Type:
RULING
|
Filing Date:
October 1, 2008
|
Filed By:
ALJ/PULSIFER/CPUC
|
|
Description:
Serving Notice of Intention to Close Proceeding. If any party believes there is reason to keep this proceeding open, this ruling provides the opportunity to identify any outstanding issues that remain to be resolved through this rulemaking. Comments, if any, shall be due no later than five business days from the effective date of this ruling.
|
Type:
STATEMENT
|
Filing Date:
June 1, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Joint; regarding Additional Departing Load and Split Wheeling Departing Load.
|
Type:
EXPARTE
|
Filing Date:
May 4, 2007
|
Filed By:
California Municipal Utilities Association
|
|
Description:
SUMMARY: On May 1, 2007, Scott Blaising, counsel for California Municipal Utilities Association (CMUA), met with Karen Shea, advisor to Cmmr. Simon in San Francisco. Blaising commented on the proposed decision (PD) relating to cost responsibility surcharge (CRS) exemption protocols for certain new Municipal Departing Load (MDL) customers. Blaising expressed concern that the PD could be construed as saying that CRS exemptions will automatically apply to certain MDL customers and noted that such a conclusion would be wrong. Blaising noted that CMUA proposed changes to the PD to resolve the ambiguity. Contact person: Scott Blaising, telephone: (916) 682-9702; email: blaising@braunlegal.com.
|
Type:
COMMENTS
|
Filing Date:
April 30, 2007
|
Filed By:
Pacific Gas and Electric Company
San Diego Gas & Electric Co
So. California Edison
|
|
Description:
Reply; on the Proposed Decision of ALJ Pulsifer regarding Allocation of 80 MW Exemption.
|
Type:
EXPARTE
|
Filing Date:
April 27, 2007
|
Filed By:
California Municipal Utilities Association
|
|
Description:
SUMMARY: On April 24, 2007, Scott Blaising, counsel for California Municipal Utilities Association (CMUA), met with Rami Kahlon, advisor to Pres. Peevey in San Francisco. Also present were Susie Berlin, counsel for Northern California Power Agency, Ann Trowbridge, counsel for Merced Irrigation District and Modesto Irrigation District, and Joy Warren, counsel for Modesto Irrigation District. Blaising provided CMUA's views on two proposed decisions of ALJ Pulsifer. The parties also commented on the proposed decisions. Contact person: Scott Blaising, telephone: (916) 682-9702; email: blaising@braunlegal.com.
|
Type:
COMMENTS
|
Filing Date:
April 24, 2007
|
Filed By:
California Municipal Utilities Association
|
|
Description:
Reply;
|
Type:
COMMENTS
|
Filing Date:
April 24, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; on the Proposed Decision of ALJ Pulsifer regarding Petition for Modification of D.03-04-030.
|
Type:
COMMENTS
|
Filing Date:
April 23, 2007
|
Filed By:
California Municipal Utilities Association
|
|
Description:
on the Proposed Decision of ALJ Pulsifer on Proposed Cost Responsibility Surcharge Exemption Protocols.
|
Type:
COMMENTS
|
Filing Date:
April 23, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; on Opinion Granting Petition for Modification of Decision 03-04-030: Opinion on Cost Responsibility Surcharge Mechanisms for Customer Generation Departing Load.
|
Type:
COMMENTS
|
Filing Date:
April 23, 2007
|
Filed By:
Merced Irrigation District
Modesto Irrigation District
|
|
Description:
Regarding Proposed Opinion Granting Petition of PG&E and SDG&E and SCE for Modificatioin of Decision 06-07-030.
|
Type:
COMMENTS
|
Filing Date:
April 23, 2007
|
Filed By:
Hercules Municipal Utility
|
|
Description:
on the Proposed Decision of ALJ Pulsifer on Proposed Cost Responsibility Surcharge Exemption Protocols.
|
Type:
COMMENTS
|
Filing Date:
April 19, 2007
|
Filed By:
California Municipal Utilities Association
|
|
Description:
Opening; on the Proposed Decision of ALJ Pulsifer in response to Pacific Gas and Electric Company's Petition to Modify D.06-07-030.
|
Type:
COMMENTS
|
Filing Date:
April 19, 2007
|
Filed By:
California Clean DG Coalition
|
|
Description:
regarding Opinion Granting Petition for Modification of Decision 03-04-030: Opinion on Cost Responsibility Surcharge Mechanisms for Customer Generation Departing Load.
|
Type:
COMMENTS
|
Filing Date:
April 19, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
on Proposed Decision of ALJ Pulsifer regarding Petition filed by PG&E Company.
|
Type:
PROPOSED DECISION
|
Filing Date:
April 3, 2007
|
Filed By:
ALJ/PULSIFER/CPUC
|
|
Description:
Opinion Granting Petition of Pacific Gas and Electric Company, San Diego Gas & Electric Company, and Southern California Edison Company for Modification of Decision 06-07-030. Opening Comments, which shall not exceed 15 pages, are due no later than April 23, 2007. Reply Comments are due 5 days after Opening Comments are filed.
|
Type:
PROPOSED DECISION
|
Filing Date:
March 30, 2007
|
Filed By:
ALJ/PULSIFER/CPUC
|
|
Description:
Regarding Petition for Modification of Decision 06-07-030 Filed by Pacific Gas and Electric Company. Opening Comments, which shall not exceed 15 pages, are due no later than April 19, 2007. Reply Comments are due 5 days after Opening Comments are filed.
|
Type:
PROPOSED DECISION
|
Filing Date:
March 30, 2007
|
Filed By:
ALJ/PULSIFER/CPUC
|
|
Description:
Opinion Granting Petition for Modification of Decision 03-04-030: Opinion on Cost Responsibility Surcharge Mechanisms for Customer Generation Departing Load. Opening Comments, which shall not exceed 15 pages, are due no later than April 19, 2007. Reply Comments are due 5 days after Opening Comments are filed.
