Filer Requested Category:
Ratesetting
Preliminary Category:
Ratesetting
Commission Designated Category:
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY (U39E)
|
|
|
DOCUMENTS
Number of Documents: 41
|
Type:
REQUEST
|
Filing Date:
May 1, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
for Award of Compensation for Substantial Contributions to Decision 07-03-013.
|
Type:
COMMENTS
|
Filing Date:
February 26, 2007
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
Reply; on the Proposed Decision of ALJ Long.
|
Type:
COMMENTS
|
Filing Date:
February 26, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; on the Proposed Decision of ALJ Long.
|
Type:
COMMENTS
|
Filing Date:
February 20, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
on the Proposed Decision of ALJ Long.
|
Type:
COMMENTS
|
Filing Date:
February 20, 2007
|
Filed By:
PACIFIC POWER PARTNERSHIP LLC
|
|
Description:
Opening; on Proposed Decision of ALJ Long.
|
Type:
COMMENTS
|
Filing Date:
February 20, 2007
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
Opening; on the Proposed Decision of ALJ Long.
|
Type:
COMMENTS
|
Filing Date:
February 20, 2007
|
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
|
|
Description:
Opening; on the Proposed Decision of ALJ Long.
|
Type:
EXPARTE
|
Filing Date:
February 13, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On February 7, 2007, Brian Cherry, Vice President, Regulatory Relations, Pacific Gas and Electric Company (PG&E) met with Peter Arth, advisor to President Peevey, in San Francisco. Also present was Meredith Allen, Chief, Regulatory Relations of PG&E. Written material (attached to the notice) was used. Cherry stated that the proposed decision should be modified to adopt PG&E's proposed ratemaking and that the language regarding firming services should be clarified.
|
Type:
PROPOSED DECISION
|
Filing Date:
January 30, 2007
|
Filed By:
ALJ/LONG/CPUC
|
|
Description:
Final Opinion authorizing PG&E to Perform a Feasibility Study of Wind-Generated and other Renewable Electric Power in British Columbia. Opening Comments which shall not exceed 15 pages are due no later than February 19, 2007; Reply Comments are 5 days after Opening Comments are filed.
|
Type:
BRIEF
|
Filing Date:
December 22, 2006
|
Filed By:
PACIFIC POWER PARTNERSHIP LLC
|
|
Description:
Reply
|
Type:
BRIEF
|
Filing Date:
December 22, 2006
|
Filed By:
DRA/DeAngelis/CPUC
|
|
Description:
Reply
|
Type:
BRIEF
|
Filing Date:
December 22, 2006
|
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
|
|
Description:
Reply
|
Type:
BRIEF
|
Filing Date:
December 22, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply
|
Type:
BRIEF
|
Filing Date:
December 22, 2006
|
Filed By:
The Utility Reform Network
|
|
Description:
Reply
|
Type:
BRIEF
|
Filing Date:
December 22, 2006
|
Filed By:
KATABATIC POWER CORPORATION
|
|
Description:
Reply
|
Type:
BRIEF
|
Filing Date:
December 8, 2006
|
Filed By:
PACIFIC POWER PARTNERSHIP LLC
|
|
Description:
Concurrent Opening
|
Type:
BRIEF
|
Filing Date:
December 8, 2006
|
Filed By:
CEERT
|
|
Description:
Opening
|
Type:
BRIEF
|
Filing Date:
December 8, 2006
|
Filed By:
The Utility Reform Network
|
|
Description:
OPENING.
|
Type:
BRIEF
|
Filing Date:
December 8, 2006
|
Filed By:
DRA/DEANGELIS/PUC
|
|
Description:
opening.
|
Type:
BRIEF
|
Filing Date:
December 8, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
OPENING.
|
Type:
RULING
|
Filing Date:
December 5, 2006
|
Filed By:
ALJ/Long/CPUC
|
|
Description:
REGARDING NOTICES OF INTENT TO CLAIM COMPENSATION. Finds that CARE and TURN are eligible for compensation in this proceeding.
|
Type:
NOTICE
|
Filing Date:
November 30, 2006
|
Filed By:
The Utility Reform Network
|
|
Description:
OF INTENT TO CLAIM COMPENSATION.
|
Type:
NOTICE
|
Filing Date:
November 27, 2006
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
of intent to claim compensation.
|
Type:
EXPARTE
|
Filing Date:
November 22, 2006
|
Filed By:
PACIFIC POWER PARTNERSHIP LLC
|
|
Description:
On November 15, 2006, Terrence P. Goggin, Vice-Chairman and Director of Governmental Affairs of Pacific Power Partnership LLC (P3), met with Comr. Grueneich in San Francisco. Also present were Traci Bone, advisor to Comr. Grueneich, and Peter Arth, advisor to Comr. Peevey. Written materials (attached to the notice) were used. Goggin stated that British Columbia has significant other potential renewable generation resources that could greatly aid Pacific Gas and Electric Company (PG&E) and California in reaching Renewable Portfolio Standard goals. Goggin explained that PG&E's proposed approach does not recognize the importance of the role that State governmental or regulatory officials must play in bringing such an international project to fruition. Goggin stated that P3 is willing to provide PG&E certain first mover benefits by negotiating an option with PG&E, but that P3 wanted to be involved in performing certain portions of study for which it believed it was uniquely qualified.
