Number of Documents: 1417
|
|
|
Type:
REQUEST
|
Filing Date:
May 4, 2012
|
Filed By:
The Utility Reform Network
|
|
Description:
for intervenor compensation for contributions to D11-07-010, D11-10-016, and
D12-03-006.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
February 6, 2012
|
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
|
|
Description:
ORDER GRANTING VARIOUS MOTIONS AND CLOSING PROCEEDINGS. Opening comments,
which shall not exceed 15 pages, are due February 26, 2012. Reply comments,
which shall not exceed 5 pages, are due 5 days after the last day for filing
comments.
|
|
|
Type:
MOTION
|
Filing Date:
December 6, 2011
|
Filed By:
California Cogeneration Council
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producedrs Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
of Settling Parties to Withdraw Petitions for Modification and to Close Dockets
R.04-04-003 and R.04-04-025
|
|
|
Type:
MOTION
|
Filing Date:
December 2, 2011
|
Filed By:
California Cogeneration Council
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Motion of Southern California Edison Company to Withdraw Claims and of Settling
Parties to Close Docket
|
|
|
Type:
MOTION
|
Filing Date:
December 2, 2011
|
Filed By:
California Cogeneration Council
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Juniper Generation LLC
PE Berkeley
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Joint Parties' motion to withdraw pending motions, pleadings, and petition for
modification in Rulemaking 99-11-022 and to close docket
|
|
|
Type:
MOTION
|
Filing Date:
December 2, 2011
|
Filed By:
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
to withdraw Joint Petition for Modification of D.07-12-052 of Southern
California Edison Company, Pacific Gas and Electric Company, and San Diego Gas
& Electric Company in R.06-02-013& Electric Company in R.06-02-013
|
|
|
Type:
REPORT
|
Filing Date:
December 1, 2011
|
Filed By:
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
Joint Semi-Annual Progress Report (pursuant to D.10-12-035)
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
November 22, 2011
|
Filed By:
ALJ/WETZELL/CPUC
|
|
Description:
Decision Granting, in Part, and Denying, in Part, Intervenor Compensation Claim
of CAlifornians for Renewable Energy for Substantial Contributions to Multiple
Decisions. Opening comments, which shall not exceed 15 pages, are due no later
than December 12, 2011. Reply comments, which shall not exceed 5 pages, are due
no later than five days after the last day for filing comments.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 6, 2011
|
Filed By:
Alliance for Retail Energy Markets
Marin Energy Authority
|
|
Description:
The Marin Energy Authority and the Alliance for Retail Energy Markets noticed
an oral ex parte communication with Commissioner Simon, and Bishu Catterjee,
advisor to Commissioner Simon, on October 4, 2011.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 3, 2011
|
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
|
|
Description:
Reply; on the Proposed and Alternate Proposed Decisions.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 3, 2011
|
Filed By:
California Cogeneration Council
Cogeneration Association of California
Division of Ratepayer Adovactes
Energy Producers and Users Coalition
Independent Energy Producers Association
PG&E
SCE
SDG&E
TURN
|
|
Description:
Pacific Gas and Electric Company, Southern California Edison Company, San Diego
Gas & Electric Company, the California Cogeneration Council, the Independent
Energy Producers Association, the Cogeneration Association of California, the
Energy Producers and Users Coalition, the Division of Ratepayer Advocates and
The Utility Reform Network noticed three separate oral ex parte communications
as follows:
1. meeting with Stephen St. Marie, advisor to Commissioner
Sandoval,
2. meeting with Damon Franz and Carol Brown, advisors to President
Peevey; and
3. meeting with Bishu Chatterjee, advisor to Commissioner Simon,
on September 29, 2011, respectively.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 28, 2011
|
Filed By:
California Cogeneration Council
California Municipal Utilities Association
Cogeneration Association of California and The Energy Producers and Users Coalition
DRA/SALVACION/CPUC
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Opening comments on Proposed Decision and Alternate Proposed Decision regarding
Petition for Modification of Decision 11-07-010.
|
|
|
Type:
NOTICE
|
Filing Date:
September 28, 2011
|
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
|
|
Description:
The Alliance for Retail Energy Markets, the Direct Access Customer Coalition
and the Marin Energy Authority noticed that they have been granted an exparte
meeting with Commissioner Simon, originally set for September 19, 2011, and
re-scheduled to October 4, 2011.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 28, 2011
|
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
|
|
Description:
on the Proposed and Alternate Proposed Decisions.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 23, 2011
|
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
|
|
Description:
LATE-FILED. The Direct Access Customer Coalition and the Alliance for Retail
Energy Markets noticed both oral and written ex parte communication with
Stephen St. Marie, Advisor to Commissioner Catherine J.K Sandoval, on September
19, 2011.
|
|
|
Type:
REPORT
|
Filing Date:
September 21, 2011
|
Filed By:
California Cogeneration Council
Cogeneration Association of California
Division of Ratepayer Advocates
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Energy Producers and Users Coalition
The Utility Reform Network
|
|
Description:
Joint Status Report on the Qualifying Facility and Combined Heat and Power
Program Settlement Agreement
|
|
|
Type:
ALTERNATE
|
Filing Date:
September 14, 2011
|
Filed By:
CMMR/FERRON/CPUC
|
|
Description:
Alternate Proposed Decision of Commissioner Ferron granting, in part, Petition
to Modify Decision 11-07-010 and request to establish a settlement agreement
effective date and grant motion for closure. Opening comments are due no later
than September 28, 2011 and reply comments must be filed within 5 days.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
September 14, 2011
|
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
|
|
Description:
DECISION DENYING PETITION TO MODIFY DECISION 11-07-010. Opening comments,
which shall not exceed 15 pages, are due September 28, 2011. Reply comments,
which shall not exceed 5 pages, are due 5 days after the last day for filing
comments.
|
|
|
Type:
AMENDMENT
|
Filing Date:
September 9, 2011
|
Filed By:
California Cogeneration Council
California Municipal Utilities Association
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Assocation
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Amendment to petition for modification (filed 7/28/2011).
|
|
|
Type:
EXPARTE
|
Filing Date:
August 26, 2011
|
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
|
|
Description:
The Alliance for Retail Energy Markets, the Marin Energy Authority and the
Direct Access Customer Coalition noticed three separate oral exparte
communications with Matthew Tisdale, advisor to Commissioner Michael Peter
Florio; Stephen St. Marie, advisor to Commissioner Catherine J. K. Sandoval;
and Damon Franz, advisor to Commission President Michael R. Peevey, on August
23, 2011.
|
|
|
Type:
REPLY
|
Filing Date:
August 9, 2011
|
Filed By:
California Cogeneration Council
California Municipal Utilities Association
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Joint; in Support of Petition for Modification of Decision 11-07-010 and
Request to Establish Settlement Effective Date and Grant Motion for Closure
|
|
|
Type:
RESPONSE
|
Filing Date:
August 5, 2011
|
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
Shell Energy North America (US), L.P.
|
|
Description:
TO JOINT PETITION FOR MODIFICATION OF DECISION 11-07-010 AND REQUEST TO
ESTABLISH SETTLEMENT EFFECTIVE DATE AND TO GRANT MOTION FOR CLOSURE
|
|
|
Type:
MOTION
|
Filing Date:
July 28, 2011
|
Filed By:
CAC and EPUC
CPUC, DRA
California Cogeneration Council
California Municipal Utilities Association
IEP
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
TURN
|
|
Description:
Joint Parties';for Expedited Consideration of Joint Petition for Modification
of D.11-07-010 and Request to Establish Settlement Effective Date and Grant
Motion for Closure
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
July 28, 2011
|
Filed By:
CAC and EPUC
CPUC, DRA
California Cogeneration Council
California Municipal Utilities Association
IEP
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
TURN
|
|
Description:
Joint; of Decision 11-07-010 and Request to Establish Settlement Effective Date
and Grant Motion for Closure
|
|
|
Type:
RESPONSE
|
Filing Date:
July 20, 2011
|
Filed By:
Pacific Gas and Electric Company
San Diego Gas and Electric Company
Southern California Edison Company
|
|
Description:
Joint response to notice of intent to claim intervenor compensation of
CAlifornians for Renewable Energy.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 11, 2011
|
Filed By:
California Cogeneration Council
California Municipal Utilities Association
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Reply; of Joint Parties on Proposed Decision of ALJ Yip-Kikugawa Granting
Petition to Modify Decision 10-12-035
|
|
|
Type:
COMMENTS
|
Filing Date:
July 5, 2011
|
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
Shell Energy North America (US), L.P.
|
|
Description:
on proposed decision granting petition to modify Decision 10-12-035
|
|
|
Type:
NOTICE
|
Filing Date:
July 5, 2011
|
Filed By:
CAlifornians for Renewable Energy, Inc.
|
|
Description:
Supplemental notice of intent to claim intervenor compensation.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 5, 2011
|
Filed By:
California Cogeneration Council
California Municipal Utilities Association
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
of Joint Petitioners on Proposed Decision of ALJ Yip-Kikugawa Granting Petition
to Modify Decision 10-12-035
|
|
|
Type:
MOTION
|
Filing Date:
June 24, 2011
|
Filed By:
CAlifornians for Renewable Energy, Inc.
|
|
Description:
FOR OFFICIAL NOTICE
|
|
|
Type:
RESPONSE
|
Filing Date:
June 23, 2011
|
Filed By:
Southern California Edison Company
|
|
Description:
Amendment to response to Request for an award of intervenor compensation to
CAlifornians for Renewable Energy (response filed on 6/22/2011).
|
|
|
Type:
RESPONSE
|
Filing Date:
June 22, 2011
|
Filed By:
Southern California Edison Company
|
|
Description:
to request for an award of intervenor compensation to CAlifornians for
Renewable Energy.
|
|
|
Type:
REPORT
|
Filing Date:
June 21, 2011
|
Filed By:
California Cogeneration Council
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Joint Status Report on the Qualifying Facility and Combined Heat and Power
Program Settlement Agreement
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
June 14, 2011
|
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
|
|
Description:
DECISION GRANTING PETITION TO MODIFY DECISION 10-12-035. Opening comments,
which shall not exceed 15 pages, are due July 4, 2011. Reply comments, which
shall not exceed 5 pages, are due 5 days after the last day for filing
comments.
|
|
|
Type:
NOTICE
|
Filing Date:
May 25, 2011
|
Filed By:
CALJ/CLOPTON/CPUC
|
|
Description:
of Co-Assignment
|
|
|
Type:
REQUEST
|
Filing Date:
May 23, 2011
|
Filed By:
CAlifornians for Renewable Energy, Inc.
|
|
Description:
for intervenor compensation for contributions to D05-12-021, D06-02-007,
D06-07-032, D07-03-015, D07-04-020, D07-09-040, and D10-12-035.
|
|
|
Type:
REQUEST
|
Filing Date:
May 20, 2011
|
Filed By:
The Utility Reform Network
|
|
Description:
for intervenor compensation for substantial contirbutions to D10-12-035 and
D11-03-051
|
|
|
Type:
NOTICE
|
Filing Date:
May 19, 2011
|
Filed By:
The Utility Reform Network
|
|
Description:
OF INTENT TO CLAIM INTERVENOR COMPENSATION
|
|
|
Type:
REPLY
|
Filing Date:
April 28, 2011
|
Filed By:
California Cogeneration Council
California Municipal Utilities Association
Cogeneration Association of California and The Energy Producers and Users Coalition
DRA/SALVACION/CPUC
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Joint reply to response of Marin Energy Authority, the Alliance for Retail
Energy Markets, Shell Energy North America (US) L.P., and the Direct Access
Customer Coalition to the joint Petition for Modification of Decision 10-12-035
(filing authorized by ALJ Yip-Kikugawa per e-mail of 4/21/2011).
|
|
|
Type:
RESPONSE
|
Filing Date:
April 18, 2011
|
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
Shell Energy North America (US), L.P.
|
|
Description:
TO THE JOINT PETITION FOR MODIFICATION OF DECISION 10-12-035
|
|
|
Type:
MOTION
|
Filing Date:
April 1, 2011
|
Filed By:
California Cogeneration Council
California Municipal Utilities Association
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Joint Motion to Shorten Time
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
April 1, 2011
|
Filed By:
California Cogeneration Council
California Municipal Utilities Association
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas and Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Joint Petition for Modification of Decision No.10-12-035
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
March 21, 2011
|
Filed By:
California Cogeneration Council
Cogeneration Association of California and The Energy Producers and Users Coalition
Division of Ratepayer Advocates
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Joint Status Report on the Qualifying Facility and Combined Heat and Power
Program Settlement Agreement
|
|
|
Type:
MOTION
|
Filing Date:
March 16, 2011
|
Filed By:
California Municipal Utilities Association
|
|
Description:
for abeyance and to shorten time.
|
|
|
Type:
RESPONSE
|
Filing Date:
February 4, 2011
|
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
|
|
Description:
TO THE APPLICATION OF CITY AND COUNTY OF SAN
FRANCISCO FOR REHEARING OF
DECISION 10-12-035
|
|
|
Type:
RESPONSE
|
Filing Date:
February 4, 2011
|
Filed By:
California Cogeneration Council
California Public Utilities Commission, Division of Ratepayer Advocates
Cogeneration Association of California and The Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
TO APPLICATIONS FOR REHEARING OF DECISION 10-12-035
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
January 20, 2011
|
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
|
|
Description:
Application for Rehearing of Decision 10-12-035.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
January 20, 2011
|
Filed By:
California Municipal Utilities Association
|
|
Description:
Application for Rehearing of Decision 10-12-035.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
January 18, 2011
|
Filed By:
City and County of San Francisco
|
|
Description:
of Decision 10-12-035
|
|
|
Type:
EXPARTE
|
Filing Date:
December 29, 2010
|
Filed By:
CAlifornians for Renewable Energy, Inc.
|
|
Description:
CAlifornians for Renewable Energy, Inc. noticed a written ExParte
Communications with the ALJs Yip-Kikugawa and Wetzell; President Peevey's Chief
of Staff, Carol Brown; Commissioner Grueneich's Chief of Staff, Theresa Cho;
Commissioner Bohn's Chief of Staff, Stephen St. Marie; Commissioner Simon's
Interim Chief of Staff, Melicia Charles; and Commissioner Ryan's Chief of
Staff, Sepideh Khosrowjah, on December 28, 2010.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 20, 2010
|
Filed By:
California Municipal Utilities Association
|
|
Description:
The California Municipal Utilities Association noticed separate oral ex parte
communications with Jason Reiger, advisor to Commissioner Nancy Ryan; Michael
Wheeler, advisor to Commissioner Dian Grueneich; Robert Kinosian, advisor to
Commissioner John Bohn; Carol Brown, Chief of Staff to President Michael
Peevey; and Paul Phillips, advisor to Commissioner Timothy Alan Simon; on
December 15, 2010.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 15, 2010
|
Filed By:
California Air Resources Board
|
|
Description:
California Air Resources Board noticed a written ex parte communication with
Commission President Michael R. Peevey and Administrative Law Judge Mark S.
Wetzell on December 14, 2010.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 14, 2010
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
The Alliance for Retail Energy Markets noticed a written exparte communication
with President Michael Peevey, Commissioner John Bohn, Commissioner Dian
Grueneich, Commissioner Nancy Ryan, and Commissioner Timothy Simon on December
14, 2010.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2010
|
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
|
|
Description:
Joint Reply; (on the ALJ Wetzell Decision adopting proposed settlement)
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2010
|
Filed By:
California Cogeneration Council
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Joint Reply; on Proposed Decision approving the qualifying facility and
combined heat and power program settlement agreement
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2010
|
Filed By:
Shell Energy North America (US), L.P.
|
|
Description:
Reply; on the Presiding Judge's Proposed Decision
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2010
|
Filed By:
City and County of San Francisco
|
|
Description:
Reply; on Judge Wetzell's Proposed Decision
|
|
|
Type:
EXPARTE
|
Filing Date:
December 10, 2010
|
Filed By:
Southern California Edison Company
|
|
Description:
LATE-FILED. Southern California Edison Company noticed an oral ex parte
communication with Steve St. Marie, Advisor to Commissioner Bohn, and Andy
Schwartz, Advisor to President Peevey on December 6, 2010.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 9, 2010
|
Filed By:
City and County of San Francisco
Constellation Energy
Marin Energy Authority
|
|
Description:
The City and County of San Francisco, the Marin Energy Authority and
Constellation Energy noticed three separate ex parte communications on December
6, 2010 with:
1) J. Jason Reiger, advisor to Commissioner Ryan,
2) Karl
Meeusen, advisor to President Peevey and Robert Kinosian, advisor to
Commissioner Bohn, and
3) Matt Tisdale, advisor to Commissioner Grueneich,
respectively.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 9, 2010
|
Filed By:
California Municipal Utilities Association
|
|
Description:
The California Municipal Utilities noticed four separate oral ex parte
communications as follows:
On December 6, 2010, with:
1. Michael Wheeler,
advisor for Commissioner Dian Grueneich;
2. Robert Kinosian, advisor to
Commissioner John Bohn;
3. Carol Brown, Chief of Staff to President Michael
Peevey, Karl Meeusen, advisor to President Michael Peevey, and Jason Reiger,
advisor to Commissioner Nancy Ryan;
On December 7, 2010, with
1. Paul
Phillips, advisor to Commissioner Timothy Alan Simon, respectively.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 8, 2010
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SEMPRA UTILITIES
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Pacific Gas and Electric Company (PG&E), Southern California Edison Company
(SCE), and Sempra Utilities (Sempra) noticed a written exparte communication
with Carol Brown (Chief of Staff to President Peevey) and Karl Meeusen (Advisor
to President Peevey) on December 3, 2010.
|
|
|
Type:
CERTIFICATE OF SERVICE
|
Filing Date:
December 7, 2010
|
Filed By:
California Cogeneration Council
Cogeneration Association of California and the Energy Producers and Users Coalition
Division of Ratepayer Advocates, CPUC
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Revised certificate of service to joint comments on Proposed Decision approving
the Qualifying Facility and Combined Heat and Power Program Settlement
Agreement.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2010
|
Filed By:
California Independent System Operator Corporation
|
|
Description:
on Proposed Decision of ALJ Wetzell
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2010
|
Filed By:
California Municipal Utilities Association
|
|
Description:
on the Proposed Decision
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2010
|
Filed By:
California Cogeneration Council
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Joint; on Proposed Decision approving the qualifying facility and combined heat
and power program settlement agreement
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2010
|
Filed By:
Shell Energy North America (US), L.P.
|
|
Description:
Opening; on the Presiding Judge's Proposed Decision
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2010
|
Filed By:
City and County of San Francisco
|
|
Description:
on Judge Wetzell's Proposed Decision
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2010
|
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
|
|
Description:
Joint; on the ALJ Wetzell Decision adopting proposed settlement
|
|
|
Type:
EXPARTE
|
Filing Date:
December 2, 2010
|
Filed By:
Calfiornia Energy Commission
|
|
Description:
The California Energy Commission noticed a written Ex Parte Communication with
President Michael R. Peevey, Commissioners Dian Grueneich, John Bohn, Timothy
Alan Simpson, and Nancy E. Ryan; and Administrative Law Judge Mark S. Wetzell,
on December 2, 2010.
|
|
|
Type:
ALJ RESOLUTION
|
Filing Date:
November 24, 2010
|
Filed By:
ALJ/WETZELL/CPUC
|
|
Description:
RESOLUTION ALJ-262 Ratification of changes to preliminary determinations
pursuant to Rule 7.5.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
November 16, 2010
|
Filed By:
ALJ/WETZELL/CPUC
|
|
Description:
Decision adopting proposed settlement. Opening comments, which shall not exceed
15 pages, are due no later than December 6, 2010. Reply comments, which shall
not exceed 5 pages, are due 5 days after the last day for filing opening
comments.
|
|
|
Type:
RULING
|
Filing Date:
November 2, 2010
|
Filed By:
ALJ/WETZELL/CPUC
|
|
Description:
Granting Motions for Party Status
|
|
|
Type:
COMMENTS
|
Filing Date:
November 1, 2010
|
Filed By:
California Cogeneration Council
Cogeneration Association of California and the Energy Producers and Users Coalition
Division of Ratepayer Advocates
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Joint reply comments in support of motion for approval of Qualifying Facility
and Combined Heat and Power Program Settlement Agreement.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 25, 2010
|
Filed By:
City and County of San Francisco
|
|
Description:
in Opposition to the QF/CHP Program Settlement Agreement
|
|
|
Type:
RESPONSE
|
Filing Date:
October 25, 2010
|
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
|
|
Description:
JOINT; TO THE JOINT MOTION FOR APPROVAL OF QUALIFYING FACILITY AND COMBINED
HEAT AND POWER SETTLEMENT AGREEMENT
|
|
|
Type:
MOTION
|
Filing Date:
October 25, 2010
|
Filed By:
California Municipal Utilities Association
|
|
Description:
for Party Status
|
|
|
Type:
MOTION
|
Filing Date:
October 25, 2010
|
Filed By:
Marin Energy Authority
|
|
Description:
for Party Status
|
|
|
Type:
COMMENTS
|
Filing Date:
October 25, 2010
|
Filed By:
CAlifornians for Renewable Energy, Inc. (CARE)
|
|
Description:
Opening; ON PROPOSED SETTLEMENT AND CONSOLIDATING PROCEEDINGS
|
|
|
Type:
COMMENTS
|
Filing Date:
October 25, 2010
|
Filed By:
California Municipal Utilities Association
|
|
Description:
on the Proposed Settlement
|
|
|
Type:
COMMENTS
|
Filing Date:
October 25, 2010
|
Filed By:
Shell Energy North America (US), L.P.
|
|
Description:
Opening; on the Qualifying Facility and Combined Heat and Power Program
Settlement Agreement
|
|
|
Type:
COMMENTS
|
Filing Date:
October 25, 2010
|
Filed By:
California Independent System Operator Corporation
|
|
Description:
on Proposed Settlement
|
|
|
Type:
EXPARTE
|
Filing Date:
October 21, 2010
|
Filed By:
Marin Energy Authority
|
|
Description:
LATE FILED: Marin Energy Authority noticed oral ex parte communications with
Michael Wheeler, advisor to Commissioner Grueneich, Robert Kinosian, advisor to
Commissioner Bohn, and Jason Reiger, advisor to Commissioner Ryan, on October
15, 2010.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 20, 2010
|
Filed By:
Southern California Edison Company
|
|
Description:
Southern California Edison Company noticed a written ex parte communication to
ALJ Wetzell on October 14, 2010. (Filing pursuant to AC and ALJ Joint Ruling
and Amended Scoping Memo issued on October 19, 2010.)
|
|
|
Type:
EXPARTE
|
Filing Date:
October 20, 2010
|
Filed By:
CAlifornians for Renewable Energy, Inc. (CARE)
|
|
Description:
CAlifornians for Renewable Energy, Inc. noticed an written ex parte
communication with ALJ Wetzell on October 14, 2010. (Filing pursuant to
Assigned Commissioner and ALJ Joint Ruling and Amended Scoping Memo issued on
October 19, 2010.)
|
|
|
Type:
EXPARTE
|
Filing Date:
October 20, 2010
|
Filed By:
CAlifornians for Renewable Energy, Inc. (CARE)
|
|
Description:
CAlifornians for Renewable Energy, Inc. (CARE) noticed a written ex parte
communication with ALJ Wetzell sent on October 20, 2010.
|
|
|
Type:
SCOPING RULING
|
Filing Date:
October 19, 2010
|
Filed By:
ALJ/WETZELL/CPUC
CMMR/PEEVEY/CPUC
|
|
Description:
Assigned Commissioner and Administrative Law Judge's Joint Ruling and Amended
Scoping Memo for consolidated proceedings. With respect to consideration of the
"Qualifying Facility and Combined Heat and Power Program Settlement Agreement",
the scope of and the schedule for these proceedings is as set forth. The
presiding officer for consideration of the Proposed Settlement is ALJ Wetzell.
The preliminary determination that A.08-11-001 is categorized as ratesetting is
confirmed. The prior scoping memo determinations that R.06-02-013, R.04-04-003,
and R.04-04-025 are ratesetting shall continue in effect for purposes of
considering the Proposed Settlement. R.09-11-022 is re-categorized as
ratesetting. Rules 8.2 and 8.3 apply with respect to ex parte communications.
CAlifornians for Renewable Energy, Inc. shall file a notice of ex parte
communication regarding its 10/14/2010 communication to the ALJ. Southern
California Edison Company shall file a notice of ex parte communication
regarding its 10/14/2010 communication to ALJ.
|
|
|
Type:
RULING
|
Filing Date:
October 18, 2010
|
Filed By:
ALJ/WETZELL/CPUC
|
|
Description:
regarding service of joint motion, rulings, and tendered documents.
|
|
|
Type:
CERTIFICATE OF SERVICE
|
Filing Date:
October 13, 2010
|
Filed By:
ALJ/WETZELL/CPUC
|
|
Description:
to ALJ Mark Wetzell's Ruling Shortening Time for Comments and Replies on
Proposed Settlement and Consolidating Proceedings (to the electronic mail
addresses on the service lists in R.07-05-025, R.08-06-024, and R.03-10-003 and
also on all registered electric service providers and community choice
aggregators)
|
|
|
Type:
RULING
|
Filing Date:
October 11, 2010
|
Filed By:
ALJ/WETZELL/CPUC
|
|
Description:
Shortening Time for Comments and Replies on Proposed Settlement and
Consolidating Proceedings. Comments on the Qualifying Facility and Combined
Heat and Power Program Settlement Agreement are due 10/25/2010 and reply
comments are due 11/1/2010.
|
|
|
Type:
MOTION
|
Filing Date:
October 8, 2010
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
COGENERATION ASSOCIATION OF CALIFORNIA
DIVISION OF RATEPAYER ADVOCATES
ENERGY PRODUCERS AND USERS COALTION
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
|
|
Description:
for Expedited Consideration of Joint Motion for Approval of Qualifying Facility
and Combined Heat and Power Program Settlement Agreement
|
|
|
Type:
MOTION
|
Filing Date:
October 8, 2010
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
COGENERATION ASSOCIATION OF CALIFORNIA
DIVISION OF RATEPAYER ADVOCATES
ENERGY PRODUCERS AND USERS COALITION
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
|
|
Description:
Joint Motion for Approval of Qualifying Facility and Combined Heat and Power
Program Settlement Agreement; settlement agreement and notice of availability
of attachment A to the joint motion are attached..
|
|
|
Type:
NOTICE
|
Filing Date:
September 30, 2010
|
Filed By:
CALJ/CLOPTON/CPUC
|
|
Description:
of co-assignment.
|
|
|
Type:
RESPONSE
|
Filing Date:
September 15, 2010
|
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Monthly Response to Administrative Law Judge's Request, dated October 29, 2009
|
|
|
Type:
REPORT
|
Filing Date:
August 16, 2010
|
Filed By:
California Cogeneration Council
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
MONTHLY RESPONSE TO ADMINISTRATIVE LAW JUDGE'S REQUEST, DATED OCTOBER 29, 2009
|
|
|
Type:
REPORT
|
Filing Date:
July 15, 2010
|
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Monthly Response to Administrative Law Judge's Request, dated October 29, 2009
|
|
|
Type:
REPORT
|
Filing Date:
June 15, 2010
|
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Monthly Response to Administrative Law Judge's Request, dated 10/29/2009
|
|
|
Type:
REPORT
|
Filing Date:
May 17, 2010
|
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Monthly Response to Administrative Law Judge's Request, dated 10/29/2009
|
|
|
Type:
REPORT
|
Filing Date:
April 15, 2010
|
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Monthly Response to Administrative Law Judge's Request, Dated October 29, 2009
|
|
|
Type:
REPORT
|
Filing Date:
March 15, 2010
|
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Monthly Response to Administrative Law Judge's Request, Dated October 29, 2009
|
|
|
Type:
REPORT
|
Filing Date:
February 16, 2010
|
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Monthly Response to Administrative Law Judge's Request, Dated October 29, 2009
|
|
|
Type:
REPORT
|
Filing Date:
January 15, 2010
|
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Monthly Response to Administrative Law Judge's Request, Dated October 29, 2009
|
|
|
Type:
REPORT
|
Filing Date:
December 15, 2009
|
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Monthly Response to Administrative Law Judge's Request, Dated October 29, 2009
|
|
|
Type:
REPORT
|
Filing Date:
November 16, 2009
|
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
MONTHLY RESPONSE TO ADMINISTRATIVE LAW JUDGE'S REQUEST, DATED OCTOBER 29, 2009
|
|
|
Type:
RULING
|
Filing Date:
October 29, 2009
|
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
|
|
Description:
Extending Limited Abeyance. During the abeyance period, parties shall file a
monthly update on the status of the global settlement negotiations. The monthly
update shall be due on the 15th day of each month. Parties shall not be
required to file a monthly update if a settlement agreement is filed with the
Commission.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 27, 2009
|
Filed By:
California Cogeneration Council
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
JOINT;
|
|
|
Type:
RULING
|
Filing Date:
October 21, 2009
|
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
|
|
Description:
seeking comments on next steps for proceeding. Parties wishing to file comments
may do so by October 27, 2009. There shall be no reply comments.
|
|
|
Type:
RESPONSE
|
Filing Date:
October 5, 2009
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to Petition of the Cogeneration Association of California for Modification of
Decision 07-09-040.
|
|
|
Type:
RESPONSE
|
Filing Date:
October 1, 2009
|
Filed By:
California Cogeneration Council
|
|
Description:
to Petition of Cogeneration Association of California for Modification of
Decision 07-09-040.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
September 4, 2009
|
Filed By:
Cogeneration Association of California
|
|
Description:
of Decision 07-09-040.
|
|
|
Type:
RULING
|
Filing Date:
August 28, 2009
|
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
|
|
Description:
granting motion for extension of limited abeyance. The joint motion filed by
Southern California Edison Company, San Diego Gas & Electric Company and The
Utility Reform Network to extend the limited abeyance for reconsideration of
the Administrative Heat Rate component of the Market Index Formula is granted.
The limited abeyance shall be extended until October 1, 2009.
|
|
|
Type:
MOTION
|
Filing Date:
August 24, 2009
|
Filed By:
Georgetta Baker San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
for Extension of Limited Abeyance.
|
|
|
Type:
REPLY
|
Filing Date:
August 13, 2009
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to Response of the California Wind Energy Association to Petition for
Modification of Decision 09-04-034.
|
|
|
Type:
RESPONSE
|
Filing Date:
August 3, 2009
|
Filed By:
California Wind Energy Association
|
|
Description:
to PG&E's petition for modification of D.09-04-034.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
July 2, 2009
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
of Decision 09-04-034
|
|
|
Type:
RULING
|
Filing Date:
June 30, 2009
|
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
|
|
Description:
Granting Motion for Limited Abeyance.
|
|
|
Type:
MOTION
|
Filing Date:
June 26, 2009
|
Filed By:
California Cogeneration Council
Cogeneration Association Of California
Energy Producers And Users Coalition
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
for limited abeyance.
|
|
|
Type:
MOTION
|
Filing Date:
June 3, 2009
|
Filed By:
California Cogeneration Council
|
|
Description:
for Leave to File a Late-Filed Response to the Application of Southern
California Edison, Pacific Gas and Electric Company, and San Diego Gas and
Electric Company for Rehearing of D.09-04-032; (Response attached).
|
|
|
Type:
RESPONSE
|
Filing Date:
June 3, 2009
|
Filed By:
California Cogeneration Council
|
|
Description:
to the Joint Parties' Application for Rehearing of D.09-04-032.
|
|
|
Type:
RESPONSE
|
Filing Date:
June 2, 2009
|
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
|
|
Description:
to joint parties' application for rehearing of Decision 09-04-034.
|
|
|
Type:
RESPONSE
|
Filing Date:
June 2, 2009
|
Filed By:
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Joint; to Cogeneration Association of California and Energy Producers and Users
Coalition Application for Rehearing of D.09-04-034
|
|
|
Type:
RESPONSE
|
Filing Date:
June 2, 2009
|
Filed By:
Independent Energy Producers Association
|
|
Description:
to Joint Parties Application for Rehearing of D.09-04-034
|
|
|
Type:
RESPONSE
|
Filing Date:
June 2, 2009
|
Filed By:
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
Joint; to applications for rehearing of Decision 09-04-032 of IEP and CAC/EPUC
|
|
|
Type:
RESPONSE
|
Filing Date:
June 2, 2009
|
Filed By:
Independent Energy Producers Association
|
|
Description:
to application of Southern California Edison, Pacific Gas and Electric Company,
and San Diego Gas & Electric Company for rehearing of D.09-04-032
|
|
|
Type:
RESPONSE
|
Filing Date:
June 2, 2009
|
Filed By:
California Cogeneration Council
|
|
Description:
to the Joint Parties' Application for Rehearing of D.09-04-034
|
|
|
Type:
RESPONSE
|
Filing Date:
June 2, 2009
|
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
|
|
Description:
to joint parties' application for rehearing of Decision 09-04-032.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
May 18, 2009
|
Filed By:
Independent Energy Producers Association
|
|
Description:
Application for Rehearing of Decision 09-04-032.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
May 18, 2009
|
Filed By:
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Joint; of Decision 09-04-034
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
May 18, 2009
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
of Decision 09-04-034
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
May 18, 2009
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
Application for Rehearing of Decision 09-04-032.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
May 18, 2009
|
Filed By:
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
Application for Rehearing of Decision 09-04-032.
|
|
|
Type:
REPLY
|
Filing Date:
April 27, 2009
|
Filed By:
California Cogeneration Council
|
|
Description:
(to response) in support of its motion for an order implementing the
prospective QF program contract options adopted in Decision 07-09-040 (filing
authorized by ALJ Yip-Kikugawa on 4/23/09 by telephone conversation).
|
|
|
Type:
EXPARTE
|
Filing Date:
April 16, 2009
|
Filed By:
Independent Energy Producers Association
|
|
Description:
Independent Energy Producers Association noticed a written ex parte
communication with Theresa Cho, Chief of Staff to Commissioner Grueneich and
Traci Bone, advisor to Commissioner Grueneich; Carol Brown, Chief of Staff to
President Peevey and Matthew Deal, advisor to President Peevey; Andrew Campbell
and Pamela Nataloni, advisors to Commissioner Chong; Paul Phillips, advisor to
Commissioner Simon; Stephen St. Marie, Chief of Staff to Commissioner Bohn and
Robert Kinosian, advisor to Commissioner Bohn, on April 13, 2009.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 16, 2009
|
Filed By:
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
Joint; to CCC's motion for an order implementing the prospective QF program
contract options adopted in Decision 07-09-040
|
|
|
Type:
EXPARTE
|
Filing Date:
April 16, 2009
|
Filed By:
Independent Energy Producers Association
|
|
Description:
Independent Energy Producers Association noticed an oral ex parte communication
with Pamela Nataloni, advisor to Commissioner Chong; Carol Brown, chief of
staff to Commissioner Peevey; Matthew Deal, advisor to Commissioner Peevey;
Paul Philips, advisor to Commissioner Simon; and Robert Kinosian, advisor to
Commissioner Bohn, on April 15, 2009.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 8, 2009
|
Filed By:
Terra-Gen Power, LLC
|
|
Description:
Terra-Gen, LLC noticed an oral and written ex parte communication with Matthew
Deal, advisor to Commissioner Peevey, on April 3, 2009.
|
|
|
Type:
MOTION
|
Filing Date:
April 1, 2009
|
Filed By:
California Cogeneration Council
|
|
Description:
for an order implementing the prospective QF program contract options adopted
in Decision 07-09-040.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 30, 2009
|
Filed By:
California Cogeneration Council
|
|
Description:
Reply; on administrative heat rate questions
|
|
|
Type:
COMMENTS
|
Filing Date:
March 30, 2009
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; in response to Scoping Memo regarding administrative heat rates for
Market Index Formula.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 30, 2009
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
Reply; on reconsideration of administrative heat rates pursuant to D.
08-11-062.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 30, 2009
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; on Scoping Memo and Ruling issued 2/24/2009.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 30, 2009
|
Filed By:
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Joint Reply; on administrative heat rate reconsideration ordered in Decision
08-11-062.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 27, 2009
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Pacific Gas and Electric Company noticed an oral ex parte communication with
Pam Nataloni, advisor to Commissioner Chong, on March 24, 2009.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 27, 2009
|
Filed By:
California Cogeneration Council
|
|
Description:
California Cogeneration Council, noticed an oral and written ex parte
communication with Carol Brown, chief of staff to President Peevey; and Matthew
Deal, advisor to President Peevey, on March 24, 2009.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 27, 2009
|
Filed By:
Independent Energy Producers Association
|
|
Description:
Independent Energy Producers Association noticed an oral ex parte communication
with Robert Kinosian, advisor to Commissioner Bohn and Pamela Nataloni, advisor
to Commissioner Chong, on March 27, 2009.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 27, 2009
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Pacific Gas and Electric Company noticed an oral ex parte communication with
Matthew Deal, advisor to Commissioner Peevey, on March 24, 2009.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 26, 2009
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Pacific Gas and Electric Company noticed an oral ex parte communication with
Robert Kinosian, advisor to Commissioner Bohn, on March 23, 2009.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 24, 2009
|
Filed By:
California Cogeneration Council
|
|
Description:
Amendment to Opening Comments on administrative heat rate questions.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 24, 2009
|
Filed By:
Independent Energy Producers Association
|
|
Description:
Independent Energy Producers Association noticed an oral ex parte communication
with Commissioner Grueneich and Theresa Cho, advisor to Commissioner Grueneich,
on March 23, 2009.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 24, 2009
|
Filed By:
Independent Energy Producers Association
|
|
Description:
Independent Energy Producers Association noticed an oral ex parte communication
with Carol Brown, advisor to President Peevey, on March 20, 2009.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 24, 2009
|
Filed By:
Independent Energy Producers Association
|
|
Description:
Independent Energy Producers Association noticed an oral ex parte communication
with Matthew Deal, advisor to President Peevey, on March 20, 2009.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 23, 2009
|
Filed By:
Independent Energy Producers Association
|
|
Description:
Reply; on proposed and alternate decisions mailed February 24, 2009.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 23, 2009
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; (on proposed decision and alternate)
|
|
|
Type:
COMMENTS
|
Filing Date:
March 23, 2009
|
Filed By:
California Cogeneration Council
Cogeneration Association of California
Energy Producers and Users Coalition
|
|
Description:
Joint Reply; on the proposed decision of ALJ Yip-Kikugawa and the alternate
proposed decision of Cmmr. Peevey.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 23, 2009
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; on the proposed decision of ALJ Yip-Kikugawa and the alternate proposed
decision of Cmmr. Peevey.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 23, 2009
|
Filed By:
Pacific Gas and Electric Company
The Utility Reform Network
|
|
Description:
Reply; on proposed decision and alternate proposed decision modifying Decision
07-09-040.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 20, 2009
|
Filed By:
Southern California Edison Company
|
|
Description:
Opening; on administrative heat rate reconsideration.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 20, 2009
|
Filed By:
California Cogeneration Council
|
|
Description:
California Cogeneration Council noticed an oral ex parte communication with
Paul Phillips, advisor to Commissioner Simon, on March 17, 2009.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 20, 2009
|
Filed By:
California Cogeneration Council
|
|
Description:
California Cogeneration Council noticed an oral ex parte communication with Pam
Nataloni, advisor to Commissioner Chong, on March 18, 2009.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 20, 2009
|
Filed By:
California Cogeneration Council
|
|
Description:
California Cogeneration Council noticed an oral ex parte communication with
Robert Kinosian, advisor to Commissioner Bohn, on March 18, 2009.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 20, 2009
|
Filed By:
California Cogeneration Council
|
|
Description:
California Cogeneration Council noticed both an oral and written ex parte
communication with Matthew Deal, advisor to President Peevey, on March 18, 2008.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 20, 2009
|
Filed By:
PurEnergy LLC
|
|
Description:
Purenergy LLC noticed both oral and written ex parte communications with Pamela
Nataloni, advisor to Commissioner Chong, and Carol Brown, advisor to President
Peevey, on March 17, 2009.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 20, 2009
|
Filed By:
Terra-Gen, LLC
|
|
Description:
LATE FILED. Terra-Gen, LLC noticed oral ex parte communications with Carol
Brown, advisor to Commission President Peevey and Robert Kinosian, advisor to
Commissioner Bohn, on March 16, 2009.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 20, 2009
|
Filed By:
Independent Energy Producers Association
|
|
Description:
on administrative heat rate reconsideration ordered in D08-11-062
|
|
|
Type:
COMMENTS
|
Filing Date:
March 20, 2009
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
Opening; on reconsideration under D08-11-062
|
|
|
Type:
COMMENTS
|
Filing Date:
March 20, 2009
|
Filed By:
California Cogeneration Council
|
|
Description:
Opening; on administrative heat rate questions
|
|
|
Type:
COMMENTS
|
Filing Date:
March 20, 2009
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
in response to Scoping Memo regarding administrative heat rates for market
index formula
|
|
|
Type:
COMMENTS
|
Filing Date:
March 20, 2009
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Opening;
|
|
|
Type:
EXPARTE
|
Filing Date:
March 19, 2009
|
Filed By:
Southern California Edison Company
|
|
Description:
LATE-FILED. Southern California Edison Company noticed both an oral and
written ex parte communication with Paul Phillips, advisor to Commissioner
Simon, on March 13, 2009.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 16, 2009
|
Filed By:
Pacific Gas and Electric Company
THE UTILITY REFORM NETWORK
|
|
Description:
Joint; on Commission President Peevey's Alternate Proposed Decision modifying
Decision 07-09-040 and granting Motion to adjust PG&E's January 2008 avoided
cost posting.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 16, 2009
|
Filed By:
Southern California Edison Company
|
|
Description:
Southern California Edison Company noticed both an oral and written ex parte
communication with Carol Brown, Chief of Staff to President Peevey and Pam
Nataloni, Advisor to Commissioner Chong, on March 11, 2009.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 16, 2009
|
Filed By:
Southern California Edison Company
|
|
Description:
Opening; on the Proposed Decision of ALJ Yip Kikugawa and the Alternate
Proposed Decision of Commissioner Peevey.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 16, 2009
|
Filed By:
Independent Energy Producers Association
|
|
Description:
on Proposed and Alternate Decisions mailed February 24, 2009.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 16, 2009
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Opening; on the Proposed Decision of Administrative Law Judge Yip-Kikugawa and
the Alternate Proposed Decision of Commissioner Peevey.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 16, 2009
|
Filed By:
California Cogeneration Council
Cogeneration Association of California
Energy Producers and Users Coalition
|
|
Description:
Joint; on the Proposed Decision of Administrative Law Judge Yip-Kikugawa and
the Alternate Proposed Decision of Commissioner Peevey.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 16, 2009
|
Filed By:
Pacific Gas and Electric Company
THE UTILITY REFORM NETWORK
|
|
Description:
Joint; on ALJ Yip-Kikugawa's Proposed Decision denying Petition for
Modification of Decision 07-09-040 and Motion to adjust PG&E's January 2008
avoided cost posting.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 3, 2009
|
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
|
|
Description:
Cogeneration Association of California and Energy Producers and Users
Coalition, noticed an oral and written ex parte communication with Andy
Campbell and Pam Nataloni, advisors to Commissioner Chong; and Matthew Deal,
advisor to Commissioner Peevey, on February 26, 2009.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 2, 2009
|
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
|
|
Description:
Cogeneration Association of California and Energy Producers and Users
Coalition, noticed an oral and written ex parte communication with Robert
Kinosian, advisor to Commissioner Bohn, on February 25, 2009.
|
|
|
Type:
EXPARTE
|
Filing Date:
February 27, 2009
|
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
|
|
Description:
Cogeneration Association of California and Energy Producers and Users
Coalition, noticed an oral ex parte communication with Commissioner Peevey, on
February 24, 2009.
|
|
|
Type:
ALTERNATE
|
Filing Date:
February 24, 2009
|
Filed By:
CMMR/PEEVEY/CPUC
|
|
Description:
Decision Granting in Part and Denying in Part Petition to Modify Decision
07-09-040 and Motions to Adjust Pacific Gas and Electric Company's January 2008
Avoided Cost Posting. Opening comments, which shall not exceed 15 pages, are
due March 16, 2009. Reply comments,which shall not exceed 5 pages, are due 5
days after the last day for filing comments.
|
|
|
Type:
SCOPING RULING
|
Filing Date:
February 24, 2009
|
Filed By:
ALJ/YIP-KIKUGAWA
CMMR/PEEVEY/CPUC
|
|
Description:
Setting Schedule and Scope for Reconsideration Ordered in Decision 08-11-062.
