All Documents For
Proceeding R0404003
Date Filed: April 1, 2004

Number of Documents: 1417

Type: REQUEST Filing Date: May 4, 2012
Filed By:
The Utility Reform Network
Description: for intervenor compensation for contributions to D11-07-010, D11-10-016, and D12-03-006.

Type: PROPOSED DECISION Filing Date: February 6, 2012
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
Description: ORDER GRANTING VARIOUS MOTIONS AND CLOSING PROCEEDINGS. Opening comments, which shall not exceed 15 pages, are due February 26, 2012. Reply comments, which shall not exceed 5 pages, are due 5 days after the last day for filing comments.

Type: MOTION Filing Date: December 6, 2011
Filed By:
California Cogeneration Council
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producedrs Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: of Settling Parties to Withdraw Petitions for Modification and to Close Dockets R.04-04-003 and R.04-04-025

Type: MOTION Filing Date: December 2, 2011
Filed By:
California Cogeneration Council
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Motion of Southern California Edison Company to Withdraw Claims and of Settling Parties to Close Docket

Type: MOTION Filing Date: December 2, 2011
Filed By:
California Cogeneration Council
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Juniper Generation LLC
PE Berkeley
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Joint Parties' motion to withdraw pending motions, pleadings, and petition for modification in Rulemaking 99-11-022 and to close docket

Type: MOTION Filing Date: December 2, 2011
Filed By:
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
Description: to withdraw Joint Petition for Modification of D.07-12-052 of Southern California Edison Company, Pacific Gas and Electric Company, and San Diego Gas & Electric Company in R.06-02-013& Electric Company in R.06-02-013

Type: REPORT Filing Date: December 1, 2011
Filed By:
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
Description: Joint Semi-Annual Progress Report (pursuant to D.10-12-035)

Type: PROPOSED DECISION Filing Date: November 22, 2011
Filed By:
ALJ/WETZELL/CPUC
Description: Decision Granting, in Part, and Denying, in Part, Intervenor Compensation Claim of CAlifornians for Renewable Energy for Substantial Contributions to Multiple Decisions. Opening comments, which shall not exceed 15 pages, are due no later than December 12, 2011. Reply comments, which shall not exceed 5 pages, are due no later than five days after the last day for filing comments.

Type: EXPARTE Filing Date: October 6, 2011
Filed By:
Alliance for Retail Energy Markets
Marin Energy Authority
Description: The Marin Energy Authority and the Alliance for Retail Energy Markets noticed an oral ex parte communication with Commissioner Simon, and Bishu Catterjee, advisor to Commissioner Simon, on October 4, 2011.

Type: COMMENTS Filing Date: October 3, 2011
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
Description: Reply; on the Proposed and Alternate Proposed Decisions.

Type: EXPARTE Filing Date: October 3, 2011
Filed By:
California Cogeneration Council
Cogeneration Association of California
Division of Ratepayer Adovactes
Energy Producers and Users Coalition
Independent Energy Producers Association
PG&E
SCE
SDG&E
TURN
Description: Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, the California Cogeneration Council, the Independent Energy Producers Association, the Cogeneration Association of California, the Energy Producers and Users Coalition, the Division of Ratepayer Advocates and The Utility Reform Network noticed three separate oral ex parte communications as follows: 1. meeting with Stephen St. Marie, advisor to Commissioner Sandoval, 2. meeting with Damon Franz and Carol Brown, advisors to President Peevey; and 3. meeting with Bishu Chatterjee, advisor to Commissioner Simon, on September 29, 2011, respectively.

Type: COMMENTS Filing Date: September 28, 2011
Filed By:
California Cogeneration Council
California Municipal Utilities Association
Cogeneration Association of California and The Energy Producers and Users Coalition
DRA/SALVACION/CPUC
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Opening comments on Proposed Decision and Alternate Proposed Decision regarding Petition for Modification of Decision 11-07-010.

Type: NOTICE Filing Date: September 28, 2011
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
Description: The Alliance for Retail Energy Markets, the Direct Access Customer Coalition and the Marin Energy Authority noticed that they have been granted an exparte meeting with Commissioner Simon, originally set for September 19, 2011, and re-scheduled to October 4, 2011.

Type: COMMENTS Filing Date: September 28, 2011
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
Description: on the Proposed and Alternate Proposed Decisions.

Type: EXPARTE Filing Date: September 23, 2011
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Description: LATE-FILED. The Direct Access Customer Coalition and the Alliance for Retail Energy Markets noticed both oral and written ex parte communication with Stephen St. Marie, Advisor to Commissioner Catherine J.K Sandoval, on September 19, 2011.

Type: REPORT Filing Date: September 21, 2011
Filed By:
California Cogeneration Council
Cogeneration Association of California
Division of Ratepayer Advocates
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Energy Producers and Users Coalition
The Utility Reform Network
Description: Joint Status Report on the Qualifying Facility and Combined Heat and Power Program Settlement Agreement

Type: ALTERNATE Filing Date: September 14, 2011
Filed By:
CMMR/FERRON/CPUC
Description: Alternate Proposed Decision of Commissioner Ferron granting, in part, Petition to Modify Decision 11-07-010 and request to establish a settlement agreement effective date and grant motion for closure. Opening comments are due no later than September 28, 2011 and reply comments must be filed within 5 days.

Type: PROPOSED DECISION Filing Date: September 14, 2011
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
Description: DECISION DENYING PETITION TO MODIFY DECISION 11-07-010. Opening comments, which shall not exceed 15 pages, are due September 28, 2011. Reply comments, which shall not exceed 5 pages, are due 5 days after the last day for filing comments.

Type: AMENDMENT Filing Date: September 9, 2011
Filed By:
California Cogeneration Council
California Municipal Utilities Association
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Assocation
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Amendment to petition for modification (filed 7/28/2011).

Type: EXPARTE Filing Date: August 26, 2011
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
Description: The Alliance for Retail Energy Markets, the Marin Energy Authority and the Direct Access Customer Coalition noticed three separate oral exparte communications with Matthew Tisdale, advisor to Commissioner Michael Peter Florio; Stephen St. Marie, advisor to Commissioner Catherine J. K. Sandoval; and Damon Franz, advisor to Commission President Michael R. Peevey, on August 23, 2011.

Type: REPLY Filing Date: August 9, 2011
Filed By:
California Cogeneration Council
California Municipal Utilities Association
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Joint; in Support of Petition for Modification of Decision 11-07-010 and Request to Establish Settlement Effective Date and Grant Motion for Closure

Type: RESPONSE Filing Date: August 5, 2011
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
Shell Energy North America (US), L.P.
Description: TO JOINT PETITION FOR MODIFICATION OF DECISION 11-07-010 AND REQUEST TO ESTABLISH SETTLEMENT EFFECTIVE DATE AND TO GRANT MOTION FOR CLOSURE

Type: MOTION Filing Date: July 28, 2011
Filed By:
CAC and EPUC
CPUC, DRA
California Cogeneration Council
California Municipal Utilities Association
IEP
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
TURN
Description: Joint Parties';for Expedited Consideration of Joint Petition for Modification of D.11-07-010 and Request to Establish Settlement Effective Date and Grant Motion for Closure

Type: PETITION FOR MODIFICATION Filing Date: July 28, 2011
Filed By:
CAC and EPUC
CPUC, DRA
California Cogeneration Council
California Municipal Utilities Association
IEP
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
TURN
Description: Joint; of Decision 11-07-010 and Request to Establish Settlement Effective Date and Grant Motion for Closure

Type: RESPONSE Filing Date: July 20, 2011
Filed By:
Pacific Gas and Electric Company
San Diego Gas and Electric Company
Southern California Edison Company
Description: Joint response to notice of intent to claim intervenor compensation of CAlifornians for Renewable Energy.

Type: COMMENTS Filing Date: July 11, 2011
Filed By:
California Cogeneration Council
California Municipal Utilities Association
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Reply; of Joint Parties on Proposed Decision of ALJ Yip-Kikugawa Granting Petition to Modify Decision 10-12-035

Type: COMMENTS Filing Date: July 5, 2011
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
Shell Energy North America (US), L.P.
Description: on proposed decision granting petition to modify Decision 10-12-035

Type: NOTICE Filing Date: July 5, 2011
Filed By:
CAlifornians for Renewable Energy, Inc.
Description: Supplemental notice of intent to claim intervenor compensation.

Type: COMMENTS Filing Date: July 5, 2011
Filed By:
California Cogeneration Council
California Municipal Utilities Association
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: of Joint Petitioners on Proposed Decision of ALJ Yip-Kikugawa Granting Petition to Modify Decision 10-12-035

Type: MOTION Filing Date: June 24, 2011
Filed By:
CAlifornians for Renewable Energy, Inc.
Description: FOR OFFICIAL NOTICE

Type: RESPONSE Filing Date: June 23, 2011
Filed By:
Southern California Edison Company
Description: Amendment to response to Request for an award of intervenor compensation to CAlifornians for Renewable Energy (response filed on 6/22/2011).

Type: RESPONSE Filing Date: June 22, 2011
Filed By:
Southern California Edison Company
Description: to request for an award of intervenor compensation to CAlifornians for Renewable Energy.

Type: REPORT Filing Date: June 21, 2011
Filed By:
California Cogeneration Council
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Joint Status Report on the Qualifying Facility and Combined Heat and Power Program Settlement Agreement

Type: PROPOSED DECISION Filing Date: June 14, 2011
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
Description: DECISION GRANTING PETITION TO MODIFY DECISION 10-12-035. Opening comments, which shall not exceed 15 pages, are due July 4, 2011. Reply comments, which shall not exceed 5 pages, are due 5 days after the last day for filing comments.

Type: NOTICE Filing Date: May 25, 2011
Filed By:
CALJ/CLOPTON/CPUC
Description: of Co-Assignment

Type: REQUEST Filing Date: May 23, 2011
Filed By:
CAlifornians for Renewable Energy, Inc.
Description: for intervenor compensation for contributions to D05-12-021, D06-02-007, D06-07-032, D07-03-015, D07-04-020, D07-09-040, and D10-12-035.

Type: REQUEST Filing Date: May 20, 2011
Filed By:
The Utility Reform Network
Description: for intervenor compensation for substantial contirbutions to D10-12-035 and D11-03-051

Type: NOTICE Filing Date: May 19, 2011
Filed By:
The Utility Reform Network
Description: OF INTENT TO CLAIM INTERVENOR COMPENSATION

Type: REPLY Filing Date: April 28, 2011
Filed By:
California Cogeneration Council
California Municipal Utilities Association
Cogeneration Association of California and The Energy Producers and Users Coalition
DRA/SALVACION/CPUC
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Joint reply to response of Marin Energy Authority, the Alliance for Retail Energy Markets, Shell Energy North America (US) L.P., and the Direct Access Customer Coalition to the joint Petition for Modification of Decision 10-12-035 (filing authorized by ALJ Yip-Kikugawa per e-mail of 4/21/2011).

Type: RESPONSE Filing Date: April 18, 2011
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
Shell Energy North America (US), L.P.
Description: TO THE JOINT PETITION FOR MODIFICATION OF DECISION 10-12-035

Type: MOTION Filing Date: April 1, 2011
Filed By:
California Cogeneration Council
California Municipal Utilities Association
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Joint Motion to Shorten Time

Type: PETITION FOR MODIFICATION Filing Date: April 1, 2011
Filed By:
California Cogeneration Council
California Municipal Utilities Association
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas and Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Joint Petition for Modification of Decision No.10-12-035

Type: COMPLIANCE FILING Filing Date: March 21, 2011
Filed By:
California Cogeneration Council
Cogeneration Association of California and The Energy Producers and Users Coalition
Division of Ratepayer Advocates
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Joint Status Report on the Qualifying Facility and Combined Heat and Power Program Settlement Agreement

Type: MOTION Filing Date: March 16, 2011
Filed By:
California Municipal Utilities Association
Description: for abeyance and to shorten time.

Type: RESPONSE Filing Date: February 4, 2011
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
Description: TO THE APPLICATION OF CITY AND COUNTY OF SAN FRANCISCO FOR REHEARING OF DECISION 10-12-035

Type: RESPONSE Filing Date: February 4, 2011
Filed By:
California Cogeneration Council
California Public Utilities Commission, Division of Ratepayer Advocates
Cogeneration Association of California and The Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: TO APPLICATIONS FOR REHEARING OF DECISION 10-12-035

Type: REHEARING REQUEST Filing Date: January 20, 2011
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
Description: Application for Rehearing of Decision 10-12-035.

Type: REHEARING REQUEST Filing Date: January 20, 2011
Filed By:
California Municipal Utilities Association
Description: Application for Rehearing of Decision 10-12-035.

Type: REHEARING REQUEST Filing Date: January 18, 2011
Filed By:
City and County of San Francisco
Description: of Decision 10-12-035

Type: EXPARTE Filing Date: December 29, 2010
Filed By:
CAlifornians for Renewable Energy, Inc.
Description: CAlifornians for Renewable Energy, Inc. noticed a written ExParte Communications with the ALJs Yip-Kikugawa and Wetzell; President Peevey's Chief of Staff, Carol Brown; Commissioner Grueneich's Chief of Staff, Theresa Cho; Commissioner Bohn's Chief of Staff, Stephen St. Marie; Commissioner Simon's Interim Chief of Staff, Melicia Charles; and Commissioner Ryan's Chief of Staff, Sepideh Khosrowjah, on December 28, 2010.