|
Type:
EXPARTE
|
Filing Date:
November 21, 2006
|
Filed By:
DRA/DeAngelis/CPUC
|
|
Description:
SUMMARY: On November 16, 2006, Regina DeAngelis, counsel for the Division of Ratepayer Advocates (DRA), met with Andrew Schwartz, Advisor to Cmmr. Peevey, in San Francisco. DeAngelis indicated that it was unclear from the Application whether Pacific Gas and Electric Company (PG&E) had sufficiently researched in-state options for meeting renewable procurement targets and expressed DRA's concern that in-state options should be reviewed first before turning to more remote locations for the procurement of renewables. DeAngelis also noted that, to the extent that PG&E's proposed study has merit, a governmental agency may be better able to perform the study in a comprehensive and independent manner.
Contact person: Sue Muniz (415) 703-1858; email: sam@cpuc.ca.gov
|
Type:
SCOPING RULING
|
Filing Date:
November 13, 2006
|
Filed By:
ALJ/LONG/CPUC
CMMR/PEEVEY/CPUC
|
|
Description:
Categorization is Ratesetting. Hearings are not required. Issues and Schedule are as set forth. ALJ Doug Long is the Presiding Officer.
|
Type:
AMENDMENT
|
Filing Date:
November 3, 2006
|
Filed By:
PACIFIC POWER PARTNERSHIP, LLC
|
|
Description:
to prehearing conference statement.
|
Type:
STATEMENT
|
Filing Date:
October 27, 2006
|
Filed By:
DRA/DEANGELIS/CPUC
|
|
Description:
Prehearing Conference
|
Type:
STATEMENT
|
Filing Date:
October 27, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Prehearing Conference
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
October 27, 2006
|
Filed By:
PACIFIC POWER PARTNERSHIP LLC
|
|
Description:
In accordance with the October 20, 2006 ALJ's Rulling
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
October 27, 2006
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
On October 20, 2006 ALJ's Ruling
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
October 27, 2006
|
Filed By:
SEA BREEZE PACIFIC REGIONAL TRANSMISSION SYSTEM, INC.
|
|
Description:
In accordance with the October 20, 2006 ALJ's Rulling
|
Type:
RULING
|
Filing Date:
October 20, 2006
|
Filed By:
ALJ/Long/CPUC
|
|
Description:
Sets a prehearing conference on October 31, 2006. Interested parties shall serve a prehearing conference statement, as set forth, by October 27, 2006.
|
Type:
REPLY
|
Filing Date:
October 16, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to Protests.
|
Type:
PROTEST
|
Filing Date:
October 6, 2006
|
Filed By:
PACIFIC POWER PARTNERSHIP LLC
|
|
Description:
[to the application].
|
Type:
PROTEST
|
Filing Date:
October 5, 2006
|
Filed By:
DRA/DEANGELIS/CPUC
|
|
Description:
to Application.
|
Type:
PROTEST
|
Filing Date:
October 5, 2006
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
to Application.
|
Type:
SUPPLEMENT
|
Filing Date:
September 22, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
RESPONSES TO ADMINISTRATIVE LAW JUDGE'S RULING
DIRECTING THE APPLICANT TO FILE A SUPPLEMENT.
TO ITS APPLICATION
|
Type:
RULING
|
Filing Date:
September 8, 2006
|
Filed By:
ALJ/LONG/CPUC
|
|
Description:
on Application Deficiencies that require Supplemental Information. The Protest period is extended to 14 days after PG&E serves the Supplement.
|
Type:
RESOLUTION ALJ-176 CATEGORIZATION
|
Filing Date:
August 24, 2006
|
Filed By:
COMR/CPUC
|
|
Description:
Resolution ALJ 176-3177; Ratification of preliminary determinations of category adopted.
|
Type:
APPLICATION
|
Filing Date:
August 9, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY (U39E)
|
|
Description:
for Recovery of Generation Feasibility Study Costs Associated with the Evaluation of Wind-Generated and Other Renewable Electric Power in British Columbia.
|
DECISIONS
Number of Decisions: 2
|
Decision Number:
D0709008
|
Rendered Date:
September 6, 2007
Effective Date:
September 6, 2007
|
|
Description:
Grants intervenor compensation to The Utility Reform Network for substantial contributions to Decision 07-03-013. This proceeding is closed.
|
Decision Number:
D0703013
|
Rendered Date:
March 1, 2007
Effective Date:
March 1, 2007
|
|
Description:
Final Opinion. Authorizes Pacific Gas and Electric Company to perform a feasibility study of wind-generated and other renewable electric power in British Columbia. This proceeding is closed.
|