninsula. O'Neill explained that the
Commission has ample legal authority to require the collocation and
undergrounding of both the existing 60kV and new 230 kV lines in this area and
urged the Commission to support the PD with the West of Skyline Boulevard
Compromise modification.
|
|
|
Type:
RULING
|
Filing Date:
July 8, 2004
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Makes transcript corrections.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 7, 2004
|
Filed By:
CITY OF BURLINGAME
|
|
Description:
On July 2, 2004, Jeanne B. Armstrong of Goodin, MacBride, Squeri, Ritchie &
Day, counsel to the City of Burlingame (City), met with David Gamson, advisor
to Cmmr. Brown, in San Francisco. Also present was Larry Anderson, City
Attorney for the City. Armstrong and Anderson indicated the City's support for
the proposed decision (PD) of ALJ TerKeurst over the alternate decision (AD)
which had been proffered by Cmmr. Peevey. Finally, Anderson stressed the
City's intent to work with Pacific Gas and Electric Company (PG&E) to implement
all the mitigation measures which are set forth in both the PD and AD and was
not attempting, as had been implied by certain PG&E's submissions, to usurp the
jurisdiction of the Commission.
|
|
|
Type:
RESPONSE
|
Filing Date:
July 7, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to ALJ's July 2, 2004 ruling requesting additional information.
|
|
|
Type:
OPPOSITION
|
Filing Date:
July 7, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to 280 Corridor Concerned Citizens' motion to reopen the record.
|
|
|
Type:
OBJECTION
|
Filing Date:
July 7, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
to PG&E's response to ALJ's July 2, 2004 ruling requiring additional
information.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 7, 2004
|
Filed By:
CITY OF BURLINGAME
|
|
Description:
On July 2, 2004, Jeanne B. Armstrong of Goodin, MacBride, Squeri, Ritchie &
Day, counsel to the City of Burlingame (City), met with Julie Fitch, advisor to
Cmmr. Peevey, in San Francisco. Also present were Roosevelt Grant, advisor to
Cmmr. Peevey, and Larry Anderson, City Attorney for the City. Armstrong and
Anderson indicated the City's support for the proposed decision (PD) of ALJ
TerKeurst over the alternate decision (AD) which had been proffered by Cmmr.
Peevey. Finally, Anderson stressed the City's intent to work with Pacific Gas
and Electric Company (PG&E) to implement all the mitigation measures which are
set forth in both the PD and AD and was not attempting, as had been implied by
certain PG&E's submissions, to usurp the jurisdiction of the Commission.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 6, 2004
|
Filed By:
CITY OF BURLINGAME
|
|
Description:
reply; on proposed decision of ALJ TerKeurst.
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
July 6, 2004
|
Filed By:
ASPEN ENVIRONMENTAL GROUP
|
|
Description:
Additional Route Alternatives Analysis for PG&E Jefferson-Martin 230 KV
Transmission Project [pursuant to the June 8, 2004 ruling].
|
|
|
Type:
EXPARTE
|
Filing Date:
July 6, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On July 1, 2004, John Clarke, Manager, Regulatory Relations, Pacific Gas and
Electric Company (PG&E), met with Cmmr. Wood, in San Francisco. Also present
were Steven Weissman, advisor to Cmmr. Wood, and Jennifer Dowdell, Manager,
Regulatory Relations, Kevin Dasso, Director, Electric Transmission &
Distribution Engineering, and Richard Raushenbush, Attorney, Latham Watkins,
for PG&E. Clarke explained why PG&E supports Cmmr. Peevey's alternate proposed
decision (APD), stating that it appropriately selects a northern route
consistent with the record and findings in the environmental impact report, and
accurately reflects the Commission's policies. Dasso explained why PG&E needs
to complete construction of the Jefferson-Martin transmission line upgrade
before the end of 2005. Raushebush stated that the record evidence shows that
there is no specific basis to conclude that EMF exposure causes adverse human
health effects.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 6, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
On July 1, 2004, Katie Carlin, representative of 280 Corridor Concerned
Citizens (280 Citizens), met with Cmmr. Lynch in San Francisco. Also present
were Darwin Farrar, advisor to Cmmr. Lynch, and Edward W. O'Neill, outside
counsel for 280 Citizens. Written materials that are part of the record were
used. Carlin explained that the proposed decision (PD) and alternate decision
(AD) address many of the concerns raised by 280 Citizens regarding adverse
impacts on residential areas, but do not address potentially significant
impacts on residents in the Loma Vista and Skyview neighborhoods in Burlingame.