Type: EXPARTE Filing Date: December 20, 2010
Filed By:
California Municipal Utilities Association
Description: The California Municipal Utilities Association noticed separate oral ex parte communications with Jason Reiger, advisor to Commissioner Nancy Ryan; Michael Wheeler, advisor to Commissioner Dian Grueneich; Robert Kinosian, advisor to Commissioner John Bohn; Carol Brown, Chief of Staff to President Michael Peevey; and Paul Phillips, advisor to Commissioner Timothy Alan Simon; on December 15, 2010.

Type: EXPARTE Filing Date: December 15, 2010
Filed By:
California Air Resources Board
Description: California Air Resources Board noticed a written ex parte communication with Commission President Michael R. Peevey and Administrative Law Judge Mark S. Wetzell on December 14, 2010.

Type: EXPARTE Filing Date: December 14, 2010
Filed By:
Alliance for Retail Energy Markets
Description: The Alliance for Retail Energy Markets noticed a written exparte communication with President Michael Peevey, Commissioner John Bohn, Commissioner Dian Grueneich, Commissioner Nancy Ryan, and Commissioner Timothy Simon on December 14, 2010.

Type: COMMENTS Filing Date: December 13, 2010
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
Description: Joint Reply; (on the ALJ Wetzell Decision adopting proposed settlement)

Type: COMMENTS Filing Date: December 13, 2010
Filed By:
California Cogeneration Council
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Joint Reply; on Proposed Decision approving the qualifying facility and combined heat and power program settlement agreement

Type: COMMENTS Filing Date: December 13, 2010
Filed By:
Shell Energy North America (US), L.P.
Description: Reply; on the Presiding Judge's Proposed Decision

Type: COMMENTS Filing Date: December 13, 2010
Filed By:
City and County of San Francisco
Description: Reply; on Judge Wetzell's Proposed Decision

Type: EXPARTE Filing Date: December 10, 2010
Filed By:
Southern California Edison Company
Description: LATE-FILED. Southern California Edison Company noticed an oral ex parte communication with Steve St. Marie, Advisor to Commissioner Bohn, and Andy Schwartz, Advisor to President Peevey on December 6, 2010.

Type: EXPARTE Filing Date: December 9, 2010
Filed By:
City and County of San Francisco
Constellation Energy
Marin Energy Authority
Description: The City and County of San Francisco, the Marin Energy Authority and Constellation Energy noticed three separate ex parte communications on December 6, 2010 with: 1) J. Jason Reiger, advisor to Commissioner Ryan, 2) Karl Meeusen, advisor to President Peevey and Robert Kinosian, advisor to Commissioner Bohn, and 3) Matt Tisdale, advisor to Commissioner Grueneich, respectively.

Type: EXPARTE Filing Date: December 9, 2010
Filed By:
California Municipal Utilities Association
Description: The California Municipal Utilities noticed four separate oral ex parte communications as follows: On December 6, 2010, with: 1. Michael Wheeler, advisor for Commissioner Dian Grueneich; 2. Robert Kinosian, advisor to Commissioner John Bohn; 3. Carol Brown, Chief of Staff to President Michael Peevey, Karl Meeusen, advisor to President Michael Peevey, and Jason Reiger, advisor to Commissioner Nancy Ryan; On December 7, 2010, with 1. Paul Phillips, advisor to Commissioner Timothy Alan Simon, respectively.

Type: EXPARTE Filing Date: December 8, 2010
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SEMPRA UTILITIES
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Pacific Gas and Electric Company (PG&E), Southern California Edison Company (SCE), and Sempra Utilities (Sempra) noticed a written exparte communication with Carol Brown (Chief of Staff to President Peevey) and Karl Meeusen (Advisor to President Peevey) on December 3, 2010.

Type: CERTIFICATE OF SERVICE Filing Date: December 7, 2010
Filed By:
California Cogeneration Council
Cogeneration Association of California and the Energy Producers and Users Coalition
Division of Ratepayer Advocates, CPUC
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Revised certificate of service to joint comments on Proposed Decision approving the Qualifying Facility and Combined Heat and Power Program Settlement Agreement.

Type: COMMENTS Filing Date: December 6, 2010
Filed By:
California Independent System Operator Corporation
Description: on Proposed Decision of ALJ Wetzell

Type: COMMENTS Filing Date: December 6, 2010
Filed By:
California Municipal Utilities Association
Description: on the Proposed Decision

Type: COMMENTS Filing Date: December 6, 2010
Filed By:
California Cogeneration Council
Cogeneration Association of California
Division of Ratepayer Advocates
Energy Producers and Users Coalition
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Joint; on Proposed Decision approving the qualifying facility and combined heat and power program settlement agreement

Type: COMMENTS Filing Date: December 6, 2010
Filed By:
Shell Energy North America (US), L.P.
Description: Opening; on the Presiding Judge's Proposed Decision

Type: COMMENTS Filing Date: December 6, 2010
Filed By:
City and County of San Francisco
Description: on Judge Wetzell's Proposed Decision

Type: COMMENTS Filing Date: December 6, 2010
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
Description: Joint; on the ALJ Wetzell Decision adopting proposed settlement

Type: EXPARTE Filing Date: December 2, 2010
Filed By:
Calfiornia Energy Commission
Description: The California Energy Commission noticed a written Ex Parte Communication with President Michael R. Peevey, Commissioners Dian Grueneich, John Bohn, Timothy Alan Simpson, and Nancy E. Ryan; and Administrative Law Judge Mark S. Wetzell, on December 2, 2010.

Type: ALJ RESOLUTION Filing Date: November 24, 2010
Filed By:
ALJ/WETZELL/CPUC
Description: RESOLUTION ALJ-262 Ratification of changes to preliminary determinations pursuant to Rule 7.5.

Type: PROPOSED DECISION Filing Date: November 16, 2010
Filed By:
ALJ/WETZELL/CPUC
Description: Decision adopting proposed settlement. Opening comments, which shall not exceed 15 pages, are due no later than December 6, 2010. Reply comments, which shall not exceed 5 pages, are due 5 days after the last day for filing opening comments.

Type: RULING Filing Date: November 2, 2010
Filed By:
ALJ/WETZELL/CPUC
Description: Granting Motions for Party Status

Type: COMMENTS Filing Date: November 1, 2010
Filed By:
California Cogeneration Council
Cogeneration Association of California and the Energy Producers and Users Coalition
Division of Ratepayer Advocates
Independent Energy Producers Association
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Joint reply comments in support of motion for approval of Qualifying Facility and Combined Heat and Power Program Settlement Agreement.

Type: COMMENTS Filing Date: October 25, 2010
Filed By:
City and County of San Francisco
Description: in Opposition to the QF/CHP Program Settlement Agreement

Type: RESPONSE Filing Date: October 25, 2010
Filed By:
Alliance for Retail Energy Markets
Direct Access Customer Coalition
Marin Energy Authority
Description: JOINT; TO THE JOINT MOTION FOR APPROVAL OF QUALIFYING FACILITY AND COMBINED HEAT AND POWER SETTLEMENT AGREEMENT

Type: MOTION Filing Date: October 25, 2010
Filed By:
California Municipal Utilities Association
Description: for Party Status

Type: MOTION Filing Date: October 25, 2010
Filed By:
Marin Energy Authority
Description: for Party Status

Type: COMMENTS Filing Date: October 25, 2010
Filed By:
CAlifornians for Renewable Energy, Inc. (CARE)
Description: Opening; ON PROPOSED SETTLEMENT AND CONSOLIDATING PROCEEDINGS

Type: COMMENTS Filing Date: October 25, 2010
Filed By:
California Municipal Utilities Association
Description: on the Proposed Settlement

Type: COMMENTS Filing Date: October 25, 2010
Filed By:
Shell Energy North America (US), L.P.
Description: Opening; on the Qualifying Facility and Combined Heat and Power Program Settlement Agreement

Type: COMMENTS Filing Date: October 25, 2010
Filed By:
California Independent System Operator Corporation
Description: on Proposed Settlement

Type: EXPARTE Filing Date: October 21, 2010
Filed By:
Marin Energy Authority
Description: LATE FILED: Marin Energy Authority noticed oral ex parte communications with Michael Wheeler, advisor to Commissioner Grueneich, Robert Kinosian, advisor to Commissioner Bohn, and Jason Reiger, advisor to Commissioner Ryan, on October 15, 2010.

Type: EXPARTE Filing Date: October 20, 2010
Filed By:
Southern California Edison Company
Description: Southern California Edison Company noticed a written ex parte communication to ALJ Wetzell on October 14, 2010. (Filing pursuant to AC and ALJ Joint Ruling and Amended Scoping Memo issued on October 19, 2010.)

Type: EXPARTE Filing Date: October 20, 2010
Filed By:
CAlifornians for Renewable Energy, Inc. (CARE)
Description: CAlifornians for Renewable Energy, Inc. noticed an written ex parte communication with ALJ Wetzell on October 14, 2010. (Filing pursuant to Assigned Commissioner and ALJ Joint Ruling and Amended Scoping Memo issued on October 19, 2010.)

Type: EXPARTE Filing Date: October 20, 2010
Filed By:
CAlifornians for Renewable Energy, Inc. (CARE)
Description: CAlifornians for Renewable Energy, Inc. (CARE) noticed a written ex parte communication with ALJ Wetzell sent on October 20, 2010.

Type: SCOPING RULING Filing Date: October 19, 2010
Filed By:
ALJ/WETZELL/CPUC
CMMR/PEEVEY/CPUC
Description: Assigned Commissioner and Administrative Law Judge's Joint Ruling and Amended Scoping Memo for consolidated proceedings. With respect to consideration of the "Qualifying Facility and Combined Heat and Power Program Settlement Agreement", the scope of and the schedule for these proceedings is as set forth. The presiding officer for consideration of the Proposed Settlement is ALJ Wetzell. The preliminary determination that A.08-11-001 is categorized as ratesetting is confirmed. The prior scoping memo determinations that R.06-02-013, R.04-04-003, and R.04-04-025 are ratesetting shall continue in effect for purposes of considering the Proposed Settlement. R.09-11-022 is re-categorized as ratesetting. Rules 8.2 and 8.3 apply with respect to ex parte communications. CAlifornians for Renewable Energy, Inc. shall file a notice of ex parte communication regarding its 10/14/2010 communication to the ALJ. Southern California Edison Company shall file a notice of ex parte communication regarding its 10/14/2010 communication to ALJ.

Type: RULING Filing Date: October 18, 2010
Filed By:
ALJ/WETZELL/CPUC
Description: regarding service of joint motion, rulings, and tendered documents.

Type: CERTIFICATE OF SERVICE Filing Date: October 13, 2010
Filed By:
ALJ/WETZELL/CPUC
Description: to ALJ Mark Wetzell's Ruling Shortening Time for Comments and Replies on Proposed Settlement and Consolidating Proceedings (to the electronic mail addresses on the service lists in R.07-05-025, R.08-06-024, and R.03-10-003 and also on all registered electric service providers and community choice aggregators)

Type: RULING Filing Date: October 11, 2010
Filed By:
ALJ/WETZELL/CPUC
Description: Shortening Time for Comments and Replies on Proposed Settlement and Consolidating Proceedings. Comments on the Qualifying Facility and Combined Heat and Power Program Settlement Agreement are due 10/25/2010 and reply comments are due 11/1/2010.

Type: MOTION Filing Date: October 8, 2010
Filed By:
CALIFORNIA COGENERATION COUNCIL
COGENERATION ASSOCIATION OF CALIFORNIA
DIVISION OF RATEPAYER ADVOCATES
ENERGY PRODUCERS AND USERS COALTION
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
Description: for Expedited Consideration of Joint Motion for Approval of Qualifying Facility and Combined Heat and Power Program Settlement Agreement

Type: MOTION Filing Date: October 8, 2010
Filed By:
CALIFORNIA COGENERATION COUNCIL
COGENERATION ASSOCIATION OF CALIFORNIA
DIVISION OF RATEPAYER ADVOCATES
ENERGY PRODUCERS AND USERS COALITION
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
Description: Joint Motion for Approval of Qualifying Facility and Combined Heat and Power Program Settlement Agreement; settlement agreement and notice of availability of attachment A to the joint motion are attached..

Type: NOTICE Filing Date: September 30, 2010
Filed By:
CALJ/CLOPTON/CPUC
Description: of co-assignment.