|
Type:
EXPARTE
|
Filing Date:
March 2, 2007
|
Filed By:
California Municipal Utilities Association
|
|
Description:
On February 27, 2007, Scott Blaising, counsel for California Municipal Utilities Association (CMUA), met with Rami Kahlon, advisor to Pres. Peevey in San Francisco. Blaising stated that CMUA is opposed to Pacific Gas and Electric Company's (PG&E) request in its petition to modify Decision 06-07-030 that the Commission disallow the use of netting to offset a "negative" indifference rate against a "positive" indifference rate. Blaising noted that PG&E's request is inconsistent with D.06-07-030, contrary to numerous other Commission's decisions, principally D.05-12-045, and should not be allowed. Blaising discussed the issue of negative and positive Indifference Rate. Contact person: Scott Blaising, telephone: (916) 682-9702; email: blaising@braunlegal.com
|
Type:
EXPARTE
|
Filing Date:
February 8, 2007
|
Filed By:
Power and Water Resources Pooling Authority
|
|
Description:
On February 6, 2007, Scott Blaising, counsel for Power and Water Resources Pooling Authority (PWRPA), met with Rami Kahlon, advisor to President Peevey in San Francisco. Written materials (attached to the notice) were used. Blaising stated that PWRPA is opposed to Pacific Gas and Electric Company's (PG&E) rate proposal in its petition to modify Decision 06-07-030. Blaising stated that the issue presented by PG&E's petition is the same issue that PWRPA protested in response to PG&E's Advice Letter 2835-E. Blaising emphasized that the Department of Water Resources (DWR) Power Charge should not be determined as proposed by PG&E, but should be determined based on the actual accrued costs. Blaising urged the Commission to reject PG&E's proposal and instead base the DWR Power Charge on actual accrued costs.
|
Type:
REPLY
|
Filing Date:
January 3, 2007
|
Filed By:
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
to the Response of the California Municipal Utilities Association (to Petition to Modify Decision 06-07-030).
|
Type:
REPLY
|
Filing Date:
December 28, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to the Response of the California Municipal Utilities Association( to PG&E Petition to Modify Decision 06-07-030).
|
Type:
REPLY
|
Filing Date:
December 27, 2006
|
Filed By:
California Clean DG Coalition
|
|
Description:
to Responses to Petition for Modification of Decision 03-04-030: Opinion on Cost Responsibility Surcharge Mechanisms for Customer Generation Departing Load.
|
Type:
COMMENTS
|
Filing Date:
December 22, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; on Petition to Modify Decision 03-04-030. (File date approved by ALJ Pulsifer)
|
Type:
RESPONSE
|
Filing Date:
December 20, 2006
|
Filed By:
California Municipal Utilities Association
|
|
Description:
TO THE PETITION OF PG&E, SDG&E, AND EDISON TO MODIFY D06-07-030.
|
Type:
RESPONSE
|
Filing Date:
December 18, 2006
|
Filed By:
California Municipal Utilities Association
|
|
Description:
TO THE PETITION OF PACIFIC GAS AND ELECTRIC COMPANY
TO MODIFY D06-07-030.
|
Type:
RESPONSE
|
Filing Date:
December 14, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to (California Clean DG Coalition) Petition for Modification of Decision 03-04-030.
|
Type:
REPLY
|
Filing Date:
December 14, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to Comments of the City of Moreno Valley and the City and County of San Francisco on the Petition to Modify Decision 06-07-030.
|
Type:
RESPONSE
|
Filing Date:
December 4, 2006
|
Filed By:
Hercules Municipal Utility
|
|
Description:
IN SUPPORT OF THE WORKING GROUP PARTIES' JOINT PETITION FOR MODIFICATION OF D06-07-030 REGARDING DIRECT ACCESS AND DEPARTINGLOAD COST RESPONSIBILITY SURCHARGE OBLIGATIONS.
|
Type:
RESPONSE
|
Filing Date:
December 4, 2006
|
Filed By:
City and County of San Francisco
City of Moreno Valley
|
|
Description:
in support of portions of the November 3, 2006 Working Group parties joint pettiion for modification of D06-07-030.
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
November 20, 2006
|
Filed By:
Pacific Gas and Electric Company
San Diego Gas and Electric Company
Southern California Edison
|
|
Description:
of Decision 06-07-030.
|
Type:
EXPARTE
|
Filing Date:
November 20, 2006
|
Filed By:
Merced Irrigation District
Modesto Irrigation District
Northern California Power Agency
|
|
Description:
SUMMARY: On November 16, 2006, Susie Berlin, counsel for the Northern California Power Agency, met with Rami Kahlon, advisor to Pres. Peevey, in San Francisco. Also present were Joy Warren, Senior Staff Attorney, for the Modesto Irrigation District, and Dan Carroll, counsel for Merced Irrigation District and Modesto Irrigation District. The parties discussed draft resolution E-3999 (draft resolution). Berlin emphasized that the publicly owned utilities (POUs) are looking for resolution of the billing and collection issue, but want to insure that what is finally adopted is both legal and practicable. Carroll commended the draft resolution's conclusion that Pacific Gas and Electric Company could not terminate natural gas service to POU customers that may fail to pay the cost responsibility surcharge. Carroll and Warren explained why the draft resolution fails to properly address a "New Party" or "Change of Party". Carroll also noted that the draft resolution should be clarified to address the fact that custome
|
Type:
EXPARTE
|
Filing Date:
November 20, 2006
|
Filed By:
Merced Irrigation District
Modesto Irrigation District
Northern California Power Agency
|
|
Description:
SUMMARY: On November 16, 2006, Susie Berlin, counsel for the Northern California Power Agency, met with Stephen St. Marie, advisor to Cmmr. Bohn, in San Francisco. Also present were Joy Warren, Senior Staff Attorney, for the Modesto Irrigation District, and Dan Carroll, counsel for Merced Irrigation District and Modesto Irrigation District. The parties discussed draft resolution E-3999 (draft resolution). Berlin emphasized that the publicly owned utilities (POUs) are looking for resolution of the billing and collection issue, but want to insure that what is finally adopted is both legal and practicable. Carroll commended the draft resolution's conclusion that Pacific Gas and Electric Company could not terminate natural gas service to POU customers that may fail to pay the cost responsibility surcharge. Carroll and Warren explained why the draft resolution fails to properly address a "New Party" or "Change of Party". Carroll also noted that the draft resolution should be clarified to address the fact that cus
|
Type:
EXPARTE
|
Filing Date:
November 20, 2006
|
Filed By:
Merced Irrigation District
Modesto Irrigation District
Northern California Power Agency
|
|
Description:
SUMMARY: On November 16, 2006, Susie Berlin, counsel for the Northern California Power Agency, had a telephonic conference with Belinda Gatti, advisor to Cmmr. Brown. Also participating were Andrew Campbell, advisor to Cmmr. Chong, Joy Warren, Senior Staff Attorney, for the Modesto Irrigation District, Jem Brown, Assistant General Manager, Energy Resources, Business and Resource Planning, Merced Irrigation District and Dan Carroll, counsel for Merced and Modesto Irrigation Districts. The parties discussed draft resolution E-3999 (draft resolution). Berlin emphasized that the publicly owned utilities (POUs) are looking for resolution of the billing and collection issue, but want to insure that what is finally adopted is both legal and practicable. Carroll commended the draft resolution's conclusion that Pacific Gas and Electric Company could not terminate natural gas service to POU customers that may fail to pay the cost responsibility surcharge. Carroll and Warren explained why the draft resolution fails t
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
November 16, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
of Decision 06-07-030.