O'Neill stated that the 1B Hybrid route that both the PD and AD would adopt
could easily be modified to address the remaining impacts on residents by
adoption of the West of Skyline Boulevard Compromise modification to the 1B
Hybrid. O'Neill stated noted that throughout this proceeding, 280 Citizens has
sought solutions to meet the reliability needs of San Francisco and the desire
of Hunters Point residents to shut down the Hunters Point Power Plant without
adversely affecting residential neighborhood or the environment of the
Peninsula. Carlin also explained the basis for 280 Citizens' concerns
regarding health and safety risks associated with exposure to EMFs from high
voltage transmission lines.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 6, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
On July 1, 2004, Edward W. O?Neill, outside counsel for 280 Corridor Concerned
Citizens (280 Citizens), met with David Gamson, advisor to Cmmr. Brown, in San
Francisco. Also present were Peter Hanson, advisor to Cmmr. Brown, and
Christopher A. Hilen, outside counsel for 280 Citizens. Written materials that
are part of the record were used. O'Neill and Hilen explained that the
proposed decision (PD) and alternate decision (AD) address many of the concerns
raised by 280 Citizens regarding adverse impacts on residential areas on the
San Francisco Peninsula, but do not address potentially significant land use
conflicts, construction impacts, visual impacts, or EMF concerns of residents
of the Loma Vista and Skyview neighborhoods in Burlingame. O'Neill and Hilen
stated that the 1B Hybrid route that both the PD and AD would adopt could
easily be modified to address the remaining impacts on residents by adoption of
the West of Skyline Boulevard Compromise modification to the 1B Hybrid.
O'Neill stated noted that throughout this proceeding, 280 Citizens has sought
solutions to meet the reliability needs of San Francisco and the desire of
Hunters Point residents to shut down the Hunters Point Power Plant without
adversely affecting residential neighborhood or the environment on the
Peninsula.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 6, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
On July 1, 2004, Katie Carlin, representative of 280 Corridor Concerned
Citizens (280 Citizens), met with Cmmr. Wood in San Francisco. Also present
were Steven Weissman, advisor to Cmmr. Wood, Edward W. O'Neill and Christopher
A. Hilen, outside counsel for 280 Citizens, and Laura Lighthouse and Tallula
Lighthouse, representatives of 280 Citizens. Written materials that are part
of the record were used. Carlin explained that the proposed decision (PD) and
alternate decision (AD) address many of the concerns raised by 280 Citizens
regarding adverse impacts on residential areas, but do not address potentially
significant impacts on residents in the Loma Vista and Skyview neighborhoods in
Burlingame. O'Neill stated that the 1B Hybrid route that both the PD and AD
would adopt could easily be modified to address the remaining impacts on
residents by adoption of the West of Skyline Boulevard Compromise modification
to the 1B Hybrid. O'Neill stated noted that throughout this proceeding, 280
Citizens has sought solutions to meet the reliability needs of San Francisco
and the desire of Hunters Point residents to shut down the Hunters Point Power
Plant without adversely affecting residential neighborhood or the environment
of the Peninsula. Carlin and Laura Lighthouse also explained the basis for 280
Citizens? concerns regarding health and safety risks associated with exposure
to EMFs from high voltage transmission lines.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
July 6, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; on the alternate of Cmmr. Peevey granting a CPCN.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
July 6, 2004
|
Filed By:
CITY OF BURLINGAME
|
|
Description:
reply; on Alternate of Cmmr. Peevey.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 6, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
reply; on the proposed decision of ALJ TerKeurst and the proposed alternate
decision of Cmmr. Peevey.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 6, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; on the proposed decision of ALJ TerKeurst granting a CPCN.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 6, 2004
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
reply; on the proposed decision of ALJ TerKeurst and alternate of Cmmr. Peevey
granting a CPCN.
|
|
|
Type:
RULING
|
Filing Date:
July 2, 2004
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Requires additional information to be filed by July 6, 2004. Objections to the
receipt into evidence of the filed information by July 7, 2004. Grants
Edison's motion to intervene. Responses to July 1, 2004 motion of the 280
Corridor Concerned Citizens to reopen the record are due July 6, 2004.
