|
Commissioner Assigned: Dian Grueneich on March 2, 2007
ALJ Assigned: Victoria S Kolakowski on March 2, 2007
|
Filer Requested Category:
Ratesetting
Preliminary Category:
Ratesetting
Commission Designated Category:
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY (U338E)
|
|
|
DOCUMENTS
Number of Documents: 9
|
Type:
PROPOSED DECISION
|
Filing Date:
November 18, 2008
|
Filed By:
ALJ/KOLAKOWSKI/CPUC
|
|
Description:
Decision Granting Southern California Edison Company a Permit to Construct Electrical Facilities for the El Casco System Project. Opening comments, which shall not exceed 15 pages, are due December 8, 2008. Reply comments,which shall not exceed 5 pages, are due 5 days after the last day for filing comments
|
Type:
SCOPING RULING
|
Filing Date:
March 20, 2008
|
Filed By:
ALJ/KOLAKOWSKI/CPUC
CMMR/GRUENEICH/CPUC
|
|
Description:
The scope and schedule is as set forth. The preliminary categorization as ratesetting is affirmed and no hearings are necessary. ALJ Victoria Kolakowski is the principal hearing officer.
|
Type:
AMENDED APPLICATION
|
Filing Date:
July 17, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
(The Amendment consists of the recalculation of the load flows and redistributing the 47 MW of load onto the correct Proposed Project Lines. There is also some minor clarifications to the text of the FMP unrelated to the milligaus level changes.)
|
Type:
RULING
|
Filing Date:
July 16, 2007
|
Filed By:
ALJ/KOLAKOWSKI/CPUC
|
|
Description:
Scheduling a Prehearing Conference.
|
Type:
REPLY
|
Filing Date:
March 28, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
to Protests and Requests for Hearings.
|
Type:
PROTEST
|
Filing Date:
March 16, 2007
|
Filed By:
EDWARD H. LEONHARDT, P.E.
|
|
Description:
to Application.
|
Type:
RESOLUTION ALJ-176 CATEGORIZATION
|
Filing Date:
March 1, 2007
|
Filed By:
COMR/CPUC
|
|
Description:
Resolution ALJ 176-3188; Ratification of preliminary determinations of category adopted.
|
Type:
APPLICATION
|
Filing Date:
February 16, 2007
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY (U338E)
|
|
Description:
for a Permit to Construct Electrical Facilities with Voltages between 50kV and 200 kV: El Casco System Project (U 338-E).
|
Type:
FEES
|
Filing Date:
February 16, 2007
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
One-third deposit of fees for recovery of costs incurred in preparing a Negative Declaration or Environment Impact Report [EIR] in accordance with Rule 2.5(c).
|
DECISIONS
Number of Decisions: 0
|