|
Type:
CERTIFICATE OF SERVICE
|
Filing Date:
November 15, 2006
|
Filed By:
CALIFORNIA CLEAN DG COALITION
|
|
Description:
Amended; to Petition for Modification of Decision 03-04-030 filed Nov 14, 2006.
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
November 14, 2006
|
Filed By:
CALIFORNIA CLEAN DG COALITION
|
|
Description:
of Decision 03-04-030: Opinion on Cost Responsibility Surcharge Mechanism for Customer Generation Departing Load.
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
November 3, 2006
|
Filed By:
Alliance for Retail Energy Network
California Large Energy Consumers Association
California Manufacturers & Technology Association
City of Corona
City of Rancho Cucamonga
Pacific Gas and Electric Company
San Diego Gas and Electric
South San Joaquin Irrigation District
Southern California Edison Company
The Utility Reform Network
|
|
Description:
of Decision 06-07-030.
|
Type:
REQUEST
|
Filing Date:
September 13, 2006
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
for award of compensation for substantial contribution to D06-07-030.
|
Type:
RESPONSE
|
Filing Date:
September 5, 2006
|
Filed By:
Pacific Gas and Electric Company
Southern California Edison Company
|
|
Description:
Joint; in Opposition to Application for Rehearing of Decision 06-07-030.
|
Type:
REHEARING REQUEST
|
Filing Date:
August 21, 2006
|
Filed By:
CALIFORNIA MUNICIPAL UTILITIES ASSOCIATION
CITY OF HERCULES
MERCED IRRIGATION DISTRICT
NORTHERN CALIFORNIA POWER AGENCY
TURLOCK IRRIGATION DISTRICT
|
|
Description:
of Decision 06-07-030.
|
Type:
RULING
|
Filing Date:
July 19, 2006
|
Filed By:
ALJ/PULSIFER/PUC
|
|
Description:
Grants motions to submit proposed modifications to the draft decision one day out of time.
|
Type:
RULING
|
Filing Date:
July 19, 2006
|
Filed By:
ALJ/Pulsifer/PUC
|
|
Description:
Grants the motions of City and County of San Francisco and the Port of Stockton for exemption eligibility, filed March 16, 2006.
|
Type:
EXPARTE
|
Filing Date:
July 18, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On July 13, 2006, Sidney Dietz, Manager, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Peter Hanson, advisor to Cmmr. Brown, in San Francisco. Also present were Belinda Gatti, advisor to Cmmr. Brown, Steve Roscow of the Energy Division, and Mark Huffman, Counsel, for PG&E. Huffman suggested that the same treatment recommended in the Working Group report with respect to direct access customers be applied to departing load customers. PG&E representatives also stated its opinion that the draft decision should not be modified to allow negative indifference amounts occurring after the CRS under-collection is repaid to offset other components of the CRS, such as the Department of Water Resources bond charge.
|
Type:
COMMENTS
|
Filing Date:
July 17, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; on Draft Opinion of ALJ Pulsifer regarding Direct Access and Departing Load Cost Responsibility Surcharge Obligations.
|
Type:
COMMENTS
|
Filing Date:
July 17, 2006
|
Filed By:
CALIFORNIA MUNICIPAL UTILITIES ASSOCIATION
CITY OF HERCULES
CITY OF RANCHO CUCAMONGA
MERCED IRRIGATION DISTRICT
MODESTO IRRIGATION DISTRICT
NORTHERN CALIFORNIA POWER AGENCY
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
TURLOCK IRRIGATION DISTRICT
|
|
Description:
joint; reply; on the draft opinion regarding Direct Access and Departing Load CRS obligations.
|
Type:
COMMENTS
|
Filing Date:
July 17, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
reply; on Draft Decision of ALJ Pulsifer regarding municipal departing load issues.
|
Type:
MOTION
|
Filing Date:
July 11, 2006
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
DRA/TUDISCO/PUC
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
|
|
Description:
of the Direct Access Agreement parties; to submit one day out of time proposed modifications to the findings of fact, conclusions of law, and ordering paragraphs of the draft decision of ALJ Pulsifer; attached.
|
Type:
MOTION
|
Filing Date:
July 11, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to submit one day out of time proposed modifications to the findings of fact, conclusions of law, and ordering paragraphs of the draft decision of ALJ Pulsifer on municipal departing load; attached.
