All Documents For
Proceeding R0110024
Date Filed: October 25, 2001

Number of Documents: 1520

Type: NOTICE Filing Date: May 3, 2012
Filed By:
CALJ/CLOPTON/CPUC
Description: OF CO-ASSIGNMENT. ALJ Robert Barnett is being co-assigned to Rulemaking 01-10-024, for the purposes of handling Petition for Modification of Decision 04-06-011 as modified.

Type: MOTION Filing Date: May 1, 2012
Filed By:
Panoche Energy Center LLC
Description: Motion for party status.

Type: MOTION Filing Date: April 24, 2012
Filed By:
Panoche Energy Center, LLC
Description: Motion for leave to file a response to San Diego Gas & Electric Company's Petition for Modification of D.04-06-011.

Type: PETITION FOR MODIFICATION Filing Date: November 16, 2011
Filed By:
San Diego Gas & Electric Company
Description: Petition for Modification of Decision 04-06-011 (as Modified by D.06-02-031 and D.06-09-021) Regarding Otay Mesa Energy Center.

Type: COMPLIANCE FILING Filing Date: July 27, 2007
Filed By:
Pacific Gas and Electric Company
Description: Notification Under Ordering Paragraph 5 of Decision 06-11-006.

Type: REQUEST Filing Date: November 7, 2006
Filed By:
The Utility Reform Network
Utility Consumers Action Network
Description: FOR AWARD OF COMPENSATION FOR SUBSTANTIAL CONTRIBUTIONS TO D04-06-011, D05-06-062, D06-02-031, AND D06-09-021

Type: EXPARTE Filing Date: July 28, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On July 25, 2006, Lad Lorenz, Vice President of Regulatory Affairs, San Diego Gas & Electric Company (SDG&E), Rami Kahlon, advisor to Cmmr. Peevey, in San Francisco. Also present were Belinda Gatti, advisor to Cmmr. Brown, Stephen St. Marie, advisor to Cmmr. Bohn, Andrew Campbell, advisor to Cmmr. Chong, and Mike Schneider, Director of Business Planning and Budgets, and Lisa Urick, Attorney, for SDG&E. Written materials were used, and are provided with this notice, as follows: confidential portions of the materials are submitted under seal, pursuant to the protective order adopted in this proceeding; and non-confidential portions of the written materials are attached to the notice. Lorenz provided a general overview of the joint petition for modification (PM) and pointed out that the Otay Mesa Plant has a new on-line date of May 1, 2009, as well as 'put' and 'call' options that could result in SDG&E owning the plant in 2019. Urick explained that the Commission has already found that the plant is needed. Urick also explained that approval of the FIN 46 effects here would be non-precedential. Schneider described the economics that support the revised Power Purchase Agreement, including the put and call options prices and why these prices are advantageous.

Type: RESPONSE Filing Date: July 21, 2006
Filed By:
CALPINE CORPORATION
Description: to Joint Petition for Modification.

Type: RESPONSE Filing Date: July 21, 2006
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: to the joint petition to modify D04-06-011and D06-02-031.

Type: RULING Filing Date: July 7, 2006
Filed By:
ALJ/BROWN/CPUC
Description: ADMINISTRATIVE LAW JUDGE'S RULING GRANTING MOTION OF SAN DIEGO GAS & ELECTRIC COMPANY FOR AN ORDER SHORTENING TIME FOR FILING RESPONSES AND REPLIES TO JOINT PETITION FOR MODIFICATION OF DECISION (D.) 04-06-011 AND D.06-02-031. Responses to the Joint Petition are due 07/21/06 and Replies are due 07/27/06.

Type: MOTION Filing Date: July 3, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: for an Order Shortening Time for Filing Responses and Replies to Joint Petition for Modification of D.04-06-011 and D.06-02-031.

Type: PETITION FOR MODIFICATION Filing Date: July 3, 2006
Filed By:
DRA/OBIORA/PUC
SAN DIEGO GAS & ELECTRIC COMPANY
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: [Public and Confidential Versions) Joint, for mofification of D.04-06-011 and D.06-02-031.

Type: RESPONSE Filing Date: April 4, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to TURN's Application for Rehearing of Decision 06-02-031.

Type: REHEARING REQUEST Filing Date: March 20, 2006
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: PUBLIC VERSION; of D06-02-031. CONFIDENTIAL VERSION filed under seal in accordance with the PROTECTIVE ORDER adopted pursuant to the January 7, 2003 Ruling.

Type: RULING Filing Date: March 7, 2006
Filed By:
ALJ/BROWN/PUC
Description: Finds TURN eligible for an award of intervenor compensation.

Type: COMMENTS Filing Date: February 27, 2006
Filed By:
SEMPRA GENERATION
Description: on Draft Decision of ALJ Walwyn.

Type: COMMENTS Filing Date: February 27, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Draft Decision of ALJ Walwyn.

Type: RULING Filing Date: February 24, 2006
Filed By:
ALJ/WALWYN/PUC
Description: Shortens reply period. Responses to the February 16, 2006 Sempra Generation's (SG) motion to withdraw its petition to modify D04-01-050 are due February 28, 2006, with a reply date for SG of March 3, 2006.

Type: MOTION Filing Date: February 16, 2006
Filed By:
SEMPRA GENERATION
Description: to Withdraw Petition to Modify D.04-01-050.

Type: DRAFT DECISION Filing Date: February 6, 2006
Filed By:
ALJ/WALWYN/PUC
Description: Opinion Addressing Petitions to Modify D02-10-062, D03-06-076, D03-12-062, and D04-01-050. Comments are due February 26, 2006; reply comments - 5 days after comments are filed.

Type: COMMENTS Filing Date: January 23, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; on Proposed Decision of ALJ Brown.

Type: COMMENTS Filing Date: January 23, 2006
Filed By:
CALPINE CORPORATION
Description: reply; on the proposed decision of ALJ Brown.

Type: COMMENTS Filing Date: January 23, 2006
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: joint; reply; on the proposed decision of ALJ Brown.

Type: COMMENTS Filing Date: January 17, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on the proposed decision of ALJ Brown.

Type: MOTION Filing Date: January 17, 2006
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTIOIN NETWORK
Description: for reopening the evidentiary record to admit additional evidence.

Type: COMMENTS Filing Date: January 17, 2006
Filed By:
DRA/OBIORA/PUC
Description: on the proposed decision of ALJ Brown.

Type: COMMENTS Filing Date: January 17, 2006
Filed By:
CALPINE CORPORATION
Description: on the proposed decision of ALJ Brown.

Type: COMMENTS Filing Date: January 17, 2006
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTIOIN NETWORK
Description: joint; on the proposed decision of ALJ Brown.

Type: PROPOSED DECISION Filing Date: December 27, 2005
Filed By:
ALJ/BROWN/PUC
Description: Opinion on Rehearing on SDG&E's application for approval for the Otay Mesa Generating Plant. Comments are due January 16, 2006; reply comments - 5 days after comments are filed.

Type: MOTION Filing Date: December 23, 2005
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: for reopening the evidentiary record to admit additional evidence.

Type: BRIEF Filing Date: December 9, 2005
Filed By:
CITY OF CHULA VISTA
Description: Reply; on OMPPA Remand.

Type: MOTION Filing Date: December 9, 2005
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: for admission of one additional Exhibit into the evidentiary record.

Type: BRIEF Filing Date: December 9, 2005
Filed By:
CALPINE CORPORATION
Description: reply; on Limited Rehearing of D04-06-011.

Type: BRIEF Filing Date: December 9, 2005
Filed By:
ORA/OBIORA/PUC
Description: reply; in the proceeding to determine the benefits of SDG&E's Otay Mesa power purchase agreement pursuant to the order of rehearing D05-06-062.

Type: BRIEF Filing Date: December 9, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: PUBLIC VERSION; Reply. [Confidential Version filed under seal pursuant to the protective order adopted on December 1, 2003, by ALJ Walwyn].

Type: BRIEF Filing Date: December 9, 2005
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: CONFIDENTIAL VERSION; reply. [Filed under seal pursuant to the protective order adopted on December 1, 2003, by ALJ Walwyn].

Type: BRIEF Filing Date: December 9, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; in Otay Mesa Purchase Power Agreement Limited Rehearing.

Type: BRIEF Filing Date: November 30, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Opening; in OTAY MESA Purchase Power Agreement Limited Rehearing.

Type: MOTION Filing Date: November 30, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: PUBLIC VERSION; for admission of two confidential Exhibits into the evidentiary record; [CONFIDENTIAL EXHIBITS ATTACHED UNDER SEAL CONSISTENT WITH THE TERMS OF THE PROTECTIVE ORDER ADOPTED ON DECEMBER 1, 2003.]

Type: BRIEF Filing Date: November 30, 2005
Filed By:
CALPINE CORPORATION
Description: opening; on limited rehearing of D04-06-011.

Type: BRIEF Filing Date: November 30, 2005
Filed By:
ORA/OBIORA/PUC
Description: opening; in the proceeding to determine the benefits of SDG&E's Otay Mesa Power Purchase Agreement pursuant to the order of rehearing D05-06-062.

Type: BRIEF Filing Date: November 30, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: PUBLIC VERSION. Redacted; Opening; on the rehearing of the Otay Mesa Power Purchase Agreement.

Type: BRIEF Filing Date: November 30, 2005
Filed By:
CITY OF CHULA VISTA
Description: Initial; on OMPRA Remand

Type: TRANSCRIPT Filing Date: November 8, 2005
Filed By:
REPORTING DIVISION
Description: Submitted; Volume 58.

Type: RESPONSE Filing Date: October 28, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to TURN Motion to strike portions of the testimony of SDG&E.

Type: RESPONSE Filing Date: October 28, 2005
Filed By:
CALPINE CORPORATION
Description: to Motion of TURN and UCAN to strike portions of the testimony of SDG&E

Type: RESPONSE Filing Date: October 28, 2005
Filed By:
ORA/OBIORA/PUC
Description: to the Motion of TURN and UCAN to strike portions of the testimony of SDG&E

Type: MOTION Filing Date: October 26, 2005
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: to shorten time.

Type: MOTION Filing Date: October 26, 2005
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: to strike portions of the testimony of SDG&E.

Type: REPLY Filing Date: September 23, 2005
Filed By:
ORA/OBIORA/PUC
Description: to SDG&E's response to the motion to strike.

Type: RESPONSE Filing Date: September 23, 2005
Filed By:
ORA/OBIORA/PUC
Description: to the motion of TURN and UCAN to strike.

Type: REPLY Filing Date: September 23, 2005
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: to the response of SDG&E to the motion to strike.

Type: RESPONSE Filing Date: September 21, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to TURN Motion to strike testimony.

Type: MOTION Filing Date: September 16, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: to shorten time.

Type: MOTION Filing Date: September 16, 2005
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: to strike portions of the testimony of SDG&E.

Type: COMMENTS Filing Date: August 25, 2005
Filed By:
ORA/OBIORA/PUC
Description: opening; on the proposed decision denying the petition for modification of D04-06-011.

Type: NOTICE Filing Date: August 22, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: AMENDED Notice of Intent to Seek Compensation.

Type: SCOPING RULING Filing Date: August 16, 2005
Filed By:
CMMR/PEEVEY/PUC
Description: on Rehearing of D04-06-011. Confirms that this proceeding on rehearing is ratesetting. Sets evidentiary hearing for October 17-21, 2005.

Type: NOTICE Filing Date: August 8, 2005
Filed By:
UTILITY CONSUMERS' ACTION NETWORK
Description: of Intent to Claim Compensation.

Type: COMMENTS Filing Date: August 5, 2005
Filed By:
ORA/OBIORA/PUC
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: on the scope and schedule for considering the reasonableness of the Otay Mesa Power Purchase Agreement.

Type: DRAFT DECISION Filing Date: August 5, 2005
Filed By:
ALJ/BROWN/PUC
Description: re Petition of the ORA for modification of D04-06-011. Comments are due August 25, 2005; and reply comments - 5 days after comments are filed.

Type: RESPONSE Filing Date: July 11, 2005
Filed By:
CALPINE CORPORATION
Description: to the petition of the ORA for modification of D04-06-011.

Type: RULING Filing Date: July 8, 2005
Filed By:
ALJ/BROWN/PUC
Description: Sets a prehearing conference for July 22, 2005.

Type: RULING Filing Date: June 28, 2005
Filed By:
CMMR/PEEVEY/PUC
Description: Denies the joint motion of CRES et al. for clarification. Any confidential material submitted with or in response to the joint motion is to be returned or destroyed.

Type: LAW & MOTION Filing Date: June 13, 2005
Filed By:
COMMUNITY RENEWABLE ENERGY SERVICES, INC.
MADERA POWER, LLC
SIERRA POWER CORPORATION
Description: Joint Motion for leave to file confidential materials under seal; confidential materials attached and filed unser seal, namely, unredacted reply to briefs in opposition to joint motion for clarification.

Type: REPLY Filing Date: June 13, 2005
Filed By:
COMMUNITY RENEWABLE ENERGY SERVICES, INC.
MADERA POWER, LLC
SIERRA POWER CORPORATION
Description: (REDACTED VERSION) to briefs in opposition to joint motion for clarification of Assigned Commissioner's Ruling Specifying Criteria for Interim Renewable Energy Solicitations, as Modified.

Type: PETITION FOR MODIFICATION Filing Date: June 9, 2005
Filed By:
ORA/OBIORA/PUC
Description: of D04-06-011.

Type: OPPOSITION Filing Date: June 1, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to joint motion for clarification of Assigned Commissioner's Ruling Specifying Criteria for interim renewable energy solicitations.

Type: RESPONSE Filing Date: June 1, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: to the joint motion seeking clarification of Assigned Commissioner's Ruling specifying criteria for interim renewable energy solicitations.

Type: LAW & MOTION Filing Date: May 17, 2005
Filed By:
COMMUNITY RENEWABLE ENERGY RESOURCES, INC.
MADERA POWER, LLC
SIERRA POWER CORPORATION
Description: Joint motion for leave to file under seal confidential materials; confidential materials attached and filed under seal.

Type: MOTION Filing Date: May 17, 2005
Filed By:
COMMUNITY RENEWABLE ENERGY RESOURCES, INC.
MADERA POWER, LLC
SIERRA POWER CORPORATION
Description: (REDACTED VERSION) joint; for clarification of assigned Commissioner's ruling specifying criteria for interim renewable energy solicitations (August 13, 2003), as modified by assigned Commissioner's Ruling granting motion for reconsideration by the Independent Energy Producers Association (September 29, 2003).

Type: NOTICE Filing Date: April 1, 2005
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: of Substitution.

Type: NOTICE Filing Date: December 23, 2004
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: of substitution.

Type: EXPARTE Filing Date: December 9, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: On December 6, 2004, Michael Alcantar, counsel to the Cogeneration Association of California (CAC), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Kelly Lucas, Executive Director, and Phil Herrington, partner of the Mid-Set Cogeneration Company (Mid-Set). Parties reviewed the status of ad hoc negotiations with utilities regarding the retention of cogeneration resources, and possible actions to resolve disputes related to utility offered contract terms or prices. With regard to SO1 offers, parties noted that Pacific Gas and Electric Company had incorporated conditions in its terms and conditions that were not consistent with SO1 contracts. Parties explained that these objectionable terms related to features seeking retroactive adjustment of payments for delivered energy and capacity. With regard to Mid-Set, parties noted that the long term firm power resource cogeneration project was in a unique position of terminating before the establishment of a policy or long run avoided cost determinations. Parties also reviewed options for needed relief related to this long term firm resource timing regarding the establishment of a firm, long term contract in light of the operating conditions associated with Mid-Set.

Type: COMMENTS Filing Date: October 25, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; on the Proposed Decision of ALJ Halligan.

Type: COMMENTS Filing Date: October 18, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Opening; on the Proposed Decision of ALJ Halligan.

Type: COMMENTS Filing Date: October 18, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the draft decision of ALJ Halligan.

Type: DRAFT DECISION Filing Date: September 28, 2004
Filed By:
ALJ/HALLIGAN/PUC
Description: Opinion Addressing Petitions to Modify D03-04-029. Comments are due October 18, 2004; reply comments - 5 days after comments are filed.

Type: EXPARTE Filing Date: September 24, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On September 21, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Pres. Peevey in San Francisco. Also present were Julie Fitch, advisor to Pres. Peevey, and Frank De Rosa, Director, and John Pappas, Manager, Power Contracts, and Mary Gandesbery, Attorney, PG&E. De Rosa and Gandesbery reviewed the status of PG&E's efforts to execute five-year SO1 contract extensions with existing qualifying facilities (QFs) and described some of the generic contract amendments being proposed by PG&E in these negotiations. De Rosa indicated that PG&E is on track to execute these contract extensions and that PG&E's long-run goal is to move QF prices to market and obviate the need for these SO1 contract extensions.

Type: RESPONSE Filing Date: September 13, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to the Green Power Institute Petition for Modification of Decision 03-06-071.

Type: EXPARTE Filing Date: September 10, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On September 7, 2004, Jerry Bloom of White & Case LLP, attorneys for the California Cogeneration Council (CCC), met with Pres. Peevey, in San Francisco. Also present were Raminder Kahlon of the Commission and Lisa Cottle of White & Case LLP. Bloom and Cottle expressed concern regarding the petition for writ of review that Southern California Edison Company recently filed in the California Court of Appeal. CCC noted that in the petition Edison seeks to set aside and vacate the Commission's decisions requiring Edison to sign SO1 contract extensions with existing qualifying facilities. CCC representatives asked for the Commission's assistance in defending the decisions. The CCC representatives also explained how important it is for California's manufacturing and industrial companies to be able to continue operating their existing cogeneration facilities.

Type: MISCELLANEOUS FILING Filing Date: September 2, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Joinder in Edison's motion to strike portions of the testimony of CCC and CAC and request for an order shortening time.

Type: MISCELLANEOUS FILING Filing Date: August 31, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Corrected Petition for Modification of D04-01-050 [filed 3/26/04].

Type: COMMENTS Filing Date: August 13, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on proposed decision denying PG&E's petition to modify D03-12-060, D03-12-062, and D04-02-059.

Type: COMMENTS Filing Date: August 13, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; to TURN comments on the draft decision denying PG&E's petition to modify D03-12-006 and D04-02-059.

Type: PETITION FOR MODIFICATION Filing Date: August 12, 2004
Filed By:
GREEN POWER INSTITUTE
Description: of D03-06-071.

Type: COMMENTS Filing Date: August 5, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the Draft Decision of ALJ Malcolm and ALJ Walwyn on PG&E's Petition for Modification of Decision 03-12-060 and Decision 04-02-059 and Petition for Modification of Decision 03-12-062.

Type: COMMENTS Filing Date: August 5, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: on Proposed Decision denying PG&E's Petition to Modify Decisions 03-12-060 and 04-02-059.

Type: RESPONSE Filing Date: July 30, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to Applications for Rehearing of D04-06-011.

Type: RESPONSE Filing Date: July 30, 2004
Filed By:
CALPINE CORPORATION
Description: to applications for rehearing of D04-06-011.

Type: DRAFT DECISION Filing Date: July 16, 2004
Filed By:
ALJ/MALCOLM/WALWYN/PUC
Description: Interim Opinion denying petition for modification of D03-12-060 and D04-02-059, and petition for modification of D03-12-062 filed by PG&E.

Type: REHEARING REQUEST Filing Date: July 15, 2004
Filed By:
CITY OF CHULA VISTA
Description: of D04-06-011, or, in the alternative, request for clarification.

Type: REHEARING REQUEST Filing Date: July 15, 2004
Filed By:
UTILITY CONSUMERS ACTION NETWORK
UTILITY REFORM NETWORK
Description: of D04-06-011.

Type: REHEARING REQUEST Filing Date: July 15, 2004
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: of Decision 04-06-011.

Type: COMMENTS Filing Date: June 28, 2004
Filed By:
ORA/OBIORA/PUC
Description: on the proposed decision of ALJ Walwyn.

Type: REPORT Filing Date: June 15, 2004
Filed By:
ALJ/COOKE/PUC
Description: Workshop Report on Resource Adequacy Issues.

Type: RULING Filing Date: June 10, 2004
Filed By:
ALJ/WALWYN/PUC
Description: Suspends the filing of responses to Western Power Trading Forum's Petition to Modify D04-01-050. (This proceeding is being reopened administratively due to pending Petitions for Modifications and Application for Rehearing.)

Type: EXPARTE Filing Date: June 8, 2004
Filed By:
CALPINE CORPORATION
Description: On June 4, 2004, Steve Schleimer, Director of Market and Regulatory Affairs for Calpine Corporation (Calpine), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present was Steven F. Greenwald, outside counsel for Calpine. The Calpine representatives discussed issues related to San Diego Gas & Electric Company?s (SDG&E) Grid Reliability Capacity Request for Proposals and issues related to Otay Mesa power purchase agreement (PPA) between SDG&E and Calpine. The Calpine representatives explained the significant reliability and RMR cost savings and other economic benefits that the PPA would provide to SDG&E and its ratepayers. The Calpine representatives further explained that approval of Cmmr. Wood?s alternate proposed decision rejecting the PPA would needlessly deny SDG&E and its ratepayers such reliability and economic benefits and ultimately increase costs to ratepayers.

Type: DRAFT DECISION Filing Date: June 8, 2004
Filed By:
ALJ/WALWYN/PUC
Description: Interim Opinion dismissing Petition to Modify Decision. Comments are due June 28, 2004; reply comments - 5 days after comments are filed.

Type: EXPARTE Filing Date: June 7, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On June 3, 2004, Jerry Bloom of White & Case LLP, attorneys for the California Cogeneration Council (CCC), met with Julie Fitch, advisor to Cmmr. Peevey, in San Francisco. Also present was Lisa Cottle of White & Case LLP. Bloom and Cottle discussed the status of CCC member companies' efforts to obtain five-year Standard Offer 1 (SO1) contracts from California's investor-owned utilities (Utilities). Bloom and Cottle explained that CCC members have not been able to obtain a five-year SO1 contracts from any Utility, despite their repeated requests. Bloom and Cottle discussed the CCC's concerns that the Utilities are likely to impose unreasonable terms on qualifying facilities (QFs) once they do finally make the five-year SO1 contracts available. Bloom and Cottle discussed the need for long-term contracts for existing and new QFs, explaining that companies are making decisions now about whether to make investments in their facilities. Bloom and Cottle noted that companies are interested in investing in new cogeneration facilities, and are paying close attention to California's QF policies in deciding whether to make those investments.

Type: COMMENTS Filing Date: June 4, 2004
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
WESTERN POWER TRADING FORUM
Description: on Proposed Revisions to the Proposed Decisions concerning SDG&E Company's Grid Reliability Request for Proposals.

Type: MOTION Filing Date: June 4, 2004
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: for reconsideration of Assigned Commissioner's ruling denying motion of TURN and UCAN seeking the recusal of Cmmr. Peevey.

Type: EXPARTE Filing Date: June 4, 2004
Filed By:
DUKE ENERGY NORTH AMERICA, LLC
Description: THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON May 28, 2004, AND APPEARED IN THE CALENDAR OF June 4, 2004. On May 25, 2004, Rod Wright, representing Duke Energy North America, LLC (Duke), met with Cmmr. Kennedy in San Francisco. Wright urged the Commission to support Cmmr. Wood?s alternate in the San Diego Gas & Electric Company (SDG&E) request for proposal (RFP). Wright stated that a new RFP that allows all generators to compete on a fair basis should be conducted. Wright also stated that the requirements for the bid in the RFP changed in the middle of the process and that this change had disadvantaged Duke.

Type: COMMENTS Filing Date: June 4, 2004
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: joint; on the revisions on the proposed decision of ALJ Brown.

Type: COMMENTS Filing Date: June 4, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on suggested revisions to Proposed Decision/Alternate Proposed Decision.

Type: EXPARTE Filing Date: June 2, 2004
Filed By:
CITY OF SAN DIEGO
Description: LATE FILED. On May 26, 2004, Dick Murphy, Mayor of the City of San Diego, had a telephone conversation with Cmmr. Brown. The Mayor discussed San Diego Gas & Electric Company's (SDG&E) motion for Grid Reliability Capacity Request for Proposals and stressed the immediate need for reliable capacity additions in the San Diego region. The Mayor urged the Commission to address this need when voting on SDG&E's motion and emphasized the City of San Diego's commitment to the development of renewable energy. The Mayor sought the Commission's assurances that approvals of SDG&E's resource procurements would not undermine the development potential for renewable resources.

Type: EXPARTE Filing Date: May 28, 2004
Filed By:
CITY OF SAN DIEGO
Description: On May 25, 2004, Dick Murphy, Mayor of the City of San Diego, sent a letter (copy attached to the notice) to Cmmrs. Peevey, Brown, Lynch, Wood, and Kennedy. The letter concerns the Mayor's perspective on the impending decision on San Diego Gas & Electric Company (SDG&E) motion on its request for proposals for Grid Reliability Capacity. The letter urges the Commission to move forward on May 27, 2004, to ensure reliable energy for San Diego.

Type: EXPARTE Filing Date: May 28, 2004
Filed By:
SEMPRA ENERGY RESOURCES
Description: On May 25, 2004, Alvin S. Pak, Director, Regulatory Policy & Analysis for Sempra Energy Global Enterprises, on behalf of Sempra Energy Resources (SER), met with Cmmr. Kennedy in San Francisco. Also present were Brian Prusnek, advisor to Cmmr. Kennedy, and William Engelbrecht, Vice President of Energy Supply for SER. Written material (attached to the notice) was used. Engelbrecht and Pak conveyed SER's support for Cmmr. Peevey's alternate decision (AD) and noted that the AD is the only pending decision that addresses the issue of maintaining the tax interests of the City of Escondido and that it correctly finds that the contract between SER and San Diego Gas & Electric Company (SDG&E) is in the public interest. Engelbrecht and Pak expressed the opposition of SER to Cmmr. Wood's alternate, and stated that the alternate holds that the Commission should defer approval of the Palomar contract. Engelbrecht and Pak indicated that the delays would result in adding substantial costs to the project, and would increase other costs to SDG&E and its ratepayers.

Type: EXPARTE Filing Date: May 28, 2004
Filed By:
DUKE ENERGY NORTH AMERICA
Description: AUGMENTATION REQUIRED. On May 25, 2004, Rod Wright, representing Duke Energy North America, LLC (Duke), met with Cmmr. Kennedy. Wright urged the Commission to support Cmmr. Wood's alternate in the San Diego Gas & Electric Company (SDG&E) request for proposal (RFP). Wright stated that a new RFP that allows all generators to compete on a fair basis should be conducted. Wright also stated that the requirements for the bid in the RFP changed in the middle of the process and that this change had disadvantaged Duke.

Type: RULING Filing Date: May 27, 2004
Filed By:
ALJ/BROWN/PUC
Description: Circulates suggested revisions to proposed decision/alternate proposed decision for comment. Comments, limited to 10 pages, are due by June 4, 2004; only one round of comments will be accepted.

Type: COMMENTS ON ALTERNATE Filing Date: May 26, 2004
Filed By:
RATEPAYERS FOR AFFORDABLE CLEAN ENERGY
Description: of Cmmr. Wood.

Type: EXPARTE Filing Date: May 26, 2004
Filed By:
DUKE ENERGY NORTH AMERICA, LLC
Description: On May 21, 2004, Rod Wright, representing Duke Energy North America, LLC (Duke), had a telephone conversation with Cmmr. Brown. Wright urged the Commission to consider the comments and arguments Duke had made in response to the alternate decision (AD) of Cmmr. Wood and urged the Commission to support the AD's recommendation that San Diego Gas & Electric Company should conduct another RFP in which all potential competitors are permitted to participate.

Type: EXPARTE Filing Date: May 26, 2004
Filed By:
SEMPRA ENERGY RESOURCES
Description: On May 21, 2004, Joseph Rowley, Vice President, Asset Management, Alvin S. Pak, Director, Regulatory Policy & Analysis, Sempra Energy Global Enterprises, on behalf of Sempra Energy Resources (SER), met with Cmmr. Brown in San Francisco. Also present were David Gamson and Peter Hanson, advisors to Cmmr. Brown, and William Engelbrecht, Vice President of Energy Supply for SER. Written mateial (attached to the notice) was used. Engelbrecht and Pak conveyed SER's support for Cmmr. Peevey's alternate decision (AD) and noted that the AD is the only pending decision that addresses the issue of maintaining the tax interests of the City of Escondido and that it correctly finds that the contract between SER and San Diego Gas & Electric Company (SDG&E) is in the public interest. Engelbrecht and Pak expressed the opposition of SER to Cmmr. Wood's alternate, and stated that the alternate holds that the Commission should defer approval of the Palomar contract. Engelbrecht and Pak indicated that the delays would result in adding substantial costs to the project, and would increase other costs to SDG&E and its ratepayers.

Type: COMMENTS ON ALTERNATE Filing Date: May 25, 2004
Filed By:
CITY OF ESCONDIDO
SEMPRA ENERGY RESOURCES
Description: reply; on Cmmr. Wood's alternate.

Type: RULING Filing Date: May 25, 2004
Filed By:
CMMR/PEEVEY/PUC
Description: Denies the April 26, 2004 motion of TURN and UCAN requesting recusal of Pres. Peevey.

Type: COMMENTS ON ALTERNATE Filing Date: May 25, 2004
Filed By:
CELERITY ENERGY, INC.
Description: reply; on alternate of Cmmr. Wood.

Type: COMMENTS ON ALTERNATE Filing Date: May 25, 2004
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: joint, reply; on the alternate of Cmmr. Wood.

Type: COMMENTS ON ALTERNATE Filing Date: May 25, 2004
Filed By:
CALPINE CORPORATION
Description: reply; on Cmmr. Wood's alternate.

Type: COMMENTS ON ALTERNATE Filing Date: May 25, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: reply; on the alternate of Cmmr. Wood.

Type: COMMENTS ON ALTERNATE Filing Date: May 24, 2004
Filed By:
DYNEGY MARKETING AND TRADE
Description: reply; on alternate of Cmmr. Wood.

Type: EXPARTE Filing Date: May 24, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
Description: On May 19, 2004, Lad Lorenz, Vice President of Regulatory Affairs in San Francisco for Sempra Energy Utilities Southern California Gas Company and San Diego Gas & Electric Company (SDG&E), met with Brian Prusnek, advisor to Cmmr. Kennedy, in San Francisco. Also present was Lee Schavrien, Vice President for Regulatory Affairs for SEU. Lorenz stated that SDG&E strongly opposes Cmmr. Wood's alternate decision (AD) since it would effectively reject both major power plant additions to the SDG&E system. Lorenz added that the AD also proposes changes to all other grid reliability additions and adds a new project not recommended for approval by SDG&E. Lorenz reiterated SDG&E's strong support for Cmmr. Peevey's alternate, which approves the needed infrastructure additions, and will provide the needed cost recovery mechanisms and the appropriate financial safeguards to the utility for new electric generation projects.

Type: EXPARTE Filing Date: May 24, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
Description: On May 19, 2004, Lad Lorenz, Vice President of Regulatory Affairs in San Francisco for Sempra Energy Utilities Southern California Gas Company and San Diego Gas & Electric Company (SDG&E), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Lorenz stated that SDG&E strongly opposes Cmmr. Wood's alternate decision (AD) since it would effectively reject both major power plant additions to the SDG&E system. Lorenz added that the AD also proposes changes to all other grid reliability additions and adds a new project not recommended for approval by SDG&E. Lorenz reiterated SDG&E's strong support for Cmmr. Peevey's alternate, which approves the needed infrastructure additions, and will provide the needed cost recovery mechanisms and the appropriate financial safeguards to the utility for new electric generation projects.

Type: COMMENTS ON ALTERNATE Filing Date: May 24, 2004
Filed By:
DUKE ENERGY NORTH AMERICA
Description: reply; on alternate of Cmmr. Wood.

Type: EXPARTE Filing Date: May 21, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On May 18, 2004, Lad Lorenz, Vice President of Regulatory Affairs for San Diego Gas & Electric Company (SDG&E), hand delivered to the offices of Pres. Peevey, Cmmrs. Wood, Lynch, Brown, and Kennedy, a copy (attached to the notice) of the San Diego Tribune article.

Type: COMMENTS ON ALTERNATE Filing Date: May 20, 2004
Filed By:
CITY OF ESCONDIDO
SEMPRA ENERGY RESOURCES
Description: Opening; Proposed Decision of Commissioner Wood.

Type: COMMENTS ON ALTERNATE Filing Date: May 20, 2004
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: of Cmmr. Wood.

Type: COMMENTS ON ALTERNATE Filing Date: May 20, 2004
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: of Cmmr. Wood on SDG&E's grid reliability RFP.

Type: COMMENTS ON ALTERNATE Filing Date: May 20, 2004
Filed By:
INTERGEN SERVICES, INC.
Description: approving motion of SDG&E for approval to enter into new electric resource contracts.

Type: COMMENTS ON ALTERNATE Filing Date: May 20, 2004
Filed By:
DYNEGY MARKETING AND TRADE
Description: of Cmmr. Wood.

Type: COMMENTS ON ALTERNATE Filing Date: May 20, 2004
Filed By:
CELERITY ENERGY, INC.
Description: of Cmmr. Wood.

Type: COMMENTS ON ALTERNATE Filing Date: May 20, 2004
Filed By:
DUKE ENERGY NORTH AMERICA
Description: of Cmmr. Wood.

Type: COMMENTS ON ALTERNATE Filing Date: May 20, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: of Cmmr. Wood.

Type: COMMENTS ON ALTERNATE Filing Date: May 20, 2004
Filed By:
CALPINE CORPORATION
Description: of Cmmr. Wood.

Type: COMMENTS ON ALTERNATE Filing Date: May 20, 2004
Filed By:
ORA/OBIORA/PUC
Description: of Cmmr. Wood.

Type: COMMENTS ON ALTERNATE Filing Date: May 20, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Proposed Decision of Commissioner Wood pertaining to SDG&E's Motion to Enter into New Electric Resource Contracts resulting from SDG&E's Grid Reliability Capacity RFP.

Type: RULING Filing Date: May 18, 2004
Filed By:
ALJ/MINKIN/PUC
Description: Removes from the record in R01-10-024 the April 2, 2004 Motion of SDG&E, seeking approval to enter into a new electric resource contract with the San Diego County Water Authority, as well as three responses to the motion. Converts that motion into a new proceeding, A04-04-042, as of April 2, 2004. Responses to the motion are transferred to A04-04-042; the pleading cycle is now closed. Directs SDG&E to contact the Docket Office re: bringing the document in compliance with the Rules related to new applications.

Type: COMMENTS Filing Date: May 17, 2004
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: joint; on confidentiality of certain data related to the proposed Otay mesa Power Purchase Agreement between Calpine and SDG&E.

Type: RESPONSE Filing Date: May 17, 2004
Filed By:
CALPINE CORPORATION
Description: to request for comments re making redacted information in Cmmr. Wood's alternate decision public.

Type: EXPARTE Filing Date: May 17, 2004
Filed By:
CELERITY ENERGY, INC.
Description: On May 12, 2004, Brian Cragg, representing Celerity Energy, Inc. (Celerity), initiated two separate telephone calls to and left voice mail messages for, Steven Weissman, advisor to Cmmr. Wood, and David Gamson, advisor to Cmmr. Brown. Cragg urged the Commission to consider the arguments in favor of approval for Celerity's project.

Type: EXPARTE Filing Date: May 17, 2004
Filed By:
CALPINE CORPORATION
Description: On May 12, 2004, Curt Hildebrand, Vice President of Marketing and Sales of Calpine Corporation, sent a letter (copy attached to the notice) by hand delivery to Cmmrs. Brown and Wood. The letter responds to questions raised during an all-party meeting with Cmmrs. Brown and Wood on May 3, 2004. In the letter, Hildebrand stated that the timely completion of Otay Mesa is largely within the Commission's control. Hildebrand explained why the costs related to the Transmission System Enhancements should not be solely attributed to Otay Mesa and that the Transmission System Enhancements are not necessary for Otay Mesa to satisfy San Diego Gas & Electric Company's local reliability needs.

Type: COMMENTS Filing Date: May 17, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on draft decision of ALJ Walwyn on PG&E's December 4, 2003 petition to modify/

Type: PETITION FOR MODIFICATION Filing Date: May 14, 2004
Filed By:
WESTERN POWER TRADING FORUM
Description: of the resource adequacy phase-in schedule adopted in D04-01-050.

Type: RESPONSE Filing Date: May 14, 2004
Filed By:
ORA/OBIORA/PUC
Description: to the motion of TURN and UCAN to recuse Pres. Peevey [pursuant to May 5, 2004 ruling].

Type: RESPONSE Filing Date: May 14, 2004
Filed By:
CITY OF ESCONDIDO
SEMPRA ENERGY RESOURCES
Description: to the Motion of TURN/UCAN seeking the Recusal of President Peevey.

Type: RESPONSE Filing Date: May 14, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to the motion of TURN/UCAN seeking the Recusal of President Peevey.

Type: ALTERNATE Filing Date: May 13, 2004
Filed By:
CMMR/WOOD/PUC
Description: Opinion approving in part the motion of SDG&E for approval to enter into new electric resource contracts, etc. Comments re redacted information are due May 17, 2004. Comments on the alternate are due May 20, 2004; reply comments - 5 days thereafter. [See, electronic note of the Chief ALJ Minkin of May 21, 2004]

Type: EXPARTE Filing Date: May 10, 2004
Filed By:
SEMPRA ENERGY RESOURCES
Description: LATE FILED. On May 3, 2004, Joseph Rowley, Vice President, Asset Management, Sempra Energy Resources (SER), met with Cmmrs. Wood and Brown in an all-party meeting in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, Steven Weissman, advisor to Cmmr. Wood, and Alvin S. Pak, Director, Regulatory Policy & Analysis, Sempra Energy Global Enterprises. Rowley and Pak stated that the Palomar Energy Project (Project) and the associated turnkey contract emerged as the clear least-cost, best-fit winner of the San Diego Gas & Electric Company Grid Reliability Request for Proposals (RFP). Pak indicated that TURN/UCAN's proposal to condition approval of the contract upon renegotiation of the California Department of Water Resources-SER contract was inappropriate, and further that the proposal was unnecessary. Rowley articulated the several unique and substantial attributes of the Project that allowed the project to win the RFP. Rowley stated that SER supported Pres. Peevey's alternate decision because it addresses the issue of franchise fee payments to the City of Escondido.

Type: EXPARTE Filing Date: May 7, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: On May 6, 2004, Matthew Freedman, attorney of The Utility Reform Network (TURN), met with Steven Weissman, advisor to Cmmr. Wood, in San Francisco. Freedman expressed concerns about the fairness of the grid-reliability solicitation conducted by San Diego Gas & Electric Company (SDG&E) and the reasonableness of the selection of the Otay Mesa project for a 10-year Power Purchase Agreement. Freedman explained that, because Otay Mesa is not needed for grid reliability purposes, ratepayers would be better served if the Commission ordered SDG&E to conduct a solicitation for long-term resources. Freedman also explained why customers of all three utilities would benefit from requiring, as a condition precedent to the approval of the Palomar transaction, Sempra Energy Resources to renegotiate its long-term supply contract with the California Department of Water Resources. Finally, Freedman expressed strong opposition to the ratemaking treatment requested by SDG&E for both the Palomar and Otay Mesa transactions.

Type: MOTION Filing Date: May 7, 2004
Filed By:
CITY OF CHULA VISTA
Description: to Intervene.

Type: EXPARTE Filing Date: May 6, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On May 3, 2004, Lad Lorenz, Vice President of Regulatory Affairs for San Diego Gas & Electric Company (SDG&E), met with Cmmrs. Brown and Wood in an all-party meeting in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, Steven Weissman, advisor to Cmmr. Wood, Gillian Wright, Director of Regulatory Affairs, and Billy Blattner, CPUC Relations Manager, for SDG&E, and other attendees, listed on the attachment to the notice. Lorenz discussed the grid reliability needs of the SDG&E system absent the Valley Rainbow transmission project, and the recognition of the need for new generation by key state leaders. Lorenz described the benefits of the Palomar and Otay Mesa projects in providing needed reliability and displacing existing costly reliability must-run contracts, and the need and justification for the proposed financial provisions related to these projects adopted in Cmmr. Peevey?s alternate decision. Lorenz explained that SDG&E will need more resources starting in 2010 and 2011, which will provide opportunities for projects not selected in this RFP. Lorenz urged quick Commission action to provide the grid reliability resources.

Type: EXPARTE Filing Date: May 6, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On May 3, 2004, Mark Huffman, Attorney, Pacific Gas and Electric Company (PG&E), participated in an all-party meeting with Cmmrs. Wood and Brown in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, and Steven Weissman, advisor to Cmmr. Wood. Huffman stated PG&E's opposition to a reallocation of the Sunrise contract from San Diego Gas & Electric Company to PG&E. Huffman also stated that PG&E supports language in the proposed decision and alternate proposed decision that defers consideration of the Sunrise reallocation issue until a decision is issued in the Department of Water Resources cost allocation proceeding.

Type: EXPARTE Filing Date: May 6, 2004
Filed By:
CALPINE CORPORATION
Description: On May 3, 2004, Joseph E. Ronan, Senior Vice President of Government and Regulatory Affairs of Calpine Corporation (Calpine), attended an all-party meeting with Cmmrs. Brown and Wood in San Francisco. Also present were Steven S. Schleimer, Director of Market and Regulatory Affairs, Curt Hildebrand, Vice President of Sales and Marketing, David Lewis, Vice President of Marketing and Sales, Richard Thomas, Vice President of Finance/Project Development, Mitchell Weinberg, Director of Project Development, and Jeffrey Gray, outside counsel, for Calpine, and other attendees listed on the attachment to the notice. Schleimer discussed the significant reliability and economic benefits that the Otay Mesa power purchase agreement (PPA) would provide to San Diego Gas & Electric Company (SDG&E) and its ratepayers. With respect to new transmission facilities proposed by SDG&E in A04-03-008, Schleimer stated that, as both the proposed decision and alternate decision correctly find, new facilities are not needed for Otay Mesa to provide local reliability nor to be eligible to qualify for RFP. Schleimer explained that these proposed new transmission facilities are needed to maximize RMR cost reduction benefits that SDG&E gets from the Otay Mesa PPA and provide additional system wide benefits to SDG&E. Gray explained that the hearing process provided parties opposing the PPA a full and fair opportunity to show that each has a viable project that is capable of meeting the RFP criteria and offered terms that were better than the Otay Mesa PPA. Gray stated that none of these parties made any such showing. Gray further stated that the failure to timely approve the Otay Mesa PPA would jeopardize SDG&E's ratepayers realization of significant economic benefits under the PPA.

Type: EXPARTE Filing Date: May 5, 2004
Filed By:
CORAL POWER, L.L.C.
Description: On May 3, 2004, John Leslie, attorney for Coral Power, L.L.C., met with Cmmr. Brown and Cmmr. Wood in an all-party meeting in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, Steven Weissman, advisor to Cmmr. Wood, and active participants in the San Diego Gas & Electric (SDG&E) RFP phase of the proceeding. Leslie stated that Coral neither supports nor opposes the proposed ten-year purchased power agreement (PPA) for the output of the Otay Mesa generation facility. Leslie expressed concern, however, that through SDG&E's acceptance of the Otay Mesa project (Project) bid, the RFP process 'morphed' into a resource procurement effort that extended far beyond the scope of SDG&E's original RFP. Leslie stated that the Otay Mesa PPA reflects a resource that is not needed for local grid reliability in the 2005-2007 RFP period, and cannot provide local grid reliability in the RFP period. Leslie stated that it is troubling that the Project was accepted when it is 'electrically' outside SDG&E's local reliability area, and when the Project cannot serve SDG&E's local reliability needs until after the end of the RFP period. Leslie explained that the economic benefits of the Project can only be assessed by considering, among all other costs, the cost of the associated transmission facilities. Leslie emphasized that Coral does not necessarily oppose the Project; however the Commission's approval of the Project should not be allowed to delay or otherwise prejudice the Commission's review of new, 500 kV transmission line projects that are being considered in the ISO's STEP process in that have the potential to increase SDG&E's import capability.

Type: RULING Filing Date: May 5, 2004
Filed By:
ALJ/BROWN/PUC
Description: Invites comments on TURN/UCAN's motion fo recusal of Pres. Peevey. Responses to the motion are due May 14, 2004.

Type: EXPARTE Filing Date: May 5, 2004
Filed By:
CALIFORNIA UNIONS OF RELIABLE ENERGY
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: On May 3, 2004, Marc Joseph, attorney for the Coalition of California Utility Employees (CUE) and also representing the California Unions for Reliable Energy (CURE) at the meeting, participated in an all-party meeting with Cmmr. Brown and Cmmr. Wood in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, Steven Weissman, advisor to Cmmr. Wood, and approximately 75 other participants. Joseph stated that CUE and CURE support the Palomar and Otay Mesa projects and that both projects have agreements that mean they will be constructed, maintained and operated with union employees. Joseph also noted that the projects will reduce the consumption of natural gas because they are much more fuel-efficient than older plants. Joseph noted that the other projects each have problems: Enpex will have trouble getting emissions offsets, the capability of the Nevada Hydro developers is questionable, new transmission is hard to site, and Mexican plants mean exporting jobs and importing pollution.

Type: EXPARTE Filing Date: May 5, 2004
Filed By:
UNITED ASSOCIATION
Description: On May 3, 2004, James W. Kellogg, International Representative for the United Association, participated in an all-party meeting with Cmmr. Brown and Cmmr. Wood in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, Steven Weissman, advisor to Cmmr. Wood, and approximately 75 other participants. Kellogg stated that Otay Mesa will provide needed generation capacity, allowing older, less efficient and less environmentally friendly generation facilities to be retired. Kellogg stated that the plant can satisfy RMR requirements for San Diego Gas & Electric Company (SDG&E), saving the utility and its ratepayers millions of dollars per year. Kellogg indicated that the emissions from the plant will be more than fully offset with new LNG trash trucks and repowered marine vessels, and will be air-cooled. Kellogg stated further that the project will be built, maintained and staffed with union labor.

Type: COMMENTS Filing Date: May 4, 2004
Filed By:
RATEPAYERS FOR AFFORDABLE CLEAN ENERGY
Description: reply; on proposed decison of ALJ Brown.

Type: COMMENTS ON ALTERNATE Filing Date: May 4, 2004
Filed By:
RATEPAYERS FOR AFFORDABLE CLEAN ENERGY
Description: reply; on alternate of Cmmr. Peevey.

Type: COMMENTS Filing Date: May 3, 2004
Filed By:
CITY OF ESCONDIDO
SEMPRA ENERGY RESOURCES
Description: Reply; on ALJ Brown's Proposed Decision and President Peevey's Alternate Proposed Decision.

Type: REPLY Filing Date: May 3, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to Comments on the Proposed Decision of ALJ Brown and the Proposed Alternate Decision of President Peevey pertainng to SDG&E's Motion to Enter into New Electric Resource Contracts resulting from SDG&E's Grid Reliability Capacity RFP.

Type: EXPARTE Filing Date: May 3, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
Description: On April 29, 2004, Lad Lorenz, Vice President of Regulatory Affairs for Sempra Energy Utilities Southern California Gas Company and San Diego Gas & Electric Company (SDG&E), met with Cmmr. Kennedy and Cmmr. Wood in two separate meetings in San Francisco. At the meeting with Cmmr. Kennedy also present was Brian Prusnek, advisor to Cmmr. Kennedy, and with Cmmr. Wood--Steven Weissman, advisor to Cmmr. Wood. Lorenz discussed the grid reliability needs of the SDG&E system absent Valley Rainbow transmission, financial issues-- including Rate of Return and debt equivalency and transmission planning. Lorenz expressed support for the Peevey alternate and urged quick Commission action in order to provide the grid reliability resources necessary to protect the SDG&E system and its customers.