The scope and schedule are as set forth and the category is confirmed as
ratesetting.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
February 24, 2009
|
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
|
|
Description:
Decision denying Petition of the California Cogeneration Council to modify
Decision 07-09-040 and granting in part and denying in part Motions to adjust
Pacific Gas and Electric Company's January 2008 avoided cost posting. Opening
Comments, which shall not exceed 15 pages, are due March 16, 2009. Reply
Comments which shall not exceed 5 pages are due within 5 days after the last
day to file Comments.
|
|
|
Type:
EXPARTE
|
Filing Date:
February 19, 2009
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
Cogeneration Association of California and Energy Producers and Users
Coalition, noticed an oral and written ex parte communication with Paul
Phillips, advisor to Commissioner Simon, on February 13, 2009.
|
|
|
Type:
RULING
|
Filing Date:
February 5, 2009
|
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
|
|
Description:
granting party status to Valero Refining Company-California.
|
|
|
Type:
MOTION
|
Filing Date:
January 28, 2009
|
Filed By:
Valero Refining Company-California
|
|
Description:
to become a party.
|
|
|
Type:
EXPARTE
|
Filing Date:
January 26, 2009
|
Filed By:
California Cogeneration Council
|
|
Description:
The California Cogeneration Council noticed oral and written ex parte
communications with Nancy Ryan, advisor to President Peevey, on January 22,
2009.
|
|
|
Type:
EXPARTE
|
Filing Date:
January 26, 2009
|
Filed By:
California Cogeneration Council
|
|
Description:
The California Cogeneration Council noticed oral and written ex parte
communications with Paul Phillips, advisor to Commissioner Simon, on January
22, 2009.
|
|
|
Type:
EXPARTE
|
Filing Date:
January 26, 2009
|
Filed By:
California Cogeneration Council
|
|
Description:
The California Cogeneration Council noticed oral and written ex parte
communications with Robert Kinosian, advisor to Commissioner Bohn, and Pamela
Nataloni, advisor to Commissioner Chong, on January 22, 2009.
|
|
|
Type:
STATEMENT
|
Filing Date:
January 16, 2009
|
Filed By:
California Cogeneration Council
|
|
Description:
Prehearing Conference;
|
|
|
Type:
STATEMENT
|
Filing Date:
January 16, 2009
|
Filed By:
Pacific Gas & Electric Company
Southern California Edison Company
|
|
Description:
Joint Prehearing Conference;
|
|
|
Type:
STATEMENT
|
Filing Date:
January 16, 2009
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Prehearing Conference;
|
|
|
Type:
COMMENTS
|
Filing Date:
January 14, 2009
|
Filed By:
California Cogeneration Council
Cogeneration Association of California
Energy Producers and Users Coalition
|
|
Description:
Amended Joint Reply; on the Proposed Decision of ALJ Yip-Kikugawa (filing
authorized by ALJ Yip-Kikugawa per email ruling dated 1/14/09).
|
|
|
Type:
EXPARTE
|
Filing Date:
January 14, 2009
|
Filed By:
Independent Energy Producers Association
|
|
Description:
Independent Energy Producers Association noticed an oral ex parte communication
with Nancy Ryan, advisor to Commissioner Peevey, on January 12, 2009.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 12, 2009
|
Filed By:
California Cogeneration Council
Cogeneration Association of California
Energy Producers and Users Coalition
|
|
Description:
Joint reply; on the proposed decision of ALJ Yip-Kikugawa
|
|
|
Type:
COMMENTS
|
Filing Date:
January 12, 2009
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; on Proposed Decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 12, 2009
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; to opening comments of QF parties
|
|
|
Type:
COMMENTS
|
Filing Date:
January 12, 2009
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; to opening comments of QF parties on proposed decision of ALJ
Yip-Kikugawa
|
|
|
Type:
COMMENTS
|
Filing Date:
January 12, 2009
|
Filed By:
Independent Energy Producers Association
|
|
Description:
Reply; on proposed decision denying joint petition for modification of Decision
08-07-048 filed by QF parties
|
|
|
Type:
COMMENTS
|
Filing Date:
January 6, 2009
|
Filed By:
Independent Energy Producers Association
|
|
Description:
on Proposed Decision Denying Joint Petition for Modification of Decision
08-07-048 filed by QF parties.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 6, 2009
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
on Proposed Decision Denying Joint Petition for Modification of Decision
08-07-048 filed by QF parties.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 6, 2009
|
Filed By:
Southern California Edison Company
|
|
Description:
Opening; on the Proposed Decision of ALJ Yip-Kikugawa.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 6, 2009
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Opening; on Proposed Decision of Administrative Law Judge Yip-Kikugawa.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 6, 2009
|
Filed By:
California Cogeneration Council
Cogeneration Association of California
Energy Producers and Users Coalition
|
|
Description:
Joint; on the Proposed Decision of ALJ Yip-Kikugawa.
|
|
|
Type:
RULING
|
Filing Date:
December 23, 2008
|
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
|
|
Description:
Setting Prehearing Conference. Any parties wishing to file a PHC statement as
further described in the ruling shall do so by no later than January 16, 2009.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 19, 2008
|
Filed By:
California Cogeneration Council
|
|
Description:
California Cogeneration Council noticed an oral ex parte communication with
Andy Schwartz, advisor to Commissioner Peevey, Paul Clanon, Commission
Executive Director, and Frank Lindh, Commission Counsel, on December 8, 2008.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 9, 2008
|
Filed By:
Independent Energy Producers Association
|
|
Description:
Independent Energy Producers Association noticed a written ex parte
communication with Andy Schwartz, advisor to Commissioner Peevey, on December
5, 2008.
Independent Energy Producers Association noticed an oral and written
ex parte communication with Theresa Cho, advisor to Commissioner Grueneich, on
December 8, 2008.
|
|
|
Type:
RULING
|
Filing Date:
December 8, 2008
|
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
|
|
Description:
Extending Time for Comments to Proposed Decision. Opening comments shall be
due on January 6, 2009 and reply comments shall be due on January 12, 2009.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 1, 2008
|
Filed By:
Independent Energy Producers Association
|
|
Description:
Independent Energy Producers Association noticed an oral ex parte communication
with Commissioner Grueneich and Traci Bone, advisor to Commissioner Grueneich;
and Andrew Schwartz, advisor to Commissioner Peevey, on November 25, 2008.
|
|
|
Type:
REQUEST
|
Filing Date:
November 21, 2008
|
Filed By:
The Utility Reform Network
|
|
Description:
for intervenor compensation for substantial contributions to D.05-04-024,
D.05-12-022, D.06-02-032, D.06-06-
063, D.06-07-032, D.07-09-040,
D.08-01-006, D.08-07-048, D.08-09-024.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
November 17, 2008
|
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
|
|
Description:
Decision Denying Joint Petition for Modification of Decision 08-07-048 Filed By
QF Parties. Opening comments, which shall not exceed 15 pages, are due
December 7, 2008. Reply comments,which shall not exceed 5 pages, are due 5
days after the last day for filing comments
|
|
|
Type:
NOTICE
|
Filing Date:
November 4, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Notice of Reservation of Rights
|
|
|
Type:
NOTICE
|
Filing Date:
November 4, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Notice of Reservation of Rights
|
|
|
Type:
EXPARTE
|
Filing Date:
October 23, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
Southern California Edison Company noticed an oral ex parte communication with
Andy Schwartz, Advisor to Commissioner Peevey, on October 21, 2008.
|
|
|
Type:
RESPONSE
|
Filing Date:
October 23, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
to QF Parties' petition for modification of Decision 08-07-048
|
|
|
Type:
RESPONSE
|
Filing Date:
October 23, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
in opposition to petition for modification of Decision 08-07-048 of the
Qualifying Facility parties
|
|
|
Type:
RESPONSE
|
Filing Date:
October 23, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
to petition for modification of Decision 08-07-048 of the Qualifying Facility
parties
|
|
|
Type:
RULING
|
Filing Date:
October 8, 2008
|
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
|
|
Description:
Shortening time for responses to petition for modification of Decision
08-07-048 to October 23, 2008.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
October 3, 2008
|
Filed By:
California Cogeneration Council
Cogeneration Association of California
Energy Producers And Users Coalition
Independent Energy Producers Association
|
|
Description:
of Decision 08-07-048.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 26, 2008
|
Filed By:
Independent Energy Producers Association
|
|
Description:
The Independent Energy Producers Association noticed oral and written ex parte
communications with President Peevey; Andrew Schwartz, advisor to President
Peevey; Joseph Como and Andrew Campbell, advisors to Commissioner Chong; Robert
Kinosian, advisors to Commissioner Bohn; Paul Phillips, advisor to Commissioner
Simon, on September 24, 2008.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 19, 2008
|
Filed By:
Southern Califorina Edison Company
|
|
Description:
Southern California Edison Company noticed oral and written ex parte
communications with Stephen St. Marie and Robert Kinosian, advisors to
Commissioner Bohn, on September 16, 2008.
|
|
|
Type:
RESPONSE
|
Filing Date:
September 18, 2008
|
Filed By:
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
Joint; to application for rehearing of Decision 08-07-048
|
|
|
Type:
EXPARTE
|
Filing Date:
September 17, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
Southern California Edison Company notices an oral ex parte communication with
Robert Kinosian, advisor to Commissioner Bohn, on September 12, 2008.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 17, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
Southern California Edison Company notices oral and written ex parte
communications with Matthew Deal, advisor to President Peevey, on September 12,
2008.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 11, 2008
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
Cogeneration Association of California and Energy Producers and Users Coalition
noticed oral and written ex parte communications with Andrew Schwartz, advisor
to President Peevey, on September 8, 2008.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 8, 2008
|
Filed By:
Independent Energy Producers Association
|
|
Description:
The Independent Energy Producers Association noticed oral and written ex parte
communications with Paul Phillips, advisor to Commissioner Simon, and Jessica
Tsang, an intern in the Commissioner Simon's office, on September 3, 2008.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
September 3, 2008
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
of Decision 08-07-048.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 2, 2008
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
Reply; on the Proposed Decision of ALJ Yip-Kikugawa
|
|
|
Type:
COMMENTS
|
Filing Date:
September 2, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; on the Proposed Decision of ALJ Yip-Kikugawa
|
|
|
Type:
COMMENTS
|
Filing Date:
September 2, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; on Proposed Decision of ALJ Yip-Kikugawa
|
|
|
Type:
COMMENTS
|
Filing Date:
September 2, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; on Proposed Decision on Joint Petition for Modification of Decision
07-09-040
|
|
|
Type:
EXPARTE
|
Filing Date:
August 29, 2008
|
Filed By:
Independent Energy Producers Association
|
|
Description:
The Independent Energy Producers Association noticed oral and written ex parte
communications with Andrew Schwartz, advisor to President Peevey, on August 27,
2008.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 25, 2008
|
Filed By:
Southern California Edison Comapny
|
|
Description:
Opening; to the proposed decision of ALJ Yip-Kikugawa
|
|
|
Type:
COMMENTS
|
Filing Date:
August 25, 2008
|
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
|
|
Description:
Open; on the draft decision granting in part and denying in part Joint Petition
for Modification of Decision 07-09-040
|
|
|
Type:
COMMENTS
|
Filing Date:
August 25, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
On proposed decision on Joint Petition for Modification of Decision 07-09-040
|
|
|
Type:
COMMENTS
|
Filing Date:
August 25, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Opening; on the proposed decision of ALJ Yip-Kikugawa
|
|
|
Type:
EXPARTE
|
Filing Date:
August 22, 2008
|
Filed By:
Independent Energy Producers Association
|
|
Description:
The Independent Energy Producers Association noticed an oral ex parte
communication with Robert Kinosian and Stephen St. Marie, advisors to
Commissioner Bohn, on August 19, 2008.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 18, 2008
|
Filed By:
Independent Energy Producers Association
|
|
Description:
The Independent Energy Producers Association noticed an oral ex parte
communication with Matthew Deal, advisor to President Peevey, on August 13,
2008.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
August 5, 2008
|
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
|
|
Description:
Decision granting in part and denying in part Joint Petition for Modification
of Decision 07-09-040. Opening Comments, which shall not exceed 15 pages, are
due August 25, 2008; Reply Comments, which shall not exceed 5 pages, are due 5
days after the last day for filing Opening Comments.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 17, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
Southern California Edison Company noticed an oral ex parte communication with
Stephen St. Marie and Robert Kinosian, advisors to Commissioner Bohn on July
15, 2008.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 15, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
Southern California Edison Company noticed an oral ex parte communication with
Robert Mason, advisor to Commissioner Simon on July 11, 2008.
|
|
|
Type:
NOTICE
|
Filing Date:
June 26, 2008
|
Filed By:
CALJ/MINKIN/CPUC
|
|
Description:
of Assignment.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 12, 2008
|
Filed By:
Sycamore Cogeneration Company
Watson Cogeneration Company
|
|
Description:
Sycamore Cogeneration Company and Watson Cogeneration Company noticed an oral
ex parte communication with President Peevey, and Andrew Schwartz, advisor to
President Peevey on June 9, 2008.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 5, 2008
|
Filed By:
California Cogeneration Council
Cogeneration Association of California/Energy Producers & Users Coalition
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The California Independent System Operator Corporation
|
|
Description:
Southern California Edison Company, Pacific Gas and Electric Company, San Diego
Gas & Electric Company, California Cogeneration Council, Cogeneration
Association of California/Energy Producers and Users Coalition, and the
California Independent System Operator Corporation noticed oral and written ex
parte communications with Andy Schwartz, advisor to President Peevey on June 2,
2008.
|
|
|
Type:
REPLY
|
Filing Date:
May 30, 2008
|
Filed By:
CAlifornians for Renewable Energy
|
|
Description:
to Responses to Petition for Modification of Decision 07-09-040.
|
|
|
Type:
RESPONSE
|
Filing Date:
May 21, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
to CARE's Petition for Modification of Decision 07-09-040.
|
|
|
Type:
RESPONSE
|
Filing Date:
May 21, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to CARE's Petition for Modification of Decision 07-09-040.
|
|
|
Type:
RESPONSE
|
Filing Date:
May 21, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
to CARE's Petition for Modification of Decision 07-09-040.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 12, 2008
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Pacific Gas and Electric Company, Southern California Edison Company, and San
Diego Gas & Electric Company noticed oral and written ex parte communication
with Andy Schwartz, advisor to President Peevey on May 7, 2008.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 5, 2008
|
Filed By:
Sycamore Cogeneration Company
Watson Cogeneration Company
|
|
Description:
Watson Cogeneration Company and Sycamore Cogeneration Company noticed oral and
written ex parte communications with President Peevey and Andrew Schwartz,
advisor to President Peevey on April 30, 2008.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
April 21, 2008
|
Filed By:
Californians for Renewable Energy, Inc.
|
|
Description:
of Decision 07-09-040.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 2, 2008
|
Filed By:
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
to Joint Petiton of the Cogeneration Association of California, the Energy
Producers and Users Coalition, and the Independent Energy Producers Association
for Modification of Decision 07-09-040.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 2, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
to Petition of the California Cogeneration Council for Modification of Decision
07-09-040.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 2, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to the California Cogeneration Council Petition for Modification of Decision
07-09-040.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 2, 2008
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
to the Petition of the California Cogeneration Council for Modification of
Decision 07-09-040.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 2, 2008
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
to the Petition of the California Cogeneration Council for Modification of
Decision 07-09-040.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 2, 2008
|
Filed By:
California Cogeneration Council
|
|
Description:
to Joint Petition of the Cogeneration Association of California, the Energy
Producers and Users Coalition and the Independent Energy Producers Association
for Modification of Decision 07-09-040.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 2, 2008
|
Filed By:
The Utility Reform Network
|
|
Description:
to Petition for Modification of Decision 07-09-040.
|
|
|
Type:
REPLY
|
Filing Date:
March 28, 2008
|
Filed By:
California Cogeneration Council
|
|
Description:
to the Responses of Pacific Gas and Electric Company and Southern California
Edison Company to the March 3, 2008 Motion of the California Cogeneration
Council concerning Pacific Gas and Electric Company's 2008 As-Delivered
Capacity Prices for Qualifying Facilities (filing authorized by ALJ
Yip-Kikugawa via phone conversation on March 19, 2008).
|
|
|
Type:
REPLY
|
Filing Date:
March 28, 2008
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
to March 18, 2008 responses of Pacific Gas and Electric Company and Southern
California Edison Company (filing authorized by ALJ Brown per email ruling of
March 19, 2008).
|
|
|
Type:
RESPONSE
|
Filing Date:
March 18, 2008
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
to March 3, 2008 Motions of California Cogeneration Council, the Cogeneration
Association of California and the Energy Producers and Users Coalition.
|
|
|
Type:
RESPONSE
|
Filing Date:
March 18, 2008
|
Filed By:
Southern California Edison Company
|
|
Description:
to Motions of California Cogeneration Council, the Cogeneration Association of
California and the Energy Producers and Users Coalition concerning Pacific Gas
and Electric Company's 2008 As-Delivered Capacity Prices for Qualifying
Facilities.
|
|
|
Type:
MOTION
|
Filing Date:
March 3, 2008
|
Filed By:
California Cogeneration Council
|
|
Description:
To Adjust Pacific Gas and Electric Company 2008 As-Delivered Capacity Prices
for Qualifying Facilities.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
March 3, 2008
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Independent Energy Producers Association
|
|
Description:
Joint; of Decision 07-09-040.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
March 3, 2008
|
Filed By:
California Cogeneration Council
|
|
Description:
of Decision 07-09-040.
|
|
|
Type:
MOTION
|
Filing Date:
March 3, 2008
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
To Adjust January 2008 Avoided Cost Posting of Pacific Gas and Electric Company.
|
|
|
Type:
EXPARTE
|
Filing Date:
November 30, 2007
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
SUMMARY: On November 28, 2007, Michael Alcantar, counsel to the Cogeneration
Association of California and the Energy Producers and Users Coalition,
(jointly, CAC/EPUC) met with Andrew Schwartz, advisor to Pres. Peevey in San
Francisco. The issues addressed were the terms and conditions for extension
contracts pursuant to D.07-09-040, and procedural options to secure CPUC
direction regarding the extension contracts. Two specific extension contract
situations were discussed. The first set was to seek specificity on the
designation of "price" terms (versus "non-price" terms, and particularly
performance provisions) that could be modified in the extension agreements. The
second set was to address the options for previously terminate firm capacity
CHP/QF resources to reinstate firm capacity terms and conditions. Contact
Person: Karen Terranova; telephone: (415) 421-4143; e-mail: kt@a-klaw.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
November 26, 2007
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
SUMMARY: On November 19, 2007, Michael Alcantar, counsel to the Cogeneration
Association of California and the Energy Producers and Users Coalition
(jointly, CAC/EPUC) met with Andrew Schwartz, advisor to Pres. Peevey in San
Francisco. Also present was Elizabeth Stolzfus, Energy Division of the CPUC.
Written material (attached to the notice) was used. Alcantar discussed: (1) the
specific designation of price and non-price terms that may be subject to change
in the extension contracts; (2) the eligibility of previously terminated firm
capacity CHP/QF generators to reinstate pre-existing firm capacity non-price
terms and conditions; and (3) the Commission's possible role in addressing
mediation of disputes over contract issues. Contact Person: Karen Terranova;
telephone: (415) 421-4143; e-mail: kt@a-klaw.com.
|
|
|
Type:
REQUEST
|
Filing Date:
November 21, 2007
|
Filed By:
Union of Concerned Scientists
|
|
Description:
For an Award of Compensation to the Union of Concerned Scientists for
Substantial Contributions to Decision 06-02-032.
|
|
|
Type:
RESPONSE
|
Filing Date:
November 9, 2007
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
to the Joint Parties' Application for Rehearing of D. 07-09-040.
|
|
|
Type:
RESPONSE
|
Filing Date:
November 9, 2007
|
Filed By:
California Cogeneration Council
|
|
Description:
to Pacific Gas and Electric Company's, Southern California Edison Company's,
San Diego Gas & Electric Company's, The Utility Reform Network's and the
Division of Rate Payer A dvocates ' Application for Rehearing of the Opinion on
Future Policy and Pricing for Qualifying Facilities, Decision 0 7-09-040.
|
|
|
Type:
RESPONSE
|
Filing Date:
November 9, 2007
|
Filed By:
Independent Energy Producers Association
|
|
Description:
to Applications for Rehearing of D.07-09-040.
|
|
|
Type:
RESPONSE
|
Filing Date:
November 9, 2007
|
Filed By:
Division of Ratepayer Advocates
Pacific Gas and Electric Company
San Diego Gas and Electric
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Joint; to Applications for Rehearing of Decision 07-09-040.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
October 25, 2007
|
Filed By:
Division of Ratepayer Advocates
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
|
|
Description:
Application for Rehearing of Decision 07-09-040.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
October 25, 2007
|
Filed By:
California Cogeneration Council
|
|
Description:
of Decision 07-09-040, Opinion on Future Policy and Pricing for Qualifying
Facilities.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
October 25, 2007
|
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
|
|
Description:
Application for Rehearing of Decision 07-09-040.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 21, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
SUMMARY: On September 18, 2007 Bruce C. Foster, Senior Vice President of
Southern California Edison Company (SCE) met with Cmmr. Grueneich in San
Francisco. Also present were Theresa Cho, advisor to Cmmr. Grueneich and
Michael Hoover, Director of Regulatory Affairs of SCE. Written materials
(attached to the notice) were used. Foster explained that the energy payment
formula in the Alternate Proposed Decision (Alternate) produces prices that
exceed SCE's short-run avoided cost (SRAC) of energy. Hoover stated that the
firm capacity price in the Alternate is too high and exceeds SCE's avoided cost
of capacity. Hoover explained that the $157/kW-year MPR capacity price used in
the Alternate should be reduced by at least $55/kWyear to account for savings
gained from running in the energy market. The firm capacity price should also
be reduced by an additional $10/kW-year. Hoover also stated that there is no
need to require standard offer contracts, particularly for QFs because QFs have
many options for selling their power, including utility all-source
solicitations, renewables solicitations, bilateral contracts and other
load-serving entities. Contact Person: Henry Romero, telephone: (626) 302-4124,
e-mail address: Henry.Romero@sce.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 20, 2007
|
Filed By:
California Cogeneration Council
|
|
Description:
SUMMARY: On September 17, 2007 Beth Vaughan, Executive Director of the
California Cogeneration Council (CCC) participated in a conference call with
Andrew Schwartz, advisor to Pres. Peevey. R. Thomas Beach, consultant to the
CCC; David Hermanson, a member of the CCC employed by Primary Energy; Jerry R.
Bloom and Joseph M. Karp of Winston & Strawn, LLP, counsel for the CCC also
participated in the conference call. CCC representatives stated that the
Alternate Proposed Decision (Alternate PD) places too much weight on the NP-15
and SP-15 spot market prices and proposed they account for no more than one
third of the SRAC formula, with the existing administrative values making up
the difference. CCC representatives proposed that the Commission require the
utilities to employ the updated time of use ("TOU") factors adopted by the
Commission for energy efficiency and demand response programs. CCC
representatives explained that Pacific Gas and Electric Company's (PG&E)
City-gate prices should be used in PG&E'S new SRAC formula. The CCC
representatives stated the 2007 MPR should serve as the basis for the combined
cycle gas turbine fixed costs of the firm capacity price calculation. Contact
Person: Joseph M. Karp, telephone: (415) 591-1000; e-mail jkarp@winston.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 20, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
SUMMARY: On September 17, 2007, Michel Peter Florio, Senior Attorney for The
Utility Reform Network (TURN), met with Theresa Cho, advisor to Cmmr.
Grueneich, in San Francisco. Florio summarized TURN's major concerns with the
Alternate Proposed Decision (APD) of Commissioner Grueneich. Florio stated that
it would be difficult and speculative to forecast the energy profits that a
proxy combined cycle plant would earn in the market over the ten-year period of
the firm capacity contract adopted by the APD. Florio recommended that the
Commission adopt a capacity payment structure for the firm contract that did
not contain a deduction for such energy profits and likewise base the energy
payment under the contract on a fixed heat rate equal to that of the proxy
unit. Florio also stated that the factors cited in the APD as justifying a
50/50 average of a market-based heat rate have been declining. Contact Person:
Larry Wong, telephone: (415) 929-8876, e-mail: Adminassistant@turn.org.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 20, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
SUMMARY: On Monday, September 17, 2007 Bruce C. Foster, Senior Vice President
of Southern California Edison Company (SCE), met with Robert Kinosian, advisor
to Cmmr. Bohn in San Francisco. Also present was Michael Hoover, Director of
Regulatory Affairs of SCE. Written materials (attached to the notice) were
used. Foster explained that the energy payment formula in the Alternate
Proposed Decision (Alternate) produces prices that exceed SCE's short-run
avoided cost (SRAC) of energy. Foster stated that the firm capacity price is
too high and explained that the $157/kW-year MPR capacity price should be
reduced by at least $55/kWyear to account for savings gained from running in
the energy market. The firm capacity price should also be reduced by an
additional $10/kW-year to account for the residual value associated with the
MPR's 20-year annualization of a proxy unit that has a 30-year
economic/operating life. The Alternate should be modified to limit the
availability of standard offer contracts to QFs with a net capacity no greater
than 20 MW. Contact Person: Henry Romero, telephone: (626) 302-4124, e-mail:
Henry.Romero@sce.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 20, 2007
|
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
|
|
Description:
SUMMARY: On September 17, 2007, Michael Alcantar, counsel to the Cogeneration
Association of California and Energy Producers and Users Coalition (jointly,
CAC/EPUC) met with Cmmr. Grueneich in San Francisco. Also present was Theresa
Cho, advisor to Cmmr. Grueneich. Written materials (attached to the notice)
were used. Issues raised in CAC/EPUC's written comments were reviewed and
discussed regarding the Alternate Proposed Decision. CAC/EPUC urged the
adoption of positions taken by CAC/EPUC in formal comments. Contact Person:
Karen Terranova, telephone: (415) 421-4143; e-mail kt@a-klaw.com.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 17, 2007
|
Filed By:
COUNTY OF LOS ANGELES
|
|
Description:
Reply; On the Alternate Proposed Decision of Commissioner Grueneich.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 17, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
SUMMARY: On September 12, 2007 Michael Hoover, Director of Regulatory Affairs,
of Southern California Edison Company (SCE) met with Jaclyn Marks, advisor to
Cmmr. Simon in San Francisco. Written materials (attached to the notice) were
used. Hoover discussed SCE's concerns with the Alternate Proposed Decision of
Commissioner Grueneich issued on August 20, 2007 (Alternate). Hoover explained
that the energy payment formula in the Alternate produces prices that exceed
SCE's short-run avoided cost (SRAC) of energy. Hoover stated that the firm
capacity price in the Alternate is too high and exceeds SCE's avoided cost of
capacity. Hoover explained that the $157/kW-year MPR capacity price used in the
Alternate should be reduced by at least $55/kW-year to account for savings
gained from running in the energy market. The firm capacity price should also
be reduced by an additional $10/kW-year to account for the residual value
associated with the MPR's 20-year annualization of a proxy unit that has a
30-year economic/operating life. Hoover explained that QFs many options for
selling their power, including utility all-source solicitations, renewables
solicitations, bilateral contracts and other load-serving entities. Contact
Person: Henry Romero, telephone: (626) 302-4124, email: Henry.Romero@sce.com.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 17, 2007
|
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
|
|
Description:
Reply; On the Alternate Decision of Commissioner Grueneich.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 17, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; on Alternate Proposed Decision of Commissioner Grueneich.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 17, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; On the Alternate Proposed Decision of Commissioner Grueneich.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 17, 2007
|
Filed By:
California Wind Energy Association
|
|
Description:
Reply; On the Alternate Proposed Decision of Commissioner Grueneich.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 17, 2007
|
Filed By:
California Cogeneration Council
|
|
Description:
Reply; On the Alternate Proposed Decision of Commissioner Grueneich.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 17, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; On Alternate Proposed Decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 14, 2007
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY INC.
|
|
Description:
Reply; on Alternative Opinion on Future Policy and Pricing For Qualifying
Facilities.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 14, 2007
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
SUMMARY: On September 12, 2007 Michael Alcantar, council to the Cogeneration
Association of California and the Energy Producers and Users Coalition
(jointly, CAC/EPUC) met with Robert Kinosian, advisor to Cmmr. Bohn; Jaclyn
Marks, advisor to Cmmr. Simon and Andrew Campbell, advisor to Cmmr. Chong; and
Andrew Schwartz, advisor to Pres. Peevey in three separate meetings in San
Francisco. Also present was Nora Sheriff, council to CAC/EPUC. Written
materials (attached to the notice) were used. Alcantar expressed the need for
contracts under the Commission's Prospective QF Program to have certainty both
as to term and pricing, along with the importance of a policy for new, small
QFs. Contact Person: Karen Terranova, telephone: (415) 421-4143, email:
kt@a-klaw.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 14, 2007
|
Filed By:
California Cogeneration Council
|
|
Description:
SUMMARY: On September 11, 2007 Beth Vaughan, Executive Director of the
California Cogeneration Council (CCC) met with Robert Kinosian, advisor to
Cmmr. Bohn. Also present were David Hermanson, a member of the CCC employed by
Primary Energy; R. Thomas Beach, consultant to CCC; and Jerry R. Bloom of
Winston & Strawn, LLP, council for the CCC. CCC representatives expressed their
support for the Alternate Proposed Decision (Alternate PD), but noted that it
places too much weight on the NP- 15 and SP-15 spot market prices. CCC
representatives proposed that the Commission require the utilities to employ,
on an interim basis, the updated time of use ("TOU") factors for energy
efficiency and demand response programs, and revisit these interim TOU factors
in the technical workshop that the Alternate PD requires 60 days after the
Commission's decision. CCC representatives also explained that PG&E City-gate
prices should be used in PG&EYS new SRAC formula rather than the arbitrary
50150 mix of Malin and Topock gas. CCC representatives stated the 2007 MPR
should serve as the basis for the combined cycle gas turbine fixed costs of the
firm capacity price calculation. Contact Person: Jerry R. Bloom, telephone:
(213) 615-1756, email: jbloom@winston.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 14, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
SUMMARY: On September 11, 2007 Bruce C. Foster, Senior Vice President of
Southern California Edison Company (SCE) met with Pres. Peevey in San
Francisco. Also present were Andrew Schwartz, advisor to Pres. Peevey; and
Michael Hoover, Director of Regulatory Affairs of SCE. Written materials
(attached to the notice) were used. Foster discussed SCE's concerns with the
Alternate Proposed Decision of Cmmr. Grueneich issued on August 20, 2007
(Alternate). Foster explained that the energy payment formula in the Alternate
produces prices that exceed SCE's short-run avoided cost (SRAC) of energy.
Foster stated that the firm capacity price in the Alternate is too high and
exceeds SCE's avoided cost of capacity. Foster explained that the $157/kW-year
MPR capacity price used in the Alternate should be reduced by at least
$55/kWyear to account for savings gained from running in the energy market. The
firm capacity price should also be reduced by an additional $10/kW-year to
account for the residual value associated with the MPR's 20-year annualization
of a proxy unit that has a 30-year economic/operating life. Foster explained
that QFs have many options for selling their power, including utility
all-source solicitations, renewables solicitations, bilateral contracts and
other load-serving entities. Contact Person: Henry Romero, telephone: (626)
302-4124, e-mail address: Henry.Romero@sce.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 14, 2007
|
Filed By:
California Cogeneration Council
|
|
Description:
SUMMARY: On September 12, 2007 Beth Vaughan, Executive Director of the
California Cogeneration Council (CCC) met with Cmmr. Grueneich in San
Francisco. Also present were Theresa Cho, advisor to Cmmr. Grueneich; R. Thomas
Beach, consultant to the CCC; Shakil Rahman, a member of the CCC employed by
Juniper Generation, David Hermanson, a member of the CCC employed by Primary
Energy; Seth Hooper, a member of the CCC employed by Weyerhaeuser Company; and
Jerry R. Bloom and Joseph M. Karp of Winston & Strawn, LLP, counsel for the
CCC. CCC representatives expressed their support for the Alternate Proposed
Decision (Alternate PD) but stated the Alternate PD places too much weight on
the NP-15 and SP-15 spot market prices. CCC representatives explained why the
Southern California Edison Company's ("SCE") administrative heat rate should be
set at 9,705 BtuIkWh. CCC representatives proposed that the Commission require
the utilities to employ, on an interim basis, the updated time of use ("TOW)
factors adopted by the Commission for energy efficiency and demand response
programs, and revisit these interim TOU factors in the technical workshop that
the Alternate PD requires 60 days after the Commission's decision. CCC
representatives also explained that PG&E City-gate prices should be used in
PG&EYS new SRAC formula rather than the arbitrary 50150 mix of Malin and Topock
gas. Contact Person: Joseph M. Karp, telephone: (415) 591-1000, e-mail:
jkarp@winston.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 14, 2007
|
Filed By:
California Cogeneration Council
|
|
Description:
SUMMARY: On September 12, 2007 Beth Vaughan, Executive Director of the
California Cogeneration Council (CCC) met with Jacklyn Marks, advisor to Cmmr.
Simon in San Francisco. Also present were Andrew Campbell, advisor to Cmmr.
Chong; Shakil Rahman, a member of the CCC employed by Juniper Generation; David
Hermanson, a member of the CCC employed by Primary Energy; Seth Hooper, a
member of the CCC employed by Weyerhaeuser Company; R. Thomas Beach, consultant
to the CCC; and Jerry R. Bloom and Joseph M. Karp of Winston & Strawn, LLP,
counsel for the CCC. CCC representatives expressed their support for the
Alternate Proposed Decision (Alternate PD) but stated the Alternate PD places
too much weight on the NP-15 and SP-15 spot market prices. CCC representatives
explained why the Southern California Edison Company's ("SCE") administrative
heat rate should be set at 9,705 BtuIkWh. CCC representatives proposed that the
Commission require the utilities to employ, on an interim basis, the updated
time of use ("TOW) factors adopted by the Commission for energy efficiency and
demand response programs, and revisit these interim TOU factors in the
technical workshop that the Alternate PD requires 60 days after the
Commission's decision. CCC representatives also explained that PG&E City-gate
prices should be used in PG&EYS new SRAC formula rather than the arbitrary
50150 mix of Malin and Topock gas. Contact Person: Joseph M. Karp, telephone:
(415) 591-1000, e-mail: jkarp@winston.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 13, 2007
|
Filed By:
HL Power
|
|
Description:
SUMMARY: On September 10, 2007, Ralph Saunders of HL Power met with Pres.
Peevey in San Francisco. Also present were Andrew Swartz, advisor to Pres.
Peevey; Jerry R. Bloom of Winston & Strawn, LLP, counsel for HL Power. HL Power
expressed continuing concerns with the Proposed Decisions ("PDs") and stated
that the PDs, as currently drafted, would have a significantly adverse impact
on HL Power's operation of its biomass qualifying facility and while the
alternative proposed decision ("APD") by Commr. Grueneich was a vast
improvement over the original Proposed Decision, there were several issues that
needed additional attention. HL Power asked: (1) that the 50150 split between
NP151SP15 and administratively determined heat rates in the APD be changed to a
one third two third split, respectively; (2) that PG&E's time of use periods be
corrected in the forthcoming Commission decision, rather than being delayed for
further consideration, and (3) that the city gas plus transportation be used
for the gas pricing utilized in PG&E payment formula. Contact Person: Jerry R.
Bloom, telephone: (213) 615-1756, email: jbloom@winston.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 13, 2007
|
Filed By:
Independent Energy Producers Association
|
|
Description:
SUMMARY: On September 11, 2007 Steven Kelly, Policy Director to Independent
Energy Producers Association (IEP) met with Andrew Campbell, advisor to Cmmr.
Chong in San Francisco. Also present was Douglas Kerner, legal representative
for IEP. Kelly agreed with the Alternate Proposed Decision that a change to the
methodology to determine avoided cost prices does not render prior avoided cost
prices incorrect, and that the modified methodology should not be applied
retroactively. Contact Person: Eric Janssen, telephone: (916) 447-2166, email:
ericj@eslawfirm.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 13, 2007
|
Filed By:
Independent Energy Producers Association
|
|
Description:
SUMMARY: On September 11, 2007 Steven Kelly, Policy Director to Independent
Energy Producers Association (IEP) met with Cmmr. Grueneich in San Francisco.
Also present were Theresa Cho, advisor to Cmmr. Grueneich; and Douglas Kerner,
legal representative for IEP. Kelly agreed with the Alternate Proposed Decision
that a change to the methodology to determine avoided cost prices does not
render prior avoided cost prices incorrect, and that the modified methodology
should not be applied retroactively. Contact Person: Eric Janssen, telephone:
(916) 447-2166, email: ericj@eslawfirm.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 13, 2007
|
Filed By:
Independent Energy Producers Association
|
|
Description:
SUMMARY: On September 11, 2007 Steven Kelly, Policy Director to Independent
Energy Producers Association (IEP) met with Pres. Peevey in San Francisco. Also
present were Andrew Schwartz, advisor to Pres. Peevey; and Douglas Kerner,
legal representative for IEP. Kelly agreed with the Alternate Proposed Decision
that a change to the methodology to determine avoided cost prices does not
render prior avoided cost prices incorrect, and that the modified methodology
should not be applied retroactively. Contact Person: Eric Janssen, telephone:
(916) 447-2166, email: ericj@eslawfirm.com.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 10, 2007
|
Filed By:
COUNTY OF LOS ANGELES
|
|
Description:
Opening; On the Alternate Proposed Decision of Commissioner Grueneich.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 10, 2007
|
Filed By:
Independent Energy Producers Association
|
|
Description:
on the Alternate Proposed Decision on Future Policy and Pricing for Qualifying
Facilities.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 10, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Opening; on the Alternate Proposed Decision of Commissioner Grueneich.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 10, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
on Alternate Proposed Decision of Commissioner Grueneich.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 10, 2007
|
Filed By:
California Cogeneration Council
|
|
Description:
on the Alternate Proposed Decision of Commissioner Grueneich.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 10, 2007
|
Filed By:
California Wind Energy Association
|
|
Description:
on the Alternate Proposed Decision of Commissioner Grueneich.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 10, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
On the Alternate Proposed Decision of Commissioner Grueineich.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 10, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Opening; On Alternate Proposed Decision of Commissioner Grueneich.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 10, 2007
|
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
|
|
Description:
Opening; On the Alternate Decision of Commissioner Grueneich.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 31, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
SUMMARY: On August 30, 2007 Brian Cherry, Vice President, Regulatory Relations
for Pacific Gas and Electric Company (PG&E) met with Cmmr. Grueneich in San
Francisco. Also present were Theresa Cho, advisor to Cmmr. Grueneich; Fong Wan,
Vice President, Energy Procurement of PG&E; and Roy Kuga, Vice President,
Energy Supply of PG&E. Written materials (attached to the notice) were used.
Cherry expressed support for the revised proposed decision and stressed the
need for expeditious Commission action on pricing and contract terms for QF
contracts not covered by PG&E-IEP Settlement Agreement in 2006. Cherry
summarized PG&E's position as to pricing and policy for non-IEP settling QFs
and noted the Alternate Proposed Decision would increase energy prices in
excess of the IEP Settlement decision. Kuga explained that new QF contracts
were not subject to CTC recovery and that bundled customers were exposed to
stranded cost risks.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 29, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On August 28, 2007 Brian Cherry, Vice President, Regulatory Relations for
Pacific Gas and Electric Company (PG&E) met with Jaclyn Marks, advisor to Cmmr.
Simon in San Francisco. Also present was Robert Mason, advisor to Cmmr. Simon.
Cherry expressed support for the revised proposed decision and stressed the
need for expeditious Commission action on pricing and contract terms for QF
contracts not covered by PG&E-IEP Settlement Agreement in 2006. Cherry
summarized PG&E¿s position with respect to pricing for non-IEP settling QFs and
noted the Alternate Proposed Decision of Cmmr. Grueneich would increase as
available energy prices in excess of the IEP Settlement decision.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 29, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On August 28, 2007, Brian Cherry, Vice President, Regulatory Relations, Pacific
Gas and Electric Company (PG&E) met with Andrew Campbell, advisor to Cmmr.