|
Type:
COMMENTS
|
Filing Date:
July 11, 2006
|
Filed By:
TURLOCK IRRIGATION DISTRICT
|
|
Description:
opening; on the "Opinion Regarding Direct Access and Departing Load Cost Responsibility Surcharge Obligations".
|
Type:
COMMENTS
|
Filing Date:
July 11, 2006
|
Filed By:
NORTHERN CALIFORNIA POWER AGENCY
|
|
Description:
opening; on the "Opinion Regarding Direct Access and Departing Load Cost Responsibility Surcharge Obligations".
|
Type:
COMMENTS
|
Filing Date:
July 10, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
ON ADMINISTRATIVE LAW JUDGE PULSIFER'S DRAFT OPINION REGARDING DIRECT ACCESS AND DEPARTING LOAD COST
RESPONSIBILITY SURCHARGE OBLIGATIONS
|
Type:
COMMENTS
|
Filing Date:
July 10, 2006
|
Filed By:
MERCED IRRIGATION DISTRICT
MODESTO IRRIGATION DISTRICT
|
|
Description:
regarding Draft Opinion Regarding Direct Access and Departing Load Cost Responsibility Surcharge Obligations.
|
Type:
COMMENTS
|
Filing Date:
July 10, 2006
|
Filed By:
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
|
|
Description:
on Draft Decision of ALJ Pulsifer.
|
Type:
COMMENTS
|
Filing Date:
July 10, 2006
|
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS AND TECHNOLOGY ASSOCIATION
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
|
|
Description:
joint; on the draft decision of ALJ Pulsifer on cost responsibility surcharge issues.
|
Type:
COMMENTS
|
Filing Date:
July 10, 2006
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
DRA/TUDISCO/PUC
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
|
|
Description:
of the Direct Access Agreement Parties; on the draft decision of ALJ Pulsifer.
|
Type:
COMMENTS
|
Filing Date:
July 10, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
on the draft decision of ALJ Pulsifer.
|
Type:
COMMENTS
|
Filing Date:
July 10, 2006
|
Filed By:
CALIFORNIA MUNICIPAL UTILITIES ASSOCIATION
|
|
Description:
on the draft decision of ALJ Pulsifer.
|
Type:
DRAFT DECISION
|
Filing Date:
June 20, 2006
|
Filed By:
ALJ/PULSIFER/CPUC
|
|
Description:
OPINION REGARDING DIRECT ACCESS AND DEPARTING LOAD COAST RESPONSBILITY SURCHARGE OBLIGATIONS. Comments are due 07/10/06; Reply Comments due 5 days thereafter.
|
Type:
EXPARTE
|
Filing Date:
June 12, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On June 6, 2006, Mark Huffman, counsel, Pacific Gas and Electric Company (PG&E), met with Belinda Gatti, advisor to Cmmr. Brown, in San Francisco. Also present were Lynn Carew, advisor to Cmmr. Chong, Rami Kahlon, advisor to Pres. Peevey, Theresa Cho, advisor to Cmmr. Grueneich, Peter Hanson, advisor to Cmmr. Brown, Chris Danforth of the Office of Ratepayer Advocates, Roger Goldstein, Senior Analyst, Energy Revenue Requirements, for PG&E, Bill Booth for CLECA, Steve McClary for AReM, and Mike Florio for The Utility Reform Network. Huffman urged the Commission to adopt the joint recommendations of the working group with respect to direct access issues, and also urged the Commission to adopt the utility recommendations set forth in the Working Group Report with respect to departing load issues.
|
Type:
EXPARTE
|
Filing Date:
June 9, 2006
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
DRA/CPUC
PACIFIC GAS AND ELECTRIC COMPANY
UTILITY REFORM NETWORK
|
|
Description:
On June 6, 2006, William H. Booth, counsel for the California Large Energy Consumers Association, met with Belinda Gatti, advisor to Cmmr. Brown, in San Francisco. Also present were Lynn Carew, advisor to Cmmr. Chong, Rami Kahlon, advisor to Pres. Peevey, Theresa Cho, advisor to Cmmr. Grueneich, Peter Hanson, advisor to Cmmr. Brown, Chris Danforth of the Office of Ratepayer Advocates, Mark Huffman and Roger Goldstein for Pacific Gas and Electric Company (PG&E), Steve McClary for the Alliance for Retail Energy Markets, and Mike Florio for The Utility Reform Network. Parties discussed the joint recommendation of these parties, and Southern California Edison Company (SCE) and the California Manufacturers and Technology Association (CMTA). Booth stated that parties had come to an agreement regarding several issues pertinent to the Direct Access Cost Responsibility Surcharge (DA CRS) and that they had incorporated their agreement in a joint proposal. Booth noted the dissatisfaction of parties with regard to previ
|
Type:
EXPARTE
|
Filing Date:
June 9, 2006
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
|
|
Description:
On June 6, 2006, William H. Booth, counsel for the California Large Energy Consumers Association (CLECA), met with Robert Lane, advisor to Cmmr. Bohn, at Max's Diner in San Francisco. Also present was Steve McClary, consultant to the Alliance for Retain Energy Markets (AReM). Booth and McClary discussed the joint recommendation of CLECA and AReM, and Southern California Edison Company (SCE) and the California Manufacturers and Technology Association. Booth stated that these parties had come to an agreement regarding several issues pertinent to the Direct Access Cost Responsibility Surcharge (DA CRS). Booth noted the dissatisfaction of parties with regard to previous attempts to quantify the DA CRS. McClary stated that the agreement will result in PG&E's DA CRS undercollection balance reaching zero on July 1, 2006, and that this will necessitate a change in the development of the DA CRS charges to its customers; prospectively, it will assemble each of the DA CRS elements on a bottoms up basis and will not imp
|
Type:
EXPARTE
|
Filing Date:
May 15, 2006
|
Filed By:
POWER AND WATER RESOURCES POOLING AUTHORITY
|
|
Description:
On May 9, 2006, Scott Blaising, counsel for the Power and Water Resources Pooling Authority (Pooling Authority) recorded a telephone voice message for Belinda Gatti, advisor to Cmmr. Brown and emailed to Belinda Gatti a copy of the Pooling Authority's reply comments on the draft decision. Blaising stated that the Pooling Authority supports the draft decision of ALJ Pulsifer and disagrees with various comments raised by PG&E.