Type: EXPARTE Filing Date: May 3, 2004
Filed By:
CALPINE CORPORATION
Description: On April 28, 2004, Joseph E. Ronan, Senior Vice President of Government and Regulatory Affairs of Calpine Corporation (Calpine), met with Cmmr. Kennedy in San Francisco. Also present were Steven S. Schleimer, Director of Market and Regulatory Affairs of Calpine and Jeremiah Hallisey of Hallisey and Johnson. Transcript pages 6884 and 6885 from the hearings in this proceeding were used. The Calpine representatives discussed issues related to San Diego Gas & Electric Company's (SDG&E) grid reliability capacity request for proposals. The Calpine representatives explained the significant reliability and economic benefits that the Otay Mesa power purchase agreement would provide to SDG&E and its ratepayers.

Type: COMMENTS ON ALTERNATE Filing Date: May 3, 2004
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: joint; reply; ont he proposed alternate of Cmmr. Peevey.

Type: COMMENTS Filing Date: May 3, 2004
Filed By:
CALPINE CORPORATION
Description: reply; on the proposed decision of ALJ Brown and alternate of Cmmr. Peevey.

Type: COMMENTS Filing Date: May 3, 2004
Filed By:
ORA/OBIORA/PUC
Description: reply; on the proposed decision of ALJ Brown and Alternate of Cmmr. Peevey re SDG&E's motion to enter into new electric resource contracts, etc.

Type: COMMENTS Filing Date: May 3, 2004
Filed By:
DYNEGY MARKETING AND TRADE
Description: on the proposed decision and alternate.

Type: COMMENTS Filing Date: May 3, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: reply; on the proposed decision of ALJ Brown and alternate of Cmmr. Peevey.

Type: COMMENTS Filing Date: May 3, 2004
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: joint; reply; on the proposed decision of ALJ Brown.

Type: COMMENTS Filing Date: May 3, 2004
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
CALIFORNIA WIND ENERGY ASSOCIATION
Description: Post-Workshop; on market price referents.

Type: EXPARTE Filing Date: April 30, 2004
Filed By:
RIDGEWOOD OLINDA, LLC
Description: LATE FILED. On April 23, 2004, Paul C. Lacourciere, of Thelen Reid & Priest, LLP, attorneys for Ridgewood Olinda, LLC (Ridgewood), delivered a letter (attached to the notice) to ALJ Allen. The letter informed the Commission of a decision issued by the Federal Regulatory Commission affirming a decision cited in Ridgewood's opening brief on Standard Terms and Conditions.

Type: EXPARTE Filing Date: April 28, 2004
Filed By:
SEMPRA ENERGY RESOURCES
Description: On April 23, 2004, Alvin Pak, Director, Regulatory Policy & Analysis, Sempra Energy Global Enterprises, met, on behalf of Sempra Energy Resources (SER), with Pres. Peevey in Los Angeles. Also present were Frederick E. John, Senior Vice President, Sempra Energy, and Leesa Nayuda, Origination Regional Director (West), for SER. SER expressed its support for Pres. Peevey's alternate decision (AD). SER also indicated its agreement with the conclusion in the AD that San Diego Gas & Electric Company conducted an open, fair and competitive solicitation and that the evidence in the proceeding has established that the Commission can effectively review and supervise affiliate transactions.

Type: EXPARTE Filing Date: April 28, 2004
Filed By:
CELERITY ENERGY, INC.
Description: On April 23, 2004, Brian Cragg, representing Celerity Energy, Inc. (Celerity), met with Julie Fitch, advisor to Cmmr. Peevey, in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, Trina Horner, advisor to Cmmr. Lynch, Steve Weissman, advisor to Cmmr. Wood, and Dennis Quinn, Senior Vice-President of Celerity. Written documents (copies attached to the notice) were used. On the same date, April 23, 2004, Cragg left copies of these documents for Brian Prusnek, advisor to Cmmr. Kennedy, and later that day, Cragg sent to the Commissioners' advisors a copy of a portion (attached to the notice) of the testimony of Kevin Woodruff. Quinn explained Celerity?s proposal in the SDG&E RFP. Quinn and Cragg described the benefits of Celerity's proposal. Quinn stated that if the proposal was approved by the Commission, Celerity could have 10-15 megawatts of its project in operation this summer. Cragg also stated that Celerity's project was consistent with the Demand Response Vision Statement attached to D03-06-032.

Type: EXPARTE Filing Date: April 28, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On April 23, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Frank De Rosa, Director, and John Pappas, Manager, Power Contracts, PG&E. De Rosa described PG&E's Advice Letter 2494-E, which requests Commission approval of a new renewable contract with Buena Vista energy to repower an existing 37.5 MW wind facility in the Altamont Pass. De Rosa explained the benefits to ratepayers from the new contract and how the Project will be eligible for federal Production Tax Credits (PTC). De Rosa stated that PG&E strongly supports both continuation of the 'California Fix' and extending the PTC. Finally, De Rosa stated that one of PG&E's primary goals is to bring the cost of its power contracts in line with market prices.

Type: EXPARTE Filing Date: April 28, 2004
Filed By:
CITY OF ESCONDIDO
Description: On April 23, 2004, Scott Blaising, outside counsel for the City of Escondido (City), met with Cmmr. Brown in San Francisco. Also present was David Gamson, advisor to Cmmr. Brown. Blaising described the expectation of the City to receive franchise fee payments on natural gas delivered to the Palomar Energy Project, and the need for an agreement between San Diego Gas & Electric Company (SDG&E) and the City on franchise fee payments should the project be transferred to SDG&E. Blaising commented that the City favors the alternate of Pres. Peevey, since it would specifically approve SDG&E's ratemaking proposals, including the proposal by SDG&E to make in-lieu franchise fee payments to the City. Blaising explained that, while the proposed decision (PD) did not specifically reject SDG&E's proposal to make in-lieu franchise fee payments to the City, the PD created ambiguity on this issue since it deferred all ratemaking issues.

Type: COMMENTS Filing Date: April 27, 2004
Filed By:
CORAL POWER, L.L.C.
INTERGEN SERVICES, INC.
Description: to ALJ Brown and Cmmr. Peevey's proposed decisions re motion of SDG&E for approval to enter into new electric resource contracts, etc.

Type: DRAFT DECISION Filing Date: April 27, 2004
Filed By:
ALJ/WALWYN/PUC
Description: Comments due 5/17/04; Reply Comments due 5/24/04.

Type: COMMENTS Filing Date: April 26, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on the Proposed Decision of ALJ Brown and the Proposed Alternate Decision of President Peevey.

Type: RESPONSE Filing Date: April 26, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: to PG&E's petition for modification of D04-01-050.

Type: RESPONSE Filing Date: April 26, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: to PG&E's Petition for Modification of Decision 04-01-050.

Type: RESPONSE Filing Date: April 26, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: to PG&E's Petition for Modification of Decision 04-01-050.

Type: RESPONSE Filing Date: April 26, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: to PG&E's Petition to Modify Decision 03-12-062.

Type: MOTION Filing Date: April 26, 2004
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: seeking the Recusal of Commission President Peevey.

Type: EXPARTE Filing Date: April 26, 2004
Filed By:
INTERGEN SERVICES, INC.
Description: On April 22, 2004, Chad Wagner representing InterGen Services, Inc. (InterGen) met with Cmmr. Peevey in San Francisco. Also present were Roosevelt Grant, advisor to Cmmr. Peevey, and Peter Esposito and Kathleen Sullivan, for InterGen. InterGen representatives expressed concerns on delays and future delays on the Miguel-Mission Project in A02-07-022 as it relates to this proceeding.

Type: COMMENTS Filing Date: April 26, 2004
Filed By:
ORA/OBIORA/PUC
Description: on the proposed decision of ALJ Brown and the alternate of Cmmr. Peevey.

Type: COMMENTS Filing Date: April 26, 2004
Filed By:
NEVADA HYDRO COMPANY, INC.
THE ELSINORE VALLEY MUNICIPAL WATER DISTRICT
Description: on the Proposed and the Alternate Proposed Decision.

Type: COMMENTS Filing Date: April 26, 2004
Filed By:
CELERITY ENERGY, INC.
Description: on the Proposed and the Alternate Proposed Decision.

Type: COMMENTS Filing Date: April 26, 2004
Filed By:
DYNEGY MARKETING AND TRADE
Description: on the Proposed Decision and Alternate Proposed Decision.

Type: COMMENTS Filing Date: April 26, 2004
Filed By:
CALPINE CORPORATION
Description: on the Proposed and Alternate Proposed Decision of President Peevey..

Type: COMMENTS Filing Date: April 26, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: on the Proposed Decision of ALJ Brown and the Alternate Proposed Decision of President Peevey.

Type: COMMENTS Filing Date: April 26, 2004
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: Joint; on the Proposed Alternate Decision of Commissioner Peevey.

Type: COMMENTS Filing Date: April 26, 2004
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: Joint; on the Proposed Decision of ALJ Brown.

Type: COMMENTS Filing Date: April 26, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the Proposed Decision of ALJ Brown and the Proposed Alternate Decision of President Peevey.

Type: COMMENTS Filing Date: April 26, 2004
Filed By:
CITY OF ESCONDIDO
SEMPRA ENERGY RESOURCES
Description: Opening; on ALJ Brown's Proposed Decision and President Peevey's Alternate Proposed Decision.

Type: EXPARTE Filing Date: April 22, 2004
Filed By:
UTILITY REFORM NETWORK
Description: On April 19, 2004, Matthew Freedman, attorney of The Utility Reform Network (TURN), met with Brian Prusnek, advisor to Cmmr. Kennedy, in San Francisco. Three hearing room exhibits that have been admitted into the evidentiary record were used. Freedman expressed his concerns about the grid-reliability solicitation conducted by San Diego Gas & Electric Company (SDG&E) and the direct involvement of the Commission staff in the negotiations between SDG&E and Calpine. In addition, Freedman explained the importance of linking any waiver of the affiliate procurement transaction ban required for SDG&E's acquisition of the Palomar plant to an agreement by Sempra Energy Resources to renegotiate its long-term supply contract with the California Department of Water Resources. Finally, Freedman expressed strong opposition to the ratemaking treatment requested by SDG&E for both the Palomar and Otay Mesa transactions.

Type: EXPARTE Filing Date: April 22, 2004
Filed By:
ORA/OBIORA/PUC
Description: On April 21, 2004, Jan Reid, analyst for the Office of Ratepayer Advocates (ORA), met with Cmmr. Peevey in San Francisco. Also present were Julie Fitch, advisors to Cmmr. Peevey, and Robert Pocta, Program Manager for the ORA. Written material (attached to the notice) was used. ORA urged the Commission not to approve the Calpine Otay Mesa contract and its debt equivalent condition. ORA also urged the Commission to oppose San Diego Gas & Electric Company's request for an increase on the return on equity for its generation ratebase.

Type: EXPARTE Filing Date: April 21, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On April 19, 2004, Lad Lorenz, Vice President of Regulatory Affairs for Sempra Energy Utilities Southern California Gas Company and San Diego Gas & Electric Company (SDG&E), met with Pres. Peevey in San Francisco. Also present was Julie Fitch, advisor to Pres. Peevey. Lorenz discussed the grid reliability needs of the SDG&E system absent Valley Rainbow transmission, financial issues - including Rate of Return and debt equivalency and transmission planning. Lorenz expressed support for the Peevey alternate and urged quick Commission action in order to provide the grid reliability resources necessary to protect the SDG&E system and its customers.

Type: EXPARTE Filing Date: April 21, 2004
Filed By:
CITY OF ESCONDIDO
Description: On April 16, 2004, Scott Blaising, outside counsel for the City of Escondido (City), met with Cmmr. Wood, in the City of Escondido. Also present were Clay Phillips, City Manager, and Jeffrey Epp, City Attorney, for the City. Epp provided a summary of the City's previous efforts to develop property on which the proposed Palomar Energy Project is to be located. Blaising described the expectation of the City to receive franchise fee payments on natural gas delivered to the Palomar Energy Project, and the need for an agreement between San Diego Gas & Electric Company (SDG&E) and the City on franchise fee payments should the project be transferred to SDG&E. Blaising commented that the City favors the alternate of Pres. Peevey, since it would specifically approve SDG&E's ratemaking proposals, including the proposal by SDG&E to make in-lieu franchise fee payments to the City. Blaising explained that, while the proposed decision (PD) did not specifically reject SDG&E's proposal to make in-lieu franchise fee payments to the City, the PD created ambiguity on this issue since it deferred all ratemaking issues.

Type: EXPARTE Filing Date: April 19, 2004
Filed By:
ORA/OBIORA/PUC
Description: LATE FILED. On April 13, 2004, Jan Reid, analyst for the Office of Ratepayer Advocates (ORA), met with Cmmr. Kennedy in San Francisco. Also present were Ross LaJeunesse and Brian Prusnek, advisors to Cmmr. Kennedy, and Robert Kinosian, analyst, and Natalie Walsh, Assistant Director, for the ORA. Written material (attached to the notice) was used. ORA urged the Commission not to approve the Calpine Otay Mesa contract and its debt equivalent condition. ORA also urged the Commission to oppose San Diego Gas & Electric Company's request for an increase on the return on equity for its generation ratebase.

Type: COMMENTS Filing Date: April 15, 2004
Filed By:
RATEPAYERS FOR AFFORDABLE CLEAN ENERGY
Description: Reply Comments On The long-Term Procurement Plan Outlines Of Edison, PG&E and SDG&E

Type: RESPONSE Filing Date: April 15, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
CALIFORNIA WIND ENERGY ASSOCIATION
Description: In Opposition To Edison's Petition For Modification Of D04-01-050

Type: RESPONSE Filing Date: April 15, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: To Edison's Petition For Modification Of D04-01-050

Type: MOTION Filing Date: April 15, 2004
Filed By:
CEERT
Description: For Leave To Late-File Comments On Market Price Referent Discussion Paper; Comments attached.

Type: COMMENTS Filing Date: April 15, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: On Working Outlines Of The Utilities' Long-Term Plans

Type: COMMENTS Filing Date: April 15, 2004
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: On The Utilities' Long-Term Plan Working Outlines

Type: COMMENTS Filing Date: April 15, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On The Long-Term Procurement Plan Working Outlines

Type: COMMENTS Filing Date: April 15, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: On The Long-Term Procurement Plan Outlines Of The Three Investor-Owned Utilities

Type: BRIEF Filing Date: April 14, 2004
Filed By:
CALPINE CORPORATION
Description: reply; on RPS standard contract terms and conditions.

Type: EXPARTE Filing Date: April 14, 2004
Filed By:
CELERITY ENERGY, INC.
Description: On April 9, 2004, Brian Cragg, representing Celerity Energy, Inc. (Celerity), initiated a telephone conversation with Julie Fitch, advisor to Cmmr. Peevey. Cragg discussed the prospects for approval of Celerity's proposal in the San Diego Gas & Electric Company (SDG&E) Grid Reliability RFP and noted that SDG&E's response did not meet its target for demand response resources in the RFP. Cragg also stated that SDG&E appeared to be willing to go ahead with Celerity's proposal if it received the Commission's approval.

Type: EXPARTE Filing Date: April 14, 2004
Filed By:
CALPINE CORPORATION
Description: On April 12, 2004, Joseph E. Ronan, Senior Vice President of Government and Regulatory Affairs of Calpine Corporation (Calpine), met with Cmmr. Brown in San Francisco. Also present were David Lewis, Vice President - Marketing & Sales, and Jeremiah Hallisey of Hallisey and Johnson, for Calpine. The Calpine representatives explained the significant reliability and economic benefits that the Otay Mesa power purchase agreement would provide to San Diego Gas & Electric Company and its ratepayers.

Type: BRIEF Filing Date: April 14, 2004
Filed By:
GREEN POWER INSTITUTE
Description: Reply; on language for standard terms and conditions.

Type: BRIEF Filing Date: April 14, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply Brief On Standard Contract Terms And Conditions

Type: BRIEF Filing Date: April 14, 2004
Filed By:
RIDGEWOOD OLINDA, LLC
Description: Reply Brief On Standard Terms And Conditions

Type: BRIEF Filing Date: April 14, 2004
Filed By:
CEERT
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
THE UTILITY REFORM NETWORK
Description: Reply Brief On Standard Contract Terms And Conditions

Type: BRIEF Filing Date: April 14, 2004
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE, L.L.C.
CALIFORNIA WIND ENERGY ASSOCIATION
VULCAN POWER COMPANY
Description: reply; on RPS Standard contract terms and conditions.

Type: BRIEF Filing Date: April 14, 2004
Filed By:
ORA/OBIORA/PUC
Description: reply; in response to joint ruling of Assigned Commissioner and ALJ re procedure for adoption for standard terms and conditions.

Type: COMMENTS Filing Date: April 12, 2004
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
Description: on Market Price Referents.

Type: COMMENTS Filing Date: April 9, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: concerning discussion on market price referents.

Type: COMMENTS Filing Date: April 9, 2004
Filed By:
ORA/OBIORA/CPUC
Description: on the Commission's "White Paper" on Market Price Referents

Type: COMMENTS Filing Date: April 9, 2004
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
CALIFORNIA WIND ENERGY ASSOCIATION
Description: Pre-Workshop Comments On Market Price Referents

Type: COMMENTS Filing Date: April 9, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: Pre-Workshop Comments on Market Price Referents

Type: COMMENTS Filing Date: April 9, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on "Discussion On Setting Market Price Referents" issued by collaborative staff and dated March 22, 2004

Type: COMMENTS Filing Date: April 9, 2004
Filed By:
GREEN POWER INSTITUTE
Description: Pre-Workshop Comments on Market Price Referent (MPR) Methodologies

Type: EXPARTE Filing Date: April 8, 2004
Filed By:
ORA/OBIORA/PUC
Description: On April 6, 2004, Jan Reid, analyst for the Office of Ratepayer Advocates (ORA), met with Cmmr. Wood in San Francisco. Also present were Steven Weissman and Manuel Ramirez, advisors to Cmmr. Wood, and Robert Kinosian, analyst, and Noel A. Obiora, Attorney, for the ORA. Written material (attached to the notice) was used. ORA urged the Commission not to approve the Calpine Otay Mesa contract and its debt equivalent condition. ORA also urged the Commission to deny San Diego Gas & Electric Company?s request for a 75 basis point increase for SDG&E's return on equity on generation ratebase.

Type: EXPARTE Filing Date: April 7, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
Description: On April 5, 2004, Lad Lorenz, Vice President of Regulatory Affairs for Sempra Energy Utilities Southern California Gas Company and San Diego Gas & Electric Company (SDG&E), met with Cmmr. Brown in San Francisco. Also present was David Gamson, advisor to Cmmr. Brown. Lorenz discussed the grid reliability needs of the SDG&E system absent Valley Rainbow transmission, financial issues and the proposed completion dates for new generation resources. Lorenz urged quick Commission action once a proposed decision is issued in order to provide the grid reliability resources necessary to protect the SDG&E system and its customers.

Type: ALTERNATE Filing Date: April 6, 2004
Filed By:
CMMR/PEEVEY/PUC
Description: approving motion of SDG&E for approval to enter into new electric resource contracts, etc. Comments are due by April 26, 2004; reply comments - 5 days after comments are filed.

Type: PROPOSED DECISION Filing Date: April 6, 2004
Filed By:
ALJ/BROWN/PUC
Description: approving motion of SDG&E for approval to enter into new electric resource contracts, etc. Comments are due by April 26, 2004; reply comments - 5 days after comments are filed.

Type: MOTION Filing Date: April 6, 2004
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS' ACTION NETWORK
Description: for acceptance of a late-filed response to the motion of SDG&E to strike portions of the TURN-UCAN response to the petition of Sempra Energy Resources for Modification of D04-01-050; Response Attached.

Type: EXPARTE Filing Date: April 5, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On March 31, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Jacobson described PG&E's opposition to reallocation of the Sunrise contract from San Diego Gas & Electric Company (SDG&E) to PG&E. Jacobson stated that the proper forum for addressing the allocation of the Department of Water Resources (DWR) contract costs is DWR revenue requirement proceeding. Jacobson also stated that it was inappropriate to change the allocation of DWR contracts for operational purposes.

Type: EXPARTE Filing Date: April 2, 2004
Filed By:
ORA/OBIORA/PUC
Description: LATE FILED. On March 25, 2004, Jan Reid, analyst for the Office of Ratepayer Advocates (ORA), met with Cmmr. Lynch in San Francisco. Also present were Trina Horner, advisor to Cmmr. Lynch, and Robert Kinosian and Natalie Wales, ORA analysts. Written material (attached to the notice) was used. ORA representatives reasserted its positions in the proceeding, specifically, that ORA opposes San Diego Gas & Electric Company's (SDG&E) request for debt equivalence and a 75 basis point increase for SDG&E's return on equity on generation investments.

Type: RULING Filing Date: April 2, 2004
Filed By:
ALJ/WALWYN/PUC
Description: Grants motions to intervene by Powerex and Silicon Valley Manufacturing Group.

Type: MOTION Filing Date: April 2, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: For Approval To Enter Into A New Electric Resource Contract WithThe San Diego County Water Authority And For Approval Of The Cost Recovery And Ratemaking Mechanisms Associated Therewith

Type: COMPLIANCE FILING Filing Date: April 1, 2004
Filed By:
SOUTHERN CALIFORNA EDSON COMPANY
Description: Outline of 2004 Long-Term Resource Plan.

Type: REPLY Filing Date: April 1, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to ORA's response to Petition for Modification of D03-12-062.

Type: REPLY Filing Date: April 1, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Responses to Petition for Modification of Decision 03-12-062.

Type: MISCELLANEOUS FILING Filing Date: April 1, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: [in accordance with March 18, 2004 Ruling]. Long-Term Procurement Plan Outline.

Type: MISCELLANEOUS FILING Filing Date: April 1, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Long-Term Resource Plan Outline.

Type: EXPARTE Filing Date: April 1, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
Description: On March 29, 2004, Lad Lorenz, Vice President of Regulatory Affairs for Sempra Energy Utilities Southern California Gas Company and San Diego Gas & Electric Company (SDG&E), met with Cmmr. Lynch in San Francisco. Also present was Trina Horner, advisor to Cmmr. Lynch. Lorenz discussed the grid reliability needs of the SDG&E system absent Valley Rainbow transmission, financial issues and the proposed completion dates for new generation resources. Lorenz urged quick Commission action once a proposed decision is issued in order to provide the grid reliability resources necessary to protect the SDG&E system and its customers.

Type: EXPARTE Filing Date: March 29, 2004
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: On March 24, 2004, Nancy Rader, Executive Director of the California Wind Association (CalWEA), met with Julie Fitch, advisor to Cmmr. Peevey, in San Francisco. Also present was Joseph Karp of White & Case LLP, attorney for the CalWEA. Written material (attached to the notice) was used. The CalWEA representatives discussed action that the Commission could take to facilitate repower.

Type: PETITION Filing Date: March 29, 2004
Filed By:
SILICON VALLEY MANUFACTURING GROUP
Description: for Intervening Party Status.

Type: BRIEF Filing Date: March 26, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Opening; on Standard Contract Terms and Conditions.

Type: RESPONSE Filing Date: March 26, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: To the Motion of SDG&E to Strike Portions of Concurrent Briefs

Type: REQUEST Filing Date: March 26, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: For An Award Of Compensation For Substantial Contributions To D04-01-050, D03-12-065, D03-10-058, Resolutions E-3814, E-3853, and Participation In Utility Procurement Review Groups

Type: REQUEST Filing Date: March 26, 2004
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: For Award Of Intervenor Compensation

Type: PETITION FOR MODIFICATION Filing Date: March 26, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of D04-01-050. [Corrected document filed August 31, 2004].

Type: EXPARTE Filing Date: March 26, 2004
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: On March 25, 2004, Joseph Karp of White & Case LLP, attorney for the California Wind Association (CalWEA), sent via electronic mail to Julie Fitch, advisor to Cmmr. Peevey, a copy of a letter (attached to the notice) addressed to John Galloway at the Energy Division. The letter described CalWEA's proposal to develop repower action plans by the utilities.

Type: BRIEF Filing Date: March 26, 2004
Filed By:
CEERT
INDEPENDENT ENERGY PRODUCERS
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
THE UTILITY REFORM NETWORK
Description: Joint Brief in compliance with the March 8, 2004 Ruling regarding procedure for adoption of standard terms and conditions.

Type: BRIEF Filing Date: March 26, 2004
Filed By:
POWEREX CORP.
Description: Opening Brief Addressing Standard Contract Terms and Conditions

Type: BRIEF Filing Date: March 26, 2004
Filed By:
RIDGEWOOD OLINDA, LLC
Description: Opening Brief on Standard Terms and Conditions

Type: BRIEF Filing Date: March 26, 2004
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE, L.L.C.
CALIFORNIA WIND ENERGY ASSOCIATION
VULCAN POWER COMPANY
Description: Opening Brief on RPS Standard Contract Terms and Conditions

Type: BRIEF Filing Date: March 26, 2004
Filed By:
GREEN POWER INSTITUTE
Description: Opening; on Language for Standard Terms and Conditions.

Type: EXPARTE Filing Date: March 25, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: On March 23, 2004, Matthew Freedman, attorney for The Utility Reform Network (TURN), met with Cmmr. Wood in San Francisco. Also present was Steven Weissman, advisor to Cmmr. Wood, and Michael Florio, attorney for TURN. Freedman and Florio expressed their concerns about the grid-reliability solicitation conducted by San Diego Gas & Electric Company (SDG&E) and the direct involvement of the Commission staff in the negotiations between SDG&E and Calpine. In addition, TURN urged the Commission to link any waiver of the affiliate procurement transaction ban required for SDG&E's acquisition of the Palomar plant to an agreement by Sempra Energy Resources to renegotiate its long-term supply contract with the California Department of Water Resources. Finally, Freedman expressed strong opposition to the ratemaking treatment requested by SDG&E for both the Palomar and Otay Mesa transactions.

Type: PETITION FOR MODIFICATION Filing Date: March 25, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of D03-12-062.

Type: EXPARTE Filing Date: March 25, 2004
Filed By:
CALPINE CORPORATION
Description: On March 23, 2004, Joseph E. Ronan, Senior Vice President of Government and Regulatory Affairs of Calpine Corporation (Calpine), met with Cmmr. Wood and Cmmr. Lynch in two separate meetings in San Francisco. At the meeting with Cmmr. Wood also present was Steven A. Weissman, advisor to Cmmr. Wood, and with Cmmr. Lynch - Trina Horner, advisor to Cmmr. Lynch. Steven S. Schleimer, Director of Market and Regulatory Affairs, and Curt Hildebrand, Vice President-Project Development, for Calpine, and Jeremiah Hallisey of Hallisey and Johnson participated in both meetings. The Calpine representatives explained the significant reliability and economic benefits that the Otay Mesa power purchase agreement (PPA) would provide to San Diego Gas & Electric Company and its ratepayers. The Calpine representatives encouraged the Commission to expeditiously authorize SDG&E to execute the PPA based on the terms and conditions set forth in the agreement.

Type: EXPARTE Filing Date: March 23, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: On March 19, 2004, Matthew Freedman, attorney for The Utility Reform Network (TURN), met with Cmmr. Lynch in San Francisco. Also present was Trina Horner, advisor to Cmmr. Lynch, and Robert Finkelstein, attorney for TURN. Freedman and Finkelstein expressed their concerns about the grid-reliability solicitation conducted by San Diego Gas & Electric Company (SDG&E) and the direct involvement of the Commission staff in the negotiations between SDG&E and Calpine. In addition, TURN urged the Commission to link any waiver of the affiliate procurement transaction ban required for SDG&E's acquisition of the Palomar plant to an agreement by Sempra Energy Resources to renegotiate its long-term supply contract with the California Department of Water Resources. Finally, Freedman expressed strong opposition to the ratemaking treatment requested by SDG&E for both the Palomar and Otay Mesa transactions.

Type: EXPARTE Filing Date: March 22, 2004
Filed By:
NEVADA HYDRO COMPANY
Description: LATE FILED. AUGMENTATION REQUIRED. On March 2, 2004, David Kates, Project Manager for The Nevada Hydro Company (TNHC) met with David Gamson, advisor to Cmmr. Brown. A copy of the PowerPoint presentation (attached to the notice) prepared by TNHC to provide an overview of the current status of the Lake Elsinore Advanced Pumped Storage and Talega-Escondido/Valley-Rainbow 500 kV Interconnection project was used. Kates provided to the Commission general information of the status of permitting.

Type: RESPONSE Filing Date: March 22, 2004
Filed By:
ORA/OBIORA/PUC
Description: to petition for modification of D03-12-062 filed by Edison.

Type: RESPONSE Filing Date: March 22, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to petition for modification onf D03-12-062 by Edison.

Type: RESPONSE Filing Date: March 22, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to SoCal Edison Co.'s Petition to Modify D03-12-062.

Type: NOTICE Filing Date: March 22, 2004
Filed By:
ORA/OBIORA/PUC
Description: of grant of request for ex parte meeting.

Type: MOTION Filing Date: March 22, 2004
Filed By:
SEMPRA ENERGY RESOURCES
Description: to Strike portions of TURN/UCAN's Response to Sempra Energy Resources Petition for Modification and/or Clarification of Decision 04-01-050.

Type: MOTION Filing Date: March 19, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to Strike Portions of the Response of TURN and UCAN to Sempra Energy Resources' Petition for Modification of Decision 04-01-050.

Type: RESPONSE Filing Date: March 19, 2004
Filed By:
DYNEGY MARKETING AND TRADE
Description: to motion to strike of SDG&E.

Type: RESPONSE Filing Date: March 19, 2004
Filed By:
ORA/OBIORA/PUC
Description: to the petition for modification of D03-12-062 filed by PG&E.

Type: RULING Filing Date: March 18, 2004
Filed By:
ALJ/CAREW/PUC
Description: Sets dates for the filing of working outlines re long-term plans: the filings are due March 31; comments on the working outlines - April 15, 2004.

Type: NOTICE Filing Date: March 16, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: of grant of request for ex parte meeting.

Type: RESPONSE Filing Date: March 16, 2004
Filed By:
CALPINE CORPORATION
Description: in support of motion of SDG&E to strike portions of the briefs of Dynegy Marketing and Trade et al.

Type: PETITION FOR MODIFICATION Filing Date: March 16, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of D04-01-050.

Type: COMMENTS Filing Date: March 12, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on resource adequacy workshop issues.

Type: NOTICE Filing Date: March 12, 2004
Filed By:
ORA/OBIORA/PUC
Description: of grant of request for ex parte meeting.

Type: EXPARTE Filing Date: March 12, 2004
Filed By:
ORA/OBIORA/PUC
Description: On March 12, 2004, Noel A. Obiora, attorney for the Office of Ratepayer Advocates (ORA), met with Cmmr. Brown in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, and Jan Reid and Robert Kinosian, Analysts for the ORA. Written material (attached to the notice) was used. ORA representatives explained that an increase in San Diego Gas & Electric Company's (SDG&E) return on equity for generation should be determined in the cost of capital proceeding. ORA further stated that Calpine?s Otay Mesa PPA is not needed, not urgent and will not serve any of the needs SDG&E claimed in this proceeding. ORA also noted that between Calpine's Otay Mesa plant and Sempra Energy Resources Palomar plant, the latter was the better project for the region, but the concerns stated by The Utility Reform Network and the Utility Consumers Action Network about the Palomar plant were valid.

Type: COMMENTS Filing Date: March 11, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: Reply; on the Resource Adequacy Workshops.

Type: RESPONSE Filing Date: March 11, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: to Applications for Rehearing of Decision 04-01-050 by (1) SoCal Edison Company and (2) the Cogeneration Association of California and the Energy Producers and Users Coalition.

Type: RESPONSE Filing Date: March 11, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: to Edison's application for partial rehearing of D04-01-050.

Type: RESPONSE Filing Date: March 11, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to applications for rehearing of D04-01-050.

Type: RESPONSE Filing Date: March 11, 2004
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS' ACTION NETWORK
Description: to Sempra Energy Resource's Petition for modification and/or clarification of D04-01-050.

Type: RESPONSE Filing Date: March 11, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to the Applications for Rehearing of D.04-01-050 by A.R.E.M. and Constellation Newenergy, Inc.

Type: REPLY Filing Date: March 11, 2004
Filed By:
POWEREX CORP.
Description: to Opening Comments on the Resource Adequacy Workshops.

Type: REPLY Filing Date: March 11, 2004
Filed By:
ORA/OBIORA/PUC
Description: regarding the Resource Adequacy Workshops.

Type: MOTION Filing Date: March 11, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to Strike Portions of the Briefs of: Dynergy Marketing and Trade; The Utility Reform Network/Utility Consumers Action Network; and Nevada Hydro Company, Inc./The Elsinore Valley Municipal Water District.

Type: COMMENTS Filing Date: March 11, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; for Resource Adequacy Workshops.

Type: COMMENTS Filing Date: March 11, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on Resource Adequacy Issues.

Type: COMMENTS Filing Date: March 11, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: Reply; in advance of the Resource Adequacy Workshops.

Type: COMMENTS Filing Date: March 11, 2004
Filed By:
CALIFORNIA CONSUMER EMPOWERMENT ALLIANCE
Description: Reply; on Resource Adequacy Discussion issues identified in ALJ Ruling.

Type: NOTICE Filing Date: March 10, 2004
Filed By:
ORA/OBIORA/PUC
Description: of grant of request for ex parte meeting.

Type: PETITION Filing Date: March 10, 2004
Filed By:
POWEREX CORP.
Description: to intervene.

Type: BRIEF Filing Date: March 9, 2004
Filed By:
CALPINE CORPORATION
Description: [PUBLIC VERSION] in support of motion of SDG&E for approval of certain resource acquisitions. [Confidential version filed under seal pursuant to a protective order of January 14, 2004]

Type: OPPOSITION Filing Date: March 9, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to California Wind Energy Association Application for Rehearing of Decision 04-01-050.

Type: MOTION Filing Date: March 9, 2004
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: for acceptance of a late-filed redacted version of the concurrent opening brief on the motion of SDG&E for approval to enter into new electric resource contracts; brief (public version) attached; brief (confidential version) attached and filed under seal.

Type: BRIEF Filing Date: March 8, 2004
Filed By:
NEVADA HYDRO COMPANY
Description: Concurrent; on motion of SDG&E for approval of contracts.

Type: RULING Filing Date: March 8, 2004
Filed By:
ALJ/ALLEN/PUC
CMMR/PEEVEY/PUC
Description: regarding procedure for adoption of standrad contract terms and conditions. Opening briefs are due March 23, and reply briefs - April 1, 2004. Settlement conference is set for April 8, 2004.

Type: BRIEF Filing Date: March 8, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: addressing [its] Motion for Approval to Enter into New Electric Resource Contracts resulting from [its] grid reliability capacity RFP and for Approval of the Associated Cost Recovery and Ratemaking Mechanisms.

Type: BRIEF Filing Date: March 8, 2004
Filed By:
SEMPRA ENERGY RESOURCES
Description: Post-Hearing;

Type: BRIEF Filing Date: March 8, 2004
Filed By:
CORAL POWER, L.L.C.
Description: Concurrent;

Type: BRIEF Filing Date: March 8, 2004
Filed By:
ORA/OBIORA/PUC
Description: in the proceeding to review and approve agreements resulting from SDG&E's grid reliability request for proposal.

Type: BRIEF Filing Date: March 8, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on SDG&E's grid reliability RFP proposals.

Type: BRIEF Filing Date: March 8, 2004
Filed By:
INTERGEN NV
Description: concurrent.

Type: BRIEF Filing Date: March 8, 2004
Filed By:
DYNEGY MARKETING AND TRADE
Description: opening.

Type: BRIEF Filing Date: March 8, 2004
Filed By:
CELERITY ENERGY, INC.
Description: opening.

Type: EXPARTE Filing Date: March 5, 2004
Filed By:
SEMPRA ENERGY RESOURCES
Description: LATE FILED. On March 1, 2004, E. Douglass Mitchell, Regulatory Policy Manager for Sempra Energy Global Enterprises, sent an email (copy attached to the notice) to ALJ Walwyn and Cmmr. Peevey. The communication concerned an update on the status of a pending petition for modification and/or clarification of D04-01-050.

Type: MOTION Filing Date: March 5, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Strike Reply Comments of the Independent Energy Producers Association concerning confidentiality.

Type: COMPLIANCE FILING Filing Date: March 4, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: Reply Comments concerning data confidentiality

Type: PETITION Filing Date: March 4, 2004
Filed By:
CALIFORNIA CONSUMER EMPOWERMENT ALLIANCE
Description: For Leave To Intervene; Opening Comments Attached

Type: MOTION Filing Date: March 4, 2004
Filed By:
GREEN POWER INSTITUTE
Description: for leave to submit Comments on Utility Compliance filings pursuant to Decision 03-06-071; COMMENTS ATTACHED.

Type: COMMENTS Filing Date: March 4, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Opening Comments on Resource Adequacy Workshop Issues

Type: COMMENTS Filing Date: March 4, 2004
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: on Resource Adequacy Workshops, pursuant to ALJ's Ruling dated February 13, 2004

Type: COMMENTS Filing Date: March 4, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: concerning scope and schedule of Resource Adequacy Workshops

Type: COMMENTS Filing Date: March 4, 2004
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: on the scope and schedule of Resource Adequacy Workshops

Type: COMMENTS Filing Date: March 4, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: Opening Comments on discussion topics for the upcoming Resource Adequacy Workshops

Type: COMMENTS Filing Date: March 4, 2004
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
THE UTILITY REFORM NETWORK
Description: Opening Comments on the Resource Adequacy Workshops

Type: COMMENTS Filing Date: March 4, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORP.
Description: Opening Comments on the Resource Adequacy Workshops

Type: COMMENTS Filing Date: March 4, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on resource adequacy.

Type: COMMENTS Filing Date: March 4, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on resource adequacy workshops.

Type: COMMENTS Filing Date: March 4, 2004
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: on First Round resorce adequacy workshop issues.

Type: COMMENTS Filing Date: March 4, 2004
Filed By:
WESTERN POWER TRADING FORUM
Description: on the scope and schedule of resource adequacy workshops.

Type: COMPLIANCE FILING Filing Date: March 4, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Reporting Achievement of 2003 Annual Procurement Target For Renewable Generation

Type: COMPLIANCE FILING Filing Date: March 1, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: Comments pursuant to D04-01-050

Type: COMPLIANCE FILING Filing Date: March 1, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: Comments concerning data confidentiality [pursuant to D04-01-050]

Type: COMPLIANCE FILING Filing Date: March 1, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Comments regarding confidentiality of information and effective public participation

Type: COMPLIANCE FILING Filing Date: March 1, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Comments on the consequences of public disclosure of confidential information

Type: COMPLIANCE FILING Filing Date: March 1, 2004
Filed By:
ORA/OBIORA/PUC
THE UTILITY REFORM NETWORK
Description: Comments on confidentiality requirements in resource planning

Type: COMPLIANCE FILING Filing Date: March 1, 2004
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: Comments on confidentiality of planning and procurement information

Type: COMPLIANCE FILING Filing Date: March 1, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Comments on confidentiality issues

Type: MOTION Filing Date: February 27, 2004
Filed By:
SEMPRA ENERGY SOLUTIONS
Description: For Late Intervention

Type: REHEARING REQUEST Filing Date: February 25, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: of D04-01-050.

Type: REHEARING REQUEST Filing Date: February 25, 2004
Filed By:
CONSTELLATION NEWENERGY, INC.
Description: of D04-01-050.

Type: REHEARING REQUEST Filing Date: February 25, 2004
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: of D04-01-050.

Type: REHEARING REQUEST Filing Date: February 25, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: of D04-01-050.

Type: REHEARING REQUEST Filing Date: February 25, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of D04-01-050.

Type: PETITION FOR MODIFICATION Filing Date: February 23, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of D03-06-076.

Type: REHEARING REQUEST Filing Date: February 23, 2004
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: of D04-01-050.

Type: EXPARTE Filing Date: February 20, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON January 20, 2004 AND APPEARED IN THE CALENDAR OF FEBRUARY 4, 2004, 2004. On January 14, 2004, Bruce C. Foster, Vice President of Regulatory Operations of Southern California Edison Company (SCE), met with Julie Fitch, advisor to Pres. Peevey, Brian Prusnek, advisor to Cmmr. Kennedy, and David Gamson, advisor to Cmmr. Brown, in three separate meetings in San Francisco. Also present was Michael Hoover, Director of Regulatory Affairs, SCE. Foster and Hoover stated that all load serving entities should meet resource adequacy (RA) requirements; that all RA requirements should start at the same time; and that RA requirements should be phased in over the next four years. Foster and Hoover also stated that debt equivalence is a cost to utility customers which needs to be recognized.

Type: PETITION FOR MODIFICATION Filing Date: February 20, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of D03-12-062.

Type: PETITION FOR MODIFICATION Filing Date: February 20, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: of D04-01-050.

Type: PETITION FOR MODIFICATION Filing Date: February 19, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of D03-12-062 (Public Version).

Type: RESPONSE Filing Date: February 18, 2004
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: to the motion of Calpine Corporation.

Type: EXPARTE Filing Date: February 17, 2004
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: On February 11, 2004, Nancy Rader, Executive Director of the California Wind Energy Association (CalWEA), sent an electronic mail (attached to the notice) to Brian Prusnek, advisor to Cmmr. Kennedy. In the electronic mail, Rader described the three attached documents and discussed the general problems that CalWEA members face in negotiating contracts with the utilities.

Type: RULING Filing Date: February 17, 2004
Filed By:
ALJ/WALWYN/PUC
Description: correcting workshop date to March 16.

Type: EXPARTE Filing Date: February 13, 2004
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: On February 10, 2004, Nancy Rader, Executive Director of the California Wind Energy Association (CalWEA), met with Cmmr. Kennedy in San Francisco. Also present were Brian Prusnek, advisor to Cmmr. Kennedy, Mauri Miller, a member of, and Joseph Karp of White & Case LLP, attorney for, CalWEA. CalWEA representatives discussed the primary concerns to be addressed by the Commission regarding standard contract terms and conditions in the proceeding, including the appropriate valuation of as-available capacity and repowering of existing wind generators.

Type: RULING Filing Date: February 13, 2004
Filed By:
ALJ/WALWYN/PUC
Description: on the scope and schedule of resource adequacy workshops. Comments are due on March 4, 2004; Reply Comments are due on March 11, 2004. Workshops will be held on March 15, 2004, April 12, 2004, April 13, 2004 and if necessary, April 14, 2004

Type: EXPARTE Filing Date: February 11, 2004
Filed By:
SEMPRA ENERGY RESOURCES
Description: LATE FILED. On January 4, 2004, Alvin S. Pak, Director of Regulatory Policy & Analysis, Sempra Energy Global Enterprises, representing Sempra Energy Resources (SER), met with David Gamson, advisor to Cmmr. Brown, and Roosevelt Grant III, advisor to Pres. Peevey, in two separate meetings in San Francisco. In the meeting with Roosevelt Grant III also participated Julie Fitch, advisor to Pres. Peevey. Also present were William R. Engelbrecht, Vice President of Energy Supply for SER, and Dale Kelly-Cochrane, Vice President of Budget & Planning for Sempra Energy LNG Corp. (LNG). SER's representatives noted that the issue of affiliate transactions continues to be addressed in this proceeding in disregard of prior procedural instructions and despite the lack of an evidentiary record. Pak pointed out that the testimony of the parties never mentioned or recommended the adoption of an outright ban on affiliate transactions. Engelbrecht stated that SER had just brought over 2350 megawatts of high-efficiency generation into the southwestern market and that precluding their participation in a future competitive solicitation conducted by affiliate San Diego Gas & Electric Company (SDG&E) would reduce the liquidity in the SDG&E market to the detriment of ratepayers. Kelly-Cochrane stated that the recently issued decision was unclear as to whether the affiliate ban covered gas-related and potentially LNG-related transactions and noted that this could affect the utilities' access to the benefits of LNG supplies. SER representatives concluded by indicating that Sempra companies would be seeking to reverse or stay the ban pending a full evidentiary exploration of the implications and adverse consequences of the affiliate ban as part of a duly convened evidentiary hearing.

Type: MOTION Filing Date: February 11, 2004
Filed By:
CALPINE CORPORATION
Description: (PUBLIC VERSION) to Limit the Scope of Testimony provided by Dr. James A. Boothe and to Strike Portions of Attachments to the Prepared Direct Testimony of Kevin Woodruff on behalf of TURN and UCAN regarding the October 7 Motion of SDG&E for Approval of certain resource acquisitions (PUBLIC VERSION).

Type: PETITION FOR MODIFICATION Filing Date: February 10, 2004
Filed By:
SEMPRA ENERGY RESOURCES
Description: and/or Clarification of D04-01-050.

Type: EXPARTE Filing Date: February 9, 2004
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: On February 4, 2004, Sara Steck Myers, attorney for the Center for Energy Efficiency and Renewable Technologies (CEERT), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were David M. Gamson, advisor to Cmmr. Brown, Roosevelt Grant, advisor to Cmmr. Peevey, Steven Weissman, advisor to Cmmr. Wood, Michael Campbell, advisor to Cmmr. Lynch, John Galloway of the Energy Division, Vincent Bartolomucci, Manager of Contract Administration - Electric and Gas Procurement, and William Blattner, CPUC Relations Manager - Regulatory Affairs, San Diego Gas & Electric Company (SDG&E), Meredith Allen, Attorney - Regulatory Affairs, Sempra Energy, V. John White, Executive Director of CEERT, and Roby Roberts, Manager of Renewable Business Development, PPM Energy. Referring to the Renewable Portfolio Standard (RPS) Program, Myers expressed concern about what appeared to be a significant lapse of time in completing implementation of that program by the Commission. Myers stated that it was CEERT's position that only a few central tasks remained to be completed by the Commission to allow for a trigger a first RPS-compliant utility solicitation for renewable generation. Myers stated that she appreciated SDG&E's commitment and contribution to RPS implementation. White emphasized the need to facilitate timely and collaborative decision-making on the key remaining RPS implementation issues. White and Myers stated that limitations in Commission, utility, and party resources made focused, efficient decision-making critical. Roberts noted that creating an unnecessary, overly-prescriptive process could delay or even thwart implementation of SB 1078.

Type: EXPARTE Filing Date: February 9, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: LATE FILED. On January 20, 2004, Vincent Bartolomucci, Manager, Contract Administration, San Diego Gas & Electric Company (SDG&E), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Roosevelt Grant, advisor to Pres. Peevey, David Gamson, advisor to Cmmr. Brown, Brian Prusnek, advisor to Cmmr. Kennedy, Steve Weissman, advisor to Cmmr. Wood, Mike Campbell, advisor to Cmmr. Lynch, John Galloway of the Energy Division, Meredith Allen, Attorney, and Billy Blattner, CPUC Relations Manager, for SDG&E, Sara Steck Myers and John White, for the Center for Energy Efficiency and Renewable Technology, and Roby Roberts, XXX. Bartolomucci stated that SDG&E is ready and willing to go forward with an RPS request for proposal for approval by the end of the year and suggested that the Commission can make the RPS implementation process more efficient by consolidating decisions and utilizing the existing record.

Type: RESPONSE Filing Date: February 5, 2004
Filed By:
INTERGEN NV
Description: to SDG&E's motion to strike the testimony of Orlando Martinez on behalf of InterGen.

Type: EXPARTE Filing Date: February 4, 2004
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: On January 30, 2004, Nancy Rader, Executive Director of the California Wind Energy Association (CalWEA), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present was Joseph Karp of White & Case LLP, attorney for CalWEA. CalWEA representatives requested the Commission to issue a ruling directing the utilities to propose plans that will facilitate repowering of wind facilities in California and discussed problems involving the 'California fix' component of the federal production tax credit statute.