Responses to PG&E's request to take official notice of the documents contained
in its comments on alternate decision are due July 6, 2004.
|
|
|
Type:
MOTION
|
Filing Date:
July 1, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
to reopen the record for receipt of five photographs.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
June 30, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
of Pres. Peevey; Request to Take Official Notice of Documents in Appendix B.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
June 30, 2004
|
Filed By:
CITY OF BURLINGAME
|
|
Description:
of Cmmr. Peevey.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
June 30, 2004
|
Filed By:
COUNTY OF SAN MATEO
|
|
Description:
of Cmmr. Peevey.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
June 30, 2004
|
Filed By:
ORA/PELEO/PUC
|
|
Description:
[of Cmmr. Peevey.]
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
June 30, 2004
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY
|
|
Description:
of Cmmr. Peevey.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
June 30, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
of Cmmr. Peevey.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
June 30, 2004
|
Filed By:
TOWN OF HILLSBOROUGH
|
|
Description:
of Cmmr. Peevey.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 28, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
on the proposed decision of ALJ TerKeurst.
|
|
|
Type:
MOTION
|
Filing Date:
June 28, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Intervene.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 28, 2004
|
Filed By:
ORA/PELEO/PUC
|
|
Description:
[on the proposed decision of AL TerKeurst].
|
|
|
Type:
COMMENTS
|
Filing Date:
June 28, 2004
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
on the proposed decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 28, 2004
|
Filed By:
TOWN OF HILLSBOROUGH
|
|
Description:
to proposed decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 28, 2004
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY
|
|
Description:
on the proposed decision of ALJ TerKeurst.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 28, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on the proposed decision of ALJ TerKeurst.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 28, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
opening; on the ALJ's proposed decision and the alternate decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 28, 2004
|
Filed By:
GENENTECH, INC.
|
|
Description:
on ALJ's proposed decision and alternate proposed decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 28, 2004
|
Filed By:
CITY OF BURLINGAME
|
|
Description:
opening; on the proposed decision of ALJ TerKeurst.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 28, 2004
|
Filed By:
CITY OF DALY CITY
|
|
Description:
on proposed decision and proposed alternate decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 28, 2004
|
Filed By:
CITY OF SOUTH SAN FRANCISCO
CONCERNED BUSINESSES EAST OF 101
|
|
Description:
joint; on proposed decision of ALJ TerKeurst.
|
|
|
Type:
ALTERNATE
|
Filing Date:
June 22, 2004
|
Filed By:
CMMR/PEEVEY/PUC
|
|
Description:
Opinion granting a CPCN. Comments are due on June 30, and reply comments -
July 6, 2004.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 18, 2004
|
Filed By:
CITY OF SAN BRUNO CITY COUNCIL AND REDEVELOPMENT AGENCY
|
|
Description:
on the Proposed Decision of ALJ TerKeurst.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
June 8, 2004
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Opinion granting a CPCN. Comments are due June 28, 2004; reply comments - 5
days after comments are filed.
|
|
|
Type:
RULING
|
Filing Date:
June 8, 2004
|
Filed By:
CMMR/LYNCH/PUC
|
|
Description:
Orders Asopen to undertake an analysis of PG&E's Route Option 2A and the San
Bruno Mountain alternatives and submit the results to the Commission by July 6,
2004.
|
|
|
Type:
RULING
|
Filing Date:
June 4, 2004
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Denies CARE's and WEM's motions to reopen the record; grants CAISO's petition
for the receipt of additional evidence, as set forth; receives certain
evidence; submits the record.
|
|
|
Type:
RESPONSE
|
Filing Date:
May 25, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to ALJ's ruling setting aside submission and requiring additional information.
|
|
|
Type:
REPLY
|
Filing Date:
May 24, 2004
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY
|
|
Description:
to Opposition to Renewed Motion to Reopen the Record.