Type: RESPONSE Filing Date: September 15, 2010
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Monthly Response to Administrative Law Judge's Request, dated October 29, 2009

Type: REPORT Filing Date: August 16, 2010
Filed By:
California Cogeneration Council
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: MONTHLY RESPONSE TO ADMINISTRATIVE LAW JUDGE'S REQUEST, DATED OCTOBER 29, 2009

Type: REPORT Filing Date: July 15, 2010
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Monthly Response to Administrative Law Judge's Request, dated October 29, 2009

Type: REPORT Filing Date: June 15, 2010
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Monthly Response to Administrative Law Judge's Request, dated 10/29/2009

Type: REPORT Filing Date: May 17, 2010
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Monthly Response to Administrative Law Judge's Request, dated 10/29/2009

Type: REPORT Filing Date: April 15, 2010
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Monthly Response to Administrative Law Judge's Request, Dated October 29, 2009

Type: REPORT Filing Date: March 15, 2010
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Monthly Response to Administrative Law Judge's Request, Dated October 29, 2009

Type: REPORT Filing Date: February 16, 2010
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Monthly Response to Administrative Law Judge's Request, Dated October 29, 2009

Type: REPORT Filing Date: January 15, 2010
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Monthly Response to Administrative Law Judge's Request, Dated October 29, 2009

Type: REPORT Filing Date: December 15, 2009
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Monthly Response to Administrative Law Judge's Request, Dated October 29, 2009

Type: REPORT Filing Date: November 16, 2009
Filed By:
California Cogeneration Council
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: MONTHLY RESPONSE TO ADMINISTRATIVE LAW JUDGE'S REQUEST, DATED OCTOBER 29, 2009

Type: RULING Filing Date: October 29, 2009
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
Description: Extending Limited Abeyance. During the abeyance period, parties shall file a monthly update on the status of the global settlement negotiations. The monthly update shall be due on the 15th day of each month. Parties shall not be required to file a monthly update if a settlement agreement is filed with the Commission.

Type: COMMENTS Filing Date: October 27, 2009
Filed By:
California Cogeneration Council
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: JOINT;

Type: RULING Filing Date: October 21, 2009
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
Description: seeking comments on next steps for proceeding. Parties wishing to file comments may do so by October 27, 2009. There shall be no reply comments.

Type: RESPONSE Filing Date: October 5, 2009
Filed By:
Pacific Gas and Electric Company
Description: to Petition of the Cogeneration Association of California for Modification of Decision 07-09-040.

Type: RESPONSE Filing Date: October 1, 2009
Filed By:
California Cogeneration Council
Description: to Petition of Cogeneration Association of California for Modification of Decision 07-09-040.

Type: PETITION FOR MODIFICATION Filing Date: September 4, 2009
Filed By:
Cogeneration Association of California
Description: of Decision 07-09-040.

Type: RULING Filing Date: August 28, 2009
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
Description: granting motion for extension of limited abeyance. The joint motion filed by Southern California Edison Company, San Diego Gas & Electric Company and The Utility Reform Network to extend the limited abeyance for reconsideration of the Administrative Heat Rate component of the Market Index Formula is granted. The limited abeyance shall be extended until October 1, 2009.

Type: MOTION Filing Date: August 24, 2009
Filed By:
Georgetta Baker San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: for Extension of Limited Abeyance.

Type: REPLY Filing Date: August 13, 2009
Filed By:
Pacific Gas and Electric Company
Description: to Response of the California Wind Energy Association to Petition for Modification of Decision 09-04-034.

Type: RESPONSE Filing Date: August 3, 2009
Filed By:
California Wind Energy Association
Description: to PG&E's petition for modification of D.09-04-034.

Type: PETITION FOR MODIFICATION Filing Date: July 2, 2009
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of Decision 09-04-034

Type: RULING Filing Date: June 30, 2009
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
Description: Granting Motion for Limited Abeyance.

Type: MOTION Filing Date: June 26, 2009
Filed By:
California Cogeneration Council
Cogeneration Association Of California
Energy Producers And Users Coalition
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: for limited abeyance.

Type: MOTION Filing Date: June 3, 2009
Filed By:
California Cogeneration Council
Description: for Leave to File a Late-Filed Response to the Application of Southern California Edison, Pacific Gas and Electric Company, and San Diego Gas and Electric Company for Rehearing of D.09-04-032; (Response attached).

Type: RESPONSE Filing Date: June 3, 2009
Filed By:
California Cogeneration Council
Description: to the Joint Parties' Application for Rehearing of D.09-04-032.

Type: RESPONSE Filing Date: June 2, 2009
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
Description: to joint parties' application for rehearing of Decision 09-04-034.

Type: RESPONSE Filing Date: June 2, 2009
Filed By:
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Joint; to Cogeneration Association of California and Energy Producers and Users Coalition Application for Rehearing of D.09-04-034

Type: RESPONSE Filing Date: June 2, 2009
Filed By:
Independent Energy Producers Association
Description: to Joint Parties Application for Rehearing of D.09-04-034

Type: RESPONSE Filing Date: June 2, 2009
Filed By:
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
Description: Joint; to applications for rehearing of Decision 09-04-032 of IEP and CAC/EPUC

Type: RESPONSE Filing Date: June 2, 2009
Filed By:
Independent Energy Producers Association
Description: to application of Southern California Edison, Pacific Gas and Electric Company, and San Diego Gas & Electric Company for rehearing of D.09-04-032

Type: RESPONSE Filing Date: June 2, 2009
Filed By:
California Cogeneration Council
Description: to the Joint Parties' Application for Rehearing of D.09-04-034

Type: RESPONSE Filing Date: June 2, 2009
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
Description: to joint parties' application for rehearing of Decision 09-04-032.

Type: REHEARING REQUEST Filing Date: May 18, 2009
Filed By:
Independent Energy Producers Association
Description: Application for Rehearing of Decision 09-04-032.

Type: REHEARING REQUEST Filing Date: May 18, 2009
Filed By:
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Joint; of Decision 09-04-034

Type: REHEARING REQUEST Filing Date: May 18, 2009
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: of Decision 09-04-034

Type: REHEARING REQUEST Filing Date: May 18, 2009
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: Application for Rehearing of Decision 09-04-032.

Type: REHEARING REQUEST Filing Date: May 18, 2009
Filed By:
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
Description: Application for Rehearing of Decision 09-04-032.

Type: REPLY Filing Date: April 27, 2009
Filed By:
California Cogeneration Council
Description: (to response) in support of its motion for an order implementing the prospective QF program contract options adopted in Decision 07-09-040 (filing authorized by ALJ Yip-Kikugawa on 4/23/09 by telephone conversation).

Type: EXPARTE Filing Date: April 16, 2009
Filed By:
Independent Energy Producers Association
Description: Independent Energy Producers Association noticed a written ex parte communication with Theresa Cho, Chief of Staff to Commissioner Grueneich and Traci Bone, advisor to Commissioner Grueneich; Carol Brown, Chief of Staff to President Peevey and Matthew Deal, advisor to President Peevey; Andrew Campbell and Pamela Nataloni, advisors to Commissioner Chong; Paul Phillips, advisor to Commissioner Simon; Stephen St. Marie, Chief of Staff to Commissioner Bohn and Robert Kinosian, advisor to Commissioner Bohn, on April 13, 2009.

Type: RESPONSE Filing Date: April 16, 2009
Filed By:
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
Description: Joint; to CCC's motion for an order implementing the prospective QF program contract options adopted in Decision 07-09-040

Type: EXPARTE Filing Date: April 16, 2009
Filed By:
Independent Energy Producers Association
Description: Independent Energy Producers Association noticed an oral ex parte communication with Pamela Nataloni, advisor to Commissioner Chong; Carol Brown, chief of staff to Commissioner Peevey; Matthew Deal, advisor to Commissioner Peevey; Paul Philips, advisor to Commissioner Simon; and Robert Kinosian, advisor to Commissioner Bohn, on April 15, 2009.

Type: EXPARTE Filing Date: April 8, 2009
Filed By:
Terra-Gen Power, LLC
Description: Terra-Gen, LLC noticed an oral and written ex parte communication with Matthew Deal, advisor to Commissioner Peevey, on April 3, 2009.

Type: MOTION Filing Date: April 1, 2009
Filed By:
California Cogeneration Council
Description: for an order implementing the prospective QF program contract options adopted in Decision 07-09-040.

Type: COMMENTS Filing Date: March 30, 2009
Filed By:
California Cogeneration Council
Description: Reply; on administrative heat rate questions

Type: COMMENTS Filing Date: March 30, 2009
Filed By:
Pacific Gas and Electric Company
Description: Reply; in response to Scoping Memo regarding administrative heat rates for Market Index Formula.

Type: COMMENTS Filing Date: March 30, 2009
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: Reply; on reconsideration of administrative heat rates pursuant to D. 08-11-062.

Type: COMMENTS Filing Date: March 30, 2009
Filed By:
San Diego Gas & Electric Company
Description: Reply; on Scoping Memo and Ruling issued 2/24/2009.

Type: COMMENTS Filing Date: March 30, 2009
Filed By:
Southern California Edison Company
The Utility Reform Network
Description: Joint Reply; on administrative heat rate reconsideration ordered in Decision 08-11-062.

Type: EXPARTE Filing Date: March 27, 2009
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Pacific Gas and Electric Company noticed an oral ex parte communication with Pam Nataloni, advisor to Commissioner Chong, on March 24, 2009.

Type: EXPARTE Filing Date: March 27, 2009
Filed By:
California Cogeneration Council
Description: California Cogeneration Council, noticed an oral and written ex parte communication with Carol Brown, chief of staff to President Peevey; and Matthew Deal, advisor to President Peevey, on March 24, 2009.

Type: EXPARTE Filing Date: March 27, 2009
Filed By:
Independent Energy Producers Association
Description: Independent Energy Producers Association noticed an oral ex parte communication with Robert Kinosian, advisor to Commissioner Bohn and Pamela Nataloni, advisor to Commissioner Chong, on March 27, 2009.

Type: EXPARTE Filing Date: March 27, 2009
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Pacific Gas and Electric Company noticed an oral ex parte communication with Matthew Deal, advisor to Commissioner Peevey, on March 24, 2009.

Type: EXPARTE Filing Date: March 26, 2009
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Pacific Gas and Electric Company noticed an oral ex parte communication with Robert Kinosian, advisor to Commissioner Bohn, on March 23, 2009.

Type: COMMENTS Filing Date: March 24, 2009
Filed By:
California Cogeneration Council
Description: Amendment to Opening Comments on administrative heat rate questions.

Type: EXPARTE Filing Date: March 24, 2009
Filed By:
Independent Energy Producers Association
Description: Independent Energy Producers Association noticed an oral ex parte communication with Commissioner Grueneich and Theresa Cho, advisor to Commissioner Grueneich, on March 23, 2009.

Type: EXPARTE Filing Date: March 24, 2009
Filed By:
Independent Energy Producers Association
Description: Independent Energy Producers Association noticed an oral ex parte communication with Carol Brown, advisor to President Peevey, on March 20, 2009.

Type: EXPARTE Filing Date: March 24, 2009
Filed By:
Independent Energy Producers Association
Description: Independent Energy Producers Association noticed an oral ex parte communication with Matthew Deal, advisor to President Peevey, on March 20, 2009.

Type: COMMENTS Filing Date: March 23, 2009
Filed By:
Independent Energy Producers Association
Description: Reply; on proposed and alternate decisions mailed February 24, 2009.

Type: COMMENTS Filing Date: March 23, 2009
Filed By:
Southern California Edison Company
Description: Reply; (on proposed decision and alternate)

Type: COMMENTS Filing Date: March 23, 2009
Filed By:
California Cogeneration Council
Cogeneration Association of California
Energy Producers and Users Coalition
Description: Joint Reply; on the proposed decision of ALJ Yip-Kikugawa and the alternate proposed decision of Cmmr. Peevey.

Type: COMMENTS Filing Date: March 23, 2009
Filed By:
San Diego Gas & Electric Company
Description: Reply; on the proposed decision of ALJ Yip-Kikugawa and the alternate proposed decision of Cmmr. Peevey.

Type: COMMENTS Filing Date: March 23, 2009
Filed By:
Pacific Gas and Electric Company
The Utility Reform Network
Description: Reply; on proposed decision and alternate proposed decision modifying Decision 07-09-040.

Type: COMMENTS Filing Date: March 20, 2009
Filed By:
Southern California Edison Company
Description: Opening; on administrative heat rate reconsideration.

Type: EXPARTE Filing Date: March 20, 2009
Filed By:
California Cogeneration Council
Description: California Cogeneration Council noticed an oral ex parte communication with Paul Phillips, advisor to Commissioner Simon, on March 17, 2009.

Type: EXPARTE Filing Date: March 20, 2009
Filed By:
California Cogeneration Council
Description: California Cogeneration Council noticed an oral ex parte communication with Pam Nataloni, advisor to Commissioner Chong, on March 18, 2009.

Type: EXPARTE Filing Date: March 20, 2009
Filed By:
California Cogeneration Council
Description: California Cogeneration Council noticed an oral ex parte communication with Robert Kinosian, advisor to Commissioner Bohn, on March 18, 2009.

Type: EXPARTE Filing Date: March 20, 2009
Filed By:
California Cogeneration Council
Description: California Cogeneration Council noticed both an oral and written ex parte communication with Matthew Deal, advisor to President Peevey, on March 18, 2008.

Type: EXPARTE Filing Date: March 20, 2009
Filed By:
PurEnergy LLC
Description: Purenergy LLC noticed both oral and written ex parte communications with Pamela Nataloni, advisor to Commissioner Chong, and Carol Brown, advisor to President Peevey, on March 17, 2009.

Type: EXPARTE Filing Date: March 20, 2009
Filed By:
Terra-Gen, LLC
Description: LATE FILED. Terra-Gen, LLC noticed oral ex parte communications with Carol Brown, advisor to Commission President Peevey and Robert Kinosian, advisor to Commissioner Bohn, on March 16, 2009.