Type: RESPONSE Filing Date: February 4, 2004
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE, L.L.C.
CALIFORNIA COGENERATION COUNCIL
CALIFORNIA WIND ENERGY ASSOCIATION
Description: to Southern California Edison Company's Application For Partial Rehearing of D03-12-062

Type: EXPARTE Filing Date: February 4, 2004
Filed By:
BERRY PETROLEUM COMPANY
SMURFIT-STONE CONTAINER CORPORATION
Description: On January 30, 2004, Joseph Karp of White & Case LLP, attorney for Berry Petroleum (Berry) and Smurfit-Stone Container Corporation (Smurfit), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Karp explained that Berry and Smurfit had a disagreement with Pacific Gas and Electric Company in connection with the requirements in D03-12-062 and D04-01-050 regarding the interim standard offer one contracts and requested the Commission's assistance in resolving the disagreement.

Type: EXPARTE Filing Date: February 3, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On January 29, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Jacobson explained PG&E's opposition to reallocation of the Sunrise contract from San Diego Gas & Electric Company (SDG&E) to PG&E. Jacobson expressed support for severing the Sunrise issue from the broader SDG&E RFP issues.

Type: MOTION Filing Date: February 3, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: To Strike The Prepared Reply Testimony of Orlando Martinez on Behalf of Intergen NV

Type: MOTION Filing Date: February 3, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: To Strike Testimony To Clarify The Record Regarding The Severance Of The Sunrise Reallocation Issue

Type: COMPLIANCE FILING Filing Date: February 2, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Report Regarding 2003 Annual Procurement Target

Type: EXPARTE Filing Date: January 30, 2004
Filed By:
ORA/OBIORA/PUC
Description: THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON JANUARY 16, 2004 AND APPEARED IN THE CALENDAR OF JANUARY 28, 2004. On January 15, 2004, Noel A. Obiora, attorney for the Office of Ratepayer Advocates (ORA), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present was Jan Reid, Analyst for the ORA. Written material (attached to the notice) was used. ORA representatives addressed statements made by San Diego Gas & Electric Company and Southern California Edison Company at Cmmr. Brown's all party meeting, that they would not enter long-term contracts unless the Commission recognized debt equivalence. ORA noted that the utilities have signed many contracts in the last year without demanding recognition of debt equivalence as a condition, and debt equivalence should be addressed in the cost of service proceeding not the procurement proceeding.

Type: COMPLIANCE FILING Filing Date: January 29, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: regarding achievement of 2003 renewable portfolio standard annual procurement target.

Type: EXPARTE Filing Date: January 27, 2004
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: LATE FILED. On January 20, 2004, Mona Tierney of Constellation New Energy, on behalf of the Alliance for Retail Energy Markets (AREM), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Tierney discussed issues related to the procurement proceeding with emphasis on the resource adequacy proposal and AREM's concerns with the implementation of a resource adequacy proposal to ESPs. Tierney also discussed the need to transition into the new requirement, energy efficiency issues and AREM's concern that ESP will not have access to fund dollars, although they are paying the non-bypassable charge.

Type: EXPARTE Filing Date: January 23, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On January 20, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas & Electric Company (PG&E), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Jacobson stated that PG&E strongly supports the draft decision of ALJ Wong that approves the interest amount of $13.3 million agreed to by the Department of Water Resources and PG&E. Jacobson explained PG&E's opposition to Cmmr. Wood's alternate. Jacobson also explained the importance of having Cmmr. Lynch's revised generation procurement alternate embrace the policy that ESPs and Community Aggregators should be subject to the same resource adequacy standards as IOUs. Finally, Jacobson explained the basis for PG&E's proposal to limit the forward contracting requirement to the peak months of July-September.

Type: EXPARTE Filing Date: January 23, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On January 20, 2004, Joe Karp of White & Case LLP, attorneys for the California Cogeneration Council (CCC), spoke on the telephone with Julie Fitch, advisor to Cmmr. Peevey. Lisa Cottle of White & Case LLP also participated in the conversation. Karp and Cottle discussed the revised alternate issued by Cmmr. Peevey on that date. Karp and Cottle offered suggestions as to where further revisions may be warranted to address the issues raised in CCC's written comments.

Type: EXPARTE Filing Date: January 23, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On January 20, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas & Electric Company (PG&E), met with Brian Prusnek, advisor to Cmmr. Kennedy, in San Francisco. Jacobson stated that PG&E strongly supports the draft decision of ALJ Wong that approves the interest amount of $13.3 million agreed to by the Department of Water Resources and PG&E. Jacobson explained PG&E's opposition to Cmmr. Wood's alternate.

Type: EXPARTE Filing Date: January 22, 2004
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: On January 16, 2004, Andrea Weller of Strategic Energy, on behalf of the Alliance for Retail Energy Markets (AREM), had a telephone conversation with Brian Prusnek, advisor to Cmmr. Kennedy. Also participating in the conversation was Mona Tierney of Constellation New Energy, on behalf of AREM. Weller and Tierney discussed issues related to the procurement proceeding with emphasis on the resource adequacy proposal and AREM's concerns with the implementation of a resource adequacy proposal to ESPs. Weller and Tierney also discussed the need to transition into the new requirement, energy efficiency issues and AREM's concern that ESP will not have access to fund dollars, although they are paying the non-bypassable charge.

Type: EXPARTE Filing Date: January 21, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On January 20, 2004, Lad Lorenz, Vice President of Regulatory Affairs, San Diego Gas & Electric Company (SDG&E), met with David Gamson, advisor to Cmmr. Brown, and Julie Fitch, advisor to Pres. Peevey, in two separate meetings in San Francisco. Brian Prusnek, advisor to Cmmr. Kennedy also attended the meeting with Julie Fitch. Also present was Billy Blattner, CPUC Relations Manager, SDG&E. Lorenz stated that the decisions misunderstand the composition of SDG&E's risk management committee, resulting in unnecessary orders affecting the membership and establishing a duplicative audit. Lorenz also noted that the permanent affiliate transaction ban will preclude SDG&E from bringing the widest range of procurement opportunities before the Commission; at the very least, the Commission should allow pre-approval. Lorenz added that without recognition of debt equivalency, the Otay Mesa project cannot go forward. Blattner offered SDG&E's resource adequacy proposal as a reasonable framework that would prevent gaming, preserve the Commission's jurisdiction, and assure resources.

Type: EXPARTE Filing Date: January 21, 2004
Filed By:
ORA/OBIORA/PUC
Description: LATE FILED. On January 7, 2004, Noel A. Obiora, attorney for the Office of Ratepayer Advocates (ORA), met with Cmmrs. Peevey, Brown, Lynch, Wood, and Kennedy in San Francisco. Also present were Jan Reid, Analyst, Scott Cauchois, Manager, and Scott Logan, Analyst, for the ORA. Reid objected to the Commission recognizing debt equivalence in the procurement proceeding and state that it was more appropriately a cost of capital issue. Cauchois stated that the ISO should have the responsibility for implementing resource adequacy requirements for non-utility load serving entities, particularly Direct Access customers and Community Aggregators. Cauchois explained that this would eliminate the need for the imposing complex surcharge mechanisms that The Utility Reform Network proposed for exit customers.

Type: EXPARTE Filing Date: January 21, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On January 16, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas & Electric Company (PG&E), met with Aaron Johnson, advisor to Cmmr. Lynch, in San Francisco. Written material (attached to the notice) was used. Jacobson stated that PG&E strongly supports the draft decision of ALJ Wong that approves the interest amount of $13.3 million agreed to by the Department of Water Resources and PG&E. Jacobson explained PG&E's opposition to Cmmr. Wood's alternate. Jacobson also explained the importance of having Cmmr. Lynch's revised generation procurement alternate embrace the policy that ESPs and Community Aggregators should be subject to the same resource adequacy standards as IOUs.

Type: COMMENTS ON ALTERNATE Filing Date: January 20, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On Revised Alternate Proposed Decision of Commissioner Lynch

Type: REHEARING REQUEST Filing Date: January 20, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: partial, of Decision 03-12-062.

Type: PETITION Filing Date: January 20, 2004
Filed By:
CELERITY ENERGY, INC.
Description: to Intervene.

Type: EXPARTE Filing Date: January 20, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: AUGMENTATION REQUIRED. On January 14, 2004, Bruce C. Foster, Vice President of Regulatory Operations of Southern California Edison Company (SCE), met with Julie Fitch, advisor to Pres. Peevey, Brian Prusnek, advisor to Cmmr. Kennedy, and David Gamson, advisor to Cmmr. Brown, in three separate meetings in San Francisco. Also present was Michael Hoover, Director of Regulatory Affairs, SCE. Foster and Hoover summarized SCE's position on resource adequacy and debt equivalence.

Type: COMMENTS ON ALTERNATE Filing Date: January 20, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: on the revised alternate of Cmmr. Lynch re long-term utility procurement.

Type: COMMENTS ON ALTERNATE Filing Date: January 20, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the revised alternate of Cmmr. Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: January 20, 2004
Filed By:
RATEPAYERS FOR AFFORDABLE GREEN ENERGY
Description: on the revised alternate of Cmmr. Lynch [mailed 1/12/04].

Type: COMMENTS ON ALTERNATE Filing Date: January 20, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: on the revised alternate of Cmmr. Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: January 20, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on the revised alternate of Cmmr. Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: January 20, 2004
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: opening; on the revised alternate of Cmmr. Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: January 20, 2004
Filed By:
NAVAJO NATION
Description: on the revised alternate of Cmmr. Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: January 20, 2004
Filed By:
ORA/OBIORA/PUC
Description: on the revised alternate of Cmmr. Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: January 20, 2004
Filed By:
RIDGEWOOD OLINDA, LLC
Description: Proposed Decision of Commissioner Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: January 20, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: Revised; Proposed Decision of Commissioner Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: January 20, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On the Revised Alternate Decision of Commissioner Lynch

Type: COMMENTS ON ALTERNATE Filing Date: January 20, 2004
Filed By:
SEMPRA ENERGY RESOURCES
Description: On the Revised Lynch Alternate Decision

Type: COMMENTS ON ALTERNATE Filing Date: January 20, 2004
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKET
Description: on the Revised Alternate Proposed Decision of Commissioner Lynch

Type: COMMENTS ON ALTERNATE Filing Date: January 20, 2004
Filed By:
CITY OF CHULA VISTA
Description: On the Alternate Revised Proposed Decision of Commissioner Lynch

Type: EXPARTE Filing Date: January 16, 2004
Filed By:
ORA/OBIORA/PUC
Description: AUGMENTATION REQUIRED. On January 15, 2004, Noel A. Obiora, attorney for the Office of Ratepayer Advocates (ORA), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present was Jan Reid, Analyst for the ORA. Written material (attached to the notice) was used. ORA representatives addressed statements made by San Diego Gas & Electric Company and Southern California Edison Company at Cmmr. Brown's all party meeting, that they would not enter long-term contracts unless the Commission recognized debt equivalence.

Type: EXPARTE Filing Date: January 16, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: On January 13, 2004, Rod Aoki, counsel to the Cogeneration Association of California (CAC), contacted Julie Fitch, advisor to Pres. Peevey, by electronic mail. Aoki transmitted a redline copy (attached to the notice) of Cmmr. Peevey's alternate reflecting provisions consistent with positions taken by CAC in this proceeding.

Type: EXPARTE Filing Date: January 16, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On January 13, 2004, Barry Lovell of Berry Petroleum, member of the California Cogeneration Council (CCC), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present were Belinda Gatti and Peter Hanson, advisors to Cmmr. Brown, Aaron Johnson, advisor to Cmmr. Lynch, Julie Fitch, advisor to Cmmr. Peevey, Dan Adler of the Strategic Planning Division, John Galloway of the Energy Division, David Hermanson of Sithe Energies, Inc., and Larry Finne of United Cogen, Inc. (members of the CCC), Joe Karp and Jerry Bloom, of White & Case LLP, attorneys, R. Thomas Beach of Crossborder Energy, consultant, and Maureen Lennon, Executive Director, for the CCC. Written and video materials (attached to the notice) were used. The CCC representatives explained cogeneration technology and the benefits of cogeneration. The CCC representatives then explained and summarized the history of cogeneration in California, the Public Utility Policies Regulatory Act of 1978, the Commission's implementation of PUURPA and state laws. In addition, the CCC explained how short-run avoided cost pricing has worked.

Type: EXPARTE Filing Date: January 15, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On January 15, 2004, Lad Lorenz, Vice President of Regulatory Affairs, San Diego Gas & Electric Company (SDG&E), met with Aaron Johnson, advisor to Cmmr. Lynch, in San Francisco. Also present was Billy Blattner, CPUC Relations Manager, SDG&E. Lorenz stated that the decisions misunderstand the composition of SDG&E's risk management committee, resulting in unnecessary orders affecting the membership and establishing a duplicative audit. Lorenz also noted that the permanent affiliate transaction ban will preclude SDG&E from bringing the widest range of procurement opportunities before the Commission; at the very least, the Commission should allow pre-approval. Lorenz added that without recognition of debt equivalency, the Otay Mesa project cannot go forward. Blattner offered SDG&E's resource adequacy proposal as a reasonable framework that would prevent gaming, preserve the Commission's jurisdiction, and assure resources.

Type: EXPARTE Filing Date: January 14, 2004
Filed By:
SEMPRA ENERGY RESOURCES
Description: LATE FILED. On January 7, 2004, Alvin S. Pak, Director of Regulatory Policy & Analysis, Sempra Energy Global Enterprises, representing Sempra Energy Resources (SER), participated in an all-party meeting with Cmmr. Brown in San Francisco. Also present was Cmmr. Lynch. Pak expressed SER's continuing opposition to the proposed ban on affiliate transactions and reiterated SER's recommendation that any consideration of affiliate-transactions issues take place outside the procurement rulemaking and in a more appropriate procedural context.

Type: RULING Filing Date: January 14, 2004
Filed By:
ALJ/WALWYN/PUC
Description: adopting Amended Protective Order and severing an issue for hearing.

Type: EXPARTE Filing Date: January 13, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: LATE FILED. On January 6, 2004, Michael Alcantar, counsel to the Cogeneration Association of California (CAC), met with Cmmr. Wood in San Francisco. Also present were Steve Weissman and Bill Julian (via teleconferencing), advisors to Cmmr. Wood. Alcantar discussed cogeneration issues including elimination of the affiliate ban, recognition of cogeneration benefits, recognition of cogeneration operating and contract needs, implementation of policies and actions to retain existing cogeneration resources.

Type: EXPARTE Filing Date: January 13, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: LATE FILED. On January 7, 2004, Bruce C. Foster, Vice President of Regulatory Operations of Southern California Edison Company (SCE), met with Cmmr. Brown and Cmmr. Lynch in an all-party meeting in San Francisco. Also present were Jan Reid and Scott Cauchois for the Office of Ratepayer Advocates, Stuart Hemphill, Director of Resource Planning and Strategy, and Beth Fox, Senior Attorney, for SCE, Matt Freedman for The Utility Reform Network, Michael Alcantar for the Cogeneration Association of California and the Energy Producers and Users Coalition, Lisa Cottle for the California Cogeneration Council, Mark Fogelman for the Navajo Nation, Mark Joseph for the Coalition of California Utility Employees, John Bogy for Pacific Gas and Electric Company, Phil Pettingill for the California Independent System Operator, Steven Kelly for the Independent Energy Producers Association, a representative for Sempra Energy Resources, Sheryl Carter for the Natural Resources Defense Council, Lad Lorenz for San Diego Gas & Electric Company, Michael Jaske for the California Energy Commission, Michael Day for Reliant, a representative of Ridgewood Olinda, LLC, a representative of Dynegy, Mona Petroschko for the Constellation, Greg Klatt for the Alliance for Retail Energy Markets, Tyler Feldman for the Pacific Environments, Tyrone Cahman for the Solar Economy Institute, Ed Maling for Sustainable Nevada, Sustainable Marin, David Ericson, an independent energy efficiency consultant working with Sonoma County, Kristin Casper for Greenpeace, Don Eichenberger for the Green Party's Energy Working Group, and Paul Finn, Pam Oberherfer, Thora Laris and Kevin Lutton, in their individual capacity. Foster stated that all load serving entities should meet resource adequacy (RA) and all RA requirements should start at the same time. Foster noted that the RA requirements should be phased in over the next four years. Foster explained that debt equivalence is a cost to utility customers, which needs to be recognized. Foster asserted that the utilities need more flexibility and should not be required to procure solely through an Request for Proposal process. Foster urged the Commission to adopt SCE's Interim Plan until it resolves the customer base issues and not issue new proposed decisions without giving parties the opportunity to comment.

Type: ALTERNATE Filing Date: January 12, 2004
Filed By:
COM/LYNCH/PUC
Description: Revised: Comments are due January 20, not to exceed 15 pages. No reply comments will be accepted.

Type: EXPARTE Filing Date: January 12, 2004
Filed By:
RIDGEWOOD OLINDA, LLC
Description: On January 7, 2004, Jeanne M. McKinney of Thelen Reid & Priest, LLP, attorneys for Ridgewood Olinda, LLC (Ridgewood), attended an all-party meeting with Cmmr. Brown in San Francisco. McKinney expressed Ridgewood's concerns that under the proposed decisions (PDs) utilities will not be obligated to purchase power from qualifying facilities (QFs). McKinney stated that the PDs conflict with the PURPA mandate for utilities to purchase power from QFs and that QFs will be left without a market for their energy in California under the decisions as currently drafted.

Type: EXPARTE Filing Date: January 12, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: On January 7, 2004, Robin Smutny-Jones of the California Independent System Operator Corporation (ISO) met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Kevin Coughlan, the Energy Division, and Kerry Hattevick, the Strategic Planning Division. Phil Pettingill and Mary McDonald of the ISO participated by telephone. ISO representatives discussed the various proposed resource adequacy programs generally and how any Commission-approved resource adequacy program would be implemented by the Commission and the ISO.

Type: EXPARTE Filing Date: January 12, 2004
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: On January 7, 2004, Marc Joseph, attorney for the Coalition of California Utility Employees (CUE), participated in an all-party meeting with Cmmr. Brown in San Francisco. Also present were Cmmr. Lynch and David Gamson, advisor to Cmmr. Brown. Joseph stated that both the proposed decision and Cmmr. Peevey's alternate erred in saying that the utilities should rely on the formal RFP process to secure utility owned long-term generation resources, and that this would be a train wreck, like the BRPU. Joseph explained that it is very hard to compare plants because the comparison cannot be based on price alone. Joseph suggested that the Commission should say that the utility is expected to develop a reasonable mix of utility and third party generation, using the traditional certificate of public convenience and necessity process for utility generation and an RFP for third party generation.

Type: EXPARTE Filing Date: January 12, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On January 7, 2004, Eric Eisenman, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), participated in an all-party meeting with Cmmr. Brown in San Francisco. Also present were Cmmr. Lynch, David Gamson, advisor to Cmmr. Brown, and Aaron Johnson, advisor to Cmmr. Lynch, and John Bogy, Attorney at Law, Roy Kuga, Lead Director, Gas & Electric Supply, Valerie Winn, Manager, and Sebastien Csapo, Team Lead, Energy Revenue Requirements, for PG&E. Bogy stated that PG&E supports adoption of a 15 percent planning reserve margin by 2008 as proposed in Cmmr. Lynch's alternate, and indicated that there are diminishing returns to purchasing higher reserve margins. Bogy explained PG&E's view that all load serving entities should be required to meet the same reserve requirements. With respect to requirements to purchase capacity on a forward basis, Bogy explained PG&E's opposition to the ISO's 90 percent year-ahead and 100 percent month-ahead requirements adopted in Cmmr. Peevey's alternate. Finally, Bogy stated that PG&E recommends modifying the proposed and alternate decisions to recognize the importance of debt equivalence. Bogy also reiterated PG&E's strong support for revising the SRAC methodology because it produces prices that exceed avoided cost.

Type: EXPARTE Filing Date: January 12, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On January 7, 2004, Lad Lorenz, Vice President of Regulatory Affairs, San Diego Gas & Electric Company (SDG&E), participated in an all-party meeting with Cmmr. Brown in San Francisco. Also present were Cmmr. Lynch, David Gamson and Peter Hanson, advisors to Cmmr. Brown, Aaron Johnson, advisor to Cmmr. Lynch, Brian Prusnek, advisor to Cmmr. Kennedy, Billy Blattner, CPUC Relations Manager, SDG&E, and other attendees listed on the attachment to the notice. Lorenz stated that the decisions misunderstand the composition of SDG&E's risk management committee, resulting in unnecessary orders affecting the membership and establishing a duplicative audit. Lorenz also noted that the permanent affiliate transaction ban will preclude SDG&E from bringing the widest range of procurement opportunities before the Commission; at the very least, the Commission should allow pre-approval. Lorenz offered SDG&E's resource adequacy proposal as a reasonable framework that would prevent gaming, preserve the Commission's jurisdiction, and assure resources. Finally, Lorenz noted that without recognition of debt equivalency, the Otay Mesa project cannot go forward.

Type: MISCELLANEOUS FILING Filing Date: December 23, 2003
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: Clarification to request for an award of compensation.

Type: EXPARTE Filing Date: December 22, 2003
Filed By:
SEMPRA ENERGY RESOURCES
Description: LATE FILED. On December 15, 2003, Alvin S. Pak, Director of Regulatory Policy & Analysis, Sempra Energy Global Enterprises, representing Sempra Energy Resources (SER), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Written material (attached to the notice) was used. Pak explained that the proposed ban on affiliate transactions found in the pending proposed decisions is contrary to public policy. Pak stated that the ban eliminates important competitors from the market. Pak also noted that SER was the only party that responded to the emerging Commission preference for turnkey generation projects, indicating the special regard for Commission policy uniquely held by affiliated generators.

Type: MISCELLANEOUS FILING Filing Date: December 19, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: Clarification to request for an award of compensation.

Type: COMMENTS Filing Date: December 16, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to ALJ's Ruling on SDG&E Motion to Amend Protective Order.

Type: EXPARTE Filing Date: December 16, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On December 11, 2003, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Aaron Johnson, advisor to Cmmr. Lynch, in San Francisco. Also present was Roy Kuga, Lead Director, Gas & Electric Supply, for PG&E. Jacobson and Kuga stated the need for confidentiality of certain bid and forecast information. Jacobson and Kuga also indicated that the PRG process was working well and should be retained. Kuga and Jacobson further explained the importance of getting a decision soon that approves PG&E's short-term procurement plan. Kuga and Jacobson described changes that should be made to Cmmr. Lynch's alternate in the area of unit contingent contracts and debt equivalence. Kuga and Jacobson stated that the alternate should also be modified to eliminate the opportunity for direct access and community aggregation customers to opt-out of any reserve charge established to recovery the cost of procuring reserves on their behalf. Finally, Kuga and Jacobson urged that the alternate be modified to allow PG&E to enter into multi-year deals under a 'no-regrets' policy.

Type: EXPARTE Filing Date: December 16, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On December 11, 2003, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with David Gamson, advisor to Cmmr. Lynch, in San Francisco. Also present was Roy Kuga, Lead Director, Gas & Electric Supply, for PG&E. Jacobson and Kuga stated the need for confidentiality of certain bid and forecast information. Jacobson and Kuga also indicated that the PRG process was working well and should be retained. Kuga and Jacobson further explained the importance of getting a decision soon that approves PG&E's short-term procurement plan. Kuga and Jacobson described changes that should be made to the decisions in the area of unit contingent contracts and debt equivalence. Kuga and Jacobson also indicated that the proposed decision by ALJ Walwyn and the alternate by Cmmr. Lynch should be modified to eliminate the opportunity for direct access and community aggregation customers to opt-out of any reserve charge established to recovery the cost of procuring reserves on their behalf.

Type: COMMENTS Filing Date: December 16, 2003
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: [pursuant to December 1, 2003 Ruling].

Type: COMMENTS Filing Date: December 16, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the "FERC model" for nondiscolsure discussed in December 1, 2003 ruling on confidentiality.

Type: COMMENTS Filing Date: December 16, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on the ALJ's ruling on SDG&E's motion to amend protective order.

Type: COMMENTS Filing Date: December 15, 2003
Filed By:
SEMPRA ENERGY RESOURCES
Description: on the ALJ's Ruling on SDG&E's Motion to Amend Protective Order.

Type: REPLY Filing Date: December 15, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to the Comments of parties on the Proposed Decision, and the Alternate Decisions of Commissioners Peevey and Lynch.

Type: EXPARTE Filing Date: December 15, 2003
Filed By:
GREEN POWER INSTITUTE
Description: THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON December 5, 2003 AND APPEARED IN THE CALENDAR OF December 15, 2003. On December 4, 2003, the Green Power Institute sent to ALJ Allen a copy of the email letter addressed to the Joint Parties of the CEERT et al. Reply Brief on Standard Terms and Conditions. A copy of the email is attached to the notice. The letter asks to clarify the Joint Parties Reply Comments regarding the position of the Green Power Institute on the issue of the definition of a REC.

Type: EXPARTE Filing Date: December 15, 2003
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On December 10, 2003, Barry Lovell of Berry Petroleum, member of the California Cogeneration Council (CCC), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present were Aaron Johnson, advisor to Cmmr. Lynch, David Hermanson of Sithe Energies, Inc. (member of the CCC), Lisa Cottle and Jerry Bloom of White & Case LLP, attorneys for the CCC, and R. Thomas Beach of Crossborder Energy, consultant for the CCC. The CCC representatives discussed the three proposed decisions (PDs) issued in this proceeding, and stated that there is a critical need to extend the interim standard offer one contracts beyond the end of this year. The CCC representatives stated further that the Commission should remove its findings in the PDs regarding short-run avoided cost prices. Lastly, the CCC representatives urged the Commission to removed language from the PDs that would condition the utilities' obligation to buy from qualifying facilities (QF) on the utilities' own determination of their need for QF power.

Type: EXPARTE Filing Date: December 15, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On December 11, 2003, Bruce C. Foster, Vice President of Regulatory Operations of Southern California Edison Company (SCE), met with Brian Prusnek, advisor to Cmmr. Kennedy at Flipper Gourmet Burgers. Also present was Gary Schoonyan, Director, Regulatory Policy and Affairs, for SCE. Written materials (attached to the notice) were used. Foster and Schoonyan discussed SCE's concerns with the proposed decision of ALJ Walwyn (PD), and the alternate of Cmmr. Peevey (AD).

Type: COMMENTS ON ALTERNATE Filing Date: December 15, 2003
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: reply; on the alternate of Cmmr. Peevey and alternate of Cmmr. Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: December 15, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on the alternate of Cmmr. Peevey re short-term and long-term utility procurement plans.

Type: COMMENTS Filing Date: December 15, 2003
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: reply on Proposed Decision of ALJ Walwyn and Atlernate of Cmmr. Peevey.

Type: COMMENTS Filing Date: December 15, 2003
Filed By:
ORA/OBIORA/PUC
Description: reply; on the alternates of Cmmr. Peevey and Lynch, and the proposed decision of ALJ Walwyn in the proceeding to determine and approve California independently owned utilities' resource plans.

Type: COMMENTS Filing Date: December 15, 2003
Filed By:
RIDGEWOOD OLINDA, LLC
Description: reply; on proposed decision of ALJ Walwyn, alternate of Cmmr. Peevey and alternate of Cmmr. Lynch.

Type: COMMENTS Filing Date: December 15, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: reply; on parties' comments to the proposed and alternate decisions.

Type: COMMENTS Filing Date: December 15, 2003
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: on the proposed decision of ALJ Walwyn.

Type: COMMENTS Filing Date: December 15, 2003
Filed By:
NAVAJO NATION
Description: reply; on the proposed decision of ALJ Walwyn and alternate of Cmmr. Peevey.

Type: COMMENTS Filing Date: December 15, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on proposed decision of ALJ Walwyn and alternates of Cmmr. Peevey and Cmmr. Lynch.

Type: COMMENTS Filing Date: December 15, 2003
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: reply; on the proposed decision of ALJ Walwyn and the alternate of Cmmr. Peevey.

Type: COMMENTS Filing Date: December 15, 2003
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: reply; on the proposed decision of ALJ Walwyn and alternates of Cmmr. Peevey and Lynch.

Type: COMMENTS Filing Date: December 15, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on the proposed decision of ALJ Walwyn and the alternate of Cmmr. Lynch re short-term and long-term utility procurement plans for 2004 and beyond.

Type: COMMENTS Filing Date: December 15, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on the Proposed Decision of ALJ Walwyn.

Type: COMMENTS Filing Date: December 15, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on the Alternate Decision of Commissioner Lynch.

Type: COMMENTS Filing Date: December 15, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on the Alternate Proposed Decision of President Peevey.

Type: COMMENTS Filing Date: December 15, 2003
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: Reply; on the Proposed Decision of ALJ Walwyn; on the Alternate Proposed Decisions of Commissioners Peevey and Lynch.

Type: COMPLIANCE FILING Filing Date: December 11, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: [Confidential Version] in Response to the December 1, 2003 Ruling of ALJ Walwyn.

Type: EXPARTE Filing Date: December 11, 2003
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: On September 9, 2003, Robin Smutny-Jones of the California Independent System Operator Corporation (ISO) met with Cmmr. Kennedy in San Francisco. Also present were Terry Winter and Jim Detmers for the ISO. ISO representatives focused on what it considers to be the primary needs of a resource adequacy program, including locking-up capacity a month ahead of time, ensuring that there is adequate accounting for available resources and the need for effective deliverability standards. ISO representatives stressed the need to avoid an over-reliance on spot market purchases.

Type: COMMENTS ON ALTERNATE Filing Date: December 11, 2003
Filed By:
ORA/OBIORA/PUC
Description: of Cmmr. Lynch in the proceeding to determine and approve California independently owned utilities' resource plans.

Type: COMMENTS ON ALTERNATE Filing Date: December 11, 2003
Filed By:
VULCAN POWER COMPANY
Description: of Cmmr. Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: December 11, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: of Cmmr. Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: December 11, 2003
Filed By:
NAVAJO NATION
Description: of Cmmr. Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: December 11, 2003
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: of Cmmr. Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: December 11, 2003
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: of Cmmr. Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: December 11, 2003
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: of Cmmr. Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: December 11, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of Cmmr. Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: December 11, 2003
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: of Cmmr. Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: December 11, 2003
Filed By:
CONSTELLATION NEWENERGY, INC.
Description: of Cmmr. Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: December 11, 2003
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: of Cmmr. Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: December 11, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: of Cmmr. Lynch re short-term and long-term utility procurement plans for 2004 and beyond.

Type: COMMENTS Filing Date: December 11, 2003
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: on the Alternate Proposed Decision of Commissioner Lynch.

Type: COMMENTS Filing Date: December 11, 2003
Filed By:
WESTERN POWER TRADING FORUM
Description: on the Proposed Decision of Commissioner Lynch.

Type: COMMENTS Filing Date: December 11, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Alternate Decision of Commissioner Lynch.

Type: COMMENTS Filing Date: December 11, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on the Alternate Decision of Commissioner Lynch.

Type: COMPLIANCE FILING Filing Date: December 11, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: in Response to the December 1, 2003 Ruling of ALJ Walwyn.

Type: MOTION Filing Date: December 10, 2003
Filed By:
GREEN POWER INSTITUTE
Description: for Leave to File Supplemental Reply Comments on standard Terms and Conditions; ATTACHED: Supplemental Reply Comments.

Type: EXPARTE Filing Date: December 9, 2003
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: LATE FILED. On December 1, 2003, Andrea Weller of Strategic Energy, on behalf of the Alliance for Retail Energy Markets (AREM), met with David Gamson, advisor to Cmmr. Brown, and Julie Fitch, advisor to Cmmr. Peevey, in two separate meetings in San Francisco. Also present was Mona Petrochko of Constellation Energy, on behalf of AREM. AREM representatives stated that AREM members do not oppose energy service providers (ESPs) being required to demonstrate resource adequacy, but would oppose being required to make that demonstration to the Commission. AREM representatives observed that the alternate of Cmmr. Peevey is consistent with AREM's position that any resource adequacy requirement for ESPs and other non-utility load-serving entities (LSEs) should be administered by the California Independent System Operator. AREM urged the Commission, however, to clarify in its final decision that consistent standards should be used to determine whether a power purchase agreement counts toward a LSE's reserve requirement, irrespective of whether the contracting party is the Department of Water Resources (DWR) or a utility, and ESP or other LSE. AREM also urged the Commission to clarify that for purposes of determining resource adequacy, the capacity associated with DWR contracts should be allocated to ESPs to the extent their customers pay for the cots of those contracts through Direct Access Cost Responsibility Surcharges.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
CITY OF SAN DIEGO
Description: on the Proposed Decision of ALJ Walwyn and the Alternate Proposed Decisions of Commissioner Peevey and Lynch.

Type: MOTION Filing Date: December 8, 2003
Filed By:
CONSTELLATION NEWENERGY, INC.
Description: to intervene; comments on proposed and alternate decisions attached.

Type: MOTION Filing Date: December 8, 2003
Filed By:
RATEPAYERS FOR AFFORDABLE GREEN ENERGY COALITION
Description: to intervene; on proposed decision of ALJ Walwyn and alternates of Cmmr. Lynch and of Cmmr. Peevey attached.

Type: COMMENTS ON ALTERNATE Filing Date: December 8, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of Cmmr. Peevey.

Type: COMMENTS ON ALTERNATE Filing Date: December 8, 2003
Filed By:
ORA/OBIORA/PUC
Description: of Cmmr. Peevey in the proceeding to determine and approve California independently owned utilities' resource plans.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: on the proposed decision of ALJ Walwyn and the alternate of Cmmr. Peevey mailed November 18, 2003.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: on the proposed decision of ALJ Walwyn and the alternates of Cmmr. Lynch and of Cmmr. Peevey.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: on the proposed decision of ALJ Walwyn and the alternate of Cmmr. Peevey mailed November 18, 2003 re: short-term and long-term utility procurement plans for 2004 and beyond.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on proposed decision.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: on proposed and alternate decisions on procurement.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: on proposed decision of ALJ Walwyn and alternate of Cmmr. Peevey.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
NAVAJO NATION
Description: on proposed decision of ALJ Walwyn and alternate of Cmmr. Peevey.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: [on proposed decision of ALJ Walwyn and alternate of Cmmr. Peevey.]

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: on proposed decision of ALJ Walwyn and alternate of Cmmr. Peevey.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
DUKE ENERGY NORTH AMERICA
Description: on proposed decision of ALJ Walwyn and alternate of Cmmr. Peevey.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: initial; on proposed decision of ALJ Walwyn and alternate of Cmmr. Peevey.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: on proposed decision of ALJ Walwyn and alternate of Cmmr. Peevey.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
VULCAN POWER COMPANY
Description: on proposed decision of ALJ Walwyn and alternate of Cmmr. Peevey.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
ORA/OBIORA/PUC
Description: on the proposed decision of ALJ Walwyn in the proceeding to determine and approve California independently owned utilities' resource plans.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: on the Proposed Decisions of Commissioner Peevey and ALJ Walwyn.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
JOINT PARTIES INTERESTED IN DISTRIBUTED GENERATION/DISTRIBUTED ENERGY RESOURCES
Description: regarding the Proposed Decision of ALJ Walwyn and the Proposed Alternate Decision of Commissioner Peevey.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
CALIFORNIA CONSUMER POWER AND CONSERVATION FINANCING AUTHORITY
Description: Opening; to the Proposed Decision of ALJ Walwyn and Alternate Decision of President Peevey.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
Description: on the Proposed Decision and Alternate Decision of Commissioner Peevey on the Interim Opinion.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
WESTERN POWER TRADING FORUM
Description: on the Proposed Decisions by ALJ Walwyn and Commissioner Peevey.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKET
Description: on the Proposed Decision of ALJ Walwyn.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the Proposed Decision of ALJ Walwyn.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Alternate Proposed Decision of President Peevey.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKET
Description: on the Alternate Proposed Decision of Commissioner Peevey.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on the Proposed Decision of ALJ Walwyn and the Alternate Decision of President Peevey.

Type: COMMENTS Filing Date: December 8, 2003
Filed By:
SEMPRA ENERGY RESOURCES
Description: on the Alternate and Proposed Decisions.

Type: EXPARTE Filing Date: December 5, 2003
Filed By:
GREEN POWER INSTITUTE
Description: AUGMENTATION REQUIRED. On December 4, 2003, the Green Power Institute sent to ALJ Allen a copy of the email letter addressed to the Joint Parties of the CEERT et al. Reply Brief on Standard Terms and Conditions. The letter asks to clarify the Joint Parties Reply Comments regarding the position of the Green Power Institute on the issue of the definition of a REC.

Type: ALTERNATE Filing Date: December 4, 2003
Filed By:
CMMR/LYNCH/PUC
Description: Interim opinion. Comments are due December 11, 2003.

Type: PETITION FOR MODIFICATION Filing Date: December 4, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of D02-10-062 for waiver for gas transmission Northwest Corporation services in connection with Department of Water Resources PPM energy contract.

Type: MOTION Filing Date: December 4, 2003
Filed By:
COMMUNITY RENEWABLE ENERGY RESOURCES, INC.
MADERA POWER, LLC
SIERRA POWER CORPORATION
Description: joint; to intervene; reply breif on standard terms and conditions attached.

Type: BRIEF Filing Date: December 3, 2003
Filed By:
GREEN POWER INSTITUTE
Description: Reply; on Standard Terms and Conditions.

Type: EXPARTE Filing Date: December 3, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: LATE FILED. On November 25, 2003, Bruce C. Foster, Vice President of Regulatory Operations of Southern California Edison Company (SCE), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Roosevelt Grant, advisor to Cmmr. Peevey, Aaron Johnson, advisor to Cmmr. Lynch, Brian Prusnek, advisor to Cmmr. Kennedy, David Gamson, advisor to Cmmr. Brown, Steve Weissman, advisor to Cmmr. Wood, and Harold B. Ray, Executive Vice President Generation, Pedro J. Pizarro, Vice President Strategy and Business Development, and Gary Schoonyan, Director, Regulatory Policy and Affairs, for SCE. Written materials (attached to the notice) were used. Foster, Ray, Pizarro and Schoonyan discussed the proposed decision of ALJ Walwyn (PD), and the alternate of Cmmr. Peevey (AD) issued on November 18, 2003. Dr. Pizarro referred to SCE's Long-Term Plan and stated that neither the PD nor the AD adopts any long-term resource plan. With respect to resource adequacy, Dr. Pizarro stated that the ramp-up period adopted by AD is too short. Ray discussed issued related to SCE's Short-Term procurement plan, and stated that numerous provisions adopted by the PD and AD would unduly prevent achievement of resource adequacy goals. Ray asked the Commission to adopt SCE's Short-Term plan with minor modifications.

Type: BRIEF Filing Date: December 3, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on standard terms and conditions.

Type: BRIEF Filing Date: December 3, 2003
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
THE UTILITY REFORM NETWORK
Description: Reply; on standard terms and conditions of renewable portfolio standard contracts.

Type: BRIEF Filing Date: December 3, 2003
Filed By:
ORA/OBIORA/PUC
Description: reply; in response to ALJ Allen's [October 22, 2003] ruling establishing procedure for adoption of standard contract terms and conditions.

Type: BRIEF Filing Date: December 3, 2003
Filed By:
RIDGEWOOD OLINDA, LLC
Description: reply; on standard terms and conditions.

Type: BRIEF Filing Date: December 3, 2003
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE, L.L.C.
CALIFORNIA WIND ENERGY ASSOCIATION
VULCAN POWER COMPANY
Description: reply; on RPS standard contract terms and conditions.

Type: EXPARTE Filing Date: December 1, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On November 25, 2003, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Roosevelt Grant, advisor to Pres. Peevey, Aaron Johnson, advisor to Cmmr. Lynch, David Gamson, advisor to Cmmr. Brown, Steven Weissman, advisor to Cmmr. Wood, and Roy Kuga, Lead Director, Gas & Electric Supply, Fong Wan, Vice President, Risk Initiative, and William Manheim, Chief Counsel, Generation, for PG&E. Kuga stated PG&E's general concerns with the proposed decision and alternate short-term and long-term procurement plants. Kuga and Manheim also expressed PG&E concern with the policy of requiring utilities to rely exclusively on unit commitment contracts for deals greater than one year in duration. Kuga and Manheim further explained PG&E's concern with the policy adopted in the alternate of requiring utilities to purchase 100 percent of their reserve capacity on a month ahead basis. Kuga and Manheim stated PG&E's concern with opt-out provisions for direct access and community aggregation suppliers. Kuga and Manheim indicated that non-utility suppliers should be held to the same planning reserve requirements imposed on utilities. Kuga and Manheim stated that with respect to the alternate, the Commission should condition any additional direct access on the ISO's implementation of effective resource adequacy requirements.

Type: RULING Filing Date: December 1, 2003
Filed By:
ALJ/WALWYN/PUC
Description: Grants, in part, the motion of SDG&E to amend protective order, as set forth. SDG&E shall submit a revised redacted version of its October 7, 2003 submittals, as set forth, by December 11, 2003. Parties shall submit comments to the ALJ, by December 16, 2003, as set forth. Directs SDG&E to provide a draft revised protective order, as set forth, by December 11, 2003.

Type: EXPARTE Filing Date: November 21, 2003
Filed By:
RIDGEWOOD ORLINDA, LLC
Description: On November 18, 2003, Dan Gulino, General Counsel and Senior Vice President of Ridgewood Olinda, LLC (Ridgewood), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present was Paul C. Lacourciere, of Thelen Reid & Priest, LLP, attorneys for Ridgewood. The Ridgewood representatives expressed their concern that the amount of interim procurement of renewable generation taking place may result in very little procurement taking place in accordance with the renewable portfolio standard. The Ridgewood representatives also expressed their support for the Commission establishing standard terms and conditions for the contracts that tare executed under the RPS that cannot be changed through negotiations.

Type: RULING Filing Date: November 20, 2003
Filed By:
ALJ/KOSS/PUC
Description: Directs TURN to provide a clarification of Energy Foundation grants relating to its request for intervenor compensation. Clarification is due within 45 days.

Type: ALTERNATE Filing Date: November 18, 2003
Filed By:
CMMR/PEEVEY/PUC
Description: Comments are due on December 8, 2003; reply comments - 5 days after comments are filed.

Type: PROPOSED DECISION Filing Date: November 18, 2003
Filed By:
ALJ/WALWYN/PUC
Description: Comments are due December 8, 2003; reply comments - 5 days after comments are filed.

Type: REPLY Filing Date: November 17, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to the Memo of CDWR on the Proposed Decision of ALJ Halligan.

Type: RULING Filing Date: November 17, 2003
Filed By:
ALJ/KOSS/PUC
Description: Directs the Union of Concerned Scientists to provide, by January 1, 2004, clarification of energy foundation grants relating to its request for interevenor compensation.

Type: WITHDRAWAL Filing Date: November 13, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of inadvertently filed comments [filed on November 10, 2003].

Type: BRIEF Filing Date: November 12, 2003
Filed By:
GREEN POWER INSTITUTE
Description: Opening; on Standard Terms and Conditions.

Type: COMMENTS Filing Date: November 12, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the proposed decision of ALJ Halligan.

Type: BRIEF Filing Date: November 12, 2003
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
INDEPENDENT ENERGY PRODUCERS
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
THE UTILITY REFORM NETWORK
Description: joint; on the standard tems and conditions of renewable portfolio standard contracts [pursuant to the ALJ's ruling of October 22, 2003].

Type: BRIEF Filing Date: November 12, 2003
Filed By:
CALIFORNIA UNIONS FOR RELIABLE ENERGY
Description: opening; on standard contract terms and conditions [pursuant to the ALJ's October 22, 2003 ruling].

Type: BRIEF Filing Date: November 12, 2003
Filed By:
RIDGEWOOD OLINDA, LLC
Description: opening; on standard contract terms and conditions [pursuant to the ALJ's October 22, 2003 ruling].

Type: BRIEF Filing Date: November 12, 2003
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE, L.L.C.
CALIFORNIA WIND ENERGY ASSOCIATION
VULCAN POWER COMPANY
Description: Opening; on RPS Standard Contract Terms and Conditions.

Type: BRIEF Filing Date: November 12, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Opening; on Standard Terms and Conditions.

Type: BRIEF Filing Date: November 12, 2003
Filed By:
ORA/OBIORA/PUC
Description: opening; in response to ALJ Allen's [October 22nd] ruling establishing procedure for adoption of standard contract terms and conditions.

Type: COMMENTS Filing Date: November 10, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on renewable distributed generation in the renewable portfolio standard program [in response to the CPUC-CEC collaborative staff's request dated October 20, 2003].

Type: EXPARTE Filing Date: November 10, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON October 24, 2003, AND APPEARED IN THE CALENDAR OF October 30, 2003. On October 15, 2003, Bruce Foster, Vice President of Regulatory Operations of Southern California Edison Company (SCE), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Dan Adler and John Galloway of the Commission, Lars Bergmann, Director of QF Resources, and James B. Woodruff, Senior Attorney, for SCE, and Joseph Karp of White & Case, and Nancy Rader, for the California Wind Energy Association (CalWEA). Bergmann discussed each issue raised in CalWEA's emergency motion regarding Edison's recent renewables solicitation, and discussed the merits of each issue raised by CalWEA in the emergency motion.

Type: COMMENTS Filing Date: November 5, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: in support of PG&E's Motion to Limit Issues considered in Response to SDG&E's October 7, 2003 Motion for Approval to Enter into a Power Purchase Agreement ith Calpine Corporation.

Type: RESPONSE Filing Date: November 5, 2003
Filed By:
ORA/OBIORA/PUC
Description: to PG&E Motion to Limits Issues or, in the Alternative, to Bifurcate Issues.

Type: RESPONSE Filing Date: November 5, 2003
Filed By:
ELSINORE VALLEY MUNICIPAL WATER DISTRICT
NEVADA HYDRO COMPANY, INC.
Description: to SDG&E's Motion to Amend Protective Order.

Type: REPLY Filing Date: November 5, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to IEP's Response and Motion re: The Confidentiality Aspect of SDG&E's Request for Proposal.

Type: EXPARTE Filing Date: November 5, 2003
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: On October 31, 2003, Joseph Karp of White & Case LLP, attorney for the California Wind Energy Association, sent an electronic mail (copy attached to the notice) to Julie Fitch, advisor to Pres. Peevey. Copies of the email were also sent to Dan Adler and John Galloway, staff at the Commission. In the email, Karp discussed the performance requirements in the two wind generator contracts from Texas that Edison representatives referred to in the October 15th meeting.

Type: COMMENTS Filing Date: November 5, 2003
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: on IEP response to SDG&E motion to amend protective order and motion to establish standards of review of utility procurement.

Type: COMMENTS Filing Date: November 5, 2003
Filed By:
PALOMAR ENERGY, LLC
Description: to the IEP Response to SDG&E's Motion to Amend Protective Order.

Type: COMMENTS Filing Date: November 5, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to the IEP Response to SDG&E's Motion to Amend the Protective Order.

Type: COMMENTS Filing Date: November 5, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Further; on PG&E's Motion to Limit Issues.

Type: EXPARTE Filing Date: October 29, 2003
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: On October 25, 2003, Nancy Rader, Executive Director of, and Joseph Karp of White & Case LLP, attorney for, the California Wind Energy Association (CalWEA), sent a memorandum (copy attached to the notice) to Julie Fitch, advisor to Pres. Peevey. Copies of the memorandum were also sent to Dan Adler and John Galloway, staff at the Commission, and Bruce Foster, James Woodruff and Lars Bergmann from Southern California Edison Company (SCE). In the memorandum, Rader and Karp summarized the discussion between CalWEA representatives and SCE representatives on October 15, 2003, during which the parties discussed each issue raised in CalWEA's emergency motion regarding SCE's recent renewables solicitation.

Type: RESPONSE Filing Date: October 27, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to Comments of Interested Parties on SDG&E's RFP Motion and to PG&E's Motion to Limit Issues.