|
|
|
Type:
RULING
|
Filing Date:
May 19, 2004
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Sets aside submission. Directs PG&E to file a document containing additional
information by May 15, 2004; parties may file objections to the receipt into
evidence of the filed information, by June 1, 2004
|
|
|
Type:
RULING
|
Filing Date:
May 10, 2004
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Addresses the supplemental statement of CARE in support of its notice of intent
to claim compensation. Determines that CARE is eligible to claim intervenor
compensation.
|
|
|
Type:
OPPOSITION
|
Filing Date:
April 28, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
to renewed motion of Californians for Renewable Energy to reopen the record.
|
|
|
Type:
MOTION
|
Filing Date:
April 26, 2004
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY
|
|
Description:
Renewed; to Reopen the Record.
|
|
|
Type:
MOTION
|
Filing Date:
April 16, 2004
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
to reopen the record. [Motion served on March 3, 2004]
|
|
|
Type:
MOTION
|
Filing Date:
April 12, 2004
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
to reopen the record, or in the alternative request the briefing schedule be
extended ten business days.
|
|
|
Type:
MOTION
|
Filing Date:
March 30, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to strike the opening and reply briefs of Women's Energy Matters.
|
|
|
Type:
STATEMENT
|
Filing Date:
March 25, 2004
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY
|
|
Description:
Supplemental; in support of Notice of Intent to Claim Compensation.
|
|
|
Type:
BRIEF
|
Filing Date:
March 19, 2004
|
Filed By:
GENENTECH, INC.
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
March 19, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
March 18, 2004
|
Filed By:
ORA/PELEO/PUC
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
March 18, 2004
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY
|
|
Description:
closing; post-hearing, in support of PG&E's application.
|
|
|
Type:
BRIEF
|
Filing Date:
March 18, 2004
|
Filed By:
CITY OF BURLINGAME
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
March 18, 2004
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
March 18, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
March 18, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
March 18, 2004
|
Filed By:
CITY OF DALY CITY
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
March 18, 2004
|
Filed By:
COUNTY OF SAN MATEO
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
March 17, 2004
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
reply.
|
|
|
Type:
RESPONSE
|
Filing Date:
March 17, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
to WEM's motion to reopen the record.
|
|
|
Type:
PETITION
|
Filing Date:
March 17, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
to set aside submission and reopen the proceeding.
|
|
|
Type:
OPPOSITION
|
Filing Date:
March 17, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to Women's Energy Matters' Motion to reopen the record.
|
|
|
Type:
RULING
|
Filing Date:
March 11, 2004
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Finds that WEM will be eligible to claim compensation, subject to conditions
set forth. Directs CARE to amend its NOI to claim compensation by March 25,
2004, as set forth.
|
|
|
Type:
BRIEF
|
Filing Date:
March 4, 2004
|
Filed By:
COUNTY OF SAN MATEO
|
|
Description:
closing.
|
|
|
Type:
BRIEF
|
Filing Date:
March 4, 2004
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
Opening Brief
|
|
|
Type:
BRIEF
|
Filing Date:
March 4, 2004
|
Filed By:
CITY OF SAN BRUNO
|
|
Description:
Opening Brief; on behalf of the City of San Bruno City Council and
Redevelopment Agency
|
|
|
Type:
BRIEF
|
Filing Date:
March 4, 2004
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
Opening Brief on the Jefferson-Martin Transmission Project
|
|
|
Type:
BRIEF
|
Filing Date:
March 4, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
Opening Brief
|
|
|
Type:
BRIEF
|
Filing Date:
March 4, 2004
|
Filed By:
DALY CITY
|
|
Description:
Opening Brief
|
|
|
Type:
BRIEF
|
Filing Date:
March 4, 2004
|
Filed By:
CITY OF BURLINGAME
|
|
Description:
Opening Brief
|
|
|
Type:
BRIEF
|
Filing Date:
March 4, 2004
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
Opening Brief regarding the construction of the Jefferson-Martin 230 kV
Transmission Project
|
|
|
Type:
BRIEF
|
Filing Date:
March 4, 2004
|
Filed By:
CITY OF SOUTH SAN FRANCISCO
|
|
Description:
Opening Brief
|
|
|
Type:
BRIEF
|
Filing Date:
March 4, 2004
|
Filed By:
ORA/PELEO/PUC
|
|
Description:
Opening Brief
|
|
|
Type:
BRIEF
|
Filing Date:
March 4, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Opening Brief regarding the Jefferson-Martin 230 kV Transmission Project
|
|
|
Type:
BRIEF
|
Filing Date:
March 4, 2004
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY
|
|
Description:
opening, post-hearing brief in favor of PG&E's application.