Type: COMMENTS Filing Date: March 20, 2009
Filed By:
Independent Energy Producers Association
Description: on administrative heat rate reconsideration ordered in D08-11-062

Type: COMMENTS Filing Date: March 20, 2009
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: Opening; on reconsideration under D08-11-062

Type: COMMENTS Filing Date: March 20, 2009
Filed By:
California Cogeneration Council
Description: Opening; on administrative heat rate questions

Type: COMMENTS Filing Date: March 20, 2009
Filed By:
Pacific Gas and Electric Company
Description: in response to Scoping Memo regarding administrative heat rates for market index formula

Type: COMMENTS Filing Date: March 20, 2009
Filed By:
San Diego Gas & Electric Company
Description: Opening;

Type: EXPARTE Filing Date: March 19, 2009
Filed By:
Southern California Edison Company
Description: LATE-FILED. Southern California Edison Company noticed both an oral and written ex parte communication with Paul Phillips, advisor to Commissioner Simon, on March 13, 2009.

Type: COMMENTS Filing Date: March 16, 2009
Filed By:
Pacific Gas and Electric Company
THE UTILITY REFORM NETWORK
Description: Joint; on Commission President Peevey's Alternate Proposed Decision modifying Decision 07-09-040 and granting Motion to adjust PG&E's January 2008 avoided cost posting.

Type: EXPARTE Filing Date: March 16, 2009
Filed By:
Southern California Edison Company
Description: Southern California Edison Company noticed both an oral and written ex parte communication with Carol Brown, Chief of Staff to President Peevey and Pam Nataloni, Advisor to Commissioner Chong, on March 11, 2009.

Type: COMMENTS Filing Date: March 16, 2009
Filed By:
Southern California Edison Company
Description: Opening; on the Proposed Decision of ALJ Yip Kikugawa and the Alternate Proposed Decision of Commissioner Peevey.

Type: COMMENTS Filing Date: March 16, 2009
Filed By:
Independent Energy Producers Association
Description: on Proposed and Alternate Decisions mailed February 24, 2009.

Type: COMMENTS Filing Date: March 16, 2009
Filed By:
San Diego Gas & Electric Company
Description: Opening; on the Proposed Decision of Administrative Law Judge Yip-Kikugawa and the Alternate Proposed Decision of Commissioner Peevey.

Type: COMMENTS Filing Date: March 16, 2009
Filed By:
California Cogeneration Council
Cogeneration Association of California
Energy Producers and Users Coalition
Description: Joint; on the Proposed Decision of Administrative Law Judge Yip-Kikugawa and the Alternate Proposed Decision of Commissioner Peevey.

Type: COMMENTS Filing Date: March 16, 2009
Filed By:
Pacific Gas and Electric Company
THE UTILITY REFORM NETWORK
Description: Joint; on ALJ Yip-Kikugawa's Proposed Decision denying Petition for Modification of Decision 07-09-040 and Motion to adjust PG&E's January 2008 avoided cost posting.

Type: EXPARTE Filing Date: March 3, 2009
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
Description: Cogeneration Association of California and Energy Producers and Users Coalition, noticed an oral and written ex parte communication with Andy Campbell and Pam Nataloni, advisors to Commissioner Chong; and Matthew Deal, advisor to Commissioner Peevey, on February 26, 2009.

Type: EXPARTE Filing Date: March 2, 2009
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
Description: Cogeneration Association of California and Energy Producers and Users Coalition, noticed an oral and written ex parte communication with Robert Kinosian, advisor to Commissioner Bohn, on February 25, 2009.

Type: EXPARTE Filing Date: February 27, 2009
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
Description: Cogeneration Association of California and Energy Producers and Users Coalition, noticed an oral ex parte communication with Commissioner Peevey, on February 24, 2009.

Type: ALTERNATE Filing Date: February 24, 2009
Filed By:
CMMR/PEEVEY/CPUC
Description: Decision Granting in Part and Denying in Part Petition to Modify Decision 07-09-040 and Motions to Adjust Pacific Gas and Electric Company's January 2008 Avoided Cost Posting. Opening comments, which shall not exceed 15 pages, are due March 16, 2009. Reply comments,which shall not exceed 5 pages, are due 5 days after the last day for filing comments.

Type: SCOPING RULING Filing Date: February 24, 2009
Filed By:
ALJ/YIP-KIKUGAWA
CMMR/PEEVEY/CPUC
Description: Setting Schedule and Scope for Reconsideration Ordered in Decision 08-11-062. The scope and schedule are as set forth and the category is confirmed as ratesetting.

Type: PROPOSED DECISION Filing Date: February 24, 2009
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
Description: Decision denying Petition of the California Cogeneration Council to modify Decision 07-09-040 and granting in part and denying in part Motions to adjust Pacific Gas and Electric Company's January 2008 avoided cost posting. Opening Comments, which shall not exceed 15 pages, are due March 16, 2009. Reply Comments which shall not exceed 5 pages are due within 5 days after the last day to file Comments.

Type: EXPARTE Filing Date: February 19, 2009
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: Cogeneration Association of California and Energy Producers and Users Coalition, noticed an oral and written ex parte communication with Paul Phillips, advisor to Commissioner Simon, on February 13, 2009.

Type: RULING Filing Date: February 5, 2009
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
Description: granting party status to Valero Refining Company-California.

Type: MOTION Filing Date: January 28, 2009
Filed By:
Valero Refining Company-California
Description: to become a party.

Type: EXPARTE Filing Date: January 26, 2009
Filed By:
California Cogeneration Council
Description: The California Cogeneration Council noticed oral and written ex parte communications with Nancy Ryan, advisor to President Peevey, on January 22, 2009.

Type: EXPARTE Filing Date: January 26, 2009
Filed By:
California Cogeneration Council
Description: The California Cogeneration Council noticed oral and written ex parte communications with Paul Phillips, advisor to Commissioner Simon, on January 22, 2009.

Type: EXPARTE Filing Date: January 26, 2009
Filed By:
California Cogeneration Council
Description: The California Cogeneration Council noticed oral and written ex parte communications with Robert Kinosian, advisor to Commissioner Bohn, and Pamela Nataloni, advisor to Commissioner Chong, on January 22, 2009.

Type: STATEMENT Filing Date: January 16, 2009
Filed By:
California Cogeneration Council
Description: Prehearing Conference;

Type: STATEMENT Filing Date: January 16, 2009
Filed By:
Pacific Gas & Electric Company
Southern California Edison Company
Description: Joint Prehearing Conference;

Type: STATEMENT Filing Date: January 16, 2009
Filed By:
San Diego Gas & Electric Company
Description: Prehearing Conference;

Type: COMMENTS Filing Date: January 14, 2009
Filed By:
California Cogeneration Council
Cogeneration Association of California
Energy Producers and Users Coalition
Description: Amended Joint Reply; on the Proposed Decision of ALJ Yip-Kikugawa (filing authorized by ALJ Yip-Kikugawa per email ruling dated 1/14/09).

Type: EXPARTE Filing Date: January 14, 2009
Filed By:
Independent Energy Producers Association
Description: Independent Energy Producers Association noticed an oral ex parte communication with Nancy Ryan, advisor to Commissioner Peevey, on January 12, 2009.

Type: COMMENTS Filing Date: January 12, 2009
Filed By:
California Cogeneration Council
Cogeneration Association of California
Energy Producers and Users Coalition
Description: Joint reply; on the proposed decision of ALJ Yip-Kikugawa

Type: COMMENTS Filing Date: January 12, 2009
Filed By:
Pacific Gas and Electric Company
Description: Reply; on Proposed Decision.

Type: COMMENTS Filing Date: January 12, 2009
Filed By:
Southern California Edison Company
Description: Reply; to opening comments of QF parties

Type: COMMENTS Filing Date: January 12, 2009
Filed By:
San Diego Gas & Electric Company
Description: Reply; to opening comments of QF parties on proposed decision of ALJ Yip-Kikugawa

Type: COMMENTS Filing Date: January 12, 2009
Filed By:
Independent Energy Producers Association
Description: Reply; on proposed decision denying joint petition for modification of Decision 08-07-048 filed by QF parties

Type: COMMENTS Filing Date: January 6, 2009
Filed By:
Independent Energy Producers Association
Description: on Proposed Decision Denying Joint Petition for Modification of Decision 08-07-048 filed by QF parties.

Type: COMMENTS Filing Date: January 6, 2009
Filed By:
Pacific Gas and Electric Company
Description: on Proposed Decision Denying Joint Petition for Modification of Decision 08-07-048 filed by QF parties.

Type: COMMENTS Filing Date: January 6, 2009
Filed By:
Southern California Edison Company
Description: Opening; on the Proposed Decision of ALJ Yip-Kikugawa.

Type: COMMENTS Filing Date: January 6, 2009
Filed By:
San Diego Gas & Electric Company
Description: Opening; on Proposed Decision of Administrative Law Judge Yip-Kikugawa.

Type: COMMENTS Filing Date: January 6, 2009
Filed By:
California Cogeneration Council
Cogeneration Association of California
Energy Producers and Users Coalition
Description: Joint; on the Proposed Decision of ALJ Yip-Kikugawa.

Type: RULING Filing Date: December 23, 2008
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
Description: Setting Prehearing Conference. Any parties wishing to file a PHC statement as further described in the ruling shall do so by no later than January 16, 2009.

Type: EXPARTE Filing Date: December 19, 2008
Filed By:
California Cogeneration Council
Description: California Cogeneration Council noticed an oral ex parte communication with Andy Schwartz, advisor to Commissioner Peevey, Paul Clanon, Commission Executive Director, and Frank Lindh, Commission Counsel, on December 8, 2008.

Type: EXPARTE Filing Date: December 9, 2008
Filed By:
Independent Energy Producers Association
Description: Independent Energy Producers Association noticed a written ex parte communication with Andy Schwartz, advisor to Commissioner Peevey, on December 5, 2008. Independent Energy Producers Association noticed an oral and written ex parte communication with Theresa Cho, advisor to Commissioner Grueneich, on December 8, 2008.

Type: RULING Filing Date: December 8, 2008
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
Description: Extending Time for Comments to Proposed Decision. Opening comments shall be due on January 6, 2009 and reply comments shall be due on January 12, 2009.

Type: EXPARTE Filing Date: December 1, 2008
Filed By:
Independent Energy Producers Association
Description: Independent Energy Producers Association noticed an oral ex parte communication with Commissioner Grueneich and Traci Bone, advisor to Commissioner Grueneich; and Andrew Schwartz, advisor to Commissioner Peevey, on November 25, 2008.

Type: REQUEST Filing Date: November 21, 2008
Filed By:
The Utility Reform Network
Description: for intervenor compensation for substantial contributions to D.05-04-024, D.05-12-022, D.06-02-032, D.06-06- 063, D.06-07-032, D.07-09-040, D.08-01-006, D.08-07-048, D.08-09-024.

Type: PROPOSED DECISION Filing Date: November 17, 2008
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
Description: Decision Denying Joint Petition for Modification of Decision 08-07-048 Filed By QF Parties. Opening comments, which shall not exceed 15 pages, are due December 7, 2008. Reply comments,which shall not exceed 5 pages, are due 5 days after the last day for filing comments

Type: NOTICE Filing Date: November 4, 2008
Filed By:
San Diego Gas & Electric Company
Description: Notice of Reservation of Rights

Type: NOTICE Filing Date: November 4, 2008
Filed By:
Pacific Gas and Electric Company
Description: Notice of Reservation of Rights

Type: EXPARTE Filing Date: October 23, 2008
Filed By:
Southern California Edison Company
Description: Southern California Edison Company noticed an oral ex parte communication with Andy Schwartz, Advisor to Commissioner Peevey, on October 21, 2008.

Type: RESPONSE Filing Date: October 23, 2008
Filed By:
Southern California Edison Company
Description: to QF Parties' petition for modification of Decision 08-07-048

Type: RESPONSE Filing Date: October 23, 2008
Filed By:
Pacific Gas and Electric Company
Description: in opposition to petition for modification of Decision 08-07-048 of the Qualifying Facility parties

Type: RESPONSE Filing Date: October 23, 2008
Filed By:
San Diego Gas & Electric Company
Description: to petition for modification of Decision 08-07-048 of the Qualifying Facility parties

Type: RULING Filing Date: October 8, 2008
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
Description: Shortening time for responses to petition for modification of Decision 08-07-048 to October 23, 2008.

Type: PETITION FOR MODIFICATION Filing Date: October 3, 2008
Filed By:
California Cogeneration Council
Cogeneration Association of California
Energy Producers And Users Coalition
Independent Energy Producers Association
Description: of Decision 08-07-048.

Type: EXPARTE Filing Date: September 26, 2008
Filed By:
Independent Energy Producers Association
Description: The Independent Energy Producers Association noticed oral and written ex parte communications with President Peevey; Andrew Schwartz, advisor to President Peevey; Joseph Como and Andrew Campbell, advisors to Commissioner Chong; Robert Kinosian, advisors to Commissioner Bohn; Paul Phillips, advisor to Commissioner Simon, on September 24, 2008.

Type: EXPARTE Filing Date: September 19, 2008
Filed By:
Southern Califorina Edison Company
Description: Southern California Edison Company noticed oral and written ex parte communications with Stephen St. Marie and Robert Kinosian, advisors to Commissioner Bohn, on September 16, 2008.

Type: RESPONSE Filing Date: September 18, 2008
Filed By:
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
Description: Joint; to application for rehearing of Decision 08-07-048

Type: EXPARTE Filing Date: September 17, 2008
Filed By:
Southern California Edison Company
Description: Southern California Edison Company notices an oral ex parte communication with Robert Kinosian, advisor to Commissioner Bohn, on September 12, 2008.