Type: EXPARTE Filing Date: October 24, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: LATE FILED. AUGMENTATION REQUIRED. On October 15, 2003, Bruce Foster, Vice President of Regulatory Operations of Southern California Edison Company (SCE), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Dan Adler and John Galloway of the Commission, Lars Bergmann, Director of QF Resources, and James B. Woodruff, Senior Attorney, for SCE, and Joseph Karp of White & Case, and Nancy Rader, for the California Wind Energy Association (CalWEA). Foster, Bergmann and Woodruff explained SCE's position with respect to each of the issues raised in CalWEA's motion seeking an ex parte order requiring changes to SCE's August 2003 Renewable Resource RFP. Karp and Rader discussed CalWEA's position with respect to the issues raised in its motion.

Type: RULING Filing Date: October 22, 2003
Filed By:
ALJ/ALLEN/PUC
Description: Establishes a procedure for adoption of standard contract terms and conditions. Opening briefs are due November 12, and reply - December 3, 2003.

Type: DRAFT DECISION Filing Date: October 22, 2003
Filed By:
ALJ/HALLIGAN/PUC
Description: [re: Edison's petition for modification of D02-12-069]. Comments are due November 11, 2003; reply comments - 5 days after comments are filed.

Type: COMMENTS Filing Date: October 21, 2003
Filed By:
CORAL POWER, L.L.C.
Description: opening; [on the motion of SDG&E for approval to enter into new electric resource contracts, etc.]

Type: RESPONSE Filing Date: October 21, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: to motion to amend protective order.

Type: MOTION Filing Date: October 21, 2003
Filed By:
ELSINORE VALLEY MUNICIPAL WATER DISTRICT
NEVADA HYDRO COMPANY, INC.
Description: to Intervene as a party; COMMENTS included.

Type: MOTION Filing Date: October 21, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to limit issues considered in response to SDG&E's motion for approval to enter into new electric resource contracts resulting from SDG&E's grid reliability capacity RFP, and for approval of the cost recovery and ratemaking mechanisms associated with, or in the alternative to bifurcate issues.

Type: COMMENTS Filing Date: October 21, 2003
Filed By:
CALIFORNIA UNIONS FOR RELIABLE ENERGY
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: on the motion of SDG&E for approval to enter into new electric resource contracts.

Type: COMMENTS Filing Date: October 21, 2003
Filed By:
CALPINE CORPORATION
Description: in support of SDG&E's motion for approval to enter into new electric resource contracts resulting from SDG&E's grid reliability capacity RFP and for approval of proposed cost recovery and ratemaking mechanisms.

Type: COMMENTS Filing Date: October 21, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on motion of SDG&E for approval to enter into new electric resource contracts resulting from SDG&E's grid reliability capacity RFP, and for approval of the cost recovery and ratemaking mechanisms associated therewith.

Type: COMMENTS Filing Date: October 21, 2003
Filed By:
THE UTILITY REFORM NETWORK
UTILITY CONSUMERS ACTION NETWORK
Description: [PUBLIC REDACTED VERSION] on the motion of SDG&E for approval to enter into new electric resource contracts. [Confidential Version submitted under seal].

Type: COMMENTS Filing Date: October 21, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the motion of SDG&E for approval to enter into new electric resource contracts resulting from its grid reliability capacity RFP, and for approval of cost recovery and ratemaking mechanisms. [Pursuant to October 3, 2003 ruling].

Type: COMMENTS Filing Date: October 21, 2003
Filed By:
ENPEX CORPORATION
Description: on the SDG&E's motion for approval to enter into new electric resource contracts resulting from SDG&E's grid reliability capacity RFP, and for approval of the cost recovery and ratemaking mechanisms associated therewith.

Type: EXPARTE Filing Date: October 20, 2003
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: On October 15, 2003, Nancy Rader, Executive Director of California Wind Energy Association (CalWEA), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Dan Adler and John Galloway of the Commission, Bruce Foster, James Woodruff and Lars Bergmann from Southern California Edison Company (SCE), and Joseph Karp of White & Case LLP, attorney for CalWEA. Karp discussed each issue raised in CalWEA's emergency motion (Motion) regarding SCE's recent renewables solicitation, and delightfully discussed the merits of each issue raised in the Motion.

Type: EXPARTE Filing Date: October 20, 2003
Filed By:
ORA/OBIORA/PUC
Description: On October 15, 2003, Noel A. Obiora, attorney for the Office of Ratepayer Advocates (ORA), met with Belinda Gatti, advisor to Cmmr. Brown, in San Francisco. Also present was Jan Reid, Senior Analyst for the ORA. ORA representatives stated that the proposed decision of Cmmr. Peevey on Southern California Edison Company's (SCE) request for interim authority to hedge Qualifying Facilities Risk erroneously concluded that New York Mercantile Exchange data are irrelevant to gas transactions in California. ORA noted that this conclusion seemed inconsistent with SCE's own motion.

Type: EXPARTE Filing Date: October 16, 2003
Filed By:
BUENA VISTA ENERGY, LLC
CALIFORNIA WIND ENERGY ASSOCIATION
Description: On October 10, 2003, Nancy Rader, Executive Director of California Wind Energy Association (CalWEA), met with Julie Fitch, advisor to Pres. Peevey, at the office of enXco in Tracy, California. Also present were Roosevelt Grant, advisor to Pres. Peevey, Aaron Johnson and Mike Campbell, advisors to Cmmr. Lynch, David Gamson, advisor to Cmmr. Brown, Brian Prusnek, advisor to Cmmr. Kennedy, Steve Weissman and Manuel Ramirez, advisors to Cmmr. Wood, Dan Adler, John Galloway, and Don Smith, for the Commission, Lisa Cottle and Joseph Karp of White & Case LLP, attorney for CalWEA, and George Hardie of G3 Energy. Hardie discussed the amount of wind generation in the Altamont pass and G3 Energy's plans to repower existing wind generators. Rader discussed the difficulties associated with obtaining federal production tax credits and in negotiating with the utilities. Karp stated that the utilities have not necessarily accepted that they need to purchase, at avoided cost prices, power provided by qualifying facilities in excess of amounts already being generated under existing contracts, but the Commission has a proceeding to address this issue.

Type: REPORT Filing Date: October 16, 2003
Filed By:
JAMES A. BOOTHE
Description: on the Negotiating Process between SDG&E and Combined-Cycle Bidders to the Request for Proposals for Grid Reliability Capacity.

Type: NOTICE Filing Date: October 16, 2003
Filed By:
JAMES A. BOOTHE
Description: of Availability of Report on the Negotiating Process between SDG&E and Combined-Cycle Bidders to the Request for Proposals for Grid Reliability Capacity.

Type: COMMENTS Filing Date: October 15, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: [Confidential Version] on the Draft Decisions addressing Interim QF Natural Gas Price Risk Hedging Authority.

Type: EXPARTE Filing Date: October 15, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON OCTOBER 3, 2003, AND APPEARED IN THE CALENDAR OF OCTOBER 10, 2003. On September 30, 2003, Bruce Foster, Vice President of Regulatory Operations of Southern California Edison Company (SCE), met with Pres. Peevey in San Francisco. Also present was Lars Bergmann, Director of QF Resources, (SCE). Copies of parties' briefs filed with the Commission, and SCE's August 29, 2003 press release concerning renewable energy, available at http://www.edisonnews.com, were used. Foster and Bergmann discussed SCE's opposition to the motion of the California Wind Energy Association for an order requiring changes to SCE's August 2003 Renewable Resources RFP.

Type: COMMENTS Filing Date: October 14, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the Draft Decisions addressing Interim QF Natural Gas Price Risk Hedging Authority (Public Version).

Type: MOTION Filing Date: October 14, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: for acceptance of late-filed commnets on draft and alternate decisions addressing QF natural gas hedging authority; comments attached.

Type: COMMENTS Filing Date: October 10, 2003
Filed By:
ORA/OBIORA/PUC
Description: of ALJ Walwyn on Edison's request for interim authority to hedge QF risk.

Type: COMMENTS ON ALTERNATE Filing Date: October 10, 2003
Filed By:
ORA/OBIORA/PUC
Description: of Cmmr. Peevey on Edison's request for interim authority to hedge QF risk.

Type: COMMENTS Filing Date: October 10, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: on the draft decision and the alternate re Edison's request for interim authority to hedge gas risks.

Type: NOTICE Filing Date: October 9, 2003
Filed By:
ALJ/MINKIN/PUC
Description: of availability of ALJ Walwyn Draft Decision and Commissioner Peevey Alternate Decision at the Commission Website at www.cpuc.ca.gov.

Type: ALTERNATE Filing Date: October 8, 2003
Filed By:
COM/PEEVEY/PUC
Description: Comments must be filed by Oct. 10. No reply comments will be accepted.

Type: DRAFT DECISION Filing Date: October 8, 2003
Filed By:
ALJ/WALWYN/PUC
Description: Comments must be filed by Oct 10. No reply comments will be accepted.

Type: LAW & MOTION Filing Date: October 7, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Motion for Authority to File and Maintain Confidential, Commercially-Sensitive and Proprietary Information Under Seal.

Type: MOTION Filing Date: October 7, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: [REDACTED] for approval to enter into new electric resource contracts resulting from SDG&E's grid reliability capacity RFP, and for approval of the cost recovery and ratemaking mechanisms associated therewith.

Type: LAW & MOTION Filing Date: October 7, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to amend protective order.

Type: EXPARTE Filing Date: October 6, 2003
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: On October 1, 2003, Nancy Rader, Executive Director of California Wind Energy Association (CalWEA), met with Pres. Peevey in San Francisco. Also present was Julie Fitch, advisor to Pres. Peevey, and Joseph Karp of White & Case LLP, attorney for CalWEA. CalWEA representatives discussed the September 30, 2003 ALJ's ruling denying CalWEA?s motion to modify the most recent request for proposals (RFP) by Southern California Edison Company (SCE). CalWEA representatives expressed disappointment with the Ruling, in that it did not directly order SCE to conform its RFP to the Assigned Commissioner's ruling issued in August and other legitimate grievances raised by CalWEA in its motion. CalWEA representatives stated that the Commission does not know how SCE will evaluate non-conforming bids. CalWEA representatives raised a concern that SCE could be trying to reach the 20% target under the renewable portfolio standards program without buying from wind generators from the Tehachapi area, so that SCE can then avoid building the transmission line upgrade for that area.

Type: EXPARTE Filing Date: October 3, 2003
Filed By:
CALPINE CORPORATION
Description: On September 30, 2003, Peter Cartwright, President and Chief Executive Officer, Calpine Corporation (Calpine), met with Pres. Peevey in San Francisco. Also present were Larry Chaset of the Legal Division, and James Macias, Executive Vice President, Joseph E. Ronan, Senior Vice President of Government and Regulatory Affairs, and Jeremiah Hallisey of Hallisey and Johnson, for Calpine. Calpine representatives addressed the benefits that Calpine's Otay Mesa Generating Project can provide to ensure that San Diego Gas & Electric Company will be able to cost-effectively meet the resource needs of ratepayers.

Type: EXPARTE Filing Date: October 3, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On September 30, 2003, Stephen L. Baum, Chief Executive Officer of Sempra Energy, had a telephone conversation with Pres. Peevey. Also participating in the conversation were Laurence Chaset of the Legal Division, Edwin A. Guiles, Chairman, and Lee Schavrien, Vice President of Regulatory Affairs, for San Diego Gas & Electric Company (SDG&E). Guiles stated that SDG&E is currently on track to have its RFP results presented to the Commission. Guiles stated that the October 3, 2003 filing may reflect an agreement in principle with the combined cycle bidders but will require further detailed negotiations.

Type: EXPARTE Filing Date: October 3, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: AUGMENTATION REQUIRED. On September 30, 2003, Bruce Foster, Vice President of Regulatory Operations of Southern California Edison Company (SCE), met with Pres. Peevey in San Francisco. Also present was Lars Bergmann, Director of QF Resources, (SCE). Copies of parties' briefs filed with the Commission, and SCE's August 29, 2003 press release concerning renewable energy, were used. Foster and Bergmann discussed the motion of the California Wind Energy Association for an order requiring changes to SCE's August 2003 Renewable Resources RFP.

Type: EXPARTE Filing Date: October 3, 2003
Filed By:
CALPINE CORPORATION
Description: Order Instituting Rulemaking to Establish Policies and Cost Recovery Mechanisms for Generation Procurement and Renewable Resource Development.

Type: EXPARTE Filing Date: October 1, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On September 29, 2003, Lee Schavrien, Vice President of Regulatory Affairs, San Diego Gas & Electric Company (SDG&E), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present was Billy Blattner, CPUC Relations Manager, SDG&E. Schavrien stated that the Williams gas contract should be allocated in its entirety to SDG&E and that the allocation proposed in the draft decision would increase SDG&E's risk profile, contrary to earlier Commission decisions.

Type: RULING Filing Date: September 30, 2003
Filed By:
CMMR/PEEVEY/PUC
Description: [DATED 9/29/03]. Grants motion for reconsideration by IEPA. Revises the language relating to the federal Production Tax Credit, as set forth.

Type: RULING Filing Date: September 30, 2003
Filed By:
ALJ/ALLEN/PUC
Description: Denies motion of CalWEA filed September 16, 2003, as set forth.

Type: EXPARTE Filing Date: September 26, 2003
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: On September 23, 2003, Nancy Rader, Executive Director of California Wind Energy Association (CalWEA), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Aaron Johnson, advisor to Cmmr. Lynch, David Gamson, advisor to Cmmr. Brown, Brian Prusnek, advisor to Cmmr. Kennedy, and Joseph Karp of White & Case LLP, attorney for CalWEA. CalWEA representatives discussed its concerns regarding the most recent request for proposals (RFP) issued by Southern California Edison Company. CalWEA representatives stated that a number of terms in the RFP do not comply with the most recent Assigned Commissioner's Ruling and D03-06-071. CalWEA representatives cautioned the Commission not to evaluate whether the RFP is successful merely based on the number of bids submitted or based on whether contracts are signed, given that projects may not be completed or that the price may be higher than otherwise due to onerous terms imposed in the RFP. Lastly, CalWEA representatives urged the Commission to take action prior to October 5, 2003, the new deadline to submit bids.

Type: RULING Filing Date: September 26, 2003
Filed By:
ALJ/WALWYN/PUC
Description: Shortens time for responses to PG&E's September 18, 2003 motion for adoption of expedited review process: responses are due by September 29, 2003; PG&E is given permission to file a reply by September 30, 2003.

Type: REPLY Filing Date: September 25, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Responses on [Edison's] Motion to Hedge QF Natural Gas Price Risk for 2004 and for Expedited Consideration.

Type: RULING Filing Date: September 25, 2003
Filed By:
ALJ/WALWYN/PUC
CMMR/PEEVEY/PUC
Description: Establishes a workshop to address selected resource adequacy issues.

Type: EXPARTE Filing Date: September 24, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: On September 19, 2003, Marcel Hawiger, attorney for The Utility Reform Network (TURN), met with Cmmr. Wood in San Francisco. Also present was Manuel Ramirez, advisor to Cmmr. Wood, and Hayley Goodson, for TURN. Hawiger discussed some of the overlap between the procurement proceeding and the energy efficiency rulemaking R01-08-028 with respect to issues concerning energy efficiency programs, funding and administration. Hawiger stated TURN's position that the Commission should not approve specific utility programs, or authorize utility administration of programs, in the procurement proceeding, but should instead address these issues in the energy efficiency rulemaking. Hawiger stated that the Commission could authorize funding as requested by the utilities but defer other issues to the energy efficiency rulemaking.

Type: RULING Filing Date: September 24, 2003
Filed By:
ALJ/WALWYN/PUC
Description: Grants a motion of the ORA to submit under seal a non-redacted version of its Opening Brief.

Type: RULING Filing Date: September 24, 2003
Filed By:
ALJ/WALWYN/PUC
Description: Grants a motion of the ORA to submit under seal a non-redacted version of its Response to the Motion of Edison for Interim Authority.

Type: BRIEF Filing Date: September 22, 2003
Filed By:
WESTERN POWER TRADING FORUM
Description: Reply;

Type: RESPONSE Filing Date: September 22, 2003
Filed By:
THE GREEN POWER INSTITUTE
Description: to motions of CalWEA and IEP [pursuant to Sept. 17, 2003 ruling].

Type: RESPONSE Filing Date: September 22, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to emergency motion of the CalWEA.

Type: RESPONSE Filing Date: September 22, 2003
Filed By:
RIDGEWOOD OLINDA, LLC
Description: to the emergency motion of CalWEA.

Type: RESPONSE Filing Date: September 22, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: to the IEP's motion for reconsideration and emergency motion of the CalWEA for an ex parte order.

Type: RESPONSE Filing Date: September 22, 2003
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: to motion for reconsideration by the IEP.

Type: COMMENTS Filing Date: September 22, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: in response to the motion for reconsideration by the Independent Energy Producers Association of Assigned Commissioner's Ruling dated August 13, 2003 specifying criteria for interim renewable solicitations.

Type: COMMENTS Filing Date: September 22, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: in response to CALWEA's Emergency Motion.

Type: BRIEF Filing Date: September 22, 2003
Filed By:
JOINT PARTIES INTERESTED IN DISTRIBUTED GENERATION/DISTRIBUTED ENERGY RESOURCES
Description: reply.

Type: BRIEF Filing Date: September 22, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply.

Type: BRIEF Filing Date: September 22, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: reply; in Phase 2 re long-term procurement issues.

Type: BRIEF Filing Date: September 22, 2003
Filed By:
CALIFORNIA CONSUMER POWER AND CONSERVATION FINANCING AUTHORITY
Description: reply.

Type: BRIEF Filing Date: September 22, 2003
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: reply.

Type: BRIEF Filing Date: September 22, 2003
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: reply.

Type: BRIEF Filing Date: September 22, 2003
Filed By:
ORA/OBIORA/PUC
Description: reply.

Type: BRIEF Filing Date: September 22, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: reply.

Type: BRIEF Filing Date: September 22, 2003
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: reply.

Type: BRIEF Filing Date: September 22, 2003
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: reply.

Type: BRIEF Filing Date: September 22, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on long-term resource plan and short-term procurement plan issues (REDACTED VERSION).

Type: BRIEF Filing Date: September 22, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: reply.

Type: BRIEF Filing Date: September 22, 2003
Filed By:
CITY OF SAN DIEGO
Description: Reply;

Type: BRIEF Filing Date: September 22, 2003
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: Reply;

Type: EXPARTE Filing Date: September 19, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On September 16, 2003, Billy Blattner, CPUC Relations Manager, San Diego Gas & Electric Company (SDG&E), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present was Brian Prusnek, advisor to Cmmr. Kennedy; and Lee Schavrien, Vice President of Regulatory Affairs, SDG&E, participated by telephone. Schavrien stated that the Williams gas contract should be allocated in its entirety to SDG&E. Schavrien stated further that the allocation proposed in the draft decision would increase SDG&E's risk profile, contrary to earlier Commission decision. Blattner added that ongoing economic dispatch decisions made by SDG&E ensure that the Department of Water Resources is indifferent to the allocation.

Type: RESPONSE Filing Date: September 19, 2003
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: to the Motions of California Wind Energy Association and Independent Energy Producers Association.

Type: EXPARTE Filing Date: September 19, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On September 17, 2003, Lee Schavrien, Vice President of Regulatory Affairs, San Diego Gas & Electric Company (SDG&E), met with Pres. Peevey in San Francisco. Also present were Julie Fitch, advisor to Pres. Peevey, and Laurence Chaset, Attorney. Schavrien stated that SDG&E's evaluation of the RFP process is on schedule to be filed on October 3, 2003. However, Schavrien further stated that negotiations with one of the bidders has been slow and tedious and may not result in any agreement by the October 3 filing.

Type: RULING Filing Date: September 18, 2003
Filed By:
ALJ/WALWYN/PUC
Description: Shortens time to respond to Edison's September 10, 2003 motion for interim authority: responses are due on September 23, and reply - September 25, 2003.

Type: LAW & MOTION Filing Date: September 17, 2003
Filed By:
ORA/OBIORA/PUC
Description: to Submit Under Seal a non-redacted version of Response to the Motion of Southern California Edison Company for Interim Authority to Hedge QF Natural Gas Price Risk for 2004.

Type: RULING Filing Date: September 17, 2003
Filed By:
ALJ/ALLEN/PUC
Description: Shortens time for responses to IEP's September 10, and CalWEA's September 16, 2003 motions: responses are due on September 22, 2003; responses to the two motions can be combined in one pleading. Moves the deadline for submitting bids from Sept. 23 to October 2, 2003.

Type: RESPONSE Filing Date: September 17, 2003
Filed By:
ORA/OBIORA/PUC
Description: to [Edison]s] Motion for Interim Authority to Hedge QF Natural Gas Price Risk for 2004 (PUBLIC VERSION).

Type: RESPONSE Filing Date: September 17, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: to Edison's motion for interim authority to hedge QF natural gas price risk for 2004.

Type: BRIEF Filing Date: September 16, 2003
Filed By:
CALIFORNIA CONSUMER POWER AND CONSERVATION FINANCING AUTHORITY
Description: Opening; [Filing authorized by ALJ Walwyn]

Type: MOTION Filing Date: September 16, 2003
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: emergency; for an ex parte order requiring changes to Edison's August 2003 renewable resource RFP.

Type: BRIEF Filing Date: September 15, 2003
Filed By:
CITY OF SAN DIEGO
Description: Opening;

Type: MISCELLANEOUS FILING Filing Date: September 15, 2003
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: Further transcript corrections.

Type: LAW & MOTION Filing Date: September 15, 2003
Filed By:
ORA/OBIORA/PUC
Description: to submit under seal a non-redacted version of opening brief.

Type: EXPARTE Filing Date: September 15, 2003
Filed By:
INDEPENDENT ENERGY PRODUCTS
Description: On September 10, 2003, Douglas K. Kerner, attorney for Independent Energy Producers (IEP), met with Ross LaJeunesse, advisor to Cmmr. Kennedy, in San Francisco. Also present were Brian Prusnek, advisor to Cmmr. Kennedy, and Steven Kelly, Policy Director, and Charles Cicchetti and Colin Long, consultants, for IEP. IEP representatives summarized the concerns it has raised in the proceeding regarding Southern California Edison Company?s proposed 'Mountainview' project.

Type: BRIEF Filing Date: September 15, 2003
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: Opening; on Long Run Procurement Topics.

Type: BRIEF Filing Date: September 15, 2003
Filed By:
SAVE SOUTHWEST RIVERSIDE COUNTY
Description: Opening;

Type: BRIEF Filing Date: September 15, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: Phase 2 Opening; regarding long-term procurement issues.

Type: BRIEF Filing Date: September 15, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Post-Hearing;

Type: BRIEF Filing Date: September 15, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: Opening;

Type: BRIEF Filing Date: September 15, 2003
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: Brief;

Type: BRIEF Filing Date: September 15, 2003
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: Opening;

Type: BRIEF Filing Date: September 15, 2003
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: Opening;

Type: BRIEF Filing Date: September 15, 2003
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: Opening;

Type: BRIEF Filing Date: September 15, 2003
Filed By:
ORA/OBIORA/PUC
Description: Opening; (REDACTED VERSION)

Type: BRIEF Filing Date: September 15, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: [PUBLIC VERSION, proprietary information redacted pursuant to the May 1, 2002 protective order] 2004 short-term procurement plan opening brief.

Type: BRIEF Filing Date: September 15, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: [CONFIDENTIAL VERSION, filed under seal pursuant to the May 1, 2002 protective order] 2004 short-term procurement plan opening brief.

Type: BRIEF Filing Date: September 15, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Opening; Long-Term Resource Plan

Type: BRIEF Filing Date: September 15, 2003
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: Opening;

Type: BRIEF Filing Date: September 15, 2003
Filed By:
CITY OF CHULA VISTA
Description: Opening; regarding SDG&E's Long Term Resource Plan.

Type: BRIEF Filing Date: September 15, 2003
Filed By:
WESTERN POWER TRADING FORUM
Description: Opening;

Type: BRIEF Filing Date: September 15, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Opening;

Type: BRIEF Filing Date: September 12, 2003
Filed By:
CAPSTONE TURBINE CORPORATION
CHEVRON ENERGY SOLUTIONS
CUMMINS WEST, INC.
CUMMINS, INC.
ENERGY NEXUS GROUP
HESS MICROGEN
IR ENERGY SYSTEMS
JOINT PARTIES INTERESTED IN DISTRIBUTED GENERATION/DISTRIBUTED ENERGY RESOURCES:
NEXT>EDGE, INC.
NEXTEK POWER SYSTEMS INC.
NORTHERN POWER SYSTEMS, INC.
REALENERGY, INC.
SOLAR TURBINES, INC.
STEWART & STEVENSON
Description: joint, opening.

Type: EXPARTE Filing Date: September 12, 2003
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: On September 9, 2003, Robin Smutny-Jones of the California Independent System Operator (ISO) met with Pres. Peevey in San Francisco. Also present were Barbara Hale, Director, Julie Fitch, advisor to Pres. Peevey, Bill Ahern, Executive Director, Jim Hendry, and Kerry Hattevik, for the Commission, and Terry Winter, Phil Pettingil, and Anjali Sheffrin, for the ISO. Written material (attached to the notice) was used. ISO personnel expressed concerns about the direction of resource adequacy in California. ISO representatives stressed that it is extremely risky to approve plans that allow the investor-owned utilities to rely heavily on spot market purchases going forward. ISO recommended that load serving entities be required to demonstrate one month ahead of real time that they have locked up sufficient firm capacity to meet their needs. ISO personnel also discussed the Joint Proposal for resource adequacy and stated that the ISO cannot support the proposal because it does not contain a month ahead capacity obligation. ISO also expressed concern about the time frame for getting resource adequacy requirements in place. Parties also discussed the Miguel-Mission transmission line. Winter expressed urgency in getting the line sited.

Type: MOTION Filing Date: September 10, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: [CONFIDENTIAL VERSION, filed under seal pursuant to Protective Order issued May 1, 2002] for interim authority to hedge QF natural gas price risk for 2004 and for expedited consideration.

Type: REPLY Filing Date: September 10, 2003
Filed By:
NAVAJO NATION
Description: to Edison's response re motion to refer issues relating to the future disposition of the Mohave Generating Station to A02-05-046.

Type: PETITION FOR MODIFICATION Filing Date: September 10, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Joint; D02-10-062.

Type: MOTION Filing Date: September 10, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: for reconsideration of Assigned Commissioner's Ruling dated August 13, 2003 specifying criteria for interim renewable energy solicitations.

Type: MOTION Filing Date: September 10, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: [PUBLIC VERSION - confidential information redacted pursuant to Protective Order issued May 1, 2002] for interim authority to hedge QF natural gas price risk for 2004 and for expedited consideration.

Type: MISCELLANEOUS FILING Filing Date: September 9, 2003
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: Transcript Corrections.

Type: COMMENTS Filing Date: September 8, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on the draft decision of ALJ Halligan.

Type: COMMENTS Filing Date: September 8, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on draft decision of ALJ Halligan.

Type: COMMENTS Filing Date: September 8, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the draft decision of ALJ Halligan re. allocation of the Williams Energy Gas Contract.

Type: EXPARTE Filing Date: September 5, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On September 2, 2003, Brian Cherry, Director, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Pres. Peevey in San Francisco. Also present were Julie Fitch, advisor to Pres. Peevey, and William Manheim, attorney, PG&E. Cherry stated that PG&E was ready to discuss the role that the California Power Authority (CPA) could play as a contributor to PG&Es integrated electricity portfolio. However, Cherry mentioned that PG&E has no need for additional peaking facilities in the 2004-2008 time-period. Manheim discussed the large surpluses of generation in 2004 and 2005, and identified this surplus as a more economic source of capacity and energy to fill PG&Es open position. Manheim further discussed the assessment of the cost/benefit ratios of the CPA peaker projects, and how effectively these projects can address local reliability issues.

Type: NOTICE Filing Date: September 5, 2003
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: of Grant of Request for Ex Parte Meeting.

Type: EXPARTE Filing Date: September 5, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS
Description: On September 2, 2003, Douglas K. Kerner, attorney for Independent Energy Producers (IEP), met with Pres. Peevey in San Francisco. Also present were Steven Kelly, Policy Director, and Charles Cicchetti, consultant, for IEP. IEP representatives summarized the concerns it has raised in the proceeding regarding Southern California Edison Companys proposed Mountainview project.

Type: EXPARTE Filing Date: September 2, 2003
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: LATE FILED. On August 26, 2003, Andrea Weller of Strategic Energy, on behalf of the Alliance for Retail Energy Markets (AREM), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present were Julie Fitch, advisor to Cmmr. Peevey, and Mona Petrochko of Constellation Energy, on behalf of AREM. AREM representatives emphasized the need to consider the proposal made by AREM concerning resource adequacy. AREM representatives further discussed the AREM supplemental testimony with regard to Southern California Edison Company (SCE) Mountainview project, in which AREM advocated that SCEs shareholders be held responsible for any `stranded costs that might be created by SCEs acquisition of the Mountainview project.

Type: RESPONSE Filing Date: August 29, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Motion of the Navajo Nation to refer issues relating to the future disposition of the Mohave Generation Station to A.02-05-046.

Type: RESPONSE Filing Date: August 29, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Motion of the Navajo Nation to Intervene.

Type: EXPARTE Filing Date: August 25, 2003
Filed By:
CALIFORNIA CONSUMER POWER/CONVERSATION FINANCING AUTHORITY
Description: On August 22, 2003, David Freeman, Chairman of the Board of Directors of the California Consumer Power and Conservation Financing Authority (CPA), spoke with Pres. Peevey by telephone. Freeman made it clear that he was not talking about the merits of the procurement case - rather, he was communicating on an agency-to-agency basis to advance implementation of the Joint Energy Action Plan. Freeman asked that the CPA peaker proposals be carved out of the proceeding and that the utilities be required to consider them and all parties file reports so that the Commission will have sufficient time to evaluate their impact prior to issuing a procurement decision.

Type: REQUEST Filing Date: August 22, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: for an award of compensation for substantial contributions to D.03-02-034, D.03-02-072, D.03-06-067, D.03-06-071, D.03-06-073, D.03-06-076 and participation in utility procurement review groups.

Type: REQUEST Filing Date: August 22, 2003
Filed By:
THE GREEN POWER INSTITUTE
Description: for an award of compensation for substantial contributions to D.03-06-071.

Type: NOTICE Filing Date: August 20, 2003
Filed By:
CALIFORNIA POWER AUTHORITY
Description: of Grant of Request for Ex Parte meeting.

Type: EXPARTE Filing Date: August 19, 2003
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: On August 14, 2003, Michael Alcantar, counsel to the Cogeneration Association of California (CAC), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present was Evelyn Kahl, counsel to CAC. Alcantar and Kahl discussed utility procurement issues, such as: affiliate moratorium and Southern California Edison Company affiliate restrictions; cogeneration base load operating needs - must take, lack of a market and SO1 concerns; implications of a loss of cogeneration resources - efficiency, fuel use, transmission/distribution loading, environmental; power development market messages; lack of transparent open bid process; Mountainview subsidiary and treatment of affiliates.

Type: DRAFT DECISION Filing Date: August 19, 2003
Filed By:
ALJ/HALLIGAN/PUC
Description: Comments are due by September 8, 2003; reply comments - 5 days after comments are filed.

Type: MOTION Filing Date: August 18, 2003
Filed By:
NAVAJO NATION
Description: to refer issues relating to the future disposition of the Mohave Generating Station to A02-05-046.

Type: MOTION Filing Date: August 18, 2003
Filed By:
NAVAJO NATION
Description: to intervene.

Type: REQUEST Filing Date: August 14, 2003
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: for an award of intervenor compensation for substantial contribution to D03-06-071, renewable portfolio standard implementation.

Type: RULING Filing Date: August 13, 2003
Filed By:
CMMR/PEEVEY/PUC
Description: specifying criteria for interim renewable energy solicitations. Proposed contracts may be submitted for approval via Advice Letter, as set forth.

Type: RESPONSE Filing Date: August 12, 2003
Filed By:
SEQUOIA GENERATING COMPANY, LLC
Description: in opposition to IEP's motion for consolidation.

Type: COMMENTS Filing Date: August 8, 2003
Filed By:
ORA/OBIORA/PUC
Description: [on draft decision of ALJ Walwyn] on the Utilities procurement proposals.

Type: MISCELLANEOUS FILING Filing Date: August 8, 2003
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: Erratum to Procurement Proceeding Cross-Examination Transcript.

Type: RESPONSE Filing Date: August 7, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to the Applications for Rehearing of PG&E and SoCal Edison Co.

Type: RESPONSE Filing Date: August 7, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: to Edison's and PG&E's applications for rehearing.

Type: RESPONSE Filing Date: August 5, 2003
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: in opposition to PG&E and Edison's applications for rehearing of D03-06-071.

Type: RESPONSE Filing Date: August 1, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: regarding 1% per year reduction in per capita energy use.

Type: MOTION Filing Date: July 28, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: for Consolidation.

Type: EXPARTE Filing Date: July 24, 2003
Filed By:
SEMPRA ENERGY RESOURCES
Description: LATE FILED. On July 16, 2003, Alvin S. Pak, Director of Regulatory Policy & Analysis, Sempra Energy Global Enterprises, for Sempra Energy Resources (SER), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Pak provided information with respect to the interest of SER in the rulemaking. Pak noted that SER had submitted a bid into the pending Request for Proposals process being conducted by San Diego Gas & Electric Company (SDG&E) and that on the previous day SDG&E had requested supplemental bids from RFP participants, seeking variants of previously submitted bids that might reflect evaluation criteria provided through the Ruling issued on July 8, 2003. Pak indicated that SER expected all bids to be evaluated under the criteria set forth both in the RFP specifications and in the Ruling.

Type: REHEARING REQUEST Filing Date: July 23, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of Decision 03-06-071.

Type: REHEARING REQUEST Filing Date: July 23, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of D03-06-071.

Type: REHEARING REQUEST Filing Date: July 23, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: of Decision 03-06-067.

Type: DRAFT DECISION Filing Date: July 22, 2003
Filed By:
ALJ/WALWYN/PUC
Description: [Addresses PG&E's May 19, 2003 motion]. Comments are due by August 11, 2003; reply comments - 5 days after comments are filed.

Type: MOTION Filing Date: July 15, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Strike a portion of the testimony of ORA.

Type: COMMENTS Filing Date: July 14, 2003
Filed By:
CALPINE CORPORATION
Description: on SDG&E's proposed schedule [in accordance with July 8, 2003 ACR].

Type: COMMENTS Filing Date: July 14, 2003
Filed By:
SEMPRA ENERGY RESOURCES
Description: on SDG&E Proposed Schedule.

Type: OPPOSITION Filing Date: July 11, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to the Motion of the California Consumer Power and Conservation Financing Authority for leave to file material under seal and for adoption of protective order.

Type: RESPONSE Filing Date: July 11, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Motion of the California Consumer Power and Conservation Financing Authority for Leave to File CPA Peaking Initiative RFP Material Term Sheet Under Seal and for Adoption of Protective Order.

Type: COMMENTS Filing Date: July 8, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Reply; in response to ALJ Halligan's June 20, 2003 Ruling on the request of SDG&E to Modify Decision 03-04-029.

Type: RULING Filing Date: July 8, 2003
Filed By:
CMMR/PEEVEY/PUC
Description: Orders testimony to be served by Calpine and SDG&E by July 11, 2003. Parties can provide written comments on SDG7Es proposed schedule by July 14, 2003.

Type: REPLY Filing Date: July 8, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to the Response of the California Department of Water Resources to Petition for Modification of Decision 03-04-029.

Type: COMMENTS Filing Date: July 8, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; on allocation of Williams Gas Supply Contract pursuant to the Ruling of ALJ Halligan.

Type: COMMENTS Filing Date: July 8, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on the Ruling of the ALJ on SDG&E's Request to Modify Decision 03-04-029 dated June 20, 2003 (REDACTED VERSION).

Type: COMMENTS Filing Date: July 3, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: concerning Draft Resolution E-3833.

Type: MOTION Filing Date: July 3, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to Bifurcate the Motion of Calpine Corporation into a separate phase addressing the May 16. 2003 RFP of SDG&E.

Type: COMMENTS Filing Date: July 1, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on the Ruling of ALJ Halligan.

Type: COMMENTS Filing Date: July 1, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: in response to ALJ Halligan's June 20, 2003 ruling on SDG&E's petition to modify D03-04-029.

Type: COMMENTS Filing Date: July 1, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the SDG&E Petition to Modify Decision 03-04-029 and the Ruling of the ALJ on the SDG&E Request to Modify Decision 03-04-029.

Type: LAW & MOTION Filing Date: June 27, 2003
Filed By:
CALIFORNIA POWER AUTHORITY
Description: for Leave to File CPA Peaking Initiative RFP Material Term Sheet Under Seal and for Adoption of Protective Order.

Type: RESPONSE Filing Date: June 27, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Petition of Cogeneration Association of California for access to Edison's Gas Supply Plan.

Type: EXPARTE Filing Date: June 23, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On June 18, 2003, Edwin A. Guiles, Chairman and Chief Executive Officer, Sempra Energy Utilities, spoke on the telephone with Pres. Peevey. Also participating in the communication were Kevin Coughlan, advisor to Pres. Peevey, and Laurence Chaset, attorney for the Commission. Guiles stated that San Diego Gas & Electric Company (SDG&E) would negotiate with bidders within the context of its currently ongoing RFP to get the best deal on behalf of its customers. Guiles further stated that SDG&E needed some generation built in San Diego for reliability purposes and that if the RFP yielded generation ownership opportunities that SDG&E would prefer to take ownership sooner rather than later.

Type: REQUEST Filing Date: June 23, 2003
Filed By:
CALIFORNIA CONSUMER POWER AND CONSERVATION FINANCIING AUTHORITY
Description: to take official notice and response to May 30, 2003 ruling.

Type: EXPARTE Filing Date: June 23, 2003
Filed By:
SEMPRA ENERGY RESOURCES
Description: LATE FILED. On June 13, 2003, Donald E. Felsinger, Group President of Sempra Energy Global Enterprises, spoke on the telephone with Pres. Peevey. Felsinger indicated that a non-litigation resolution could be acceptable to Sempra Energy Resources.

Type: RULING Filing Date: June 20, 2003
Filed By:
ALJ/HALLIGAN/PUC
Description: Orders comments on SDG&E's petition to modify D03-04-029; comments are due by July 1, 2003. Parites that wish to file and serve recommended allocations re: the Williams Gas Supply Contract shall do so by July 1, 2003; reply comments on SDG&E's petition to modify and recommended allocations are due on July 8, 2003.

Type: RESPONSE Filing Date: June 19, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to Calpine Corporation's motion for leave to file term sheet under seal and for adoption of protective order.

Type: RULING Filing Date: June 19, 2003
Filed By:
ALJ/WALWYN/PUC
Description: changing the due date for testimony on Calpine's assertions from June 23, 2003 to July 11, 2003 for Calpine and SDG&E

Type: COMMENTS ON ALTERNATE Filing Date: June 18, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on the alternate of Cmmr. Lynch to the draft decision of ALJ Halligan.

Type: EXPARTE Filing Date: June 18, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On June 13, Joe Kloberdanz, Manager of Electric Case Management, San Diego Gas & Electric Company (SDG&E), met with Cmmr. Lynch in an all-party meeting in San Francisco. Also present were Aaron Johnson, advisor to Cmmr. Lynch, Manuel Ramirez, advisor to Cmmr. Wood, Billy Blattner, SDG&E CPUC Relations Manager, and other attendees, listed on the attachment to the notice. Kloberdanz stated that SDG&E appreciates the inclusion of language in the alternate that indicates support for the SDG&E/The Utility Reform Network flexible compliance methodology, however the mechanism is not included in the alternate. Kloberdanz further stated that SDG&E does not support predetermined penalties and disagrees with the proposed and alternate decisions recommendations related to the treatment of energy and capacity in the market price referents and as part of least cost, best fit evaluation. Kloberdanz recommended that bidders should identify both capacity and energy costs, and that a projects total costs should be considered in the bid ranking.

Type: EXPARTE Filing Date: June 18, 2003
Filed By:
SEMPRA ENERGY RESOURCES
Description: On June 13, 2003, Stephen L. Baum, Chairman, President and Chief Executive Officer, Sempra Energy Corporation (SEC), met with Pres. Peevey in Los Angeles. Also present was Donald E. Felsinger, Group President of Sempra Energy Global Enterprises. Written materials (attached to the notice) were used. Baum and Felsinger discussed Calpines recent request that the Commission direct San Diego Gas & Electric Company to execute a contract with Calpine related to Calpines Otay Mesa Project. Baum and Felsinger described Californias long-term electric resource needs, and discussed how the outcome of the Calpine hearings could impact these needs, and potential alternatives to Calpines request.

Type: EXPARTE Filing Date: June 17, 2003
Filed By:
ORA/OBIORA/PUC
Description: On June 17, 2003, Noel A. Obiora, attorney for the Office of Ratepayer Advocates (ORA), met with Cmmr. Lynch in an all-party meeting in San Francisco. Also present were Aaron Johnson, advisor to Cmmr. Lynch, Don Smith, ORA analyst, and representatives of Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, The Utility Reform Network, the Green Power Institute, Center for Energy Efficiency and Renewable Technologies, the California Wind Energy Association, the Alliance for Retail Energy Markets, the Independent Energy Producers, the California Biomass Energy Alliance, Ridgewood Olinda, LLC, Solargenix Energy LLC, and Vulcan Power Company. ORA representatives stated that the split of energy and capacity values in the proposed decision of ALJ Allen and the alternate of Cmmr. Lynch was a better opinion than combining the two values for purposes of determining a market referent price. ORA further noted that requiring the utilities to seek pre-approval before allowing a significant deficit in the annual procurement target, does not reduce flexible compliance with the RPS program, but goes only to administration and implementation of the program. ORA also stated that pre-determined penalties should be imposed at the rate proposed by many parties, to wit, 5 cents per kilowatt-hour, despite the utilities claim that such a rate was arbitrary.

Type: EXPARTE Filing Date: June 17, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON June 9, 2003 AND APPEARED IN THE CALENDAR OF June18, 2003. On June 4, 2003, Lad Lorenz, Electric and Gas Procurement Vice President, San Diego Gas & Electric Company (SDG&E), met with Pres. Peevey in an all-party meeting in San Francisco. Also present were Cmmr. Kennedy, Julie Fitch, advisor to Pres. Peevey, and other attendees listed on the attachment to the notice. Lorenz stated that SDG&E supports the proposed decision (PD) which incorporates most of the joint principles developed by SDG&E and The Utility Reform Network. Lorenz specifically indicated that SDG&E supported that PDs recommendations with respect to contract terms and unlimited forward banking of excess procurement and indicated that SDG&E was encouraged by the PDs recommendation for adoption of a REC-based accounting system. Lorenz also indicated that SDG&E disagreed with the PDs recommendations related to the treatment of energy and capacity in the market price referents and as part of least cost, best fit evaluation. Lorenz recommended that bidders should identify both capacity and energy costs, and that a projects total costs should be considered in the bid ranking. Lastly, Lorenz indicated SDG&Es support for the Commission?s renewable portfolio program.

Type: COMMENTS Filing Date: June 16, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on the proposed decision of ALJ Allen.

Type: EXPARTE Filing Date: June 16, 2003
Filed By:
RIDGEWOOD OLINDA, LLC
Description: AUGMENTATION REQUIRED. On June 13, 2003, Paul C. Lacourciere, of Thelen Reid & Priest, LLP, attorneys for Ridgewood Olinda, LLC (Ridgewood), attended an all-party meeting with Cmmr. Lynch in San Francisco. Lacourciere expressed Ridgewood support for maintaining the division of the market referent price into capacity and energy components, adopting up-front, automatic penalties if utilities fail to comply with their procurement obligations, and deferring final resolution of the definition of the renewable energy credit until a later date.

Type: EXPARTE Filing Date: June 16, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On June 9, 2003, Bruce Foster, Vice President of Regulatory Operations of Southern California Edison Company (SCE), met with Cmmr. Brown in an all-party meeting in San Francisco. Also present were Cmmr. Wood, David Gamson, advisor to Cmmr. Brown, Manuel Ramirez, advisor to Cmmr. Wood, Michael R. Hoover, Director of Regulatory Affairs, SCE, Kent Harvey, William Stock, and Brian Cherry, of Pacific Gas and Electric Company, and Lad Lorenz, Lisa Urick, and Billy Blattner, of Sempra Energy. SCE urged the Commission to support the Peevey alternate with the following modifications: the scope of the disallowance cap should be expanded to include reasonableness of the Investor Owned Utilities' (IOU) compliance with their filed procurement plans; and reasonable timelines should be established for the decisions on the annual and quarterly submissions of IOUs regarding their compliance with their procurement plans. Foster explained that SCE is uncompensated for the administration of the Department of Water Resources? (DWR) contracts and for activities undertaken in compliance with SCE's procurement plans. Foster indicated that efforts to transfer the risk of these activities, especially gas procurement for the DWR, will further jeopardize SCE's credit quality and is in direct violation of Section 454.5(c) of the California Public Utilities Code.

Type: COMMENTS ON ALTERNATE Filing Date: June 16, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on the alternate of Cmmr. Lynch re the implementation of the California Renewables Portfolio Standard.

Type: COMMENTS ON ALTERNATE Filing Date: June 16, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the alternate of Cmmr. Lynch to the draft decision of ALJ Halligan.

Type: COMMENTS ON ALTERNATE Filing Date: June 16, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; of Cmmr. Lynch to the draft decision of ALJ Allen.

Type: COMMENTS ON ALTERNATE Filing Date: June 16, 2003
Filed By:
ORA/OBIORA/PUC
Description: of Cmmr. Lynch to the proposed decision of ALJ Allen.

Type: COMMENTS ON ALTERNATE Filing Date: June 16, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: reply; on the alternate of Cmmr. Lynch

Type: COMMENTS ON ALTERNATE Filing Date: June 16, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the Alternate Draft Decision of Commr. Lynch on the Dept. of Water Resources' Petition For Modification of D02-09-053

Type: COMMENTS ON ALTERNATE Filing Date: June 16, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; concerning the Draft Decision of ALJ Peter Allen and the Alternate Draft Decision of Commr. Lynch

Type: COMMENTS ON ALTERNATE Filing Date: June 16, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on the Alternate Draft Decision of Commr. Lynch

Type: COMMENTS Filing Date: June 16, 2003
Filed By:
RIDGEWOOD OLINDA, LLC
Description: reply; on the proposed decision and the alternate.

Type: COMMENTS Filing Date: June 16, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on the proposed decision of ALJ Allen re the implementation of the California Renewables Portfolio Standard.

Type: COMMENTS Filing Date: June 16, 2003
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: reply; on the proposed decision.

Type: COMMENTS Filing Date: June 16, 2003
Filed By:
GREEN POWER INSTITUTE
Description: reply; on the proposed decision of ALJ Allen and the alternate of Cmmr. Lynch re the implementation of the California Renewables Portfolio Standard.

Type: COMMENTS Filing Date: June 16, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on the proposed order of ALJ Allen re the implementation of the California Renewables Portfolio Standard.

Type: COMMENTS Filing Date: June 16, 2003
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: reply; to ALJ Allen's proposed decision and Cmmr. Lynch's alternate.

Type: COMMENTS Filing Date: June 16, 2003
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: reply; on proposed decision of ALJ Allen and alternate of Cmmr. Lynch on implementation of the renewable portfolio standard.

Type: COMMENTS Filing Date: June 16, 2003
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: reply; on proposed decision of ALJ Allen and alternate of Cmmr. Lynch on implementation of the renewable portfolio standard.

Type: COMMENTS Filing Date: June 16, 2003
Filed By:
VULCAN POWER COMPANY
Description: reply; on the proposed decision on the implementation of the renewable portfolio standard.