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
February 10, 2004
|
Filed By:
CITY OF DALY CITY
|
|
Description:
Joinder in Motion for an Order to Recirculate the Final EIR of South San
Francisco and Concerned Businesses East of Highway 101.
|
|
|
Type:
REPLY
|
Filing Date:
February 10, 2004
|
Filed By:
CITY OF DALY CITY
|
|
Description:
to PG&E's opposition to Joinder in Motion for an Order to Recirculate the Final
EIR of South San Francisco and Concerned Businesses East of Highway 101.
|
|
|
Type:
OPPOSITION
|
Filing Date:
February 10, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to Joinder of City of Daly City in Motion for an Order to Recirculate the Final
EIR of South San Francisco and Concerned Businesses East of Highway 101.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 28, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to the Burlingame Elementary School District's motion to intervene.
|
|
|
Type:
MOTION
|
Filing Date:
January 22, 2004
|
Filed By:
BURLINGAME ELEMENTARY SCHOOL DISTRICT
|
|
Description:
to intervene.
|
|
|
Type:
MOTION
|
Filing Date:
January 8, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
in Limine to Strike January 5, 2003 Statement of the County of San Mateo and to
Exclude all Testimony and evidence related thereto. [includes Proposed Order
and Proof of Service].
|
|
|
Type:
RESPONSE
|
Filing Date:
January 6, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to the City of South San Francisco and Concerned Businesses East of Highway
101's Motion for an Order to Recirculate the Final Environmental Impact Report.
|
|
|
Type:
RESPONSE
|
Filing Date:
December 29, 2003
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to WEM's amended petition to intervene and amended motion for acceptance of
late-filed notice of intent to claim compensation.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
December 17, 2003
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Motion for Leave to Submit Confidential Materials Under Seal; Confidential
Materials Attached and Filed Under Seal, namely, Proprietary Land Cost
Information and Sensitive Biology Information contained in PG&E's Direct
Testimony on issues other than need consisting of (i)Unredacted Direct
Testimony on Issues other than need (ii) Volume 1 of 3 (iii) Volume 2 of 3; and
(iv) Volume 3 of 3.
|
|
|
Type:
NOTICE
|
Filing Date:
December 17, 2003
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
of Availability of Testimony regarding issues other than need.
|
|
|
Type:
MOTION
|
Filing Date:
December 15, 2003
|
Filed By:
CITY OF SOUTH SAN FRANCISCO
CONCERNED BUSINESSES EAST OF HIGHWAY 101
|
|
Description:
for an order to recirculate the final environmental impact report.
|
|
|
Type:
PETITION
|
Filing Date:
December 15, 2003
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
AMENDED Petition to intervene; comments attached.
|
|
|
Type:
MOTION
|
Filing Date:
December 15, 2003
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
AMENDED Motion for acceptance of late-filed notice of intent to claim
compensation.
|
|
|
Type:
RESPONSE
|
Filing Date:
December 11, 2003
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to WEM's motion to intervene.
|
|
|
Type:
MOTION
|
Filing Date:
December 5, 2003
|
Filed By:
CITY OF MILLBRAE
|
|
Description:
to Intervene.
|
|
|
Type:
MOTION
|
Filing Date:
December 5, 2003
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
to Intervene; ATTACHED: Notice of Intent to Claim Compensation.
|
|
|
Type:
RULING
|
Filing Date:
December 3, 2003
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Grants requests to intervene and modifies the schedule. Re-sets evidentiary
hearings for January 12, 2004.
|
|
|
Type:
MOTION
|
Filing Date:
December 2, 2003
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
for acceptance of late-filed notice of intent to claim compensation; notice
attached.