Chong in San Francisco. Written materials (attached to the notice) were used.
Cherry expressed support for the revised proposed decision and stressed the
need for expeditious Commission action on pricing and contract terms for QF
contracts not covered by PG&E-IEP Settlement Agreement in 2006. Cherry
summarized PG&E's position and noted the Alternate PD of Cmmr. Grueneich would
increase as available energy prices in excess of the IEP Settlement decision.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 28, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
LATE FILED: On August 22, 2007 Thomas Bottorff, Senior Vice President,
Regulatory Relations for Pacific Gas and Electric Company (PG&E) met with Pres.
Peevey in San Francisco. Also present were Andy Schwartz, advisor to Pres.
Peevey; Jana Corey, Director of Smart Energy Web; and Sean Gallagher, Director
of the Energy Division. Bottorff expressed support for the revised proposed
decision and stressed the need for expeditious Commission action on pricing and
contract terms for QF contracts not covered by PG&E-IEP Settlement Agreement in
2006. Bottorff summarized PG&E's position with respect to pricing and policy
for non-IEP settling QFs and noted the Alternate Proposed Decision increase
energy prices in excess of the IEP Settlement decision.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 24, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On August 22, 2007, Brian Cherry, Vice President, Regulatory Relations, Pacific
Gas and Electric Company (PG&E) met with Pres. Peevey in San Francisco. Also
present were Fong Wan, Vice President, Energy Procurement and Roy Kuga, Vice
President, Energy Supply, for PG&E. Written materials (attached to the notice)
were used. Cherry expressed general support for the revised proposed decision
and stressed the need for expeditious Commission action on pricing and contract
terms for QF contracts not covered by PG&E-IEP Settlement Agreement in 2006.
The representatives also commented on the Alternate Proposed Decision of Cmmr.
Grueneich. The representatives recommended that the PD be revised to reflect a
6-month measurement period instead of 24-month period.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 23, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
SUMMARY: On August 20, 2007 Bruce C. Foster, Senior Vice President of Southern
California Edison Company (SCE) met with Andrew Schwartz, advisor to Pres.
Peevey in San Francisco. Also present was Michael Hoover, Director of
Regulatory Affairs of SCE. Foster stated that any methodology for calculating
the short run avoided cost (SRAC) of energy should be based on data for a
robust market from a transparent source. The methodology in the Revised
Proposed Decision (PD) does not satisfy this, criteria because there is no
publication that provides the 24 months of forward electricity prices required
by the Revised PD. SCE's proposed SRAC methodology uses historical SP-15
day-ahead prices and relies on transparent, market-based data that SCE actually
uses to dispatch resources. Foster also stated that there is no need to require
Standard Offer contracts for expiring or new QF resources. Contact Person:
Henry Romero, telephone: (626) 302-3102, email: Henry.Romero@sce.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 21, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On August 17, 2007, Brian Cherry, Vice President, Regulatory Relations, Pacific
Gas and Electric Company (PG&E) met with Andy Campbell, advisor to Cmmr. Chong
in San Francisco. Cherry expressed general support for the revised proposed
decision and stressed the need for expeditious Commission action on pricing and
contract terms for QF contracts not covered by PG&E-IEP Settlement Agreement in
2006. Cherry recommended that the Commission utilize a more limited measurement
interval for forward prices and asked that the PD be revised to reflect a
6-month measurement period instead of 24-month period.
|
|
|
Type:
ALTERNATE
|
Filing Date:
August 20, 2007
|
Filed By:
CMMR/GRUENEICH/CPUC
|
|
Description:
Opinion on Future Policy and Pricing for Qualifying Facilities. Opening
Comments, which shall not exceed 15 pages, are due no later than September 9,
2007. Reply Comments are due 5 days after Opening Comments are filed.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 15, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On August 13, 2007 Brian Cherry, Vice President, Regulatory Relations of
Pacific Gas and Electric Company (PG&E) met with Cmmr. Bohn in San Francisco.
Also present were Stephen St. Marie and Robert Kinosian, advisors to Cmmr.
Bohn; and Fong Wan, Vice President, Energy Procurement for PG&E. Written
materials (attached to the notice) were used. Cherry expressed general support
for the revised proposed decision (PD) and stressed the need for expeditious
Commission action on pricing and contract terms for QF contracts not covered by
PG&E-IEP Settlement Agreement in 2006. Cherry summarized PG&E's position with
respect to pricing and policy for non-IEP settling QFs. Wan suggested that the
Commission utilize a more limited measurement interval for forward prices and
recommended that the PD be revised to reflect a 6-month measurement period
instead of the 24-month period described in the PD.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 14, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
SUMMARY: On August 9, 2007, Michael Hoover, Director of Regulatory Affairs of
Southern California Edison Company (SCE) sent an electronic note (copies
attached to the notice) to Nancy Ryan and Andrew Schwartz, advisors to Pres.
Peevey. Contact Person: Henry Romero, telephone: (626) 302-4124, email:
Henry.Romero@sce.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
August 13, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
SUMMARY: On August 8, 2007, Bruce C. Foster, Senior Vice President of Southern
California Edison Company (SCE) had a telephone conversation with Nancy Ryan,
advisor to Pres. Peevey. Foster discussed the Revised Proposed Decision (PD) of
ALJ Halligan on Future Policy and Pricing for Qualifying Facilities (QFs).
Foster stated that the short run avoided cost (SRAC) methodology in the Revised
PD may not be able to be implemented because it relies on using estimates of
two-year forward transactions for power and gas to calculate a heat rate. In
contrast, SCE's SRAC relies on transparent, market-based data that SCE uses to
actually dispatch resource; therefore, SP-15 day-ahead prices represent SCE's
true short-run avoided cost of energy. Foster explained that MRTU is scheduled
for completion next year when SCE will petition the Federal Energy Regulatory
Commission (FERC) to be relieved of the PURPA must-take obligation. Foster
further explained that the 20 MW cap is consistent with FERC's recently adopted
PURPA regulations. Contact Person: Henry Romero, telephone: (626) 302-4124,
email: Henry.Romero@sce.com
|
|
|
Type:
EXPARTE
|
Filing Date:
August 13, 2007
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
SUMMARY: On August 8, 2007, Jerry R. Bloom, counsel for the California
Cogeneration Council (CCC) met with Nancy Ryan, advisor to Pres. Peevey in San
Francisco. Also present was Andrew Swartz, advisor to Pres. Peevey. Bloom
stated that the Proposed Decision (PD) would have a significantly adverse
impact on existing cogenerators and the second circulated draft suffered the
same problems as the first draft. Bloom emphasized that NP-15 and SP-15 market
prices need to be adjusted to account for the fact that the prices in these
markets are deflated and do not reflect the utilities' avoided costs. Bloom
explained that language in the PD should be corrected in respect of the
retrospective application of a revised SRAC formula. Bloom also stated that the
time of use factors for Pacific Gas and Electric Company and San Diego Gas and
Electric Company need to be adjusted at the same time as the rest of the
changes to the SRAC pricing methodology are adopted. Contact Person: Jerry R.
Bloom, telephone: (213) 615-1756, email: jbloom@winston.com and
jchung@winston.com.
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
July 27, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Notification Under Ordering Paragraph 5 of Decision 06-11-006.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 26, 2007
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
SUMMARY: On July 23, 2007, Michael Alcantar, counsel to the Cogeneration
Association of California and the Energy Producers and Users Coalition (jointly
CAC/EPUC), met with Jaclyn Marks, advisor to Cmmr. Simon and Andrew Campbell,
advisor to Cmmr. Chong in two separate meetings in San Francisco. Also present
were Nora Sheriff, counsel to CAC/EPUC; Donald Schoenbeck of RCS, Inc.,
consultant to CAC/EPUC; Neil Burgess, Executive Director of Sycamore
Cogeneration Company; and Gaylord Edwards, Business Manager, Chevron Global
Power Company. Written materials (attached to the notice) were used. Alcantar
referred to the attached documents regarding the proposed decision and
emphasized the importance of resolving the Qualifying Facilities' (QF) pricing
and policy issues. Contact Person: Karen Terranova, telephone: (415) 421-4143,
email: kt@a-klaw.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 24, 2007
|
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
|
|
Description:
SUMMARY: On July 20, 2007, Michael Alcantar counsel for the Cogeneration
Association of California and the Energy Producers and Users Coalition
(jointly, CAC/EPUC) met with Mathew Deal, advisor to Pres. Peevey in San
Francisco. Also present was Donald Schoenbeck, counsel for CAC/EPUC. Written
materials (attached to the notice) were used. Alcantar discussed the importance
of resolving the Qualifying Facilities (QF) pricing and policy issues. Contact
Person: Karen Terranova, telephone: (415) 421-4143, email: kt@a-klaw.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 2, 2007
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
On June 29, 2007, Beth Vaughan, Executive Director of the California
Cogeneration Council (CCC), met with Andy Schwartz, advisor to Pres. Peevey in
San Francisco. Also present were R. Thomas Beach, consultant to the CCC; Shakil
Rahman, a member of the CCC employed by Juniper Generation; Dick Thomson, a
member of the CCC employed by Proctor & Gamble; and Jerry R. Bloom and Joseph
M. Karp of Winston & Strawn, L.L.P., counsel for the CCC. Written materials
(attached to the notice) were used. The CCC representatives discussed the
Proposed Decision (PD) and explained that NP-15 and SP-15 market prices need to
be adjusted to reflect avoided costs and that the adjustment mechanism should
be adopted. The CCC representatives also stated that the Commission should
modify the TOU factors for SDG&E and PG&E when heat rate calculations are made.
The CCC representatives further explained that the PD should be clarified
regarding the revised SRAC formula and the new firm capacity price should be
set with reference to the RPS MPR.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 25, 2007
|
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
|
|
Description:
SUMMARY: On June 20, 2007, Brian O'Sullivan, a member of California Wind Energy
Association (CalWEA), employed by Coram Energy, met with Pres. Peevey in San
Francisco. Also present were Andy Schwartz, advisor to Pres. Peevey; and Joseph
M. Karp of Winston & Strawn, L.L.P., counsel for CalWEA. CalWEA representatives
discussed the Proposed Decision (PD) urging the Commission to retain the
as-available standard offer contract option. CalWEA representatives explained
that such an option will not discourage participation in the Renewable
Portfolio Standard program stating that the revised SRAC energy pricing formula
will have a significant effect on a number of renewable qualifying facilities.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 22, 2007
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
SUMMARY: On June 20, 2007, Rod Aoki, counsel to Cogeneration Association of
California and Energy Producers and Users Coalition (CAC/EPUC) met with Stephen
St. Marie, advisor to Cmmr. Bohn in San Francisco. Also present were Theresa
Cho, advisor to Cmmr. Grueneich; and Donald Schoenbeck of RCS Inc., consultant
to CAC/EPUC. Written materials (attached to the notice) were used. The
representatives clarified the efficiencies of industrial cogeneration
operations and emphasized the need for contracts under the Commission's
Prospective QF Program to have certainty both as to term and pricing, and the
importance of a policy for new, small QFs. Contact person: Karen Terranova,
telephone: (415) 421-4143; email: kt@a-klaw.com
|
|
|
Type:
OPPOSITION
|
Filing Date:
June 20, 2007
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
to Motion of PG&E, SCE and SDG&E to strike Appendices to Opening and Reply
Comments of the California Cogeneration Council.
|
|
|
Type:
RESPONSE
|
Filing Date:
June 20, 2007
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
to the Motion to Strike Appendices to the Reply Comments filed on June 4, 2007.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 18, 2007
|
Filed By:
Independent Energy Producers Association
|
|
Description:
SUMMARY: On June 15, 2007, Douglas Kerner, attorney for the Independent Energy
Producers Association (IEP), met with Andrew Schwartz, advisor to Pres. Peevey
in San Francisco. Also present was Steven K. Kelly, Policy Director for IEP.
The representatives expressed concern over the many flaws in the Proposed
Decision (PD) ranging from legal, technical, and implementation problems and
the PD is technically flawed in a number of areas for failing to adequately and
precisely explain how key price factors will be determined. The representatives
also stated that the PD has numerous gaps or is silent on the implementation of
its proposal, including issues such as development, timing of updates,
potential for protest, and review of mechanisms that will need to be in place
before any new methodology could be employed. The representatives also
expressed concern that failure to address these issues prior to adoption of a
final decision will lead to future disputes and protests.
Contact Person:
Eric Janssen, telephone: (916) 447-2166, email: ericj@eslawfirm.com.
|
|
|
Type:
RULING
|
Filing Date:
June 15, 2007
|
Filed By:
ALJ/BROWN/CPUC
|
|
Description:
Setting Final Oral Argument Before the Commission. The Commission shall hold
final oral argument on Tuesday, July 10, 2007, from 3:00 p.m. to 4:30 p..m., at
the Commission Auditorium, State Office Building, 505 Van Ness Avenue, San
Francisco, California.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 13, 2007
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
SUMMARY: On June 8, 2007, Michael Alcantar, counsel to the Cogeneration
Association of California and the Energy Producers and Users Coalition
(jointly, CAC/EPUC), met with Andrew Campbell, advisor to Cmmr. Chong in San
Francisco. Also present were Jaclyn Marks, advisor to Cmmr. Simon and Donald
Schoenbeck of RCS, Inc., consultant to CAC/EPUC. The representatives emphasized
the need for contracts under the Commission's Prospective QF Program to have
certainty both as to term and pricing, the importance of implementing the
Prospective QF Program as a coherent whole, the need for the issuance of a
timely decision and the importance of a policy for new, small QFs. Contact
Person: Karen Terranova, telephone: (415) 421-4143, email: kt@a-klaw.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 13, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
SUMMARY: On June 8, 2007, Michael Hoover, Director of Regulatory Affairs of
Southern California Edison Company, met with Andrew Schwartz, advisor to Pres.
Peevey in San Francisco. Written materials (attached to the notice) were used.
Hoover discussed the Proposed Decision (PD) of ALJ Halligan explaining that the
PD makes significant progress by basing short run avoided cost energy payments
on a market-based formula. Hoover also explained that the PD has flaws that, if
left uncorrected, will produce above-market payments in excess of avoided cost
and impose long-term contracting burdens on utility bundled service customers
that will not be shared by customers of other retail providers.
Contact
Person: Henry Romero, telephone: (626) 302-4124, email: Henry.Romero@sce.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 13, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
SUMMARY: On June 8, 2007, Michael Hoover, Director of Regulatory Affairs of
Southern California Edison Company, met with Andrew Campbell, advisor to Cmmr.
Chong in San Francisco. Written materials (attached to the notice) were used.
Hoover discussed the Proposed Decision (PD) of ALJ Halligan explaining that the
PD makes significant progress by basing short run avoided cost energy payments
on a market-based formula. Hoover also explained that the PD has flaws that, if
left uncorrected, will produce above-market payments in excess of avoided cost
and impose long-term contracting burdens on utility bundled service customers
that will not be shared by customers of other retail providers.
Contact
Person: Henry Romero, telephone: (626) 302-4124, email: Henry.Romero@sce.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 13, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
SUMMARY: On June 8, 2007, Bruce C. Foster, Senior Vice President of Southern
California Edison Company (SCE) met with Jaclyn Marks, advisor to Cmmr. Simon
in San Francisco. Also present was Michael Hoover, Director of Regulatory
affairs of SCE. Written materials (attached to the notice) were used. Hoover
discussed the Proposed Decision (PD) of ALJ Halligan explaining that the PD
makes significant progress by basing short run avoided cost energy payments on
a market-based formula. Hoover also explained that the PD has flaws that, if
left uncorrected, will produce above-market payments in excess of avoided cost
and impose long-term contracting burdens on utility bundled service customers
that will not be shared by customers of other retail providers.
Contact
Person: Henry Romero, telephone: (626) 302-4124, email: Henry.Romero@sce.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 11, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
SUMMARY: On June 6, 2007, Bruce C. Foster, Senior Vice President of Southern
California Edison Company (SCE) met with Stephen St. Marie, advisor to Cmmr.
Bohn in San Francisco. Also present was Michael Hoover, Director of Regulatory
Affairs of SCE. Written materials (attached to the notice) were used. Hoover
discussed the Proposed Decision (PD) of ALJ Halligan explaining that the PD
makes significant progress by basing short run avoided cost energy payments on
a market-based formula. Hoover also explained that the PD has flaws that, if
left uncorrected, will produce above-market payments in excess of avoided cost
and impose long-term contracting burdens on utility bundled service customers
that will not be shared by customers of other retail providers.
Contact
Person: Henry Romero, telephone: (626) 302-4124, email: Henry.Romero@sce.com.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 11, 2007
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
SUMMARY: On June 6, 2007, Rod Aoki, counsel to the Cogeneration Association of
California and the Energy Producers and Users Coalition (jointly, CAC/EPUC),
met with Pres. Peevey in San Francisco. Also present were Andrew Schwartz,
advisor to Pres. Peevey; Nora Sheriff, counsel to CAC/EPUC; and Donald
Schoenbeck of RCS, Inc. The representatives emphasized the need for contracts
under the Commission's Prospective QF Program to have certainty both as to term
and pricing. The representatives also discussed the importance of implementing
the Prospective QF Program as a coherent whole and the need for a timely
decision as well as a policy for new, small QFs. Contact Person: Karen
Terranova, telephone: (415) 421-4143, email: kt@a-klaw.com.
|
|
|
Type:
OPPOSITION
|
Filing Date:
June 8, 2007
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
of the California Cogeneration Council to shorten time to respond to the motion
to strike.
|
|
|
Type:
MOTION
|
Filing Date:
June 5, 2007
|
Filed By:
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison
|
|
Description:
to shorten time to respond to motion to strike and to shorten time for
responses to this motion.
|
|
|
Type:
MOTION
|
Filing Date:
June 5, 2007
|
Filed By:
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
to strike Appendices to Opening and Reply Comments of the California
Cogeneration Council and to the Reply Comments of the Cogeneration Association
of California and the Energy Producers and Users Coalition.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 4, 2007
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
Reply; of the California Cogeneration Council on the Proposed Decision of ALJ
Halligan.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 4, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
Reply; on the Proposed Decision of ALJ Halligan.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 4, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Reply; on Proposed Decision of ALJ Halligan. (6/4/07 file date for Reply
Comments per CALJ Minkin Email message dated 6/1/07. MMN)
|
|
|
Type:
COMMENTS
|
Filing Date:
June 4, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; on Proposed Decision of ALJ Halligan. (6/4/07 file date for Reply
Comments per CALJ Minkin Email message dated 6/1/07. MMN
|
|
|
Type:
COMMENTS
|
Filing Date:
June 4, 2007
|
Filed By:
California Independent System Operator Corporation
|
|
Description:
Reply; on Proposed Decision of ALJ Halligan.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 4, 2007
|
Filed By:
Independent Energy Producers Association
|
|
Description:
Reply; on the Proposed Decision on Future Policy and Pricing for Qualifying
Facilities.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 4, 2007
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
Reply; on the Proposed Decision of ALJ Halligan.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 4, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; on Proposed Decision of ALJ Halligan.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 4, 2007
|
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
|
|
Description:
Reply; of the California Wind Energy Association on the Proposed Decision on
Future Policy and Pricing for Qualifying Facilities.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 1, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On May 29, 2007, Brian Cherry, Vice President, Regulatory Relations for Pacific
Gas and Electric Company (PG&E) met with Nancy Ryan, advisor to Pres. Peevey in
San Francisco. Written materials (attached to the notice) were used. Cherry
expressed support for the Proposed Decision (PD) and stressed the need for
expeditious action on pricing and contract terms for QF contracts not covered
by PG&E-IEP Settlement Agreement in 2006. Cherry compared the PD's SRAC prices
with market prices; summarized PG&E's position with respect to pricing and
policy for non-IEP settling QFs; and stated that the PD's calculation of a
Variable O&M adder was in error.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 1, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On May 29, 2007, Brian Cherry, Vice President, Regulatory Relations for Pacific
Gas and Electric Company (PG&E) met with Jaclyn Marks, advisor to Cmmr. Simon
in San Francisco. Also present were Robert Kinosian, Deputy Director for the
Division of Ratepayer Advocates (DRA) and Marion Peleo, Attorney for DRA.
Written materials (attached to the notice) were used. Cherry expressed support
for the Proposed Decision (PD) and stressed the need for expeditious action on
pricing and contract terms for QF contracts not covered by PG&E-IEP Settlement
Agreement in 2006. Cherry compared the PD's SRAC prices with market prices;
summarized PG&E's position with respect to pricing and policy for non-IEP
settling QFs; and stated that the PD's calculation of a Variable O&M adder was
in error.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 1, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On May 29, 2007, Brian Cherry, Vice President, Regulatory Relations for Pacific
Gas and Electric Company (PG&E) met with Stephen St. Marie, advisor to Cmmr.
Bohn in San Francisco. Also present were Robert Kinosian, Deputy Director for
the Division of Ratepayer Advocates (DRA); Marion Peleo, Attorney for DRA; and
Michael Florio, lead counsel for The Utility Reform Network. Written materials
(attached to the notice) were used. Cherry expressed support for the Proposed
Decision (PD) and stressed the need for expeditious action on pricing and
contract terms for QF contracts not covered by PG&E-IEP Settlement Agreement in
2006. Cherry compared the PD's SRAC prices with market prices; summarized
PG&E's position with respect to pricing and policy for non-IEP settling QFs;
and stated that the PD's calculation of a Variable O&M adder was in error.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 31, 2007
|
Filed By:
DRA/PELEO/CPUC
|
|
Description:
SUMMARY: On May 29, 2007, Robert Kinosian, Policy Advisor for the Division of
Ratepayer Advocates (DRA) met with Jaclyn Marks, advisor to Cmmr. Simon in San
Francisco. Also present were Brian Cherry, Vice President, Regulatory Relations
for Pacific Gas and Electric Company (PG&E) and Marion Peleo, Attorney for DRA.
Kinosian expressed support for the Proposed Decision (PD) of ALJ Halligan
agreeing that the PD would affect a number of enhanced oil recovery facilities.
Kinosian noted that in addition to standard offers, the option of bilateral
contracts is also available to qualifying facilities. Contact Person: Sue
Muniz, telephone: (415) 703-1858, email: sam@cpuc.ca.gov.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 31, 2007
|
Filed By:
DRA/PELEO/CPUC
|
|
Description:
SUMMARY: On May 29, 2007, Robert Kinosian, Policy Advisor to Division of
Ratepayer Advocates (DRA) met with Nancy Ryan, advisor to Pres. Peevey in San
Francisco. Also present were Andy Schwartz, advisor to Pres. Peevey; and
Michel Florio, counsel for The Utility Reform Network (TURN). Kinosian
expressed DRA's overall support for the proposed decision (PD) of ALJ Halligan
and stated that the PD should be modified. Florio discussed TURN's comments to
the PD.
Contact person: Sue Muniz, telephone: (415) 703-1858; email:
sam@cpuc.ca.gov.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 31, 2007
|
Filed By:
DRA/PELEO/CPUC
|
|
Description:
SUMMARY: On May 29, 2007, Robert Kinosian, Policy Advisor to Division of
Ratepayer Advocates (DRA) met with Stephen St. Marie, advisor to Cmmr. Bohn in
San Francisco. Also present were Michel Florio, counsel for The Utility Reform
Network and Marion Peleo, counsel for DRA. Kinosian expressed DRA's overall
support for the proposed decision (PD) of ALJ Halligan and stated that the PD
should be modified. DRA representative discussed DRA's comments filed on May
25, 2007. Contact person: Sue Muniz, telephone: (415) 703-1858; email:
sam@cpuc.ca.gov.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 29, 2007
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
Amended; of the California Cogeneration Council on the Proposed Decision of ALJ
Halligan.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 29, 2007
|
Filed By:
DRA/PELEO/CPUC
|
|
Description:
SUMMARY: On May 23, 2007, Robert Kinosian, Policy Advisor to Division of
Ratepayer Advocates (DRA) met with Andy Campbell, advisor to Cmmr. Chong in San
Francisco. Also present were Michael Florio, counsel for The Utility Reform
Network and Marion Peleo, counsel for DRA. Kinosian expressed DRA's overall
support for the Proposed Decision of ALJ Halligan, but noted that qualifying
facilities (QFs) that are inefficient do not meet the Commission's policy goals
and, therefore, should not receive subsidies from the QF program.
Contact
Person: Sue Muniz, telephone: (415) 703-1858, email: sam@cpuc.ca.gov.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 25, 2007
|
Filed By:
Independent Energy Producers Association
|
|
Description:
on the Proposed Decision on Future Policy and Pricing for Qualifying Facilities.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 25, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On May 23, 2007, Brian Cherry, Vice President, Regulatory Relations for Pacific
Gas and Electric Company (PG&E) met with Andy Campbell, advisor to Cmmr. Chong
in San Francisco. Also present were Robert Kinosian, Deputy Director and Marion
Peleo, Attorney for the Division of Ratepayer Advocates, and Michael Florio,
lead counsel for The Utility Reform Network. Written materials (attached to the
notice) were used. Cherry expressed support for the proposed decision and
stressed the need for expeditious Commission action on pricing and contract
terms for QF contracts not covered by PG&E-IEP Settlement Agreement in 2006.
Cherry compared the proposed decision's SRAC prices with market prices and
summarized PG&E's position with respect to pricing and policy for non-IEP
settling QFs.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 25, 2007
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
on the Proposed Decision of ALJ Halligan.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 25, 2007
|
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
|
|
Description:
on the Proposed Decision of Future Policy and Pricing for Qualifying Facilities.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 25, 2007
|
Filed By:
COUNTY OF LOS ANGELES
|
|
Description:
Opening; by the County of Los Angeles on the Proposed Decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 25, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Opening; on Proposed Decision of ALJ Halligan.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 25, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
on Proposed Decision of ALJ Halligan.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 25, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Opening; on Proposed Decision of ALJ Halligan.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 25, 2007
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
Opening; on the Proposed Decision of ALJ Halligan.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 25, 2007
|
Filed By:
DRA/PELEO/PUC
|
|
Description:
Opening; on the Proposed Decision of ALJ Halligan.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 25, 2007
|
Filed By:
The Utility Reform Network
|
|
Description:
on the Proposed Decision of ALJ Halligan.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 24, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On May 23, 2007, Brian Cherry, Vice President, Regulatory Relations for Pacific
Gas and Electric Company (PG&E) met with Andy Campbell, advisor to Pres. Peevey
in San Francisco. Also present were Robert Kinosian, Deputy Director and Marion
Peleo, Attorney for the Division of Ratepayer Advocates; and Michael Florio,
lead counsel for The Utility Reform Network. Written materials (attached to the
notice) were used. Cherry expressed support for the proposed decision and
stressed the need for expeditious Commission action on pricing and contract
terms for QF contracts not covered by PG&E-IEP Settlement Agreement in 2006.
Cherry summarized PG&E's position with respect to pricing and policy for
non-IEP settling QFs.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 21, 2007
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
On May 16, 2007, R. Thomas Beach, consultant of the California Cogeneration
Council (CCC) met with Theresa Cho, advisor to Cmmr. Grueneich in San
Francisco. Also present were Shakil Rahman, a member of the CCC employed by
Juniper Generation; David Hermanson, a member of the CCC employed by Primary
Energy; Barry Lovell, a member of the CCC employed by Berry Petroleum; Dick
Thomson, a member of the CCC employed by Procter & Gamble; and Jerry R. Bloom
and Joseph M. Karp of Winston & Strawn, LLP, counsel for the CCC. The CCC
representatives explained to the advisors their concerns with the Proposed
Decision (PD). The CCC representatives stated that the PD would have a
significant adverse impact on existing cogenerators; that the NP-15 and SP-15
market prices need to be adjusted to account for the fact that these markets do
not reflect avoided costs; and that the PD should be clarified in lieu of the
revised SRAC formula.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 21, 2007
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
On May 16, 2007, R. Thomas Beach, consultant of the California Cogeneration
Council (CCC) met with Cmmr. Bohn in San Francisco. Also present were Stephen
St. Marie, advisor to Cmmr. Bohn; Shakil Rahman, a member of the CCC employed
by Juniper Generation; David Hermanson, a member of the CCC employed by Primary
Energy; Barry Lovell, a member of the CCC employed by Berry Petroleum; Dick
Thomson, a member of the CCC employed by Procter & Gamble; and Jerry R. Bloom
and Joseph M. Karp of Winston & Strawn, LLP, counsel for the CCC. The CCC
representatives explained to the advisors their concerns with the Proposed
Decision (PD). The CCC representatives stated that the PD would have a
significant adverse impact on existing cogenerators and that the NP-15 and
SP-15 market prices need to be adjusted to account for the fact that these
markets do not reflect avoided costs.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 18, 2007
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
On May 15, 2007, R. Thomas Beach, consultant of the California Cogeneration
Council (CCC) met with Jaclyn Marks, advisor to Cmmr. Simon in San Francisco.
Also present were Pam Nataloni, advisor to Cmmr. Simon; Shakil Rahman, a member
of the CCC employed by Juniper Generation; Dick Thomson, a member of the CCC
employed by Proctor & Gamble; and Joseph M. Karp of Winston & Strawn, LLP,
counsel for the CCC. The CCC representatives explained to the advisors their
concerns with the Proposed Decision (PD). The CCC representatives stated that
the PD would have a significant adverse impact on existing cogenerators and
that the NP-15 and SP-15 market prices need to be adjusted to account for the
fact that these markets do not reflect avoided costs.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 14, 2007
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
on opinion on future policy and pricing for qualifying facilities.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 11, 2007
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
On May 8, 2007, R. Thomas Beach, consultant to California Cogeneration Council
(CCC) met with Pres. Peevey in San Francisco. Also present were Rami Kahlon and
Nancy Ryan, advisors to Pres. Peevey; and David Hermanson of Primary Energy,
Barry Lovell of Berry Petroleum, Shakil Rahman of Juniper Generation, Dick
Thomson of Procter & Gamble, and Jerry R. Bloom and Joseph M. Karp of Winston &
Strawn, LLP, counsels for CCC. Wade McCartney, Energy Division, also
participated in the communication by phone. The CCC representatives explained
their concerns with the Proposed Decision (PD) and explained that NP-15 and
SP-15 market prices need to be adjusted to reflect avoided costs; the
adjustment proposed by the CCC should be adopted; the proposed collar in the PD
is unreasonable. The representatives stated that the PD should be clarified in
respect of the prospective application of the revised SRAC formula; and that
the operations and maintenance adder should be escalated.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 10, 2007
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
On May 7, 2007, R. Thomas Beach, consultant to California Cogeneration Council
(CCC) met with Andrew Campbell, advisor to Cmmr. Chong in San Francisco. Also
present were David Hermanson of Primary Energy, Barry Lovell of Berry
Petroleum, Shakil Rahman of Juniper Generation, and Jerry R. Bloom and Joseph
M. Karp of Winston & Strawn, LLP, counsels for CCC. The CCC representatives
explained their concerns with the Proposed Decision (PD) and explained that
NP-15 and SP-15 market prices need to be adjusted; the adjustment proposed by
the CCC should be adopted; and the proposed collar in the PD is unreasonable.
The representatives explained that the Commission should clarify the gas prices
to be used in the SRAC formula and that forward market prices be used in lieu
of historical prices. Subsequent to the meeting, Beach sent an e-mail with
attachments (attached to the notice) to the advisor.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 3, 2007
|
Filed By:
Energy Producers and Users Coalition
|
|
Description:
SUMMARY: On May 2, 2007, Nora Sheriff, counsel for Energy Producers and Users
Coalition (EPUC) met with Rami Kahlon, advisor to Pres. Peevey in San
Francisco. Also present were Donald Schoenbeck of RCS Inc., consultant to EPUC
and Mathew Deal of the Commission's Energy Division. Written materials
(attached to the notice) were used. The representatives discussed the
importance of addressing EPUC's petition to modify D.04-12-048, et seq. and
explained the impact the procurement nonbypassable charge has on potential new
cogeneration projects. Contact person: Karen Terranova, telephone: (415)
421-4143; email: kt@a-klaw.com
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
April 24, 2007
|
Filed By:
ALJ/HALLIGAN/CPUC
|
|
Description:
Opinion on Future Policy and Pricing for Qualifying Facilities. Opening
Comments which shall not exceed 15 pages are due no later than May 14, 2007.
Reply Comments are due 5 days after Opening Comments are filed.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 10, 2007
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
On April 5, 2007, Michael Alcantar, counsel to Cogeneration Association of
California and Energy Producers and Users Coalition (CAC/EPUC) met with Rami
Kahlon, advisor to Pres. Peevey in San Francisco. Also present were Nora
Sheriff, counsel, and Donald Schoenbeck of RCS Inc., consultant, for CAC/EPUC.
Judith Ikle and Robert Strauss of the Commission's Energy Division were also
present. Written materials (attached to the notice) were used. The
representatives discussed the importance of resolving the Qualifying Facilities
(QF) pricings issues and offered an explanation of the four avoided cost QF
prices.
|
|
|
Type:
COMMENTS
|
Filing Date:
April 9, 2007
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
on the Proposed Decision of ALJ Brown. (Late-filing authorized by ALJ Carol
Brown)
|
|
|
Type:
EXPARTE
|
Filing Date:
April 2, 2007
|
Filed By:
Energy Producers and Users Coalition
|
|
Description:
SUMMARY: On March 30, 2007, Evelyn Kahl, counsel for Energy Producers and Users
Coalition (EPUC) met with Rami Kahlon, advisor to Pres. Peevey in San
Francisco. Also present was Nora Sheriff, counsel for EPUC. Written materials
(attached to the notice) were used. The meeting was to discuss EPUC's Petition
for Modification of D.04-12-048. Kahl stated that the nonbypassable charges
(NBC) are now being used to recover ongoing procurement costs in the normal
course of utility business, and emphasized that the mounting NBC obligations
unnecessarily discourage the development of new combined heat and power
systems. Kahl urged that the Commission grant the EPUC petition. Sheriff
discussed the more recent NBC problems arising from SCE's petition to modify
D.06-07-029 and explained that customer generation departing load should not
pay net capacity cost associated with power purchase agreements.
Contact
person: Karen Terranova, telephone: (415) 421-4143; email: kt@a-klaw.com
|
|
|
Type:
COMMENTS
|
Filing Date:
March 29, 2007
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
Opening; and objections on Opinion on Petitions for Modification of Decision
04-12-048.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 27, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On March 23, 2007, Brian Cherry, Vice President, Regulatory Relations, Pacific
Gas and Electric Company sent a note (attached to the notice) electronically to
Rami Kahlon and Andy Schwartz, advisors to Pres. Peevey; and Wade McCartney,
Public Utilities Regulatory Analyst of the Division of Strategic Planning.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 21, 2007
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
SUMMARY: On March 19, 2007, Rod Aoki, counsel of Cogeneration Association of
California and Energy Producers and Users Coalition (CAC/EPUC) met with Rami
Kahlon, advisor to Pres. Peevey in San Francisco. Also present were Nora
Sheriff, counsel, and Donald Schoenbeck of RCS Inc, consultant, of CAC/EPUC.
The representatives discussed the importance of resolving the issue of access
to confidential information pursuant to a reasonable protective order. The
parties also discussed the need for implementation of a reasonable, long-term
policy for CHP and differing avoided cost pricing theories and positions. The
parties made reference to opening briefs filed March 3, 2006 by CAC/EPUC and
Division of Ratepayer Advocates. Contact person: Karen Terranova, telephone:
(415) 421-4143; email: kt@a-klaw.com
|
|
|
Type:
EXPARTE
|
Filing Date:
March 14, 2007
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
SUMMARY: On March 9, 2007, Michael Alcantar, counsel to Cogeneration
Association of California and Energy Producers and Users Coalition (CAC/EPUC)
met with Rami Kahlon, advisor to Pres. Peevey in San Francisco. Also present
were Rod Aoki, counsel to CAC/EPUC and Donald Schoenbeck of RCS Inc, consultant
to CAC/EPUC. Alcantar discussed the importance of resolving the issue of access
to confidential information pursuant to a reasonable protective order. The
parties discussed the lack of implementation of the state policy on combined
heat and power resources. Alcantar explained the uncertainty that delay in
issuance of the decision has caused for both existing and new CHP projects.
Contact person: Karen Terranova, telephone: (415) 421-4143; email: kt@a-klaw.com
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
March 9, 2007
|
Filed By:
ALJ/BROWN/CPUC
|
|
Description:
Decision granting in part and denying in part petition by Southern California
Edison Company and Pacific Gas and Electric Company to modify Decision
04-12-048. Opening comments, which shall not exceed 15 pages, are due no later
than March 29, 2007. Reply comments are due 5 days after the filing of Opening
comments.
|
|
|
Type:
EXPARTE
|
Filing Date:
February 9, 2007
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
On February 6, 2007, Maureen Lennon, Executive Director of California
Cogeneration Council (CCC) met with Rami Kahlon, advisor to Pres. Peevey in San
Francisco. Also present were Jerry Bloom, counsel, and Tom Beach, consultant,
to CCC, Shakil Rahman representing Delta Power Company and Barry Lovell
representing Berry Petroleum Company. Wade McCartney, Energy Division,
participated by phone. Written materials (attached to the notice) were used.
Bloom expressed CCC's concern regarding communications during an ex parte
meeting between Pres. Peevey¿s staff and representatives of Pacific Gas and
Electric Company (PG&E) and Southern California Edison Co. on January 17, 2007.
The parties discussed the comparisons between SRAC prices and prices under the
PG&E/IEP settlement. Beach stated that the comparison of PG&E's winter SRAC
energy prices to NP-15 market prices and PG&E/IEP settlement prices were
misleading. The parties also discussed CCC's position in the QF case and CCC's
view that cogeneration QFs need to get reasonable options for contract renewals
when their existing contracts expire.
|
|
|
Type:
REPLY
|
Filing Date:
January 31, 2007
|
Filed By:
Energy Producers and Users Coalition
|
|
Description:
to Response of SCE and the Opposition of PG&E to Petition for Modification of
Decision 04-12-048.
|
|
|
Type:
EXPARTE
|
Filing Date:
January 22, 2007
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On January 17, 2007, Trina Horner, Chief, Regulatory Relations, Pacific Gas and
Electric Company (PG&E), met with Andy Schwartz, advisor to Comr. Peevey, in
San Francisco. Also present were Frank De Rosa, Director, Renewables Supply,
Janos Laszlo, Manager, Power Contracts, PG&E, and Michael Hoover, Director,
Regulatory Affairs for Southern California Edison Company (SCE). Molly Sterkel
and Wade McCartney, Energy Division, participated by phone. Written materials
(attached to the notice) were used. Horner expressed the need for timely
Commission guidance on pricing and contract terms for Qualifying Facility (QF)
contracts not covered by PG&E-IEP Settlement Agreement in 2006. Laszlo and
Hoover summarized the costs for PG&E's and SCE's customers of the existing
pricing formula, and emphasized the importance of reducing SRAC prices. De
Rosa added that new QFs and QFs with expiring contracts should compete in
utility all-source solicitations for long-term contracts.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 22, 2007
|
Filed By:
Southern California Edison Company
|
|
Description:
to the Petition for Modification of Decision 04-12-048 of the Energy Producers
and Users Coalition.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 22, 2007
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Opposition to the Energy Producers and Users Coalition Petition to Modify
Decision 04-12-048.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 22, 2007
|
Filed By:
Merced Irrigation District
Modesto Irrigation District
|
|
Description:
to Petition for Modification of Decision 04-12-048 of the Energy Producers and
Users Coalition.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 22, 2007
|
Filed By:
California Clean DG Coalition
|
|
Description:
to Petition for Modification of Decision 04-12-048 of the Energy Producers and
Users Coalition.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
January 2, 2007
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
of D06-12-037.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
December 22, 2006
|
Filed By:
Energy Producers and Users Coalition
|
|
Description:
of Decision 04-12-048.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 21, 2006
|
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
|
|
Description:
SUMMARY: On December 18, 2006, Michael Alcantar, counsel to the Cogeneration
Association of California and the Energy Producers and Users Coalition
(CAC/EPUC), met with Rami Kahlon, advisor to Pres. Peevey, in San Francisco.
Also present were Rod Aoki, counsel, and Donald Schoenbeck, consultant, to
CAC/EPUC, and Kelly Lucas and Rick Williams, representing the Coalinga
Cogeneration Company, Sargent Canyon Cogeneration Company and Salinas River
Cogeneration Company. Written materials (attached to this notice) were used.
Key actions to preserve and encourage combined heat and power (CHP) facilities
were discussed. The parties noted that the lack of a clear long term policy for
CHP is having a detrimental effect upon both the ability of existing CHP
projects to continue operations after their contracts expire; as well as the
ability of new projects to come on-line. The parties also discussed critical
importance of fair pricing and contractual terms and conditions for CHP
facilities. Finally, the parties emphasized the need for the Commission to
issue its decision on long term qualifying facilities policy and avoided cost.
Contact person: Karen Terranova, telephone: (415) 421-4143; facsimile (415)
989-1263; email: kt@a-klaw.com
|
|
|
Type:
COMMENTS
|
Filing Date:
December 11, 2006
|
Filed By:
POWEREX CORP.
|
|
Description:
reply; on ALJ Wetzell draft decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 11, 2006
|
Filed By:
Southern California Edison Company
|
|
Description:
REPLY; ON PROPOSED DECISION ON PETITIONS FOR
MODIFICATION OF D05-10-042.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 11, 2006
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
Reply; on Proposed Decision - Opinion on Petitions for Modification of Decision
05-10-042.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 11, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Reply; on the Proposed Decision of ALJ Wetzell.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 11, 2006
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
|
|
Description:
reply; on opinion on petitions for modification of D05-10-042.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 4, 2006
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
|
|
Description:
on opinion on petitions for modification of D05-10-042.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 4, 2006
|
Filed By:
Sempra Global
|
|
Description:
ON PROPOSED OPINION ON PETITIONS FOR MODIFICATION OF D05-10-042.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 4, 2006
|
Filed By:
Calpine Corporation
|
|
Description:
ON PROPOSED DECISION OF ALJ WETZELL ON PETITIONS FOR MODIFICATION OF DECISION
05-10-042.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 4, 2006
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
ON THE PROPOSED DECISION OF
ADMINISTRATIVE LAW JUDGE WETZELL
|
|
|
Type:
COMMENTS
|
Filing Date:
December 4, 2006
|
Filed By:
Alliance for Retail Energy Markets
|
|
Description:
ON PROPOSED DECISION ON PETITIONS FOR MODIFICATION OF D05-10-042.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 4, 2006
|
Filed By:
Constellation Energy Commodities Group, Inc.