Type: EXPARTE Filing Date: September 17, 2008
Filed By:
Southern California Edison Company
Description: Southern California Edison Company notices oral and written ex parte communications with Matthew Deal, advisor to President Peevey, on September 12, 2008.

Type: EXPARTE Filing Date: September 11, 2008
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: Cogeneration Association of California and Energy Producers and Users Coalition noticed oral and written ex parte communications with Andrew Schwartz, advisor to President Peevey, on September 8, 2008.

Type: EXPARTE Filing Date: September 8, 2008
Filed By:
Independent Energy Producers Association
Description: The Independent Energy Producers Association noticed oral and written ex parte communications with Paul Phillips, advisor to Commissioner Simon, and Jessica Tsang, an intern in the Commissioner Simon's office, on September 3, 2008.

Type: REHEARING REQUEST Filing Date: September 3, 2008
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: of Decision 08-07-048.

Type: COMMENTS Filing Date: September 2, 2008
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: Reply; on the Proposed Decision of ALJ Yip-Kikugawa

Type: COMMENTS Filing Date: September 2, 2008
Filed By:
San Diego Gas & Electric Company
Description: Reply; on the Proposed Decision of ALJ Yip-Kikugawa

Type: COMMENTS Filing Date: September 2, 2008
Filed By:
Southern California Edison Company
Description: Reply; on Proposed Decision of ALJ Yip-Kikugawa

Type: COMMENTS Filing Date: September 2, 2008
Filed By:
Pacific Gas and Electric Company
Description: Reply; on Proposed Decision on Joint Petition for Modification of Decision 07-09-040

Type: EXPARTE Filing Date: August 29, 2008
Filed By:
Independent Energy Producers Association
Description: The Independent Energy Producers Association noticed oral and written ex parte communications with Andrew Schwartz, advisor to President Peevey, on August 27, 2008.

Type: COMMENTS Filing Date: August 25, 2008
Filed By:
Southern California Edison Comapny
Description: Opening; to the proposed decision of ALJ Yip-Kikugawa

Type: COMMENTS Filing Date: August 25, 2008
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
Description: Open; on the draft decision granting in part and denying in part Joint Petition for Modification of Decision 07-09-040

Type: COMMENTS Filing Date: August 25, 2008
Filed By:
Pacific Gas and Electric Company
Description: On proposed decision on Joint Petition for Modification of Decision 07-09-040

Type: COMMENTS Filing Date: August 25, 2008
Filed By:
San Diego Gas & Electric Company
Description: Opening; on the proposed decision of ALJ Yip-Kikugawa

Type: EXPARTE Filing Date: August 22, 2008
Filed By:
Independent Energy Producers Association
Description: The Independent Energy Producers Association noticed an oral ex parte communication with Robert Kinosian and Stephen St. Marie, advisors to Commissioner Bohn, on August 19, 2008.

Type: EXPARTE Filing Date: August 18, 2008
Filed By:
Independent Energy Producers Association
Description: The Independent Energy Producers Association noticed an oral ex parte communication with Matthew Deal, advisor to President Peevey, on August 13, 2008.

Type: PROPOSED DECISION Filing Date: August 5, 2008
Filed By:
ALJ/YIP-KIKUGAWA/CPUC
Description: Decision granting in part and denying in part Joint Petition for Modification of Decision 07-09-040. Opening Comments, which shall not exceed 15 pages, are due August 25, 2008; Reply Comments, which shall not exceed 5 pages, are due 5 days after the last day for filing Opening Comments.

Type: EXPARTE Filing Date: July 17, 2008
Filed By:
Southern California Edison Company
Description: Southern California Edison Company noticed an oral ex parte communication with Stephen St. Marie and Robert Kinosian, advisors to Commissioner Bohn on July 15, 2008.

Type: EXPARTE Filing Date: July 15, 2008
Filed By:
Southern California Edison Company
Description: Southern California Edison Company noticed an oral ex parte communication with Robert Mason, advisor to Commissioner Simon on July 11, 2008.

Type: NOTICE Filing Date: June 26, 2008
Filed By:
CALJ/MINKIN/CPUC
Description: of Assignment.

Type: EXPARTE Filing Date: June 12, 2008
Filed By:
Sycamore Cogeneration Company
Watson Cogeneration Company
Description: Sycamore Cogeneration Company and Watson Cogeneration Company noticed an oral ex parte communication with President Peevey, and Andrew Schwartz, advisor to President Peevey on June 9, 2008.

Type: EXPARTE Filing Date: June 5, 2008
Filed By:
California Cogeneration Council
Cogeneration Association of California/Energy Producers & Users Coalition
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The California Independent System Operator Corporation
Description: Southern California Edison Company, Pacific Gas and Electric Company, San Diego Gas & Electric Company, California Cogeneration Council, Cogeneration Association of California/Energy Producers and Users Coalition, and the California Independent System Operator Corporation noticed oral and written ex parte communications with Andy Schwartz, advisor to President Peevey on June 2, 2008.

Type: REPLY Filing Date: May 30, 2008
Filed By:
CAlifornians for Renewable Energy
Description: to Responses to Petition for Modification of Decision 07-09-040.

Type: RESPONSE Filing Date: May 21, 2008
Filed By:
San Diego Gas & Electric Company
Description: to CARE's Petition for Modification of Decision 07-09-040.

Type: RESPONSE Filing Date: May 21, 2008
Filed By:
Pacific Gas and Electric Company
Description: to CARE's Petition for Modification of Decision 07-09-040.

Type: RESPONSE Filing Date: May 21, 2008
Filed By:
Southern California Edison Company
Description: to CARE's Petition for Modification of Decision 07-09-040.

Type: EXPARTE Filing Date: May 12, 2008
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Pacific Gas and Electric Company, Southern California Edison Company, and San Diego Gas & Electric Company noticed oral and written ex parte communication with Andy Schwartz, advisor to President Peevey on May 7, 2008.

Type: EXPARTE Filing Date: May 5, 2008
Filed By:
Sycamore Cogeneration Company
Watson Cogeneration Company
Description: Watson Cogeneration Company and Sycamore Cogeneration Company noticed oral and written ex parte communications with President Peevey and Andrew Schwartz, advisor to President Peevey on April 30, 2008.

Type: PETITION FOR MODIFICATION Filing Date: April 21, 2008
Filed By:
Californians for Renewable Energy, Inc.
Description: of Decision 07-09-040.

Type: RESPONSE Filing Date: April 2, 2008
Filed By:
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
Description: to Joint Petiton of the Cogeneration Association of California, the Energy Producers and Users Coalition, and the Independent Energy Producers Association for Modification of Decision 07-09-040.

Type: RESPONSE Filing Date: April 2, 2008
Filed By:
Southern California Edison Company
Description: to Petition of the California Cogeneration Council for Modification of Decision 07-09-040.

Type: RESPONSE Filing Date: April 2, 2008
Filed By:
Pacific Gas and Electric Company
Description: to the California Cogeneration Council Petition for Modification of Decision 07-09-040.

Type: RESPONSE Filing Date: April 2, 2008
Filed By:
San Diego Gas & Electric Company
Description: to the Petition of the California Cogeneration Council for Modification of Decision 07-09-040.

Type: RESPONSE Filing Date: April 2, 2008
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: to the Petition of the California Cogeneration Council for Modification of Decision 07-09-040.

Type: RESPONSE Filing Date: April 2, 2008
Filed By:
California Cogeneration Council
Description: to Joint Petition of the Cogeneration Association of California, the Energy Producers and Users Coalition and the Independent Energy Producers Association for Modification of Decision 07-09-040.

Type: RESPONSE Filing Date: April 2, 2008
Filed By:
The Utility Reform Network
Description: to Petition for Modification of Decision 07-09-040.

Type: REPLY Filing Date: March 28, 2008
Filed By:
California Cogeneration Council
Description: to the Responses of Pacific Gas and Electric Company and Southern California Edison Company to the March 3, 2008 Motion of the California Cogeneration Council concerning Pacific Gas and Electric Company's 2008 As-Delivered Capacity Prices for Qualifying Facilities (filing authorized by ALJ Yip-Kikugawa via phone conversation on March 19, 2008).

Type: REPLY Filing Date: March 28, 2008
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: to March 18, 2008 responses of Pacific Gas and Electric Company and Southern California Edison Company (filing authorized by ALJ Brown per email ruling of March 19, 2008).

Type: RESPONSE Filing Date: March 18, 2008
Filed By:
Pacific Gas and Electric Company
Description: to March 3, 2008 Motions of California Cogeneration Council, the Cogeneration Association of California and the Energy Producers and Users Coalition.

Type: RESPONSE Filing Date: March 18, 2008
Filed By:
Southern California Edison Company
Description: to Motions of California Cogeneration Council, the Cogeneration Association of California and the Energy Producers and Users Coalition concerning Pacific Gas and Electric Company's 2008 As-Delivered Capacity Prices for Qualifying Facilities.

Type: MOTION Filing Date: March 3, 2008
Filed By:
California Cogeneration Council
Description: To Adjust Pacific Gas and Electric Company 2008 As-Delivered Capacity Prices for Qualifying Facilities.

Type: PETITION FOR MODIFICATION Filing Date: March 3, 2008
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Independent Energy Producers Association
Description: Joint; of Decision 07-09-040.

Type: PETITION FOR MODIFICATION Filing Date: March 3, 2008
Filed By:
California Cogeneration Council
Description: of Decision 07-09-040.

Type: MOTION Filing Date: March 3, 2008
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: To Adjust January 2008 Avoided Cost Posting of Pacific Gas and Electric Company.

Type: EXPARTE Filing Date: November 30, 2007
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: SUMMARY: On November 28, 2007, Michael Alcantar, counsel to the Cogeneration Association of California and the Energy Producers and Users Coalition, (jointly, CAC/EPUC) met with Andrew Schwartz, advisor to Pres. Peevey in San Francisco. The issues addressed were the terms and conditions for extension contracts pursuant to D.07-09-040, and procedural options to secure CPUC direction regarding the extension contracts. Two specific extension contract situations were discussed. The first set was to seek specificity on the designation of "price" terms (versus "non-price" terms, and particularly performance provisions) that could be modified in the extension agreements. The second set was to address the options for previously terminate firm capacity CHP/QF resources to reinstate firm capacity terms and conditions. Contact Person: Karen Terranova; telephone: (415) 421-4143; e-mail: kt@a-klaw.com.

Type: EXPARTE Filing Date: November 26, 2007
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: SUMMARY: On November 19, 2007, Michael Alcantar, counsel to the Cogeneration Association of California and the Energy Producers and Users Coalition (jointly, CAC/EPUC) met with Andrew Schwartz, advisor to Pres. Peevey in San Francisco. Also present was Elizabeth Stolzfus, Energy Division of the CPUC. Written material (attached to the notice) was used. Alcantar discussed: (1) the specific designation of price and non-price terms that may be subject to change in the extension contracts; (2) the eligibility of previously terminated firm capacity CHP/QF generators to reinstate pre-existing firm capacity non-price terms and conditions; and (3) the Commission's possible role in addressing mediation of disputes over contract issues. Contact Person: Karen Terranova; telephone: (415) 421-4143; e-mail: kt@a-klaw.com.

Type: REQUEST Filing Date: November 21, 2007
Filed By:
Union of Concerned Scientists
Description: For an Award of Compensation to the Union of Concerned Scientists for Substantial Contributions to Decision 06-02-032.

Type: RESPONSE Filing Date: November 9, 2007
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: to the Joint Parties' Application for Rehearing of D. 07-09-040.

Type: RESPONSE Filing Date: November 9, 2007
Filed By:
California Cogeneration Council
Description: to Pacific Gas and Electric Company's, Southern California Edison Company's, San Diego Gas & Electric Company's, The Utility Reform Network's and the Division of Rate Payer A dvocates ' Application for Rehearing of the Opinion on Future Policy and Pricing for Qualifying Facilities, Decision 0 7-09-040.

Type: RESPONSE Filing Date: November 9, 2007
Filed By:
Independent Energy Producers Association
Description: to Applications for Rehearing of D.07-09-040.

Type: RESPONSE Filing Date: November 9, 2007
Filed By:
Division of Ratepayer Advocates
Pacific Gas and Electric Company
San Diego Gas and Electric
Southern California Edison Company
The Utility Reform Network
Description: Joint; to Applications for Rehearing of Decision 07-09-040.

Type: REHEARING REQUEST Filing Date: October 25, 2007
Filed By:
Division of Ratepayer Advocates
Pacific Gas & Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
The Utility Reform Network
Description: Application for Rehearing of Decision 07-09-040.

Type: REHEARING REQUEST Filing Date: October 25, 2007
Filed By:
California Cogeneration Council
Description: of Decision 07-09-040, Opinion on Future Policy and Pricing for Qualifying Facilities.

Type: REHEARING REQUEST Filing Date: October 25, 2007
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
Description: Application for Rehearing of Decision 07-09-040.