|
|
|
Type:
PETITION
|
Filing Date:
December 2, 2003
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
to intervene.
|
|
|
Type:
OPPOSITION
|
Filing Date:
November 19, 2003
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to motion of the 280 Corridor Concerned Citizens to compel discovery from PG&E.
|
|
|
Type:
OPPOSITION
|
Filing Date:
November 13, 2003
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to motion of 280 Corridor Concerned Citizens for an order shortening time to
respond to motion to compel discovery responses.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
November 12, 2003
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
to compel discovery responses from PG&E.
|
|
|
Type:
PETITION
|
Filing Date:
November 12, 2003
|
Filed By:
GOLDEN GATE PRODUCE TERMINAL, LTD.
|
|
Description:
to intervene.
|
|
|
Type:
MOTION
|
Filing Date:
November 12, 2003
|
Filed By:
GENENTECH, INC.
|
|
Description:
to intervene.
|
|
|
Type:
MOTION
|
Filing Date:
November 12, 2003
|
Filed By:
CONCERNED BUSINESSES EAST OF 101
HMS OYSTER POINT BLVD., LLC.
|
|
Description:
joint; to intervene.
|
|
|
Type:
MOTION
|
Filing Date:
November 12, 2003
|
Filed By:
TOWN OF HILLSBOROUGH
|
|
Description:
to Intervene.
|
|
|
Type:
MOTION
|
Filing Date:
November 12, 2003
|
Filed By:
GATEWAY PROPERTY OWNERS ASSOCIATION
|
|
Description:
to Intervene.
|
|
|
Type:
MOTION
|
Filing Date:
November 12, 2003
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS
|
|
Description:
for an order shortening time to respond to motion to compel discovery responses
from PG&E.
|
|
|
Type:
RULING
|
Filing Date:
November 10, 2003
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Grants requests to intervene of the City of Burlingame filed October 22, and of
the City of South San Francisco filed October 29, 2003. Suspends a schedule
for submission of testimony.
|
|
|
Type:
RESPONSE
|
Filing Date:
November 3, 2003
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to the City of Burlingame's motion to intervene.
|
|
|
Type:
PETITION
|
Filing Date:
October 29, 2003
|
Filed By:
CITY OF SOUTH SAN FRANCISCO
|
|
Description:
to intervene.
|
|
|
Type:
MOTION
|
Filing Date:
October 22, 2003
|
Filed By:
CITY OF BURLINGAME
|
|
Description:
to Intervene.
|
|
|
Type:
REPLY
|
Filing Date:
June 6, 2003
|
Filed By:
CITY OF DALY CITY
|
|
Description:
to Response Brief of PG&E to Daly City's Petition to Intervene; filing
authorized by ALJ
|
|
|
Type:
RESPONSE
|
Filing Date:
May 27, 2003
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to City of Daly City's Petition to Intervene
|
|
|
Type:
PETITION
|
Filing Date:
May 14, 2003
|
Filed By:
CITY OF DALY CITY
|
|
Description:
to intervene.
|
|
|
Type:
PETITION
|
Filing Date:
May 12, 2003
|
Filed By:
CITY OF DALY CITY
|
|
Description:
to Intervene.
|
|
|
Type:
RULING
|
Filing Date:
May 6, 2003
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
Regarding Notice of Intent to Claim Compensation and Other Procedural Matters
|
|
|
Type:
PETITION
|
Filing Date:
April 15, 2003
|
Filed By:
CITY OF SAN BRUNO
|
|
Description:
to intervene
|
|
|
Type:
EXPARTE
|
Filing Date:
April 10, 2003
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On April 7, 2003, John Clarke, Manager, Regulatory Relations, Pacific Gas and
Electric Company (PG&E), met with Aaron Johnson, advisor to Cmmr. Lynch, in San
Francisco. Also present were Billie Blanchard, Project Manager, Energy
Division, Pamela Nataloni, Attorney, Legal Division, and David Kraska,
Attorney, and Kevin Dasso, Director, Electric T&D Engineering, for PG&E.