Type: COMMENTS Filing Date: June 13, 2003
Filed By:
ORA/OBIORA/PUC
Description: Reply; on the implementation of the Renewal Portfoliio Standards Program

Type: PETITION FOR MODIFICATION Filing Date: June 13, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: of D03-04-029.

Type: EXPARTE Filing Date: June 13, 2003
Filed By:
ORA/OBIORA/PUC
Description: LATE FILED. On June 9, 2003, Noel A. Obiora, attorney for the Office of Ratepayer Advocates (ORA), met with Cmmr. Peevey and Kennedy in an all-party meeting in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, Noel A. Obiora, attorney, and Don Smith, analyst, for ORA, and representatives of Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, The Utility Reform Network, Union of Concerned Scientists, the Green Power Institute, Center for Energy Efficiency and Renewable Technologies, the California Wind Energy Association, the Alliance for Retail Energy Markets, the Independent Energy Producers, the California Biomass Energy Alliance, Ridgewood Olinda, LLC, Solargenix Energy LLC, Chateau Energy, Inc., and Vulcan Power Company. ORA representatives explained that the proposed decision (PD) of ALJ Allen and the alternate erroneously omitted ORAs proposal for an independent study of externalities. ORA representatives also pointed out the fact that a preliminary penalty scheme, which combines predetermined penalties with an OSC, would serve to strengthen the PD and the alternate even along the lines of their present direction, and voiced its support for the proposal that the utilities apply to the Commission when they anticipate a shortfall of more than twenty-five percent. ORA representatives requested more guidelines in the PD for the next phases of the RPS proceeding.

Type: EXPARTE Filing Date: June 13, 2003
Filed By:
ORA/OBIORA/PUC
Description: LATE FILED. On June 9, 2003, Noel A. Obiora, attorney for the Office of Ratepayer Advocates (ORA), met with Cmmr. Wood and Cmmr. Brown, in an all-party meeting in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, Noel A. Obiora, attorney, and Farzard Ghazzagh, analyst, for ORA, and representatives of Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, and the California Department of Water Resources. ORAs did not take a position at this meeting.

Type: EXPARTE Filing Date: June 13, 2003
Filed By:
ORA/OBIORA/PUC
Description: LATE FILED. On June 9, 2003, Noel A. Obiora, attorney for the Office of Ratepayer Advocates (ORA), met with Cmmr. Wood and Cmmr. Brown in an all-party meeting in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, Noel A. Obiora, attorney, and Don Smith, analyst, for ORA, and representatives of Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, The Utility Reform Network, Union of Concerned Scientists, the Green Power Institute, Center for Energy Efficiency and Renewable Technologies, the California Wind Energy Association, the Alliance for Retail Energy Markets, the Independent Energy Producers, the California Biomass Energy Alliance, Ridgewood Olinda, LLC, Solargenix Energy LLC, Chateau Energy, Inc., and Vulcan Power Company. ORA representatives explained that the proposed decision (PD) of ALJ Allen erroneously omitted ORAs proposal for an independent study of externalities. ORA representatives also pointed out the fact that a preliminary penalty scheme, which combines predetermined penalties with an OSC, would serve to strengthen the PD, and voiced its support for the proposal that the utilities apply to the Commission when they anticipate a shortfall of more than twenty-five percent.

Type: EXPARTE Filing Date: June 13, 2003
Filed By:
CALPINE CORPORATION
Description: On June 11, 2003, Peter Cartwright, President and Chief Executive Officer, Calpine Corporation (Calpine) met with Pres. Peevey in San Francisco. Also present were Kevin Coughlan, advisor to Pres. Peevey, and James Macias, Executive Vice President, and Steven Schleimer, Director of Market and Regulatory Affairs, for Calpine. Calpine representatives discussed issues related to the motion filed by Calpine on May 9, 2003 requesting the provision of expedited guidance and authority to San Diego Gas & Electric Company (SDG&E) to enable it to satisfy its procurement needs for 2005. Calpine stated the need for the Commission to expeditiously take action necessary to ensure that can meet the resource needs of its ratepayers.

Type: EXPARTE Filing Date: June 13, 2003
Filed By:
RIDGEWOOD OLINDA LLC
Description: AUGMENTATION REQUIRED. On June 9, 2003, Paul C. Lacourciere, of Thelen Reid & Priest, LLP, attorney for Ridgewood Olinda LLC (Ridgewood), attended an all-party meeting with Cmmr. Brown. Also present was David Gamson, advisor to Cmmr. Brown. Lacourciere expressed Ridgewood?s support for the proposed decision mailed on May 20, 2003, and requested that the Commission make no substantive changes to the PD's resolution of issues associated with establishing the market referent price, the least cost/best fit analysis and the flexibly compliance mechanism.

Type: EXPARTE Filing Date: June 13, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On June 11, 2003, Bruce Foster, Vice President of Regulatory Operations of Southern California Edison Company (SCE), sent to Cmmr. Brown a letter (attached to the notice). The letter concerns initiation of a proceeding to address issues related to the true-up of the Department of Water Resources revenue requirement for the 2001-2002 period.

Type: COMMENTS ON ALTERNATE Filing Date: June 12, 2003
Filed By:
RIDGEWOOD OLINDA, LLC
Description: of Cmmr. Lynch.

Type: PETITION Filing Date: June 12, 2003
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: For Access To Edison's Gas Supply Plan

Type: LAW & MOTION Filing Date: June 12, 2003
Filed By:
CALPINE CORPORATION
Description: for leave to file term sheet under seal and for adoption of protective order.

Type: EXPARTE Filing Date: June 12, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On June 9, 2003, Lad Lorenz, Electric and Gas Procurement Vice President, San Diego Gas & Electric Company (SDG&E), met with Cmmrs. Brown and Wood in an all-party meeting in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, Steven Weissman, advisor to Cmmr. Wood, and other attendees listed on the attachment to the notice. Lorenz stated that SDG&E supports the proposed decision (PD), which incorporates most of the joint principles developed by SDG&E and The Utility Reform Network. Lorenz specifically indicated that SDG&E supported that PD's recommendations with respect to contract terms, unlimited forward banking of excess procurement, and adoption of the ISO?s Amendment 42 and indicated that SDG&E was encouraged by the PD?s recommendation for adoption of a REC-based accounting system. Lorenz also indicated that SDG&E disagreed with the PD's recommendations related to the treatment of energy and capacity in the market price referents and as part of least cost, best fit evaluation. Lorenz recommended that bidders should identify both capacity and energy costs, and that a project's total costs should be considered in the bid ranking. Lastly, Lorenz indicated SDG&E?s support for the Commission's renewable portfolio program.

Type: EXPARTE Filing Date: June 12, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On June 9, 2003, Lad Lorenz, Electric and Gas Procurement Vice President, San Diego Gas & Electric Company (SDG&E), met with Cmmrs. Brown and Wood in an all-party meeting in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, Steven Weissman, advisor to Cmmr. Wood, Kevin Coughlan, advisor to Cmmr. Peevey, Brian Prusnek, advisor to Cmmr. Kennedy, and other attendees listed on the attachment to the notice. Lorenz stated that all three pending draft decisions would impose hindsight reasonableness reviews. Lorenz explained that while a 'disallowance cap' mitigates to some extent the impact of a reasonableness review, SDG&E believes that the Commission must eliminate reasonableness reviews for conduct consistent with the utilities' annual procurement plans. Lorenz stated that if the Commission continues to conduct reasonableness reviews subject to a disallowance cap, then among the three pending drafts the revised Peevey alternate is preferable, but it should be modified to apply to all procurement activities consistent with the adopted annual procurement plans. Lorenz noted that the Commission would still retain ample opportunities to review utility procurement conduct.

Type: EXPARTE Filing Date: June 12, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: AUGMENTATION REQUIRED. On June 9, 2003, William Stock, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Cmmr. Cmmr. Brown in an all-party meeting in San Francisco. Also present was David Gamson, advisor to Cmmr. Brown. Stock noted that there were significant issues that needed to be corrected in the proposed decision, including: avoiding pre-investment grade annual procurement targets; providing for greater flexibility in deficit banking; avoiding predetermined penalties; and not setting 10 years as the minimum contracting period.

Type: EXPARTE Filing Date: June 12, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: AUGMENTATION REQUIRED. On June 9, 2003, William Stock, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Cmmr. Brown in an all-party meeting in San Francisco. Also present was David Gamson, advisor to Cmmr. Brown. Stock reviewed the statutory framework created by AB 57 and noted that the statute requires procurement plans approved by the Commission to eliminate the need fro after-the-fact reasonableness reviews of an electrical corporation's actions which are in compliance with such approved plans. Stock stated that the various draft decisions would expose PG&E to risks of procurement reasonableness review. Stock requested that the Commission adopt an annual disallowance cap for PG&E of $36 million, eliminate Standard of Conduct 6 and 7, and reaffirm the broad scope for the annual disallowance cap to cover all procurement-related activities

Type: COMMENTS ON ALTERNATE Filing Date: June 12, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: on the Alternate Decision of Commr. Lynch regarding the implementation of the California Renewables Portfolio Standard

Type: COMMENTS ON ALTERNATE Filing Date: June 12, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on Alternative Proposed Decision of Commr. Lynch "Order Initiating Implementation of the Senate Bill 1078 Renewable Portfolio Standard Program"

Type: COMMENTS ON ALTERNATE Filing Date: June 12, 2003
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: on Alternate Draft Decision of Commr. Lynch on Renewable Portfolio Standard Implementation

Type: COMMENTS ON ALTERNATE Filing Date: June 12, 2003
Filed By:
VULCAN POWER COMPANY
Description: on the Alternate Decision of Commr. Lynch on the implementation of the Renewable Portfolio Standard

Type: COMMENTS ON ALTERNATE Filing Date: June 12, 2003
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: on the Alternate Proposed Decision of Commr. Lynch

Type: COMMENTS ON ALTERNATE Filing Date: June 12, 2003
Filed By:
ORA/OBIORA/PUC
Description: on Commr. Lynch's Alternate to the Proposed Decision of ALJ Allen

Type: COMMENTS ON ALTERNATE Filing Date: June 12, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the Alternte Draft Decision of Commr. Lynch to the Draft Decision of ALJ Allen

Type: COMMENTS ON ALTERNATE Filing Date: June 12, 2003
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: on the Alternate Draft Decision of Commr. Lynch (Renewable Portfolio StandarProgram Phase)

Type: COMMENTS ON ALTERNATE Filing Date: June 12, 2003
Filed By:
CHATEAU ENERGY, INC.
Description: On Alternate Draft Decision of Commr. Lynch: Order Initiating Implementation of the Senate Bill 1078 Renewables Portfolio Standard Program

Type: COMMENTS ON ALTERNATE Filing Date: June 12, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of Cmmr. Lynch concerning implementation of the SB 1078 renewable portfolio standard program

Type: COMMENTS ON ALTERNATE Filing Date: June 12, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: of Cmmr. Lynch.

Type: AMENDMENT Filing Date: June 11, 2003
Filed By:
SEMPRA ENERGY RESOURCES
Description: of Response to Calpine Motion requesting the Commission to provide expedited guidance and authority to SDG&E to enable it to satisfy its procurement needs for 2005.

Type: REPLY Filing Date: June 11, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to responses to motion of PG&E for expedited partial authorization of short term procurement

Type: EXPARTE Filing Date: June 11, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: LATE FILED. AUGMENTATION REQUIRED. On June 4, 2003, William Stock, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Cmmr. Peevey in an all-party meeting in San Francisco. Also present were Cmmr. Kennedy, and Frank De Rosa, Director, Power Contracts, PG&E. De Rosa noted that there were significant issues that needed to be corrected in the ALJ's proposed decision including: avoiding a pre-investment grade annual procurement targets; providing for greater flexibility in deficit banking as is provided in the enabling statute; avoiding predetermined penalties; and not setting ten years as the minimum contracting period.

Type: EXPARTE Filing Date: June 11, 2003
Filed By:
ORA/OBIORA/PUC
Description: On June 10, 2003, Noel A. Obiora, attorney for the Office of Ratepayer Advocates (ORA), met with Aaron Johnson, advisor to Cmmr. Lynch, in San Francisco. Also present was Don Smith, Senior Analyst for ORA. ORA representatives stated that the proposed decision (PD) of ALJ Allen erroneously omitted ORA?s proposal for an independent study of externalities and that the said study was necessary for achieving the ultimate end of Public Utilities Code Section 701.3. ORA representatives also pointed out the fact that a preliminary penalty scheme which combines predetermined penalties with an OSC would serve to strengthen the PD even along the lines of its present direction, and voiced support for the proposal that the utilities apply to the Commission when they anticipate a deficit of more than twenty-five percent. ORA representatives stated that it sought more guidelines in the PD for the next phases of the RPS proceeding.

Type: COMMENTS Filing Date: June 11, 2003
Filed By:
ORA/OBIORA/PUC
Description: on the alternate draft decision of Cmmr. Lynch to the draft decision of ALJ Walwyn.

Type: MISCELLANEOUS FILING Filing Date: June 10, 2003
Filed By:
SEMPRA ENERGY RESOURCES
Description: Revision to Notice of Grant of Request for Ex Parte Meeting.

Type: NOTICE Filing Date: June 10, 2003
Filed By:
SEMPRA ENERGY RESOURCES
Description: of Grant of Request for Ex Parte Meeting.

Type: COMMENTS Filing Date: June 9, 2003
Filed By:
VULCAN POWER COMPANY
Description: on the Draft Decision of ALJ Allen on the implementation of the Renewable Portfolio Standard

Type: EXPARTE Filing Date: June 9, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: AUGMENTATION REQUIRED. On June 4, 2003, Lad Lorenz, Electric and Gas Procurement Vice President, San Diego Gas & Electric Company (SDG&E), met with Pres. Peevey in an all-party meeting in San Francisco. Also present were Cmmr. Kennedy, Julie Fitch, advisor to Pres. Peevey, and other attendees. Lorenz stated that SDG&E supports the proposed decision (PD) which incorporates most of the joint principles developed by SDG&E and The Utility Reform Network. Lorenz specifically indicated that SDG&E supported that PD's recommendations with respect to contract terms and unlimited forward banking of excess procurement and indicated that SDG&E was encouraged by the PD's recommendation for adoption of a REC-based accounting system. Lorenz also indicated that SDG&E disagreed with the PD's recommendations related to the treatment of energy and capacity in the market price referents and as part of least cost, best fit evaluation. Lorenz recommended that bidders should identify both capacity and energy costs, and that a project's total costs should be considered in the bid ranking. Lastly, Lorenz indicated SDG&E's support for the Commission's renewable portfolio program.

Type: EXPARTE Filing Date: June 9, 2003
Filed By:
RIDGEWOOD OLINDA, LLC
Description: AUGMENTATION REQUIRED. On June 4, 2003, Dan Gulino, General Counsel and Senior Vice President of Ridgewood Power, LLC (Ridgewood), attended an all-party meeting with Pres. Peevey. Also present were Cmmr. Kennedy, Julie Fitch, advisor to Pres. Peevey, and William P. Short III, Vice President of Power Marketing, and Paul C. Lacourciere, of Thelen Reid & Priest, LLP, attorneys, for Ridgewood. Lacourciere expressed Ridgewood's support for the proposed decision (PD) issued by ALJ Allen, and requested that the Commission make no substantive changes to the PD's resolution of issues associated with establishing the market referent price, the least cost/best fit analysis and the flexibly compliance mechanism.

Type: EXPARTE Filing Date: June 9, 2003
Filed By:
RIDGEWOOD OLINDA, LLC
Description: LATE FILED. On May 27, 2003, Dan Gulino, General Counsel and Senior Vice President of Ridgewood Power, LLC (Ridgewood), met with David Gamson, advisor to Cmmr. Brown, and Julie Fitch, advisor to Pres. Peevey, in two separate meetings in San Francisco. Also present were William P. Short III, Vice President of Power Marketing, and Paul C. Lacourciere, of Thelen Reid & Priest, LLP, attorneys, for Ridgewood, and Karen Skelton, of the Dewey Square Group. Ridgewood representatives expressed their support for the proposed decision (PD) issued by ALJ Allen, but requested that the Commission modify the PD.

Type: COMMENTS Filing Date: June 9, 2003
Filed By:
SOLARGENIX ENERGY, LLC
Description: Opening; on Proposed Decision of ALJ Allen.

Type: COMMENTS Filing Date: June 9, 2003
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: on the Proposed Decision of ALJ Allen initiating implementation of the SB 1078 Renewable Portfolio Standard Program

Type: COMMENTS Filing Date: June 9, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: Opening; on the Proposed Decision of ALJ Allen regarding the implementation of the California Renewable Portfolio Standard

Type: COMMENTS Filing Date: June 9, 2003
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: on the Proposed Decision

Type: COMMENTS Filing Date: June 9, 2003
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: on the order initiating implementation of the SB 1078 Renewable Portfolio Standard Program

Type: COMMENTS Filing Date: June 9, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on the proposed decision of ALJ Allen.

Type: COMMENTS Filing Date: June 9, 2003
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: on the proposed decision of ALJ Allen.

Type: COMMENTS Filing Date: June 9, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the proposed decision of ALJ Allen concerning implementation of the renewable portfolio standard legislation.

Type: COMMENTS Filing Date: June 9, 2003
Filed By:
ORA/OBIORA/PUC
Description: on the Proposed Decision of ALJ Allen order initiating implementation of the Renewable Portfolio Standards Program

Type: COMMENTS Filing Date: June 9, 2003
Filed By:
GREEN POWER INSTITUTE
Description: on the Proposed Decision of ALJ Allen: Order initiating implementation of the Senate Bill 1078 Renewable Portfolio Standard Program

Type: COMMENTS Filing Date: June 9, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on Proposed Decision of ALJ Allen Order Initiating Implementation of the Senate Bill 1078 Renewable Portfolio Standard Program

Type: COMMENTS Filing Date: June 9, 2003
Filed By:
THEROUX ENVIRONMENTAL
Description: on order initiating implementation of the Senate Bill 1078 Renewable Portfolio Standards Program

Type: COMMENTS Filing Date: June 9, 2003
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: Openiing; on the Proposed Decision of ALJ Allen initiating implementation of SB 1078 Renewable Portfolio Standard

Type: COMMENTS Filing Date: June 9, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Opening; on the Proposed Decision of ALJ Allen regarding methodology for implementing the Renewable Portfolio Standard

Type: COMMENTS Filing Date: June 9, 2003
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: on ALJ's Proposed Decision on Renewable Portfolio Standard implementation

Type: COMMENTS Filing Date: June 9, 2003
Filed By:
RIDGEWOOD OLINDA, LLC
Description: on Proposed Decision of ALJ Allen

Type: ALTERNATE Filing Date: June 5, 2003
Filed By:
COM/LYNCH/PUC
Description: to the draft decision of ALJ Halligan. Comments are due 6/16, reply comments due 6/18.

Type: EXPARTE Filing Date: June 5, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On June 2, 2003, Bill Stock, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Robert Kionsian, advisor to Cmmr. Lynch, and Manuel Ramirez, advisor to Cmmr. Wood, in two separate meetings in San Francisco. At the meeting with Manuel Ramirez also present was Steven Weissman, advisor to Cmmr. Wood. Roy Kuga, Lead Director, Gas & Electric Supply, PG&E, participated in both meetings. Stock and Kuga reviewed the statutory framework created by AB 57 and noted that the statute requires procurements plans approved by the Commission to eliminate the need for after-the-fact reasonableness reviews of an electrical corporation's actions which are in compliance with such approved plans. PG&E representatives also stated that the various drat decisions in this matter would expose PG&E to risks of procurement reasonableness review. PG&E representatives requested that the Commission adopt an annual disallowance cap for PG&E of $36 million, eliminate Standard of Conducts 6 and 7, and reaffirm the broad scope for the annual disallowance cap to cover all procurement-related activities.

Type: EXPARTE Filing Date: June 5, 2003
Filed By:
SEMPRA ENERGY RESOURCES
Description: On May 29, 2003, Joseph Rowley, Vice President, Asset Development, Sempra Energy Resources (SER), met with Kevin Coughlan, advisor to Pres. Peevey, in San Francisco. Also present were Alvin S. Pak, Director of Regulatory Policy & Analysis, and Douglas Mitchell, Manager of Regulatory Policy, for Sempra Energy Global Enterprises. Written materials (attached to the notice) were used. SERs representatives updated the Commission with respect to the progress of SERs development of its Palomar Energy Project in northern San Diego County. SERs representatives also articulated the companys position that the pending Calpine motion requesting that the Commission direct San Diego Gas & Electric Company (SDG&E) to execute a contract with Calpine related to Calpines Otay Mesa Project, inappropriately seeks to preempt SDG&Es ongoing request for proposals process, commenced pursuant to the Commissions orders. SERs representatives explained that the Commission should deny or at least defer action on the motion.

Type: ALTERNATE Filing Date: June 5, 2003
Filed By:
COM/LYNCH/PUC
Description: to the draft decision of ALJ Allen. Comments are due 6/12, reply comments due 6/16.

Type: COMMENTS ON ALTERNATE Filing Date: June 3, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on Alternate Decision of Commissioner Lynch addressing [Edison's] Petition for Modification of Decision 02-12-074.

Type: RESPONSE Filing Date: June 3, 2003
Filed By:
UTILITY REFORM NETWORK
Description: in support of PG&E's Motion For Expedited Partial Authorization of 2004 Procurement

Type: RESPONSE Filing Date: June 3, 2003
Filed By:
ORA/OBIOROA/PUC
Description: to PG&E's Motion For Expedited partial Authorization of Short Term Procurement

Type: RESPONSE Filing Date: June 3, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to Motion of PG&E for expedited partial authorization of short-term procurement

Type: EXPARTE Filing Date: June 3, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On May 29, 2003, Bill Stock, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with David Gamson, advisor to Cmmr. Brown, and Kevin Coughlan, advisor to Pres. Peevey, in two separate meetings in San Francisco. Also present were Kent Harvey, Chief Financial Officer, and Karen Tomcala, Vice President, Regulatory Relations, PG&E. PG&E representatives reviewed the statutory framework created by AB 57 and noted that the statute requires procurements plans approved by the Commission to eliminate the need for after-the-fact reasonableness reviews of an electrical corporation's actions which are in compliance with such approved plans. PG&E representatives also stated that the various drat decisions in this matter would expose PG&E to risks of procurement reasonableness review. PG&E representatives requested that the Commission adopt an annual disallowance cap for PG&E of $36 million, eliminate Standard of Conducts 6 and 7, and reaffirm the broad scope for the annual disallowance cap to cover all procurement-related activities.

Type: COMMENTS ON ALTERNATE Filing Date: June 3, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on the alternate of Cmmr. Lynch

Type: RULING Filing Date: May 30, 2003
Filed By:
ALJ/WALWYN/PUC
Description: Calpine and all interested parties should provide testimony on June 16, 2003; SDG&E should provide rebuttal testimony on July 7, 2003; Petitions to Intervene by Dynergy, InterGen, N.V., Save Southwest Riverside County, Sempra Energy Resources, and Peabody Western Coal Company are granted; respondent utilities should serve supplemental testimony on June 16, 2003, as set forth.

Type: COMMENTS ON ALTERNATE Filing Date: May 29, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of Cmmr. Lynch addressing SCE's petition for modification of D02-12-074.

Type: EXPARTE Filing Date: May 29, 2003
Filed By:
SEMPRA ENERGY UTILITIES
Description: On May 23, 2003, Leslie Katz, Regulatory Relations Regional Vice President, Sempra Energy Utilities (SEU), met with Cmmr. Wood in San Francisco. Also present were Steve Weissman and Manuel Ramirez, advisors to Cmmr. Wood, and Lee Schavrien, Vice President Regulatory Affairs, SEU. Schavrien stated that while San Diego Gas & Electric Company (SDG&E) agrees that the Commission should promptly address SDG&Es near- and long-term resource needs, the preferred way to do so is through SDG&Es recently issued Request for Proposals (RFP) seeking firm capacity resources. Katz noted that the RFP was developed in conjunction with SDG&Es Procurement Review Group (PFG) and that the PRG will review bid results. Katz suggested that the Commission should encourage Calpine Corporation to participate in the open, competitive bid process.

Type: COMMENTS ON ALTERNATE Filing Date: May 29, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the Alternative Draft Decision of Commr. Lynch to the Draft Decision of ALJ Walwyn

Type: COMMENTS ON ALTERNATE Filing Date: May 29, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: of Cmmr. Lynch.

Type: EXPARTE Filing Date: May 28, 2003
Filed By:
CALPINE CORPORATION
Description: On May 23, 2003, James Macias of Calpine Corporation (Calpine), met with Cmmr. Wood in San Francisco. Also present were Steven Weissman, advisor to Cmmr. Wood, and Steven Schleimer of Calpine. The Calpine representatives discussed issues related to utility procurement. The Calpine representatives discussed the motion filed by Calpine on May 9, 2003, requesting the provision of expedited guidance and authority to San Diego Gas & Electric Company to enable it to satisfy its procurement needs for 2005. The Calpine representatives further addressed the need for the Commission to expeditiously take action necessary to ensure that the utilities can meet the resource needs of their ratepayers.

Type: MOTION Filing Date: May 27, 2003
Filed By:
INTERGEN, N.V.
Description: to intervene; response attached.

Type: RESPONSE Filing Date: May 27, 2003
Filed By:
SEMPRA ENERGY
Description: To Calpine's Motion Requesting the Commission To Provide Expedited Guidance and Authoirty

Type: RESPONSE Filing Date: May 27, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: To Motion of Calpine Corporation regarding 2005 Resource needs

Type: RESPONSE Filing Date: May 27, 2003
Filed By:
DYNEGY MARKETING AND TRADE
Description: to motion of Calpine Corporation for expedited guidance and authority.

Type: REQUEST Filing Date: May 27, 2003
Filed By:
SAVE SOUTHWEST RIVERSIDE COUNTY
Description: to intervene; response attached

Type: PETITION Filing Date: May 27, 2003
Filed By:
DYNEGY MARKETING AND TRADE
Description: to intervene

Type: NOTICE Filing Date: May 27, 2003
Filed By:
SAVE SOUTHWEST RIVERSIDE COUNTY
Description: of intent to claim intervenor compensation

Type: NOTICE Filing Date: May 23, 2003
Filed By:
SEMPRA ENERGY GLOBAL ENTERPRISES
Description: of Grant of Request for Ex Parte Meeting.

Type: ALTERNATE Filing Date: May 22, 2003
Filed By:
COM/LYNCH/PUC
Description: Comments are due by 6/11, reply comments due 5 days after comments are filed.

Type: EXPARTE Filing Date: May 22, 2003
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: On May 15, 2003, Nancy A. Rader, Executive Director of the California Wind Energy Association (CalWEA), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present was Joseph Karp of White & Case LLP, attorney for CalWEA. CalWEA representatives discussed its position in the development of the Renewables Portfolio Standard (RPS) program. Specifically, the CalWEA representatives urged the Commission to adopt its proposals on the determination of a market price referent for the RPS program, the evaluation of renewable bids and the adoption of standardized contract terms.

Type: EXPARTE Filing Date: May 22, 2003
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: On May 19, 2003, Alan Nogee of the Union of Concerned Scientists (UCS), met with David Gamson, advisor to Cmmr. Brown, and Julie Fitch, advisor to Pres. Peevey, in two separate meetings; and on May 20, 2003, - with Robert Kinosian, advisor to Cmmr. Lynch, and Steven Weissman, advisor to Cmmr. Wood, in two separate meetings. All the meetings were held in San Francisco. Also present was Jody London of Grueneich Resource Advocates. At the meeting with Robert Kinosian also present was Aaron Johnson, advisor to Cmmr. Lynch. A copy of the UCS report 'Plugging in Rnewable Energy' available online at www.ucsusa.org, was used. Nogee and London described UCS' testimony and briefs in the renewable portfolio standard phase of the procurement rulemaking. At the meeting with Robert Kinosian and Steven Weissman, Nogee and London also described how those issues were addressed in the proposed decision of ALJ Allen.

Type: PROPOSED DECISION Filing Date: May 20, 2003
Filed By:
ALJ/ALLEn/PUC
Description: Comments are due by June 9, 2003; reply comments - 5 days after comments are filed.

Type: RULING Filing Date: May 20, 2003
Filed By:
ALJ/ALLEN/PUC
Description: adopting modified protective order.

Type: MOTION Filing Date: May 19, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: for expedited partial authorization of short term procurement.

Type: MISCELLANEOUS FILING Filing Date: May 16, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: 2004 Short-Term Procurement Plan [CONFIDENTIAL VERSION].

Type: NOTICE Filing Date: May 16, 2003
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: of grant of request for Ex Parte meeting.

Type: MISCELLANEOUS FILING Filing Date: May 16, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: REDACTED /pursuant to the May 1, 2002 protective order as modified by April 4, 2003 ruling/: 2004 Short-Term Procurement Plan [pursuant to the February 18, 2003 ALJ's ruling at the prehearing conference].

Type: MISCELLANEOUS FILING Filing Date: May 16, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: CONFIDENTIAL - FILED UNDER SEAL /pursuant to the May 1, 2002 protective order, as modified by April 4, 2003 ruling/: 2004 Short-Term Procurement Plan [pursuant to the February 18, 2003 ALJ's ruling at the prehearing conference].

Type: MISCELLANEOUS FILING Filing Date: May 16, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: 2004 Short-Term Procurement Plan [PUBLIC VERSION].

Type: COMMENTS Filing Date: May 15, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on the Revised Draft Decision of ALJ Walwyn and the Revised Alternate Draft Decision of Commission President Peevey.

Type: RESPONSE Filing Date: May 15, 2003
Filed By:
CALIFORNIA POWER AUTHORITY
Description: in support of Calpine's motion that the Commission provide guidance and authority to SDG&E to enable it to satisfy procurement needs for 2005.

Type: MISCELLANEOUS FILING Filing Date: May 15, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: 2004 Procurement Plan [PUBLIC VERSION].

Type: COMMENTS Filing Date: May 15, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the revised draft decision of ALJ Walwyn and the revised alternate of Cmmr. Peevey.

Type: COMMENTS Filing Date: May 15, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the Revised Draft Decision and Revised Alternate Draft Decision addressing [Edison] Petition for Modification of Decision 02-12-074.

Type: COMMENTS Filing Date: May 12, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; in response to Interim Opinion addressing Petition for Modification of Decision 02-09-053 by DWR.

Type: RESPONSE Filing Date: May 12, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to Motion of the Green Power Institute.

Type: MOTION Filing Date: May 12, 2003
Filed By:
PEABODY WESTERN COAL COMPANY
Description: to intervene out of time

Type: ALTERNATE Filing Date: May 9, 2003
Filed By:
CMMR/PEEVEY/PUC
Description: revised; re: Edison's February 3, 2002 petition for modification of D02-12-074. Comments are due by May 15, 2003.

Type: DRAFT DECISION Filing Date: May 9, 2003
Filed By:
ALJ/WALWYN/PUC
Description: revised; re: Edison's February 3, 2002 petition for modification of D02-12-074. Comments are due by May 15, 2003.

Type: MOTION Filing Date: May 9, 2003
Filed By:
CALPINE CORPORATION
Description: requesting the Commission to provide expedited guidance and authority to San Diego Gas & Electric Company to enable it to satisfy its Procurement Needs for 2005.

Type: EXPARTE Filing Date: May 9, 2003
Filed By:
CALPINE CORPORATION
Description: On May 6, 2003, James Macias of Calpine Corporation (Calpine), met with Pres. Peevey in San Francisco. Also present were Kevin Coughlan and Julie Fitch, advisors to Pres. Peevey, and Steven Schleimer for Calpine. The Calpine representatives addressed the need for the Commission to expeditiously take action necessary to ensure that the utilities can meet the resource needs of their ratepayers.

Type: EXPARTE Filing Date: May 9, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: LATE FILED. On May 5, 2003, Bruce Foster, Vice President, Regulatory Operations, Southern California Edison Company (Edison), met with Kevin Coughlan, advisor to Pres. Peevey, in San Francisco. Foster discussed Edison's Petition for Modification of D02-12-074, filed on February 3, 2003, and urged the Commission to approve all aspects of the petition.

Type: EXPARTE Filing Date: May 9, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On May 6, 2003, Bruce Foster, Vice President, Regulatory Operations, Southern California Edison Company (Edison), met with Aaron Johnson, advisor to Cmmr. Lynch, and David Gamson, advisor to Cmmr. Brown, in two separate meetings in San Francisco. Also present was Michael R. Hoover, Director of Regulatory Policy and Affairs at Edison. Foster and Hoover discussed Edison's Petition for Modification of D02-12-074, filed on February 3, 2003 and urged the Commission to approve all aspects of the petition.

Type: BRIEF Filing Date: May 5, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; re: Implementation issues.

Type: MOTION Filing Date: May 5, 2003
Filed By:
THE UNION OF CONCERNED SCIENTIST
Description: to Amend its request for an Award of Compensation in [this Docket].

Type: BRIEF Filing Date: May 5, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Reply; on the Methodology for Implementing the Renewables Portfolio Standard.

Type: BRIEF Filing Date: May 5, 2003
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: Reply; in the Renewable Portfolio Standard Phase.

Type: BRIEF Filing Date: May 5, 2003
Filed By:
VULCAN POWER COMPANY
Description: Reply; on the Implementation of the Renewable Portfolio Standard.

Type: BRIEF Filing Date: May 5, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: Reply; relating to Standard Contract terms and conditions.

Type: BRIEF Filing Date: May 5, 2003
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: Reply; on the Implementation of the California Renewables Portfolio Standard Program.

Type: BRIEF Filing Date: May 5, 2003
Filed By:
ORA/OBIORA/PUC
Description: Reply; on the implementation of the Renewables Portfolio Standards Program.

Type: BRIEF Filing Date: May 5, 2003
Filed By:
THE UNION OF CONCERNED SCIENTISTS
Description: Reply; in the Renewable Portfolio Standard Phase.

Type: BRIEF Filing Date: May 5, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: Reply; on implementation of the California Renewables Portfolio Standard.

Type: BRIEF Filing Date: May 5, 2003
Filed By:
RIDGEWOOD OLINDA, LLC
Description: Reply; on RPS Implementation.

Type: BRIEF Filing Date: May 5, 2003
Filed By:
THE GREEN POWER INSTITUTE
Description: Reply; in the RPS Phase of the Rulemaking.

Type: BRIEF Filing Date: May 5, 2003
Filed By:
CHATEAU ENERGY, INC.
Description: Reply; on implementation of the Renewables Portfolio Standards Program.

Type: BRIEF Filing Date: May 5, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on RPS Implementation Issues.

Type: BRIEF Filing Date: May 5, 2003
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: Reply; on Renewable Portfolio Standard Program Implementation Issues.

Type: COMMENTS Filing Date: April 30, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On Draft Order Modifying D02-08-071

Type: COMMENTS Filing Date: April 30, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On Draft Decision Modifying D02-08-071

Type: COMMENTS Filing Date: April 30, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On ALJ Walwyn's Draft Decision To Modify D02-08-071

Type: EXPARTE Filing Date: April 29, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On April 24, 2003, Bill Stock, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Cmmr. Kennedy in San Francisco. Also present were Lynne McGhee, advisor to Cmmr. Kennedy, Steve Roscow of the Energy Division, and Karen Tomcala, Vice President, and Brian Cherry, Directory, Regulatory Relations, PG&E. Tomcala stated that WAPA remittance should not be considered in isolation, and that resolution of the WAPA remittance should be made in conjunction with revising the Department of Water Resources' (DWR) 2003 revenue requirement. Cherry stated that there is no need to reopen the existing cost allocation among the utilities once DWR revised its 2003 revenue requirement.

Type: TRANSCRIPT Filing Date: April 29, 2003
Filed By:
REPORTING DIVISION
Description: Submitted; Volume 28

Type: REPLY Filing Date: April 29, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Responses filed on the Second Petition for Modification of Decision 02-12-074 by [Edison] (Redacted Version).

Type: BRIEF Filing Date: April 28, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: Opening; on implementation of the California Renewables Portfolio Standard [Redacted Version].

Type: REPLY Filing Date: April 28, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: [Confidential]; to Responses filed on the Second Petition for Modification of Decision 02-12-074 by [Edison]

Type: LAW & MOTION Filing Date: April 28, 2003
Filed By:
UTILITY REFORM NETWORK
Description: Motion for Leave to File Confidential Material Under Seal; Confidential Material Attached and Filed Under Seal, Namely, Confidential Appendices to the Opening Brief of T.U.R.N. on implementation of the California Renewables Portfolio Standard.

Type: BRIEF Filing Date: April 28, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: Opening; related to standard contract terms and conditions.

Type: BRIEF Filing Date: April 28, 2003
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: on the implementation of the Renewables Portfolio Standard.

Type: BRIEF Filing Date: April 28, 2003
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: Opening; on the Implementation of the California Renewables Portfolio Standard Program.

Type: BRIEF Filing Date: April 28, 2003
Filed By:
CHATEAU ENERGY, INC.
Description: in response to issues raised during the April 7-16, 2003 Evidentiary Hearings for Renewable Procurement.

Type: BRIEF Filing Date: April 28, 2003
Filed By:
ORA/OBIORA/PUC
Description: Opening; on the Implementation of the Renewables Portfolio Standards Program.

Type: BRIEF Filing Date: April 28, 2003
Filed By:
THE GREEN POWER INSTITUTE
Description: Opening; in the RPS Phase of the Rulemaking.

Type: BRIEF Filing Date: April 28, 2003
Filed By:
RIDGEWOOD OLINDA, LLC
Description: Opening; on RPS Implementation.

Type: BRIEF Filing Date: April 28, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Opening; on the Methodology for Implementing the Renewables Portfolio Standard.

Type: BRIEF Filing Date: April 28, 2003
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLES TECHNOLOGIES
Description: Opening; in the Renewable Portfolio Standard Phase.

Type: BRIEF Filing Date: April 28, 2003
Filed By:
UNION OF CONCERNED SCIENTIST
Description: Opening;

Type: BRIEF Filing Date: April 28, 2003
Filed By:
VULCAN POWER COMPANY
Description: Opening; on the Implementation of the Renewable Portfolio Standard.

Type: BRIEF Filing Date: April 28, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Opening; regarding implementation of SB1078.

Type: BRIEF Filing Date: April 28, 2003
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: Opening; on renewable portfolio standard program implementation issues.

Type: BRIEF Filing Date: April 28, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Opening;

Type: DRAFT DECISION Filing Date: April 24, 2003
Filed By:
ALJ/WALWYN/PUC
Description: comments are due by April 30, 2003; reply comments - by May 2, 2003.

Type: EXPARTE Filing Date: April 22, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On April 16, 2003, Brian Cherry, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), had a telephone conversation with Sean Gallagher, advisor to Cmmr. Kennedy. Cherry updated the Commission on the status and content of the Advice Letter, which was being prepared in conjunction with the yet to be executed Operating Agreement between PG&E and the California Department of Water Resources. Cherry noted that approval of that Advice Letter and the Operating Agreement would be a key element in helping to resolve WAPA-related remittance issues.

Type: BRIEF Filing Date: April 21, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on issues in compliance with March 7, 2003 Order. [Filing authorized by ALJ Walwyn].

Type: BRIEF Filing Date: April 18, 2003
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
WESTERN POWER TRADING FORUM
Description: Reply;

Type: EXPARTE Filing Date: April 18, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On April 15, 2003, Lee Schavrien, Vice President Regulatory Affairs, San Diego Gas & Electric Company (SDG&E), met with Kevin Coughlan, advisor to Cmmr. Peevey, in San Francisco. Also present was Leslie Katz, SDG&E Regional Vice President. Schavrien stated that SDG&E supports Cmmr. Peevey alternate, but that it should be modified to clarify that least-cost dispatch applies to all procurement activities. Schavrien noted that extending the disallowance cap does not limit the Commission?s ability to disallow costs relating to gross incompetence, fraud, abuse, or similar grounds.

Type: COMMENTS Filing Date: April 18, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on adopted framework regarding general confidentiality issues

Type: COMMENTS Filing Date: April 18, 2003
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: on the April 4, 2003 ruling regarding confidentiality of information and effective public participation.

Type: COMMENTS Filing Date: April 18, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the ALJ Ruling regarding Confidentiality of Information and effective Public Participation.

Type: COMMENTS Filing Date: April 18, 2003
Filed By:
WESTERN POWER TRADING FORUM
Description: on the Joint ALJ Ruling regarding confidentiality of information and effective public participation.

Type: BRIEF Filing Date: April 18, 2003
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: Reply; on the PHC Issues of ALJ Walywyn.

Type: BRIEF Filing Date: April 18, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Reply; to opening briefs in compliance with ALJ Walwyn's March 7, 2003 PHC Order.

Type: BRIEF Filing Date: April 18, 2003
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: reply; on the issues raised in the March 7, 2003 prehearing conference.

Type: EXPARTE Filing Date: April 17, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On April 14, 2003, William Stock, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Cmmr. Kennedy in San Francisco. Also present was Brian Cherry, Director, Regulatory Relations, PG&E. Cherry and Stock updated the Commission on the status and content of the Advice Letter, which was being prepared in conjunction with the yet to be executed Operating Agreement between PG&E and the California Department of Water Resources. Stock and Cherry noted that approval of that Advice Letter and the Operating Agreement would be a key element in helping to resolve WAPA-related remittance issues.

Type: PETITION FOR MODIFICATION Filing Date: April 17, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Joint; of D03-04-029.

Type: MISCELLANEOUS FILING Filing Date: April 17, 2003
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: letter [re: data confidentiality policies].

Type: COMMENTS Filing Date: April 16, 2003
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: on Draft Resolution E-3816 approving a portion of Edison's Advice Letter 1676-E (Renewable Contracts)

Type: COMPLIANCE FILING Filing Date: April 15, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: [UNREDACTED VERSION] Long-Term Procurement Plan

Type: REPORT Filing Date: April 15, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Workshop Status; on Procurement Incentive Mechanism Proposal.

Type: DRAFT DECISION Filing Date: April 15, 2003
Filed By:
ALJ/HALLIGAN/PUC
Description: [Interim Opinion Addressing Petition for Modification of Decision 02-09-053] mailed 4/15/03. Comments are due by 5/5/03; reply comments due 5 days thereafter. Opening Comments shall not exceed 15 pages.

Type: EXPARTE Filing Date: April 15, 2003
Filed By:
RIDGEWOOD OLINDA, LLC
Description: LATE FILED. On April 2, 2003, Dan Gulino, General Counsel and Senior Vice President of Ridgewood Power, LLC (Ridgewood), met with Cmmr. Kennedy and Julie Fitch, advisor to Pres. Peevey, in two separate meetings in San Francisco. Also present were William P. Short III, Vice President of Power Marketing, Ridgewood Power, LLC, Paul C. Lacourciere of Thelen Reid & Priest LLP, attorneys, for Ridgewood Olinda, LLC, and Karen Skelton of the Dewey Square Group. The Ridgewood representatives requested that the Commission adopt a mechanism of establishing the market referent price that would result in appropriate use of public goods charge funds, recognize that not all environmental attributes attributable to a renewable generator need to be transferred to the utility as part of the renewable procurement process, and ensure that renewable generators are paid for any environmental attributes that are transferred to the utilities. The Ridgewood representatives also discussed whether any changes to the California Public Utilities Code may be necessary in order to accommodate their concerns.

Type: COMPLIANCE FILING Filing Date: April 15, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Long-Term Procurement Plan [REDACTED].

Type: COMPLIANCE FILING Filing Date: April 15, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Long-Term Resource Plan.

Type: COMMENTS Filing Date: April 14, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Reply; to Comments of TURN on the Draft Decision of ALJ Walwyn and the Alternate Draft Decision of Commissioner Peevey.

Type: RESPONSE Filing Date: April 14, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: to Edison's Second Confidential Petition to Modify D02-12-074

Type: RESPONSE Filing Date: April 14, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Edison's Public Petition to Modify D02-12-074

Type: MISCELLANEOUS FILING Filing Date: April 14, 2003
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
ORA/PUC
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
Description: Revised proposed order re confidentiality of Edison, PG&E and SDG&E power procurement information [pursuant to April 4, 2003 ruling].

Type: BRIEF Filing Date: April 11, 2003
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: on PHC Statement Questions of ALJ Walwyn.

Type: MOTION Filing Date: April 11, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: for Official Notice.

Type: COMMENTS ON ALTERNATE Filing Date: April 11, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Draft Decision of Commission President Peevey.

Type: COMMENTS Filing Date: April 11, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: on the Draft Decision of ALJ Walwyn and the Alternate Draft Decision of Commissioner Peevey.

Type: COMMENTS Filing Date: April 11, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the Draft Decision of ALJ Walwyn and the Alternate Draft Decision of Commissioner Peevey on [Edison's] February 3, 2002 Petition for Modification of Decision 02-12-074.

Type: COMMENTS Filing Date: April 11, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Draft Decisions modifying Decision 02-12-074.

Type: COMMENTS Filing Date: April 11, 2003
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: in response to the March 7, 2003 Prehearing Conference Statement of ALJ Walwyn.

Type: COMMENTS Filing Date: April 11, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS
Description: on the Draft Decision of ALJ Walwyn and the alternate Draft Decision of Commissioner Peevey.

Type: BRIEF Filing Date: April 11, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: Opening; on the issues raised in the March 7, 2003 Prehearing Conference Statement of ALJ Walwyn.

Type: BRIEF Filing Date: April 11, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the four questions presented in the March 7, 2003 Prehearing Conference Ruling of ALJ.

Type: BRIEF Filing Date: April 11, 2003
Filed By:
SEMPRA ENERGY RESOURCES
Description: addressing issues raised by ALJ Walwyn during the March 7, 2003 Prehearing Conference.

Type: BRIEF Filing Date: April 11, 2003
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
WESTERN POWER TRADING FORUM
Description: on Legal Issues.

Type: BRIEF Filing Date: April 11, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of Issues in compliance with March 7, 2003 Order.

Type: BRIEF Filing Date: April 11, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Prehearing Opening.

Type: BRIEF Filing Date: April 11, 2003
Filed By:
ORA/SCARFF/PUC
Description: in response to the Ruling of ALJ Walwyn of March 7 (The Utilities obligation to provide reserve capacities, etc.)

Type: RESPONSE Filing Date: April 9, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Edison's Public Petition to Modify D02-10-062

Type: ALTERNATE Filing Date: April 7, 2003
Filed By:
CMMR/PEEVEY/PUC
Description: [re: Edison's PM D02-12-074.] Comments due by April 11, 2003; reply comments - by April 14, 2003.

Type: RESPONSE Filing Date: April 7, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Petition of Edison to Modify D02-12-069

Type: RESPONSE Filing Date: April 7, 2003
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: In Opposition to Edison's and PG&E's Motion In Limine

Type: MOTION Filing Date: April 7, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
Description: in Limine to exclude evidence regarding renewable energy credits

Type: EXPARTE Filing Date: April 7, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: LATE FILED. On April 1, 2003, Lee Schavrien, Vice President Regulatory Affairs, San Diego Gas & Electric Company (SDG&E), spoke with Kevin Coughlan, advisor to Pres. Peevey, by telephone. Schavrien stated that SDG&E supports Cmmr. Peevey alternate, but in any event, feels it is important for the Commission to adopt one of the decisions at the next Commission meeting. Schavrien added that revisions proposed by the Department of Water Resources in a March letter are not based on the record, were not developed in consultation with SDG&E, and should not be incorporated into the Operating Agreement decision.

Type: MOTION Filing Date: April 4, 2003
Filed By:
RIDGEWOOD OLINDA, LLC
Description: for clarification

Type: DRAFT DECISION Filing Date: April 4, 2003
Filed By:
ALJ/WALWYN/PUC
Description: [On Edison's petition for modification of D02-12-074.] Comments are due by April 11, 2003; reply comments - by April 14, 2003.