Constellation NewEnergy, Inc.
|
|
Description:
TO PROPOSED DECISION OF ALJ WETZELL REGARDING
PETITIONS FOR MODIFICATION.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 4, 2006
|
Filed By:
The Utility Reform Network
|
|
Description:
ON THE PROPOSED DECISION OF ALJ WETZELL.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 4, 2006
|
Filed By:
POWEREX CORP.
|
|
Description:
on ALJ Wetzell Draft Decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 4, 2006
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
on Opinion on Petitions for Modification of D05-10-042.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 4, 2006
|
Filed By:
POWEREX CORP.
|
|
Description:
Amended; on ALJ Wetzell Draft Decision.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
November 14, 2006
|
Filed By:
ALJ/Wetzell/CPUC
|
|
Description:
OPINION ON PETITIONS FOR MODIFICATION OF D05-10-042. Comments are due December
4, 2006; reply comments - five days after comments are filed.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 11, 2006
|
Filed By:
Energy Producers and Users Coalition
|
|
Description:
SUMMARY: On October 9, 2006, the Energy Producers and Users Coalition (EPUC)
mailed via U.S. mail to Pres. Peevey a summary (attached to the notice) of
EPUC's position in this proceeding.
Contact person: Karen Terranova (415)
421-4143; facsimile (415) 989-1263; email: kt@a-klaw.com
|
|
|
Type:
EXPARTE
|
Filing Date:
August 28, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On August 23, 2006, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and
Electric Company (PG&E), met with Rami Kahlon, advisor to Cmmr. Peevey, in San
Francisco. Also present were Frank De Rosa, Director, Renewables Supply, and
Janos Laszlos, Manager, Power Contracts, for PG&E. Jacobson expressed PG&E's
appreciation for the Commission's approval of the voluntary contract amendments
that PG&E executed with over half of its Qualifying Facilities pursuant to the
PG&E-IEPA Settlement Agreement. De Rosa emphasized the importance of reducing
SRAC prices so that they reflect PG&E's true avoided cost. Laszlos explained
how thermal efficiencies vary with different technologies. De Rosa explained
that lower QF prices will not threaten electric reliability or the Commission's
GHG emission reduction goals
|
|
|
Type:
COMMENTS
|
Filing Date:
July 17, 2006
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
joint; reply; on Proposed Decision adopting Settlement Agreement.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 14, 2006
|
Filed By:
DRA/PELEO/PUC
|
|
Description:
On July 12, 2006, Robert Kinosian of the Division of Ratepayer Advocates
("DRA"), met with Rami Kahlon, advisor to President Peevey, and Peter Hanson,
advisor to Cmmr. Brown, in two separate meetings in San Francisco. At the
meeting with Peter Hanson also present was Belinda Gatti, advisor to Cmmr.
Brown. Kinosian explained that DRA supports the proposed decision approving the
settlement agreement between Pacific Gas and Electric Company and the
Independent Energy Producers Association on qualifying facility ("QF") pricing.
However, DRA does not support using the prices in the settlement as a precedent
for general pricing for QFs.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 14, 2006
|
Filed By:
DRA/PELEO/CPUC
|
|
Description:
On July 12, 2006, Robert Kinosian of the Division of Ratepayer Advocates
("DRA"), met with Rami Kahlon, advisor to President Peevey, and Peter Hanson,
advisor to Cmmr. Brown, in two separate meetings in San Francisco. At the
meeting with Peter Hanson also present was Belinda Gatti, advisor to Cmmr.
Brown. Kinosian explained that DRA supports the proposed decision approving the
settlement agreement between Pacific Gas and Electric Company and the
Independent Energy Producers Association on qualifying facility ("QF") pricing.
However, DRA does not support using the prices in the settlement as a precedent
for general pricing for QFs.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 11, 2006
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
on the proposed decision of ALJs Brown, DeBerry and Halligan.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 6, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON JUNE
26, 2006, AND APPEARED IN THE CALENDAR OF JUNE 29, 2006. On June 20, 2006, Lad
Lorenz, Vice President of Regulatory Affairs for San Diego Gas & Electric
Company (SDG&E) and Southern California Gas Company, met with Nancy Ryan,
advisor to Pres. Peevey, at the Snow King Resort in Jackson Hole, Wyoming. The
meeting was followed up by an e-mail letter (attached to the notice). Lorenz
stated that SDG&E, while generally satisfied with the resource adequacy (RA)
proposed decision, requests an elimination of the RA penalty exception, as well
as implementation of the transfer payment mechanism, or alternatively
penalizing deficient LSEs without regard to whether or not a load pocket is in
net surplus.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 30, 2006
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
On June 29, 2006, Michael Alcantar, counsel to the Cogeneration Association of
California and Energy Producers and Users Coalition (CAC/EPUC), met with Cmmr.
Grueneich in San Francisco. Also present were Theresa Cho, advisor to Cmmr.
Grueneich, and Rod Aoki, counsel to CAC/EPUC. Written material (attached to the
notice) was used. Alcantar discussed the fact that yet to be issued proposed
decision will be critical to the preservation of existing cogeneration projects
and the encouragement of new projects in California. Alcantar explained the
necessity for long term, standard offer contracts with reasonable terms and
conditions. Alcantar also noted the deleterious impact the loss of existing
cogeneration qualifying facilities (QFs) and the failure to encourage new
cogeneration QFs would have on Governor Schwarzenegger's Climate Action Team
goals for CO2 reductions.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 28, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
joint; on Proposed Decision Adopting Settlement Agreement.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 26, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPAN Y
|
|
Description:
AUGMENTATION REQUIRED. On June 20, 2006, Lad Lorenz, Vice President of
Regulatory Affairs for San Diego Gas & Electric Company (SDG&E) and Southern
California Gas Company, met with Nancy Ryan, advisor to Pres. Peevey. The
meeting was followed up by an e-mail letter (attached to the notice). Lorenz
stated that SDG&E, while generally satisfied with the resource adequacy (RA)
proposed decision, requests an elimination of the RA penalty exception, as well
as implementation of the transfer payment mechanism, or alternatively
penalizing deficient LSEs without regard to whether or not a load pocket is in
net surplus.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
June 21, 2006
|
Filed By:
ALJS/BROWN/DEBERRY/HALLIGAN/CPUC
|
|
Description:
OPINION ADOPTING SETTLEMENT AGREEMENT BETWEEN PACIFIC GAS AND ELECTRIC COMPANY
AND THE INDEPENDENT ENERGY PRODUCERS ASSOCIATION REGARDING QUALIFYING
FACILITIES. Comments are due July 11, 2006; reply comments - 5 days after
comments are filed.
|
|
|
Type:
RULING
|
Filing Date:
June 21, 2006
|
Filed By:
ALJ/Halligan/CPUC
|
|
Description:
ON SHORTENING THE PUBLIC REVIEW PERIOD OFTHE PROPOSED DECISION REGARDING THE
JOINT MOTION FOR ADOPTION OF SETTLEMENT AGREEMENT AND ASSOCIATED AMENDMENTS.
The ruling asks the parties to stipulate to shortenting the waitng period by
one day, as set forth.
|
|
|
Type:
REPLY
|
Filing Date:
June 9, 2006
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
joint; on the joint motion for adoption of the settlement agreement and
associated amendments.
|
|
|
Type:
MOTION
|
Filing Date:
June 2, 2006
|
Filed By:
MODESTO IRRIGATION DISTRICT
|
|
Description:
to file late comments regarding joint motion of PG&E and IEPA for adoption of
settlement agreement; comments attached.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 1, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on RPS Implications of the Settlement Agreement between PG&E and IEPA.
|
|
|
Type:
RESPONSE
|
Filing Date:
June 1, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to ALJ's ruling providing notice of joint motion for settlement agreement.
|
|
|
Type:
RESPONSE
|
Filing Date:
June 1, 2006
|
Filed By:
CENTRAL HYDROELECTRIC COMPANY
MEGA RENEWABLES AKA SHASTA HYRDO
|
|
Description:
to Invitation to Comment by ALJ Issued May 18, 2006.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 1, 2006
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
in opposition to the settlement agreement between PG&E and IEPA.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 1, 2006
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
on the settlement agreement between PG&E and IEPA.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 1, 2006
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on the treatment of renewable energy certificates under existing qualifying
facilities contracts.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 25, 2006
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON May
23, 2006, AND APPEARED IN THE CALENDAR OF May 25, 2006. On May 22, 2006,
Michael Alcantar, counsel to the Cogeneration Association of California and
Energy Producers and Users Coalition (CAC/EPUC), met with Andy Campbell,
advisor to Cmmr. Chong, in San Francisco. Also present were Nora Sheriff and
Rod Aoki, counsel to CAC/EPUC. Written material (attached to the notice) was
used. CAC/EPUC indicated no opposition to the approval of the settlement, but
noted that it should not be characterized as precedent for any purpose related
to avoided cost pricing or for long term Qualifying Facility (QF) contract
policy issues. Alcantar also noted the potential deleterious impact the loss of
existing cogeneration QFs and the failure to encourage new cogeneration QFs
would have on Governor Schwarzenegger's Climate Action Team goals for CO2
reductions.
|
|
|
Type:
AMENDMENT
|
Filing Date:
May 24, 2006
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
Second; to Joint Motion for Adoption of Settlement Agreement and Approval of
Associated Amendments.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 23, 2006
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
AUGMENTATION REQUIRED. On May 22, 2006, Michael Alcantar, counsel to the
Cogeneration Association of California and Energy Producers and Users Coalition
(CAC/EPUC), met with Andy Campbell, advisor to Cmmr. Chong, in San Francisco.
Also present were Nora Sheriff and Rod Aoki, counsel to CAC/EPUC. Written
material was used. CAC/EPUC indicated no opposition to the approval of the
settlement, but noted that it should not be characterized as precedent for any
purpose related to avoided cost pricing or for long term Qualifying Facility
(QF) contract policy issues. Alcantar also noted the potential deleterious
impact the loss of existing cogeneration QFs and the failure to encourage new
cogeneration QFs would have on Governor Schwarzenegger's Climate Action Team
goals for CO2 reductions.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 23, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On May 18, 2006, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and
Electric Company (PG&E), met with Theresa Cho, advisor to Cmmr. Grueneich, in
San Francisco. Also present were Janos Laszlos, Manager, Power Contracts, PG&E,
and Steven Kelly, Policy Director of the Independent Energy Producers
Association (IEPA). Jacobson described some of the key terms and conditions of
the PG&E-IEPA Settlement Agreement (SA) regarding QF pricing and policy and
explained that the SA applied only to QFs that voluntarily execute contract
amendments and that it represented a fair compromise of the parties' positions.
Kelly described why the SA was strongly supported by IEPA's members. Laszlos
explained the litigation surrounding the PX switcher issue and the SA provision
that resolves that dispute. Jacobson said that it was critical to obtain
Commission approval of the contract amendments prior to the September 1
deadline.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 22, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On May 17, 2006, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and
Electric Company (PG&E), met with Belinda Gatti, advisor to Cmmr. Brown, in San
Francisco. Also present were Janos Laszlos, Manager, Power Contracts, PG&E, and
Steven Kelly, Policy Director of the Independent Energy Producers Association
(IEPA). Written material (attached to the notice) was used. Jacobson described
some of the key terms and conditions of the PG&E-IEPA Settlement Agreement (SA)
regarding QF pricing and policy and explained that the SA applied only to QFs
that voluntarily execute contract amendments and that it represented a fair
compromise of the parties' positions. Kelly described why the SA was strongly
supported by IEPA's members. Laszlos explained the litigation surrounding the
PX switcher issue and the SA provision that resolves that dispute. Jacobson
said that it was critical to obtain Commission approval of the contract
amendments prior to the September 1 deadline.
|
|
|
Type:
RESPONSE
|
Filing Date:
May 22, 2006
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION.
|
|
Description:
to ALJ's ruling [of May 18, 2006] providing notice of joint motion for
settlement agreement.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 19, 2006
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
On May 16, 2006, R. Thomas Beach, a consultant to the California Cogeneration
Council (CCC), met with Robert Lane, advisor to Cmmr. Bohn, and Belinda Gatti,
advisor to Cmmr. Brown, in two separate meetings in San Francisco. Also present
were Jerry R. Bloom and Joseph M. Karp of White & Case, LLP, counsel for the
CCC. An excerpt from Mr. Beach's opening testimony (attached to the notice) was
sent to Robert Lane after the meeting. Bloom and Karp explained that the joint
settlement proposed by Pacific Gas and Electric Company (PG&E) and Independent
Energy Producers (IEP) is not a true settlement that aligns with the
Commission's traditional understanding of settlements. Bloom and Karp explained
that the arrangement between PG&E and IEP is, rather, a set of bilateral
agreements that do not resolve any key issues of these proceedings. Bloom and
Karp also explained that the bilateral agreements involving a few gas-fired
Qualifying Facilities (QFs) for which PG&E and IEP seek approval are not
generally applicable to other QFs, and thus should not be considered as a basis
for a decision in this proceeding.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 18, 2006
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
to the joint motion of PG&E and IEPA for adoption of settlement agreement, etc.
|
|
|
Type:
RULING
|
Filing Date:
May 18, 2006
|
Filed By:
ALJS/DEBERRY/BROWN/HALLIGAN
|
|
Description:
Providing Notice of Joint Motion for Settlement Agreement. Comments on the
settlement agreement may be filed by June 1, 2006; and reply comments - by June
15, 2006.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 18, 2006
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
On May 16, 2006, R. Thomas Beach, a consultant to the California Cogeneration
Council (CCC), met with Robert Lane, advisor to Cmmr. Bohn, and Belinda Gatti,
advisor to Cmmr. Brown, in two separate meetings in San Francisco. Also present
were Jerry R. Bloom and Joseph M. Karp of White & Case, LLP, counsel for the
CCC. An excerpt from Mr. Beach's opening testimony (attached to the notice) was
sent to Robert Lane after the meeting. Bloom and Karp explained that the joint
settlement proposed by Pacific Gas and Electric Company (PG&E) and Independent
Energy Producers (IEP) is not a true settlement that aligns with the
Commission's traditional understanding of settlements. Bloom and Karp explained
that the arrangement between PG&E and IEP is, rather, a set of bilateral
agreements that do not resolve any key issues of these proceedings. Bloom and
Karp also explained that the bilateral agreements involving a few gas-fired
Qualifying Facilities (QFs) for which PG&E and IEP seek approval are not
generally applicable to other QFs, and thus should not be considered as a basis
for a decision in this proceeding.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 18, 2006
|
Filed By:
RCM BIOTHANE
|
|
Description:
on the joint motion of PG&E and IEP for adoption of a settlement agreement.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 18, 2006
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on the joint motion of PG&E and IEP for adoption of settlement agreement.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 18, 2006
|
Filed By:
DRA/PELEO/PUC
|
|
Description:
on the proposed settlement agreement of PG&E and IEPA.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 18, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on Settlement Agreement between PG&E and IEPA.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 18, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Opening Answer; on Settlement Agreement between PG&E and IEPA.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 15, 2006
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
On May 10, 2006, R. Thomas Beach, a consultant to the California Cogeneration
Council (CCC), met with Pres. Peevey in San Francisco. Also present were Rami
Kahlon, advisor to Cmmr. Peevey, David Hermanson, a member of the CCC employed
by Primary Energy, Barry Lovell, a member of the CCC employed by Berry
Petroleum, Shakil Rahman, a member of the CCC employed by Delta Power, and
Jerry R. Bloom and Joseph M. Karp of White & Case, LLP, counsel for the CCC.
Bloom and Karp explained that the joint settlement proposed by Pacific Gas and
Electric Company (PG&E) and Independent Energy Producers (IEP) is not a true
settlement that aligns with the Commission's traditional understanding of
settlements. Bloom and Karp explained that the arrangement between PG&E and IEP
is, rather, a set of bilateral agreements that do not resolve any key issues of
these proceedings. Bloom and Karp also explained that the bilateral agreements
involving a few gas-fired Qualifying Facilities (QFs) for which PG&E and IEP
seek approval are not generally applicable to other QFs, and thus should not be
considered as a basis for a decision in this proceeding.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 11, 2006
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
On May 10, 2006, Michael Alcantar, counsel to the Cogeneration Association of
California (CAC) and the Energy Producers and Users Coalition (EPUC), met with
Pres. Peevey in San Francisco. Also present were Rami Kahlon, advisor to Pres.
Peevey, and Nora Sheriff and Rod Aoki, counsel to CAC/EPUC. Written material
(attached to the notice) was used. CAC/EPUC discussed the Pacific Gas and
Electric Company (PG&E) and the Independent Energy Producers Association (IEP)
Settlement Agreement. CAC/EPUC indicated no opposition to the approval of the
settlement, but noted that it should not be characterized as precedent for any
purpose related to avoided cost pricing or for long term Qualifying Facility
(QF) contract policy issues. Alcantar and Sheriff explained that the PG&E-IEP
settlement did not address the need for a Commission-established long-term
policy for cogeneration QFs with appropriate pricing. Alcantar discussed the
necessity of long term, standard offer contracts with reasonable terms and
conditions to sustain existing and encourage new cogeneration QFs. Alcantar
also noted the potential deleterious impact the loss of existing cogeneration
QFs and the failure to encourage new cogeneration QFs would have on Governor
Schwarzenegger's Climate Action Team goals for CO2 reductions.
|
|
|
Type:
AMENDMENT
|
Filing Date:
May 10, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to Joint Motion of PG&E and IEPA for Adoption of Settlement Agreement and
Approval of Associated Amendments.
|
|
|
Type:
NOTICE
|
Filing Date:
May 10, 2006
|
Filed By:
CALJ/MINKIN/PUC
|
|
Description:
of removal of assignment.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 10, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
LATE FILED. On May 2, 2006, Erik Jacobson, Chief, Regulatory Relations, Pacific
Gas and Electric Company (PG&E), met with Cmmr. Peevey in San Francisco. Also
present were Rami Kahlon, advisor to Cmmr. Peevey, Roy Kuga, Vice President,
Energy Supply, Frank DeRosa, Director, Power Contracts, John Pappas, Manager,
Electric Resource Procurement, and William Manheim, Chief Counsel, Generation,
for PG&E, and Steven Kelly on behalf of the Independent Energy Producers
Association (IEPA). DeRosa described some of the key terms and conditions of
the PG&E-IEPA Settlement Agreement (SA) regarding QF pricing and policy. DeRosa
explained that the SA applied only to QFs that voluntarily execute contract
amendments and that it represented a fair compromise of the parties' positions.
DeRosa stated that PG&E anticipates that savings from the SA will range from
$100-$200 million annually. Kelly described why the SA was strongly supported
by IEPA's members. Jacobson said that it was critical to obtain Commission
approval of the contract amendments prior to the September 1 deadline.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 3, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On April 28, 2006, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and
Electric Company (PG&E), met with Rami Kahlon, advisor to Cmmr. Peevey, in San
Francisco. Also present were Paul Clanon, Deputy Executive Director, and Sean
Gallagher, Director, Energy Division, of the Commission, Roy Kuga, Vice
President, Energy Supply, Frank DeRosa, Director, Power Contracts, John Pappas,
Manager, Electric Resource Procurement, Janos Laszlos, Manager, Power
Contracts, for PG&E, and Steven Kelly and Doug Kerner, for the Independent
Energy Producers Association. DeRosa described some of the key terms and
conditions of the PG&E-IEPA Settlement Agreement (SA) regarding QF pricing and
policy. DeRosa explained that the SA will range from $100-$200 million
annually, depending on how many QFs execute the contract amendments. Kelly
described why the SA was strongly supported by IEPA's members. Jacobson said
that it was critical to obtain Commission approval of the contract amendments
prior to the September 1 deadline.
|
|
|
Type:
RESPONSE
|
Filing Date:
May 3, 2006
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
to Motion of Edison to clarify the record.
|
|
|
Type:
COMMENTS
|
Filing Date:
April 28, 2006
|
Filed By:
DAVIS HYDRO
|
|
Description:
(on PG&E and IEPA Settlement Agreement).
|
|
|
Type:
REQUEST
|
Filing Date:
April 28, 2006
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
for Award of Intervenor Compensation.
|
|
|
Type:
RULING
|
Filing Date:
April 27, 2006
|
Filed By:
ALJS/BROWN/HALLIGAN/DEBERRY/PUC
|
|
Description:
Grants the request of PG&E and IEPA to late-file the proposed settlement.
Denies the request for order shortening time to respond to the motion. Denies
the request to shorten time for comments on Settlement Agreement. Comments on
the settlement are due May 18, 2006.
|
|
|
Type:
OPPOSITION
|
Filing Date:
April 26, 2006
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
to Motion of PG&E and IEPA to shorten Rule 51.4's 30-day comment period and to
shorten time for responses to Motion for Leave to File Late-Filed Settlement
Agreement.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 24, 2006
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
to the joint motions of PG&E and the IEPA.
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
April 21, 2006
|
Filed By:
RCM BIOTHANE
|
|
Description:
Support of the CCC's opposition to the joint motion of PG&E and IEP to shorten
the comment period and time for responses to motion for leave to file
late-filed Settlement Agreement.
|
|
|
Type:
REPLY
|
Filing Date:
April 21, 2006
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to Opposition of CCC to joint motion to shorten Rule 51.4's comment period and
to shorten time for responses to motion for leave to file late-filed settlement
agreements.
|
|
|
Type:
OPPOSITION
|
Filing Date:
April 20, 2006
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
to Joint Motion of PG&E and IEP to Shorten Rule 51.4's 30-Day Comment Period
and to Shorten Time for Responses to Motion fo rLeave to File Late-Filed
Settlement Agreements.
|
|
|
Type:
MOTION
|
Filing Date:
April 18, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
joint; for adoption of Settlement Agreement and approval of associated
amendments (attached).
|
|
|
Type:
REQUEST
|
Filing Date:
April 18, 2006
|
Filed By:
GREEN POWER INSTITUTE
|
|
Description:
for an Award of Compensation for Substantial Contributions to D.06-02-032.
|
|
|
Type:
MOTION
|
Filing Date:
April 18, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
joint; for leave to late-file settlement agreements; to shorten Rule 51.4's
30-day comment period and to shorten time for responses to this motion.
|
|
|
Type:
REQUEST
|
Filing Date:
April 17, 2006
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
for Award of Intervenor Compensation.
|
|
|
Type:
MOTION
|
Filing Date:
April 13, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Clarify the Record.
|
|
|
Type:
SUPPLEMENTAL
|
Filing Date:
April 7, 2006
|
Filed By:
CENTER FOR ENERGY AND ECONOMIC DEVELOPMENT
|
|
Description:
affidavit in support of Motion to Intervene as related to portions that involve
Application for Rehearing.
|
|
|
Type:
REPLY
|
Filing Date:
April 5, 2006
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
|
|
Description:
to the petition to modify D05-10-042 of Edison.
|
|
|
Type:
REPLY
|
Filing Date:
April 4, 2006
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
|
|
Description:
to Edison's Petition to Modify D05-10-042.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 4, 2006
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
to Applications for Rehearing of D06-02-032.
|
|
|
Type:
REPLY
|
Filing Date:
April 3, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
in support of Petition to Modify D05-10-042.
|
|
|
Type:
REPLY
|
Filing Date:
April 3, 2006
|
Filed By:
CALPINE CORPORATION
|
|
Description:
to Edison's petition to modify [D05-10-042].
|
|
|
Type:
RESPONSE
|
Filing Date:
March 24, 2006
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
to Edison's Petition to Modify Decision D.05-10-042.
|
|
|
Type:
RESPONSE
|
Filing Date:
March 24, 2006
|
Filed By:
CAISO
|
|
Description:
to the Petition to Modify Decision 05-10-042 of Southern California Edison
Company
|
|
|
Type:
RESPONSE
|
Filing Date:
March 24, 2006
|
Filed By:
TURN
|
|
Description:
to SCE's Petition For Modification of Decision 05-10-042
|
|
|
Type:
RESPONSE
|
Filing Date:
March 24, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC CO.
|
|
Description:
to Petition to Modify Decision 05-10-042 of Southern California Edison Co.
|
|
|
Type:
RESPONSE
|
Filing Date:
March 24, 2006
|
Filed By:
SEMPRA GLOBAL
|
|
Description:
to Edison's Petition for Modify D.05-10-042.
|
|
|
Type:
BRIEF
|
Filing Date:
March 20, 2006
|
Filed By:
DAVIS HYDRO
|
|
Description:
Reply
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
March 20, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
of D06-02-032.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
March 20, 2006
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
of D06-02-032.
|
|
|
Type:
BRIEF
|
Filing Date:
March 17, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
March 17, 2006
|
Filed By:
CENTER FOR ENERGY AND ECONOMIC DEVELOPMENT
|
|
Description:
of D06-02-032.
|
|
|
Type:
MOTION
|
Filing Date:
March 17, 2006
|
Filed By:
CENTER FOR ENERGY AND ECONOMIC DEVELOPMENT
|
|
Description:
to intervene.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 17, 2006
|
Filed By:
RCM BIOTHANE
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
March 17, 2006
|
Filed By:
COUNTY OF LOS ANGELES
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
March 17, 2006
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
March 17, 2006
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
reply; on QF issues.
|
|
|
Type:
BRIEF
|
Filing Date:
March 17, 2006
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
March 17, 2006
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
March 17, 2006
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
March 17, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
March 17, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Reply;
|
|
|
Type:
MOTION
|
Filing Date:
March 10, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to withdraw Motion dated December 15, 2005, for a ruling authorizing PG&E to
purchase and deliver gas, as needed for electric and gas system reliability,
etc.
|
|
|
Type:
RULING
|
Filing Date:
March 10, 2006
|
Filed By:
ALJ/GOTTSTEIN/PUC
|
|
Description:
Grants Edison Mission Energy's motion to intervene, filed March 6, 2006.
|
|
|
Type:
MOTION
|
Filing Date:
March 7, 2006
|
Filed By:
EDISON MISSION ENERGY
|
|
Description:
to Intervene.
|
|
|
Type:
RULING
|
Filing Date:
March 7, 2006
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
on NRDC's supplemental notice of intent to claim compensation. Establishes that
NRDC is eligible for an award of intervenor compensation.
|
|
|
Type:
BRIEF
|
Filing Date:
March 6, 2006
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
concurrent, opening.
|
|
|
Type:
BRIEF
|
Filing Date:
March 6, 2006
|
Filed By:
DAVIS HYDRO
|
|
Description:
Post-Hearing
|
|
|
Type:
BRIEF
|
Filing Date:
March 3, 2006
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
March 3, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Opening
|
|
|
Type:
BRIEF
|
Filing Date:
March 3, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Opening;
|
|
|
Type:
BRIEF
|
Filing Date:
March 3, 2006
|
Filed By:
RCM BIOTHANE
|
|
Description:
post-hearing.
|
|
|
Type:
BRIEF
|
Filing Date:
March 3, 2006
|
Filed By:
COUNTY OF LOS ANGELES
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
March 3, 2006
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
opening;
|
|
|
Type:
BRIEF
|
Filing Date:
March 3, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
March 3, 2006
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
March 3, 2006
|
Filed By:
RENEWABLES COALITION
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
March 3, 2006
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
March 3, 2006
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
March 3, 2006
|
Filed By:
DRA/PELEO/PUC
|
|
Description:
opening.
|
|
|
Type:
RULING
|
Filing Date:
March 2, 2006
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Dismisses a Motion to Augment Record filed on September 23, 2005, by the CAISO,
as moot, as set forth.
|
|
|
Type:
RULING
|
Filing Date:
February 24, 2006
|
Filed By:
ALJ/GOTTSTEIN/PUC
|
|
Description:
Denies, without prejudice, Redefining Progress' motion to intervene, as set
forth.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
February 22, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
for Modification of D.05-10-042.
|
|
|
Type:
EXPARTE
|
Filing Date:
February 14, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On February 8, 2006, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas
and Electric Company (PG&E), met with Rancy Ryan, advisor to Cmmr. Peevey, in
San Francisco. Also present were Lainie Motamedi of the Division of Strategic
Planning of the Commissions and Hal La Flash, Director, Integrated Resource
Planning, for PG&E. Jacobson stated that PG&E supports a comprehensive,
market-based national program to reduce greenhouse gas (GHG) emissions.
Jacobson expressed concern that the proposed single-state, single-industry GHG
program would unfairly discriminate against investor-owned utilities. Jacobson
recommended that the Commission defer implementation of the draft decision (DD)
at least until there is more certainty over expected GHG legislation. La Flash
noted that the Climate Action Team report will be submitted to the Governor and
Legislature soon and the Commission should not adopt the DD prior to issuance
of that report. Jacobson stated that the Commission should not adopt a
penalty-only compliance mechanism and that the DD should be modified so that
the incentive mechanism provides a balanced opportunity for reward and risk of
penalty. Jacobson and La Flash suggested that the detailed requirements for
suppliers to register with the California Climate Action Registry be addressed
in the implementation workshops and that offsets not be limited by type or
location.
|
|
|
Type:
EXPARTE
|
Filing Date:
February 14, 2006
|
Filed By:
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
On February 9, 2006, Evelyn Kahl, counsel to the Energy Producers and Users
Coalition (EPUC), met with Nancy Ryan, advisor to Cmmr. Peevey, in San
Francisco. Kahl urged that the Commission defer its adoption of a carbon cap
for electric utility procurement until a broader statewide, regional or federal
program is in place. Kahl also summarized three additional points made in the
EPUC¿s comments.
|
|
|
Type:
MOTION
|
Filing Date:
February 10, 2006
|
Filed By:
REDEFINING PROGRESS
|
|
Description:
to intervene.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 7, 2006
|
Filed By:
CALIFORNIA CLIMATE ACTION REGISTRY
|
|
Description:
Reply; on the Draft Decision on Procurement Incentives Framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 7, 2006
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
UNION OF CONCERNED SCIENTISTS
|
|
Description:
reply; on the draft opinion on procurement incentives framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 7, 2006
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
on the draft decision on petition of PG&E for modification of D05-10-042.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 7, 2006
|
Filed By:
SEMPRA GLOBAL
|
|
Description:
Reply; on the Draft Decision on Procurement Incentives Framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 7, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Reply; on the Draft Decision on Procurement Incentives Framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 7, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on the Draft Decision on Procurement Incentives Framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 7, 2006
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
Reply; on the Draft Decision on Procurement Incentives Framework.
|
|
|
Type:
EXPARTE
|
Filing Date:
February 6, 2006
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
On February 3, 2006, Devra Wang, Director, California Energy Program at the
Natural Resources Defense Council (NRDC) met with Belinda Gatti, advisor to
Cmmr. Brown, in San Francisco. Also present was Audrey Chang, Staff Scientist
at NRDC. Wang stated NRDC's support for the draft decision (DD). Wang also
stated NRDC's support for the DD's call for a load-based cap on greenhouse gas
(GHG) emissions and NRDC's support for additional elements of the DD. Wang
urged the Commission to clarify the difference between offsets and allowances
in the DD, and to open a new proceeding to address the implementation issues
surrounding this load-based cap on GHG emissions.
|
|
|
Type:
EXPARTE
|
Filing Date:
February 6, 2006
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
On February 6, 2006, Devra Wang, Director, California Energy Program at the
Natural Resources Defense Council (NRDC) met with Brian Prusnek, advisor to
Cmmr. Chong, in San Francisco. Also present was Audrey Chang, Staff Scientist
at NRDC. Wang stated NRDC's support for the draft decision (DD). Wang also
stated NRDC's support for the DD's call for a load-based cap on greenhouse gas
(GHG) emissions and NRDC's support for additional elements of the DD. Wang
urged the Commission to clarify the difference between offsets and allowances
in the DD, and to open a new proceeding to address the implementation issues
surrounding this load-based cap on GHG emissions. Wang affirmed that NRDC will
continue to work with other parties to develop implementation details of the
load-based cap that will maximize the net benefits of such a program while
still producing meaningful GHG emission reductions. In addition, Wang
reiterated NRDC's ultimate support of a statewide multi-sector cap on GHG
emissions, but also emphasized the importance of the Commission's continued
process to address a cap.
|
|
|
Type:
EXPARTE
|
Filing Date:
February 6, 2006
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
On February 3, 2006, Devra Wang, Director, California Energy Program at the
Natural Resources Defense Council (NRDC) met with Cmmr. Bohn in San Francisco.
Also present were Steve St. Marie and Robert Lane, advisors to Cmmr. Bohn, and
Audrey Chang, Staff Scientist at NRDC. Wang stated NRDC's support for the draft
decision (DD). Wang also stated NRDC's support for the DD's call for a
load-based cap on greenhouse gas (GHG) emissions and NRDC's support for
additional elements of the DD. Wang urged the Commission to clarify the
difference between offsets and allowances in the DD, and to open a new
proceeding to address the implementation issues surrounding this load-based cap
on GHG emissions. Wang affirmed that NRDC will continue to work with other
parties to develop implementation details of the load-based cap that will
maximize the net benefits of such a program while still producing meaningful
GHG emission reductions. In addition, Wang reiterated NRDC's ultimate support
of a statewide multi-sector cap on GHG emissions, but also emphasized the
importance of the Commission's continued process to address a cap.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 2, 2006
|
Filed By:
CALIFORNIA CLIMATE ACTION REGISTRY
|
|
Description:
on Commissioner Peevey's Draft Decision on Procurement Incentives Framework.
|
|
|
Type:
REPLY
|
Filing Date:
February 2, 2006
|
Filed By:
COUNTY OF LOS ANGELES
|
|
Description:
to the response of the Joint Parties to the motion for interlocutory relief.
|
|
|
Type:
EXPARTE
|
Filing Date:
February 2, 2006
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
On February 1, 2006, Sheryl Carter, Director, Western Energy Program at the
Natural Resources Defense Council (NRDC) met with Nancy Ryan, advisor to Cmmr.
Peevey, in San Francisco. Also present was Devra Wang, Director, California
Energy Program at NRDC. Wang stated NRDC's support for the draft decision (DD)
on procurement incentives. Wang stated NRDC's support for the DD's call for a
load-based cap on greenhouse gas (GHG) emissions. Wang also stated NRDC's
support for additional elements of the DD. Finally, Wang urged the Commission
to clarify the difference between offsets and allowances in the DD, and to open
a new proceeding to address the implementation issues surrounding this
load-based cap on GHG emissions.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 2, 2006
|
Filed By:
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
|
|
Description:
on Draft Opinion on Procurement Incentives Framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 2, 2006
|
Filed By:
GREEN POWER INSTITUTE
|
|
Description:
on Draft Opinion of Commissioner Peevey on Procurement Incentives Framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 2, 2006
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
opening; on the draft decision of Cmmr. Peevey on a procurement incentives
framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 2, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
opening; on the proposed decision on procurement incentive framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 2, 2006
|
Filed By:
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
on Draft Decision on procurement incentives framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 2, 2006
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
on the draft decision of Cmmr. Peevey.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 2, 2006
|
Filed By:
DRA/OBIORA/PUC
|
|
Description:
on the draft decision on procurement incentives framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 2, 2006
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
UNION OF CONCERNED SCIENTISTS
|
|
Description:
on the draft decision on procurement incentives framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 2, 2006
|
Filed By:
SEMPRA GLOBAL
|
|
Description:
on Draft Decision on Procurement Incentives Framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 2, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
on Draft Decision on Procurement Incentive Framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 2, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on Draft Decision on Procurement Incentives Framework.
|
|
|
Type:
EXPARTE
|
Filing Date:
January 30, 2006
|
Filed By:
CALPINE CORPORATION
|
|
Description:
On January 25, 2006, Avis Kowalewski, Director, Western Regulatory Affairs,
Calpine Corporation (Calpine), met with Nancy Ryan, advisor to Cmmr. Peevey, in
San Francisco. Also present were Lainie Motamedi of the Division of Strategic
Planning, and Peggy Duxbury, Vice President, Governmental and Environmental
Affairs of Calpine. Calpine representatives discussed the draft decision and
Calpine's general support for the creation of a load-based cap on greenhouse
gas emissions. Calpine representatives also expressed support for the
imposition of a cap on load serving entities as the best option for addressing
issues associated with carbon `leakage' from imported power.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 30, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Motion for interlocutory relief of the County of Los Angeles.
|
|
|
Type:
EXPARTE
|
Filing Date:
January 27, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On January 24, 2006, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas
and Electric Company (PG&E), had a telephone conversation with Rami Kahlon,
advisor to Cmmr. Peevey. Jacobson discussed PG&E's motion for authorization to
purchase gas for Calpine's reliability must-run units. Jacobson emphasized that
PG&E still recommends the Commission to adopt the draft decision of ALJ Brown
and urged the Commission to act at its January 26th meeting.
|
|
|
Type:
DRAFT DECISION
|
Filing Date:
January 27, 2006
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Opinion on Petition of PG&E for modification of D05-10-042. Comments are due
February 7, 2006; no reply comments will be accepted.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 23, 2006
|
Filed By:
CALPINE CORPORATION
|
|
Description:
reply; on Draft Decision of ALJ Brown.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 23, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
in opposition to QF parties' motion for interlocutory relief.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 23, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to IEPA Petition for Modification of D.05-10-042.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 23, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; on Draft Decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 20, 2006
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
and objections to the draft decision on Petition of PG&E for Modification of
D05-10-042.
|
|
|
Type:
REQUEST
|
Filing Date:
January 20, 2006
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
for award of intervenor compensation for work in the CEC's 2005 IEPR process.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 20, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on Draft Decision of ALJ Wetzell.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 20, 2006
|
Filed By:
POWEREX CORP.
|
|
Description:
on ALJ Wetzell draft decision.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
January 19, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
for Leave to File Confidential Material Under Seal; Confidential Materials
Attached and Filed Under Seal, namely, Unredacted Attachment 1 to the Prepared
Testimony of Michael J. Iammarino, which has been subsequently adopted and
modified by Sue Garcia.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 18, 2006
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
to Applications for Rehearing of D05-12-029.
|
|
|
Type:
RULING
|
Filing Date:
January 18, 2006
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Requests reply comments on the January 3, 2006 draft decision from PG&E,
Calpine and intervenors, by January 23, 2006.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 18, 2006
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
to applications for rehearing of D05-12-009.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 13, 2006
|
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
|
|
Description:
reply; to post-workshop comments on Assigned Commissioner's Ruling regarding
next steps in procurement proceeding.
|
|
|
Type:
DRAFT DECISION
|
Filing Date:
January 13, 2006
|
Filed By:
CMMR/PEEVEY/PUC
|
|
Description:
Opinion on Procurement Incentives Framework. Comments are due February 2, 2006;
reply comments - 5 days after comments are filed.
|
|
|
Type:
MOTION
|
Filing Date:
January 13, 2006
|
Filed By:
COUNTY OF LOS ANGELES
|
|
Description:
for interlocutory relief and request for shortened response time.
|
|
|
Type:
EXPARTE
|
Filing Date:
January 13, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On January 10, 2006, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas
and Electric Company (PG&E), had a telephone conversation with Rami Kahlon,
advisor to Cmmr. Peevey. Jacobson discussed PG&E's motion for authorization to
purchase gas for Calpine's reliability must-run units. Jacobson stated that
PG&E supports the draft decision (DD) of ALJ Brown authorizing PG&E to purchase
gas. Jacobson indicated that the significant uncertainties and complexities
associated with Calpine's bankruptcy case warranted PG&E's proposal as a
contingency plan. Jacobson recommended that the Commission adopt the DD, with
minor clarifications, as soon as possible.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 12, 2006
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
Post Workshop Reply;
|
|
|
Type:
DRAFT DECISION
|
Filing Date:
January 12, 2006
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Opinion on Petition of PG&E for Modification of D05-10-042. Comments are due
January 20, 2006; no reply comments will be accepted.
|
|
|
Type:
STIPULATION
|
Filing Date:
January 12, 2006
|
Filed By:
MODESTO IRRIGATION DISTRICT
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
resolving PG&E's motion to strike the reply testimony of Christopher J. Mayer
on behalf of the Modesto Irrigation District.
|
|
|
Type:
MOTION
|
Filing Date:
January 12, 2006
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
to file opening testimony one day out of time.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 12, 2006
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
post-workshop; reply [in accordance with the December 2, 2006 Ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
January 12, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
post-workshop; reply [in accordance with the December 2, 2006 Ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
January 12, 2006
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
post-workshop; reply [in accordance with the December 2, 2006 Ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
January 12, 2006
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
post-workshop; reply [in accordance with the December 2, 2005 Ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
January 12, 2006
|
Filed By:
UNION OF CONCERNED SCIENTISTS
|
|
Description:
post-workshop; reply [in accordance with the December 2, 2005 Ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
January 12, 2006
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
post-workshop; reply [in accordance with the December 2, 2006 Ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
January 12, 2006
|
Filed By:
DRA/OBIORA/PUC
|
|
Description:
post-workshop; reply [in accordance with the December 2, 2005 Ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
January 12, 2006
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
post-workshop; reply [in accordance with the December 2, 2005 Ruling].
|
|
|
Type:
EXPARTE
|
Filing Date:
January 10, 2006
|
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
|
|
Description:
On January 9, 2006, Marc Joseph, attorney for the Coalition of California
Utility Employees (CUE), met with Aaron Johnson, advisor to Cmmr. Grueneich, in
San Francisco. Also present was David Marcus, consultant for CUE. Joseph and
Marcus explained the comments by CUE on the Capacity Markets White Paper.