|
Type:
RULING
|
Filing Date:
May 11, 2006
|
Filed By:
ALJ/PULSIFER/PUC
|
|
Description:
Regarding Confidential Data Provided purusant to Cmmission Staff Inquiry.
|
Type:
COMMENTS
|
Filing Date:
May 8, 2006
|
Filed By:
POWER AND WATER RESOURCES POOLING AUTHORITY
|
|
Description:
Reply; on Draft Decision of ALJ Pulsifer.
|
Type:
COMMENTS
|
Filing Date:
May 1, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on the draft decision of ALJ Pulsifer resolving petition for modification of D03-09-052.
|
Type:
RULING
|
Filing Date:
April 21, 2006
|
Filed By:
ALJ/PULSIFER/PUC
|
|
Description:
Grants Motions for Exemption Eligibilty filed on March 16, 2006.
|
Type:
DRAFT DECISION
|
Filing Date:
April 11, 2006
|
Filed By:
ALJ/PULSIFER/PUC
|
|
Description:
Opinion Resolving Petition for Modification of D03-09-052. Comments are due May 1, 2006; reply comments - 5 days after comments are filed.
|
Type:
REPLY
|
Filing Date:
April 6, 2006
|
Filed By:
CALIFORNIA MUNICIPAL UTILITIES ASSOCIATION
|
|
Description:
to PG&E's Response to Motion Requesting Determination of Eligibility.
|
Type:
REPLY
|
Filing Date:
April 3, 2006
|
Filed By:
CITY OF CORONA
|
|
Description:
and Supplemental Affidavit.
|
Type:
REPLY
|
Filing Date:
April 3, 2006
|
Filed By:
CALIFORNIA MUNICIPAL UTILITIES ASSOCIATION
|
|
Description:
to Edison's Response (to City of Corona Motion).
|
Type:
RESPONSE
|
Filing Date:
April 3, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to Motions of Hercules Municipal Utilities and CCSF requesting determination of eligibility.
|
Type:
EXPARTE
|
Filing Date:
March 29, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On March 24, 2006, Sidney Dietz, Manager of Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present were Belinda Gatti, advisor to Cmmr. Brown, Erik Kaltman, intern, Cmmr. Brown's office, and Mark Huffman, counsel, PG&E. Huffman suggested that the same treatment recommended in the Working Group report with respect to direct access (DA) customers be applied to departing load customers. PG&E also explained that, consistent with the recommendation in the Working Group Report with respect to DA customers, once the CTC is calculated on a `bottoms up' basis, then the sum of the ongoing CTC plus the Department of Water Resources power charge should not be allowed to be negative.
|
Type:
RESPONSE
|
Filing Date:
March 24, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to the City of Corona's Motion requesting Determination of Eligibility.
|
Type:
MOTION
|
Filing Date:
March 21, 2006
|
Filed By:
PORT OF STOCKTON
|
|
Description:
to file Reply and Reply to Response of PG&E to Various Motions (included).
|
Type:
RESPONSE
|
Filing Date:
March 20, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to various motions of the Port of Stockton [filed March 17, 2006].
|
Type:
COMMENTS
|
Filing Date:
March 17, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
joint; reply; on the final report of the working group to calculate CRS obigations associated with municipal departing load and direct access.
|
Type:
COMMENTS
|
Filing Date:
March 17, 2006
|
Filed By:
CALIFORNIA MUNICIPAL UTILITIES ASSOCIATION
CITY OF CORONA
CITY OF RANCHO CUCAMONGA
HERCULES MUNICIPAL UTILITY
MERCED IRRIGATION DISTRICT
MODESTO IRRIGATION DISTRICT
NORTHERN CALIFORNIA POWER AGENCY
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
TURLOCK IRRIGATION DISTRICT
|
|
Description:
joint; reply; on the final report of the working group to calculate CRS obigations associated with municipal departing load and direct access.
|
Type:
MOTION
|
Filing Date:
March 17, 2006
|
Filed By:
PORT OF STOCKTON
|
|
Description:
to strike, request for sanctions, for leave to file reply; reply to Response of PG&E to Motion of the Port of Stockton to Be Added to Eligibility List attached.
|
Type:
MOTION
|
Filing Date:
March 16, 2006
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
to be added to eligibility list.
|
Type:
MOTION
|
Filing Date:
March 16, 2006
|
Filed By:
HERCULES MUNICIPAL UTILITY
|
|
Description:
Requesting Determination of Eligibility.
|
Type:
MOTION
|
Filing Date:
March 15, 2006
|
Filed By:
CITY OF CORONA
|
|
Description:
requesting Determination of Eligibility.
|
Type:
RESPONSE
|
Filing Date:
March 14, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to Motion of the Port of Stockton to be added to eligibility list.
|
Type:
EXPARTE
|
Filing Date:
March 13, 2006
|
Filed By:
MODESTO IRRIGATION DISTRICT
NORTHERN CALIFORNIA POWER AGENCY
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
TURLOCK IRRIGATION DISTRICT
|
|
Description:
On Mach 9, 2006, Chris Mayer, Assistant General Manager, Planning and Marketing, Modesto Irrigation District, met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present were Susie Berlin, counsel for Northern California Power Agency and Turlock Irrigation District, and Jeanne Armstrong, counsel for South San Joaquin Irrigation District. A copy of the filed comments of the public owned utilities (POUs) was used. Armstrong discussed the total portfolio adjustment (TPA) and its application to municipal departing load (DL) exempt from the Department of Water Resources (DWR) Power Charge, noting that the TPA was essentially the same as the PCIA recommended for customers not exempt from the DWR Power Charge. Mayer, Armstrong and Berlin also discussed the Working Group process noting that the DL parties were not asked to participate in that process, and further that it was the understanding of the DL parties that the settlement discussions between the direct access (DA) and investor-owned utility
|
Type:
RULING
|
Filing Date:
March 9, 2006
|
Filed By:
ALJ/PULSIFER/PUC
|
|
Description:
Provides for reply comments regarding the final report of the working group to calculate the CRS obligations associated with municipal departing load and direct access. Reply comments are due by March 17, 2006.