Type: RULING Filing Date: April 4, 2003
Filed By:
ALJ/ WALWYN/PUC
ALJ/ALLEN/PUC
Description: regarding confidentiality of information and effective public participation; comments due on April 18, 2003.

Type: MOTION Filing Date: April 3, 2003
Filed By:
THE GREEN POWER INSTITUTE
Description: to Modify CPUC-CEC RPS Collaboration Workplan.

Type: EXPARTE Filing Date: April 2, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON March 10, 2003, AND APPEARED IN THE CALENDAR OF March 19, 2003. On March 5, 2003, Bruce Foster, Vice President, Regulatory Operations, Southern California Edison Company (Edison), met with Cmmr. Lynch in San Francisco. Also present were Robert Kinosian and Aaron Johnson, advisors to Cmmr. Lynch, and Michael R. Hoover, Director of Regulatory Policy and Affairs, Edison. Written materials were used. Edison representatives discussed the contract submitted for Commission approval with Advice Letter 1680. Edison representatives took the position that the contract is reasonable and should be approved by the Commission. The contents of the advice filing and attachments are confidential pursuant to the Protective Order of May 1, 2002.

Type: MOTION Filing Date: April 1, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: for acceptance of late-filed pleading [re: March 5, 2003 filing]

Type: TESTIMONY Filing Date: April 1, 2003
Filed By:
CHATEAU ENERGY, INC.
Description: Regarding RPS Implementation Specific To Repowering of the Mesquite Lake Renewable Power Plant

Type: NOTICE Filing Date: April 1, 2003
Filed By:
RIDGEWOOD OLINDA, LLC
Description: of scheduled individual ex parte meeting on April 2, 2003 at 9:30 a.m.

Type: NOTICE Filing Date: April 1, 2003
Filed By:
RIDGEWOOD OLINDA, LLC
Description: of scheduled individual ex parte meeting on April 2, 2003 at 10:30 a.m.

Type: COMMENTS ON ALTERNATE Filing Date: March 28, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Reply; on Alternate Draft Decision of Commr. Peevey on Motions to Approve Operating Agreement.

Type: RESPONSE Filing Date: March 28, 2003
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: to PG&E's Application For Rehearing of D03-02-072

Type: MOTION Filing Date: March 28, 2003
Filed By:
GREEN POWER INSTITUTE
Description: For the Acceptance of a Late-Filed Notice of Intent to Claim Compensation; Notice of Intent to Claim Compensation Attached.

Type: MOTION Filing Date: March 28, 2003
Filed By:
WESTERN POWER TRADING FORUM
Description: to accept Comments on the Joint Report of PG&E, SDG&E, SoCal Edison Co., ORA and TURN on Confidentiality Issues relating to the long-term plan showingsof he Utilities; Comments attached.

Type: COMMENTS ON ALTERNATE Filing Date: March 27, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; to comments on the Alternate Draft Decision of Commr. Peevey.

Type: RESPONSE Filing Date: March 27, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to Petition of Edison to Modify D02-10-062

Type: COMMENTS ON ALTERNATE Filing Date: March 25, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On the Alternate Draft Decision of Commr. Peevey on Motions to Approve Operating Agreement.

Type: COMMENTS ON ALTERNATE Filing Date: March 25, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of Cmmr. Peevey

Type: COMMENTS ON ALTERNATE Filing Date: March 25, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: of Cmmr. Peevey.

Type: COMMENTS Filing Date: March 21, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Supplemental; on access to information.

Type: ALTERNATE Filing Date: March 20, 2003
Filed By:
CMMR/PEEVEY/PUC
Description: comments are due by March 25, 2003; reply comments - by March 28, 2003.

Type: MISCELLANEOUS FILING Filing Date: March 20, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: showing that the confidentiality limits it now recommends allow for meaningful public participation in the evaluation of the long term plan

Type: EXPARTE Filing Date: March 20, 2003
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: LATE FILED: On March 6, 2003, Andrea Weller of Strategic Energy met with David Gamson, advisor to Cmmr. Brown, Laura Krannawitter, advisor to Cmmr. Kennedy, and Pres. Peevey, in three separate meetings in San Francisco. Also present were Mona Petrochko of Constellation New Energy, Rebecca Schlanert of electricAmerica, Alvin Pak of Sempra Energy Global Enterprises and Daniel W. Douglass, counsel for the Alliance for Retail Energy Markets. During the meetings, the parties? representatives discussed issues related to the procurement proceeding with emphasis on the need for the proceeding to consider the possible reopening of direct access and the possible implementation of a core/noncore market. Parties stated that failure to consider such alternatives could lead to the creation of a whole new class of stranded costs should the utilities contract on a long-term basis to meet the requirements of all of their currently bundled customers. Additionally, the parties asserted that the procedural schedule should provide that the forthcoming short-term 2004 and long-term proceedings should be conducted largely consecutively, as opposed to concurrently.

Type: COMMENTS Filing Date: March 20, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Additional; on confidentiality and the use of information in this proceeding.

Type: RESPONSE Filing Date: March 19, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Edison's Motion to Consolidate Consideration

Type: RESPONSE Filing Date: March 19, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: In support of SCE's Motion to Consolidate Consideration

Type: EXPARTE Filing Date: March 18, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: LATE FILED. On March 5, 2003, Bruce Foster, Vice President, Regulatory Operations, Southern California Edison Company (SCE), met with Cmmr. Lynch and Cmmr. Kennedy in two separate meetings in San Francisco. At the meeting with Cmmr. Lynch also present were Aaron Johnson and Robert Kinosian, advisors to Cmmr. Lynch, and Michael Hoover, Director of Regulatory Affairs, for SCE; and at the meeting with Cmmr. Kennedy - Lynne McGhee, advisor to Cmmr. Kennedy, and James B. Woodruff, Senior Attorney, for SCE. SCE representatives took the position that the contract submitted with Advice Letter 1680 is reasonable and should be approved by the Commission.

Type: PETITION FOR MODIFICATION Filing Date: March 17, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Second, of Decision 02-12-074 [Redacted Version].

Type: REPLY Filing Date: March 17, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to comments on ALJ's Ruling on procedural coordination of renewables procurement, transmission planning and statutory interpretation of Public Utilities Code Section 399.25.

Type: REPLY Filing Date: March 17, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to comments of California Wind Energy Association on procedural coordination of renewables procurement, transmission planning and statutory interpretation of Public Utilities Code Section 399.25.

Type: REPLY Filing Date: March 17, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to the comments of the California Wind Energy Association and Independent Energy Producers Association.

Type: PETITION FOR MODIFICATION Filing Date: March 14, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: [Confidential Version] Second, of Decision 02-12-074.

Type: REHEARING REQUEST Filing Date: March 13, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of D03-02-072.

Type: RULING Filing Date: March 13, 2003
Filed By:
ALJ/ALLEN/PUC
Description: setting prehearing conference on 4/3 at 10 a.m. in SF, and modifying scope of testimony.

Type: EXPARTE Filing Date: March 12, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: LATE FILED. On March 6, 2003, Southern California Edison Company (SCE), provided documents to Steven Weissman, advisor to Cmmr. Wood, and on March 7, 2003, SCE provided copies of the same documents to David Gamson, advisor to Cmmr. Brown, Laura Krannawitter, advisor to Cmmr. Kennedy, Robert Kinosian, advisor to Cmmr. Lynch, and Kevin Coughlan, advisor to Pres. Peevey, in San Francisco. The documents provided by SCE are confidential and subject to the Protective Order in this matter and to Public Utilities Code Section 583 and General Order 66C. The documents were provided in support of one of the power purchase agreements for which approval is sought in Advice Letter 1676-E.

Type: COMMENTS Filing Date: March 11, 2003
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: On Procedural Coordination of Renewables Procurement, Transmission Planning and Statutory Interpretation of Public Utilities Code Section 399.25

Type: COMMENTS Filing Date: March 11, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On February 25, 2003 ALJs' Ruling Requesting Comments on Procedural Coordination of Renewables procurement, Transmission Planning and Statutory Interpretation of Public Utilities Code Section 399.25

Type: COMMENTS Filing Date: March 11, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: Concerning the ALJs' Ruling on Procedural Coordinatin of Renewable Procurement, Transmission Planning and Statutory Interpretation of Public Utilities Code Section 399.25

Type: COMMENTS Filing Date: March 10, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on draft decision on motions to approve operating agreement.

Type: PETITION FOR MODIFICATION Filing Date: March 10, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of Decision 02-10-062 [Public Version}

Type: PETITION FOR MODIFICATION Filing Date: March 10, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of Decision 02-10-062 [Confidential Version]

Type: EXPARTE Filing Date: March 10, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: AUGMENTATION REQUIRED. On March 5, 2003, Bruce Foster, Vice President, Regulatory Operations, Southern California Edison Company (Edison), met with Cmmr. Lynch in San Francisco. Also present were Robert Kinosian and Aaron Johnson, advisors to Cmmr. Lynch, and Michael R. Hoover, Director of Regulatory Policy and Affairs, Edison. Written materials (attached to the notice) were used. Edison representatives discussed the attached handout and related matters.

Type: COMMENTS Filing Date: March 7, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Revised; on the Draft Decision of ALJ Halligan.

Type: PETITION FOR MODIFICATION Filing Date: March 7, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of Decision 02-12-069.

Type: NOTICE Filing Date: March 7, 2003
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: Of New RPS Collaborative Staff Member Pursuant to Collaboration Guidelines

Type: COMMENTS Filing Date: March 6, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on draft decision of ALJ Halligan

Type: COMMENTS Filing Date: March 6, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on draft decision on motions to approve operating agreement.

Type: COMMENTS Filing Date: March 6, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the draft decision of ALJ Halligan.

Type: RESPONSE Filing Date: March 5, 2003
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
THE UTILITY REFORM NETWORK
Description: to Edison's petition for modification of D02-12-074.

Type: MOTION Filing Date: March 4, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Consolidate Consideration

Type: COMMENTS Filing Date: March 3, 2003
Filed By:
PACIFICORP
Description: Comments

Type: RULING Filing Date: March 3, 2003
Filed By:
CMMR/LYNCH/PUC
Description: PHC is to be held on March 13, 2003.

Type: EXPARTE Filing Date: March 3, 2003
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: On February 26, 2003, Sara Steck Myers, attorney for the Center for Energy Efficiency and Renewable Technologies (CEERT), met with Pres. Peevey in San Francisco. Also present were Julie Fitch and Kevin Coughlan, advisors to Pres. Peevey, V. John White, Executive Director of CEERT, Jonathan Weisgall, Chairman and Vice President, Legislative and Regulatory Affairs, MidAmerican Energy Holdings Company, Don Winslow, Vice-President, PPM Energy, Steve Ponder, Director of Regulatory Affairs-West Coast, FPL Energy, Inc., Dean Anderson, West Region Development Leader, Clipper Windpower, Inc., and David Capparelli, Development Director, RES North America, LLC. Myers indicated CEERT's commitment to renewable generation being a meaningful part of the utilities? long-term integrated resources procurement plans consistent with SB 1078 and Public Utilities Code Section 701.3. Each of the renewable companies represented at the meeting, stated their appreciation for the Commission's commitment to renewable development, including the recently concluded interim renewables solicitations, and also expressed their interest in the timely implementation of SB 1078 and the inclusion of renewable generation in the utilities' long term procurement plans.

Type: COMMENTS Filing Date: February 28, 2003
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
WESTERN POWER TRADING FORUM
Description: concerning criteria and procedures for confidential treatment of procurement data and other issues

Type: PREHEARING CONFERENCE STATEMENT Filing Date: February 28, 2003
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: of CEC

Type: MISCELLANEOUS FILING Filing Date: February 28, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Amended Long-Term Procurement Outline

Type: MOTION Filing Date: February 28, 2003
Filed By:
CITY OF BERKELEY
CITY OF SANTA MONICA
Description: to intervene

Type: COMMENTS Filing Date: February 28, 2003
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: on the ALJ's preliminary assessment of issues and proposed schedule

Type: COMMENTS Filing Date: February 28, 2003
Filed By:
CALPINE CORPORATION
Description: in response to ALJ Ruling from February 18, 2003 PHC

Type: COMMENTS Filing Date: February 28, 2003
Filed By:
CALIFORNIA CONSUMER POWER AND CONSERVATION FINANCIAL AUTHORITY
Description: in response to ALJ's Ruling from February 18, 2003 PHC

Type: COMMENTS Filing Date: February 28, 2003
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: on confidentiality criteria

Type: COMMENTS Filing Date: February 28, 2003
Filed By:
DUKE ENERGY NORTH AMERICA
Description: on ALJ's Ruling from February 18, 2003 PHC

Type: COMMENTS Filing Date: February 28, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: concerning data confidentiality

Type: COMMENTS Filing Date: February 28, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Revised outline of Long-Term Procurement Plan and comments on standardized planning assumptions

Type: COMMENTS Filing Date: February 28, 2003
Filed By:
CITY OF BERKELEY
CITY OF SANTA MONICA
Description: on market scenarios for utility long-term procurement plans regarding community aggregation

Type: COMMENTS Filing Date: February 28, 2003
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: on procurement issues and schedules

Type: COMMENTS Filing Date: February 28, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Reply; to response of SDG&E regarding access to information

Type: COMMENTS Filing Date: February 28, 2003
Filed By:
CAPSTONE TURBINE CORPORATION
CHEVRON ENERGY SOLUTIONS
CUMMINS WEST, INC.
CUMMINS, INC.
ENERGY NEXUS GROUP
HESS MICROGEN
IR ENERGY SYSTEMS
NEXT>EDGE, INC.
NEXTEK POWER SYSTEMS, INC.
NORTHERN POWER SYSTEMS, INC.
REALENERGY, INC.
SOLAR TURBINES, INC.
Description: on the Ruling of the ALJ from February 18, 2003 Prehearing Conference.

Type: COMMENTS Filing Date: February 28, 2003
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: concerning data and information confidentiality.

Type: COMMENTS Filing Date: February 28, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on the ALJ's PHC Statement

Type: COMMENTS Filing Date: February 28, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on PHC Statement of ALJ Walwyn

Type: COMMENTS Filing Date: February 26, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
Description: Confidential Joint comments on the Draft and Alternate Decisions on the DWR's January 7, 2003 Request to Modify D02-09-053.

Type: COMMENTS ON ALTERNATE Filing Date: February 26, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of Cmmr. Peevey addressing petition for modification of D02-09-053 by the DWR.

Type: COMMENTS Filing Date: February 26, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the proposed decision of ALJ Halligan addressing petition for modification of D02-09-053 by the DWR.

Type: COMMENTS Filing Date: February 26, 2003
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: on the draft and alternate decisions adressing the DWR's petition for modification of D02-09-053.

Type: COMMENTS Filing Date: February 26, 2003
Filed By:
ORA/SCARFF/PUC
Description: on the draft and alternate decisions (biomass contracts allocation).

Type: COMMENTS Filing Date: February 26, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
Description: Joint; Public; on the Draft Decision of ALJ Halligan and on the Alternate Draft Decision of Commissioner Peevey on the Department of Water Resources January 7, 2003 Request to Modify Decision 02-09-053. [Public Version]

Type: RULING Filing Date: February 25, 2003
Filed By:
ALJ/ALLEN/PUC
ALJ/GOTTSTEIN/PUC
Description: Solicits comments on the proposed framework and interpretation of SB 1078; comments are due by March 11, reply - by March 17, 2003.

Type: WITHDRAWAL Filing Date: February 25, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of oppositions to request for compensation and motion to amend of the Union of Concerned Scientists

Type: ALTERNATE Filing Date: February 24, 2003
Filed By:
COM/PEEVEY/PUC
Description: addressing petition of DWR for modification of D02-09-053. Comments are due 2/26, no reply comments will be accepted.

Type: DRAFT DECISION Filing Date: February 24, 2003
Filed By:
ALJ/HALLIGAN/PUC
Description: on motions to approve operating agreements; comments are due3/6, reply comments due 3/10.

Type: DRAFT DECISION Filing Date: February 24, 2003
Filed By:
ALJ/HALLIGAN/PUC
Description: addressing the petition of the Department of Water Resources for modification of D02-09-053. Comments are due 2/26. No reply comments will be accepted.

Type: RESPONSE Filing Date: February 24, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: regarding access to information

Type: COMMENTS Filing Date: February 24, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on ALJ Ruling requesting criteria and procedures for confidential treatment of market sensitive procurement data

Type: COMMENTS Filing Date: February 24, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On the classification and protection of confidential information

Type: RESPONSE Filing Date: February 21, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Edison's petition for modification of D02-12-074. [Confidential appendix is attached and filed under seal pursuant to the May 1, 2002 protective order.]

Type: RULING Filing Date: February 21, 2003
Filed By:
ALJ/ALLEN/PUC
Description: setting procedural schedule for the Renewable Portfolio Standard (RPS) phase; Concurrent opening briefs to be filed/served by April 25, reply briefs filed/served by 5/2.

Type: RULING Filing Date: February 21, 2003
Filed By:
ALJ/WALWYN/PUC
Description: transmitting to parties the revised service list and 2/18 prehearing statements.

Type: RESPONSE Filing Date: February 20, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to the ISO's motion

Type: RESPONSE Filing Date: February 20, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Motion of the CA ISO to modify protective order

Type: OPPOSITION Filing Date: February 19, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to the motion of the Union of Concerned Scientists to amend its request for an award of compensation

Type: COMPLIANCE FILING Filing Date: February 18, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Workshop Report On Incentive Mechanism Proposal

Type: REQUEST Filing Date: February 18, 2003
Filed By:
AGLET CONSUMER ALLIANCE
Description: For Award of Compensation

Type: PREHEARING CONFERENCE STATEMENT Filing Date: February 18, 2003
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: in advance of the PHC to be held February 18, 2003

Type: MOTION Filing Date: February 14, 2003
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: For Leave To File Supplemental Comments On Workplan; Supplemental Comments attached.

Type: REQUEST Filing Date: February 14, 2003
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: For Award of Intervenor Compensation

Type: EXPARTE Filing Date: February 13, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: AUGMENTATION REQUIRED. On February 11, 2002, Bruce Foster, Vice President, Regulatory Operations, Southern California Edison Company (Edison), met with Lynn McGhee, advisor to Cmmr. Kennedy, Julie Fitch, advisor to Pres. Peevey, Cmmr. Brown, and Steven Weissman, advisor to Cmmr. Wood, in four separate meetings in San Francisco. At the meeting with Cmmr. Brown also present was David Gamson, advisor to Cmmr. Brown; Lars Bergmann, Director of QF Contracts, participated in all four meetings; and Mike Hoover, Director of Regulatory Affairs, participated in the meetings with Lynne McGhee, Julie Fitch, and Cmmr. Brown. Confidential comments on draft Resolution E-3814 concerning renewables Advice Letter No. 1680-E, dated February 10, 2003, previously filed with the Commission were used. Edison representatives discussed the current status of and issues related to renewable procurement matters.

Type: PREHEARING CONFERENCE STATEMENT Filing Date: February 13, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: pursuant to Rule 6.2

Type: COMMENTS Filing Date: February 11, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: concerning the ruling of the ALJ issuing workplan and collaboration guidelines.

Type: EXPARTE Filing Date: February 11, 2003
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: On February 6, 2003, Nancy A. Rader, Policy Advisor to the California Wind Energy Association (CalWEA), met with Cmmr. Wood, Cmmr. Brown, Lynne McGhee, advisor to Cmmr. Kennedy, and Pres. Peevey in four separate meetings in San Francisco. At the meeting with Cmmr. Wood also present was Steven Weissman, advisor to Cmmr. Wood, and with Pres. Peevey - Julie Fitch, advisor to Pres. Peevey, and Hal Romanowitz and Sheldon Greene, members of CalWEA. Brian O'Sullivan, a member of CalWEA, and Joseph Karp of White & Case LLP, attorney for CalWEA, participated in all four meetings. Written material (attached to the notice) was used. CalWEA representatives discussed conduct by Southern California Edison Company (SCE) that has created undue barriers to the development of renewable resources in California. The CalWEA representatives urged the Commission to investigate SCE's failure to file promptly its advice letter and related conduct. Karp indicated CalWEA's general support for the February 2, 2003 draft Renewable Procurement Standards Collaboration Workplan.

Type: COMMENTS Filing Date: February 10, 2003
Filed By:
CALPINE CORPORATION
Description: on the implementation of the Renewable Portfolio Standard Program

Type: RESPONSE Filing Date: February 10, 2003
Filed By:
CALIFORNIA SOLAR ENERGY INDUSTRIES ASSOCIATION
Description: on the ALJ's Ruling issuing workplan and collaboration guidelines

Type: RESPONSE Filing Date: February 10, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: in support of PG&E's emergency motion to suspend Standard of Conduct #7 in D02-10-062

Type: COMMENTS Filing Date: February 10, 2003
Filed By:
WESTERN POWER TRADING FORUM
Description: On Long-Term Procurement Plan Outlines

Type: COMMENTS Filing Date: February 10, 2003
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: Concerning Draft Workplan For Collaborative Implementation of Renewable Portfolio Standard Program

Type: COMMENTS Filing Date: February 10, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On Workplan and Collaboration Guidelines

Type: COMMENTS Filing Date: February 10, 2003
Filed By:
PACIFICORP
Description: On Workplan

Type: COMMENTS Filing Date: February 10, 2003
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: on the outlines of long-term procurement plans of the investor owned utilities

Type: COMMENTS Filing Date: February 10, 2003
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: on workplan

Type: COMMENTS Filing Date: February 10, 2003
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: on the long-term procurement plan outlines of the investor-owned utilities

Type: COMMENTS Filing Date: February 10, 2003
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: on the long-term procurement plan outlines

Type: COMMENTS Filing Date: February 10, 2003
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: on the proposed workplan for implementation of the California Renewables Portfolio Standard Program

Type: COMMENTS Filing Date: February 10, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on CPUC-CEC Workplan

Type: COMMENTS Filing Date: February 10, 2003
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: on workplan

Type: COMMENTS Filing Date: February 10, 2003
Filed By:
ORA/SCARFF/PUC
Description: on the workplan and collaborative guidelines for the Renewable Portfolio Standard (SB 1078) and the long-term procurement plan outlines (D02-10-062)

Type: COMMENTS Filing Date: February 10, 2003
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: on PG&E outline of long-term procurement plan

Type: EXPARTE Filing Date: February 7, 2003
Filed By:
CALPINE CORPORATION
Description: THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON JANUARY 31, 2003 AND APPEARED IN THE CALENDAR OF FEBRUARY 7, 2003. On January 28, 2003, Joseph E. Ronan, Senior Vice President of Government and Regulatory Affairs, Calpine Corporation (Calpine), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, and Steven F. Greenwald, counsel to Calpine. The Calpine representatives discussed the status of the procurement process. The Calpine representatives expressed support for Commission approval of power purchase agreements executed by Southern California Edison Company for renewable resources in a manner consistent with D02-08-071.

Type: MOTION Filing Date: February 7, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: For Expedited Consideration of Its Petition For Modification of D02-12-074

Type: MOTION Filing Date: February 6, 2003
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: to intervene and file introductory comments and for modification of the protective order; documents attached

Type: RESPONSE Filing Date: February 5, 2003
Filed By:
ORA/SCARFF/PUC
Description: to emergency motion of PG&E for suspension of Standard of Conduct #7 in D02-10-062 for April 1 - September 30, inclusive.

Type: RESPONSE Filing Date: February 5, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to emergency motion of PG&E to suspend standard of conduct no. 7

Type: RESPONSE Filing Date: February 5, 2003
Filed By:
SEMPRA ENERGY RESOURCES
Description: to emergency motion of PG&E

Type: RESPONSE Filing Date: February 5, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to emergency motion of PG&E to suspend standard of conduct no. 7 in D02-10-062 for April 1-Sept. 30, inclusive.

Type: RESPONSE Filing Date: February 5, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: to Applications For Rehearing and Petition For Modification

Type: RESPONSE Filing Date: February 5, 2003
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: to Applications For Rehearing of D02-12-074 by PG&E and Edison

Type: MOTION Filing Date: February 4, 2003
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: to amend its request for an award of compensation

Type: RESPONSE Filing Date: February 4, 2003
Filed By:
ORA/SCARFF/PUC
Description: to the Applications for Rehearing of D02-12-074 filed by Edison, PG&E and SDG&E

Type: COMPLIANCE FILING Filing Date: February 3, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Long-Term Procurement Plan Outline

Type: RULING Filing Date: February 3, 2003
Filed By:
ALJ/ALLEN/PUC
Description: Comments on attached Workplan due 2/10.

Type: REPLY Filing Date: February 3, 2003
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: to Edison's Response to UCS's Request For Compensation in R01-10-024

Type: PETITION FOR MODIFICATION Filing Date: February 3, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: [PUBLIC VERSION] of D02-12-074. [Confidential version is filed separately].

Type: PETITION FOR MODIFICATION Filing Date: February 3, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: [CONFIDENTIAL VERSION, filed pursuant to May 1, 2002 protective order] of D02-12-074.

Type: COMPLIANCE FILING Filing Date: February 3, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Outline of Long Term Procurement Plan

Type: COMPLIANCE FILING Filing Date: February 3, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Outline of Long-Term Procurement Plan

Type: EXPARTE Filing Date: January 31, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: On January 29, 2003, Matthew Freedman, attorney for The Utility Reform Network (TURN), met with Pres. Peevey in San Francisco. Also present were Julie Fitch, advisor to Pres. Peevey, and Tim Tutt representing the California Energy Commission (CEC). Freedman and Tutt expressed their concerns about the interim renewable resource procurement practices of Southern California Edison Company (SCE) pursuant to D02-08-071 and urged the Commission to consider issues raised in confidential protests and comments filed by the CEC and TURN in response to SCE Advice Letters 1676-E and I680-E. In particular, Freedman requested that the Commission grant the CEC and TURN requests for a finding of contempt and that specific modifications to SCE's proposed contracts be ordered.

Type: RULING Filing Date: January 31, 2003
Filed By:
ALJ/WALWYN/PUC
Description: shortening time for response to PG&E's emergency motion; responses to the emergency motion are due on February 5, 2003

Type: EXPARTE Filing Date: January 31, 2003
Filed By:
CALPINE CORPORATION
Description: AUGMENTATION REQUIRED. On January 28, 2003, Joseph E. Ronan, Senior Vice President of Government and Regulatory Affairs, Calpine Corporation (Calpine), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, and Steven F. Greenwald, counsel to Calpine. Calpine representatives discussed the status of the procurement process.

Type: EXPARTE Filing Date: January 31, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On January 29, 2002, Michael R. Hoover, Southern California Edison Company (SCE), met with Cmmr. Wood in San Francisco. Also present were Gary Schoonyan and Pedro Pizarro of SCE. Written material (attached to the notice) was used. SCE representatives provided the Commission with an update of the issues, approaches and major assumptions which SCE would address in its February 3, 2003 filing of an outline of its long-term integrated resource plan.

Type: MOTION Filing Date: January 29, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Emergency; for Suspension of Standard of Conduct No.7 in D.02-10-062 for April 1 - September 30, inclusive.

Type: RESPONSE Filing Date: January 28, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to ALJ's Rulng requesting additional information

Type: COMMENTS Filing Date: January 27, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: regarding the Dept. of Water Resources' proposed allocation of four biomass contracts

Type: EXPARTE Filing Date: January 27, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On January 22, 2002, Bruce Foster, Vice President, Regulatory Operations of Southern California Edison Company (SCE), met with Pres. Peevey and Cmmr. Brown in two separate meetings in San Francisco. At the meeting with Pres. Peevey also present were Kevin Coughlan and Julie Fitch, advisors to Pres. Peevey, and with Cmmr. Brown - David Gamson, advisor to Cmmr. Brown. Gary Schoonyan and Pedro Pizarro of Edison attended both meetings. Written material (attached to the notice) was used. Edison representatives provided the Commission with an update on the issues, approaches and major assumptions which Edison would address in its February 3, 2003 filing of an outline of its long-term integrated resource plan.

Type: EXPARTE Filing Date: January 27, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On January 22, 2002, Bruce Foster, Vice President, Regulatory Operations of Southern California Edison Company (SCE), met with Lynne McGhee, advisor to Cmmr. Kennedy, Cmmr. Brown and Pres. Peevey in three separate meetings in San Francisco. At the meeting with Cmmr. Brown also present was David Gamson, advisor to Cmmr. Brown, and with Pres. Peevey - Kevin Coughlan and Julie Fitch, advisors to Pres. Peevey. Lars Bergmann, Director of QF Contracts, Edison, attended all three meetings. Written material (attached to the notice) was used. Foster and Bergmann discussed the renewable contracts filed in Advice Letter 1676-E and the points on the document attached to the notice.

Type: COMMENTS Filing Date: January 27, 2003
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: to CDWR's petition for modification of D02-09-053 /pursuant to the January 17, 2003 ruling/

Type: COMMENTS Filing Date: January 27, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: CONFIDENTIAL - FILED UNDER SEAL; in response to the Ruling of the ALJ on Department of Water Resources Request to Modify Decision 02-09-053.

Type: COMMENTS Filing Date: January 24, 2003
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: reply; on the CDWR's petition for modification of D09-09-053

Type: RULING Filing Date: January 24, 2003
Filed By:
ALJ/HALLIGAN/PUC
Description: Requesting additional information from PG&E to be filed/served by 1/28/03.

Type: EXPARTE Filing Date: January 24, 2003
Filed By:
UTILITY REFORM NETWORK
Description: On January 22, 2003, Matthew Freedman, attorney for The Utility Reform Network (TURN), met with Cmmr. Brown in San Francisco. Also present were Peter Hanson, advisor to Cmmr. Brown, and Tim Tutt representing the California Energy Commission (CEC). Copies of TURNs confidential protests in response to Southern California Edisons (SCE) Advice Letters 1676-E and I680-E filed with the Commission and of a data requests (attached to the notice) from SCE to TURN were used. Freedman and Tutt expressed their concerns about the interim renewable resource procurement practices of SCE and urged the consideration of issues raised in the confidential protests. In particular, Freedman requested that the Commission grant the CEC and TURN requests for a finding of contempt and that specific modifications to SCEs proposed contracts be ordered.

Type: NOTICE Filing Date: January 23, 2003
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: of Meeting.

Type: EXPARTE Filing Date: January 22, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: LATE FILED. On January 7, 2002, Bruce Foster, Vice President, Regulatory Operations of Southern California Edison Company (SCE), met with Lynne McGhee, advisor to Cmmr. Kennedy, Kevin Coughlan, advisor to Pres. Peevey, and Robert Kinosian, advisor to Cmmr. Lynch, in three separate meetings in San Francisco. At the meeting with Kevin Coughlan also present were Julie Fitch, advisor to Pres. Peevey, and Laura Krannawitter, advisor to Cmmr. Kennedy. Harold Ray, Executive Vice President of SCE, participated in all three meetings. Foster and Ray expressed SCE's view that the Commission's addition of The Utility Reform Network's 1 cents/kWh hedging criteria to the Assembly Bill 57 procurement plan adopted by the Commission effectively prevents SCE from securing any procurement further ahead than 30 days. Foster and Ray suggested that the Commission should waive the 1 cents/kWh criterion for procurement of less than one year.

Type: REHEARING REQUEST Filing Date: January 21, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: of Decision 02-12-069

Type: REHEARING REQUEST Filing Date: January 21, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of D02-12-074.

Type: REHEARING REQUEST Filing Date: January 21, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: of Decision 02-12-074

Type: REHEARING REQUEST Filing Date: January 21, 2003
Filed By:
SEMPRA ENERGY RESOURCES
Description: of Decision 02-12-074

Type: REHEARING REQUEST Filing Date: January 21, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Decision 02-12-074 (Public Version)

Type: REHEARING REQUEST Filing Date: January 21, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: [CONFIDENTIAL VERSION] of Decision 02-12-074

Type: COMMENTS Filing Date: January 17, 2003
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: Amended, Reply; on implementation of SB 1078.

Type: RULING Filing Date: January 17, 2003
Filed By:
ALJ/HALLIGAN/PUC
Description: Directing that the 1/7/03 memorandum submitted by the Department of Water Resources be treated as a petition to modify D02-09-053. Comments are due 1/27; DWR reply comment due by 1/31.

Type: RESPONSE Filing Date: January 17, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to the request for an award of compensation of the Union of Concerned Scientists

Type: PETITION FOR MODIFICATION Filing Date: January 17, 2003
Filed By:
DEPARTMENT OF WATER RESOURCES
Description: of D02-09-053. (See 1/17/03 ALJ Halligan Ruling)

Type: EXPARTE Filing Date: January 16, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: LATE FILED. On December 11, 2002, Bruce Foster, Vice President, Regulatory Operations of Southern California Edison Company (SCE), met with Cmmr. Brown in San Francisco. Also present were David Gamson and Peter Hanson, advisors to Cmmr. Brown, and Mike Hoover, Director of Regulatory Affairs of SCE. Written material (attached to the notice) was used. Foster and Hoover stated that the Commission should not order SCE to enter into an operating agreement with the Department of Water Resources.

Type: COMMENTS Filing Date: January 15, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the California Department of Water Resources' Petition for Modification of Decision 02-09-053.

Type: RESPONSE Filing Date: January 15, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to Department of Water Resources Petition to Modify D.02-09-053.

Type: COMMENTS Filing Date: January 15, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the California Department of Water Resources' Petition to Modify D.02-09-053 to Reallocate the Williams Contract.

Type: EXPARTE Filing Date: January 14, 2003
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: On January 10, 2003, Peter H. Weiner, representing the California Biomass Energy Alliance (CBEA), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present was Jon Welner of CBEA. CBEA representatives stated that to the extent that the Commission finds that one or more utilities are not in compliance with the Commission's 1% interim renewables requirement, the Commission should quickly develop and implement mechanisms that will assure swift and total compliance.

Type: COMMENTS Filing Date: January 13, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; concerning implementation of renewable portfolio standard program and proposed procedural schedule.

Type: RESPONSE Filing Date: January 13, 2003
Filed By:
CALIFORNIA SOLAR ENERGY INDUSTRIES ASSOCIATION
Description: on implementation of the Renewable Portfolio Standard Program.

Type: COMMENTS Filing Date: January 13, 2003
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: Reply; on the implementation of SB 1078.

Type: COMMENTS Filing Date: January 13, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: Reply; on implementation issues related to the California Renewables Portfolio Standard (SB 1078).

Type: COMMENTS Filing Date: January 13, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on implementation of SB 1078.

Type: COMMENTS Filing Date: January 13, 2003
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: Reply; on implementation of SB 1078.

Type: COMMENTS Filing Date: January 13, 2003
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: Reply; on the implementation of the California Renewables Portfolio Standard Program.

Type: COMMENTS Filing Date: January 13, 2003
Filed By:
ORA/SCARFF/PUC
Description: Reply; on the implementation of the Renewable Portfolio Standard Program.

Type: COMMENTS Filing Date: January 13, 2003
Filed By:
CHATEAU ENERGY, INC.
Description: Reply to; on the implementation of SB 1078.

Type: COMMENTS Filing Date: January 13, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; regarding implementation of the Renewable Portfolio Standard Program.

Type: COMMENTS Filing Date: January 13, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: Reply; on SB 1078 implementation matters.

Type: PETITION Filing Date: January 8, 2003
Filed By:
GREEN POWER INSTITUTE
Description: for leave to intervene

Type: REPLY Filing Date: January 8, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to Edison's Response to Joint Emergency Motion of PG&E and SDG&E

Type: REPLY Filing Date: January 8, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to response of Edison

Type: RULING Filing Date: January 7, 2003
Filed By:
ALJ/THOMAS/PUC
Description: granting the motions of Edison and SDG&E requesting review of non-disclosure agreements proposed for procurement review groups.

Type: COMMENTS Filing Date: January 6, 2003
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on SB 1078 implementation matters [in response to D02-10-062]

Type: RESPONSE Filing Date: January 6, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to joint emergency motion of PG&E and SDG&E

Type: PETITION Filing Date: January 6, 2003
Filed By:
CHATEAU ENERGY, INC.
Description: to Intervene; Comments included.

Type: PETITION Filing Date: January 6, 2003
Filed By:
CALIFORNIA SOLAR ENERGY INDUSTRIES ASSOCIATION
Description: for leave to intervene; comments attached

Type: COMMENTS Filing Date: January 6, 2003
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: on the implementation of the California Renewables Portfolio Standard Program

Type: COMMENTS Filing Date: January 6, 2003
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: on the implementation of SB 1078

Type: COMMENTS Filing Date: January 6, 2003
Filed By:
ORA/SCARFF/PUC
Description: On the implementation of the Renewable Portfolio Standard Program

Type: COMMENTS Filing Date: January 6, 2003
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: on RPS implementation issues identified in D02-10-062

Type: COMMENTS Filing Date: January 6, 2003
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on implementation of SB 1078

Type: COMMENTS Filing Date: January 6, 2003
Filed By:
THE UTILITY REFORM NETWORK
Description: on implementation issues related to the California Renewables Protfolio Standard

Type: COMMENTS Filing Date: January 6, 2003
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: on implementation on SB 1078

Type: COMMENTS Filing Date: January 6, 2003
Filed By:
SOOUTHERN CALIFORNIA EDISON COMPANY
Description: concerning implementation of Renewable Portfolio Standard Program and proposed procedural schedule

Type: COMMENTS Filing Date: January 6, 2003
Filed By:
GREEN POWER INSTITUTE
Description: /re: implementation of the state's Renewable Portfolio Standard program.

Type: COMMENTS Filing Date: January 6, 2003
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: regarding implementation of the renewables portfolio standard program /pursuant to the schedule established in D02-10-062/.

Type: COMPLIANCE FILING Filing Date: January 2, 2003
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: re: 2001 Retail Sales Figure.

Type: REHEARING REQUEST Filing Date: December 30, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of D02-12-069.

Type: RESPONSE Filing Date: December 27, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Emergency Motion of [SDG&E] for Reconsideration and Suspension of Standard of Conduct No.7 in D.02-10-062.

Type: RESPONSE Filing Date: December 26, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to December 23, 2002 [Electronic] Ruling of Assistant Chief ALJ Minkin.

Type: RESPONSE Filing Date: December 26, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to SDG&E Emergency Motion for Reconsideration and Suspension of Standard of Conduct No. 7 in D.02-10-062.

Type: RESPONSE Filing Date: December 24, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to December 23, 2002 Ruling of Assistant Chief ALJ (Minkin).

Type: MOTION Filing Date: December 23, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Emergency; for Reconsideration and Suspension of Standard of Conduct No.7 in D.02-10-062.

Type: WITHDRAWAL Filing Date: December 23, 2002
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: of Motion to Shorten Time

Type: RESPONSE Filing Date: December 23, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to Motion of the Western Power Trading Forum for Disclosure of Utility Forecasts and Reserve Levels.

Type: REQUEST Filing Date: December 23, 2002
Filed By:
THE UTILITY REFORM NETWORK
Description: for an award of compensation for substantial contributions to D02-08-071, D02-10-062 and the interim procurement process

Type: OPPOSITION Filing Date: December 23, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Motion of the Western Power Trading Forum for disclosure of utility forecasts and reserve levels

Type: EXPARTE Filing Date: December 20, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On December 16, 2002, William Stock, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Robert Kinosian, advisor to Pres. Lynch, in San Francisco. Also present was Les Guliasi, Director of Regulatory Relations, for PG&E. Guliasi and Stock discussed how the Commission should adopt a maximum disallowance risk associated with the administration of the California Department of Water Resources (CDWR) contracts, and that the cap be equal to PG&E's incremental costs incurred to administer the CDWR contracts. Guliasi and Stock noted that the draft decision (DD) needed to be modified so that contractual issues, such as the creation of a limited agency relationship with CDWR, are agreed to in a separate operating agreement rather than including them in the Commission order. Guliasi and Stock also noted that the DD should be modified to ensure that CDWR indemnifies PG&E or, if CDWR does not indemnify PG&E, such costs should be recoverable in rates.

Type: RULING Filing Date: December 20, 2002
Filed By:
COMMR/LYNCH/PUC
Description: Requesting additional information and comments: additional information is due on January 6, 2003; comments are due on January 15, 2003

Type: REQUEST Filing Date: December 20, 2002
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: For an Award of Compensation For Substantial Contributions to Rulemaking 01-10-024

Type: PETITION FOR MODIFICATION Filing Date: December 20, 2002
Filed By:
DEPARTMENT OF WATER RESOURCES
Description: of D02-09-053.

Type: MOTION Filing Date: December 20, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Expedited Joint; for Stay of Decision No.02-12-069.

Type: MOTION Filing Date: December 20, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Expedited; to terminate operating order and approve operating agreement.

Type: COMPLIANCE FILING Filing Date: December 19, 2002
Filed By:
ALJ/WALWYN/PUC
Description: in compliance with D02-12-074, Ordering Paragraph 2: Confidential appendices A (re: PG&E's Procurement Plan); B (re: Edison's procurement plan); and C (re: SDG&E's procurement plan) filed under seal, subject to the May 1, 2002 protective order.

Type: MOTION Filing Date: December 19, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: requesting consideration and approval of Operating Agreement with the Department of Water Resources regarding contract administration.

Type: EXPARTE Filing Date: December 18, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: LATE FILED. On December 12, 2002, William Stock, Chief of Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Laura Krannawitter, advisor to Cmmr. Duque, in San Francisco. Also present were Roy Kuga, Director, Gas and Electric Supply, and Bill Manheim, Attorney, for PG&E. PG&E representatives discussed how the Commission should adopt a maximum disallowance risk associated with the administration of the California Department of Water Resources (CDWR) contracts, and that the cap be equal to PG&E's incremental costs incurred to administer the CDWR contracts. PG&E representatives noted that the draft decision (DD) needed to be modified so that contractual issues, such as the creation of a limited agency relationship with CDWR, are agreed to in a separate operating agreement rather than including them in the Commission order. PG&E representatives also noted that the DD should be modified to ensure that CDWR indemnifies PG&E or, if CDWR does not indemnify PG&E, such costs should be recoverable in rates.

Type: RESPONSE Filing Date: December 18, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: In opposition to motion of Western Power Trading Forum for disclosure of utility forecasts and reserve levels

Type: EXPARTE Filing Date: December 18, 2002
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: LATE FILED. On December 11, 2002, Peter H. Weiner, representing the California Biomass Energy Alliance (CBEA), met with Cmmr. Peevey in San Francisco. Also present were Julie Fitch, advisor to Cmmr. Peevey, and Kent Duysen, LeRoy Pope, John Richardson, Patrick Volkar and Jon Welner, of CBEA. CBEA representatives stated that a number of biomass facilities submitted bids in the interim renewable power solicitations and did not receive contracts. CBEA representatives urged the Commission to find some way to prevent these facilities from shutting down

Type: EXPARTE Filing Date: December 17, 2002
Filed By:
CALPINE CORPORATION
Description: On December 12, 2002, Joseph E. Ronan, Senior Vice President of Government and Regulatory Affairs, Calpine Corporation (Calpine), met with Cmmr. Brown and Lynne McGhee, advisor to Cmmr. Duque, in two separate meetings in San Francisco. At the meeting with Cmmr. Brown also present was Jeremiah Hallisey, consultant to Calpine. Curt Hildebrand, Vice President of Project Development, and Steven S. Schleimer, Director of Market and Regulatory Affairs, of Calpine, participated in both meetings. The Calpine representatives addressed the eligibility of geothermal energy with respect to utility procurement of renewable power.

Type: RULING Filing Date: December 17, 2002
Filed By:
ALJ/WONG/HALLIGAN/PUC
Description: Grants Edison's motion for leave to file late comments on the draft decisions regarding the Operating Order and Servicing Order, filed on Dec. 10, 2002. Comments should be filed as of December 10, 2002.

Type: REQUEST Filing Date: December 17, 2002
Filed By:
CONSUMERS UNION
Description: for an Award of Compensation for Substantial Contribution to D.02-10-062 and D.02-08-071.

Type: COMMENTS Filing Date: December 16, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply;

Type: EXPARTE Filing Date: December 16, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: LATE FILED. On December 9, 2002, Alan J. Fohrer, Chairman, President and Chief Executive Officer of Southern California Edison Company (SCE), met with Cmmr. Wood in San Francisco. Also present were Steven Weissman and Manuel Ramirez, advisors to Cmmr. Wood, and Bruce Foster, Vice President, Regulatory Operations of SCE. Written material (attached to the notice) was used. Fohrer and Foster stated that the Commission should not order SCE to enter into an operating agreement with the Department of Water Resources.

Type: COMMENTS Filing Date: December 16, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; to comments on Draft Decision of ALJ Halligan.

Type: COMMENTS Filing Date: December 13, 2002
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: on the status of negotiations and contracts between investor-owned utilities and existing renewable facilities

Type: MOTION Filing Date: December 13, 2002
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: for consideration of CAC comments on the utilities' procurement plan filings; comments attached.

Type: MOTION Filing Date: December 13, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: for leave to file response to "Comments of CAC on the utilities' short-term procurement plan filings" and "Update of CBEA on contract status of existing renewable facilities"; response attached.

Type: COMMENTS ON ALTERNATE Filing Date: December 12, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On Alternate Draft Decision of Commr. Peevey

Type: RESPONSE Filing Date: December 12, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to the motion of Biomass Energy Alliance to compel compliance with D01-08-071

Type: EXPARTE Filing Date: December 12, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On December 9, 2002, Bill Stock, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Kevin Coughlan, advisor to Cmmr. Peevey, and Manuel Ramirez, advisor to Cmmr. Wood, in two separate meetings in San Francisco. At the meeting with Manuel Ramirez also present was Steve Weissman, advisor to Cmmr. Wood. Roy Kuga, Director, Gas and Electric Supply, and Bill Manheim, Attorney, for PG&E, participated in both meetings. PG&E representatives discussed how the Commission should adopt a maximum disallowance risk associated with the administration of the California Department of Water Resources (CDWR) contracts, and that the cap be equal to PG&E's incremental costs incurred to administer the CDWR contracts. PG&E representatives noted that the draft decision (DD) needed to be modified so that contractual issues, such as the creation of a limited agency relationship with CDWR, are agreed to in a separate operating agreement rather than including them in a CPUC order. PG&E representatives also suggested that the DD should be modified to ensure that CDWR indemnifies PG&E or, if CDWR does not indemnify PG&E, such costs should be recoverable in rates.

Type: COMMENTS ON ALTERNATE Filing Date: December 12, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Draft Decision of Commissioner Peevey.

Type: COMMENTS ON ALTERNATE Filing Date: December 12, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Draft Decision of Commissioner Peevey.

Type: COMMENTS Filing Date: December 10, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Draft Decisions as to an Operating Order and Servicing Order for DWR.

Type: RESPONSE Filing Date: December 10, 2002
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: to Applications for Rehearing of Decision 02-10-062 by [Edison} and PG&E.

Type: RESPONSE Filing Date: December 10, 2002
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: to Applications for Rehearing of Decision 02-10-062.

Type: RESPONSE Filing Date: December 10, 2002
Filed By:
THE UTILITY REFORM NETWORK
Description: to the Applications for Rehearing of Decision 02-10-062.

Type: OPPOSITION Filing Date: December 10, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to Petition of the Independent Energy Producers Association for Commission Review of Redacted Materials.

Type: MOTION Filing Date: December 10, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: for Leave to file late Comments on Draft Decisions as to an Operating Order and Servicing Order for DWR.

Type: COMMENTS Filing Date: December 9, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on Draft Decision of ALJ Halligan

Type: RESPONSE Filing Date: December 9, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Petition of IEP for Commission review of redacted materials

Type: MISCELLANEOUS FILING Filing Date: December 9, 2002
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: Update on contract status of existing renewable facilities.