Joseph and Marcus stated that a capacity market was inconsistent with and would
have to replace the resource adequacy requirements, that it would not likely
result in 15-17 percent margin, that it would be very complex, that it would
require locational markets with many different capacity products and would not
result in new generation. Joseph also stated that the current RFO process was
resulting in competitive procurement.
|
|
|
Type:
MOTION
|
Filing Date:
January 10, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to strike the reply testimony of Christopher J. Mayer on behalf of Modesto
Irrigation District.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 9, 2006
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
on the January 3, 2006 Draft Decision.
|
|
|
Type:
RULING
|
Filing Date:
January 9, 2006
|
Filed By:
ALJS/BROWN/HALLIGAN/PUC
|
|
Description:
Denies Motion to Strike Filed by CARE on November 15, 2005.
|
|
|
Type:
RULING
|
Filing Date:
January 9, 2006
|
Filed By:
ALJS/BROWN/HALLIGAN/PUC
|
|
Description:
joint; granting the September 19, 2005 Motion to Strike filed by Edison, PG&E
and SDG&E, as set forth.
|
|
|
Type:
RULING
|
Filing Date:
January 9, 2006
|
Filed By:
ALJS/BROWN/HALLIGAN/PUC
|
|
Description:
Denies CAC/EPUC's motion to stirke testimony of PG&E, filed November 16, 2005,
without prejudice, as set forth.
|
|
|
Type:
RULING
|
Filing Date:
January 9, 2006
|
Filed By:
ALJS/BROWN/HALLIGAN/PUC
|
|
Description:
Grants Motion to Designate Sponsoring Witness, filed by CAISO on December 7,
2005.
|
|
|
Type:
OPPOSITION
|
Filing Date:
January 9, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to QF Parties' request for an order shortenting time on their motion for
interlocutory relief.
|
|
|
Type:
OPPOSITION
|
Filing Date:
January 9, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to parties' Request for an Order Shortening Time on their Motion for
Interlocutory Relief.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 9, 2006
|
Filed By:
CALPINE CORPORATION
|
|
Description:
on Draft Decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 9, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on Draft Decision Authorizing PG&E to Purchase and Deliver Gas to Supply RMR
Generating Units.
|
|
|
Type:
MOTION
|
Filing Date:
January 6, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
for Leave to File Comments One Day Late; ATTACHED - Post Workshop Comments.
|
|
|
Type:
MOTION
|
Filing Date:
January 6, 2006
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
RENEWABLES COALITION
|
|
Description:
for Interlocutory Relief of the QF Parties and Request for Shortened Response
Time.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 5, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Post Workshop
|
|
|
Type:
RULING
|
Filing Date:
January 5, 2006
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Grants RCM Biothane's request to intervene.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 5, 2006
|
Filed By:
POWEREX CORP.
|
|
Description:
to PG&E's petition to modify D05-10-042.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 5, 2006
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
to the petitions for modification of D05-10-042 filed by PG&E and CAISO.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 5, 2006
|
Filed By:
ORA/PAULL/PUC
|
|
Description:
to Petitions to Modify D05-12-042 filed by PG&E and the CAISO.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 5, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to Petition of the CAISO to Modify D05-10-042.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 5, 2006
|
Filed By:
WESTERN POWER TRADING FORUM
|
|
Description:
to PG&E Petition to Modify Decision 05-10-042.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 5, 2006
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
to PG&E Petition to Modify Decision 05-10-042.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 5, 2006
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
to Cal ISO Petition to Modify Decision 05-10-042.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 5, 2006
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
to PG&E and Cal ISO Petition to Modify Decision 05-10-042.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 5, 2006
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to PG&E and Cal ISO Petition to Modify Decision 05-10-042.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 5, 2006
|
Filed By:
CALIFORNIA FARM BUREAU FEDERATION
|
|
Description:
on CPUC, CEC and CAISO Dec 14, 2005 Workshop for Transmission Planning
Collabration.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 5, 2006
|
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
|
|
Description:
post-workshop; on Assigned Commissioner's Ruling Regarding Next Steps in
Procurement Proceeding.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 5, 2006
|
Filed By:
NATIONAL GRID USA
|
|
Description:
post-workshop.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 5, 2006
|
Filed By:
DRA/OBIORA/PUC
|
|
Description:
post-workshop.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 5, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
post-workshop.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 5, 2006
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
post-workshop.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 5, 2006
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
post-workshop; in response to the December 2, 2005 ruling.
|
|
|
Type:
COMMENTS
|
Filing Date:
January 5, 2006
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
Post Workshop
|
|
|
Type:
RULING
|
Filing Date:
January 4, 2006
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Regarding Applicability of Interim Protective Order. Determines that data
submitted by LSEs in response to the Energy Division's RA Guide, as set forth,
shall be subject to the confidentiality projections and procedures set forth in
the IPO that was issued June 24, 2005.
|
|
|
Type:
NOTICE
|
Filing Date:
January 3, 2006
|
Filed By:
CALJ/MINKIN/PUC
|
|
Description:
of Prehearing Conference.
|
|
|
Type:
DRAFT DECISION
|
Filing Date:
January 3, 2006
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
authorizing PG&E to purchase and deliver gas to supply RMR generating units.
Comments are due by January 9, 2006, and no reply comments will be accepted.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 3, 2006
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
and objections to the CAISO and PG&E petitions for modification of D05-10-042.
|
|
|
Type:
RESPONSE
|
Filing Date:
January 3, 2006
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
to Edison & PG&E Petition for Modification of D.04-12-048.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
January 3, 2006
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
of D05-12-009.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
December 30, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
of D05-12-009.
|
|
|
Type:
MOTION
|
Filing Date:
December 29, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
for a determination that 'public necessity' within the meaning of Rule 77.7
(f)(9) exists and justifies shortening time for public comment.
|
|
|
Type:
REQUEST
|
Filing Date:
December 23, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
for Award of Compensation for Substantial Contribution to D05-10-042 and for
Participation in Utility Procurement Review Groups.
|
|
|
Type:
RULING
|
Filing Date:
December 23, 2005
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
on requests to shorten time for responses to Petitions for Modification of
D05-10-042. Responses to the CAISO and PG&E petitions for modification are due
January 5, 2006; motions for a determination that public necessity requires
reduction or waiver of the 30-day period for public review and comment on a
draft decision on these petitions may be filed December 29, 2005. Responses to
any such motions are due January 5, 2006 and may be incorporated within the
party's response to the petition(s).
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
December 22, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
of D05-10-042.
|
|
|
Type:
RESPONSE
|
Filing Date:
December 20, 2005
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC. (CARE)
|
|
Description:
and objections to the December 15, 2005 motion of PG&E to shorten time for
responses to PG&E motion for a ruling authorizing PG&E to purchase and deliver
gas, etc.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
December 19, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
of D05-10-042 and request to shorten time for responses to January 5, 2006.
|
|
|
Type:
RULING
|
Filing Date:
December 16, 2005
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Grants PG&E's motion to shorten time for responses to its motion for
authorization to purchase and deliver gas, etc. Responses to the motion are due
December 22, 2005.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 15, 2005
|
Filed By:
WESTERN POWER TRADING FORUM
|
|
Description:
on Application for Rehearing of D05-10-042.
|
|
|
Type:
RESPONSE
|
Filing Date:
December 15, 2005
|
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
|
|
Description:
to applications for rehearing [of D05-10-042].
|
|
|
Type:
RESPONSE
|
Filing Date:
December 15, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Applications for Rehearing of D05-10-042.
|
|
|
Type:
RESPONSE
|
Filing Date:
December 15, 2005
|
Filed By:
SEMPRA GLOBAL
|
|
Description:
to Applications for Rehearing of D05-10-042.
|
|
|
Type:
MOTION
|
Filing Date:
December 15, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
for a ruling authorizing PG&E to purchase and deliver gas, as needed for
electric and gas system reliability purposes, to supply generating units under
the CAISO reliability must run contracts with Calpine and its affiliates, and
to authorize cost recovery.
|
|
|
Type:
MOTION
|
Filing Date:
December 15, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to shorten time for responses to PG&E's motion for a ruling authorizing PG&E to
purchase and deliver gas, etc.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2005
|
Filed By:
SILICON VALLEY LEADERSHIP GROUP
|
|
Description:
Pre-Workshop; on Assigned Commissioner's Ruling regarding next steps in
procurement proceeding
|
|
|
Type:
EXPARTE
|
Filing Date:
December 13, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On December 8, 2005, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas
and Electric Company (PG&E), met with Rami Kahlon, advisor to Cmmr. Peevey, in
San Francisco. Jacobson described PG&E's recommendation to modify D04-12-048
regarding the capital cost cap structure and sharing mechanism for
utility-owned generation projects. Jacobson emphasized the importance of
allowing traditional cost of service ratemaking for utility-owned generation.
Jacobson explained that the cost cap for utility-owned generation should be
eliminated. Jacobson noted, that if the cost cap is not eliminated, the
Commission has already indicated its intent to reexamine the extent to which
there will be customer/shareholder sharing of cost overruns and underruns for
utility-owned generation in the 2006 long-term procurement plan proceeding.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2005
|
Filed By:
SAN DIEGO ASSOCIATION OF GOVERNMENTS
|
|
Description:
Pre-Workshop; on Assigned Commissioner's Ruling regarding next steps in
procurement proceeding.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 12, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on Assigned Commissioner's Ruling regarding next steps in procurement
proceeding.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 12, 2005
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
to the December 2, 2005 ruling regarding next steps in procurement proceeding.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 12, 2005
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
on the Assigned Commissioner's ruling regarding next steps in procurement
proceeding.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 12, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on Assigned Commissioner's Ruling regarding next steps in procurement
proceeding.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 12, 2005
|
Filed By:
MIRANT CALIFORNIA, LLC
MIRANT DELTA, LLC
MIRANT POTRERO, LLC
|
|
Description:
on Assigned Commissioner's Ruling regarding next steps in procurement
proceeding.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 12, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
pre-workshop; in response to the December 2, 2005 Assigned Commissioner's
Ruling.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 12, 2005
|
Filed By:
WEST COAST POWER LLC
|
|
Description:
on Assigned Commissioner's Ruling regarding next steps in procurement
proceeding.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 12, 2005
|
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
|
|
Description:
pre-workshop; on Assigned Commissioner's Ruling regarding next steps in
procurement proceeding.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 12, 2005
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
[on the Assigned Commissioner's Ruling of December 2, 2005].
|
|
|
Type:
COMMENTS
|
Filing Date:
December 12, 2005
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
pre-workshop; on the Assigned Commissioner's ruling regarding next steps in
procurement proceeding.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 12, 2005
|
Filed By:
CALIFORNIA CLEAN DG COALITION
|
|
Description:
on the Assigned Commissioner's ruling regarding the next steps in procurement
proceeding.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 12, 2005
|
Filed By:
MOUNTAIN UTILITIES
|
|
Description:
on Assigned Commissioner's Ruling.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 12, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
on Assigned Commissioner's Ruling regarding next steps in procurement
proceeding.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 12, 2005
|
Filed By:
SEMPRA GLOBAL
|
|
Description:
on Assigned Commissioner's Ruling dated 12/02/05.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 12, 2005
|
Filed By:
WESTERN POWER TRADING FORUM
|
|
Description:
on Assigned Commissioner's Ruling.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
December 8, 2005
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
Amended Petition to Modify D05-10-042.
|
|
|
Type:
MOTION
|
Filing Date:
December 7, 2005
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
|
|
Description:
to designate sponsoring witness.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
December 6, 2005
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
|
|
Description:
of D05-10-042 on resource adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 5, 2005
|
Filed By:
CALPINE CORPORATION
|
|
Description:
reply; on the draft decision of ALJ Brown granting in part, and denying in
part, petitions for modification of D04-12-048.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
December 2, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
of D04-12-048.
|
|
|
Type:
RULING
|
Filing Date:
December 2, 2005
|
Filed By:
CMMR/PEEVEY/PUC
|
|
Description:
Regarding Next Steps in Procurment Proceeding. Sets the following schedule:
12/12/05 - comments on the ruling; 12/14 - workshop; 1/5/6 - post workshop
comments; 1/12/6 - post workshop reply comments.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 1, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
AUGMENTATION REQUIRED. On November 28, 2005, Colin E. Cushnie, Director of
Regulatory Affairs of Southern California Edison Company (SCE), met with
Stephen St. Marie, advisor to Cmmr. Bohn, Peter Arth, advisor to Cmmr. Peevey,
and Aaron Johnson, advisor to Cmmr. Grueneich, in three separate meetings.
Written material (attached to the notice) was used. Cushnie discussed ALJ
Brown's draft decision (DD) on the Department of Water Resources (DWR) Contract
Reallocation and ALJ Allen's DD on the Allocation of DWR's 2006 Revenue
Requirement Determination. Cushnie requested that the Commission adopt ALJ
Brown's DD reallocating the Williams Product 'D' contract to SCE's customers.
Cushnie also requested that the ALJ Allen's DD be modified to reject Pacific
Gas and Electric Company's proposal to calculate the mark-to-market benefits of
the Williams gas supply contract and allocate the benefits to all utility
customers.
|
|
|
Type:
OPPOSITION
|
Filing Date:
November 30, 2005
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
to Motion to Strike Reference of CARE.
|
|
|
Type:
RESPONSE
|
Filing Date:
November 30, 2005
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
to Motion of CARE filed on November 15, 2005.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
November 30, 2005
|
Filed By:
FPL ENERGY, LLC
|
|
Description:
of D05-10-042.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
November 30, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
of D05-10-042.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
November 30, 2005
|
Filed By:
CALPINE CORPORATION
|
|
Description:
of D05-10-042.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 29, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on the draft decision of ALJ Brown.
|
|
|
Type:
RULING
|
Filing Date:
November 29, 2005
|
Filed By:
ALJ/HALLIGAN/BROWN/PUC
|
|
Description:
Grants Davis Hydro, LLC's motion to intervene, filed on November 8, 2005.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 29, 2005
|
Filed By:
CALPINE CORPORATION
|
|
Description:
on the draft decision of ALJ Brown granting in part, and denying in party,
petitions for modification of D04-12-048.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 29, 2005
|
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
|
|
Description:
on the draft decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 29, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on Draft Decision of ALJ Brown granting in part, and denying in part, petitions
to modify D04-12-048.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 29, 2005
|
Filed By:
WESTERN POWER TRADING FORUM
|
|
Description:
on Opinion granting in part, and denying in party, petitions for modification
of D04-12-048.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 28, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Reply; on Draft Decision of ALJ Brown.
|
|
|
Type:
RESPONSE
|
Filing Date:
November 28, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to the motion of the CAC/EPUC to strike testimony.
|
|
|
Type:
EXPARTE
|
Filing Date:
November 28, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
On November 22, 2005, Lad Lorenz, Vice President, Regulatory Affairs - San
Francisco, for San Diego Gas & Electric Company (SDG&E) and Southern California
Gas Company met with Rami Kahlon, advisor to Pres. Peevey, in San Francisco.
Lorenz discussed ALJ Brown's draft decision to reallocate the 1175 MW Williams
Product `D' Department of Water Resources contract from SDG&E to Southern
California Edison Company. Lorenz urged that the DD be modified, to maintain
the status quo allocation of the Department of Water Resources contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 28, 2005
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
reply; on the draft decision of ALJs Brown and Halligan.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 28, 2005
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
reply; on the draft decision of ALJs Brown and Halligan.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 28, 2005
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
reply; on the draft decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 28, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on Draft Decision of ALJs Brown & Halligan.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 28, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on Draft Decision of ALJ Brown.
|
|
|
Type:
EXPARTE
|
Filing Date:
November 23, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
AUGMENTATION REQUIRED. On November 18, 2005, Colin E. Cushnie, Director of
Regulatory Affairs of Southern California Edison Company (SCE), met with Brian
Prusnek, advisor to Cmmr. Kennedy. Written material (attached to the notice)
was used. Cushnie discussed ALJ Brown's draft decision (DD) on the Department
of Water Resources (DWR) Contract Reallocation and ALJ Allen's DD on the
Allocation of DWR's 2006 Revenue Requirement Determination. Cushnie requested
that the Commission adopt ALJ Brown's DD reallocating the Williams Product 'D'
contract to SCE's customers. Cushnie also requested that the ALJ Allen's DD be
modified to reject Pacific Gas and Electric Company's (PG&E) proposal to
calculate the mark-to-market benefits of the Williams gas supply contract and
allocate the benefits to all utility customers. Additionally, Cushnie requested
that the DD be modified to adopt SCE's Petition to Modify D05-06-060, which
would levelize shift in cost responsibility from San Diego Gas & Electric
Company's customers to the customers of SCE and PG&E.
|
|
|
Type:
RULING
|
Filing Date:
November 22, 2005
|
Filed By:
ALJ/BROWN/HALLIGAN/PUC
|
|
Description:
Shortens time to respond to the Cogeneration Association of California, et
al.'s motion to stirke of November 16, 2005. Responses to the motion are due
November 28, 2005.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 21, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
(PUBLIC & CONFIDENTIAL VERSIONS) on Draft Decision of ALJ Brown.
|
|
|
Type:
MOTION
|
Filing Date:
November 21, 2005
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
to file comments on draft decisions of the ALJ one day out of time; [comments
included].
|
|
|
Type:
EXPARTE
|
Filing Date:
November 21, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On November 16, 2005, Colin E. Cushnie, Director of Southern California Edison
Company (SCE), spoke on the telephone with David Gamson, advisor to Cmmr.
Brown. Written material (attached to the notice) was used. Cushnie requested
that the Commission adopt ALJ Brown's draft decision reallocating the Williams
Product 'D' contract to SCE's customers. Cushnie also requested that ALJ
Allen's draft decision be modified to reject Pacific Gas and Electric Company's
proposal to calculate the mark-to-market benefits of the Williams gas supply
contract and allocate the benefits to all utility customers.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 21, 2005
|
Filed By:
MODESTO IRRIGATION DISTRICT
|
|
Description:
on Draft Decision of ALJ Brown & Halligan re: Expiring QF contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 21, 2005
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
on the draft decision of ALJs Brown and Halligan.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 21, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on Draft Decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 21, 2005
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
on the draft decision of ALJs Brown and Halligan.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 21, 2005
|
Filed By:
ORA/PELEO/PUC
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
|
|
Description:
Opening; on Draft Decision re: Expiring QF Contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 21, 2005
|
Filed By:
SEMPRA GLOBAL
|
|
Description:
on Draft Decision re: Reallocation of DWR Contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 21, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on Draft Decision of ALJ Brown.
|
|
|
Type:
MOTION
|
Filing Date:
November 16, 2005
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
to strike testimony of PG&E and request for shortened response time.
|
|
|
Type:
MOTION
|
Filing Date:
November 15, 2005
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
to strike reference to the California Energy Commission's Draft 2005 Integrated
Energy Policy Report in the Prepared Rebuttal Testimony of R. Thomas Beach on
Behalf of the California Cogeneration Council, the Prepared Rebuttal Testimony
of James A. Ross and Donald W. Schoenbeck on Behalf of the Cogeneration
Association of California and the Energy Producers and Users Coalition, and
other parties.
|
|
|
Type:
DRAFT DECISION
|
Filing Date:
November 9, 2005
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Opinion Granting in Part, and Denying in Part, Petitions to Modify D04-12-048.
Comments are due by November 29, 2005; reply comments - 5 days after comments
are filed.
|
|
|
Type:
PETITION
|
Filing Date:
November 8, 2005
|
Filed By:
DAVIS HYDRO, LLC
|
|
Description:
to intervene.
|
|
|
Type:
EXPARTE
|
Filing Date:
November 3, 2005
|
Filed By:
SEMPRA GLOBAL
|
|
Description:
THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON
OCTOBER 26, 2005, AND APPEARED IN THE CALENDAR OFOctober 28, 2005. On October
17, 2005, Thomas Corr, Regulatory Policy Manager for Sempra Global (Global),
participated in two separate all-party meetings in San Francisco - with Cmmr.
Brown, and Cmmr. Peevey. Cmmr. Peevey participated via telecast from Los
Angeles. Also present was Greg Bass, Director of Retail Commodity Operations
for Sempra Energy Solutions. Copies of the sign-up sheets listing the names of
other participants of the meetings are attached to the notice. Bass and Corr
discussed resource adequacy requirements (RAR) and the draft decision of
September 27, 2005. Bass emphasized that electric service providers should not
be subjected to RA capacity allocations for customers that are not under
contract.
|
|
|
Type:
MOTION
|
Filing Date:
November 3, 2005
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
RENEWABLES COALITION
|
|
Description:
for leave to file reply; reply attached.
|
|
|
Type:
DRAFT DECISION
|
Filing Date:
October 31, 2005
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Opening Comments not to exceed 15 pages are due NLT 11/20/05; Reply Comments
not to exceed 5 pages are due NLT 11/26/05
|
|
|
Type:
DRAFT DECISION
|
Filing Date:
October 31, 2005
|
Filed By:
ALJ/BROWN/HALLIGAN/PUC
|
|
Description:
Opening Comments not to exceed 15 pages are due NLT 11/20/05; Reply Comments
not to exceed 5 pages are due NLT 11/26/05
|
|
|
Type:
MOTION
|
Filing Date:
October 28, 2005
|
Filed By:
PACIFIC GAS & ELECTRIC COMPANY
|
|
Description:
requesting Official Notice of Documents.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 27, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On October 24, 2005, Colin E. Cushnie, Director, Southern California Edison
Company (SCE), met with Nilgun Atamturk, advisor to Cmmr. Grueneich, in San
Francisco. Written material (attached to the notice) was used. Cushnie
requested that the Commission clarify that Department of Water Resources
contracts are excluded from the draft decision's (DD) adopted restrictions on
liquidated damages contracts (LDCs) and asked that the Commission increase the
proposed five percent phase-out limit on LDCs in 2008 to ten percent.
Additionally, SCE's representatives requested that the Commission not
incorporate load migration into Load Serving Entities' monthly RA compliance
filings, or in the alternative, provide a ninety-day grace period for
investor-owned utilities (IOU). Cushnie also said that SCE supports the DD's
decision to defer implementation of Local Area requirements (LARs) to 2007, but
requested that the DD be changed to allow IOU ninety days to submit LARs
proposals.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 26, 2005
|
Filed By:
SEMPRA GLOBAL
|
|
Description:
LATE FILED. AUGMENTATION REQUIRED. On October 17, 2005, Thomas Corr, Regulatory
Policy Manager for Sempra Global (Global), participated in two separate
all-party meetings in San Francisco - with Cmmr. Brown, and Cmmr. Peevey.
Cmmr. Peevey participated via telecast from Los Angeles. Also present was Greg
Bass, Director of Retail Commodity Operations for Sempra Energy Solutions. Bass
and Corr discussed resource adequacy requirements (RAR) and the draft decision
of September 27, 2005. Bass emphasized that electric service providers should
not be subjected to RA capacity allocations for customers that are not under
contract.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 25, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
Reply; on Draft Decision of ALJ Wetzell on Resource Adequacy Requirements.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 25, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On October 20, 2005, Bruce C. Foster, Vice President, Southern California
Edison Company (SCE), met with Stephen St. Marie, advisor to Cmmr. Bohn, at 601
Van Ness Avenue in San Francisco. Also present were Gary L. Schoonyan and Colin
E. Cushnie, Directors of SCE. Written material (attached to the notice) was
used. SCE's representatives discussed ALJ Wetzell's draft decision on Phase II
Resource Adequacy proceeding. SCE's representatives requested that the
Commission clarify that Department of Water Resources contracts are excluded
from the DD's adopted restrictions on liquidated damages contracts (LDCs) and
asked that the Commission increase the proposed five percent phase-out limit on
LDCs in 2008 to ten percent. Additionally, SCE's representatives requested that
the Commission not incorporate load migration into Load Serving Entities'
monthly RA compliance filings, or in the alternative, provide a ninety-day
grace period for investor-owned utilities.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 25, 2005
|
Filed By:
WESTERN POWER TRADING FORUM
|
|
Description:
Reply; on Proposed Decision of ALJ Wetzell Re Resource Adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 25, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on Proposed Decision of ALJ Wetzell Re Resource Adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 24, 2005
|
Filed By:
CALIFORNIA ELECTRICITY OVERSIGHT BOARD
|
|
Description:
reply; to the draft decision.
|
|
|
Type:
OPPOSITION
|
Filing Date:
October 24, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Motion of the CCC et al. to strike the testimony of Dr. Peter Fox-Penner.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 24, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On October 19, 2005, Bruce C. Foster, Vice President, Southern California
Edison Company, sent a letter (attached to the notice) to Cmmr. Brown. The
letter concerned the proposed decision on resource adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 24, 2005
|
Filed By:
ORA/PAULL/PUC
|
|
Description:
reply; on ALJ Wetzell's draft decision re resource adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 24, 2005
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
|
|
Description:
reply; on the draft decision of ALJ Wetzell regarding resource adequacy
requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 24, 2005
|
Filed By:
MIRANT CALIFORNIA LLC; MIRANT DELTA LLC; MIRANT POTRERO LLC
WEST COAST POWER
|
|
Description:
joint reply; on the ALJ draft decision on resource adequacy requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 24, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
reply; on the draft decision on resource adequacy requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 24, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; on the draft decision of ALJ Wetzell on resource adequacy requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 24, 2005
|
Filed By:
DUKE ENERGY NORTH AMERICA
|
|
Description:
reply; on the draft decision of ALJ Wetzell concerning the resource adequacy
requirement.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 24, 2005
|
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
|
|
Description:
reply; on ALJ Draft Decision on Resource Adequacy Requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 24, 2005
|
Filed By:
POWEREX CORP.
|
|
Description:
reply; on ALJ Wetzell's Draft Decision Addressing RAR.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 24, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
reply; on the draft decision on resource adequacy requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 24, 2005
|
Filed By:
CALPINE CORPORATION
|
|
Description:
reply; on the draft decision of ALJ Wetzell on resource adequacy requirement.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 24, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Reply; on Proposed Decision of ALJ Wetzell on Resource Adequacy Requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 24, 2005
|
Filed By:
SEMPRA GLOBAL
|
|
Description:
Reply; on Draft Decision of ALJ Wetzell on Resource Adequacy Requirements.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 20, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On October 17, 2005, Bruce C. Foster, Vice President, Southern California
Edison Company (SCE), participated in two separate all-party meetings - with
Cmmr. Brown, and Cmmr. Peevey, in San Francisco. At the meeting with Cmmr.Brown
also present was David Gamson, advisor to Cmmr. Brown, and with Cmmr. Peevey -
Julie Fitch, advisor to Cmmr. Peevey. Harold B. Ray, Executive Vice President,
Colin E. Cushnie, Director, and Douglas R. Parker, Manager, for SCE,
participated in the meetings. Written material (attached to the notice) was
used. Foster requested that the Commission clarify that Department of Water
Resources contracts are excluded from the draft decision's (DD) adopted
restrictions on liquidated damages (LD) contracts and asked that the Commission
increase the proposed five percent phase-out limit on LD contracts in 2008 to
ten percent. Cushnie requested that the Commission not incorporate load
migration into Load Serving Entities' monthly RA compliance filings, or in the
alternative, provide a ninety-day grace period for investor-owned utilities
(IOUs). Cushnie stated that SCE supports the DD's decision to defer
implementation of Local Area requirements (LARs) to 2007, and requested that
the DD be changed to allow IOUs ninety days to submit LARs proposals.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 20, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On October 17, 2005, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas
and Electric Company (PG&E), attended two separate all-party meetings - with
Cmmr. Peevey and with Cmmr. Brown, in San Francisco. At the meeting with Cmmr.
Peevey also present was Julie Fitch, advisor to Cmmr. Peevey, and with Cmmr.
Brown - David Gamson, advisor to Cmmr. Brown. Roy Kuga, Vice President, Gas and
Electric Supply, for PG&E, participated in both meetings. A list of attendees
is attached to the notice. Written material (attached to the notice) was used.
Kuga urged the Commission to pursue a multi-year resource adequacy requirement
(RAR). Kuga indicated that it was important for the Commission to define the
exemptions to the 7x24 availability requirement. Kuga expressed concern that
Reliability Must Run Must Offer Obligation and Resource Adequacy payments could
potentially duplicate one another. Kuga recommended that the Commission clarify
that Department of Water Resources contracts are excluded from the phase out
percentages for liquidated damages contracts. Kuga stated that the RAR should
extend into real-time. Kuga expressed support for the Commission's decision to
defer implementation of local capacity requirements until 2007. Kuga proposed
that the draft decision be clarified with respect to the allocation of intertie
capacity.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 20, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
On October 17, 2005, Lad Lorenz, Vice President, Regulatory Affairs - San
Francisco, for San Diego Gas & Electric Company (SDG&E) and Southern California
Gas Company (SoCalGas) participated in two separate all-party meetings - with
Pres. Peevey and with Cmmr. Brown in San Francisco. In the meeting with Cmmr.
Peevey, Lorenz participated by video conference from the Commission's Los
Angeles office in Los Angeles. Wendy Keilani, Regulatory Case Manager for SDG&E
and SoCalGas participated in the meetings. A list of other attendees is
attached to the notice. Lorenz discussed SDG&E's overall support for the
proposed decision and expressed appreciation for the PD¿s adoption of many
SDG&E's positions. Lorenz, however, encouraged caution and the need for
flexibility in implementation interpretation.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 19, 2005
|
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
|
|
Description:
on the proposed decision on resource adequacy requirements.
|
|
|
Type:
MOTION
|
Filing Date:
October 18, 2005
|
Filed By:
COUNTY OF LOS ANGELES
|
|
Description:
to Strike portions of the Reply of the Joint Parties.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 17, 2005
|
Filed By:
WESTERN POWER TRADING FORUM
|
|
Description:
on the Proposed Decision of ALJ Wetzell.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 17, 2005
|
Filed By:
SILICON VALLEY LEADERSHIP GROUP
|
|
Description:
on Phase 2 resource adequacy requirement draft decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 17, 2005
|
Filed By:
POWEREX CORP.
|
|
Description:
on ALJ Wetzell's draft decision addressing RAR.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 17, 2005
|
Filed By:
MORGAN STANLEY CAPITAL GROUP INC.
|
|
Description:
on the draft decision on Resource Adequacy Requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 17, 2005
|
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
|
|
Description:
on the draft decision on Resource Adequacy Requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 17, 2005
|
Filed By:
DUKE ENERGY NORTH AMERICA
|
|
Description:
on the draft decision on Resource Adequacy Requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 17, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
on the draft decision on Resource Adequacy Requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 17, 2005
|
Filed By:
MIRANT CALIFORNIA LLC
MIRANT DELTA LLC
MIRANT PORTERO LLC
WEST COAST POWER
|
|
Description:
joint; on the draft decision on Resource Adequacy Requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 17, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
[on the draft decision on Resource Adequacy Requirements.]
|
|
|
Type:
COMMENTS
|
Filing Date:
October 17, 2005
|
Filed By:
CALPINE CORPORATION
|
|
Description:
on the draft decision on Resource Adequacy Requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 17, 2005
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
|
|
Description:
on the draft decision on Resource Adequacy Requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 17, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on the draft decision on Resource Adequacy Requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 17, 2005
|
Filed By:
ORA/PAULL/PUC
|
|
Description:
opening; on ALJ Wetzell's draft decision on Resource Adequacy Requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 17, 2005
|
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
|
|
Description:
on the Proposed Decision of ALJ Wetzell on Resource Adequacy Requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 17, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on the Proposed Decision of ALJ Wetzell on Resource Adequacy Requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 17, 2005
|
Filed By:
SEMPRA GLOBAL
|
|
Description:
on the Proposed Decision of ALJ Wetzell on Resource Adequacy Requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 17, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
on Draft Decision of ALJ Wetzell on Resource Adequacy Requirements.
|
|
|
Type:
REPLY
|
Filing Date:
October 14, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to the Opposition of the County of Los Angeles to the Motion of the Joint
Parties to Strike testimony of the County of Los Angeles.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 12, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On October 7, 2005, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and
Electric Company (PG&E), met with Stephen St. Marie, advisor to Cmmr. Bohn, in
San Francisco. Also present were Claudia Greif, Manager, and Joe Lawlor,
Principal, Strategic Consulting, for PG&E. Jacobson stated that PG&E strongly
recommends that the Commission move expeditiously towards instituting a
multi-year Resource Adequacy Requirement (RAR). Lawlor asserted that the
proposed decision should be modified to explicitly state that Department of
Water Resources contracts are excluded from the adopted portfolio share
limitations for liquidated damages contracts. Greif explained that PG&E was
concerned over the exception rules that would be applied to determine whether
or not an LSE complied with the top-down RAR. Greif explained that reliance on
a system peak RAR was inconsistent with the Commission's resource planning
requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 11, 2005
|
Filed By:
SEMPRA GLOBAL
|
|
Description:
Reply; on capacity markets white paper.
|
|
|
Type:
RESPONSE
|
Filing Date:
October 11, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Comments on capacity markets white paper.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 11, 2005
|
Filed By:
ORA/PAULL/PUC
|
|
Description:
reply; on the Energy Division staff capacity markets white paper.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 11, 2005
|
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
|
|
Description:
reply.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 11, 2005
|
Filed By:
CALPINE CORPORATION
|
|
Description:
reply; on capacity markets white paper.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 11, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
reply; on the staff's capacity markets white paper.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 11, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; on the capacity markets white paper.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 11, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
reply; on the Energy Division's Capacity Markets White Paper.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 11, 2005
|
Filed By:
DUKE ENERGY NORTH AMERICA
|
|
Description:
reply; on Capacity Markets White Paper.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 11, 2005
|
Filed By:
MIRANT CALIFORNIA, LLC
MIRANT DELTA, LLC
MIRANT POTRERO, LLC
|
|
Description:
reply; on Capacity Markets White Paper.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 11, 2005
|
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
|
|
Description:
reply; on the Staff Capaicty Markets White Paper.
|
|
|
Type:
COMMENTS
|
Filing Date:
October 11, 2005
|
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
|
|
Description:
Reply; on Energy Division Capacity Markets White Paper.
|
|
|
Type:
MOTION
|
Filing Date:
October 7, 2005
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
RENEWABLES COALITION
|
|
Description:
to strike the testimony of Dr. Peter Fox-Penner submitted on behalf of PG&E and
Edison.
|
|
|
Type:
RULING
|
Filing Date:
October 5, 2005
|
Filed By:
ALJ/BROWN/HALLIGAN/PUC
|
|
Description:
Adopts the revised schedule, as follows: evidentiary hearing - 1/18 - 2/3,
2006; concurrent opening briefs - 3/3/06; concurrent responding briefs - 3/17/6.
|
|
|
Type:
RULING
|
Filing Date:
October 5, 2005
|
Filed By:
ALJ/BROWN/HALLIGAN/PUC
|
|
Description:
Denies a motion to strike filed by PG&E and SCE on September 9, 2005.
|
|
|
Type:
OPPOSITION
|
Filing Date:
October 4, 2005
|
Filed By:
COUNTY OF LOS ANGELES
|
|
Description:
to Motion to Strike testimony of the County of Los Angeles.
|
|
|
Type:
DRAFT DECISION
|
Filing Date:
September 27, 2005
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
comments not to exceed 15 pages are due 10/17, reply comments are due 5 days
after comments are filed.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 26, 2005
|
Filed By:
WILLIAMS POWER COMPANY, INC.
|
|
Description:
on Capacity Markets White Paper.
|
|
|
Type:
RESPONSE
|
Filing Date:
September 26, 2005
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
RENEWABLES COALITION
|
|
Description:
to Motion by PG&E and SoCal Edison Co., to Strike Portions of the Testimony of
the California Cogeneration Council, the Cogeneration Association of California
and the Renewables Coalition.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 26, 2005
|
Filed By:
SILICON VALLEY LEADERSHIP GROUP
|
|
Description:
concerning Capacity Markets White Paper.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on Capacity Markets White Paper.
|
|
|
Type:
MOTION
|
Filing Date:
September 23, 2005
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
to augment the record re: resource Adequacy Phase 2.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 23, 2005
|
Filed By:
WEST COAST POWER
|
|
Description:
On September 20, 2005, Greg Blue, representing West Coast Power, met with Julie
Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Stephen St.
Marie, advisor to Cmmr. Bohn, Sean Gallagher, Manuel Ramirez, and Kirk Bracht
of the Energy Division, and Brian Cragg, counsel, and Alan Comnes, for West
Coast Power. Brian Despard of West Coast Power participated in the meeting by
telephone. Written materials (attached to the notice) were used. Blue and
Comnes described how recent developments have created a potential for
reliability problems in Southern California for next year. Blue and Comnes
explained that West Coast Power was concerned that local reliability problems
could arise in Southern California during the first five months of 2006, and
possibly longer.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
CALIFORNIA ELECTRICITY OVERSIGHT BOARD
|
|
Description:
on the CPUC Energy Division Capacity Markets White Paper.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
ENERNOC
|
|
Description:
on Capacity Markets White Paper.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on the Energy Division's Capacity Markets White Paper "Don't Rush to
Judgement!" [in accordance with August 25, 2005 Ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
|
|
Description:
on Capacity Markets White Paper.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on the Energy Division Capacity Markets White Paper [in accordance with the
August 25, 2005 ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
MORGAN STANLEY CAPITAL GROUP INC.
|
|
Description:
on Staff Capacity Markets White Paper [in accordance with the August 25, 2005
ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
DUKE ENERGY NORTH AMERICA
|
|
Description:
on Capacity Markets White Paper [in accordance with the August 25, 2005 ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
ORA/PAULL/PUC
|
|
Description:
on the Energy Division Capacity Markets White Paper [in accordance with the
August 25, 2005 ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
WEST COAST POWER LLC
|
|
Description:
on CPUC Staff Capacity Markets White Paper [in accordance with the August 25,
2005 ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
on the Staff's Capacity Markets White Paper [in accordance with the August 25,
2005 ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
|
|
Description:
on the staff Capacity Markets White Paper [in accordance with the August 25,
2005 ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
MIRANT CALIFORNIA, LLC
MIRANT DELTA, LLC
MIRANT POTRERO, LLC
|
|
Description:
on Capacity Markets White Paper [in accordance with the August 25, 2005 ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
POWEREX CORP.
|
|
Description:
Addressing the Staff "Capacity Markets White Paper."
|
|
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
CALPINE CORPORATION
|
|
Description:
on Capacity Markets White Paper.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
on the CPUC's Capacity Markets White Paper.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
on the Capacity Markets White Paper.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
SEMPRA GLOBAL
|
|
Description:
on the Capacity Markets White Paper.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 23, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
on the Capacity Market White Paper.
|
|
|
Type:
RULING
|
Filing Date:
September 21, 2005
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Finds CARE eligible to claim an award of compensation.
|
|
|
Type:
OPPOSITION
|
Filing Date:
September 20, 2005
|
Filed By:
COUNTY OF LOS ANGELES
|
|
Description:
to Request of Joint Parties to Shorten Time and Allow Replies.
|
|
|
Type:
MOTION
|
Filing Date:
September 19, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Strike testimony of the County of Los Angeles and portions of the testimony
of the Cogeneration Association of California, and the Energy Producers and
Users Coalition; and Request for an Order Shortening time.
|
|
|
Type:
RULING
|
Filing Date:
September 19, 2005
|
Filed By:
ALJ/BROWN/HALLIGAN/PUC
|
|
Description:
Grants PG&E's motion for leave to file under seal and SCE's motion for
confidential treatment, filed on August 31, 2005, as set forth.
|
|
|
Type:
OPPOSITION
|
Filing Date:
September 14, 2005
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
to the Joint PG&E and SCE Motion to Shorten Time for Responses to Motion to
Strike Testimony.
|
|
|
Type:
RESPONSE
|
Filing Date:
September 13, 2005
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
RENEWABLES COALITION
|
|
Description:
to [PG&E and SCE's] Request for Order Shortening Time (and for Leave to File
Third Round Pleading).
|
|
|
Type:
COMMENTS
|
Filing Date:
September 9, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; re: Year-End Issues
|
|
|
Type:
MOTION
|
Filing Date:
September 9, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to strike portions of the testimony of the CCC, CAC, and the Renewables
Coalition; Request for an Order Shortening Time.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 9, 2005
|
Filed By:
MODESTO IRRIGATION DISTRICT
|
|
Description:
Reply; concerning potential Commission action on extension of QF contracts and
new QF contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 9, 2005
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
reply; re the need for immediate interim relief for cogeneration QFs.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 9, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; on interim measures addressing existing QF contracts expriring in 2006
and new QF contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 9, 2005
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
reply; on extending the five-year SO1 requirement.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 9, 2005
|
Filed By:
ORA/PELEO/PUC
|
|
Description:
reply; re interim treatment of expiring QF contracts.
|
|
|
Type:
RULING
|
Filing Date:
September 8, 2005
|
Filed By:
ALJ/BROWN/HALLIGAN/PUC
|
|
Description:
Revises schedule for serving Phase 2 rebuttal testimony.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 7, 2005
|
Filed By:
CALPINE CORPORATION
|
|
Description:
LATE FILED. On August 22, 2005, Steven S. Schleimer, Vice President of Market
and Regulatory Affairs, Calpine Corporation (Calpine), met with Stephen St.
Marie, advisor to Cmmr. Bohn, in San Francisco. Also present was Kenneth E.