Type: EXPARTE Filing Date: September 21, 2007
Filed By:
Southern California Edison Company
Description: SUMMARY: On September 18, 2007 Bruce C. Foster, Senior Vice President of Southern California Edison Company (SCE) met with Cmmr. Grueneich in San Francisco. Also present were Theresa Cho, advisor to Cmmr. Grueneich and Michael Hoover, Director of Regulatory Affairs of SCE. Written materials (attached to the notice) were used. Foster explained that the energy payment formula in the Alternate Proposed Decision (Alternate) produces prices that exceed SCE's short-run avoided cost (SRAC) of energy. Hoover stated that the firm capacity price in the Alternate is too high and exceeds SCE's avoided cost of capacity. Hoover explained that the $157/kW-year MPR capacity price used in the Alternate should be reduced by at least $55/kWyear to account for savings gained from running in the energy market. The firm capacity price should also be reduced by an additional $10/kW-year. Hoover also stated that there is no need to require standard offer contracts, particularly for QFs because QFs have many options for selling their power, including utility all-source solicitations, renewables solicitations, bilateral contracts and other load-serving entities. Contact Person: Henry Romero, telephone: (626) 302-4124, e-mail address: Henry.Romero@sce.com.

Type: EXPARTE Filing Date: September 20, 2007
Filed By:
California Cogeneration Council
Description: SUMMARY: On September 17, 2007 Beth Vaughan, Executive Director of the California Cogeneration Council (CCC) participated in a conference call with Andrew Schwartz, advisor to Pres. Peevey. R. Thomas Beach, consultant to the CCC; David Hermanson, a member of the CCC employed by Primary Energy; Jerry R. Bloom and Joseph M. Karp of Winston & Strawn, LLP, counsel for the CCC also participated in the conference call. CCC representatives stated that the Alternate Proposed Decision (Alternate PD) places too much weight on the NP-15 and SP-15 spot market prices and proposed they account for no more than one third of the SRAC formula, with the existing administrative values making up the difference. CCC representatives proposed that the Commission require the utilities to employ the updated time of use ("TOU") factors adopted by the Commission for energy efficiency and demand response programs. CCC representatives explained that Pacific Gas and Electric Company's (PG&E) City-gate prices should be used in PG&E'S new SRAC formula. The CCC representatives stated the 2007 MPR should serve as the basis for the combined cycle gas turbine fixed costs of the firm capacity price calculation. Contact Person: Joseph M. Karp, telephone: (415) 591-1000; e-mail jkarp@winston.com.

Type: EXPARTE Filing Date: September 20, 2007
Filed By:
The Utility Reform Network
Description: SUMMARY: On September 17, 2007, Michel Peter Florio, Senior Attorney for The Utility Reform Network (TURN), met with Theresa Cho, advisor to Cmmr. Grueneich, in San Francisco. Florio summarized TURN's major concerns with the Alternate Proposed Decision (APD) of Commissioner Grueneich. Florio stated that it would be difficult and speculative to forecast the energy profits that a proxy combined cycle plant would earn in the market over the ten-year period of the firm capacity contract adopted by the APD. Florio recommended that the Commission adopt a capacity payment structure for the firm contract that did not contain a deduction for such energy profits and likewise base the energy payment under the contract on a fixed heat rate equal to that of the proxy unit. Florio also stated that the factors cited in the APD as justifying a 50/50 average of a market-based heat rate have been declining. Contact Person: Larry Wong, telephone: (415) 929-8876, e-mail: Adminassistant@turn.org.

Type: EXPARTE Filing Date: September 20, 2007
Filed By:
Southern California Edison Company
Description: SUMMARY: On Monday, September 17, 2007 Bruce C. Foster, Senior Vice President of Southern California Edison Company (SCE), met with Robert Kinosian, advisor to Cmmr. Bohn in San Francisco. Also present was Michael Hoover, Director of Regulatory Affairs of SCE. Written materials (attached to the notice) were used. Foster explained that the energy payment formula in the Alternate Proposed Decision (Alternate) produces prices that exceed SCE's short-run avoided cost (SRAC) of energy. Foster stated that the firm capacity price is too high and explained that the $157/kW-year MPR capacity price should be reduced by at least $55/kWyear to account for savings gained from running in the energy market. The firm capacity price should also be reduced by an additional $10/kW-year to account for the residual value associated with the MPR's 20-year annualization of a proxy unit that has a 30-year economic/operating life. The Alternate should be modified to limit the availability of standard offer contracts to QFs with a net capacity no greater than 20 MW. Contact Person: Henry Romero, telephone: (626) 302-4124, e-mail: Henry.Romero@sce.com.

Type: EXPARTE Filing Date: September 20, 2007
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
Description: SUMMARY: On September 17, 2007, Michael Alcantar, counsel to the Cogeneration Association of California and Energy Producers and Users Coalition (jointly, CAC/EPUC) met with Cmmr. Grueneich in San Francisco. Also present was Theresa Cho, advisor to Cmmr. Grueneich. Written materials (attached to the notice) were used. Issues raised in CAC/EPUC's written comments were reviewed and discussed regarding the Alternate Proposed Decision. CAC/EPUC urged the adoption of positions taken by CAC/EPUC in formal comments. Contact Person: Karen Terranova, telephone: (415) 421-4143; e-mail kt@a-klaw.com.

Type: COMMENTS Filing Date: September 17, 2007
Filed By:
COUNTY OF LOS ANGELES
Description: Reply; On the Alternate Proposed Decision of Commissioner Grueneich.

Type: EXPARTE Filing Date: September 17, 2007
Filed By:
Southern California Edison Company
Description: SUMMARY: On September 12, 2007 Michael Hoover, Director of Regulatory Affairs, of Southern California Edison Company (SCE) met with Jaclyn Marks, advisor to Cmmr. Simon in San Francisco. Written materials (attached to the notice) were used. Hoover discussed SCE's concerns with the Alternate Proposed Decision of Commissioner Grueneich issued on August 20, 2007 (Alternate). Hoover explained that the energy payment formula in the Alternate produces prices that exceed SCE's short-run avoided cost (SRAC) of energy. Hoover stated that the firm capacity price in the Alternate is too high and exceeds SCE's avoided cost of capacity. Hoover explained that the $157/kW-year MPR capacity price used in the Alternate should be reduced by at least $55/kW-year to account for savings gained from running in the energy market. The firm capacity price should also be reduced by an additional $10/kW-year to account for the residual value associated with the MPR's 20-year annualization of a proxy unit that has a 30-year economic/operating life. Hoover explained that QFs many options for selling their power, including utility all-source solicitations, renewables solicitations, bilateral contracts and other load-serving entities. Contact Person: Henry Romero, telephone: (626) 302-4124, email: Henry.Romero@sce.com.

Type: COMMENTS Filing Date: September 17, 2007
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
Description: Reply; On the Alternate Decision of Commissioner Grueneich.

Type: COMMENTS Filing Date: September 17, 2007
Filed By:
Southern California Edison Company
Description: Reply; on Alternate Proposed Decision of Commissioner Grueneich.

Type: COMMENTS Filing Date: September 17, 2007
Filed By:
San Diego Gas & Electric Company
Description: Reply; On the Alternate Proposed Decision of Commissioner Grueneich.

Type: COMMENTS Filing Date: September 17, 2007
Filed By:
California Wind Energy Association
Description: Reply; On the Alternate Proposed Decision of Commissioner Grueneich.

Type: COMMENTS Filing Date: September 17, 2007
Filed By:
California Cogeneration Council
Description: Reply; On the Alternate Proposed Decision of Commissioner Grueneich.

Type: COMMENTS Filing Date: September 17, 2007
Filed By:
Pacific Gas and Electric Company
Description: Reply; On Alternate Proposed Decision.

Type: COMMENTS Filing Date: September 14, 2007
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY INC.
Description: Reply; on Alternative Opinion on Future Policy and Pricing For Qualifying Facilities.

Type: EXPARTE Filing Date: September 14, 2007
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: SUMMARY: On September 12, 2007 Michael Alcantar, council to the Cogeneration Association of California and the Energy Producers and Users Coalition (jointly, CAC/EPUC) met with Robert Kinosian, advisor to Cmmr. Bohn; Jaclyn Marks, advisor to Cmmr. Simon and Andrew Campbell, advisor to Cmmr. Chong; and Andrew Schwartz, advisor to Pres. Peevey in three separate meetings in San Francisco. Also present was Nora Sheriff, council to CAC/EPUC. Written materials (attached to the notice) were used. Alcantar expressed the need for contracts under the Commission's Prospective QF Program to have certainty both as to term and pricing, along with the importance of a policy for new, small QFs. Contact Person: Karen Terranova, telephone: (415) 421-4143, email: kt@a-klaw.com.

Type: EXPARTE Filing Date: September 14, 2007
Filed By:
California Cogeneration Council
Description: SUMMARY: On September 11, 2007 Beth Vaughan, Executive Director of the California Cogeneration Council (CCC) met with Robert Kinosian, advisor to Cmmr. Bohn. Also present were David Hermanson, a member of the CCC employed by Primary Energy; R. Thomas Beach, consultant to CCC; and Jerry R. Bloom of Winston & Strawn, LLP, council for the CCC. CCC representatives expressed their support for the Alternate Proposed Decision (Alternate PD), but noted that it places too much weight on the NP- 15 and SP-15 spot market prices. CCC representatives proposed that the Commission require the utilities to employ, on an interim basis, the updated time of use ("TOU") factors for energy efficiency and demand response programs, and revisit these interim TOU factors in the technical workshop that the Alternate PD requires 60 days after the Commission's decision. CCC representatives also explained that PG&E City-gate prices should be used in PG&EYS new SRAC formula rather than the arbitrary 50150 mix of Malin and Topock gas. CCC representatives stated the 2007 MPR should serve as the basis for the combined cycle gas turbine fixed costs of the firm capacity price calculation. Contact Person: Jerry R. Bloom, telephone: (213) 615-1756, email: jbloom@winston.com.

Type: EXPARTE Filing Date: September 14, 2007
Filed By:
Southern California Edison Company
Description: SUMMARY: On September 11, 2007 Bruce C. Foster, Senior Vice President of Southern California Edison Company (SCE) met with Pres. Peevey in San Francisco. Also present were Andrew Schwartz, advisor to Pres. Peevey; and Michael Hoover, Director of Regulatory Affairs of SCE. Written materials (attached to the notice) were used. Foster discussed SCE's concerns with the Alternate Proposed Decision of Cmmr. Grueneich issued on August 20, 2007 (Alternate). Foster explained that the energy payment formula in the Alternate produces prices that exceed SCE's short-run avoided cost (SRAC) of energy. Foster stated that the firm capacity price in the Alternate is too high and exceeds SCE's avoided cost of capacity. Foster explained that the $157/kW-year MPR capacity price used in the Alternate should be reduced by at least $55/kWyear to account for savings gained from running in the energy market. The firm capacity price should also be reduced by an additional $10/kW-year to account for the residual value associated with the MPR's 20-year annualization of a proxy unit that has a 30-year economic/operating life. Foster explained that QFs have many options for selling their power, including utility all-source solicitations, renewables solicitations, bilateral contracts and other load-serving entities. Contact Person: Henry Romero, telephone: (626) 302-4124, e-mail address: Henry.Romero@sce.com.

Type: EXPARTE Filing Date: September 14, 2007
Filed By:
California Cogeneration Council
Description: SUMMARY: On September 12, 2007 Beth Vaughan, Executive Director of the California Cogeneration Council (CCC) met with Cmmr. Grueneich in San Francisco. Also present were Theresa Cho, advisor to Cmmr. Grueneich; R. Thomas Beach, consultant to the CCC; Shakil Rahman, a member of the CCC employed by Juniper Generation, David Hermanson, a member of the CCC employed by Primary Energy; Seth Hooper, a member of the CCC employed by Weyerhaeuser Company; and Jerry R. Bloom and Joseph M. Karp of Winston & Strawn, LLP, counsel for the CCC. CCC representatives expressed their support for the Alternate Proposed Decision (Alternate PD) but stated the Alternate PD places too much weight on the NP-15 and SP-15 spot market prices. CCC representatives explained why the Southern California Edison Company's ("SCE") administrative heat rate should be set at 9,705 BtuIkWh. CCC representatives proposed that the Commission require the utilities to employ, on an interim basis, the updated time of use ("TOW) factors adopted by the Commission for energy efficiency and demand response programs, and revisit these interim TOU factors in the technical workshop that the Alternate PD requires 60 days after the Commission's decision. CCC representatives also explained that PG&E City-gate prices should be used in PG&EYS new SRAC formula rather than the arbitrary 50150 mix of Malin and Topock gas. Contact Person: Joseph M. Karp, telephone: (415) 591-1000, e-mail: jkarp@winston.com.

Type: EXPARTE Filing Date: September 14, 2007
Filed By:
California Cogeneration Council
Description: SUMMARY: On September 12, 2007 Beth Vaughan, Executive Director of the California Cogeneration Council (CCC) met with Jacklyn Marks, advisor to Cmmr. Simon in San Francisco. Also present were Andrew Campbell, advisor to Cmmr. Chong; Shakil Rahman, a member of the CCC employed by Juniper Generation; David Hermanson, a member of the CCC employed by Primary Energy; Seth Hooper, a member of the CCC employed by Weyerhaeuser Company; R. Thomas Beach, consultant to the CCC; and Jerry R. Bloom and Joseph M. Karp of Winston & Strawn, LLP, counsel for the CCC. CCC representatives expressed their support for the Alternate Proposed Decision (Alternate PD) but stated the Alternate PD places too much weight on the NP-15 and SP-15 spot market prices. CCC representatives explained why the Southern California Edison Company's ("SCE") administrative heat rate should be set at 9,705 BtuIkWh. CCC representatives proposed that the Commission require the utilities to employ, on an interim basis, the updated time of use ("TOW) factors adopted by the Commission for energy efficiency and demand response programs, and revisit these interim TOU factors in the technical workshop that the Alternate PD requires 60 days after the Commission's decision. CCC representatives also explained that PG&E City-gate prices should be used in PG&EYS new SRAC formula rather than the arbitrary 50150 mix of Malin and Topock gas. Contact Person: Joseph M. Karp, telephone: (415) 591-1000, e-mail: jkarp@winston.com.