|
Type:
COMMENTS
|
Filing Date:
March 8, 2006
|
Filed By:
CALIFORNIA STATE UNIVERSITY
COMMUNITY COLLEGE LEAGUE OF CALIFORNIA
UNIVERSITY OF CALIFORNIA
|
|
Description:
joint; on the final report of the working group to calculate the CRS obligations associated with Municipal Departing Load and Direct Access [pursuant to a February 23, 2006 ruling].
|
Type:
COMMENTS
|
Filing Date:
March 8, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on the final report of the Working Group to calculate CRS obligations associated with Municipal Departing Load and Direct Access.
|
Type:
COMMENTS
|
Filing Date:
March 8, 2006
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
CALIFORNIA LARGE ELECTRIC CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
DRA/TUDISCO/PUC
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
|
|
Description:
on Working Group report.
|
Type:
EXPARTE
|
Filing Date:
March 8, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On March 3, 2006, Ann Kim, counsel for Pacific Gas and Electric Company (PG&E), sent a letter (attached to the notice) to Cmmr. Brown. In the letter, Kim expressed PG&E's position on what would constitute an `incidental' increase in usage by new allottees that might be exempted from the Department of Water Resources Power Charge.
|
Type:
COMMENTS
|
Filing Date:
March 8, 2006
|
Filed By:
CALIFORNIA MUNICIPAL UTILITIES ASSOCIATION
CITY OF CORONA
CITY OF RANCHO CUCAMONGA
HERCULES MUNICIPAL UTILITY
MERCED IRRIGATION DISTRICT
MODESTO IRRIGATION DISTRICT
NORTHERN CALIFORNIA POWER AGENCY
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
TURLOCK IRRIGATION DISTRICT
|
|
Description:
on final report of the working group to calculate CRS obligations associated with municipal departing load and direct access.
|
Type:
MOTION
|
Filing Date:
March 6, 2006
|
Filed By:
PORT OF STOCKTON
|
|
Description:
to be added to Eligibility List.
|
Type:
COMMENTS
|
Filing Date:
February 27, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; on Draft Decision of ALJ Pulsifer establishing procedures for exemption eligibility.
|
Type:
COMMENTS
|
Filing Date:
February 27, 2006
|
Filed By:
HERCULES MUNICIPAL UTILITY
|
|
Description:
reply; on the draft decision of ALJ Pulsifer establishing procedures for exemption eligibility.
|
Type:
COMMENTS
|
Filing Date:
February 27, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on Draft Opinion establishing procedures for exemption eligibility.
|
Type:
COMMENTS
|
Filing Date:
February 27, 2006
|
Filed By:
CITY OF CORONA
|
|
Description:
reply;
|
Type:
EXPARTE
|
Filing Date:
February 24, 2006
|
Filed By:
POWER AND WATER RESOURCES POOLING AUTHORITY
|
|
Description:
On February 21, 2006, Scott Blaising, counsel for the Power and Water Resources Pooling Authority (Pooling Authority) recorded a telephone message for David Gamson, advisor to Cmmr. Brown and emailed to David Gamson a written material (attached to the notice) that was referred to in the message. Blaising stated that the Pooling Authority had developed principles for discussion with Pacific Gas and Electric Company (PG&E) and had revised the principles hoping to reach agreement with PG&E. Blaising communicated his understanding that PG&E is unwilling to participate in informal mediation noting that the Pooling Authority is willing to do so. Blaising suggested a specific individual to act in the role of mediator.
|
Type:
RULING
|
Filing Date:
February 23, 2006
|
Filed By:
ALJ/PULSIFER/PUC
|
|
Description:
Reactivates schedule for Advice Letter filings and protests for Municipal Departing Load.
|
Type:
RULING
|
Filing Date:
February 23, 2006
|
Filed By:
ALJ/PULSIFER/PUC
|
|
Description:
Incorporating Report and Letter Into the Record and Providing for Comments Thereon. Allows parties to file concurrent comments on issues addressed in the Report, to the extent set forth. Comments are due by March 8, 2006.
|
Type:
COMMENTS
|
Filing Date:
February 21, 2006
|
Filed By:
CITY OF CORONA
|
|
Description:
in support of the draft decision of ALJ Pulsifer establishing procedure of exemption eligibility.
|
Type:
COMMENTS
|
Filing Date:
February 21, 2006
|
Filed By:
HERCULES MUNICIPAL UTILITY
|
|
Description:
in support of the draft decision of ALJ Pulsifer establishing procedure of exemption eligibility.
|
Type:
COMMENTS
|
Filing Date:
February 21, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on the Draft Opinion establishing procedures of Exemption Eligibility.
|
DECISIONS
Number of Decisions: 44
|
Decision Number:
D0811019
|
Rendered Date:
November 6, 2008
Effective Date:
November 6, 2008
|
|
Description:
Closes rulemaking proceeding.
|
Decision Number:
D0705006
|
Rendered Date:
May 3, 2007
Effective Date:
May 3, 2007
|
|
Description:
The petition for modification of Decision 03-04-030 is granted, in part, and denied, in part, as set forth.
|
Decision Number:
D0705013
|
Rendered Date:
May 3, 2007
Effective Date:
May 3, 2007
|
|
Description:
Grants petition of Pacific Gas and Electric Company, San Diego Gas & Electric Company, and Southern California Edison Company for modification of Decision 06-07-030.