Abreu, Director of Market Policy for Calpine. Schleimer and Abreu discussed the
need for an expeditious decision from the Commission establishing a strong and
effective resource adequacy program that addresses the linkage between
contractual commitments by load serving entities and corresponding obligations
of generators.
|
|
|
Type:
RULING
|
Filing Date:
September 7, 2005
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Grants CARE's Motion to Serve Opening Testimony One Day Late, filed on
September 1, 2005.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 7, 2005
|
Filed By:
CALPINE CORPORATION
|
|
Description:
On August 29, 2005, Steven S. Schleimer, Vice President of Market and
Regulatory Affairs, Calpine Corporation (Calpine), met with Stephen St. Marie,
advisor to Cmmr. Bohn, in San Francisco. Also present was Kenneth E. Abreu,
Director of Market Policy for Calpine. Schleimer and Abreu discussed the need
for an expeditious decision from the Commission establishing a strong and
effective resource adequacy program that addresses the linkage between
contractual commitments by load serving entities and corresponding obligations
of generators.
|
|
|
Type:
RESPONSE
|
Filing Date:
September 6, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
to Edsion's Motion to Strike.
|
|
|
Type:
MOTION
|
Filing Date:
September 1, 2005
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
to file opening testimony one day out of time.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
August 31, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Motion for Confidential Treatment of Data re: Expiring QF Contracts;
Confidential Materials Attached and Filed Under Seal, namely, Exhibit 1.
|
|
|
Type:
MOTION
|
Filing Date:
August 31, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
CONSTELLATION NEWENERGY
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
|
|
Description:
Joint; to Adopt Revised Protective Order.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
August 31, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
REDACTED PUBLIC VERSION. [UNREDACTED CONFIDENTIAL VERSION FILED UNDER SEAL]
Motion for Leave to File Confidential Information Under Seal, Namely Certain
Information Related to the Expiration of QF Contracts (ATTACHED).
|
|
|
Type:
MOTION
|
Filing Date:
August 26, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Clarify 09/19/05 ALJ Ruling on remaining Discovery Disputes.
|
|
|
Type:
RULING
|
Filing Date:
August 25, 2005
|
Filed By:
CALJ/MINKIN/PUC
|
|
Description:
re: capacity markets White Paper. Comments shall be filed/served by 9/23,
reply comments filed/served by 10/10.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 23, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
re: interim treatment for expiring and new contracts with Qualifying Facilities.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 23, 2005
|
Filed By:
MODESTO IRRIGATION DISTRICT
|
|
Description:
concerning potential commission action on extension of contracts and new QF
contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 23, 2005
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
on extending the 5-year SO1 Requirement.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 23, 2005
|
Filed By:
PSACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on Interim Measures addressing existing contracts expiring in 2006 and new QF
contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 23, 2005
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
re: the need for immediate interim relief for cogeneration qualifying
facilities.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 23, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
on expiring qualifying facility contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 23, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
concerning year end issues.
|
|
|
Type:
RULING
|
Filing Date:
August 19, 2005
|
Filed By:
ALJ/HALLIGAN/BROWN/PUC
|
|
Description:
on Remaining Discovery Disputes. Evidentiary hearing is set for October 26,
2005.
|
|
|
Type:
RESPONSE
|
Filing Date:
August 17, 2005
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
to supplemental comments [of August 12, 2005] regarding DWR gas supply plans.
|
|
|
Type:
NOTICE
|
Filing Date:
August 16, 2005
|
Filed By:
MODESTO IRRIGATION DISTRICT
|
|
Description:
of Association of Counsel.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 12, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on the need to maintain the confidentiality of DWR gas supply plans.
|
|
|
Type:
RESPONSE
|
Filing Date:
August 12, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
to the motion and supplemental testimony of CMTA.
|
|
|
Type:
COMMENTS
|
Filing Date:
August 12, 2005
|
Filed By:
ORA/PAULL/PUC
|
|
Description:
reply; on supplemental comments of the CAISO on resource adequacy issues.
|
|
|
Type:
SUPPLEMENTAL
|
Filing Date:
August 11, 2005
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
Notice of Intent to Claim Compensation.
|
|
|
Type:
NOTICE
|
Filing Date:
August 9, 2005
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
of intent to claim compensation.
|
|
|
Type:
MOTION
|
Filing Date:
August 8, 2005
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
for leave to file supplemental opening comments on the Commission Staff's
Resource Adequacy Workshop Report; Report attached.
|
|
|
Type:
MOTION
|
Filing Date:
August 3, 2005
|
Filed By:
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
|
|
Description:
for Leave to File Supplemental Comments: ATTACHED - Supplemental Comments.
|
|
|
Type:
RULING
|
Filing Date:
July 29, 2005
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
modifies Interagency Confidentiality Agreement as set forth in Appendix A.
|
|
|
Type:
RULING
|
Filing Date:
July 29, 2005
|
Filed By:
ALJ/HALLIGAN/PUC
|
|
Description:
setting PHC for 8/9/05 at 10 am.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 28, 2005
|
Filed By:
SILICON VALLEY LEADERSHIP GROUP
|
|
Description:
concerning Phase 2 Resource Adequacy Requirement Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 26, 2005
|
Filed By:
ORA/HINES/PUC
|
|
Description:
reply; on the Resource Adequacy (Phase 2) Workshop Report.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 26, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
On July 22, 2005, Mona Tierney, Director, Government Affairs, Constellation
NewEnergy, representing the Alliance for Retail Energy Markets (AReM), met with
Aaron Johnson, advisor to Cmmr. Grueneich, in San Francisco. Also present were
Jennifer Chamberlin, Market Manager, Regulatory Affairs, Strategic Energy,
L.L.C., and William Chen, Director of Governmental Affairs, Constellation New
Energy. The AReM representatives discussed issues related to R04-04-026.
Additionally, with regard to procurement-related issues, the top-down and
bottom-up methodologies were discussed. AReM urged the Commission to adopt the
bottom-up approach to RAR. AReM members also indicated that firm LD contracts
are flexible, tradable and provide reliable and economical power to meet LSE
loads.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 26, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
On July 21, 2005, Mona Tierney, Mona Tierney, Director, Government Affairs,
Constellation NewEnergy, representing the Alliance for Retail Energy Markets
(AReM), met with Julie Fitch, advisor to Cmmr. Peevey, and on July 22, 2005, -
with Aaron Johnson, advisor to Cmmr. Grueneich. Both meetings took place in San
Francisco. At the meeting with Aaron Johnson also present were Jennifer
Chamberlin, Market Manager, Regulatory Affairs, Strategic Energy, L.L.C., and
William Chen, Director of Governmental Affairs, Constellation New Energy,
representatives of AReM. The AReM representatives discussed issues related to
R04-04-026. Additionally, with regard to procurement-related issues, the
top-down and bottom-up methodologies were discussed. AReM urged the Commission
to adopt the bottom-up approach to RAR. AReM members also indicated that firm
LD contracts are flexible, tradable and provide reliable and economical power
to meet LSE loads.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 25, 2005
|
Filed By:
DUKE ENERGY NORTH AMERICA
|
|
Description:
reply; on Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 25, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
reply; on the Phase Two Resource Adequacy Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 25, 2005
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
reply; on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 25, 2005
|
Filed By:
CALPINE CORPORATION
|
|
Description:
reply; on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 25, 2005
|
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
|
|
Description:
reply.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 25, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
reply; on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 25, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 25, 2005
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
reply; on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 25, 2005
|
Filed By:
POWEREX CORP.
|
|
Description:
reply; on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 25, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
Reply; on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 25, 2005
|
Filed By:
SEMPRA GLOBAL
|
|
Description:
Reply; on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 25, 2005
|
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
ORA/
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
|
|
Description:
Joint; Reply; on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 25, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
July 15, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
(PUBLIC & CONFIDENTIAL VERSIONS) Resource Adequacy Load Forecast.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 14, 2005
|
Filed By:
CALIFORNIA ELECTRICITY OVERSIGHT BOARD
|
|
Description:
on the Resource Adequacy Phase 2 Workshop.
|
|
|
Type:
RULING
|
Filing Date:
July 14, 2005
|
Filed By:
ALJCAREW/PUC
|
|
Description:
Denies Constellation NewEnergy's Motion for Modification of June 24, 2005
interim protective order.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANYA
|
|
Description:
(PUBLIC & CONFIDENTIAL VERSIONS) on the Resource Adequacy Phase 2 Workshop
Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS AND TECHNOLOGY ASSOCIATION
|
|
Description:
on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
ORA/CPUC
|
|
Description:
on the June 10, 2005 Workshop Report on Phase 2 Resource Adequacy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
POWEREX CORP.
|
|
Description:
on the draft Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
MIRANT CALIFORNIA LLC
MIRANT DELTA LLC
MIRANT POTRERO LLC
WEST COAST POWER
|
|
Description:
joint; on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
FPL ENERGY, LLC
|
|
Description:
on the Second Resource Adequacy Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on Phase 2 Resource Adequacy Requirements Workshop Report on interim opinion
regarding resource adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
CALPINE CORPORATION
|
|
Description:
on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
DUKE ENERGY NORTH AMERICA
|
|
Description:
on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
|
|
Description:
on June 10, 2005 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
on Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
SEMPRA GLOBAL
|
|
Description:
on Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
APS ENERGY SERVICES
|
|
Description:
on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS AND TECHNOLOGY ASSOCIATION
ORA/
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
|
|
Description:
on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
STATE WATER CONTRACTORS
STATE WATER PROJECT
|
|
Description:
on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
on the Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
RESPONSE
|
Filing Date:
July 12, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
in opposition to the motion of Constellation NewEnergy to modify the interim
protective order.
|
|
|
Type:
RULING
|
Filing Date:
July 12, 2005
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Finds that Aglet Consumer Alliance is eligible for an award of intervenor
compensation.
|
|
|
Type:
MOTION
|
Filing Date:
July 11, 2005
|
Filed By:
CONSTELLATION NEWENERGY
|
|
Description:
for modification of June 24, 2005 Interim Protective Order and request for
expedited treatment.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 8, 2005
|
Filed By:
SOUTHERN CALIFORNIA WATER COMPANY
|
|
Description:
on Phase 2 RAR Workshop Report.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 29, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
On June 24, 2005, Katie Kaplan, Manager of State Policy Affairs, Independent
Energy Producers Association (IEPA), met with Stephen St. Marie, advisor to
Cmmr. Bohn, in San Francisco. Also present were Aaron Johnson, advisor to Cmmr.
Grueneich, Maryam Ebke, Acting Director of the Division of Strategic Planning,
Philippe Auclair, Advisor, Policy and Planning, who joined in by the telephone,
Brian Cragg, attorney for IEPA, and Brian Theaker of Williams, a member of
IEPA. Cragg noted that in the context of the Resource Adequacy Requirement, the
emphasis on capacity of the "top-down" approach would help ensure that power
was available to meet California's needs at times when capacity is tight, while
the "bottom-up" approach would be most vulnerable when capacity was in short
supply. Kaplan added that in other areas of the country, firm liquidated
damages contracts had in fact been liquidated at times of high demand. Theaker
noted that the payment of liquidated damages, rather than the actual delivery
of energy, was an express contractual remedy under firm liquidated damages
contracts, not a breach of these contracts. Theaker and Kaplan stated that the
emphasis of the Resource Adequacy Requirement should be on the recovery of the
fixed costs of generation resources, and California electricity markets as
currently structured would not produce prices that would cover the costs of
investing in new generation.
|
|
|
Type:
RULING
|
Filing Date:
June 24, 2005
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Directs load-serving entities to submit load data and adopts protective order.
|
|
|
Type:
RULING
|
Filing Date:
June 14, 2005
|
Filed By:
ALJ/HALLIGAN/PUC
|
|
Description:
Revises schedule for the filing of testimony and the joint evidentiary hearings
in R04-04-003 and R04-04-025 on policy and pricing of QFs: Joint outline for
testimony and briefs - August 3, 2005; evidentiary hearings September 19 -
October 7, 2005.
|
|
|
Type:
REQUEST
|
Filing Date:
June 13, 2005
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
for clarification on the allocation of power prucahse agreement of the City and
County of San Francisco within the Cal. Dept. of Water Resources.
|
|
|
Type:
RESPONSE
|
Filing Date:
June 13, 2005
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
to SDG&E's motion for bifurcation.
|
|
|
Type:
RULING
|
Filing Date:
June 10, 2005
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Providing Notice of Availability of Phase 2 Resource Adequacy Requirements
Workshop Report and Providing for Comments. Comments are due on July 8, 2005;
and replies to the comments - on July 18, 2005.
|
|
|
Type:
REPORT
|
Filing Date:
June 10, 2005
|
Filed By:
CALIFORNIA ENERGY COMMISSION
ENERGY/PUC
|
|
Description:
Resource Adequacy Phase 2 Workshop Report.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
June 9, 2005
|
Filed By:
CITY OF CORONA
MODESTO IRRIGATION DISTRICT
|
|
Description:
of D05-03-013.
|
|
|
Type:
OBJECTION
|
Filing Date:
June 6, 2005
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
to meeting.
|
|
|
Type:
MOTION
|
Filing Date:
June 3, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRC COMPANY
|
|
Description:
for an Order Shortening Time to Respond to Motion for Bifurcation.
|
|
|
Type:
MOTION
|
Filing Date:
June 3, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
for Bifurcation.
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
May 31, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Recommendations in Response to 04/21/05 ALJ Ruling re: Mohave Study Plan.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 27, 2005
|
Filed By:
WEST COAST POWER
|
|
Description:
On May 24, 2005, Greg Blue, representing West Coast Power, transmitted written
materials (attached to the notice) through electronic mail to Julie Fitch and
Peter Arth, advisors to Pres. Peevey, David Gamson, advisor to Cmmr. Brown,
Aaron Johnson and Therese Cho, advisors to Cmmr. Grueneich, Robert Lane and
Stephen St. Marie, advisors to Cmmr. Bohn, and Brian Prusnek, advisor to Cmmr.
Kennedy. The written communication concerned the conditions necessary to
stimulate private investment in electric generating facilities in California.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 27, 2005
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
On May 24, 2005, R. Thomas Beach, a consultant to the California Cogeneration
Council (CCC), met with Cmmr. Peevey in San Francisco. Also present were Julie
Fitch, advisor to Cmmr. Peevey, Barry Lovell, a member of the CCC, and Joseph
M. Karp of White & Case, LLP, counsel for the CCC. Written materials (attached
to the notice) were used. The CCC's representatives discussed the protective
order (PO) recently issued in this proceeding and explained that various
aspects of the PO are of concern to the CCC. CCC's representatives urged the
Commission to adopt long-term contracts for both qualifying facilities (QFs)
with expiring contracts and new QFs. CCC's representatives also urged the
Commission to consider adopting a fixed-price option for the utilities' energy
payments to QFs.
|
|
|
Type:
NOTICE
|
Filing Date:
May 26, 2005
|
Filed By:
AGLET CONSUMER ALLIANCE
|
|
Description:
of Intent to Claim Intervenor Compensation.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 25, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On May 23, 2005, Colin E. Cushnie, A Director of Regulatory Policy and Affairs
of Southern California Edison Company (SCE), met with Bob Lane, advisor to
Cmmr. Bohn, in San Francisco. Written materials (attached to the notice) were
used. Cushnie stated that all the workshop comments filed by the generation
community in support of the `Top Down' Resource Adequacy methodology explicitly
or implicitly call for the immediate creation of a bilaterally traded
capacity-only product for Load Serving Entities (LSEs) to procure to
demonstrate compliance with the Commission's adopted Resource Adequacy
requirements. Cushnie indicated that the immediate creation of a capacity-only
product without the centrally administered market structure and safeguards
found in the Eastern United States' capacity markets would expose customers and
LSEs to undue risk. Cushnie stated that SCE is not opposed to capacity markets
but urges that the Commission consider the creation of a capacity market in the
context of Assigned Commissioner Ruling on this issue.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 24, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On May 19, 2005, Colin 0, 2005, Colin E. Cushnie, Director of Regulatory Policy
and Affairs of Southern California Edison Company (SCE), met with Stephen St.
Marie, advisor to Cmmr. Bohn, in San Francisco. Also present were Sean
Gallagher, Director, and Judith Ikle, Supervisor, for the Energy Division.
Written materials (attached to the notice) were used. Cushnie stated that all
the comments filed by the generation community in support of the "Top Down"
Resource Adequacy methodology explicitly or implicitly call for the immediate
creation of a bilaterally traded capacity-only product for Load Serving
Entities (LSEs) to procure to demonstrate compliance with the Commission's
adopted Resource Adequacy requirements. Cushnie indicated that the immediate
creation of a capacity-only product without the centrally administered market
structure and safeguards found in the capacity markets of the Eastern United
Stated would expose customers and LSEs to undue risk. Cushnie further
identified several unresolved issues surrounding the potential adoption of a
capacity-only product.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 23, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on procurement incentives.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 23, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
On May 18, 2005, Steven Kelly, representing the Independent Energy Producers
Association (IEPA), met with David Gamson, advisor to Cmmr. Brow, in San
Francisco. Also present was Brian Cragg, representing IEPA. Written material
(attached to the notice) was used. Kelly expressed that IEPA feels the proposed
rulemaking to be considered at the Commission's May 26, 2005 meeting would be a
good forum to resolve the confidentiality issues. Cragg and Kelly emphasized
that there is an urgent need to resolve the confidentiality issues in the
procurement context.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 23, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On May 18, 2005, Colin E. Cushnie, Director of Regulatory Policy and Affairs of
Southern California Edison Company (SCE), met with Stephen St. Marie, advisor
to Cmmr. Bohn, in San Francisco. Written materials (attached to the notice)
were used. Cushnie stated that all the comments filed by the generation
community in support of the "Top Down" Resource Adequacy methodology explicitly
or implicitly call for the immediate creation of a bilaterally traded
capacity-only product for Load Serving Entities (LSEs) to procure to
demonstrate compliance with the Commission's adopted Resource Adequacy
requirements. Cushnie indicated that the immediate creation of a capacity-only
product without the centrally administered market structure and safeguards
found in the capacity markets of the Eastern United Stated would expose
customers and LSEs to undue risk. Cushnie further identified several unresolved
issues surrounding the potential adoption of a capacity-only product. Cushnie
also highlighted the numerous mischaracterizations that were expressed by the
generation community regarding the merits and mechanics of the "Bottom-Up"
methodology that SCE and the Joint Parties sponsored.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 23, 2005
|
Filed By:
UNION OF CONCERNED SCIENTISTS
|
|
Description:
reply; post-workshop.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 23, 2005
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC. (CARE)
|
|
Description:
reply; on the procurement incentive framework workshop held on March 7th and
8th 2005.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 23, 2005
|
Filed By:
GREEN POWER INSTITUTE
|
|
Description:
Reply; on a procurement incentive framework for GHG reduction.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 23, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
reply; on the procurement incentive framework workshop report.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 23, 2005
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
reply, post-workshop; on a procurement incentive framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 23, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply, post-workshop; on procurement incentive frameworks.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 20, 2005
|
Filed By:
HOPI TRIBE
|
|
Description:
On May 19, 2005, James I. Ham of Arnold & Porter LLC, attorneys for the Hopi
Tribe, mailed a written a written communication (attached to the notice) to
Cmmrs. Peevey, Brown, Kennedy, Grueneich, and Bohn, to ALJ Brown, to Julie
Fitch and Rami Kahlon, advisors to Cmmr. Peevey, David Gamson, advisor to Cmmr.
Brown, Theresa Cho, advisor to Cmmr. Grueneich, Amy Yip-Kikugawa, and Steve St.
Marie, of the Commission.
|
|
|
Type:
RULING
|
Filing Date:
May 18, 2005
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
On Second Notice of Intent to Claim Compensation of UCAN. Finds that UCAN
remains eligible for an award of intervenor compensation.
|
|
|
Type:
RULING
|
Filing Date:
May 18, 2005
|
Filed By:
ALJ/YACKNIN/PUC
|
|
Description:
Grants withdrawal of Motion to Compel filed by ORA on May 12, 2005.
|
|
|
Type:
MOTION
|
Filing Date:
May 12, 2005
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
to withdraw the Motion to Compel PG&E to respond to data requests on Adivce
Letter 2619-E.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 9, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On May 4, 2005, Dan Richard, Senior Vice President for Policy and Governmental
Affairs, Pacific Gas and Electric Company (PG&E), met with Pres. Peevey in San
Francisco. Also present were Rami Kahlon, advisor to Pres. Peevey, Brian
Prusnek, advisor to Cmmr. Kennedy, Sean Gallagher, Director, Energy Division,
and Fong Wan, Vice President, Power Contracts and Electric Resource
Development, Frank De Rosa, Director, Power Contracts, and Erik Jacobson,
Chief, Regulatory Relations, for PG&E. Written material (attached to the
notice) was used. Richard stated that while qualifying facilities (QFs) are an
important part of PG&E's resource mix, their cost exceeds the cost of PG&E's
other procurement options. Richard indicated that the Commission's Short-Run
Avoided Cost (SRAC) methodology is outdated and not well correlated to PG&E's
true avoided cost. Wan said that day-ahead, NP-15 firm market prices are an
appropriate measure of PG&E's true SRAC. Richard explained that QFs with
expiring contracts should compete in PG&E's all-source solicitations and that
this will reduce QF capacity prices to market levels. Wan and De Rosa stated
that there is a large amount of existing and proposed electric supply available
at competitive prices.
|
|
|
Type:
RULING
|
Filing Date:
May 9, 2005
|
Filed By:
ALJ/HALLIGAN/THORSON/PUC
|
|
Description:
on Protective Order and Remaining Discovery Disputes. Issues the protective
order. Sets evidentiary hearings for Phase 2 for August 15, 2005.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 3, 2005
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC. (CARE)
|
|
Description:
on the procurement incentive framework workshop held on March 7th and 8th as
prepared by the CPUC workshop staff, March 29, 2005.
|
|
|
Type:
MOTION
|
Filing Date:
May 3, 2005
|
Filed By:
UNION OF CONCERNED SCIENTISTS
|
|
Description:
to accept filing of comments one day late; post-workshop opening comments on
procurement incentive framework workshop report attached.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 2, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
post-workshop; on procurement incentives.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 2, 2005
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
opening; on the workshop report on procurement incentive framework [pursuant to
the April 21, 2005 ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
May 2, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
post-hearing; on procurement incentive frameworks.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 2, 2005
|
Filed By:
GREEN POWER INSTITUTE
|
|
Description:
on a procurement incentive framework for GHG reduction.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 2, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on the procurement incentive framework workshop report.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 2, 2005
|
Filed By:
DUKE ENERGY NORTH AMERICA
|
|
Description:
on the procurement incentive framework workshop report.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 2, 2005
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
[Joint] on the procurement incentives framework workshop report.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 2, 2005
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
pre-workshop; on a procurement incentive framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 2, 2005
|
Filed By:
SOLARGENIX ENERGY, LLC
|
|
Description:
on the Procurement Incentive Framework Workshop held March 7 - 8, 2005 etc.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 2, 2005
|
Filed By:
SEMPRA GLOBAL
|
|
Description:
on the procurement incentive framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 2, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
on Workshop Report and in response to ALJ Ruling.
|
|
|
Type:
REPLY
|
Filing Date:
April 26, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
to the motion for clarification of the application of D04-12-048 to utility
RFOs.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 25, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On April 20, 2005, Gary L. Schoonyan, Director, Regulatory Policy and Affairs,
Southern California Edison Company (SCE), met with Pres. Peevey in San
Francisco. Also present were Julie Fitch, advisor to Pres. Peevey, and Colin E.
Cushnie, Director of Regulatory Policy and Affairs for SCE. Written material
(attached to the notice) was used. SCE representatives discussed Pres. Peevey's
January 28, 2005 ruling and indicated that SCE supported the proposed
reallocation. Additionally, SCE's representatives explained that the
Commission's current cost allocation methodology for the Department of Water
Resources (DWR) power charges would ensure that each IOU's customers would
continue to receive their allocated share of the above-market costs associated
with the DWR contracts. SCE also explained that it would not oppose a
reallocation of the Sunrise Power Company contract to SCE's customers. SCE also
offered a second alternative proposal in which the Sempra contract would be
allocated to San Diego Gas & Electric Company's customers and all of the
Williams contract would be allocated to SCE's customers.
|
|
|
Type:
MOTION
|
Filing Date:
April 25, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
re limited operational responsibility for the California Department of Water
Resources' Kings River Conservation District contract.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 22, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On April 19, 2005, Brian Cherry, Director of Regulatory Relations for Pacific
Gas and Electric Company (PG&E), met with Pres. Peevey in San Francisco. Also
present were Roy Kuga, Vice President, Gas and Electric Procurement, Policy and
Planning, and Erik Jacobson, Chief, Regulatory Relations, for PG&E. Written
material (attached to the notice) was used. Cherry stated that PG&E would
support a swap of the Williams D and Sempra contracts between Southern
California Edison Company and San Diego Gas & Electric Company to the extent
there are operational benefits in such a swap and as long as the Sunrise
contract is not reallocated to PG&E. Kuga stated that the cost allocation issue
has already been resolved and the Commission should not modify its cost
allocation approach. Kuga said that PG&E would also support a decision not to
reallocate any of the Department of Water Resources contracts.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 22, 2005
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
to the motion of IEPA for clarification of the application of D04-12-048 to
utility RFOs.
|
|
|
Type:
MOTION
|
Filing Date:
April 22, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Strike Portions of the Reply Comments of Sempra Global.
|
|
|
Type:
RULING
|
Filing Date:
April 21, 2005
|
Filed By:
ALJ/CAREW/PUC
|
|
Description:
Grants extension of time to file post-workshop comments on procurement
incentive framework: opening comments are due May 2, 2005, and reply comments
are due May 23, 2005.
|
|
|
Type:
RULING
|
Filing Date:
April 21, 2005
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Re: Mohave Study Plan.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 20, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Motion for clarification of D04-12-048.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 20, 2005
|
Filed By:
CALPINE CORPORATION
|
|
Description:
in support of the IEPA's motion for clarification.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 20, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to Motion of IEPA for clarification.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 20, 2005
|
Filed By:
WESTERN POWER TRADING FORUM
|
|
Description:
to Motion for clarification of the application of D04-12-048 to utility RFOs;
request to shorten time and for expedited consideration.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 19, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
|
|
Description:
On April 14, 2005, Ed Guiles, Chairman and Chief Executive Officer of San Diego
Gas & Electric Company (SDG&E) and Southern California Gas Company (SoCalGas),
met with Pres. Peevey in San Francisco. Julie Fitch, advisor to Pres. Peevey,
attended the meeting via videoconference. Also present were Debbie Reed,
President and Chief Operational Officer, and Lee Schavrien, Vice President of
Regulatory Affairs, for SDG&E and SoCalGas. Guiles discussed the January 28,
2005 ruling regarding potential reallocation of the existing Department of
Water Resources (DWR) contracts, including the possible reallocation of the
Sempra Generation contract to Southern California Edison Company. Guiles
explained that SDG&E opposes this allocation. Reed described SDG&E's
`minimalist' alternative allocation proposal. Schavrien added that SDG&E's
minimalist proposal would resolve several issues in this docket as well as the
DWR cost allocation proceeding.
|
|
|
Type:
REPLY
|
Filing Date:
April 18, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
to responses to Petition for Modification of D04-12-048.
|
|
|
Type:
COMMENTS
|
Filing Date:
April 15, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Reply; on allocation of certain DWR contracts.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 15, 2005
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
to proposed alternatives on allocation of certain Dept. of Water Resources
Contracts [pursuant to January 28th and April 8th rulings].
|
|
|
Type:
MOTION
|
Filing Date:
April 15, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
for clarification of the application of D04-12-048 to utility RFOs; request to
shorten time and for expedited consideration.
|
|
|
Type:
COMMENTS
|
Filing Date:
April 15, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; on reallocation of the Cal. Dept. of Water Resources power contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
April 15, 2005
|
Filed By:
SEMPRA GLOBAL
|
|
Description:
Reply; on the ACR re: the Sempra, Williams, King River, City and County of S.F.
and Sunrise DWR Contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
April 15, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on the allocation of certain California DWR contracts.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 14, 2005
|
Filed By:
SEMPRA GLOBAL
|
|
Description:
On April 12, 2005, Mark Snell, President of Sempra Global (Global), met with
Pres. Peevey, in San Francisco. Also present were Julie Fitch, advisor to Pres.
Peevey, and Alvin S. Pak, Director of State Regulatory Affairs for Global. The
representatives of Global discussed the assigned Commissioner's ruling of
January 28, 2005. The representatives of Global indicated that reallocation of
the SG-CDWR contracts to San Diego Gas & Electric Company (SDG&E) could pose
several operational issues and burdens for SDG&E that Edison, because of its
much greater size in relation to the scale of the contract, did not face. The
representatives of Global explained that while these issues and burdens could
potentially be resolved, it did not appear to Global that any economic benefits
would accrue to ratepayers, the utilities or the state from reallocation, in
any event.
|
|
|
Type:
NOTICE
|
Filing Date:
April 13, 2005
|
Filed By:
WOMEN'S ENERGY MATTERS
|
|
Description:
of intent to claim compensation in CEC's 2005 integrated energy policy report
process and CPUC's 2006 procurement proceedings.
|
|
|
Type:
NOTICE
|
Filing Date:
April 12, 2005
|
Filed By:
GREEN POWER INSTITUTE
|
|
Description:
Supplemental; of Intent to Claim Compensation.
|
|
|
Type:
NOTICE
|
Filing Date:
April 12, 2005
|
Filed By:
UNION OF CONCERNED SCIENTISTS
|
|
Description:
Supplemental Notice of Intent to Claim Compensation.
|
|
|
Type:
REPLY
|
Filing Date:
April 11, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to the response of the Western Power Trading Forum to the Petition for
Modification of D04-12-048.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 11, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
to petition of TURN for modification of D04-10-035
|
|
|
Type:
COMMENTS
|
Filing Date:
April 8, 2005
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
reply; on the Assigned Commissioner's Ruling placing consideration of certain
Department of Water and Power contracts.
|
|
|
Type:
NOTICE
|
Filing Date:
April 8, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
supplemental; of intent to claim compensation for work in the CEC's 2005 IEPR
process.
|
|
|
Type:
COMMENTS
|
Filing Date:
April 8, 2005
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
reply; on the allocation of the power purchase agreement with the Cal. Dept. of
Water Resources to PG&E. [Pursuant to the January 28, 2005 ruling].
|
|
|
Type:
RULING
|
Filing Date:
April 7, 2005
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Sets additional workshops for resource adequacy requirements - Phase 2.
Specifies that straw proposals should not be filed with the Docket Office.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 6, 2005
|
Filed By:
WESTERN POWER TRADING FORUM
|
|
Description:
to IEPA Petition for Modification of Decision 04-12-048.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 6, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to IEPA Petition for Modification of Decision 04-12-048.
|
|
|
Type:
RESPONSE
|
Filing Date:
April 5, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to the Petition of IEPA for modification of D04-12-048.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 4, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On March 30, 2005, Glenn Goldbeck, Energy Trading Consultant for Pacific Gas
and Electric Company, participated in an all-party meeting with Pres. Peevey in
San Francisco. Also present were other attendees listed on the attachment to
the notice. Goldbeck stated that the all-hours requirement should be
established at 115 percent - 117 percent for each hour. Goldbeck indicated that
under the proposal, sufficient resources will be available to assure
operational reliability. Goldbeck stated that it was important to recognize
that the development of appropriate LSE portfolios is guided by a number of
existing Commission orders.
|
|
|
Type:
RULING
|
Filing Date:
April 4, 2005
|
Filed By:
ALJ/GOTTSTEIN/PUC
|
|
Description:
Solicits post-workshop comments on procurement incentive framework. Opening
Comments are due April 25, 2005; Reply Comments - May 16, 2005.
|
|
|
Type:
MOTION
|
Filing Date:
April 4, 2005
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
for leave to file comments out of time; public comments on the limited
extension of the Commission's intervenor compensation program to participate in
certain proceedings of the California Energy Commission [per the March 14, 2005
ruling] included.
|
|
|
Type:
EXPARTE
|
Filing Date:
April 4, 2005
|
Filed By:
CORAL POWER, L.L.C.
|
|
Description:
On March 30, 2005, John Leslie, an attorney for Coral Power, L.L.C.,
participated in an all-party meeting with Cmmr. Peevey in San Francisco. A list
of the other participants is attached to the notice. Leslie discussed the March
7 draft decision of ALJ Wetzell. Leslie stated that based upon the overview of
the joint proposal, Coral generally supports the joint proposal and is
interested in working with parties to develop the details of the proposal.
Leslie also stated that it is important that the Commission adopt a forward
contract obligation for LSEs that recognizes the value and the benefit of firm
liquidated damages contracts and limited use resources.
|
|
|
Type:
COMMENTS
|
Filing Date:
April 1, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
reply; on the assigned Commissioner's ruling re coordination with the CEC's
2005 IEPR process.
|
|
|
Type:
NOTICE
|
Filing Date:
April 1, 2005
|
Filed By:
UNION OF CONCERNED SCIENTISTS
|
|
Description:
of Substitution.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 30, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
reply; on the assigned Commissioner's ruling re coordination with the CEC's
2005 IEPR process.
|
|
|
Type:
RESPONSE
|
Filing Date:
March 30, 2005
|
Filed By:
WESTERN POWER TRADING FORUM
|
|
Description:
to PG&E's Petition for Modification of D.04-12-048.
|
|
|
Type:
RESPONSE
|
Filing Date:
March 30, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
to PG&E's petition for modification of D04-12-048.
|
|
|
Type:
RESPONSE
|
Filing Date:
March 30, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
to the petitions for modification of D04-12-048 filed by PG&E and IEP with
respect to the treatment of utility-owned generation.
|
|
|
Type:
REPLY
|
Filing Date:
March 30, 2005
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
to PG&E's response to the motion to compel responses to data requests on Advice
Letter 2619-E.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 29, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
On March 24, 2005, Mona Tierney, Director of Government Affairs of
Constellation NewEnergy, Inc., representing the Alliance for Retail Energy
Markets (AReM), met with Julie Fitch, advisor to Cmmr. Peevey, in San
Francisco. Tierney discussed the assigned Commissioner's Ruling dated March 14,
2005. Tierney articulated AReM's concerns that the Ruling represented an
inappropriate expansion of the current application of intervenor funding from
CPUC to CEC processes. Tierney stated that CEC has developed the Integrated
Energy Policy Report with significant public participation and without the need
for intervenor compensation. Tierney noted further that information that is
provided in response to CEC requests is considered confidential.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 29, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On March 24, 2005, Erik Jacobson, Chief of Regulatory Relations of Pacific Gas
and Electric Company (PG&E), met with Julie Fitch, advisor to Pres. Peevey, in
San Francisco. Also present were Claudia Greif, Manager, GES Strategic
Consulting, and Mary Gandesbery, Attorney, for PG&E. Jacobson sated that the
planning reserve requirement should be 15-17 percent of the load in each hour
of the month and not 15-17 percent of the monthly peak load. Greif explained
why a monthly peak load requirement applied to all hours of the month could
negatively impact the value of PG&E's hydroelectric resources, exchanges and
imports.
|
|
|
Type:
MOTION
|
Filing Date:
March 28, 2005
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
for leave to file out of time comments on the allocation of power purchase
agreement with the Cal. Department of Water Resources; comments included.
|
|
|
Type:
RULING
|
Filing Date:
March 28, 2005
|
Filed By:
ALJ/GOTTSTEIN/PUC
|
|
Description:
denies CARE's Notice of Intent to claim compensation and Motion to Intervene
Out of Time.
|
|
|
Type:
RESPONSE
|
Filing Date:
March 28, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to the March 16, 2005 motion of ORA for an order compelling PG&E to respond to
data requests, etc.
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
March 25, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
(PUBLIC & CONFIDENTIAL VERSIONS) Long-term resource plan Compliance Filing.
|
|
|
Type:
NOTICE
|
Filing Date:
March 25, 2005
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
supplemental notice of intent to claim compensation for work in the CEC's 2005
IEPR Process.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 25, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On March 22, 2005, Bruce C. Foster, Vice President of Regulatory Operations of
Southern California Edison Company (SCE), met with Julie Fitch, advisor to
Pres. Peevey, in San Francisco. Also present were Brian Prusnek, advisor to
Cmmr. Kennedy, David Gamson, advisor to Cmmr. Brown, Aaron Johnson, advisor to
Cmmr. Grueneich, Laura Doll, Sean Gallagher, Kerry Hattevik, Steve St. Marie,
Bob Lane, Phillippe Auclair, and Maryam Ebke, of the Commission, and Colin E.
Cushnie, Director of Regulatory Affairs, and Gary Schoonyan, Director of
Regulatory Policy, for SCE. Written material (attached to the notice) was used.
SCE representatives discussed the draft decision and expressed SCE's concern
that requiring load serving entities to maintain reserves levels equal to 15-17
percent of the amount required to meet a monthly peak, in every hour of a
month, is unnecessary to ensure reliability and is not cost effective. SCE
stated further that if the Commission decided that an all-hours resource
adequacy requirement was necessary, the appropriate level of reserves would be
an amount equal to 15-17 percent of each hour's load.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 25, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on Assigned Commissioner's Ruling re: Coordination with the CEC's 2005 IEPR
Process.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 25, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
concerning the Assigned Commissioner's Ruling re: the Integrated Energy Policy
Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 25, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on Assigned Commissioner's Ruling detailing how the CEC 2005 Integrated Energy
Policy Report will be used etc.
|
|
|
Type:
REPLY
|
Filing Date:
March 24, 2005
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
to Response of Independent Energy Producers Association to C.A.R.E.'s Notice of
Intent.
|
|
|
Type:
RULING
|
Filing Date:
March 23, 2005
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Re: Schedule for Motions on Mohave Feasibility Final Study Plan (FSP). Sets
the following schedule: March 31, 2005 - deadline for any stakeholder motions
re: FSP; April 1, 2005 - deadline for any responses to motions filed March 31,
2005.
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
March 21, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Final Study Plan for Mohave Alternatives/Complements Study.
|
|
|
Type:
RESPONSE
|
Filing Date:
March 21, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
to CARE's notice of intent.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 18, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on Allocation of Certain California Department of Water Resources Contracts.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 18, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On March 15, 2005, Bruce C. Foster, vice president of regulatory operations of
Southern California Edison Company (SCE), met with David Gamson, advisor to
Cmmr. Brown, in San Francisco. Also present was Colin E. Cushnie, director of
regulatory policy of SCE. Written materials (attached to the notice) were used.
SCE¿s representatives discussed the Second Interim Opinion Regarding Resource
Adequacy (DD). SCE stated that the DD had not considered the considerable cost
involved in requiring load serving entities to acquire and maintain capacity at
a level equal to or greater than 115 percent of the peak hour in each month.
SCE stated that if an "all hours" requirement is to be adopted, it should be
115 percent to 117 percent of each hour in the month, and not the peak hour in
the month. SCE reiterated its position that the DD has not justified a change
from the peak resource adequacy requirement adopted in D04-10-035.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 18, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On March 16, 2005, Bruce C. Foster, vice president of regulatory operations of
Southern California Edison Company (SCE), met with Julie Fitch, advisor Pres.
Peevey, in San Francisco. Also present was Colin E. Cushnie, director of
regulatory policy of SCE. Written materials (attached to the notice) were used.
SCE's representatives discussed the Second Interim Opinion Regarding Resource
Adequacy (DD). SCE stated that the DD had not considered the considerable cost
involved in requiring load serving entities to acquire and maintain capacity at
a level equal to or greater than 115 percent of the peak hour in each month.
SCE stated that if an "all hours" requirement is to be adopted, it should be
115 percent to 117 percent of each hour in the month, and not the peak hour in
the month. SCE reiterated its position that the DD has not justified a change
from the peak resource adequacy requirement adopted in D04-10-035.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 18, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on the reallocation of the California Department of Water Resources power
contracts [pursuant to the January 28, 2005 ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
March 18, 2005
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
on the allocation of its power purchase agreement with the California
Department of Water Resources to PG&E [pursuant to the January 28, 2005 ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
March 18, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
and Alternative Proposal on Allocation of Certain Department of Water Resources
Contracts.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 17, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On March 14, 2005, Bruce C. Foster, vice president of regulatory operations of
Southern California Edison Company (SCE), met with Brian Prusnek, advisor to
Cmmr. Kennedy, in San Francisco. Colin E. Cushnie, director of regulatory
policy of SCE, participated in the meeting via telephone. Follow-up email note
and documents (attached to the notice) were transmitted to Brian Prusnek. SCE's
representatives discussed the Second Interim Opinion Regarding Resource
Adequacy (DD). SCE stated that the DD had not considered the considerable cost
involved in requiring load serving entities to acquire and maintain capacity at
a level equal to or greater than 115 percent of the peak hour in each month.
SCE stated that if an "all hours" requirement is to be adopted, it should be
115 percent to 117 percent of each hour in the month, and not the peak hour in
the month. SCE reiterated its position that the DD has not justified a change
from the peak resource adequacy requirement adopted in D04-10-035.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 16, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On March 11, 2005, Bruce C. Foster, vice president of regulatory operations of
Southern California Edison Company (SCE), met with Brian Prusnek, advisor to
Cmmr. Kennedy, in San Francisco. Foster discussed the Second Interim Opinion
Regarding Resource Adequacy (DD). Foster stated that the DD had not considered
the considerable cost involved in requiring load serving entities to acquire
and maintain capacity at a level equal to or greater than 115 percent of the
peak hour in each month. SCE stated that if an "all hours" requirement is to be
adopted, it should be 115 percent to 117 percent of each hour in the month, and
not the peak hour in the month. SCE reiterated its position that the DD has not
justified a change from the peak resource adequacy requirement adopted in
D04-10-035.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
March 16, 2005
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
Motion for an order compelling PG&E to respond to data requests on Advice
Letter 2619-E.
|
|
|
Type:
EXPARTE
|
Filing Date:
March 15, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
On March 10, 2005, Jennifer Chamberlin, Market Manager, Regulatory Affairs,
Strategic Energy, L.L.C., representing the Alliance for Retail Energy Markets
(AReM), met with Julie Fitch, advisor to Cmmr. Peevey, in San Francisco. Also
present were David Gamson, advisor to Cmmr. Brown, and Bill Chen, Director of
Governmental Affairs, Constellation NewEnergy, Inc., and Sue Mara, Principal,
RTO Advisors, APS Energy Services, Inc., on behalf of AReM. The AReM
representatives discussed the draft decision (DD) of ALJ Wetzell modifying the
Order Instituting Rulemaking to name electric service providers (ESPs) and
community choice aggregators (CCAs) as respondents. AReM representatives stated
that it would be filing comments recommending that the Commission reject the DD
and administer resource adequacy requirements for ESPs through the existing ESP
registration/licensing framework. AReM representatives stated that, in the
event the Commission determines that ESPs and CCAs should be named as
respondents, AReM recommends that the Commission open a separate, narrowly
defined proceeding for that purpose. AReM representatives also stressed the
need for protection of confidential data submitted by ESPs. AReM
representatives discussed the Draft Second Interim Opinion Regarding Resource
Adequacy, stating that an all-hours resource adequacy requirement is not
needed. AReM also stated that it should be made clear that LSEs are not
required to procure resources beyond what is needed to serve their loads plus
15 percent to 17 percent reserves.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 14, 2005
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
on Edison's Initial Sturdy Plan for Mohave Alternatives Study/Complements Study.
|
|
|
Type:
RULING
|
Filing Date:
March 14, 2005
|
Filed By:
COMR/PEEVEY/PUC
|
|
Description:
comments on the CEC 2005 IEPR issues due 3/25; replies due 3/31. Notice of
intent to claim compensation due 4/13 to be served on parties & CEC. Responses
are subject to Section 1804(a).
|
|
|
Type:
NOTICE
|
Filing Date:
March 14, 2005
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
of Intent to Claim Compensation.
|
|
|
Type:
MOTION
|
Filing Date:
March 14, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
to Accept Comments one day late: ATTACHED - Comments on the Draft Decision of
ALJ Wetzell.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2005
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
CITY OF CHULA VISTA
COUNTY OF LOS ANGELES
LOCAL GOVERNMENT COMMISSION COALITION
|
|
Description:
on Draft Decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2005
|
Filed By:
ORA/PAULL/PUC
|
|
Description:
Supplemental; on ALJ Wetzell's March 7 Draft Decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on ALJ Wetzell's March 7 Draft Decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2005
|
Filed By:
WEST COAST POWER
|
|
Description:
on ALJ Wetzell's March 7 Draft Decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
on ALJ Wetzell's March 7 Draft Decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on Draft Decision modifying OIR.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2005
|
Filed By:
BP ENERGY COMPANY
|
|
Description:
on Draft Decision modifying OIR.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on Draft Decision modifying OIR.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2005
|
Filed By:
DUKE ENERGY NORTH AMERICA
|
|
Description:
on Draft Second Interim Opinion re: Resource Adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2005
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
on Second Interim Opinion re: Resource adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2005
|
Filed By:
SEMPRA GLOBAL ENTERPRISES
|
|
Description:
on Draft Decision of ALJ Wetzell.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2005
|
Filed By:
SEMPRA GLOBAL ENTERPRISES
|
|
Description:
on the Draft Decision of ALJ Wetzell - Second Interim Opinion re: Resource
Adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETING
CALIFORNIA AMANUFACTURERS & TECHNOLOGY ASSOCIATION
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
ORA
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
|
|
Description:
Opening; on Draft Second Interim Opinion re: Resource Adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 11, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on Draft opinion modifying OIR.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
March 10, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
of D04-10-035.
|
|
|
Type:
RULING
|
Filing Date:
March 10, 2005
|
Filed By:
ALJ/GOTTSTEIN/PUC
|
|
Description:
on scope and agenda for procurement incentive framework workshops.
|
|
|
Type:
COMMENTS
|
Filing Date:
March 8, 2005
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
in support of the draft opinion modifying OIR.