Type: EXPARTE Filing Date: September 13, 2007
Filed By:
HL Power
Description: SUMMARY: On September 10, 2007, Ralph Saunders of HL Power met with Pres. Peevey in San Francisco. Also present were Andrew Swartz, advisor to Pres. Peevey; Jerry R. Bloom of Winston & Strawn, LLP, counsel for HL Power. HL Power expressed continuing concerns with the Proposed Decisions ("PDs") and stated that the PDs, as currently drafted, would have a significantly adverse impact on HL Power's operation of its biomass qualifying facility and while the alternative proposed decision ("APD") by Commr. Grueneich was a vast improvement over the original Proposed Decision, there were several issues that needed additional attention. HL Power asked: (1) that the 50150 split between NP151SP15 and administratively determined heat rates in the APD be changed to a one third two third split, respectively; (2) that PG&E's time of use periods be corrected in the forthcoming Commission decision, rather than being delayed for further consideration, and (3) that the city gas plus transportation be used for the gas pricing utilized in PG&E payment formula. Contact Person: Jerry R. Bloom, telephone: (213) 615-1756, email: jbloom@winston.com.

Type: EXPARTE Filing Date: September 13, 2007
Filed By:
Independent Energy Producers Association
Description: SUMMARY: On September 11, 2007 Steven Kelly, Policy Director to Independent Energy Producers Association (IEP) met with Andrew Campbell, advisor to Cmmr. Chong in San Francisco. Also present was Douglas Kerner, legal representative for IEP. Kelly agreed with the Alternate Proposed Decision that a change to the methodology to determine avoided cost prices does not render prior avoided cost prices incorrect, and that the modified methodology should not be applied retroactively. Contact Person: Eric Janssen, telephone: (916) 447-2166, email: ericj@eslawfirm.com.

Type: EXPARTE Filing Date: September 13, 2007
Filed By:
Independent Energy Producers Association
Description: SUMMARY: On September 11, 2007 Steven Kelly, Policy Director to Independent Energy Producers Association (IEP) met with Cmmr. Grueneich in San Francisco. Also present were Theresa Cho, advisor to Cmmr. Grueneich; and Douglas Kerner, legal representative for IEP. Kelly agreed with the Alternate Proposed Decision that a change to the methodology to determine avoided cost prices does not render prior avoided cost prices incorrect, and that the modified methodology should not be applied retroactively. Contact Person: Eric Janssen, telephone: (916) 447-2166, email: ericj@eslawfirm.com.

Type: EXPARTE Filing Date: September 13, 2007
Filed By:
Independent Energy Producers Association
Description: SUMMARY: On September 11, 2007 Steven Kelly, Policy Director to Independent Energy Producers Association (IEP) met with Pres. Peevey in San Francisco. Also present were Andrew Schwartz, advisor to Pres. Peevey; and Douglas Kerner, legal representative for IEP. Kelly agreed with the Alternate Proposed Decision that a change to the methodology to determine avoided cost prices does not render prior avoided cost prices incorrect, and that the modified methodology should not be applied retroactively. Contact Person: Eric Janssen, telephone: (916) 447-2166, email: ericj@eslawfirm.com.

Type: COMMENTS Filing Date: September 10, 2007
Filed By:
COUNTY OF LOS ANGELES
Description: Opening; On the Alternate Proposed Decision of Commissioner Grueneich.

Type: COMMENTS Filing Date: September 10, 2007
Filed By:
Independent Energy Producers Association
Description: on the Alternate Proposed Decision on Future Policy and Pricing for Qualifying Facilities.

Type: COMMENTS Filing Date: September 10, 2007
Filed By:
San Diego Gas & Electric Company
Description: Opening; on the Alternate Proposed Decision of Commissioner Grueneich.

Type: COMMENTS Filing Date: September 10, 2007
Filed By:
Southern California Edison Company
Description: on Alternate Proposed Decision of Commissioner Grueneich.

Type: COMMENTS Filing Date: September 10, 2007
Filed By:
California Cogeneration Council
Description: on the Alternate Proposed Decision of Commissioner Grueneich.

Type: COMMENTS Filing Date: September 10, 2007
Filed By:
California Wind Energy Association
Description: on the Alternate Proposed Decision of Commissioner Grueneich.

Type: COMMENTS Filing Date: September 10, 2007
Filed By:
The Utility Reform Network
Description: On the Alternate Proposed Decision of Commissioner Grueineich.

Type: COMMENTS Filing Date: September 10, 2007
Filed By:
Pacific Gas and Electric Company
Description: Opening; On Alternate Proposed Decision of Commissioner Grueneich.

Type: COMMENTS Filing Date: September 10, 2007
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
Description: Opening; On the Alternate Decision of Commissioner Grueneich.

Type: EXPARTE Filing Date: August 31, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: SUMMARY: On August 30, 2007 Brian Cherry, Vice President, Regulatory Relations for Pacific Gas and Electric Company (PG&E) met with Cmmr. Grueneich in San Francisco. Also present were Theresa Cho, advisor to Cmmr. Grueneich; Fong Wan, Vice President, Energy Procurement of PG&E; and Roy Kuga, Vice President, Energy Supply of PG&E. Written materials (attached to the notice) were used. Cherry expressed support for the revised proposed decision and stressed the need for expeditious Commission action on pricing and contract terms for QF contracts not covered by PG&E-IEP Settlement Agreement in 2006. Cherry summarized PG&E's position as to pricing and policy for non-IEP settling QFs and noted the Alternate Proposed Decision would increase energy prices in excess of the IEP Settlement decision. Kuga explained that new QF contracts were not subject to CTC recovery and that bundled customers were exposed to stranded cost risks.

Type: EXPARTE Filing Date: August 29, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On August 28, 2007 Brian Cherry, Vice President, Regulatory Relations for Pacific Gas and Electric Company (PG&E) met with Jaclyn Marks, advisor to Cmmr. Simon in San Francisco. Also present was Robert Mason, advisor to Cmmr. Simon. Cherry expressed support for the revised proposed decision and stressed the need for expeditious Commission action on pricing and contract terms for QF contracts not covered by PG&E-IEP Settlement Agreement in 2006. Cherry summarized PG&E¿s position with respect to pricing for non-IEP settling QFs and noted the Alternate Proposed Decision of Cmmr. Grueneich would increase as available energy prices in excess of the IEP Settlement decision.

Type: EXPARTE Filing Date: August 29, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On August 28, 2007, Brian Cherry, Vice President, Regulatory Relations, Pacific Gas and Electric Company (PG&E) met with Andrew Campbell, advisor to Cmmr. Chong in San Francisco. Written materials (attached to the notice) were used. Cherry expressed support for the revised proposed decision and stressed the need for expeditious Commission action on pricing and contract terms for QF contracts not covered by PG&E-IEP Settlement Agreement in 2006. Cherry summarized PG&E's position and noted the Alternate PD of Cmmr. Grueneich would increase as available energy prices in excess of the IEP Settlement decision.

Type: EXPARTE Filing Date: August 28, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: LATE FILED: On August 22, 2007 Thomas Bottorff, Senior Vice President, Regulatory Relations for Pacific Gas and Electric Company (PG&E) met with Pres. Peevey in San Francisco. Also present were Andy Schwartz, advisor to Pres. Peevey; Jana Corey, Director of Smart Energy Web; and Sean Gallagher, Director of the Energy Division. Bottorff expressed support for the revised proposed decision and stressed the need for expeditious Commission action on pricing and contract terms for QF contracts not covered by PG&E-IEP Settlement Agreement in 2006. Bottorff summarized PG&E's position with respect to pricing and policy for non-IEP settling QFs and noted the Alternate Proposed Decision increase energy prices in excess of the IEP Settlement decision.

Type: EXPARTE Filing Date: August 24, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On August 22, 2007, Brian Cherry, Vice President, Regulatory Relations, Pacific Gas and Electric Company (PG&E) met with Pres. Peevey in San Francisco. Also present were Fong Wan, Vice President, Energy Procurement and Roy Kuga, Vice President, Energy Supply, for PG&E. Written materials (attached to the notice) were used. Cherry expressed general support for the revised proposed decision and stressed the need for expeditious Commission action on pricing and contract terms for QF contracts not covered by PG&E-IEP Settlement Agreement in 2006. The representatives also commented on the Alternate Proposed Decision of Cmmr. Grueneich. The representatives recommended that the PD be revised to reflect a 6-month measurement period instead of 24-month period.

Type: EXPARTE Filing Date: August 23, 2007
Filed By:
Southern California Edison Company
Description: SUMMARY: On August 20, 2007 Bruce C. Foster, Senior Vice President of Southern California Edison Company (SCE) met with Andrew Schwartz, advisor to Pres. Peevey in San Francisco. Also present was Michael Hoover, Director of Regulatory Affairs of SCE. Foster stated that any methodology for calculating the short run avoided cost (SRAC) of energy should be based on data for a robust market from a transparent source. The methodology in the Revised Proposed Decision (PD) does not satisfy this, criteria because there is no publication that provides the 24 months of forward electricity prices required by the Revised PD. SCE's proposed SRAC methodology uses historical SP-15 day-ahead prices and relies on transparent, market-based data that SCE actually uses to dispatch resources. Foster also stated that there is no need to require Standard Offer contracts for expiring or new QF resources. Contact Person: Henry Romero, telephone: (626) 302-3102, email: Henry.Romero@sce.com.

Type: EXPARTE Filing Date: August 21, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On August 17, 2007, Brian Cherry, Vice President, Regulatory Relations, Pacific Gas and Electric Company (PG&E) met with Andy Campbell, advisor to Cmmr. Chong in San Francisco. Cherry expressed general support for the revised proposed decision and stressed the need for expeditious Commission action on pricing and contract terms for QF contracts not covered by PG&E-IEP Settlement Agreement in 2006. Cherry recommended that the Commission utilize a more limited measurement interval for forward prices and asked that the PD be revised to reflect a 6-month measurement period instead of 24-month period.

Type: ALTERNATE Filing Date: August 20, 2007
Filed By:
CMMR/GRUENEICH/CPUC
Description: Opinion on Future Policy and Pricing for Qualifying Facilities. Opening Comments, which shall not exceed 15 pages, are due no later than September 9, 2007. Reply Comments are due 5 days after Opening Comments are filed.

Type: EXPARTE Filing Date: August 15, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On August 13, 2007 Brian Cherry, Vice President, Regulatory Relations of Pacific Gas and Electric Company (PG&E) met with Cmmr. Bohn in San Francisco. Also present were Stephen St. Marie and Robert Kinosian, advisors to Cmmr. Bohn; and Fong Wan, Vice President, Energy Procurement for PG&E. Written materials (attached to the notice) were used. Cherry expressed general support for the revised proposed decision (PD) and stressed the need for expeditious Commission action on pricing and contract terms for QF contracts not covered by PG&E-IEP Settlement Agreement in 2006. Cherry summarized PG&E's position with respect to pricing and policy for non-IEP settling QFs. Wan suggested that the Commission utilize a more limited measurement interval for forward prices and recommended that the PD be revised to reflect a 6-month measurement period instead of the 24-month period described in the PD.

Type: EXPARTE Filing Date: August 14, 2007
Filed By:
Southern California Edison Company
Description: SUMMARY: On August 9, 2007, Michael Hoover, Director of Regulatory Affairs of Southern California Edison Company (SCE) sent an electronic note (copies attached to the notice) to Nancy Ryan and Andrew Schwartz, advisors to Pres. Peevey. Contact Person: Henry Romero, telephone: (626) 302-4124, email: Henry.Romero@sce.com.