Kraska stated that several parties commenting on the scope of the Commission's
Environmental Impact Report for the Jefferson-Martin 230 kV Transmission
Project (Project) had requested the inclusion of separate projects to relocate
existing 60 kV lines in the Project area, but have not established the
necessary legal 'nexus' between any impacts caused by the Project and the
requested relocation of existing facilities. Kraska and Clarke explained that
any decision to condition approval of the Project on PG&E's agreement to
implement these relocation projects would, in addition to violating applicable
standards under the California Environmental Quality Act, create a significant
and unnecessary ratepayer cost burden. Dasso expressed the necessity of meeting
the California Independent System Operator's deadline for completing the
Project.
|
|
|
Type:
SUPPLEMENT
|
Filing Date:
March 27, 2003
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS GROUP
|
|
Description:
To Notice Of Intent To Claim Compensation
|
|
|
Type:
SCOPING RULING
|
Filing Date:
March 19, 2003
|
Filed By:
ALJ/TERKEURST/PUC
CMMR/LYNCH/PUC
|
|
Description:
Affirms the preliminary categorization of ratesetting. Sets the following
schedule: draft EIR - July 2003; final EIR - October 2003; hrgs: 12/4-10;
concurrent opening briefs - 1/9/2004; reply briefs and submission - 1/23; PD -
4/4; final decision - 5/4.
|
|
|
Type:
NOTICE
|
Filing Date:
February 7, 2003
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS GROUP
|
|
Description:
of intent to claim compensation
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
January 7, 2003
|
Filed By:
TOWN OF HILLSBOROUGH
|
|
Description:
Prehearing Conference Statement.
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
January 7, 2003
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
pursuant to ALJ Terkeurst's Ruling of 12/13/02
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
January 7, 2003
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS GROUP
|
|
Description:
pursuant to ALJ Terkeurst's Ruling of 12/13/02.
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
January 7, 2003
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
pursuant to ALJ Terkeurst's Ruling of 12/13/02
|
|
|
Type:
RULING
|
Filing Date:
December 13, 2002
|
Filed By:
ALJ/TERKEURST/PUC
|
|
Description:
sets a prehearing conference for January 10, 2003; PHC statements are due by
January 7, 2003.
|
|
|
Type:
REPLY
|
Filing Date:
November 21, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Consolidated Reply to Protests, Request for Hearings, and Comments filed by
interested parties
|
|
|
Type:
MOTION
|
Filing Date:
November 13, 2002
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS GROUP
|
|
Description:
for leave to file late file protest; protest attached
|
|
|
Type:
PROTEST
|
Filing Date:
November 12, 2002
|
Filed By:
TOWN OF HILLSBOROUGH
|
|
Description:
and request for hearing.
|
|
|
Type:
PROTEST
|
Filing Date:
November 12, 2002
|
Filed By:
280 CORRIDOR CONCERNED CITIZENS GROUP
|
|
Description:
to the application
|
|
|
Type:
PROTEST
|
Filing Date:
November 12, 2002
|
Filed By:
ORA/SCARFF/PUC
|
|
Description:
to application
|
|
|
Type:
PROTEST
|
Filing Date:
November 6, 2002
|
Filed By:
DR. MARIO RABINOWITZ
LAVERNE RABINOWITZ
|
|
Description:
to the application
|
|
|
Type:
PROTEST
|
Filing Date:
October 30, 2002
|
Filed By:
DR. CHEOL HOON LEE
|
|
Description:
and Request for Hearing.
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
October 15, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Declarations of mailing and posting of notice of an application for CPCN
|
|
|
Type:
RESOLUTION ALJ-176 CATEGORIZATION
|
Filing Date:
October 3, 2002
|
Filed By:
COMR/PUC
|
|
Description:
Resolution ALJ 176-3096; Ratification of preliminary determination of category
adopted.
|
|
|
Type:
APPLICATION
|
Filing Date:
September 30, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY (U 39-M)
|
|
Description:
for a Certificate of Public Convenience and Necessity Authorizing the
Construction of the Jefferson-Martin 230 kV Transmission Project.
|
|
|
Type:
FEES
|
Filing Date:
September 30, 2002
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
One-Third Environmental Impact Report (EIR) Fee Deposit per Rule 17.1(j).
|