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
March 7, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Initial study plan for Mohave Alternatives/Complements Study.
|
|
|
Type:
DRAFT DECISION
|
Filing Date:
March 7, 2005
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Second Interim Opinion Regarding Resource Adequacy. Comments are due March 11,
2005; no reply comments will be entertained.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
March 7, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
of D04-12-048.
|
|
|
Type:
MOTION
|
Filing Date:
March 7, 2005
|
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
|
|
Description:
to intervene out of time.
|
|
|
Type:
REPLY
|
Filing Date:
March 4, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Responses to Petition for Modification of Decision 04-12-048.
|
|
|
Type:
DRAFT DECISION
|
Filing Date:
March 2, 2005
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Opinion Modifying Order Instituting Rulemaking. Comments are due March 11,
2005; no reply comments willl be entertained.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 28, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS AND TECHNOLOGY ASSOCIATION
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
|
|
Description:
Joint; Reply on ACR
|
|
|
Type:
RULING
|
Filing Date:
February 28, 2005
|
Filed By:
CMMR/PEEVEY/PUC
|
|
Description:
Providing Guidance on Next Steps for Potential Capacity Market Development.
|
|
|
Type:
REPLY
|
Filing Date:
February 28, 2005
|
Filed By:
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
|
|
Description:
to opposition of PG&E to petition for modification of D04-12-048.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
February 28, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
for modification of D04-12-048.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 28, 2005
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
reply; on the February 8, 2005 ruling re forward commitment obligations for
resource adequacy requirement.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 28, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply;
|
|
|
Type:
COMMENTS
|
Filing Date:
February 28, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
reply; on the assigned Commissioner's ruling re modification to the interim
resource adequacy requirements decision D04-10-035.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 28, 2005
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
reply; on modification to the interim resource adequacy requirements decision
D04-10-035.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 28, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
supplemental; reply; re the February 8th ACR.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 25, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
reply; on procurement incentive mechanisms.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 25, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
reply; pre-workshop; on procurement incentive frameworks.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 25, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; pre-workshop; on procurement incentive frameworks.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 25, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
reply; pre-workshop; on procurement incentive frameworks.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 18, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS AND TECHNOLOGY ASSOCIATION
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
|
|
Description:
Joint; on ACR regarding Modification to the Interim Resource Adequacy
Requirements of Decision 04-10-035.
|
|
|
Type:
SCOPING RULING
|
Filing Date:
February 18, 2005
|
Filed By:
CMMR/PEEVEY/KENNEDY/PUC
|
|
Description:
Consolidates R04-04-003 and R04-04-025 for the limited purpose of joint
evidentiary hearing on policy and pricing of QFs. Sets the evidentiary hearing
for May 2-20, 2005.
|
|
|
Type:
RESPONSE
|
Filing Date:
February 18, 2005
|
Filed By:
CALIFORNIA RETAILERS ASSOCIATION
|
|
Description:
to Edison's petition for modification of D04-12-048.
|
|
|
Type:
RESPONSE
|
Filing Date:
February 18, 2005
|
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS AND TECHNOLOGY ASSOCIATION
|
|
Description:
joint; in oppositition to Edison's petition for modification of D04-12-048.
|
|
|
Type:
RESPONSE
|
Filing Date:
February 18, 2005
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
to the petition for modification of D04-12-048 filed by Edison.
|
|
|
Type:
RESPONSE
|
Filing Date:
February 18, 2005
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
to Edison's petition for modification of D04-12-048.
|
|
|
Type:
RESPONSE
|
Filing Date:
February 18, 2005
|
Filed By:
SEMPRA GLOBAL
|
|
Description:
to ACR on Modification to the Interim Resource Adequacy Requirements Decision
D04-10-035.
|
|
|
Type:
RESPONSE
|
Filing Date:
February 18, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
WESTERN POWER TRADING FORUM
|
|
Description:
Joint; to Edison's Petition for Modification of Decision 04-12-048.
|
|
|
Type:
REQUEST
|
Filing Date:
February 18, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
for award of compensation for substantial contribution to D04-07-038,
D04-10-035, D04-12-048, D04-12-051, Resolutions E-3902 and E-3896, and
participation in utility procurement review groups.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 18, 2005
|
Filed By:
POWEREX CORP.
|
|
Description:
re the forward commitment obligation and related modification of D04-10-035 [in
accordance with Feb. 8, 2005 ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
February 18, 2005
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
on modification to the interim resource adequacy requirements decision
D04-10-035.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 18, 2005
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
on the February 8, 2005 Assigned Commissioner's ruling.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 18, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
opening; [in response to the ruling issued Feb. 8, 2005].
|
|
|
Type:
COMMENTS
|
Filing Date:
February 18, 2005
|
Filed By:
DUKE ENERGY NORTH AMERICA
|
|
Description:
in response to Cmmr.'s ruling re interim resource adequacy obligation.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 18, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
opening; to the interim resource adequacy requirements decision D04-10-035
[pursuant to the February 8, 2005 ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
February 18, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
on ACR proposing to clarify the Interim Resource Adequacy Requirements Decision.
|
|
|
Type:
OPPOSITION
|
Filing Date:
February 17, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to petition of South San Joaquin Irrigation District for modification of
D04-12-048.
|
|
|
Type:
REQUEST
|
Filing Date:
February 15, 2005
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
for award of intervenor compensation.
|
|
|
Type:
EXPARTE
|
Filing Date:
February 14, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
On February 9, 2005, Mona Tierney, Director, Government Affairs, Constellation
NewEnergy, representing the Alliance for Retail Energy Markets (AREM), met with
Pres. Peevey in San Francisco. Also present were Julie Fitch, advisor to Pres.
Peevey, Vicki Sandler of APS Energy Services, and Andrea Weller of Strategic
Energy. AREM representatives discussed Pacific Gas and Electric Company's
upcoming request for proposals. AREM representatives urged the Commission to
reject Southern California Edison Company's petition for modification of
D04-12-048, noting that there is no valid reason to hold existing direct access
customers responsible for utility procurement decisions.
|
|
|
Type:
EXPARTE
|
Filing Date:
February 14, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
On February 9, 2005, Steven Kelly, representing the Independent Energy
Producers Association (IEP), met with Pres. Peevey in San Francisco. Also
present were Julie Fitch, advisor to Pres. Peevey, and Brian Cragg,
representing IEP. Written material (attached to the notice) was used. Kelly
urged support for the key principles that were adopted in the recent
procurement decision. Kelly stated that the principles include an open,
transparent, competitive bidding, all-source solicitations, bidders held to
bids, and an independent evaluator. Kelly and Cragg noted that independent
generators face a wide array of asymmetrical incentives that work against them
in procurement. Kelly and Cragg urged the Commission to correct procurement
incentives so that all projects, whether sponsored by utilities or generators,
can compete on a fair basis.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 11, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on a generation procurement incentive framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 11, 2005
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
on ALJ Gottstein's ruling on procurement incentive framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 11, 2005
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
pre-workshop; on a procurement incentive framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 11, 2005
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
opening; pre-workshop; on staff's proposed procurement incentive framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 11, 2005
|
Filed By:
UNION OF CONCERNED SCIENTISTS
|
|
Description:
pre-workshop; opening; on proposed procurement incentive framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 11, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
pre-workshop; on procurement incentive framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 11, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
pre-workshop, opening; on procurement incentive framework.
|
|
|
Type:
COMMENTS
|
Filing Date:
February 11, 2005
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
pre-workshop; on a procurement incentive framework.
|
|
|
Type:
RULING
|
Filing Date:
February 8, 2005
|
Filed By:
CMMR/PEEVEY/PUC
|
|
Description:
Providing for Comments and Replies on Modification to the Interim Resource
Adequacy Requirements Decision D04-10-035. Opening comments are due February
18, 2005; reply comments - February 23, 2005.
|
|
|
Type:
RESPONSE
|
Filing Date:
February 4, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
to Edison's application for rehearing of D04-12-048.
|
|
|
Type:
RESPONSE
|
Filing Date:
February 4, 2005
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
to Edison's petition for modification of D04-12-048.
|
|
|
Type:
EXPARTE
|
Filing Date:
February 3, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On January 31, 2005, Fong Wan, Vice President, Power Contracts and Electric
Resource Development, Pacific Gas and Electric Company (PG&E), met with Cmmr.
Brown in San Francisco. Also present was Eric Jacobson, Chief, Regulatory
Relations, for PG&E. Wan stated that PG&E expects to resume its long-term
request for offers (RFO) soon. Wan described the bids PG&E has received in its
intermediate RFO, indicating that there is a large amount of existing electric
supply available at low prices. Wan also stated that PG&E expects good
participation in its long-term RFO. Jacobson explained PG&E's concerns with the
asymmetrical initial cost cap mechanism adopted for utility-owned generation in
the Commission's recent long-term procurement decision.
|
|
|
Type:
RESPONSE
|
Filing Date:
February 3, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to SCE Application for Rehearing of Decision 04-12-048.
|
|
|
Type:
RESPONSE
|
Filing Date:
February 3, 2005
|
Filed By:
DUKE ENERGY NORTH AMERICA
|
|
Description:
in opposition to the application for rehearing of Edison.
|
|
|
Type:
RESPONSE
|
Filing Date:
February 3, 2005
|
Filed By:
CALPINE CORPORATION
|
|
Description:
to Edison's application for rehearing of D04-12-048.
|
|
|
Type:
RESPONSE
|
Filing Date:
February 3, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to applications for rehearing of D04-12-048.
|
|
|
Type:
NOTICE
|
Filing Date:
February 2, 2005
|
Filed By:
UTILITY CONSUMERS' ACTION NETWORK
|
|
Description:
of Intent to Claim Compensation.
|
|
|
Type:
RESPONSE
|
Filing Date:
February 2, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Applications of Rehearing of Decision 0410-048.
|
|
|
Type:
EXPARTE
|
Filing Date:
January 28, 2005
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On January 25, 2005, Dan Richard, Senior Vice President, Public Affairs,
Pacific Gas and Electric Company (PG&E), met with Pres. Peevey in San
Francisco. Also present were Julie Fitch, advisor to Pres. Peevey, and Fong
Wan, Vice President, Power Contracts and Electric Resource Development, and
Erik Jacobson, Chief, Regulatory Relations, for PG&E. Richard stated that PG&E
expects to resume its long-term request for offers (RFO) soon. Wan described
the bids PG&E has received in its intermediate RFO, indicating that there is a
large amount of existing electric supply available at low prices. Richard
explained PG&E's concerns with the asymmetrical initial cost cap mechanism
adopted for utility-owned generation (UOG) in the Commission's recent long-term
procurement decision. Richard said that PG&E would prefer cost-of-service
ratemaking for UOG. Richard indicated that price adjustments should be
permitted for force majeure events for both PPAs and utility-owned resources.
|
|
|
Type:
RULING
|
Filing Date:
January 28, 2005
|
Filed By:
CMMR/PEEVEY/PUC
|
|
Description:
Places consideration of the Sempra, Williams, King River, City and County of
San Francisco and Sunrise DWR contracts in R04-04-003, requests comments and
alternative proposals for the allocation of these contracts, by March 18, 2005,
and responses to comments and proposed alternatives by April 8, 2005; and sets
a prehearing conference for April 26, 2005.
|
|
|
Type:
EXPARTE
|
Filing Date:
January 27, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
On January 24, 2005, Mona Tierney, Director, Government Affairs, Constellation
NewEnergy, representing the Alliance for Retail Energy Markets (AREM), met with
Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were David
Gamson, advisor to Cmmr. Brown, and Sue Mara, TRO Advisors, LLC, on behalf of
Strategic Energy and APS Energy Services. Tierney and Mara indicated that AREM
will oppose Southern California Edison Company's request that D04-12-048 be
modified so as to authorize the utilities to recover so-called "stranded costs"
of new generation resource commitments from all customers, and to remove the
ten-year limitation on the recovery of stranded costs of new fossil-fuel
resources from currently bundled customers that depart utility service in the
future.
|
|
|
Type:
RULING
|
Filing Date:
January 21, 2005
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Regarding Workshops for Resource Adequacy Requirements - Phase 2.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
January 20, 2005
|
Filed By:
SOUTH SAN JOAQUIN IRRIGATION DISTRTICT
|
|
Description:
of D04-12-048.
|
|
|
Type:
PETITION FOR MODIFICATION
|
Filing Date:
January 19, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
of D04-12-048.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
January 19, 2005
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
of D04-12-048.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
January 19, 2005
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
CONSTELLATION NEWENERGY, INC.
STRATEGIC ENERGY, L.L.C.
|
|
Description:
od S04-12-048.
|
|
|
Type:
REHEARING REQUEST
|
Filing Date:
January 18, 2005
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
of D04-12-048.
|
|
|
Type:
RULING
|
Filing Date:
January 18, 2005
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Finds that CEERT is eligible to file a request for an award of compensation, as
set forth.
|
|
|
Type:
RULING
|
Filing Date:
January 7, 2005
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Revises and updates workshop schedule and adopts overall procedural schedule -
resource adequacy requirements (RAR) - phase 2. Workshop report due 3/11/05;
comments - 3/30/05; reply comments - 4/08/05; final decision - 6/30/05.
|
|
|
Type:
REQUEST
|
Filing Date:
January 6, 2005
|
Filed By:
UNION OF CONCERNED SCIENTISTS
|
|
Description:
for an award of compensation for substantial contribution to R04-04-003.
|
|
|
Type:
RULING
|
Filing Date:
January 4, 2005
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Schedules prehearing conference, as set forth, for January 24, 2005.
|
|
|
Type:
REQUEST
|
Filing Date:
December 30, 2004
|
Filed By:
UTILITY CONSUMERS' ACTION NETWORK
|
|
Description:
for Intervenor Compensation.
|
|
|
Type:
RULING
|
Filing Date:
December 30, 2004
|
Filed By:
ALJ/WETZELL/BROWN/PUC
|
|
Description:
Grants requests to intervene of the Cal. Biomass Energy Alliance, Cal. Landfill
Gas Coalition, and the Solar Thermal Electric Alliance; Morgan Stanley Capital
Group; and the San Diego Assoc. of Governments.
|
|
|
Type:
NOTICE
|
Filing Date:
December 23, 2004
|
Filed By:
UNION OF CONCERNED SCIENTISTS
|
|
Description:
of substitution.
|
|
|
Type:
RULING
|
Filing Date:
December 20, 2004
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Adopts protective order to facilitate deliverability baseline analysis. Grants
CAISO's motion for adoption of a "deliverability" protective order.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 17, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On December 14, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas
and Electric Company (PG&E), had a telephone conversation with David Gamson,
advisor to Cmmr. Brown. Jacobson described some of PG&E's recommended
modifications to the proposed decision of ALJ Brown.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 15, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On December 10, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas
and Electric Company (PG&E), had a telephone conversation with Trina Horner,
advisor to Cmmr. Lynch. Jacobson described some of PG&E's recommended
modifications to the proposed decision of ALJ Brown.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 15, 2004
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
On December 10, 2004, Lad Lorenz, Vice President - Regulatory Affairs for San
Diego Gas & Electric Company (SDG&E), met with Julie Fitch, advisor to Pres.
Peevey, in San Francisco. Lorenz expressed overall support for the proposed
decision (PD). Lorenz then described the issues of concern to SDG&E in the PD,
including the Debt Equivalence Risk Factor, the cost cap for utility owned
turnkey resources, and the recovery of potential stranded costs from CCA
departing load.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 15, 2004
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
On December 15, 2004, Devra Bachrach, Staff Scientist at the Natural Resources
Defense Council (NRDC), met with Brian Prusnek, advisor to Cmmr. Kennedy, in
San Francisco. Bachrach discussed NRDC's support for the draft decision's (DD)
proposed "greenhouse gas (GHG) adder." Bachrach requested that the Commission
clarify that the "HG adder" represents the financial risk associated with
carbon emissions, and is not an externality value. Bachrach noted that many
parties are interpreting the renewables provisions of the in very different
ways and urged the Commission to clarify the DD's intent to fully implement the
Renewable Portfolio Standard (RPS). Bachrach requested hat the Commission
provide additional guidance in the DD to ensure that future long-term plans are
truly comprehensive, integrated long-term plans.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 14, 2004
|
Filed By:
CONSTELLATION NEWENERGY, INC.
STRATEGIC ENERGY, L.L.C.
|
|
Description:
LATE FILED. On December 2, 2004, Mona Tierney, Director of Government Affairs
of Constellation NewEnergy, Inc. (CNE), also representing Strategic Energy,
L.L.C. (Strategic), met with David Gamson, advisor to Cmmr. Brown, in San
Francisco. Also present was Mary Lynch of Constellation Energy Commodities
Group formerly known as Constellation Power Source (CPS). Tierney discussed
the proposed decision (PD) of ALJ Brown. Tierney articulated Strategic and
CNE's concerns that the utilities have "under-forecasted" potential load
migration due to the development of community choice aggregation and re-opening
of the direct access market, that the utilities will overprocure as a result,
and that the PD authorizes the utilities to impose exit fees on departing
customers to recover their stranded costs. Tierney also discussed CPS' "slice
of load" proposal as a means of addressing future stranded costs concerns.
|
|
|
Type:
REPLY
|
Filing Date:
December 14, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to responses to CA ISO's motion for protective order.
|
|
|
Type:
REPLY
|
Filing Date:
December 14, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
to the motion for a protective order.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 14, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
LATE FILED. On December 6, 2004, Bruce C. Foster, Vice President, Regulatory
Affairs of Southern California Edison Company (SCE), met with Julie Fitch,
advisor to Pres. Peevey, in San Francisco. Also present were Colin E. Cushnie,
Director of Regulatory Affairs of SCE, and Sheryl Carter, Director of Western
Energy Programs of the Natural Resources Defense Council (NRDC). Written
material (attached to the notice) was used. SCE's representatives expressed
concern regarding the proposed decision's (PD) adoption of a greenhouse gas
(GHG) bid evaluation adder for all of SCE's procurement activity. SCE expressed
that with a change in the decision to the application of the GHG adder, it will
support the PD's GHG adder policy. SCE stated that SCE and NRDC now support a
change to the PD that would apply the GHG adder to evaluation of new utility
commitments or contracts with terms greater than five years. SCE encouraged a
revision to the PD to indicate that the Commission was going to seek a much
broader application of GHG considerations. SCE expressed a willingness to work
at the legislature to develop a more board-based carbon policy. SCE's
representatives expressed concern that the final decision on SCE's long-term
procurement plan not preclude the continuation of SCE's current solicitation
for multi-year electrical capacity. SCE's representatives stated that all
utility customers should be responsible for stranded costs through a
non-bypassable wires charge for contracts that SCE enters into for the benefit
of all customers or for grid reliability.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2004
|
Filed By:
UNION OF CONCERNED SCIENTISTS
|
|
Description:
reply; on utility long-term procurement plans.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 13, 2004
|
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
|
|
Description:
On December 8, 2004, Marc Joseph, attorney for the Coalition of California
Utility Employees, had a telephone conversation with Bill Julian, advisor to
Cmmr. Wood. Joseph stated that utilities should be able to develop utility
owned generation on a separate track from contracts with independent
generation, and that utilities should be able to develop local reliability
generation separately, and charge the costs to all customers.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2004
|
Filed By:
CALPINE CORPORATION
|
|
Description:
reply; on Proposed Decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
reply; on the proposed decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2004
|
Filed By:
MODESTO IRRIGATION DISTRICT
|
|
Description:
reply.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; on Proposed Decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2004
|
Filed By:
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
|
|
Description:
reply; on Proposed Decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2004
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
reply; on the ALJ's draft decision adopting long term procurement plans.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2004
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
reply;.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2004
|
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
|
|
Description:
on the proposed decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2004
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
reply; on the opinion adopting utilities' long term procurement plans.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on Proposed Decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2004
|
Filed By:
SEMPRA ENERGY GLOBAL ENTERPRISES
|
|
Description:
Reply; on Proposed Decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2004
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Reply; on Proposed Decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2004
|
Filed By:
STRATEGIC ENERGY AND CONSTELLATION NEWENERGY
|
|
Description:
Reply; on Proposed Decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 13, 2004
|
Filed By:
CITY OF CHULA VISTA
|
|
Description:
Reply; on Proposed Decision of ALJ Brown.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 10, 2004
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
On December 9, 2004, Devra Bachrach, Staff Scientist at the Natural Resources
Defense Council (NRDC), met with Trina Horner, advisor to Cmmr. Lynch, in San
Francisco. Bachrach discussed NRDC's support for the draft decision's (DD)
proposed "greenhouse gas (GHG) adder," because it will help protect customers
from financial risk associated with GHG emissions. Bachrach requested that the
Commission clarify that the "GHG adder" represents the financial risk
associated with carbon emissions, and is not an externality value. Bachrach
recommended that the DD require the utilities to use the GHG adder both in
procurement and in future long-term plans. Bachrach noted that many parties are
interpreting the renewables provisions of the DD in very different ways and
urged the Commission to clarify the DD's intent to fully implement the
Renewable Portfolio Standard (RPS). Bachrach stated that the RPS solicitations
should be the main vehicle to procure renewables. Bachrach requested that the
Commission provide additional guidance in the DD to ensure that future
long-term plans are truly comprehensive, integrated long-term plans.
|
|
|
Type:
RESPONSE
|
Filing Date:
December 10, 2004
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
|
|
Description:
in opposition to Motion of CA ISO for a protective order.
|
|
|
Type:
RESPONSE
|
Filing Date:
December 10, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to CAL ISO Motion for Protective Order.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 10, 2004
|
Filed By:
WEST COAST POWER
|
|
Description:
On December 7, 2004, Greg Blue, Senior Director, Government Affairs, Dynegy,
Inc., met with Julie Fitch, advisor to Pres. Peevey, and David Gamson, advisor
to Cmmr. Brown, in two separate meetings in San Francisco. Also present was
Brian Cragg of Goodin, MacBride, Squeri, Ritchie and Day, attorneys for West
Coast Power (WCP). Written materials (attached to the notice) were used. Blue
and Cragg expressed support for the proposed decision (PD) of ALJ Brown. Blue
stated WCP would like to see more discussion to support the findings and
conclusions on repowering and a clarification of the terminology related to
repowering and brownfield development. WCP recommended that the PD should
include a consideration of the conclusions and policy recommendations of the
Energy Commission's 2004 Update to the Intergrated Energy Policy Report.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 10, 2004
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
On December 7, 2004, Sheryl Carter, Director, Western Energy Programs at the
Natural Resources Defense Council (NRDC), met with Julie Fitch, advisor to
Pres. Peevey, in San Francisco. Also present were Colin E. Cushnie, Director,
Regulatory Affairs, and Bruce C. Foster, Vice President, for Southern
California Edison Company (SCE). Carter indicated that, with SCE's change of
position to support the greenhouse gas (GHG) adder policy in the proposed
decision (PD) of ALJ Brown, NRDC supported the revised application of a GHG
adder to apply to long-term resource commitments that would require Commission
pre-approval. Carter noted that applying it to these long-term resource
commitments also simplifies implementation and would allow quicker application
of the GHG adder. Carter emphasized that the PD justified the application of a
GHG adder because of the financial risk associated with carbon emissions and
not as an externality value, and recommended that the PD language be clarified
to reflect this.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 10, 2004
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
On December 9, 2004, Sheryl Carter, Director, Western Energy Program at the
Natural Resources Defense Council (NRDC), met with Julie Fitch, advisor to
Pres. Peevey, in San Francisco. Also present was Devra Bachrach, Staff
Scientist at NRDC. Bachrach noted that many parties are interpreting the
renewables provisions of the draft decision (DD) in very different ways and
urged the Commission to clarify the DD's intent to fully implement the
Renewable Portfolio Standard (RPS). Bachrach stated that the RPS solicitations
should be the main vehicle to procure renewables. Bachrach requested that the
Commission provide additional guidance in the DD to ensure that future
long-term plans are truly comprehensive, integrated long-term plans. Carter
noted that while NRDC would have preferred that the Commission approve funding
for the procurement of additional energy efficiency resources in this decision,
NRDC does not object to the DD's proposed process of having the administrators
file program and funding applications.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 9, 2004
|
Filed By:
CONSTELLATION NEWENERGY, INC.
STRATEGIC ENERGY, L.L.C.
|
|
Description:
On December 8, 2004, Mona Tierney, Director of Government Affairs of
Constellation New Energy, Inc. (CNE), also representing Strategic Energy,
L.L.C. (Strategic), met with Julie Fitch, advisor to Cmmr. Peevey, in San
Francisco. Tierney discussed the proposed decision (PD) of ALJ Brown. Tierney
articulated Strategic and CNE's concerns that the utilities have
"under-forecasted" potential load migration due to the development of community
choice aggregation and re-opening of the direct access market, that the
utilities will overprocure as a result, and that the PD authorizes the
utilities to impose exit fees on departing customers to recover their stranded
costs. Tierney also discussed Constellation Power Source's "slice of load"
proposal as a means of addressing future stranded costs concerns.
|
|
|
Type:
RULING
|
Filing Date:
December 9, 2004
|
Filed By:
ALJ/THORSON/PUC
|
|
Description:
Grants the Cal. ISO's motion to shorten time to respond to its motion for a
protective order. Responses to the motion must be filed by December 10, 2004.
Any replies to responses must be filed by December 14, 2004.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 9, 2004
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
On December 7, 2004, Devra Bachrach, Staff Scientists at the Natural Resources
Defense Council (NRDC), met with David Gamson, advisor to Cmmr. Brown, and
Steven Weissman, advisor to Cmmr. Wood, in two separate meetings in San
Francisco. Bachrach discussed NRDC's support for the draft decision's (DD)
proposed `greenhouse gas (GHG) adder'. Bachrach requested that the Commission
clarify that the `GHG adder' represents the financial risk associated with
carbon emissions, and is not an externality value. Further, Bachrach
recommended that the DD require the utilities to use the GHG adder both in
procurement and in future long-term plans. Bachrach also noted that many
parties are interpreting the renewables provisions of the DD in very different
ways and urged the Commission to clarify the DD's intent to fully implement the
Renewable Portfolio Standard (RPS). Bachrach stated that RPS solicitations
should be the main vehicle to procure renewables. Finally, Bachrach requested
hat the Commission provide additional guidance in the DD to ensure that future
long-term plans are truly comprehensive, integrated long-term plans.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2004
|
Filed By:
COUNTY OF LOS ANGELES
|
|
Description:
on Proposals for Long-Term Policy for Expiring QF Contracts.
|
|
|
Type:
REPLY
|
Filing Date:
December 8, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to proposals and comments on the development of a long-term policy for expiring
QF contracts.
|
|
|
Type:
PETITION
|
Filing Date:
December 8, 2004
|
Filed By:
MORGAN STANLEY CAPITAL GROUP INC.
|
|
Description:
to Intervene;
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
reply; on the development of a long-term policy for expiring QFs contracts
[Pursuant to the Sept. 29, 2004 ruling.]
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2004
|
Filed By:
ORA/DEANGELIS/PUC
|
|
Description:
reply; on the development of long-term policy for expiring QF contract.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2004
|
Filed By:
GREEN POWER INSTITUTE
|
|
Description:
on policy Proposals for Expiring QF Contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2004
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
on proposals for development of a long-term policy for expiring QF contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2004
|
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE, L.L.C.
CALIFORNIA LANDFILL GAS COALITION
CALIFORNIA WIND ENERGY ASSOCIATION
SOLAR THERMAL ELECTRIC ALLIANCE
|
|
Description:
on proposals for a long-term policy for expiring QF contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2004
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
on proposals for the development of a long-term policy for expiring and new QF
contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2004
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
on proposals for a long-term policy for QF contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2004
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Reply; on the Development of a Long-Term Policy for Expiring QF Contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 8, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on Proposals for a Long-Term Policy for Expiring QF Contracts and new QFs..
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
UNION OF CONCERNED SCIENTISTS
|
|
Description:
opening; on utility long-term procurement plans.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
MODESTO IRRIGATION DISTRICT
|
|
Description:
on proposed decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS AND TECHNOLOGY ASSOCIATION
|
|
Description:
on ALJ Brown's Proposed Decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
CONSTELLATION POWER SOURCE, INC.
|
|
Description:
on the proposed decision of ALJ Brown re utility long term procurement plans.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
on the proposed decision of ALJ Brown re utility long term procurement plans.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
DUKE ENERGY NORTH AMERICA
|
|
Description:
on the proposed decision of ALJ Brown re utility long term procurement plans.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
on the proposed decision of ALJ Brown re utility long term procurement plans.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
WEST COAST POWER
|
|
Description:
on the proposed decision of ALJ Brown re utility long term procurement plans.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
|
|
Description:
on the proposed decision of ALJ Brown re utility long term procurement plans.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on the proposed decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
on the ALJ's draft opinion adopting utlities' long term procurement plans.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
|
|
Description:
on the proposed decision of ALJ Brown re long term procurement plans.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
|
|
Description:
on the proposed decision of ALJ Brown on utility long term procurement plans.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
SILICON VALLEY MANUFACTURING GROUP
|
|
Description:
on the proposed decision of ALJ Brown re long term procurement plans.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
CALPINE CORPORATION
|
|
Description:
on the proposed decision of ALJ Brown re long term procurement plans.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
on the proposed decision of ALJ Brown re long term procurement plans.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on the proposed decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
opening; on the opinion adopting utility long-term procurement plans.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
[on the Proposed Decision of ALJ Brown.]
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
UTILITY CONSUMERS ACTION NETWORK
|
|
Description:
Opening; on Proposed Decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
CITY OF CHULA VISTA
|
|
Description:
Opening; on Proposed Decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Opening; on Proposed Decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Opening; on Proposed Decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
STRATEGIC ENERGY AND CONSTELLATION NEWENERGY
|
|
Description:
Opening; on Proposed Decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
WESTERN POWER TRADING FORUM
|
|
Description:
Opening; on Proposed Decision of ALJ Brown.
|
|
|
Type:
COMMENTS
|
Filing Date:
December 6, 2004
|
Filed By:
SEMPRA ENERGY GLOBAL ENTERPRISES
|
|
Description:
on Proposed Decision of ALJ Brown.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 3, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On November 30, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas
and Electric Company (PG&E), met with Brian Prusnek, advisor to Cmmr. Kennedy,
in San Francisco. Also present was Sabrina Chaw, Regulatory Representative,
Regulatory Relations, PG&E. Written material (attached to the notice) was used.
Jacobson described some of PG&E's recommended modifications to the proposed
decision of ALJ Brown.
|
|
|
Type:
MOTION
|
Filing Date:
December 3, 2004
|
Filed By:
SAN DIEGO ASSOCIATION OF GOVERNMENTS
|
|
Description:
to Intervene; ATTACHED - Comments on ALJ Brown's Proposed Decision.
|
|
|
Type:
EXPARTE
|
Filing Date:
December 2, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On November 29, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas
and Electric Company (PG&E), met with Julie Fitch, advisor to Pres. Peevey, in
San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, Roy
Kuga, Vice President, Gas and Electric Procurement, Policy and Planning, Ray
Williams, Director, Power Contracts and Resource Development, and William
Manheim, Chief Counsel, for PG&E; and Bruce Foster, Vice President, and Colin
Cushnie, Director, Regulatory Operations, for Southern California Edison
Company. Written material (attached to the notice) was used. Kuga and Manheim
described some of PG&E's recommended modifications to the proposed decision of
ALJ Brown.
|
|
|
Type:
RULING
|
Filing Date:
December 2, 2004
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Schedules final oral argument for December 13, 2004.
|
|
|
Type:
MOTION
|
Filing Date:
December 2, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
for a protective order concerning data used to develop a deliverability
baseline analysis and to shorten time.
|
|
|
Type:
RESPONSE
|
Filing Date:
December 1, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to ALJ's ruling re final oral argument.
|
|
|
Type:
EXPARTE
|
Filing Date:
November 30, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On November 29, 2004, Bruce C. Foster, Vice President, Regulatory Affairs of
Southern California Edison Company (SCE), met with Julie Fitch, advisor to
Pres. Peevey, in San Francisco. Also present were David Gamson, advisor to
Cmmr. Brown, Colin E. Cushnie, Director, Regulatory Affairs of SCE, and Roy
Kuga, William Manheim, Ray Williams, and Erik Jacobson, Pacific Gas and
Electric Company (PG&E). Written material (attached to the notice) was used.
SCE representatives expressed general support for ALJ Brown's proposed decision
(PD). However, SCE requested that the PD be modified to explicitly permit CPCN
applications for certain utility projects. SCE requested that the PD be
modified to state that stranded costs incurred as the result of utility
commitments that benefit all customers be assessed to all customers, and not
just departing bundled load. SCE expressed concern that the PD's adoption of a
carbon adder could unnecessarily add costs to SCE's bundled customers without
any associated benefits. SCE requested that the Commission clarify what is
meant by the requirement that utilities procure the maximum feasible amount of
renewable energy. SCE also requested to change the requirement that
pre-approval be sought for all contracts with terms of three years or greater.
Finally, SCE agreed with PG&E that the PD should be modified to reflect a 30%
debt equivalence factor.
|
|
|
Type:
REQUEST
|
Filing Date:
November 30, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
for Final Oral Argument.
|
|
|
Type:
EXPARTE
|
Filing Date:
November 29, 2004
|
Filed By:
CENTER FOR ENERGY EFFICIENCY/RENEWABLE TECHNOLOGIES
|
|
Description:
On November 22, 2004, Sara Steck Myers, attorney for the Center for Energy
Efficiency and Renewable Technologies (CEERT), met with Julie Fitch, advisor to
Pres. Peevey, in San Francisco. Also present were Paul Clanon, Director, Paul
Douglas, and Lisa Paulo, of the Energy Division, Dan Adler of the Division of
Strategic Planning, and James H. Caldwell, Jr., Director of Renewable Policy
for PPM Energy, LLP. Written material (attached to the notice) was used. Myers
stated that CEERT fully supports the proposed decision's (PD) policy statements
that reflected the environmental and diversity value of renewables procurement
to the utilities¿ LTPPs and general electric generation procurement. Myers
expressed concern that the findings made by the PD did not adequately address
the shortcomings of the renewable procurement plans of Southern California
Edison Company and Pacific Gas and Electric Company. Myers stated that CEERT
believed that the PD had inappropriately deferred revisions to the utilities'
renewable plans to another proceeding. Myers noted that an endless deferral of
needed revisions of utility renewable procurement plans would undermine good
faith reliance on Commission's directives, as well as effective regulation, and
would place at risk the state's accelerated target of 20% renewable generation
by 2010. Myers emphasized the need for integrated renewables procurement and
transmission planning.
|
|
|
Type:
RULING
|
Filing Date:
November 23, 2004
|
Filed By:
ALJ/GOTTSTEIN/PUC
|
|
Description:
Schedules workshops on procurement incentive framework. Pre-workshop opening
comments on procurement incentive framework are due February 11, 2005; reply
comments - February 25, 2004; workshop report - 3/21/05; post-workshop opening
comments on workshop report - 4/8/05; post-workshop reply comments - 4/18/05.
|
|
|
Type:
RULING
|
Filing Date:
November 22, 2004
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Regarding Final Oral Argument. Any request for the final oral argument must be
received by December 1, 2004.
|
|
|
Type:
RULING
|
Filing Date:
November 19, 2004
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Sets workshops to address Phase 2 Resource Adequacy topics.
|
|
|
Type:
PROPOSED DECISION
|
Filing Date:
November 16, 2004
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Opinion adopting PG&E, Edison and SDG&E's long term procurement plans. Comments
are due December 6, 2004; reply comments - 5 days after comments are filed.
|
|
|
Type:
EXPARTE
|
Filing Date:
November 15, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On November 10, 2004, Erik Jacobson, Chief of Regulatory Relations, Pacific Gas
and Electric Company (PG&E), met with Julie Fitch, advisor to Pres. Peevey, in
San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, Brian
Prusnek, advisor to Cmmr. Kennedy, Paul Clanon, Clayton Tang, Bob Lane and
Philippe Auclair on behalf of the Energy Division and Executive Division, and
Roy Kuga, Vice President of Gas and Electric Procurement, Policy and Planning,
Hal LaFlash, Strategy Director of Gas and Electric Supply, and Wan Fong, Vice
President, Ray Williams, Director, and Kevin Butler, Senior Director, of Power
Contracts and Electric Resource Development, for PG&E. Written material
(attached to the notice) was used. Kuga and Fong explained the need for the
Commission to authorize a non-bypassable charge from bundled customers to
ensure full cost recovery of long-term commitments made by PG&E on behalf of
those customers. Kuga recommended that the Commission extend the ERRA 5 percent
trigger mechanism. Fong explained the rationale for PG&E's recommended target
to procure 50% of new long-term commitments as utility-owned generation. Fong
also explained the need for adoption of a debt equivalence policy that allows
PG&E to evaluate the debt equivalence impacts of long-term power purchase
contracts.
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
November 10, 2004
|
Filed By:
COUNTY OF LOS ANGELES
|
|
Description:
Proposal for a Long-Term Policy for Expiring QF Contracts.
|
|
|
Type:
RESPONSE
|
Filing Date:
November 10, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to ALJ's ruling requesting Proposals and Comments on the development of a
long-term policy for expiring QF contracts.
|
|
|
Type:
PETITION
|
Filing Date:
November 10, 2004
|
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE, L.L.C.
CALIFORNIA LANDFILL GAS COALITION
SOLAR THERMAL ELECTRIC ALLIANCE
|
|
Description:
to intervene; proposal for a long-term QF policy attached.
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
November 10, 2004
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
Proposal for a Long-Term Qualifying Facility Policy.
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
November 10, 2004
|
Filed By:
COGENERTION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
Proposal for the development of a long-term policy for expiring and new QF
contracts.
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
November 10, 2004
|
Filed By:
MODESTO IRRIGATION DISTRICT
|
|
Description:
on the development of a long-term policy for expiring QF contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 10, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
|
|
Description:
on the development of a long-term policy for expiring QF contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 10, 2004
|
Filed By:
ORA/SCARFF/PUC
|
|
Description:
on the development of a long-term policy for expiring QF contracts.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 10, 2004
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
on the development of a long-term policy for expiring QF contracts.
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
November 10, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Proposal for a Long-Term Policy for Expiring QF Contracts and New QFs.
|
|
|
Type:
COMMENTS
|
Filing Date:
November 9, 2004
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
pre-workshop comments concerning scope and schedule of Phase 2 of the Resource
Adequacy.
|
|
|
Type:
RULING
|
Filing Date:
November 4, 2004
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Sets the following schedule: workshop on resource adequacy requirements issues
- Phase 2 - November 16, 2004; workshop report - 3/11/2005; comments 3/23/05;
replies to comments - 4/06/05.
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
reply; on long-term plans of the investor owned utilities.
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
MODESTO IRRIGATION DISTRICT
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
reply [in accordance with September 28, 2004 ruling].
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
WEST COAST POWER
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
UNION OF CONCERNED SCIENTISTS
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
SILICON VALLEY MANUFACTURING GROUP
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
reply; on electric utiliyt long-term resource plans.
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
CALPINE CORPORATION
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
|
|
Description:
reply; in the long term procurement plan phase.
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
DUKE ENERGY NORTH AMERICA
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
CONSTELLATION POWER SOURCE, INC.
|
|
Description:
reply.
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on procurement plan issues.
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Reply;
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
STRATEGIC ENERGY AND CONSTELLATION NEWENERGY
|
|
Description:
Reply;
|
|
|
Type:
BRIEF
|
Filing Date:
November 1, 2004
|
Filed By:
CITY OF CHULA VISTA
|
|
Description:
Reply;
|
|
|
Type:
EXPARTE
|
Filing Date:
October 28, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
LATE FILED. On October 21, 2004, Bruce C. Foster, Vice President, Regulatory
Affairs of Southern California Edison Company (SCE), met with David Gamson,
advisor to Cmmr. Brown, in San Francisco. Also present was Colin E. Cushnie,
Director, Regulatory Affairs, of SCE. SCE representatives discussed ALJ
Fukutome's proposed decision (FPD) in SCE's Energy Resource Recovery Account
(ERRA) proceeding. Additionally, SCE's representatives discussed SCE's concerns
with ALJ Wetzell's proposed decision (WPD) on resource adequacy issues
(R04-04-003). SCE's representatives expressed concern that FPD improperly
expands the scope of the least-cost dispatch compliance showing that the
Commission previously ordered in its adoption of Standard of Conduct No. 4 in
each IOU's procurement plan. SCE's representatives also noted that FPD is
inconsistent with AB 57. SCE¿s representatives also expressed concern with WPD
on resource adequacy because it would accelerate the 15%-17% planning reserve
requirement from 2008 to 2006, without providing any market power mitigation
measures to protect customers. Further, SCE's representatives described why
liquidated damages contracts and DWR long-term power contracts should continue
to be allowed to count toward each IOU's planning reserve requirement.
|
|
|
Type:
REPLY
|
Filing Date:
October 27, 2004
|
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
|
|
Description:
to the response of Edison to CEERT's notice of intent to claim compensation.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 22, 2004
|
Filed By:
SEMPRA ENERGY SOLUTIONS
|
|
Description:
On October 19, 2004, Alvin S. Pak, Director, State Regulatory Affairs of Sempra
Energy Global Enterprises (SEGE), met on behalf of Sempra Energy Solutions with
David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present was
Thomas P. Corr, SEGE Regulatory Policy Manager. Written material (attached to
the notice) was used. Pak and Corr explained that eliminating Firm LD contracts
from Resource Adequacy (RA) accounting eligibility prior to the availability of
a replacement product or market would hinder the ability of non-utility LSEs to
comply with the Commission's proposed RA counting protocols; will certainly
increase costs to those providing DA service; and may threaten the ability of
some non-utility LSEs to continue to provide DA service, or to expand such
service. Pak and Corr proposed that the Firm LD contract issue be deferred to
Phase 2 of the RA proceeding.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 22, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On October 19, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas
and Electric Company (PG&E), met with David Gamson, advisor to Cmmr. Brown, and
Trina Horner, advisor to Cmmr. Lynch, in two separate meetings in San
Francisco. Also present were Gary Jeung, Director, Gas and Electric
Procurement, and Joe Lawlor, Energy Trading Consultant, Gas and Electric Supply
Strategic Consulting, PG&E. Written material (attached to the notice) was used.