|
Decision Number:
D0705005
|
Rendered Date:
May 3, 2007
Effective Date:
May 3, 2007
|
|
Description:
Grants in part, and denies in part, the petition for modification of Decision 06-07-030 filed by PG&E.
|
Decision Number:
D0703028
|
Rendered Date:
March 15, 2007
Effective Date:
March 15, 2007
|
|
Description:
Grants intervenor compensation to The Utility Reform Network for its contributions to Decision 06-07-030.
|
Decision Number:
D0701030
|
Rendered Date:
January 25, 2007
Effective Date:
January 25, 2007
|
|
Description:
Grants joint petition for modification of Decision 06-07-030.
|
Decision Number:
D0701020
|
Rendered Date:
January 11, 2007
Effective Date:
January 11, 2007
|
|
Description:
Denies rehearing of Decision 06-07-030.
|
Decision Number:
D0607030
|
Rendered Date:
July 20, 2006
Effective Date:
July 20, 2006
|
|
Description:
Resolves various outstanding issues relating to the Direct Access and Departing Load cost responsibility surcharge obligations. This proceeding is closed.
|
Decision Number:
D0605018
|
Rendered Date:
May 11, 2006
Effective Date:
May 11, 2006
|
|
Description:
Grants, in part, and denies, in part, the petition for modification of D03-09-052, filed by PG&E on July 18, 2005, as set forth. (Comr. Bohn, being necessarily absent, did not participate.)
|
Decision Number:
D0603004
|
Rendered Date:
March 2, 2006
Effective Date:
March 2, 2006
|
|
Description:
Establishes procedures to seek exemption eligibility.
|
Decision Number:
D0602030
|
Rendered Date:
February 16, 2006
Effective Date:
February 16, 2006
|
|
Description:
Resolves the Petition for Clarification of Decision D.03-09-052, filed on May 10, 2005 by the Regents of the University of California on behalf of the University of California, Davis. (Comr. Grueneich recused herself from this agenda item and was not part of the quorum in its consideration.)
|
Decision Number:
D0508030
|
Rendered Date:
August 25, 2005
Effective Date:
August 25, 2005
|
|
Description:
Awards $40,459.66 in intervenor compensation to TURN, in compensation for its substantial contributions to D04-07-025, D05-01-040, D05-02-051, and D05-03-025.
|
Decision Number:
D0507038
|
Rendered Date:
July 21, 2005
Effective Date:
July 21, 2005
|
|
Description:
The petition to modify D04-12-059 filed by the California Municipal Utilities Association is granted, in part, and denied, in part. (Comr. Grueneich recused herself from this agenda item and was not part of the quorum in its consideration.)
|
Decision Number:
D0503036
|
Rendered Date:
March 29, 2005
Effective Date:
March 29, 2005
|
|
Description:
Corrects errors in D05-03-025.
|
Decision Number:
D0503025
|
Rendered Date:
March 17, 2005
Effective Date:
March 17, 2005
|
|
Description:
Implements affidavit process for direct access accounts. (Comr. Grueneich recused herself from this agenda item and was not part of the quorum in its consideration.)
|
Decision Number:
D0502051
|
Rendered Date:
February 24, 2005
Effective Date:
February 24, 2005
|
|
Description:
The petition to modify D03-04-030, filed by CLECA and CMTA is granted, in part, and denied, in part, as set forth. (Pres. Peevey will file a concurrence. Comr. Kennedy reserves the right to file a concurrence or join in Pres. Peevey's concurrence. Comr. Grueneich recused herself from this agenda item and was not part of the quorum in its consideration.)
|
Decision Number:
D0501040
|
Rendered Date:
January 27, 2005
Effective Date:
January 27, 2005
|
|
Description:
Adopts cost responsibility requirements for 2001 - 2003. (Comr. Grueneich recused herself from this agenda item and was not part of the quorum in its consideration.)
|
Decision Number:
D0412059
|
Rendered Date:
December 16, 2004
Effective Date:
December 16, 2004
|
|
Description:
Modifies D04-11-014 for purposes of clarification and denies rehearing of the Decision, as modified. (Comr. Lynch dissents.)
|
Decision Number:
D0411014
|
Rendered Date:
November 19, 2004
Effective Date:
November 19, 2004
|
|
Description:
The Municipal Departing Load Decision cost responsibility surcharge exception for new load applicable to publicly owned utilities formed on or before February 1, 2001, as established in D03-07-028 is hereby modified pursuant to the rehearing ordered in this proceeding. (Comr. Wood reserves the right to file a dissent. Comr. Lynch reserves the right to file a dissent.)
|
Decision Number:
D0409006
|
Rendered Date:
September 2, 2004
Effective Date:
September 2, 2004
|
|
Description:
Extends the monthly reporting requirements established in D97-05-040 and D99-05-034.
|
Decision Number:
D0408039
|
Rendered Date:
August 19, 2004
Effective Date:
August 19, 2004
|
|
Description:
Grants the SBC Services Inc. petition for modification of D03-05-034. (Comr. Wood dissents and reserves the right to file a dissent. Comr. Lynch dissents and reserves the right to join Comr. Wood's dissent.)
|
Decision Number:
D0407025
|
Rendered Date:
July 8, 2004
Effective Date:
July 8, 2004
|
|
Description:
Denies petitions to modify D03-04-057 and D02-03-055. (Comr. Lynch and Comr. Wood reserve the right to file a dissent.)
|
Decision Number:
D0402017
|
Rendered Date:
February 11, 2004
Effective Date:
February 11, 2004
|
|
Description:
Awards TURN $219,866.00 in compensation for its substantial contribution to D02-03-055, D02-04-067, D02-11-022, D02-12-027, D03-04-030, D03-05-034, D03-06-035, D03-07-030, D03-07-028 and D03-08-076.