Type: EXPARTE Filing Date: December 9, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On December 4, 2002, Les Guliasi, Director, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with David Gamson, advisor to Cmmr. Brown, and Robert Kinosian, advisor to Pres. Lynch, in two separate meetings in San Francisco. Also present were Roy Kuga, Director, Gas and Electric Supply, and Bill Manheim, Attorney, for PG&E. PG&E representatives stated that the Commission should adopt a maximum disallowance risk associated with the administration of the California Department of Water Resources (CDWR) contracts, and that the cap be equal to PG&E's incremental costs incurred to administer the CDWR contracts. PG&E representatives noted that the draft decision (DD) needed to be modified to insure that surplus sales should be sold under the utility's procurement plan and therefore not be subject to reasonableness review. PG&E representatives also noted that the cost of financial hedges for the CDWR contracts should be borne by CDWR and recovered as a part of the CDWR revenue requirement. PG&E representatives suggested that the DD should be modified to ensure that CDWR indemnifies PG&E or, if CDWR does not indemnify PG&E, such costs should be recoverable in rates. PG&E representatives also stated PG&E's continuing objection to any general effort to compel any forced assumption of CDWR contract operation, dispatch, fuel procurement, administration, or other duties.

Type: COMMENTS Filing Date: December 9, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: [REDACTED] reply; to comments on PG&E's interim 2003 procurement plan. [Redacted pursuant to the May 1, 2002 protective order]

Type: COMMENTS Filing Date: December 9, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: [UNREDACTED] reply to comments on PG&E's interim 2003 procurement plan. [Filed under seal pursuant to the May 1, 2002 protective order].

Type: COMMENTS Filing Date: December 9, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on Draft Decision of ALJ Halligan.

Type: COMMENTS Filing Date: December 9, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply;

Type: COMMENTS Filing Date: December 9, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on Modified short-term Procurement Plan [REDACTED].

Type: MOTION Filing Date: December 6, 2002
Filed By:
WESTERN POWER TRADING FORUM
Description: for disclosure of utility forecasts and reserve levels

Type: REPLY Filing Date: December 6, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to responses to petition to modify D02-10-062

Type: NOTICE Filing Date: December 6, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMAPNY
Description: of scheduled individual ex parte communication meeting

Type: NOTICE Filing Date: December 6, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of scheduled individual ex parte communication meeting

Type: ALTERNATE Filing Date: December 5, 2002
Filed By:
COM/PEEVEY/PUC
Description: comments are due 12/12. No reply comments will be accepted.

Type: RESPONSE Filing Date: December 5, 2002
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: Response to Applications for Rehearing of Decision 02-10-062 by PG&E, Southern California Edison Company, SDG&E, Sempra Energy Resources, and Cogeneration Association of California

Type: RESPONSE Filing Date: December 5, 2002
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: Response to Petitions for Modification of Decision 02-10-062 by the Center for Energy Efficiency and Renewable Technologies, Independent Energy Producers Association, California Power Authority, PG&E, and Consumers Union

Type: MOTION Filing Date: December 5, 2002
Filed By:
ORA/TUDISCO/PUC
Description: for acceptance of late-filed comments on SDG&E's procurement plan; comments attached

Type: EXPARTE Filing Date: December 5, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On December 2, 2002, Bill Stock, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Kevin Coughlan, advisor to Cmmr. Peevey, in San Francisco. Also present were Roy Kuga, Director, Gas and Electric Supply, and Bill Manheim, Attorney, for PG&E. Manheim stated that the Commission should adopt a maximum disallowance risk associated with the administration of the California Department of Water Resources (CDWR) contracts, and that the cap be equal to PG&E's incremental costs incurred to administer the CDWR contracts. Kuga stated that the draft decision (DD) needed to be modified to ensure that surplus sales should be sold under the utility's procurement plan and therefore not be subject to reasonableness review. Kuga also noted that the cost of financial hedges for the CDWR contracts should be borne by CDWR and recovered as part of the CDWR revenue requirement. Manheim stated that the DD should be modified to ensure that CDWR indemnifies PG&E or, if CDWR does not indemnify PG&E, such costs should be recoverable in rates. Manheim and Kuga also registered PG&E's continuing objection to any general effort to compel any forced assumption of CDWR contract operation, dispatch, fuel procurement, or other duties.

Type: COMMENTS Filing Date: December 4, 2002
Filed By:
THE UTILITY REFORM NETWORK
Description: [UNREDACTED VERSION] on Southern California Edison Company's modified short-term procurement plan pursuant to D.02-10-062.

Type: OPPOSITION Filing Date: December 4, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Petition of the IEPA for Commission review of redacted materials

Type: LAW & MOTION Filing Date: December 4, 2002
Filed By:
ORA/TUDISCO/PUC
Description: to submit under seal a non-redacted version of comments on the utilities' procurement proposals

Type: COMMENTS Filing Date: December 4, 2002
Filed By:
ORA/SCARFF/PUC
Description: REDACTED. On the utilities' procurement proposals

Type: COMMENTS Filing Date: December 4, 2002
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: on interim procurement plans filed by PG&E, Edison, and SDG&E; pursuant to D02-10-062

Type: COMMENTS Filing Date: December 4, 2002
Filed By:
THE UTILITY REFORM NETWORK
Description: on PG&E Company's Generation Procurement Plan testimony responding to D.02-10-062. [REDACTED VERSION]

Type: COMMENTS Filing Date: December 4, 2002
Filed By:
THE UTILITY REFORM NETWORK
Description: on Southern California Edison Company's modified short-term procurement plan pursuant to D.02-10-062. {REDACTED VERSION]

Type: COMMENTS Filing Date: December 4, 2002
Filed By:
THE UTILITY REFORM NETWORK
Description: [UNREDACTED VERSION] on PG&E Company's Generation Procurement Plan testimony responding to D.02-10-062.

Type: COMMENTS Filing Date: December 3, 2002
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: On the utilities' short-term procurement plan filings

Type: RESPONSE Filing Date: December 3, 2002
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: Response to PG&E's petition for modification of D.02-10-062

Type: RESPONSE Filing Date: December 3, 2002
Filed By:
THE UTILITY REFORM NETWORK
Description: Response to the petitions to modify Decision 01-10-062 of PG&E, The Independent Energy Producers, and Center for Energy Efficiency and Renewable Technologies

Type: RESPONSE Filing Date: December 3, 2002
Filed By:
SEMPRA ENERGY RESOURCES
Description: Response to Petition of PG&E for Modification of Decision 02-10-062

Type: MOTION Filing Date: December 2, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to approve Non-Disclosure Agreement for Edison Procurement Review Group

Type: PETITION FOR MODIFICATION Filing Date: December 2, 2002
Filed By:
CONSUMERS UNION
Description: of D02-10-062 to remove provisions preventing utility power contracting and response to the Applications for Rehearing on reliability provisions.

Type: EXPARTE Filing Date: November 27, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On November 22, 2002, Bill Stock, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Kevin Coughlan, advisor to Cmmr. Peevey, in San Francisco. Also present were Les Guliasi, Director, Regulatory Relations, Roy Kuga, Director, Gas and Electric Supply, and Bill Manheim, Attorney, for PG&E. Manheim stated that the plan approved by the Commission needs to include a trigger mechanism to ensure that cost recovery timely tracks procurement costs incurred. Kuga stated that approval of the plan constitutes up-front approval of the procurement costs and that PG&Es reasonableness exposure is limited to the utilitys cost of administering the contracts.

Type: RULING Filing Date: November 27, 2002
Filed By:
ALJ/WALWYN/PUC
Description: grants ORA's request for extension of time to file comments to Dec. 9.

Type: MOTION Filing Date: November 27, 2002
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: to compel Edison to comply with D02-08-071

Type: EXPARTE Filing Date: November 27, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On November 22, 2002, Bill Stock, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Laura Krannawitter, advisor to Cmmr. Duque, in San Francisco. Also present were Lynne McGhee, advisor to Cmmr. Duque, and Les Guliasi, Director, Regulatory Relations, Roy Kuga, Director, Gas and Electric Supply, and Bill Manheim, Attorney, for PG&E. Kuga stated that PG&E intends to continue to work with the Commission to ensure that the procurement plan meets the requirements of SB 1976. Manheim stated that the plan approved by the Commission needs to include a trigger mechanism to ensure that cost recovery timely tracks procurement costs incurred. Kuga stated that approval of the plan constitutes up-front approval of the procurement costs and that PG&E's reasonableness exposure is limited to the utility?s cost of administering the contracts.

Type: PETITION Filing Date: November 26, 2002
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: Petition for Commission review of redacted materials

Type: EXPARTE Filing Date: November 25, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On November 20, 2002, Bill Stock, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present were Les Guliasi, Director, Regulatory Relations, Roy Kuga, Director, Gas and Electric Supply, and Bill Manheim, Attorney, for PG&E. Manheim stated that the plan approved by the Commission needs to include a trigger mechanism to ensure that cost recovery timely tracks procurement costs incurred. Kuga stated that approval of the plan constitutes up-front approval of the procurement costs and that PG&E's reasonableness exposure is limited to the utility's cost of administering the contracts.

Type: REHEARING REQUEST Filing Date: November 25, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of D02-10-062.

Type: REHEARING REQUEST Filing Date: November 25, 2002
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: and Petition for Modificaiton of D02-10-062.

Type: REHEARING REQUEST Filing Date: November 25, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: of Decision 02-10-062.

Type: REHEARING REQUEST Filing Date: November 25, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of Decision 02-10-062.

Type: REHEARING REQUEST Filing Date: November 25, 2002
Filed By:
SEMPRA ENERGY RESOURCES
Description: of Decision 02-10-062.

Type: PETITION FOR MODIFICATION Filing Date: November 25, 2002
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: and Application for Rehearing of D02-10-062.

Type: MOTION Filing Date: November 22, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: for leave to file supplement to interim short-term procurement plan for 2003. Supplement attached.

Type: RULING Filing Date: November 22, 2002
Filed By:
ALJ/WALWYN/PUC
Description: Shortens response time to PG&E's petition to modify D02-10-062 to Dec. 3, 2002. PG&E is given permission to reply on Dec. 6.

Type: PETITION FOR MODIFICATION Filing Date: November 22, 2002
Filed By:
CENTER FOR EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: of D02-10-062.

Type: PETITION FOR MODIFICATION Filing Date: November 22, 2002
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: of Decision 02-10-062 to remove commercially infeasible requirements.

Type: MOTION Filing Date: November 20, 2002
Filed By:
SAN DIEGO GAS AND ELECTRIC COMPANY
Description: to Approve Non-Disclosure Agreement For Procurement Review Group

Type: REQUEST Filing Date: November 20, 2002
Filed By:
AGLET CONSUMER ALLIANCE
Description: Request for award of compensation

Type: PETITION FOR MODIFICATION Filing Date: November 20, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of Decision 02-10-062.

Type: MOTION Filing Date: November 20, 2002
Filed By:
PACIFIC GAS AND ELECTRIC CO0MPANY
Description: for Ordering Shortening Time for Responses and Replies.

Type: DRAFT DECISION Filing Date: November 19, 2002
Filed By:
ALJ/HALLIGAN/PUC
Description: Comments are due 12/9, reply comments due 12/16.

Type: MISCELLANEOUS FILING Filing Date: November 15, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: [CONFIDENTIAL VERSION] Revised 2003 Procurement Plan.

Type: MISCELLANEOUS FILING Filing Date: November 15, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Revised 2003 Procurement Plan [REDACTED VERSION].

Type: COMPLIANCE FILING Filing Date: November 14, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Modified Short-Term Procurement Plan pursuant to D02-10-062 Volume II - Redacted Version

Type: MISCELLANEOUS FILING Filing Date: November 14, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Modified short-term procurement plan pursuant to D.02-10-062 Volume II - REDACTED VERSION.

Type: MISCELLANEOUS FILING Filing Date: November 12, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Modified short-term procurement plan pursuant to D.02-10-062 Volume I and Declaration of Susan Abbott.

Type: COMMENTS Filing Date: November 8, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On Supplemental Filing of Department of Water Resources

Type: RULING Filing Date: November 8, 2002
Filed By:
ALJ/HALLIGAN/PUC
Description: granting motion to file updated information of SDG&E

Type: MOTION Filing Date: November 8, 2002
Filed By:
MORGAN, LEWIS AND BOCKIUS LLP
Description: to Intervene

Type: COMMENTS Filing Date: November 8, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply Comments on the Draft Operating Agreement

Type: MOTION Filing Date: November 6, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Seeking leave to file updated information on the California Department of Water Resources Draft Operating Agreement

Type: REPLY Filing Date: November 4, 2002
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: Reply to PG&E's response to petition for modification of D.02-08-071 (filing authorized by ALJ Walwyn)

Type: RESPONSE Filing Date: October 31, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: To Petition by California Biomass Energy Alliance For Modification of D02-08-071

Type: COMMENTS Filing Date: October 23, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on California Department of Water Resources' Agreements.

Type: REHEARING REQUEST Filing Date: October 23, 2002
Filed By:
SEMPRA ENERGY RESOURCES
Description: of D02-09-053.

Type: REHEARING REQUEST Filing Date: October 23, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: of D02-09-053.

Type: REHEARING REQUEST Filing Date: October 23, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of D02-09-053.

Type: COMMENTS Filing Date: October 23, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Reply Comments on Draft DWR Operating Agreement

Type: COMMENTS Filing Date: October 23, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Reply Comments on Proposed Reasonableness Standards For Utility Administration of Allocated DWR Contracts

Type: COMMENTS Filing Date: October 23, 2002
Filed By:
SAN DIEGO GAS AND ELECTRIC COMPANY
Description: Reply Comments on the Draft Operating Agreement

Type: COMMENTS Filing Date: October 22, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: reply; on alternate decision of Com Peevey

Type: EXPARTE Filing Date: October 22, 2002
Filed By:
IMC CHEMICALS, INC.
Description: On October 17, 2002, Joseph Karp of White & Case LLP, attorney for IMC Chemicals, Inc. (IMC), had three separate telephone contacts with Lynne McGhee, advisor to Cmmr. Duque, Julie Fitch, advisor to Cmmr. Peevey, and Belinda Gatti, advisor to Cmmr. Brown. Karp stated that Southern California Edison Company (Edison) is asking IMC to sign a Revised Standard Offer 1 form contract that would require IMC to arrange for its own interconnection, scheduling and metering services. Karp stated that IMC plans to file a motion to require Edison to maintain interconnection with IMC and to purchase power from IMC at the short-run avoided cost prices.

Type: COMMENTS Filing Date: October 22, 2002
Filed By:
AGLET CONSUMER ALLIANCE
Description: Reply Comments on Proposed Decision of ALJ Walwyn

Type: COMMENTS Filing Date: October 22, 2002
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: reply; on the alernate decisio of Com Peevey establishing interim procurement and cost recovery mechanisms.

Type: COMMENTS Filing Date: October 21, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply Comments on ALJ Walwyn Proposed Decision

Type: EXPARTE Filing Date: October 21, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On October 16, 2002, Bill Stock, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Cmmr. Brown and Cmmr. Duque in two separate meetings in San Francisco. Stock stated that ALJ's proposed decision (PD) to be consistent with AB 57 and SB 1078 must be changed to establish a regulatory framework that supports PG&E's return to investment grade credit ratings. Stock also suggested that the PD's contracting requirements and tests, which will choke-off critical avenues for power procurement must be eliminated. Stock also stated that the PD's language must be changed to limit reasonableness review for the utilities' power procurement contracts only to the scope allowed in AB 57. Stock noted that the alternate contains some of the same problems as the PD. Stock also stated that the 15% reserve margin requirement in the alternate should not be adopted. Stock also explained that the 5% spot procurement guideline in the alternate should be clarified to establish that "5%" is relative to total annual demand while "spot market" includes both hour-ahead and day-ahead procurement. Stock further suggested that the AD should provide that an incentive program is an option available to the utilities if they request it.

Type: EXPARTE Filing Date: October 21, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On October 16, 2002, Bill Stock, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Robert Kinosian, advisor to Pres. Lynch, in San Francisco. Stock stated that ALJ's proposed decision (PD) to be consistent with AB 57 and SB 1078 must be changed to establish a regulatory framework that supports PG&E's return to investment grade credit ratings. Stock also suggested that the PD's language must be changed to limit reasonableness review for the utilities' power procurement contracts only to the scope allowed in AB 57. Stock noted that the alternate contains some of the same problems as the PD.

Type: COMMENTS ON ALTERNATE Filing Date: October 21, 2002
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: Reply Comments on the Alternate Decision of Commr. Peevey

Type: COMMENTS ON ALTERNATE Filing Date: October 21, 2002
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: Reply Comments to Comments on the Alternate Decision of Commr. Peevey.

Type: COMMENTS ON ALTERNATE Filing Date: October 21, 2002
Filed By:
THE UTILITY REFORM NETWORK
Description: Reply Comments on the Proposed Alternate Decision of Commr. Peevey.

Type: COMMENTS ON ALTERNATE Filing Date: October 21, 2002
Filed By:
SAN DIEGO GAS AND ELECTRIC COMPANY
Description: Reply Comments on Proposed Alternate Decision of Commr. Peevey

Type: COMMENTS Filing Date: October 21, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Reply Comments on Proposed Decision of ALJ Walwyn and Alternate Decision of Commr. Peevey

Type: COMMENTS Filing Date: October 21, 2002
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: Reply Comments on the Proposed Decision of ALJ Walwyn establishing interim procurement and cost recovery mechanisms.

Type: COMMENTS Filing Date: October 21, 2002
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: Reply Comments on the Proposed Alternate Decision of Commr. Peevey.

Type: COMMENTS Filing Date: October 21, 2002
Filed By:
THE UTILITY REFORM NETWORK
Description: Reply Comments on the Proposed Decision of ALJ Walwyn

Type: COMMENTS Filing Date: October 21, 2002
Filed By:
COGENERATION ASSOCIAITON OF CALIFORNIA
Description: Reply Comments on the Proposed Decision of ALJ Walwyn and Alternate Decision of Commr. Peevey.

Type: COMMENTS Filing Date: October 21, 2002
Filed By:
SAN DIEGO GAS AND ELECTRIC COMPANY
Description: On Proposed Decision of ALJ Walwyn

Type: COMMENTS Filing Date: October 18, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Draft Operating Agreement.

Type: EXPARTE Filing Date: October 18, 2002
Filed By:
CALPINE CORPORATION
Description: On October 15, 2002, Joseph E. Ronan, Senior Vice President of Government and Regulatory Affairs, Calpine Corporation (Calpine), met with Cmmr. Brown, Cmmr. Duque and Cmmr. Peevey in three separate meetings in San Francisco. At the meeting with Cmmr. Brown also present were David Gamson, advisor to Cmmr. Brown, and Jeremiah Hallisey of Hallisey and Johnson, with Cmmr. Duque - Laura Krannawitter and Lynne McGhee, advisors to Cmmr. Duque, and with Cmmr. Peevey - Kevin Coughlan and Julie Fitch, advisors to Cmmr. Peevey. Bradley S. Carroll, Senior Counsel, Pack Pigott, Director of Renewable Affairs, and Steven S. Schleimer, Director of Market and Regulatory Affairs, of Calpine, participated in all three meetings. Written material (attached to the notice) was used. The Calpine representatives addressed the environmental benefits of geothermal power as a renewable resource, and urged that any Commission decision on utility procurement recognize the desirability of ensuring that geothermal resources be made available to all consumers, and also be consistent with the terms of SB 1078.

Type: COMMENTS Filing Date: October 18, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: regarding proposed draft DWR servicing order.

Type: COMMENTS Filing Date: October 18, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on draft DWR operating agreement and reasonableness standards.

Type: COMMENTS Filing Date: October 18, 2002
Filed By:
AGLET CONSUMER ALLIANCE
Description: on proposed reasonableness review standards.

Type: COMMENTS Filing Date: October 18, 2002
Filed By:
SEMPRA ENERGY RESOURCES
Description: on Utility Administration of DWR contracts and the proposed operating agreement.

Type: COMMENTS Filing Date: October 18, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on the California Department of Water Resources draft operating agreement.

Type: COMMENTS ON ALTERNATE Filing Date: October 17, 2002
Filed By:
ORA/SCARFF/PUC
Description: of Cmmr. Peevey

Type: RULING Filing Date: October 17, 2002
Filed By:
CMMR/LYNCH/PUC
Description: clarifying scope of Comments on Operating Agreements

Type: COMMENTS ON ALTERNATE Filing Date: October 17, 2002
Filed By:
SAN DIEGO GAS AND ELECTRIC COMPANY
Description: On Proposed Alternate Decision of Commr. Peevey

Type: COMMENTS ON ALTERNATE Filing Date: October 17, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On the Alternate Decision of Commr. Peevey

Type: COMMENTS ON ALTERNATE Filing Date: October 17, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of Cmmr. Peevey

Type: COMMENTS ON ALTERNATE Filing Date: October 17, 2002
Filed By:
CALPINE CORPORATION
Description: of Cmmr. Peevey

Type: COMMENTS ON ALTERNATE Filing Date: October 17, 2002
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: of Cmmr. Peevey

Type: COMMENTS ON ALTERNATE Filing Date: October 17, 2002
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: of Cmmr. Peevey

Type: COMMENTS ON ALTERNATE Filing Date: October 17, 2002
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: of Cmmr. Peevey

Type: COMMENTS ON ALTERNATE Filing Date: October 17, 2002
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: of Cmmr. Peevey

Type: COMMENTS ON ALTERNATE Filing Date: October 17, 2002
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: of Cmmr. Peevey

Type: COMMENTS ON ALTERNATE Filing Date: October 17, 2002
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: of Cmmr. Peevey

Type: COMMENTS ON ALTERNATE Filing Date: October 17, 2002
Filed By:
THE UTILITY REFORM NETWORK
Description: of Cmmr. Peevey

Type: COMMENTS ON ALTERNATE Filing Date: October 17, 2002
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: of Cmmr. Peevey

Type: COMMENTS ON ALTERNATE Filing Date: October 17, 2002
Filed By:
CALIFORNIA CONSUMER POWER AND CONSERVATION FINANCING AUTHORITY
Description: of Cmmr. Peevey

Type: MOTION Filing Date: October 16, 2002
Filed By:
VULCAN POWER COMPANY
Description: to become an active party to the proceeding; Comments attached.

Type: REHEARING REQUEST Filing Date: October 16, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of D02-09-053.

Type: COMMENTS Filing Date: October 15, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on Proposed Decision of ALJ Walwyn.

Type: COMMENTS Filing Date: October 15, 2002
Filed By:
SEMPRA ENERGY RESOURCES
Description: on the Proposed Interim Opinion on procurement issues of ALJ Walwyn and the Proposed Alternate Decision of Commissioner Peevey.

Type: COMMENTS Filing Date: October 15, 2002
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: Comments on the Proposed Decision of ALJ Walwyn establishing interim procurement and cost recovery mechanisms

Type: COMMENTS Filing Date: October 15, 2002
Filed By:
ORA/SCARFF/PUC
Description: Comments on the Proposed Decision of ALJ Walwyn

Type: COMMENTS Filing Date: October 15, 2002
Filed By:
DUKE ENERGY NORTH AMERICA, LLC
Description: Comments on the Proposed Decision of ALJ Walwyn on Phase I issues

Type: COMMENTS Filing Date: October 15, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Comments on Proposed Decision of ALJ Walwyn

Type: COMMENTS Filing Date: October 15, 2002
Filed By:
THE UTILITY REFORM NETWORK
Description: Comments on the Proposed Decision of ALJ Walwyn

Type: COMMENTS Filing Date: October 15, 2002
Filed By:
COALITION OF UTILITY EMPLOYEES
Description: Comments on the Proposed Decision of ALJ Walwyn

Type: COMMENTS Filing Date: October 15, 2002
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: Comments on the Proposed Decision of ALJ Walwyn establishing interim procurement and cost recovery mechanisms

Type: COMMENTS Filing Date: October 15, 2002
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: Comments on Proposed Decision of ALJ Walwyn and Alternate Proposed Decision of Cmmr. Peevey

Type: COMMENTS Filing Date: October 15, 2002
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: Comments on the Proposed Decision of ALJ Walwyn

Type: COMMENTS Filing Date: October 15, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the Proposed Decision of ALJ Walwyn.

Type: COMMENTS Filing Date: October 15, 2002
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: on the Proposed Decision of ALJ Walwyn.

Type: COMMENTS Filing Date: October 11, 2002
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
WESTERN POWER TRADING FORUM
Description: on proposed decision of ALJ Walwyn

Type: RULING Filing Date: October 11, 2002
Filed By:
ALJ/GOTTSTEIN/PUC
Description: Extending Time For Comments and Reply Comments on the Proposed Operating Agreements and Reasonableness Review Standards: comments due on October 18, 2002; reply comments due on October 23, 2002.

Type: ALTERNATE Filing Date: October 10, 2002
Filed By:
CMMR/PEEVEY/PUC
Description: Alternate Proposed Decision mailed 10/10/2002 (Comments are due by 10/17/2002; reply comments due by 10/21/2002.)

Type: RULING Filing Date: October 10, 2002
Filed By:
ALJ/WALWYN/PUC
Description: Grants PG&E's motion of September 24, 2002 requesting Commission review of its non-disclosure agreement for PG&E's procurement review group.

Type: RESPONSE Filing Date: October 10, 2002
Filed By:
RIDGEWOOD OLINDA, LLC
Description: Response to Southern California Edison Company Application for Partial Rehearing of Decision 02-08-071

Type: RESPONSE Filing Date: October 10, 2002
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: Response to Southern California Edison Company's Application for Rehearing of Decision 02-08-071

Type: RESPONSE Filing Date: October 10, 2002
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: Response to Application for Partial Rehearing of D.02-08-071 by Southern California Edison Company

Type: RESPONSE Filing Date: October 10, 2002
Filed By:
THE UTILITY REFORM NETWORK
Description: Response to Southern California Edison's Application for Rehearing of Decision 02-08-071

Type: RESPONSE Filing Date: October 10, 2002
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: Response to Southern California Edison Company's Application for Partial Rehearing of Decision 02-08-071

Type: COMMENTS Filing Date: October 9, 2002
Filed By:
AGLET CONSUMER ALLIANCE
Description: on Proposed Decision of ALJ Walwyn.

Type: COMPLIANCE FILING Filing Date: October 8, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Comments on Proposed Operating Agreement and Proposed Reasonableness Standards

Type: STATEMENT Filing Date: October 8, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: regarding Draft DWR Operating Agreement.

Type: MISCELLANEOUS FILING Filing Date: October 8, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Proposed Reasonableness Standards for Utility Administration of Allocated DWR Contracts.

Type: COMPLIANCE FILING Filing Date: October 8, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Required by D02-09-053 concerning utility administration of DWR contracts

Type: MOTION Filing Date: October 7, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Motion to strike a portion of the Response by California Biomass Energy Alliance to Application for Rehearing of D.02-08-071

Type: RESPONSE Filing Date: October 4, 2002
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: To Edison's Application For Partial Rehearing of D02-08-071

Type: COMMENTS Filing Date: October 3, 2002
Filed By:
CONSUMERS UNION
Description: on Proposed Decision of ALJ Walwyn on Utility Power Procurement.

Type: COMPLIANCE FILING Filing Date: October 2, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: pursuant to Ordering Paragraph 8 of D02-09-053; confidential version.

Type: EXPARTE Filing Date: October 1, 2002
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On September 30, 2002, Joseph Karp of White & Case LLP, attorneys for the California Cogeneration Council (CCC), sent to a letter to Cmmr. Peevey. A copy of the letter is attached to the notice.

Type: RESPONSE Filing Date: October 1, 2002
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: Response to Applications for Rehearing of D.02-08-071 by Southern California Edison Company and by Pacific Gas and Electric Company

Type: PETITION FOR MODIFICATION Filing Date: October 1, 2002
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: of Decision 02-08-071.

Type: COMPLIANCE FILING Filing Date: September 30, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: required by D02-09-053 (confidential version attached and filed under seal).

Type: COMPLIANCE FILING Filing Date: September 30, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Compliance Filing.

Type: COMPLIANCE FILING Filing Date: September 30, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Confidential Version of September 30, 2002 Compliance Filing.

Type: COMPLIANCE FILING Filing Date: September 30, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: pursuant to Ordering Paragraph 8 of D02-09-053.

Type: EXPARTE Filing Date: September 26, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: LATE FILED. On September 10, 2002, John Fielder, Senior Vice President, Regulatory Policy & Affairs, Southern California Edison Company (SCE), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present were Laura Krannawitter and Lynne McGhee, advisors to Cmmr. Duque, Manuel Ramirez, Advisor to Cmmr. Wood, Gary Cohen, General Counsel, and Bruce Foster, Vice President, Regulatory Policy & Affairs, Jim Scillacci, Vice President and Chief Financial Officer, and Stephen Pickett, General Counsel, for SCE. SCE's representatives stated SCE's concerns regarding ALJ Gottstein's proposed decision (PD). SCE's representatives explained that the PD's allocation is inequitable because it will require SCE's ratepayers to pay $350,000,000 more over the term of the contracts than SCE's proposed contract allocation.

Type: COMMENTS Filing Date: September 25, 2002
Filed By:
ORA/SCARFF/PUC
Description: Comments on PG&E's corrected calculation of residual net short [Redacted Version] (filing authorized by ALJ Walwyn)

Type: REHEARING REQUEST Filing Date: September 25, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of Decision 02-08-071.

Type: REHEARING REQUEST Filing Date: September 25, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: for Partial Rehearing of D02-08-071.

Type: LAW & MOTION Filing Date: September 25, 2002
Filed By:
ORA/SCARFF/PUC
Description: to accept under seal the Comments of The Office of Ratepayer Advocates on Pacific Gas & Electric Company's corrected calculation of residual net short, Confidential filed under seal.

Type: MOTION Filing Date: September 24, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Motion to approve Non-Disclosure Agreement for Pacific Gas and Electric Company Procurement Review Group

Type: PROPOSED DECISION Filing Date: September 24, 2002
Filed By:
ALJ/WALWYN/PUC
Description: mailed 9/24/2002 (Comments are due by 10/14/2002; reply comments due 5 days after comments are filed. Opening comments shall not exceed 15 pages.)

Type: MISCELLANEOUS FILING Filing Date: September 19, 2002
Filed By:
CALIFORNIA DEPARTMENT OF WATER RESOURCES
Description: Miscellaneous filings (filing authorized by ALJ Gottstein)

Type: EXPARTE Filing Date: September 18, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On September 16, 2002, Bill Stock, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Laura Krannawitter, advisor to Cmmr. Duque, Robert Kinosian, advisor to Cmmr. Lynch, and David Gamson, advisor to Cmmr. Brown, in three separate meetings in San Francisco. Also present were Roy Kuga, Director, Gas and Electric Supply, and Les Guliasi, Director, Regulatory Relations, for PG&E. Stock noted that, while PG&E is not completely satisfied with the contract allocation presented in the proposed decision, PG&E understands that it represents a 'middle ground' among the various proposals presented in the proceeding. Stock noted that PG&E will operate the California Department of Water Resources (CDWR) contracts only as CDWR's agent and the Commission has no reasonableness review authority over contract operation or administration. Kuga stated that CDWR will remain responsible for fuel supply arrangements for its gas-fired contracts. Kuga also urged the Commission to adopt the trigger mechanisms proposed by the utilities.

Type: EXPARTE Filing Date: September 18, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On September 13, 2002, Bill Stock, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), initiated a telephone call to Kevin Coughlan, advisor to Cmmr. Peevey. Stock noted that, while PG&E is not completely satisfied with the contract allocation presented in the proposed decision, PG&E understands that it represents a 'middle ground' among the various proposals presented in the proceeding. Stock noted that PG&E will operate the California Department of Water Resources (CDWR) contracts only as CDWR's agent and the Commission has no reasonableness review authority over contract operation or administration. Stock stated that CDWR will remain responsible for fuel supply arrangements for its gas-fired contracts.

Type: TESTIMONY Filing Date: September 13, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: [UNREDACTED VERSION] Supplemental; regarding a low case residual net short procurement scenario requested by August 27, 2002 Ruling of ALJ. [filed per ALJ Walwyn]

Type: TESTIMONY Filing Date: September 13, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Supplemental; regarding a low case residual net short procurement scenario requested by August 27, 2002 Ruling of ALJ. [REDACTED VERSION] [filed per ALJ Walwyn]

Type: COMMENTS Filing Date: September 12, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; on Draft Decision of ALJ Gottstein.

Type: COMMENTS Filing Date: September 12, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Reply Comments on Draft Decision of ALJ Gottstein

Type: COMMENTS Filing Date: September 12, 2002
Filed By:
ORA/SCARFF/PUC
Description: Reply Comments on the Draft Decision of ALJ Gottstein

Type: COMMENTS Filing Date: September 12, 2002
Filed By:
AGLET CONSUMER ALLIANCE
Description: Reply Comments on Draft Decision of ALJ Gottstein

Type: COMMENTS Filing Date: September 12, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on the Proposed Decision of ALJ Meg Gottstein on allocation of the California Department of Water Resources' long term power contracts.

Type: RULING Filing Date: September 9, 2002
Filed By:
ALJ/GOTTSTEIN/PUC
Description: on shortening the public review period of the proposed interim decision regarding DWR contract allocation

Type: COMMENTS Filing Date: September 6, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on Proposed Decision of ALJ Gottstein.

Type: COMMENTS Filing Date: September 6, 2002
Filed By:
ORA/SCARFF/PUC
Description: On the Draft Decision of ALJ Gottstein

Type: COMMENTS Filing Date: September 6, 2002
Filed By:
AGLET CONSUMER ALLIANCE
Description: On Draft Decision of ALJ Gottstein

Type: COMMENTS Filing Date: September 6, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On Proposed Decision of ALJ Gottstein

Type: COMMENTS Filing Date: September 6, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the Proposed Decision of ALJ Meg Gottstein on Allocation of the California Department of Water Resources' Long Term Power Contracts.

Type: RULING Filing Date: September 5, 2002
Filed By:
ALJ/WALWYN/PUC
Description: granting PG&E's request for a 10-day extension of time: comment extended from 9/11/2002 to 9/21

Type: REQUEST Filing Date: August 29, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: For Extension of Time Within Which To File Low-Case Residual Net Short Scenario

Type: RULING Filing Date: August 27, 2002
Filed By:
ALJ/WALWYN/PUC
Description: reopening record for PG&E filing and comments: PG&E to file by 9/3/2002 both redacted and unredacted versions; parties' comments due by 9/11.

Type: EXPARTE Filing Date: August 26, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On August 20, 2002, Joseph Henri, Director, Utility Electric Portfolio Management, Pacific Gas and Electric Company (PG&E), met with Cmmr. Peevey in San Francisco. Also present were Kevin Coughlan and Julie Fitch, advisors to Cmmr. Peevey, and William Stock, Chief of Regulatory Relations, PG&E. Henri noted that it is imperative to put into place the right rules for interim procurement now in order to take advantage of current market conditions, to be able to work with the California Department of Water Resources before its authority expires. Stock noted that the alternate of Cmmr. Peevey, with a few suggested changes, would strike the right balance of regulation and procurement efficiency. Stock suggested that the proposed and alternate decisions by ALJ Walwyn and Pres. Lynch, respectively, will not allow for the needed procurement to be accomplished in time.

Type: EXPARTE Filing Date: August 26, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: LATE FILED. On August 20, 2002, William Stock, Chief of Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Laura Krannawitter, advisor to Cmmr. Duque, in San Francisco. Also present was Lynne McGhee, advisor to Cmmr. Duque. Stock noted that it is imperative to put into place the right rules for interim procurement now in order to take advantage of current market conditions, to be able to work with the California Department of Water Resources before its authority expires. Stock noted that the alternate of Cmmr. Peevey, with a few suggested changes, would strike the right balance of regulation and procurement efficiency. Stock suggested that the proposed and alternate decisions by ALJ Walwyn and Pres. Lynch, respectively, will not allow for the needed procurement to be accomplished in time.

Type: EXPARTE Filing Date: August 23, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: LATE FILED. On August 19, 2002, William Stock, Chief of Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Cmmr. Wood in an all-party meeting in San Francisco. Also present were Manuel Ramirez, advisor to Cmmr. Wood, Antonio Alvarez, Manager, Utility Electric Portfolio Management, PG&E, and other attendees listed on the attachment to the notice. Stock noted that it is imperative to put into place the right rules for interim procurement now in order to take advantage of current market conditions, to be able to work with the California Department of Water Resources before its authority expires. Stock noted that the alternate of Cmmr. Peevey, with a few suggested changes, would strike the right balance of regulation and procurement efficiency. Stock suggested that the proposed and alternate decisions by ALJ Walwyn and Pres. Lynch, respectively, will not allow for the needed procurement to be accomplished in time.

Type: EXPARTE Filing Date: August 23, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: LATE FILED. On August 19, 2002, William Stock, Chief of Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Belinda Gatti, advisor to Cmmr. Brown, in San Francisco. Stock noted that it is imperative to put into place the right rules for interim procurement now in order to take advantage of current market conditions, to be able to work with the California Department of Water Resources before its authority expires. Stock noted that the alternate of Cmmr. Peevey, with a few suggested changes, would strike the right balance of regulation and procurement efficiency. Stock suggested that the proposed and alternate decisions by ALJ Walwyn and Pres. Lynch, respectively, will not allow for the needed procurement to be accomplished in time.

Type: EXPARTE Filing Date: August 22, 2002
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: On August 21, 2002, Andrew Brown, attorney for the Independent Energy Producers Association (IEP), met with Belinda Gatti, advisor to Cmmr. Brown, and Cmmr. Peevey in two separate meetings in San Francisco. Also present were Kelly Lloyd and Steven Schleimer, IEP members. In the meeting with Cmmr. Peevey also participated Kevin Coughlan and Julie Fitch, advisors to Cmmr. Peevey, and Douglas K. Kerner, attorney for IEP. IEP representatives stated concerns regarding Cmmr. Peevey alternate, as well as the proposed decision and Pres. Lynch alternate.

Type: EXPARTE Filing Date: August 21, 2002
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On August 20, 2002, Joseph Karp of White & Case LLP, attorneys for the California Cogeneration Council (CCC), met with Julie Fitch, advisor to Cmmr. Peevey, in San Francisco. Also present were Kevin Coughlan, advisor to Cmmr. Peevey, Tom Beach of Crossborder Energy, consultant to the CCC, and Barry Lovell of Berry Petroleum Company, a member of the CCC. Karp stated the CCC's support for the alternate of Cmmr. Peevey. Karp also urged the Commission to make three modifications to the alternate. Karp added that the Commission should reject Southern California Edison Company's proposal that the Commission adjust the SO1 price to account for the incremental losses associated with sales of excess power during net-long hours.

Type: DRAFT DECISION Filing Date: August 21, 2002
Filed By:
ALJ/GOTTSTEIN/PUC
Description: [Interim Oinion on Procurement Issues: DWR Contract Allocation] mailed 8/21/2002 (Comments are due by 9/6/2002; reply comments by 9/12/2002.)

Type: MISCELLANEOUS FILING Filing Date: August 21, 2002
Filed By:
CALIFORNIA DEPARTMENT OF WATER RESOURCES
Description: filings of the California Department of Water Resources.

Type: EXPARTE Filing Date: August 21, 2002
Filed By:
SEMPRA ENERGY UTILITIES
Description: On August 19, 2002, Leslie Katz, Regional Vice President of Sempra Energy Utilities (Sempra), met with Cmmrs. Wood and Brown in an all-party meeting in San Francisco. Also present were Steve Weissman and Manuel Ramirez, advisors to Cmmr. Wood, Belinda Gatti, advisor to Cmmr. Brown, Lad Lorenz, Director of Fuel and Power for San Diego Gas & Electric Company, Billy Blattner, CPUC Relations Manager for Sempra, and other attendees, listed on the attachment to the notice. Katz urged the Commission to focus its attention on a Phase I decision which adopts a regular procurement process. Katz noted that the value of an interim procurement mechanism as envisioned in the proposed (PD) and alternate decisions has been eroded with the passage of time. However, Katz recommended that the Commission craft an amalgam of the three decisions if any interim mechanism is to be adopted. Lorenz explained that such a decision would include, among other provisions, renewables policies consistent with AB 57, per the PD and Pres. Lynch alternate; and the PD's treatment of SO1 contracts to avoid over-supply of off-peak power.

Type: EXPARTE Filing Date: August 21, 2002
Filed By:
SEMPRA ENERGY UTILITIES
Description: On August 16, 2002, Leslie Katz, Regional Vice President of Sempra Energy Utilities (Sempra), had two telephone conversations: with Kevin Coughlan and with Julie Fitch, advisors to Cmmr. Peevey. Katz urged the Commission to focus its attention on a Phase I decision which adopts a regular procurement process. Katz noted that the value of an interim procurement mechanism as envisioned in the proposed (PD) and alternate decisions has been eroded with the passage of time. However, Katz recommended that the Commission craft an amalgam of the three decisions if any interim mechanism is to be adopted. Katz explained that such a decision would include, among other provisions, renewables policies consistent with AB 57, per the PD and Pres. Lynch alternate; and the PD's treatment of SO1 contracts to avoid over-supply of off-peak power.

Type: EXPARTE Filing Date: August 21, 2002
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On August 16, 2002, Joseph Karp of White & Case LLP, attorneys for the California Cogeneration Council (CCC), met with Lynne McGhee, advisor to Cmmr. Duque, in San Francisco. Also present was Belinda Gatti, advisor to Cmmr. Brown. Karp stated that the draft decision by ALJ mischaracterizes the record and incorporates factual conclusions outside the record. Karp stated that the CCC supports the alternate by Cmmr. Peevey but noted that the Commission should make certain modifications.

Type: EXPARTE Filing Date: August 20, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On August 15, 2002, William Stock, Chief of Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Robert Kinosian, advisor to Cmmr. Lynch, in San Francisco. Stock noted that it is imperative to put into place the right rules for interim procurement now in order to take advantage of current market conditions, to be able to work with the California Department of Water Resources before its authority expires. Stock noted that the alternate of Cmmr. Peevey, with a few suggested changes, would strike the right balance of regulation and procurement efficiency. Stock suggested that the proposed and alternate decisions by ALJ Walwyn and Pres. Lynch, respectively, will not allow for the needed procurement to be accomplished in time.

Type: RULING Filing Date: August 20, 2002
Filed By:
ALJ/WALWYN/PUC
Description: on intent to claim compensation served by Union of Cencerned Scientists.

Type: COMMENTS Filing Date: August 19, 2002
Filed By:
SEMPRA ENERGY RESOURCES
Description: to the alternate decision of Comr. Peevey and limited comments to the proposed decision of ALJ Walwyn and alternate decision of Pres. Lynch

Type: EXPARTE Filing Date: August 19, 2002
Filed By:
RIDGEWOOD OLINDA, LLC
Description: On August 19, 2002, Paul C. Lacourciere of Thelen Reid & Priest LLP, attorneys for Ridgewood Olinda, LLC (Ridgewood), sent a letter (attached to the notice) to ALJ Walwyn. In the letter, Ridgewood clarifies a mistake set for the in their August 6, 2002 letter to ALJ Walwyn.

Type: EXPARTE Filing Date: August 19, 2002
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: On August 15, 2002, Nancy A. Rader, Policy Advisor to the California Wind Energy Association (CalWEA), met with Cmmr. Peevey in San Francisco. Also present were Maurice Miller and Hal Romanowitz, for CalWEA. Written materials (attached to the notice) were used. CalWEA representatives discussed the alternate of Cmmr. Peevey.

Type: EXPARTE Filing Date: August 19, 2002
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: On August 15, 2002, Peter H. Weiner, representing the California Biomass Energy Alliance, met with Kevin Coughlan, advisor to Cmmr. Peevey, in San Francisco. Weiner urged the Commission to adopt a decision that would permit 10 biomass facilities to remain in operation after the expiration of their contracts with the Department of Water Resources.

Type: EXPARTE Filing Date: August 19, 2002
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: LATE FILED. On August 12, 2002, Peter H. Weiner, representing the California Biomass Energy Alliance, met with Robert Kinosian, advisor to Pres. Lynch, and David Gamson, advisor to Cmmr. Brown, in two separate meetings in San Francisco. Weiner urged the Commission to adopt a decision that would permit 10 biomass facilities to remain in operation after the expiration of their contracts with the Department of Water Resources.

Type: COMMENTS ON ALTERNATE Filing Date: August 19, 2002
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: Comments on the Draft Alternate Proposed Decision of Cmmr. Peevey

Type: COMMENTS ON ALTERNATE Filing Date: August 19, 2002
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: Comments on the Alternate Decision of Cmmr. Peevey regarding transitional procurement issues

Type: COMMENTS Filing Date: August 19, 2002
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
WESTERN POWER TRADING FORUM
Description: Comments on the Draft Decision and President Lynch's Alternate Proposed Decision

Type: COMMENTS Filing Date: August 19, 2002
Filed By:
RIDGEWOOD OLINDA, LLC
Description: Comments on Proposed Decision of ALJ Walwyn, Alternate Proposed Decision of President Lynch, and Alternate Proposed Decision of Cmmr. Peevey.

Type: COMMENTS Filing Date: August 19, 2002
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: Comments on the Proposed Decision of ALJ Walwyn and the Alternate Decision of Cmmr. Lynch regarding transitional procurement issues

Type: COMMENTS Filing Date: August 19, 2002
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: Comments on the Proposed Decision of ALJ Walwyn, the Alternate Proposed Decision of Cmmr. Lynch and the Alternate Proposed Decision of Cmmr. Peevey.

Type: COMMENTS Filing Date: August 19, 2002
Filed By:
ORA/ZELLER/PUC
Description: Comments on the Proposed Decision of ALJ Walwyn, the Alternate Decision of Cmmr. Lynch and the Alternate Decision of Cmmr. Peevey

Type: COMMENTS Filing Date: August 19, 2002
Filed By:
THE UTILITY REFORM NETWORK
Description: Comments on the Proposed Decision of ALJ Walwyn, Alternate Decision of Cmmr. Lynch, and Alternate Decision of Cmmr. Peevey.

Type: COMMENTS Filing Date: August 19, 2002
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: Comments on the Proposed Decision of ALJ Walwyn, the Alternate Proposed Decisions of Cmmr. Lynch and Cmmr. Peevey

Type: COMMENTS Filing Date: August 19, 2002
Filed By:
CALIFORNIA CONSUMER POWER AND CONSERVATION FINANCING AUTHORITY
CALIFORNIA ENERGY COMMISSION
Description: Joint Comments to Proposed Decision of ALJ Walwyn, Alternate Decision of Cmmr. Lynch and Alternate Decision of Cmmr. Peevey

Type: COMMENTS Filing Date: August 19, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Comments on the Proposed Decision of ALJ Walwyn and the Alternate Proposed Decision of Cmmr. Lynch addressing transitional procurement

Type: COMMENTS Filing Date: August 19, 2002
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: Comments on the Proposed Decision of ALJ Walwyn and the Alternate Proposed Decisions of Cmmrs. Lynch and Peevey

Type: COMMENTS Filing Date: August 19, 2002
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: Comments on the Proposed Decision and Alternate Decisions on transitional procurement

Type: COMMENTS Filing Date: August 19, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to the proposed decision of ALJ Walwyn and Pres. Lynch's alternate

Type: COMMENTS Filing Date: August 19, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to the proposed alternate decision of Comr. Peevey concerning transitional procurement issues

Type: COMMENTS Filing Date: August 19, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to the proposed decision of ALJ Walwyn, Pres. Lynch's alternate, and Comr. Peevey's alternate

Type: COMMENTS Filing Date: August 16, 2002
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: Comments on Proposed Decision of ALJ Walwyn, Proposed Alternate Decision of Cmmr. Lynch, and Proposed Alternate Decision of Cmmr. Peevey

Type: COMMENTS ON ALTERNATE Filing Date: August 16, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Comments on the Proposed Alternate Decision of Cmmr. Peevey

Type: COMMENTS ON ALTERNATE Filing Date: August 16, 2002
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
WESTERN POWER TRADING FORUM
Description: Comments on the Alternate Decision of Cmmr. Peevey

Type: EXPARTE Filing Date: August 15, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On August 14, 2002, Bruce Foster, Vice President of Regulatory Operations of Southern California Edison Company (Edison), had a telephone conversation with Julie Fitch, advisor to Cmmr. Peevey. Gary Schoonyan, Director of Regulatory Affairs of Edison, also participated in the communication. Foster stated Edison's concerns on Cmmr. Peevey's alternate decision regarding Edison's May 6, 2002 motion. Schoonyan also pointed out the need for the Commission to adopt a market price, for their use in determining what portion of the renewable offers directed by the alternate, would be contracted for by utilities, and what remaining portion would require supplemental Public Goods Charge payments.