Lawlor and Jeung stated that system contracts with liquidated damage provisions
should be eligible to count as qualified capacity, as long as they are limited
to no more than 25 percent of a LSE's total MW need. Lawlor and Jeung explained
why it is not feasible to require a demonstration that the generator's asset
portfolio is not oversold. Jacobson emphasized that the Department of Water
Resources contracts should be provided full value and should not be subject to
a deliverability test. Lawlor explained PG&E's concern with both ALJ Wetzell's
proposed decision and Cmmr. Lynch's alternate.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 22, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On October 19, 2004, Colin E. Cushnie, Director, Regulatory Affairs of Southern
California Edison Company (SCE), met with Trina Horner, advisor to Cmmr. Lynch,
in San Francisco. Cushnie advised the Commission of SCE's concerns about
suppliers exercising market power in the event that the Commission adopts a
15%-17% planning reserve margin for 2006. Cushnie recommended that the
Commission address this concern by providing appropriate market power
mitigation language in its adopted decision. Specifically, Cushnie asked the
Commission to reiterate and augment the market power concerns expressed in
D04-07-028.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 20, 2004
|
Filed By:
WEST COAST POWER
|
|
Description:
On October 15, 2004, Greg Blue, Senior Director, Government Affairs, Dynegy,
Inc., met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also
present was Brian Cragg, representing West Coast Power. Blue indicated West
Coast Power's support of the ALJ's draft decision on the Resource Adequacy
Requirement (RAR) and the acceleration of the implementation of the RAR. Blue
and Cragg discussed the concerns about locational market power and offered
suggestions on how to mitigate market power. Blue and Cragg also discussed the
current structure of the California electricity market and the prospects for
the electric supply shortages next summer. Blue also suggested that there are
three elements necessary for the improved operation of electricity markets:
RAR, a capacity market, and deliverability standards.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 20, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On October 15, 2004, Colin E. Cushnie, Director, Regulatory Affairs of Southern
California Edison Company (SCE), met with Trina Horner, advisor to Cmmr. Lynch,
in San Francisco. Cushnie advised the Commission that SCE supports a phase-in
of the planning reserve margin between 2006 and 2008, encouraged the Commission
to state in its decision that the Commission may temporarily relax its planning
reserve margin requirements for the investor-owned utilities if it becomes
apparent that market participants are seeking noncompetitive prices for
electrical capacity, and supported a continuation of liquidated damages
contracts until the issue could be further examined.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 19, 2004
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
On October 15, 2004, Scott Cauchois, Manager with the Office of Ratepayer
Advocates, met with David Gamson, advisor to Cmmr. Brown, in San Francisco.
Written material (attached to the notice) was used. Cauchois noted that some
accounting of resources available in California to meet resource adequacy
requirements is necessary and that imminent plant retirement could be deferred
with contracts between the owners and utilities, but some framework has to be
devised to address that issue.
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
WEST COAST POWER
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
|
|
Description:
Opening;
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
MODESTO IRRIGATION DISTRICT
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
DUKE ENERGY NORTH AMERICA
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
CONSTELLATION POWER SOURCE, INC.
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
UNION OF CONCERNED SCIENTISTS
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
opening; on electric utility long-term resource plans.
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
CALPINE CORPORATION
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
opening; on long-term plans of the investor owned utilities.
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
opening; on long-term plans of the investor owned utilities.
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
opening.
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
|
|
Description:
opening; in the long term procurement plan phase.
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Opening; on procurement plan issues.
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
SEMPRA ENERGY GLOBAL ENTERPRISES
|
|
Description:
Post-Hearing Opening;
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
WESTERN POWER TRADING FORUM
|
|
Description:
Opening;
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
UTILITY CONSUMERS' ACTION NETWORK
|
|
Description:
Opening;
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
BORDER GENERATION GROUP
|
|
Description:
Concurrent Opening;
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
CITY OF SAN DIEGO
|
|
Description:
Opening;
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
CITY OF CHULA VISTA
|
|
Description:
Concurrent Opening;
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
STRATEGIC ENERGY AND CONSTELLATION NEWENERGY
|
|
Description:
Opening;
|
|
|
Type:
BRIEF
|
Filing Date:
October 18, 2004
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Opening;
|
|
|
Type:
COMPLIANCE FILING
|
Filing Date:
October 13, 2004
|
Filed By:
BORGER GENERATION GROUP
|
|
Description:
Transcript Corrections.
|
|
|
Type:
RESPONSE
|
Filing Date:
October 12, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Notice of Intent to Claim Compensation of Center for Energy Efficiency and
Renewable Technologies.
|
|
|
Type:
SUPPLEMENT
|
Filing Date:
October 12, 2004
|
Filed By:
WEST COAST POWER
|
|
Description:
to Motion for Official Notice.
|
|
|
Type:
MOTION
|
Filing Date:
October 8, 2004
|
Filed By:
WEST COAST POWER
|
|
Description:
For Official Notice
|
|
|
Type:
EXPARTE
|
Filing Date:
October 7, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On October 5, 2004, Southern California Edison Company provided a document
(copy attached to the notice) to Pres. Peevey, Cmmrs. Brown, Kennedy, and Lynch
and to their respective energy advisors via email.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
October 5, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
reply; on alternate draft decision on resource adequacy.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
October 5, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
|
|
Description:
reply; on the alternate of Cmmr. Lynch re resource adequacy.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
October 5, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
reply; on the alternate of Cmmr. Lynch re resource adequacy.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
October 5, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; on the alternate of Cmmr. Lynch re resource adequacy.
|
|
|
Type:
EXPARTE
|
Filing Date:
October 1, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
On September 29, 2004, Bruce C. Foster, Vice President, Regulatory Operations
for Southern California Edison Company (SCE), met with Steven Weissman, advisor
to Cmmr. Wood, in San Francisco. Also present were Trina Horner, advisor to
Cmmr. Lynch, and Colin Cushnie, Director of Regulatory Affairs of SCE. Foster
and Cushnie indicated SCE's support for the continuation of system sales ("LD")
contracts, or at a minimum, to defer consideration of this issue to Phase 2.
SCE expressed its support for a 2008 start for the resource adequacy
requirement (RAR), or alternatively, a phase-in of RAR. SCE also indicated its
support for grandfathering the Department of Water Resources contracts to count
towards meeting a RAR.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
September 30, 2004
|
Filed By:
SEMPRA ENERGY GLOBAL ENTERPRISES
|
|
Description:
Draft Decision of Commissioner Lynch.
|
|
|
Type:
RULING
|
Filing Date:
September 30, 2004
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Requests proposals and comments on the development of a long-term policy for
expiring QF contracts. Proposals are due November 10, 2004; comments on the
proposals - November 24, 2004.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
September 30, 2004
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
of Cmmr. Lynch on Resource Adequacy Issues.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
September 30, 2004
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
of Cmmr. Lynch on Resource Adequacy Issues.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
September 30, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
of Cmmr. Lynch on Resource Adequacy Issues.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
September 30, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
of Cmmr. Lynch on Resource Adequacy Issues.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
September 30, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
of Cmmr. Lynch on Resource Adequacy Issues.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
September 30, 2004
|
Filed By:
DUKE ENERGY NORTH AMERICA
|
|
Description:
of Cmmr. Lynch on Resource Adequacy Issues.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
September 30, 2004
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
of Cmmr. Lynch on Resource Adequacy Issues.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
September 30, 2004
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
Draft Decision of Commissioner Lynch.
|
|
|
Type:
COMMENTS ON ALTERNATE
|
Filing Date:
September 30, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Draft Decision.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 29, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On September 24, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas
and Electric Company (PG&E), met with Trina Horner, advisor to Cmmr. Lynch, in
San Francisco. Also present were Julie Fitch, advisor to Cmmr. Peevey, and
Antonio Alvarez, Manager, Gas and Electric Supply, and Joe Lawlor, Energy
Trading Consultant, Gas and Electric Supply Strategic Consulting, PG&E.
Jacobson stated that the proposed decision should be modified to provide the
utilities with authority to procure resources for terms up to five years.
Alvarez explained PG&E's recommendation that minimum monthly energy
requirements should be satisfied on a portfolio basis rather than an individual
unit basis. Alvarez noted that the draft decision's 0.89 percent cap on demand
response limited PG&E to about 150 MW of demand response and contradicted
previous demand response targets provided by the Commission. Lawlor stated
that system contracts with liquidated damage provisions should be eligible to
count as qualified capacity, as long as they are limited to no more than 25
percent of a LSE's total MW need. Lawlor also said that the Department of Water
Resources contracts that are not unit specific should not be subject to a
deliverability test.
|
|
|
Type:
RULING
|
Filing Date:
September 28, 2004
|
Filed By:
ALJ/BROWN/PUC
|
|
Description:
Establishes a briefing outline and sets briefing schedule. Concurrent opening
briefs are due October 18, 2004; concurrent reply briefs (limited to 20 pages)
- November 1, 2004.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 27, 2004
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
Reply; on Draft Decision of ALJ Wetzell.
|
|
|
Type:
TRANSCRIPT
|
Filing Date:
September 27, 2004
|
Filed By:
REPORTING DIVISION
|
|
Description:
Submitted; Volume 17.
|
|
|
Type:
REPLY
|
Filing Date:
September 27, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Comments on the Draft Decision regarding Resource Adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 27, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
reply; on the draft decision of ALJ Wetzell regarding resource adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 27, 2004
|
Filed By:
POWEREX CORP.
|
|
Description:
reply; on ALJ's proposed decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 27, 2004
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
reply; concerning Draft Decision regarding resource adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 27, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; on interim opinion regarding resource adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 27, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
reply; on the draft decision on resource adequacy requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 27, 2004
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
reply; on the draft decision regarding resource adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 27, 2004
|
Filed By:
WESTERN POWER TRADING FORUM
|
|
Description:
Reply; on Resource Adequacy Draft Decision.
|
|
|
Type:
NOTICE
|
Filing Date:
September 24, 2004
|
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
|
|
Description:
of intent to claim compensation.
|
|
|
Type:
ALTERNATE
|
Filing Date:
September 23, 2004
|
Filed By:
CMMR/LYNCH/PUC
|
|
Description:
Interim Opinion Regarding Resource Adequacy. Comments are due September 30,
2004; reply comments - October 5, 2004.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 22, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
opening; on the draft decision of ALJ Wetzell re resource adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 20, 2004
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
on Draft Interim Opinion regarding Resource Adequacy.
|
|
|
Type:
REPLY
|
Filing Date:
September 20, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
in support of [its] Motion to Strike Portions of the testimony of the
California Cogeneration Council and the Cogeneration Association of California.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 20, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on the draft decision of ALJ Wetzell on resource adequacy requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 20, 2004
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
opening; on the draft decision of ALJ Wetzell.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 20, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on draft interim opinion regarding resource adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 20, 2004
|
Filed By:
CALPINE CORPORATION
|
|
Description:
on draft interim opinion regarding resource adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 20, 2004
|
Filed By:
DUKE ENERGY NORTH AMERICA
|
|
Description:
on draft interim opinion regarding resource adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 20, 2004
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
on draft interim opinion regarding resource adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 20, 2004
|
Filed By:
POWEREX CORP.
|
|
Description:
on ALJ's proposed decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 20, 2004
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
on the draft decision of ALJ Wetzell on resource adequacy issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 20, 2004
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
on the draft decision of ALJ Wetzell on resource adequacy issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 20, 2004
|
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
|
|
Description:
on the draft decision of ALJ Wetzell on resource adequacy issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 20, 2004
|
Filed By:
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
|
|
Description:
on draft interim opinion regarding resource adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 20, 2004
|
Filed By:
WESTERN POWER TRADING FORUM
|
|
Description:
on the Resource Adequacy Draft Decision.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 20, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on Draft Decision of ALJ Wetzell.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 20, 2004
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
on the Draft Decision of ALJ Wetzell.
|
|
|
Type:
COMMENTS
|
Filing Date:
September 20, 2004
|
Filed By:
SEMPRA ENERGY GLOBAL ENTERPRISES
|
|
Description:
on Draft Decision of ALJ Wetzell.
|
|
|
Type:
RULING
|
Filing Date:
September 16, 2004
|
Filed By:
ASSIGNED COMM. PEEVEY/CPUC
|
|
Description:
On Interaction Between the CPUC-Long-Term Planning Process and the California
Energy Commission (CEC) Integrated Energy Policy Report (IEPR) Process
|
|
|
Type:
RULING
|
Filing Date:
September 16, 2004
|
Filed By:
ALJ/WETZELL/CPUC
|
|
Description:
on UCAN's Notice of Intent to claim intervenor compensation
|
|
|
Type:
RESPONSE
|
Filing Date:
September 13, 2004
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
to motion of Edison to strike portions of the testimony of CAC.
|
|
|
Type:
RESPONSE
|
Filing Date:
September 13, 2004
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
to Edison's motion to strike and PG&E's joinder.
|
|
|
Type:
RESPONSE
|
Filing Date:
September 13, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to Reply to Motion of PG&E to strike testimony of Western Power Trading Forum
on Diablo Canyon refurbishment
|
|
|
Type:
RESPONSE
|
Filing Date:
September 13, 2004
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
|
|
Description:
to motion of Edison to strike portions of the testimony of CAC.
|
|
|
Type:
NOTICE
|
Filing Date:
September 8, 2004
|
Filed By:
UTILITY CONSUMERS' ACTION NETWORK
|
|
Description:
of Intent to Claim Compensation.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 7, 2004
|
Filed By:
WEST COAST POWER
|
|
Description:
On September 1, 2004, Greg Blue, Senior Director, Government Affairs, Dynegy,
Inc., met with Brian Prusnek, advisor to Cmmr. Kennedy, in San Francisco. Also
present was Brian Cragg, representing West Coast Power. Blue and Cragg
described the challenges West Coast faces at its Long Beach and El Segundo
plants after the expiration of West Coast Power's contracts with the California
Department of Water Resources at the end of the year. Blue recounted recent
meetings with the California Independent System Operator concerning the role
West Coast Power's plants play in promoting local grid reliability and energy
deliverability in the congested west Los Angeles area and described West Coast
Power's unsuccessful attempts to negotiate bilateral contracts with Southern
California Edison Company.
|
|
|
Type:
EXPARTE
|
Filing Date:
September 7, 2004
|
Filed By:
WEST COAST POWER
|
|
Description:
On September 1, 2004, Ershel Redd, Executive Vice-President of Commercial
Operations and President of West Coast Operations for NRG Energy Inc., met with
Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Ben
Trammell, Managing Director, and Greg Blue, Senior Director of Government
Affairs, of Dynegy, Inc., and Brian Cragg of Goodin, MacBride, Squeri, Ritchie
and Day, attorneys for West Coast Power. Written material (attached to the
notice) was used. Redd and Blue described the challenges West Coast faces at
its Long Beach and El Segundo plants after the expiration of West Coast Power's
contracts with the California Department of Water Resources at the end of the
year. Trammell recounted recent meetings with the California Independent System
Operator concerning the role West Coast Power's plants play in promoting local
grid reliability and energy deliverability in the congested west Los Angeles
area. Trammell described West Coast Power's unsuccessful attempts to negotiate
bilateral contracts with Southern California Edison Company. Cragg presented a
written analysis of the authority the Commission had granted in D04-07-028.
|
|
|
Type:
MOTION
|
Filing Date:
September 1, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Strike Portions of the Testimony of the California Cogeneration Council and
the Cogeneration Association of California and request for Order Shortening
Time.
|
|
|
Type:
DRAFT DECISION
|
Filing Date:
August 31, 2004
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Interim opinion re resource adequacy. Comments are due September 20, 2004;
reply comments - 5 days after comments are filed.
|
|
|
Type:
OPPOSITION
|
Filing Date:
August 27, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
To Motion of Strategic Energy and Constellation NewEnergy To Strike Testimony
of Edison and TURN
|
|
|
Type:
RESPONSE
|
Filing Date:
August 27, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
In Opposition to the Motion of Strategic Energy and Constellation NewEnergy to
Strike Portions of the Prepared Testimony of TURN Witness Kevin Woodruff
|
|
|
Type:
RESPONSE
|
Filing Date:
August 27, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Motion of Strategic Energy/Constellation New Energy to strike testimony
|
|
|
Type:
EXPARTE
|
Filing Date:
August 26, 2004
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
On August 23, 2004, Lisa Cottle of White & Case LLP, attorneys for the
California Cogeneration Council (CCC), spoke on the telephone with Julie Fitch,
advisor to Cmmr. Peevey. Cottle communicated the CCC's interest in determining
the scope of the qualifying facility issues and explained that, if the
Commission defers a decision on long-term QF policy issues, all three utilities
must be required to reserve a place for QF capacity in their resource plans.
|
|
|
Type:
REPLY
|
Filing Date:
August 20, 2004
|
Filed By:
WESTERN POWER TRADING FORUM
|
|
Description:
to Motion of PG&E to Strike Testimony of Weatern Power Trading Forum on Diablo
Canyon Refurbishment.
|
|
|
Type:
MOTION
|
Filing Date:
August 19, 2004
|
Filed By:
CONSTELLATION NEW ENERGY, INC.
STRATEGIC ENERGY, L.L.C.
|
|
Description:
to Intervene; ATTACHED: Motion to Strike Testimony of SoCal Edison Co., and
TURN;
ATTACHED: Motion for Order Shortening Time for Filing and Serving
Responses to Motion to Strike Testimony of SoCal Edison Co., and TURN.
|
|
|
Type:
MOTION
|
Filing Date:
August 18, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to strike testimony of Western Power Trading Forum on Diablo Canyon
refurbishment.
|
|
|
Type:
RULING
|
Filing Date:
August 16, 2004
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Dismisses PG&E's motion to sever (August 11, 2004) as moot.
|
|
|
Type:
RULING
|
Filing Date:
August 13, 2004
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Grants the motion of UCAN to intervene.
|
|
|
Type:
MOTION
|
Filing Date:
August 11, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to sever long-term policy for expiring QF issues and request for order
shortening time for responses.
|
|
|
Type:
RESPONSE
|
Filing Date:
August 6, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to an emergency motion of Calpine for a ruling establishine appropriate
guidelines governing the scope of information to be considered confidential.
|
|
|
Type:
PETITION
|
Filing Date:
August 5, 2004
|
Filed By:
UTILITY CONSUMERS' ACTION NETWORK
|
|
Description:
to Intervene.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 29, 2004
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
Reply; on additional Resource Adequacy issues.
|
|
|
Type:
RULING
|
Filing Date:
July 29, 2004
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Grants the motion of South San Joaquin Irrigation District to intervene.
|
|
|
Type:
RULING
|
Filing Date:
July 29, 2004
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Grants the July 9, 2004 motion of PG&E for a protective order, as set forth.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 29, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; in response to ALJ Ruling requesting additional comments on resource
adequacy issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 29, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
reply; on ALJ Ruling re acceleration of resource adequacy requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 29, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
reply; to ALJ's Ruling requesting additonal comments on resource adequacy
issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 29, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Reply; on ALJ Wetzell Ruling regarding Resource Adequacy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 27, 2004
|
Filed By:
CALIFORNIA CONSUMER EMPOWERMENT ALLIANCE
|
|
Description:
reply; on resource adequacy workshop.
|
|
|
Type:
RULING
|
Filing Date:
July 27, 2004
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Finds that the Green Power Institute, Natural Resources Defense Council, Union
of Concerned Scientists and TURN are each eligible for an award of intervenor
compensation. Grants the requests of UCS, Constellation Power, FPL Energy, and
Cal. Dept. of Water Resources State Water Project/State Water Contractors to
intervene.
|
|
|
Type:
REPLY
|
Filing Date:
July 27, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Comments on Resource Adequacy Workshop Report.
|
|
|
Type:
MOTION
|
Filing Date:
July 27, 2004
|
Filed By:
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
|
|
Description:
to intervene.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 27, 2004
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
reply; on the workshop report on resource adequacy issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 27, 2004
|
Filed By:
DUKE ENERGY NORTH AMERICA
|
|
Description:
reply; on the workshop report on resource adequacy issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 27, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; on the workshop report on resource adequacy issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 27, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
reply; on the workshop report on resource adequacy issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 27, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
reply; on workshop report on resource adequacy issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 27, 2004
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
reply; on workshop report on resource adequacy issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 27, 2004
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
Reply; on Resource Adequacy Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 27, 2004
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Reply; on Resource Adequacy Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 27, 2004
|
Filed By:
POWEREX CORP.
|
|
Description:
Reply; on Workshop Report addressing Resource Adequacy issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 27, 2004
|
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
|
|
Description:
Reply; on the Resource Adequacy Workshop Report.
|
|
|
Type:
RESPONSE
|
Filing Date:
July 26, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
to Emergency Motion of Calpine Corporation for a Ruling establishing
confidentiality guidelines.
|
|
|
Type:
RESPONSE
|
Filing Date:
July 26, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
to PG&E's motion for protective order.
|
|
|
Type:
RESPONSE
|
Filing Date:
July 26, 2004
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
in support of the July 22, 2004 Calpine motions re confidentiality.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 23, 2004
|
Filed By:
SILICON VALLEY MANUFACTURING GROUP
|
|
Description:
concerning ALJ Cooke's Report regarding Workshops on Resource Adequacy Issues:
SVMG Capacity Tagging Proposal..
|
|
|
Type:
COMMENTS
|
Filing Date:
July 22, 2004
|
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
|
|
Description:
in response to July 8, 2004 ruling on resource adequacy issues.
|
|
|
Type:
RESPONSE
|
Filing Date:
July 22, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
to ALJ's ruling requesting additional comments on resource adequacy issues.
|
|
|
Type:
MOTION
|
Filing Date:
July 22, 2004
|
Filed By:
CALPINE CORPORATION
|
|
Description:
for an order shortening time to respond to emergency motion for a ruling
establishing appropriate guidelines governing the scope of information to be
considered confidential.
|
|
|
Type:
LAW & MOTION
|
Filing Date:
July 22, 2004
|
Filed By:
CALPINE CORPORATION
|
|
Description:
Emergency motion for a ruling establishing appropriate guidelines governing the
scope of information to be considered confidential.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 22, 2004
|
Filed By:
DYNEGY, INC.
|
|
Description:
LATE FILED. On June 28, 2004, Bruce A. Williamson, Chairman and Chief Executive
Officer of Dynegy Inc. (Dynegy), met with Cmmr. Kennedy in San Francisco, and
on July 20, 2004, sent a follow-up letter (copy attached to the notice) to
Cmmr. Kennedy. Also present were Brian Prusnek, advisor to Cmmr. Kennedy, and
Pete Wilt, Vice-President, Investor Relations, Greg Blue and Jennifer Rosser,
Senior Directors, Government Affairs, and Brian Cragg, representing Dynegy.
Dynegy's executives discussed Dynegy's new corporate policies and goals.
Dynegy executives discussed the need for an accelerated Resource Adequacy
timeline and for Deliverability Standards.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 22, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on the Ruling of ALJ Wetzell regarding resource adequacy issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 22, 2004
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
on additional resource adequacy issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 22, 2004
|
Filed By:
WESTERN POWER TRADING FORUM
|
|
Description:
on the Ruling requesting additional comments on resource adequacy issues and
phase-in schedule adopted in Decision 04-01-050.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 22, 2004
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
on additional resource adequacy issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 22, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on ALJ Ruling re acceleration of resource adequacy requirements.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 22, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
in response to ALJ's ruling requesting additional comments on resource adequacy
issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 22, 2004
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
on proposed accelaration of the phase-in of full resource adequacy.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 22, 2004
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
additional; on resource adequacy issues.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 15, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
On July 13, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and
Electric Company (PG&E), met with Julie Fitch, advisor to Cmmr. Peevey, in San
Francisco. Also present were Barbara Hale, Robert Lane, Stephen St. Marie,
Maryam Ebke, Jeanette Lo, Clayton Tang, and Shannon Eddy of the Commission;
Constance Leni and Dave Vidaver of the California Energy Commission; and Roy
Kuga, Vice President, Hal La Flash and Ray Williams, Directors, Gas and
Electric Supply, Fong Wan, Vice President, Power Contracts & Electric Resource
Development, Valerie Winn, Manager, Electric Revenue Requirements, and John
Bogy, Attorney, for PG&E. Written material (attached to the notice) was used.
Kuga described PG&E's proposal to implement the Energy Action Plan loading
order. Wan reviewed PG&E's plan to conduct two separate and simultaneous
long-term solicitations - one for resources that would be purchased under
long-term contracts and one for new utility-owned generation facilities. Wan
explained the benefits of PG&E's target for long-term commitments. Jacobson
emphasized PG&E's need for immediate authority to conduct mid-term
solicitations.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 14, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
on Workshop Report on Resource Adequacy Issues (REVISED). [Pursuant to the June
4, 2004 ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on Resource Adequacy Issues Workshop Report.
|
|
|
Type:
PETITION
|
Filing Date:
July 13, 2004
|
Filed By:
CALIFORNIA DEPARTMENT OF WATER RESOURCES
STATE WATER PROJECTS
THE STATE WATER CONTRACTORS
|
|
Description:
Joint Late; to Intervene; COMMENTS included.
|
|
|
Type:
MOTION
|
Filing Date:
July 13, 2004
|
Filed By:
FPL ENERGY, LLC
|
|
Description:
to Intervene & included COMMENTS on the Workshop Report on Resource Adequacy
Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2004
|
Filed By:
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
|
|
Description:
on the Workshop Report on Resource Adequacy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2004
|
Filed By:
CALIFORNIA MUNICIPAL UTILITIES ASSOCIATION
|
|
Description:
on the Workshop Report on Resource Adequacy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2004
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
Opening; on the Workshop Report on Resource Adequacy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2004
|
Filed By:
POWEREX CORP.
|
|
Description:
on Workshop Report addressing Resource Adequacy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2004
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
Opening; on the Workshop Report on Resource Adequacy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on the Workshop Report on Resource Adequacy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2004
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
on the Workshop Report on Resource Adequacy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2004
|
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
|
|
Description:
on ALJ Cooke's Workshop Report on Resource Adequacy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2004
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
Opening; on the Workshop Report on Resource Adequacy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2004
|
Filed By:
NORTHERN CALIFORNIA POWER AGENCY
|
|
Description:
on the Workshop Report on Resource Adequacy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on the Workshop Report on Resource Adequacy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
on the Workshop Report on Resource Adequacy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2004
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
on Resource Adequacy Workshop Report.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2004
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
on the Workshop Report on Resource Adequacy Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 13, 2004
|
Filed By:
SEMPRA ENERGY GLOBAL ENTERPRISES
|
|
Description:
on Workshop Report on Resource Adequacy Issues.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 12, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
LATE FILED. On July 2, 2004, Bruce C. Foster, Vice President, Regulatory
Operations for Southern California Edison Company (SCE), met with Julie Fitch,
advisor to Pres. Peevey, in San Francisco. Also present were Sean Gallagher of
the Legal Division, Stephen St. Marie of the Energy Division, Gary Schoonyan,
Director, Regulatory Policy and Affairs for SCE, and Robert Lane. Written
material (copy attached to the notice) was used. SCE representatives discussed
SCE's concerns regarding proposed interim order regarding electricity
reliability issues.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 9, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
LATE FILED. On July 2, 2004, Erik Jacobson, Chief, Regulatory Relations,
Pacific Gas and Electric Company (PG&E), met with Trina Horner, advisor to
Cmmr. Lynch, and Julie Fitch, advisor to Cmmr. Peevey, in two separate meetings
in San Francisco, and had a telephone conversation with Peter Hanson, advisor
to Cmmr. Brown. At the meetings with Trina Horner and Julie Fitch also present
were Claudia Greif, Manager, and Joe Lawlor, Energy Trading Consultant, Gas and
Electric Supply Strategic Consulting, PG&E. Written material (attached to the
notice) was used. Jacobson stated that the proposed decision should be modified
to apply only to 2004. Jacobson also emphasized the importance of full cost
recovery and getting clear guidance from the ISO regarding the nature of
reliability problems. Greif explained that PG&E has a merchant role and its
access to information regarding congestion is limited. Lawlor sated that there
are no known reliability situations in PG&E's service territory that are not
being addressed through RMR contracts.
|
|
|
Type:
RULING
|
Filing Date:
July 9, 2004
|
Filed By:
ALJ/CAREW/PUC
|
|
Description:
Concerns access of collaborative staff to long-term plans and supporting
testimony.
|
|
|
Type:
MOTION
|
Filing Date:
July 9, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
for protective order pursuant to Rule 74.7.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 9, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
On July 7, 2004, Robin Smutny-Jones of the California Independent System
Operator (ISO) had a telephone conversation with Julie Fitch, advisor to Pres.
Peevey. Jim Detmers of the ISO also participated in the communication. The
ISO discussed the proposed Commission order regarding electricity reliability
issues. The ISO explained that the order is a positive step in the right
direction to help direct utility procurement and planning to better align with
the limitations of the transmission grid. The ISO discussed the need for close
coordination with appropriate parties in the event the order is approved.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 9, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
On July 6, 2004, Robin Smutny-Jones of the California Independent System
Operator (ISO), met with Brian Prusnek, advisor to Cmmr. Kennedy, in San
Francisco. Also present was Jim Detmers of the ISO. The ISO discussed ISO
real time operational issues that arise as a result of utility procurement and
dispatch practices. The ISO noted that real time congestion management has
increased dramatically during the past couple of years. The ISO urged that the
Commission procurement rules as well as cost recovery rules be aligned with
efficient scheduling and dispatch to enable the ISO to reliably operate the
grid.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 9, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
On July 6, 2004, Robin Smutny-Jones of the California Independent System
Operator (ISO), met with David Gamson, advisor to Cmmr. Brown, in San
Francisco. Also present was Jim Detmers of the ISO. The ISO discussed the
pending Commission order regarding electricity reliability issues. The ISO
stated that the order would be beneficial for California by helping to direct
utility procurement and dispatch to better reflect the physical limitations of
the transmission grid. The ISO also discussed the impact of this order on
total overall costs and whether the order would be effective in changing
utility procurement and scheduling behavior.
|
|
|
Type:
EXPARTE
|
Filing Date:
July 9, 2004
|
Filed By:
WEST COAST POWER
|
|
Description:
On July 6, 2004, Greg Blue, representing West Coast Power, an interested
person, as defined by Rule 5(h)(2), had two separate telephone conversations:
with David Gamson, advisor to Cmmr. Brown, and Brian Prusnek, advisor to Cmmr.
Kennedy; and later the same day, he emailed to David Gamson and Brian Prusnek a
document (copy attached to the notice). Blue urged support for the proposed
decision of Pres. Peevey.
|
|
|
Type:
RULING
|
Filing Date:
July 8, 2004
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Requests additional comments on resource adequacy issues. Comments are due
July 22, 2004; replies - July 29, 2004.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 1, 2004
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
on Draft Decision regarding Electricity Reliability.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 1, 2004
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
on the interim draft order re electricity reliability issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 1, 2004
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
on interim order re electricity reliability issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 1, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
on the draft decision re reliability issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 1, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on proposed interim order re electricity reliability issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 1, 2004
|
Filed By:
CALPINE CORPORATION
|
|
Description:
on ALJ's draft decision re electricity reliability issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 1, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
|
|
Description:
on the draft decision mailed June 28, 2004.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 1, 2004
|
Filed By:
WESTERN POWER TRADING FORUM
|
|
Description:
in support of the Draft Interim Order regarding Reliability issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
July 1, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on Interim Order regarding Electricity Reliability Issues.
|
|
|
Type:
MOTION
|
Filing Date:
June 30, 2004
|
Filed By:
CONSTELLATION POWER SOURCE
|
|
Description:
to intervene.
|
|
|
Type:
RULING
|
Filing Date:
June 29, 2004
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Supplements requirements for long-term plan filings.
|
|
|
Type:
DRAFT DECISION
|
Filing Date:
June 28, 2004
|
Filed By:
ALJ/CPUC
|
|
Description:
Interim order re electricity reliability issues. Comments are due July 1,
2004; no reply comments will be entertained.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 21, 2004
|
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
|
|
Description:
reply; on Ruling re reliability issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 21, 2004
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
reply; in response to the June 10, 2004 ruling re reliability issues [pursuant
to the June 17th ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
June 21, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
reply; in response to the June 10, 2004 ruling.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 21, 2004
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
reply; concerning ruling re reliability issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 21, 2004
|
Filed By:
ORA/OBIORA/PUC
|
|
Description:
reply; on the ruling re reliability issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 21, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
reply; on Ruling re reliability issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 21, 2004
|
Filed By:
TERMOELECTRICA DE MEXICALI S. DE R.L. DE C.V.
|
|
Description:
Reply;
|
|
|
Type:
COMMENTS
|
Filing Date:
June 21, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on Assigned Commissioner's Ruling regarding Reliability Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 17, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on Assigned Commissioner's Ruling regarding Reliability Issues.
|
|
|
Type:
RULING
|
Filing Date:
June 17, 2004
|
Filed By:
ALJ/MINKIN/PUC
|
|
Description:
Concerns reply comments on reliability issues. Reply comments are due June 21,
2004.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 17, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
in response to the June 10, 2004 Assigned Commissioner's Ruling.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 17, 2004
|
Filed By:
NORTHERN CALIFORNIA POWER AGENCY
|
|
Description:
on the Assigned Commissioner's Ruling re Reliability Issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 17, 2004
|
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
|
|
Description:
concerning the Assigned Commissioner's Ruling re reliability issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 17, 2004
|
Filed By:
CALPINE CORPORATION
|
|
Description:
on the Assigned Commissioner's Ruling re reliability issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 17, 2004
|
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
|
|
Description:
concerning the Assigned Commissioner's Ruling re reliability issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 17, 2004
|
Filed By:
CALIFORNIA MUNICIPAL UTILITIES ASSOCIATION
|
|
Description:
on the Assigned Commissioner's Ruling re reliability issues.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 17, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on Assigned Commissioner's Ruling re Reliability Isuses.
|
|
|
Type:
COMMENTS
|
Filing Date:
June 17, 2004
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
on Assigned Commissioner's Ruling regarding Reliability Issues.
|
|
|
Type:
RULING
|
Filing Date:
June 16, 2004
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Clarifies instructions on long-term plan filings set in Appendix A to the June
4, 2004 Ruling and Scoping Memo.
|
|
|
Type:
REPORT
|
Filing Date:
June 15, 2004
|
Filed By:
ALJ/COOKE/PUC
|
|
Description:
Workshop Report on Resource Adequacy Issues.
|
|
|
Type:
RULING
|
Filing Date:
June 10, 2004
|
Filed By:
CMMR/PEEVEY/PUC
|
|
Description:
Re: Reliability Issues. Comments on the issues raised in the ruling shall be
filed by June 17, 2004.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 8, 2004
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
|
|
Description:
On June 3, 2004, Evelyn Kahl, counsel to the Cogeneration Association of
California (CAC), met with Julie Fitch, advisor to Pres. Peevey, in San
Francisco. Kahl raised CAC's concern over the possibility of loosing 1100 MW
of existing cogeneration resources in Southern California Edison Company's
(SCE) portfolio. Kahl explained that four existing qualifying facility
contracts will be expiring beginning in 2005. Kahl emphasized that currently
there are no rules or guidelines governing renewal of these contracts and
encouraged the Commission to take an active role to avoid loss of SCE existing
resource base in light of the state's evident need for generation.
|
|
|
Type:
EXPARTE
|
Filing Date:
June 7, 2004
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
On June 3, 2004, Jerry Bloom of White & Case LLP, attorneys for the California
Cogeneration Council (CCC), met with Julie Fitch, advisor to Cmmr. Peevey, in
San Francisco. Also present was Lisa Cottle of White & Case LLP. Bloom and
Cottle discussed the status of CCC member companies' efforts to obtain
five-year Standard Offer 1 (SO1) contracts from California's investor-owned
utilities (Utilities). Bloom and Cottle explained that CCC members have not
been able to obtain a five-year SO1 contracts from any Utility, despite their
repeated requests. Bloom and Cottle discussed the CCC's concerns that the
Utilities are likely to impose unreasonable terms on qualifying facilities
(QFs) once they do finally make the five-year SO1 contracts available. Bloom
and Cottle discussed the need for long-term contracts for existing and new QFs,
explaining that companies are making decisions now about whether to make
investments in their facilities. Bloom and Cottle noted that companies are
interested in investing in new cogeneration facilities, and are paying close
attention to California's QF policies in deciding whether to make those
investments.
|
|
|
Type:
SCOPING RULING
|
Filing Date:
June 4, 2004
|
Filed By:
CMMR/PEEVEY/PUC
|
|
Description:
Determines that this is a ratesetting proceeding. Sets the following schedule:
2nd prehearing conference - 8/25/4; evidentiary hearing - 8/30/4; Long Term
Procurement: concurrent opening briefs - 9/27, concurrent reply
briefs/submission - 10/8/4, final order - 12/16/4; Resource Adequacy: workshop
report - June 2004, comments on workshop report due 21 days after report - July
2004, reply to comments/submission due 14 days after comments - July 2004;
final order - 9/23/4.
|
|
|
Type:
MOTION
|
Filing Date:
June 1, 2004
|
Filed By:
UNION OF CONCERNED SCIENTISTS
|
|
Description:
to intervene.
|
|
|
Type:
NOTICE
|
Filing Date:
June 1, 2004
|
Filed By:
THE UTILITY REFORM NETWORK
|
|
Description:
of intent to claim compensation.
|
|
|
Type:
NOTICE
|
Filing Date:
June 1, 2004
|
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
|
|
Description:
of intent to claim compensation.
|
|
|
Type:
NOTICE
|
Filing Date:
June 1, 2004
|
Filed By:
UNION OF CONCERNED SCIENTISTS
|
|
Description:
of intent to claim intervenor compensation.
|
|
|
Type:
NOTICE
|
Filing Date:
May 28, 2004
|
Filed By:
GREEN POWER INSTITUTE
|
|
Description:
of intent to claim compensation.
|
|
|
Type:
EXPARTE
|
Filing Date:
May 17, 2004
|
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
|
|
Description:
On May 12, 2004, Michael Alcantar representing the Cogeneration Association of
California (Cogen) met with Pres. Peevey in San Francisco. Also present were
Julie Fitch, advisor to Pres. Peevey, and Neil Burgess, Tom Lu, and Kelly
Lucas, on behalf of Cogen. Cogen representatives discussed the benefits of
cogeneration resources for multiple state policy interests; the contract
termination dates for several of the existing Cogen project contracts; the need
to secure a clear indication of the desire and need to retain the firm capacity
from these resources quickly and decisively from the Commission; and possible
procedures to seek prompt Commission review of utility and cogeneration contact
extension filings.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 14, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
on the allocation of Kings River Conservation District and City and County of
San Francisco Power Purchase Agreement.
|
|
|
Type:
COMMENTS
|
Filing Date:
May 14, 2004
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
[per ALJ Ruling dated May 4, 2004].
|
|
|
Type:
COMMENTS
|
Filing Date:
May 14, 2004
|
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
|
|
Description:
on the CDWR's letter dated April 14, 2004 [pursuant to May 4, 2004 ruling].
|
|
|
Type:
COMMENTS
|
Filing Date:
May 14, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
on the request of the CDWR to allocate peakers [pursuant to the May 4, 2004
ruling].
|
|
|
Type:
MISCELLANEOUS FILING
|
Filing Date:
May 7, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Joint Outline for the 2004 Resource Plan.
|
|
|
Type:
RULING
|
Filing Date:
May 4, 2004
|
Filed By:
ALJ/WETZELL/PUC
|
|
Description:
Confirms and clarifies bench ruling. Comments on the DWR request set forth in
the attached letter may be filed by May 14, 2004, in this proceeding. Comments
should not be filed in R01-10-024.
|
|
|
Type:
COMMENTS
|
Filing Date:
April 26, 2004
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
|
|
Description:
and prehearing conference statement, pursuant to the OIR.
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
April 26, 2004
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
Prehearing Conference Statement.
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
April 26, 2004
|
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
|
|
Description:
Prehearing Conference Statement.
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
April 26, 2004
|
Filed By:
CALIFORNIA COGENERATION COUNCIL
|
|
Description:
[pursuant to the OIR].
|
|
|
Type:
PREHEARING CONFERENCE STATEMENT
|
Filing Date:
April 26, 2004
|
Filed By:
CALPINE CORPORATION
|
|
Description:
[pursuant to Ordering Paragraph 8 of the OIR].
|
|
|
Type:
COMMISSION RULEMAKING
|
Filing Date:
April 1, 2004
|
Filed By:
CPUC - PG&E, EDISON, SDG&E
|
|
Description:
Order Instituting Rulemaking to promote policy and program coordination and
integration in electric utility resource planning. [Preliminary determines
that this is a ratesetting proceeding. Sets the following preliminary
schedule: Interested parties comments on utilitiies' working outlines - April
15, 2004; prehearing conference statements - April 26; prehearing conference -
April 30, 2004.]
|