|
Decision Number:
D0402024
|
Rendered Date:
February 11, 2004
Effective Date:
February 11, 2004
|
|
Description:
Grants the Petition for Modification of D03-04-057, as set forth. (Comr. Wood will file a dissent; and Comr. Lynch reserves the right to join in Commissioner Wood's dissent).
|
Decision Number:
D0401013
|
Rendered Date:
January 8, 2004
Effective Date:
January 8, 2004
|
|
Description:
Adopts a proxy for pricing of short-term power procured to serve Direct Access customers returning to bundled service on a temporary basis.
|
Decision Number:
D0309052
|
Rendered Date:
September 18, 2003
Effective Date:
September 18, 2003
|
|
Description:
Grants in part and denies in part, Central Valley Project Preference Power Post 2004 Implementation Group's motion filed on June 4, 2003.
|
Decision Number:
D0309061
|
Rendered Date:
September 18, 2003
Effective Date:
September 18, 2003
|
|
Description:
Grants Petition to Modify D03-07-030.
|
Decision Number:
D0309027
|
Rendered Date:
September 4, 2003
Effective Date:
September 4, 2003
|
|
Description:
Denies rehearing and request for clarification of Decision 03-01-078. (Comr. Lynch dissents).
|
Decision Number:
D0308076
|
Rendered Date:
August 21, 2003
Effective Date:
August 21, 2003
|
|
Description:
Grants limited rehearing on the issue of the allocation of the exception for new municipal load, modifies D03-07-028 for purposes of clarification, and denies rehearing of D03-07-028, as modified, in all other respects. (Comrs. Peevey and Kennedy dissent).
|
Decision Number:
D0307030
|
Rendered Date:
July 10, 2003
Effective Date:
July 10, 2003
|
|
Description:
The existing Direct Access cost responsibility surcharge cap of 2.7 cents/kWh applicable to each of the three utilities shall continue to remain in effect for the period beginning on and after July 1, 2003. Comr. Kennedy will file a concurrence; and Comrs. Wood and Lynch will file a dissent.
|
Decision Number:
D0307028
|
Rendered Date:
July 10, 2003
Effective Date:
July 10, 2003
|
|
Description:
Adopts cost responsibility surcharge mechanisms for municipal departing load. Comrs. Peevey and Kennedy dissent.
|
Decision Number:
D0306035
|
Rendered Date:
June 5, 2003
Effective Date:
June 5, 2003
|
|
Description:
Grants limited rehearing of D03-05-034 on the use of the Cal-ISO hourly price, and denies rehearing of the decision on all other aspects. (Comrs. Lynch and Wood dissent).
|
Decision Number:
D0305036
|
Rendered Date:
May 8, 2003
Effective Date:
May 8, 2003
|
|
Description:
Modifies D02-11-022 as set forth.
|
Decision Number:
D0305039
|
Rendered Date:
May 8, 2003
Effective Date:
May 8, 2003
|
|
Description:
Denies rehearing of D03-04-030 as modified.
|
Decision Number:
D0305034
|
Rendered Date:
May 8, 2003
Effective Date:
May 8, 2003
|
|
Description:
Adopts rules for switching exemption. (Com Lynch dissents, Com Wood will file a dissent).
|
Decision Number:
D0304057
|
Rendered Date:
April 17, 2003
Effective Date:
April 17, 2003
|
|
Description:
Grants in part and denies in part Albertson's petition to modify D02-03-055 as set forth in Appendix A. Modifies D02-03-055 as set forth. (Com Lynch dissents, Com Wood will file a dissent).
|
Decision Number:
D0304041
|
Rendered Date:
April 15, 2003
Effective Date:
April 15, 2003
|
|
Description:
Corrects errors in D03-04-030 as set forth.
|
Decision Number:
D0304030
|
Rendered Date:
April 3, 2003
Effective Date:
April 3, 2003
|
|
Description:
Opinion on cost responsibility surcharge mechanisms for customer generation departing load. (Com Lynch will file a dissent; Com Wood will file a dissent).
|
Decision Number:
D0301078
|
Rendered Date:
January 30, 2003
Effective Date:
January 30, 2003
|
|
Description:
Grants the petition of the City of Corona to clarify or modify D02-03-055 as set forth. (Com Lynch dissents; Com Wood will file a dissent).
|
Decision Number:
D0212027
|
Rendered Date:
December 5, 2002
Effective Date:
December 5, 2002
|
|
Description:
Modifies D02-11-022 as set forth. Denies rehearing of D02-11-022 as modified. (Pres. Lynch absent; Com Wood will file a dissent).
|
Decision Number:
D0211022
|
Rendered Date:
November 7, 2002
Effective Date:
November 7, 2002
|
|
Description:
Addresses the issue of direct access customers (DA) cost responsibility and related issues; establishes mechanisms to implement surcharges applicable to DA customers within the service territories of Southern California Edison, Paciffic Gas and Electric, and San Diego Gas & Electric Company, as set forth. (Pres Lynch and Com Wood will file dissents, Com Peevey will file a concurrence).
|
Decision Number:
D0204052
|
Rendered Date:
April 22, 2002
Effective Date:
April 22, 2002
|
|
Description:
Interim decision moving the proceedings on direct access cost responsibility surcharges from A00-11-038, et al. to R02-01-011. Recategorized this proceeding from quasi-legislative to ratesetting.
|
Decision Number:
D0204067
|
Rendered Date:
April 22, 2002
Effective Date:
April 22, 2002
|
|
Description:
Grants limited rehearing on switching exemption issue, modifies D02-03-055 to clarify some issues realted to cost shifting, denies rehearing of the decision, as modified. (Pres. Lynch dissents. Com Wood dissents).
|
Decision Number:
D0203055
|
Rendered Date:
March 21, 2002
Effective Date:
March 21, 2002
|
|
Description:
Prohibits Southern California Edison Company, Pacific Gas and Electric Company, and San Diego Gas & Electric Company from entering into, or executing new contracts for direct access service, after September 20, 2001, as set forth. This proceeding is closed. (Comr Lynch dissents; Comr Wood will file a dissent).
|