Type: EXPARTE Filing Date: August 15, 2002
Filed By:
OILDALE ENERGY LLC
Description: On August 14, 2002, Joseph Karp of White & Case LLP, attorney for Oildale Energy LLC, contacted Belinda Gatti, advisor to Cmmr. Brown, by telephone. During the telephone conversation, Karp urged the Commission to adopt the draft decision. Karp stated that the Commission should look at the big picture and approve the application because the Amendment pays only a small premium for three and a half years to preserve an important cogeneration resource that will be preserved for a long term.

Type: EXPARTE Filing Date: August 15, 2002
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On August 14, 2002, Joseph Karp of White & Case LLP, attorneys for the California Cogeneration Council (CCC), spoke with Julie Fitch, advisor to Cmmr. Peevey, over the telephone. During the telephone conversation, Karp stated that the CCC supports the alternate by Cmmr. Peevey, but noted certain required modifications. In particular, Karp stated that the long term procurement expiration date for the standard Offer 1 contract needs to be clarified and the eligibility requirement that a qualified facility (QF) contract must have expired should include QF contracts that were terminated.

Type: EXPARTE Filing Date: August 14, 2002
Filed By:
RIDGEWOOD OLINDA, LLC
Description: On August 9, 2002, Dan Gulino, General Counsel and Senior Vice President of Ridgewood Power, LLC (Ridgewood), met with Lynne McGhee, advisor to Cmmr. Duque, in San Francisco. Also present was Paul C. Lacourciere of Thelen Reid & Priest LLP, attorneys for Ridgewood. Gulino and Lacourciere urged the Commission to reject the proposed decision issued by the ALJ Walwyn and the alternate by Cmmr. Lynch, and to issue and adopt an alternate decision.

Type: EXPARTE Filing Date: August 14, 2002
Filed By:
RIDGEWOOD OLINDA, LLC
Description: On August 9, 2002, Dan Gulino, General Counsel and Senior Vice President of Ridgewood Olinda, LLC (Ridgewood), met with Kevin Coughlan, advisor to Cmmr. Peevey, David Gamson, advisor to Cmmr. Brown, and Manuel Ramirez, advisor to Cmmr. Wood, in three separate meetings in San Francisco. At the meeting with Kevin Coughlan also present was Julie Fitch, advisor to Cmmr. Peevey, and at the meeting with Manuel Ramirez - Steven Weissman, advisor to Cmmr. Wood. Paul C. Lacourciere of Thelen Reid & Priest LLP, attorneys for Ridgewood, participated in all three meetings. In the meeting with Kevin Coughlan and Julie Fitch, written materials (attached to the notice) were used. Gulino and Lacourciere urged the Commission to reject the proposed decision issued by ALJ Walwyn and the alternate proposed decision issued by Cmmr. Lynch. The Ridgewood representatives further requested that the Commission issue and adopt an alternate.

Type: ALTERNATE Filing Date: August 12, 2002
Filed By:
CMMR/PEEVEY/PUC
Description: Alternate Proposed Decision mailed 8/12/2002 (Comments are due by 8/19/2002; no reply comments will be accepted [Due date revised per Interim Chief ALJ Brown's 8/13/2002 Letter].)

Type: COMMENTS Filing Date: August 12, 2002
Filed By:
CONSUMERS UNION
Description: Comments on Proposed Decision of ALJ Walwyn regarding SCE's Motion on Interim Procurement

Type: EXPARTE Filing Date: August 9, 2002
Filed By:
RIDEGWOOD OLINDA, LLC
Description: On August 6, 2002, Paul C. Lacourciere of Thelen Reid & Priest LLP, attorneys for Ridgewood Olinda, LLC (Ridgewood), sent a letter (attached to the notice) to ALJ Walwyn. In the letter, Ridgewood asserts that the electricity price set forth in the contracts that are the subject of A02-01-018 are not representative of the market price for electricity generated for landfill gas-fired generation due to certain federal and state subsidies.

Type: ALTERNATE Filing Date: August 6, 2002
Filed By:
COMR/LYNCH/PUC
Description: Proposed Decision; Oral arguments set for 8/8/02. If no objections are raised to shortening time for public review, comments will be due on August 19, and decision will be placed on the August 22 Agenda.

Type: PROPOSED DECISION Filing Date: August 6, 2002
Filed By:
ALJ/WALWYN/PUC
Description: Oral arguments set for 8/8/02. If no objections are raised to shortening time for public review, comments will be due on August 19, and decision will be placed on the August 22 Agenda.

Type: COMMENTS Filing Date: August 6, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply Comments concerning proposals for allocation of California Department of Water Resources contract power and costs among the investor-owned utilities (per 7/26/2002 ALJ Gottstein's Ruling.)

Type: BRIEF Filing Date: August 6, 2002
Filed By:
AGLET CONSUMER ALLIANCE
Description: Reply Brief (filing authorized by ALJ Walwyn)

Type: BRIEF Filing Date: August 5, 2002
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: Reply brief

Type: RESPONSE Filing Date: August 5, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Response to 7/30/2002 comments on allocation of California Department of Water Resources contracts

Type: REPLY Filing Date: August 5, 2002
Filed By:
SEMPRA ENERGY RESOURCES
Description: Brief on utility procurement plan issues

Type: REPLY Filing Date: August 5, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Brief addressing issues related to purchases from renewable sources

Type: REPLY Filing Date: August 5, 2002
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
WESTERN POWER TRADING FORUM
Description: Joint Reply Brief addressing the proposal of the Union of Concerned Scientists

Type: COMMENTS Filing Date: August 5, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply Comments (filing authorized by ALJ Gottstein)

Type: COMMENTS Filing Date: August 5, 2002
Filed By:
ORA/YACKNIN/PUC
Description: Reply comments regarding the allocation of DWR contracts

Type: COMMENTS Filing Date: August 5, 2002
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: Reply Comments regarding DWR contract allocation

Type: BRIEF Filing Date: August 5, 2002
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: Reply Brief

Type: BRIEF Filing Date: August 5, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply Brief addressing only some of the argumetns raised by the other parties to this proceeding

Type: BRIEF Filing Date: August 5, 2002
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: Reply brief

Type: BRIEF Filing Date: August 5, 2002
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: Reply brief

Type: BRIEF Filing Date: August 5, 2002
Filed By:
THE UTILITY REFORM NETWORK
Description: Reply brief

Type: BRIEF Filing Date: August 5, 2002
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: Reply brief

Type: BRIEF Filing Date: August 5, 2002
Filed By:
ORA/ZELLER/PUC
Description: Reply brief

Type: BRIEF Filing Date: August 5, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Reply brief

Type: BRIEF Filing Date: August 5, 2002
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
WESTERN POWER TRADING FORUM
Description: Reply brief

Type: EXPARTE Filing Date: August 2, 2002
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: On July 31, 2002, Peter H. Weiner, representing the California Biomass Energy Alliance, met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Weiner urged the Commission to act in such a way as to ensure the continued operation of biomass facilities whose contracts with the Department of Water Resources (DWR) will otherwise expire in December. Weiner further urged the Commission to accomplish this objective through a combination of encouraging contract extensions by the DWR and directing utilities to enter into contracts with such facilities prior to December 31, 2002.

Type: COMMENTS Filing Date: July 31, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: in response to the 7/26/02 Ruling of ALJ Gottstein

Type: EXPARTE Filing Date: July 31, 2002
Filed By:
RIDGEWOOD POWER, LLC
Description: On July 26, 2002, Dan Gulino, General Counsel and Senior Vice President of Ridgewood Power, LLC (Ridgewood), met with Cmmr. Brown, Laura Krannawitter, advisor to Cmmr. Duque, and Robert Kinosian, advisor to Cmmr. Lynch, in three separate meetings in San Francisco. At the meeting with Cmmr. Brown also present was David Gamson, advisor to Cmmr. Brown. William P. Short III, Director of Power Marketing, Paul C. Lacourciere and Carol A. Smoots, attorneys, for Ridgewood, participated in all three meetings. The Ridgewood representatives requested that the Commission order Southern California Edison Company (SCE) to purchase electricity from those renewable generators located in SCE's territory holding short-term contracts with the California Department of Water Resources under the terms and conditions set forth in those contracts. Ridgewood's representatives further urged the Commission to require that SCE be ordered to procure a certain amount of renewable electricity as part of any procurement plan, and to reject the proposal to procure capacity contracts set for the in SCE's May 6 motion as it would effectively foreclose SCE from procuring renewable electricity in the near term.

Type: COMMENTS Filing Date: July 31, 2002
Filed By:
CALIFORNIA CONSUMER POWER AND CONSERVATION FINANCING AUTHORITY
Description: to the DWR contract allocation to the utilities

Type: BRIEF Filing Date: July 30, 2002
Filed By:
AGLET CONSUMER ALLIANCE
Description: Opening [Public Version].

Type: REPLY Filing Date: July 30, 2002
Filed By:
ORA/YACKNIN/PUC
Description: Reply regarding the allocation of DWR contracts (per ALJ Ruling)

Type: COMMENTS Filing Date: July 30, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Comments on DWR contract allocation (per ALJ Ruling)

Type: COMMENTS Filing Date: July 30, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: confidential version only;

Type: BRIEF Filing Date: July 29, 2002
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: Second brief

Type: MISCELLANEOUS FILING Filing Date: July 29, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: workshop presentation

Type: BRIEF Filing Date: July 29, 2002
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
WESTERN POWER TRADING FORUM
Description: Joint Opening Brief

Type: BRIEF Filing Date: July 29, 2002
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: Brief

Type: BRIEF Filing Date: July 29, 2002
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: Brief

Type: BRIEF Filing Date: July 29, 2002
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
WESTERN POWER TRADING FORUM
Description: Opening brief

Type: BRIEF Filing Date: July 29, 2002
Filed By:
ORA/ZELLER/PUC
Description: second round opening;

Type: BRIEF Filing Date: July 29, 2002
Filed By:
THE UTILITY REFORM NETWORK
Description: opening; on procurement issues

Type: BRIEF Filing Date: July 29, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: opening; in Phase 1

Type: BRIEF Filing Date: July 29, 2002
Filed By:
CALIFORNIA CONSUMER POWER AND CONSERVATION FINANCING AUTHORITY
Description: opening;

Type: BRIEF Filing Date: July 29, 2002
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: opening;

Type: BRIEF Filing Date: July 29, 2002
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: on Long Term Renewable Procurement

Type: BRIEF Filing Date: July 29, 2002
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: Opening Brief addressing why the Commission should adopt the California Cogeneration Council proposals

Type: BRIEF Filing Date: July 29, 2002
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: Initial Brief addressing other issues presented by the Applicant

Type: BRIEF Filing Date: July 29, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: opening; confidential version only.

Type: BRIEF Filing Date: July 29, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: opening; confidential materials attached and filed under seal.

Type: BRIEF Filing Date: July 29, 2002
Filed By:
SEMPRA ENERGY RESOURCES
Description: Opening Brief on utility procurement plan issues

Type: TRANSCRIPT Filing Date: July 26, 2002
Filed By:
REPORTING DIVISION
Description: Submitted; Volume 18

Type: RESPONSE Filing Date: July 25, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to the 7/19/02 E-Mail request of ALJ Gottstein; confidential materials attached and filed under seal.

Type: SUPPLEMENTAL Filing Date: July 25, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: confidential version only: workshop materials

Type: SUPPLEMENTAL Filing Date: July 25, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: workshop materials.

Type: EXPARTE Filing Date: July 24, 2002
Filed By:
OILDALE ENERGY LLC
Description: On July 24 2002, Joseph Karp of White & Case LLP (W&C), attorney for Oildale Energy LLC (Oildale), sent an electronic mail (attached to the notice) to Kevin Coughlan, advisor to Cmmr. Peevey. A copy of the Court's order in Oildale's bankruptcy proceeding was also provided. The letter informs the Commission that the Court has approved the Assumption Agreement.

Type: EXPARTE Filing Date: July 24, 2002
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On July 23, 2002, Joseph Karp of White & Case LLP (W&C), attorney for the California Cogeneration Council (CCC), met with Cmmr. Wood in San Francisco. Also present were Steve Weissman and Manuel Ramirez, advisors to Cmmr. Wood, Jerry Bloom of W&C, Tom Beach of Crossborder Energy, technical consultant to CCC, and Barry Lovell of Berry Petroleum Company, a member of CCC. Written materials (attached to the notice) were used. Also provided was a copy of CCC's brief filed with the Commission. CCC representatives urged the Commission to support CCC's proposals to reinstate Standard Offer 1 contracts for qualifying facilities (QFs) for one-year term and to give QFs a first right of refusal in connection with capacity and other products that the utilities may seek in the future.

Type: WITHDRAWAL Filing Date: July 22, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Of Motion To File Confidential-Table B and Confidential-Table C From Comments On Allocation of California Department of Water Resources Contract Power Under Seal

Type: COMMENTS Filing Date: July 19, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on Allocation of California Department of Water Resources Contract Power (Public Version).

Type: MISCELLANEOUS FILING Filing Date: July 19, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: proposal for allocation of California Department of Water Resources contract power and costs among investor-owned utilities. Attachment Exhibit A filed under seal.

Type: MISCELLANEOUS FILING Filing Date: July 19, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: confidentail version only filed under seal on: proposal and comments regarding allocation of power from California Department of Water Resources contracts.

Type: LAW & MOTION Filing Date: July 19, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to File Confidential - Table B and Confidential - Table C from Comments on Allocation of California Department of Water Resources Contract Power Under Seal

Type: BRIEF Filing Date: July 18, 2002
Filed By:
CONSUMERS UNION
Description: Brief on establishing policies for utility power procurement

Type: LAW & MOTION Filing Date: July 16, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Mark and Admit Confidential Collateral Exhibit Into Evidence; Confidential Materials Attached and Filed Under Seal (filing of exhibit requested by ALJ Walwyn)

Type: RULING Filing Date: July 16, 2002
Filed By:
ALJ/GOTTSTEIN/PUC
Description: regarding recent electronic notices to parties, filing extentsion: Utility and DWR comments - 7/19; Workshop - 7/26; Replies - 7/30; Utility/DWR responses to replies - 8/5.

Type: MOTION Filing Date: July 16, 2002
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: to consider Notice of Intent timely and properly filed and served. Notice of Intent to Claim Compensation attached.

Type: BRIEF Filing Date: July 12, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On generation procurement issues related to May 6, 2002 capacity procurement motion

Type: RESPONSE Filing Date: July 12, 2002
Filed By:
SEMPRA ENERGY RESOURCES
Description: to Southern California Edison's Motion for Interim Decision Granting Approval of Process for Early Procurement of Capacity.

Type: REQUEST Filing Date: July 12, 2002
Filed By:
RIDGEWOOD OLINDA, LLC
Description: For Judicial Notice

Type: BRIEF Filing Date: July 12, 2002
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: Brief

Type: BRIEF Filing Date: July 12, 2002
Filed By:
AGLET CONSUMER ALLIANCE
Description: Brief

Type: BRIEF Filing Date: July 12, 2002
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On Edison's May 6 Motion For Interim Decision

Type: BRIEF Filing Date: July 12, 2002
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: On transitional procurement issues

Type: BRIEF Filing Date: July 12, 2002
Filed By:
THE UTILITY REFORM NETWORK
Description: Opening Brief on the Motion of Edison for authority to conduct interim capacity procurement and on issues relating to the short-term purchase of renewable resources.

Type: BRIEF Filing Date: July 12, 2002
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
WESTERN POWER TRADING FORUM
Description: Opening Brief regarding transitional procurement issues

Type: BRIEF Filing Date: July 12, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Supporting A Transitional Procurement Program For PG&E, Edison, and SDG&E as Requesting In SCE's Motion of May 6, 2002 and SCE's, PG&E's and SDG&E's Supporting Testimony.

Type: BRIEF Filing Date: July 12, 2002
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: Opening Brief Regarding Interim Procurement Issues

Type: BRIEF Filing Date: July 12, 2002
Filed By:
RIDGEWOOD OLINDA, LLC
Description: On Expedited Issues

Type: BRIEF Filing Date: July 12, 2002
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: On Issues Related To Edison's Motion For Interim Decision

Type: BRIEF Filing Date: July 12, 2002
Filed By:
CONSUMERS UNION
Description: On SCE's Motion On Interim Procurement

Type: BRIEF Filing Date: July 12, 2002
Filed By:
ORA/ZELLER/PUC
Description: On Interim Procurement Issues

Type: BRIEF Filing Date: July 12, 2002
Filed By:
CALIFORNIA CONSUMER POWER AND CONSERVATION FINANCING AUTHORITY
Description: Re: Edison's Motion For Interim Decision

Type: BRIEF Filing Date: July 12, 2002
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: On transitional procurement issues

Type: BRIEF Filing Date: July 12, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on Interim Procurement Proposal of Southern California Edison Company.

Type: EXPARTE Filing Date: July 11, 2002
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On July 10, 2002, Joseph Karp of White & Case LLP, attorney for the California Cogeneration Council (CCC), met with Cmmr. Brown in San Francisco. Also present were Tom Beach of Crossborder Energy, technical consultant to CCC, and Barry Lovell of Berry Petroleum Company, a member of CCC. Written materials (attached to the notice) were used. CCC representatives urged the Commission to support CCC's proposals to reinstate Standard Offer 1 contracts for qualifying facilities (QFs) for one-year term and to give QFs a first right of refusal in connection with capacity and other products that the utilities may seek in the future.

Type: MOTION Filing Date: July 11, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to mark and admit confidential collateral exhibit into evidence

Type: RULING Filing Date: July 10, 2002
Filed By:
ALJ/WALWYN/PUC
Description: modifying briefing schedule: Opening briefs due by 12 PM 7/29/2002; reply briefs by 12 PM 8/5. Schedule for written proposals and comments on allocation of DWR contracts: utilities' proposals, DWR's contract allocation scenarios - 7/15; parties' comments - 7/25; utilities' replies - 7/30

Type: EXPARTE Filing Date: July 8, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON June 27, 2002 AND APPEARED IN THE CALENDAR OF July 9, 2002. On June 25, 2002, Leslie Katz, Regional Vice President of Sempra Energy Utilities (Sempra), met with Cmmr. Brown on behalf of San Diego Gas & Electric Company (SDG&E) in San Francisco. Also present were Peter Hanson, advisor to Cmmr. Brown, and Joe Kloberdanz, Manager of Electric Case Management, and Billy Blattner, CPUC Relations Administrator, for Sempra. Katz stated that SDG&E supports Southern California Edison Company's (SCE) objective of using the Department of Water Resources (DWR) as the creditworthy buyer for any capacity contracts entered into prior to their return to creditworthiness provided that such authority is granted simultaneously to SDG&E, SCE and Pacific Gas and Electric Company (PG&E). With respect to any interim procurement, Katz urged the Commission to adopt clear procurement rules and reasonableness criteria, expedited contract review, and timely cost recovery. Katz also stated that the interim mechanism should allow for procurement of only a limited amount of capacity. Katz asserted that the Commission should also consider limiting some percent of the interim purchase contracts to one year. Katz further stated that the Policy Goals for DWR Contract Allocation are contradictory. Katz recommended that the Commission adopt a portfolio approach rather than allocate contracts to utilities.

Type: RESPONSE Filing Date: July 2, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Supplemental Response to Motion by Ridgewood Olinda, LLC For Expedited Decision Concerning Treatment of 90 Day Contracts With Renewable Generators; Request For Official Notice Pursuant to Rule 73.

Type: EXPARTE Filing Date: June 27, 2002
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On June 26, 2002, Jerry Bloom of White & Case LLP (W&C), attorneys for the California Cogeneration Council (CCC), met with Cmmr. Peevey in San Francisco. Also present were Julie Fitch and Kevin Coughlan, advisors to Cmmr. Peevey, Joseph Karp of W&C, Tom Beach of Crossborder Energy, technical consultant to CCC, and Barry Lovell of Berry Petroleum Company, a member of CCC. CCC representatives urged the Commission to support CCC's proposals to reinstate Standard Offer 1 contracts for qualifying facilities (QFs) for one-year term and to give QFs a first right of refusal in connection with capacity and other products that the utilities may seek in the future.

Type: EXPARTE Filing Date: June 27, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: AUGMENTATION REQUIRED. On June 25, 2002, Leslie Katz, Regional Vice President of Sempra Energy Utilities (Sempra), met with Cmmr. Brown on behalf of San Diego Gas & Electric Company (SDG&E). Also present were Peter Hanson, advisor to Cmmr. Brown, and Joe Kloberdanz, Manager of Electric Case Management, and Billy Blattner, CPUC Relations Administrator, for Sempra. Katz stated that SDG&E supports Southern California Edison Company's (SCE) objective of using the Department of Water Resources (DWR) as the creditworthy buyer for any capacity contracts entered into prior to their return to creditworthiness provided that such authority is granted simultaneously to SDG&E, SCE and Pacific Gas and Electric Company (PG&E). With respect to any interim procurement, Katz urged the Commission to adopt clear procurement rules and reasonableness criteria, expedited contract review, and timely cost recovery. Katz also stated that the interim mechanism should allow for procurement of only a limited amount of capacity. Katz asserted that the Commission should also consider limiting some percent of the interim purchase contracts to one year. Katz further stated that the Policy Goals for DWR Contract Allocation are contradictory. Katz recommended that the Commission adopt a portfolio approach rather than allocate contracts to utilities.

Type: EXPARTE Filing Date: June 19, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On June 17, 2002, William Stock, Chief of Regulatory Relations of Pacific Gas and Electric Company (PG&E), met with Cmmr. Brown in San Francisco. Also present were Roy Kuga, Director, Gas & Electric Supply, and Kent Harvey, Senior Vice President and Chief Financial Officer, for PG&E. Harvey noted that it was imperative that all three investor-owned utilities be granted concurrent reasonableness review standards for interim dispatchable capacity contracts. Harvey also noted that having clear standards in place is also important to suppliers and to the financial community.

Type: EXPARTE Filing Date: June 19, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On June 17, 2002, William Stock, Chief of Regulatory Relations of Pacific Gas and Electric Company (PG&E), attended an all-party meeting with Cmmr. Duque in San Francisco. Also present were Roy Kuga, Director, Gas & Electric Supply, and Joseph Henry, Utility Electric Portfolio Management, for PG&E and other attendees indicated on the attachment to the notice. Kuga noted that it was imperative that all three investor-owned utilities be granted concurrent reasonableness review standards for interim dispatchable capacity contracts. Kuga also noted that having clear standards in place is also important to suppliers and to the financial community.

Type: EXPARTE Filing Date: June 18, 2002
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: On June 17, 2002, Douglas Kerner, attorney for Independent Energy Producers Association (IEP), met with Cmmr. Brown in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, and Andrew Brown, attorney, and Steven Kelly, Policy Director, for IEP. Written materials (attached to the notice) were used. IEP representatives summarized its proposal for implementation of a generation procurement process which could be accomplished by year's end but consistent with California state policies and requirements for competitive processes and ensuring a place for expanded renewable energy.

Type: RESPONSE Filing Date: June 18, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: To the motion of Ridgwood Olinda, LLC for an expedited decision concerning treatment of 90 day contracts with renewable generators

Type: EXPARTE Filing Date: June 18, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On June 14, 2002, Leslie Katz, Regional Vice President of Sempra Energy Utilities (Sempra), attended an all-party meeting met with Cmmr. Duque on behalf of San Diego Gas & Electric Company (SDG&E). Also present were Laura Krannawitter and Lynne McGhee, advisors to Cmmr. Duque, Peter Hansen, advisor to Cmmr. Brown, Manuel Ramirez, advisor to Cmmr. Wood, Billy Blattner, CPUC Relations Administrator for Sempra and other attendees listed on the attachment to the notice. Katz stated that SDG&E supports Southern California Edison Company's (Edison) objective of using the Department of Water Resources as the creditworthy buyer for any capacity contracts entered into prior to their return to creditworthiness provided that such authority is granted simultaneously to SDG&E, Edison and Pacific Gas and Electric Company. Katz also urged the Commission to adopt clear procurement rules and reasonableness criteria, expedited contract review, and timely cost recovery. Katz indicated that the Commission should consider limiting some percent of the interim purchase contracts to one year only.

Type: EXPARTE Filing Date: June 18, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On June 13, 2002, Les Guliasi, Director, Regulatory Relations of Pacific Gas and Electric Company (PG&E), met with Kevin Coughlan, advisor to Cmmr. Peevey, in San Francisco. Also present were Julie Fitch, advisor to Cmmr. Peevey, and Karen Tomcala, Vice President-Regulatory Relations, and Kent Harvey, Chief Financial Officer, for PG&E. Harvey noted that it was imperative that all three investor-owned utilities be granted concurrent reasonableness review guidance for interim dispatchable capacity contracts. Harvey noted that having clear standards in place is also important to suppliers and to the financial community.

Type: EXPARTE Filing Date: June 17, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On June 13, 2002, Leslie Katz, Regional Vice President of Sempra Energy Utilities (Sempra), sent a letter (attached to the notice) on behalf of San Diego Gas & Electric Company (SDG&E) to Cmmrs. Lynch, Brown, Duque, Peevey and Wood. The letter states that SDG&E supports Southern California Edison Company's (Edison) objective of using the Department of Water Resources functioning as the creditworthy buyer provided that such authority is granted simultaneously to SDG&E, Edison and Pacific Gas and Electric Company. The letter further states that SDG&E seeks interim authority for only a conservative estimate of capacity and that the utilities should have an option to arrange for some multi-year dispatchable capacity arrangements.

Type: EXPARTE Filing Date: June 13, 2002
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: On June 11, 2002, Douglas Kerner, attorney for Independent Energy Producers Association (IEP), met with Cmmr. Peevey in San Francisco. Also present were Kevin Coughlan, advisor to Cmmr. Peevey, and Andrew Brown, attorney, and Steven Kelly, Policy Director, for IEP. Written materials (attached to the notice) were used. IEP representatives summarized its proposal for implementation of a generation procurement process which could be accomplished by year's end but consistent with California state policies and requirements for competitive processes and ensuring a place for expanded renewable energy.

Type: EXPARTE Filing Date: June 12, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On June 12, 2002, Les Guliasi, Director, Regulatory Relations of Pacific Gas and Electric Company (PG&E), sent a letter (attached to the notice) to Cmmrs. Lynch, Brown, Duque, Peevey, and Wood. Copies of the letter were also sent to ALJ Walwyn, Robert Kinosian, advisor to Cmmr. Lynch, Kevin Coughlan, advisor to Cmmr. Peevey, David Gamson and Peter Hanson, advisors to Cmmr. Brown, Laura Krannawitter and Lynne McGhee, advisors to Cmmr. Duque, and Manuel Ramirez, advisor to Cmmr. Wood. The letter states that PG&E supports Southern California Edison Company's objective of using capacity contracts as one of the tools to minimize customers' exposure to price volatility in the spot market.

Type: MOTION Filing Date: June 12, 2002
Filed By:
RIDGEWOOD OLINDA, LLC
Description: Motion for an expedited decision concerning treatment of 90 day contracts with renewable generators

Type: EXPARTE Filing Date: June 10, 2002
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: On June 6, 2002, Jan Smutny-Jones, Executive Director, Independent Energy Producers Association (IEP), sent via email a letter (attached to the notice) to Cmmr. Lynch, Cmmr. Brown, Cmmr. Duque, Cmmr. Peevey, and Cmmr. Wood. Copies of the letter were also forwarded to ALJ Walwyn, Kevin Coughlan, advisor to Cmmr. Peevey, David Gamson, advisor to Cmmr. Brown, Robert Kinosian, advisor to Cmmr. Lynch, Laura Krannawitter, advisor to Cmmr. Duque, and Manuel Ramirez, advisor to Cmmr. Wood. Referring to a Southern California Edison Company?s motion for an interim procurement process, IEP suggests three basic modifications to the motion.

Type: EXPARTE Filing Date: June 7, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On June 4, 2002, Bruce Foster, Vice President of Regulatory Operations of Southern California Edison Company (Edison), sent a letter (attached to the notice) addressed to Cmmr. Lynch, Cmmr. Brown, Cmmr. Duque, Cmmr. Peevey, and Cmmr. Wood. Copies of the letter were also sent to ALJ Walwyn, Kevin Coughlan, advisor to Cmmr. Peevey, David Gamson, advisor to Cmmr. Brown, Robert Kinosian, advisor to Cmmr. Lynch, Laura Krannawitter, advisor to Cmmr. Duque, and Manuel Ramirez, advisor to Cmmr. Wood. The letter asks for timely approval of Edison's motion for an interim capacity procurement program.

Type: EXPARTE Filing Date: June 5, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On May 31, 2002, Michael Hoover, Director of Regulatory Affairs of Southern California Edison Company (Edison), provided a copy of the document (attached to the notice) to Laura Krannawitter, advisor to Cmmr. Duque, and Kevin Coughlan, advisor to Cmmr. Peevey. The document explains the reasons why the Commission should adopt Edison's motion for interim approval of a framework for capacity procurement.

Type: MOTION Filing Date: June 3, 2002
Filed By:
RIDGEWOOD OLINDA, LLC
Description: Motion to intervene and Request for expedited treatment (re-submitted)

Type: PETITION Filing Date: May 31, 2002
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: To Intervene

Type: MOTION Filing Date: May 30, 2002
Filed By:
RIDGEWOOD OLINDA, LLC
Description: to intervene

Type: RULING Filing Date: May 30, 2002
Filed By:
ALJ/WALWYN/PUC
Description: on the motion of the Independent Energy Producers Association and Western Power Trading Forum

Type: RULING Filing Date: May 29, 2002
Filed By:
ALJ/WALWYN/PUC
Description: re: ALJ McKenzie's Ruling transmitted electronically to parties on 5/28/2002

Type: RESPONSE Filing Date: May 28, 2002
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: To the Motion of May 21, 2002 of the IEP and WPTF

Type: RULING Filing Date: May 28, 2002
Filed By:
ALJ/WALWYN/PUC
Description: regarding notices of intent to claim compensation filed by Aglet Consumer Alliance, Consumers Union, The Natural Resources Defense Council, and The Utility Reform Network.

Type: RESPONSE Filing Date: May 24, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: To the Motion of IEP and WPTF to compel service of a public version of testimony and for clarification regarding participation eligibility for upcoming Commision-ordered meetings

Type: RESPONSE Filing Date: May 24, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: To May 21 Motion of IEP/WPTF

Type: RESPONSE Filing Date: May 23, 2002
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: In support of the May 21, 2002 Motion of the IEP and WPTF

Type: MOTION Filing Date: May 22, 2002
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: Motion to intervene

Type: MOTION Filing Date: May 21, 2002
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
WESTERN POWER TRADING FORUM
Description: Motion to compel service of a public version of testimony and for clarification regarding participation eligibility for upcoming Commission ordered meetings.

Type: MOTION Filing Date: May 16, 2002
Filed By:
SEMPRA ENERGY RESOURCES
Description: to be granted party status

Type: RULING Filing Date: May 15, 2002
Filed By:
ALJ/WALWYN/PUC
CMMR/LYNCH/PUC
Description: changing procedural schedule for testimony and hearing in response to Southern California Edison Company's motion of 5/6/2002: Supplemental testimony by utilities - 5/24/2002; Direct testimony by parties - 5/31; Rebuttal testimony - 6/5; Cross exam. estimates - 6/6; Prehearing Conference - 6/7; Evidentiary Hearings start - 6/10; Oral argument - 6/26

Type: EXPARTE Filing Date: May 13, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On May 8, 2002, William Stock, Chief of Regulatory Relations of Pacific Gas and Electric Company (PG&E), met with Robert Kinosian, advisor to Cmmr. Lynch, in San Francisco. Also present were Julie Fitch, advisor to Cmmr. Peevey, and Joseph Henri, Director, Utility Electric Portfolio Management, and David Rubin, Director, Service Analysis, for PG&E. Stock outlined general changes that have occurred in the procurement market and noted the importance of establishing reasonable up-front standards. Stock stated it is imperative that PG&E be returned to investment grade status prior to engaging in energy procurement activities. Henri outlined the customers? current net-open position, suppliers? heightened need for investment quality counter-parties, the type of reasonableness standards needed, and the type of energy transactions that are needed to cover the net open portions.

Type: MOTION Filing Date: May 13, 2002
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE
Description: Motion to intervene

Type: EXPARTE Filing Date: May 10, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On May 7, 2002, Bruce Foster, Vice President of Regulatory Operations of Southern California Edison Company (Edison), issued a letter (attached to the notice) addressed to Cmmr. Lynch, Cmmr. Brown, Cmmr. Duque, Cmmr. Peevey, and Cmmr. Wood. Copies of the letter were also sent to Robert Kinosian, advisor to Cmmr. Lynch, Kevin Coughlan, advisor to Cmmr. Peevey, David Gamson, advisor to Cmmr. Brown, Laura Krannawitter, advisor to Cmmr. Duque, Linda Serizawa, advisor to Cmmr. Wood, Paul Clanon, Director of the Energy Division, and Peter Garris and Viju Patel of the California Department of Water Resources. The letter pertains to Edison's motion for an interim granting approval of process for early procurement of capacity, filed May 6, 2002. The letter urges the Commission to expedite Edison's request.

Type: EXPARTE Filing Date: May 9, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Summary: On May 7, 2002, Gary Schoonyan, Director of Public Affairs of Southern California Edison Company (Edison), met with David Gamson, advisor to Cmmr. Brown, and Robert Kinosian, advisor to Cmmr. Lynch, in two separate meetings in San Francisco. Also present was Bruce Foster, Vice President of Regulatory Affairs of Edison. Written material (attached to the notice) was used. Schoonyan discussed the status of legislation addressing the development of future renewables and indicated Edison?s commitment to purchase up to 200MW of new renewables, with the existing PGC funds used to supplement any costs required beyond the Commission-determined benchmark price. Schoonyan also discussed the approach for dealing with transmission and other operational costs.

Type: EXPARTE Filing Date: May 9, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On May 6, 2002, William Stock, Chief of Regulatory Relations of Pacific Gas and Electric Company (PG&E), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present were Belinda Gatti and Peter Hanson, advisors to Cmmr. Brown, and Joseph Henri, Director, Utility Electric Portfolio Management, and Mark Huffman, Attorney, for PG&E. Stock outlined the changes that have occurred in the procurement market and noted the importance of establishing reasonable up-front standards. Stock stated it is imperative that PG&E be returned to investment grade status prior to engaging in energy procurement activities. Henri outlined the customers 'current net-open position, suppliers' heightened need for investment quality counter-parties, the type of reasonableness standards needed, and the type of energy transactions that are needed to cover the net-open portions.

Type: EXPARTE Filing Date: May 7, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Summary: On May 2, 2002, Gary Schoonyan, Director of Public Affairs of Southern California Edison Company (Edison), met with Cmmr. Peevey and Steve Weissman and Manuel Ramirez, advisors to Cmmr. Wood, in two separate meetings in San Francisco. Also present was Bruce Foster, Vice President of Regulatory Operations, for Edison. Written material (attached to the notice) was used. Schoonyan discussed the status of legislation addressing the development of future renewables and indicated Edison?s commitment to purchase up to 200 MW of new renewables, with the existing PGC funds used to supplement any costs required beyond the Commission-determined benchmark. Schoonyan also discussed the approach for dealing with transmission and other operational costs.

Type: MOTION Filing Date: May 7, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: For an interim decision granting approval of process for early procurement of capacity

Type: COMPLIANCE FILING Filing Date: May 3, 2002
Filed By:
SAN DIEGO GAS AND ELECTRIC COMPANY
Description: In compliance with May 1, 2002 Ruling of ALJ McKenzie

Type: RULING Filing Date: May 1, 2002
Filed By:
ALJ/MCKENZIE/PUC
Description: revising protective order; directing PG&E, Edison, and SDG&E to file individualized version of the protective order by 5/3/2002.

Type: EXPARTE Filing Date: April 30, 2002
Filed By:
SEMPRA ENERGY UTILITIES
Description: Summary: On April 25, 2002, Bill Reed, Senior Vice President of Sempra Energy Utilities (Sempra), met with Cmmr. Brown in San Francisco. Also present were David Gamson and Belinda Gatti, advisors to Cmmr. Brown, and Leslie Katz, Regional Vice President, and Robert Resley, Vice President, of Sempra Energy Utilities. Reed stated that there is a customer benefit from a statewide planning, acquisition, procurement and dispatch model that should be given serious consideration as an alternative to returning the utilities to procurement. Reed proposed that any return of utilities to procurement be delayed so that a process can be established to ensure that it is done properly. Katz noted that there should be a process to bring together the utilities and other necessary parties to develop long-term procurement processes and policies. Resley explained that California Department of Water Resources? procurement role for the three utilities? net short should be extended through 2003. Reed also stated that there would be a need for procedures to be in place to avoid after-the-fact reasonableness reviews. Reed also emphasized that all three utilities must be creditworthy before the utilities return to procurement.

Type: EXPARTE Filing Date: April 30, 2002
Filed By:
SEMPRA ENERGY UTILITIES
Description: Summary: On April 25, 2002, Bill Reed, Senior Vice President of Sempra Energy Utilities (Sempra), met with Cmmr. Peevey in San Francisco. Also present were Leslie Katz, Regional Vice President, and Robert Resley, Vice President, of Sempra Energy Utilities. Reed stated that there needs to be a state planning, acquisition, procurement and dispatch model instead of returning the utilities to procurement, and that Department of Water Resources (DWR) should continue to engage in procurement until a model is established that will be for the long-term procurement. Reed further stated that if the utilities are to return to procurement, San Diego Gas & Electric Company should not be the only utility procuring and that, instead, the steps necessary to return the other utilities to creditworthiness must have been implemented and the others must also begin procurement at that time. Resley stated that reasonableness reviews should be avoided. Katz noted that there should be a mechanism for contemporaneous recovery of purchased power costs. Reed also stated that in order to return to procurement, there is a need to determine the DWR allocation.

Type: COMMENTS Filing Date: April 29, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: In response to the April 25, 2002 ALJ's Ruling concerning draft protective order

Type: NOTICE Filing Date: April 29, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of grant of request for ex-parte meeting

Type: COMMENTS Filing Date: April 29, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: in compliance with 4/25/02 Ruling of ALJ McKenzie

Type: RULING Filing Date: April 25, 2002
Filed By:
ALJ/MCKENZIE/PUC
Description: concerning draft protective order: Adopts the Protective Order. Parties identifying drafting error shall file a solution by 4/29/2002. The three respondent utilities shall file their individualized protective order by 4/30/2002.

Type: MOTION Filing Date: April 16, 2002
Filed By:
WESTERN POWER TRADING FORUM
Description: to Intervene.

Type: COMMENTS Filing Date: April 15, 2002
Filed By:
ORA/SCARFF/PUC
Description: on recommended steps for transition

Type: RULING Filing Date: April 15, 2002
Filed By:
ALJ/WALWYN/PUC
Description: correcting administrative error

Type: COMMENTS Filing Date: April 15, 2002
Filed By:
SOUTHERN CALIFORNIA EDIOSN COMPANY
Description: on transitional issues

Type: COMMENTS Filing Date: April 15, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: in response to April 2, 2002 ACR

Type: COMMENTS Filing Date: April 15, 2002
Filed By:
THE UTILITY REFORM NETWORK
Description: in support of continued procurement by DWR/CERS beyond December 31, 2002

Type: BRIEF Filing Date: April 12, 2002
Filed By:
CONSUMERS UNION
Description: on Required Steps for transition.

Type: BRIEF Filing Date: April 12, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Transitional Issues.

Type: BRIEF Filing Date: April 12, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: in response to April 2, 2002 ACR

Type: BRIEF Filing Date: April 12, 2002
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on Required Steps for Transition.

Type: NOTICE Filing Date: April 10, 2002
Filed By:
CONSUMERS UNION
Description: of Intent to Claim Compensation.

Type: RULING Filing Date: April 10, 2002
Filed By:
ALJ/WALWYN/PUC
Description: grants Edison's 4/5/2002 request for extension to serve testimony; amends procedural schedule as follows: Testimony of respondent utilities - 4/29; Testimony of interested parties - 5/20; Rebuttal testimony - 5/29; Cross-exam. estimates - 5/30; Proposals for witness order - 5/31; Evidentiary hearings - starts 6/3; Opening briefs - 7/3; Reply briefs - 7/17; Proposed Decision - 9/10; Final Commission decision - 10/2002.

Type: SCOPING RULING Filing Date: April 2, 2002
Filed By:
CMMR/LYNCH/PUC
Description: Confirms this is a ratesetting proceeding. Sets the scope and following schedule: Required Steps for Transition Briefs - 4/12/2002; Comments on Additional Steps for Transition - 4/15; Testimony of respondent utilities - 4/22; Testimony of parties - 5/13; Rebuttal testimony of all parties - 5/22; Cross-exam. estimates - 5/23; Proposals for witness order - 5/24; Evidentiary hearings - 5/28-6/4; Opening briefs - 6/21; Reply briefs - 7/3; Proposed decision - 9/3; Final Commission decision - 10/02. Designates ALJ Walwyn as the principal hearing officer. Ex-parte rules apply. Adopts the official service list.

Type: RULING Filing Date: February 15, 2002
Filed By:
ALJ/WALWYN/PUC
Description: addressing PG&E's submittal of proposed testimony on 2/13/2002

Type: NOTICE Filing Date: February 7, 2002
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: of intent to claim compensation

Type: NOTICE Filing Date: February 5, 2002
Filed By:
AGLET CONSUMER ALLIANCE
Description: of intent to claim compensation

Type: NOTICE Filing Date: February 5, 2002
Filed By:
THE UTILITY REFORM NETWORK
Description: of intent to claim compensation

Type: PREHEARING CONFERENCE STATEMENT Filing Date: January 4, 2002
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: for consideration at the PHC scheduled for January 8, 2002

Type: PREHEARING CONFERENCE STATEMENT Filing Date: January 4, 2002
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: in advance of the January 8, 2002 PHC in the OIR

Type: COMMENTS Filing Date: December 24, 2001
Filed By:
WESTERN POWER TRADING FORUM
Description: On the Procurement Plans of PG&E, SDG&E and Edison.

Type: COMMENTS Filing Date: December 21, 2001
Filed By:
COUNTY OF LOS ANGELES
Description: in response to the procurement planning proposals of Edison

Type: PETITION Filing Date: December 21, 2001
Filed By:
AMERICAN ENERGY INSTITUTE
Description: for Leave to intervene; Comments Attached

Type: MOTION Filing Date: December 21, 2001
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: To Intervene; Comments Attached

Type: COMMENTS Filing Date: December 21, 2001
Filed By:
ORA/SCARFF/PUC
Description: pursuant to the OIR

Type: COMMENTS Filing Date: December 21, 2001
Filed By:
DYNEGY MARKETING AND TRADE
Description: in response to Commission OIR regarding cost recovery mechanisms for generation procurement and renewable resource development

Type: COMMENTS Filing Date: December 21, 2001
Filed By:
CALPINE CORPORATION
Description: Initial Comments in response to Utility proposals on policies and cost recovery mechanisms for generation procurement and renewable resource development

Type: COMMENTS Filing Date: December 21, 2001
Filed By:
CALIFORNIA ENERGY COMMISSION
Description: Opening Comments pursuant to the procedural schedule set forth in the October 25, 2001 OIR

Type: COMMENTS Filing Date: December 21, 2001
Filed By:
CALIFORNIA FARM BUREAU FEDERATION
Description: on Utility Electricity Procurement Proposals

Type: COMMENTS Filing Date: December 21, 2001
Filed By:
FEDERAL EXECUTIVE AGENCIES
Description: on Utility Proposed Procurement Mechanisms

Type: COMMENTS Filing Date: December 21, 2001
Filed By:
CALIFORNIA MANUFACTURERS AND TECHNOLOGY ASSOC.
Description: in accordance with the schedule established in this proceeding

Type: COMMENTS Filing Date: December 21, 2001
Filed By:
DEPARTMENT OF GENERAL SERVICES
Description: on Utility Procurement Proposals.

Type: COMMENTS Filing Date: December 21, 2001
Filed By:
AGLET CONSUMER ALLIANCE
Description: On Respondents' Proposals

Type: COMMENTS Filing Date: December 21, 2001
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: Initial Comments in response to the OIR

Type: COMMENTS Filing Date: December 21, 2001
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: On Respondent Utilities' Procurement Proposals

Type: COMMENTS Filing Date: December 21, 2001
Filed By:
THE UTILITY REFORM NETWORK
Description: on procurement policies, portfolio management and renewable resource acquisitions

Type: COMMENTS Filing Date: December 21, 2001
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: in accordance with the OIR

Type: COMMENTS Filing Date: December 21, 2001
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
Description: on Utility filings on policies and cost recovery mechanisms for generation procurement

Type: COMMENTS Filing Date: December 20, 2001
Filed By:
CONSUMER UNION
Description: in response to OIR regarding policies and cost recovery mechanisms for generation procurement and renewable resosurce development

Type: COMMENTS Filing Date: December 14, 2001
Filed By:
CALIFORNIA CONSUMER POWER AND CONSERVATION FINANCING AUTHORITY
Description: Comments in response to OIR 01-10-024 regarding policies and cost recovery mechanisms for generation procurement and renewable resource development.

Type: MOTION Filing Date: November 26, 2001
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: for Leave to File Late Procurement Planning Proposals in Response to [this] OIR; PROPOSALS ATTACHED.

Type: MISCELLANEOUS FILING Filing Date: November 21, 2001
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Proposal in Compliance with [this] O.I.R.

Type: RESPONSE Filing Date: November 21, 2001
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on policies and cost recovery mechanisms for generation procurement and renewable resource development

Type: EXPARTE Filing Date: November 19, 2001
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On November 14, 2001, Bill Stock, Manager of Regulatory Relations of Pacific Gas and Electric Company (PG&E), met with David Gamson, advisor to Cmmr. Brown, and Linda Serizawa, advisor to Cmmr. Wood, in two separate meetings in San Francisco. Also present was Joseph Henri, Director of Utility Electric Portfolio Management, PG&E. Henri stated that there has been a significant reduction in transaction liquidity, that there would likely to be an increase in credit calls to match contract prices with changes in market prices, and that the creditworthiness of purchasers would be a significant issue in the future energy market.

Type: EXPARTE Filing Date: November 16, 2001
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On November 13, 2001, Bill Stock, Manager of Regulatory Relations of Pacific Gas and Electric Company (PG&E), met with Laura Krannawitter, advisor to Cmmr. Duque, in San Francisco. Also present was Joseph Henri, Director of Utility Electric Portfolio Management, PG&E. Henri stated that there has been a significant reduction in transaction liquidity, that there would likely to be an increase in credit calls to match contract prices with changes in market prices, and that the creditworthiness of purchasers would be a significant issue in the future energy market.

Type: COMMISSION RULEMAKING Filing Date: October 25, 2001
Filed By:
CPUC
Description: Order Instituting Rulemaking to Establish Policies and Cost Recovery Mechanisms for Generation Procurement and Renewable Resource Development; sets the following preliminary schedule: 11/21/01 - Edison, SDG&E and PG&E submit their proposals; 12/14/01 - interested parties submit comments on the proposals; 1/8/2002 - PHC; 12/15/2002 - Final Decision.