Type: EXPARTE Filing Date: August 13, 2007
Filed By:
Southern California Edison Company
Description: SUMMARY: On August 8, 2007, Bruce C. Foster, Senior Vice President of Southern California Edison Company (SCE) had a telephone conversation with Nancy Ryan, advisor to Pres. Peevey. Foster discussed the Revised Proposed Decision (PD) of ALJ Halligan on Future Policy and Pricing for Qualifying Facilities (QFs). Foster stated that the short run avoided cost (SRAC) methodology in the Revised PD may not be able to be implemented because it relies on using estimates of two-year forward transactions for power and gas to calculate a heat rate. In contrast, SCE's SRAC relies on transparent, market-based data that SCE uses to actually dispatch resource; therefore, SP-15 day-ahead prices represent SCE's true short-run avoided cost of energy. Foster explained that MRTU is scheduled for completion next year when SCE will petition the Federal Energy Regulatory Commission (FERC) to be relieved of the PURPA must-take obligation. Foster further explained that the 20 MW cap is consistent with FERC's recently adopted PURPA regulations. Contact Person: Henry Romero, telephone: (626) 302-4124, email: Henry.Romero@sce.com

Type: EXPARTE Filing Date: August 13, 2007
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: SUMMARY: On August 8, 2007, Jerry R. Bloom, counsel for the California Cogeneration Council (CCC) met with Nancy Ryan, advisor to Pres. Peevey in San Francisco. Also present was Andrew Swartz, advisor to Pres. Peevey. Bloom stated that the Proposed Decision (PD) would have a significantly adverse impact on existing cogenerators and the second circulated draft suffered the same problems as the first draft. Bloom emphasized that NP-15 and SP-15 market prices need to be adjusted to account for the fact that the prices in these markets are deflated and do not reflect the utilities' avoided costs. Bloom explained that language in the PD should be corrected in respect of the retrospective application of a revised SRAC formula. Bloom also stated that the time of use factors for Pacific Gas and Electric Company and San Diego Gas and Electric Company need to be adjusted at the same time as the rest of the changes to the SRAC pricing methodology are adopted. Contact Person: Jerry R. Bloom, telephone: (213) 615-1756, email: jbloom@winston.com and jchung@winston.com.

Type: COMPLIANCE FILING Filing Date: July 27, 2007
Filed By:
Pacific Gas and Electric Company
Description: Notification Under Ordering Paragraph 5 of Decision 06-11-006.

Type: EXPARTE Filing Date: July 26, 2007
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: SUMMARY: On July 23, 2007, Michael Alcantar, counsel to the Cogeneration Association of California and the Energy Producers and Users Coalition (jointly CAC/EPUC), met with Jaclyn Marks, advisor to Cmmr. Simon and Andrew Campbell, advisor to Cmmr. Chong in two separate meetings in San Francisco. Also present were Nora Sheriff, counsel to CAC/EPUC; Donald Schoenbeck of RCS, Inc., consultant to CAC/EPUC; Neil Burgess, Executive Director of Sycamore Cogeneration Company; and Gaylord Edwards, Business Manager, Chevron Global Power Company. Written materials (attached to the notice) were used. Alcantar referred to the attached documents regarding the proposed decision and emphasized the importance of resolving the Qualifying Facilities' (QF) pricing and policy issues. Contact Person: Karen Terranova, telephone: (415) 421-4143, email: kt@a-klaw.com.

Type: EXPARTE Filing Date: July 24, 2007
Filed By:
Cogeneration Association of California
Energy Producers and Users Coalition
Description: SUMMARY: On July 20, 2007, Michael Alcantar counsel for the Cogeneration Association of California and the Energy Producers and Users Coalition (jointly, CAC/EPUC) met with Mathew Deal, advisor to Pres. Peevey in San Francisco. Also present was Donald Schoenbeck, counsel for CAC/EPUC. Written materials (attached to the notice) were used. Alcantar discussed the importance of resolving the Qualifying Facilities (QF) pricing and policy issues. Contact Person: Karen Terranova, telephone: (415) 421-4143, email: kt@a-klaw.com.

Type: EXPARTE Filing Date: July 2, 2007
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On June 29, 2007, Beth Vaughan, Executive Director of the California Cogeneration Council (CCC), met with Andy Schwartz, advisor to Pres. Peevey in San Francisco. Also present were R. Thomas Beach, consultant to the CCC; Shakil Rahman, a member of the CCC employed by Juniper Generation; Dick Thomson, a member of the CCC employed by Proctor & Gamble; and Jerry R. Bloom and Joseph M. Karp of Winston & Strawn, L.L.P., counsel for the CCC. Written materials (attached to the notice) were used. The CCC representatives discussed the Proposed Decision (PD) and explained that NP-15 and SP-15 market prices need to be adjusted to reflect avoided costs and that the adjustment mechanism should be adopted. The CCC representatives also stated that the Commission should modify the TOU factors for SDG&E and PG&E when heat rate calculations are made. The CCC representatives further explained that the PD should be clarified regarding the revised SRAC formula and the new firm capacity price should be set with reference to the RPS MPR.

Type: EXPARTE Filing Date: June 25, 2007
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: SUMMARY: On June 20, 2007, Brian O'Sullivan, a member of California Wind Energy Association (CalWEA), employed by Coram Energy, met with Pres. Peevey in San Francisco. Also present were Andy Schwartz, advisor to Pres. Peevey; and Joseph M. Karp of Winston & Strawn, L.L.P., counsel for CalWEA. CalWEA representatives discussed the Proposed Decision (PD) urging the Commission to retain the as-available standard offer contract option. CalWEA representatives explained that such an option will not discourage participation in the Renewable Portfolio Standard program stating that the revised SRAC energy pricing formula will have a significant effect on a number of renewable qualifying facilities.

Type: EXPARTE Filing Date: June 22, 2007
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: SUMMARY: On June 20, 2007, Rod Aoki, counsel to Cogeneration Association of California and Energy Producers and Users Coalition (CAC/EPUC) met with Stephen St. Marie, advisor to Cmmr. Bohn in San Francisco. Also present were Theresa Cho, advisor to Cmmr. Grueneich; and Donald Schoenbeck of RCS Inc., consultant to CAC/EPUC. Written materials (attached to the notice) were used. The representatives clarified the efficiencies of industrial cogeneration operations and emphasized the need for contracts under the Commission's Prospective QF Program to have certainty both as to term and pricing, and the importance of a policy for new, small QFs. Contact person: Karen Terranova, telephone: (415) 421-4143; email: kt@a-klaw.com

Type: OPPOSITION Filing Date: June 20, 2007
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: to Motion of PG&E, SCE and SDG&E to strike Appendices to Opening and Reply Comments of the California Cogeneration Council.

Type: RESPONSE Filing Date: June 20, 2007
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: to the Motion to Strike Appendices to the Reply Comments filed on June 4, 2007.

Type: EXPARTE Filing Date: June 18, 2007
Filed By:
Independent Energy Producers Association
Description: SUMMARY: On June 15, 2007, Douglas Kerner, attorney for the Independent Energy Producers Association (IEP), met with Andrew Schwartz, advisor to Pres. Peevey in San Francisco. Also present was Steven K. Kelly, Policy Director for IEP. The representatives expressed concern over the many flaws in the Proposed Decision (PD) ranging from legal, technical, and implementation problems and the PD is technically flawed in a number of areas for failing to adequately and precisely explain how key price factors will be determined. The representatives also stated that the PD has numerous gaps or is silent on the implementation of its proposal, including issues such as development, timing of updates, potential for protest, and review of mechanisms that will need to be in place before any new methodology could be employed. The representatives also expressed concern that failure to address these issues prior to adoption of a final decision will lead to future disputes and protests. Contact Person: Eric Janssen, telephone: (916) 447-2166, email: ericj@eslawfirm.com.

Type: RULING Filing Date: June 15, 2007
Filed By:
ALJ/BROWN/CPUC
Description: Setting Final Oral Argument Before the Commission. The Commission shall hold final oral argument on Tuesday, July 10, 2007, from 3:00 p.m. to 4:30 p..m., at the Commission Auditorium, State Office Building, 505 Van Ness Avenue, San Francisco, California.

Type: EXPARTE Filing Date: June 13, 2007
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: SUMMARY: On June 8, 2007, Michael Alcantar, counsel to the Cogeneration Association of California and the Energy Producers and Users Coalition (jointly, CAC/EPUC), met with Andrew Campbell, advisor to Cmmr. Chong in San Francisco. Also present were Jaclyn Marks, advisor to Cmmr. Simon and Donald Schoenbeck of RCS, Inc., consultant to CAC/EPUC. The representatives emphasized the need for contracts under the Commission's Prospective QF Program to have certainty both as to term and pricing, the importance of implementing the Prospective QF Program as a coherent whole, the need for the issuance of a timely decision and the importance of a policy for new, small QFs. Contact Person: Karen Terranova, telephone: (415) 421-4143, email: kt@a-klaw.com.

Type: EXPARTE Filing Date: June 13, 2007
Filed By:
Southern California Edison Company
Description: SUMMARY: On June 8, 2007, Michael Hoover, Director of Regulatory Affairs of Southern California Edison Company, met with Andrew Schwartz, advisor to Pres. Peevey in San Francisco. Written materials (attached to the notice) were used. Hoover discussed the Proposed Decision (PD) of ALJ Halligan explaining that the PD makes significant progress by basing short run avoided cost energy payments on a market-based formula. Hoover also explained that the PD has flaws that, if left uncorrected, will produce above-market payments in excess of avoided cost and impose long-term contracting burdens on utility bundled service customers that will not be shared by customers of other retail providers. Contact Person: Henry Romero, telephone: (626) 302-4124, email: Henry.Romero@sce.com.

Type: EXPARTE Filing Date: June 13, 2007
Filed By:
Southern California Edison Company
Description: SUMMARY: On June 8, 2007, Michael Hoover, Director of Regulatory Affairs of Southern California Edison Company, met with Andrew Campbell, advisor to Cmmr. Chong in San Francisco. Written materials (attached to the notice) were used. Hoover discussed the Proposed Decision (PD) of ALJ Halligan explaining that the PD makes significant progress by basing short run avoided cost energy payments on a market-based formula. Hoover also explained that the PD has flaws that, if left uncorrected, will produce above-market payments in excess of avoided cost and impose long-term contracting burdens on utility bundled service customers that will not be shared by customers of other retail providers. Contact Person: Henry Romero, telephone: (626) 302-4124, email: Henry.Romero@sce.com.

Type: EXPARTE Filing Date: June 13, 2007
Filed By:
Southern California Edison Company
Description: SUMMARY: On June 8, 2007, Bruce C. Foster, Senior Vice President of Southern California Edison Company (SCE) met with Jaclyn Marks, advisor to Cmmr. Simon in San Francisco. Also present was Michael Hoover, Director of Regulatory affairs of SCE. Written materials (attached to the notice) were used. Hoover discussed the Proposed Decision (PD) of ALJ Halligan explaining that the PD makes significant progress by basing short run avoided cost energy payments on a market-based formula. Hoover also explained that the PD has flaws that, if left uncorrected, will produce above-market payments in excess of avoided cost and impose long-term contracting burdens on utility bundled service customers that will not be shared by customers of other retail providers. Contact Person: Henry Romero, telephone: (626) 302-4124, email: Henry.Romero@sce.com.

Type: EXPARTE Filing Date: June 11, 2007
Filed By:
Southern California Edison Company
Description: SUMMARY: On June 6, 2007, Bruce C. Foster, Senior Vice President of Southern California Edison Company (SCE) met with Stephen St. Marie, advisor to Cmmr. Bohn in San Francisco. Also present was Michael Hoover, Director of Regulatory Affairs of SCE. Written materials (attached to the notice) were used. Hoover discussed the Proposed Decision (PD) of ALJ Halligan explaining that the PD makes significant progress by basing short run avoided cost energy payments on a market-based formula. Hoover also explained that the PD has flaws that, if left uncorrected, will produce above-market payments in excess of avoided cost and impose long-term contracting burdens on utility bundled service customers that will not be shared by customers of other retail providers. Contact Person: Henry Romero, telephone: (626) 302-4124, email: Henry.Romero@sce.com.

Type: EXPARTE Filing Date: June 11, 2007
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: SUMMARY: On June 6, 2007, Rod Aoki, counsel to the Cogeneration Association of California and the Energy Producers and Users Coalition (jointly, CAC/EPUC), met with Pres. Peevey in San Francisco. Also present were Andrew Schwartz, advisor to Pres. Peevey; Nora Sheriff, counsel to CAC/EPUC; and Donald Schoenbeck of RCS, Inc. The representatives emphasized the need for contracts under the Commission's Prospective QF Program to have certainty both as to term and pricing. The representatives also discussed the importance of implementing the Prospective QF Program as a coherent whole and the need for a timely decision as well as a policy for new, small QFs. Contact Person: Karen Terranova, telephone: (415) 421-4143, email: kt@a-klaw.com.

Type: OPPOSITION Filing Date: June 8, 2007
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: of the California Cogeneration Council to shorten time to respond to the motion to strike.

Type: MOTION Filing Date: June 5, 2007
Filed By:
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison
Description: to shorten time to respond to motion to strike and to shorten time for responses to this motion.

Type: MOTION Filing Date: June 5, 2007
Filed By:
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
Description: to strike Appendices to Opening and Reply Comments of the California Cogeneration Council and to the Reply Comments of the Cogeneration Association of California and the Energy Producers and Users Coalition.

Type: COMMENTS Filing Date: June 4, 2007
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: Reply; of the California Cogeneration Council on the Proposed Decision of ALJ Halligan.

Type: COMMENTS Filing Date: June 4, 2007
Filed By:
The Utility Reform Network
Description: Reply; on the Proposed Decision of ALJ Halligan.

Type: COMMENTS Filing Date: June 4, 2007
Filed By:
San Diego Gas & Electric Company
Description: Reply; on Proposed Decision of ALJ Halligan. (6/4/07 file date for Reply Comments per CALJ Minkin Email message dated 6/1/07. MMN)

Type: COMMENTS Filing Date: June 4, 2007
Filed By:
Southern California Edison Company
Description: Reply; on Proposed Decision of ALJ Halligan. (6/4/07 file date for Reply Comments per CALJ Minkin Email message dated 6/1/07. MMN

Type: COMMENTS Filing Date: June 4, 2007
Filed By:
California Independent System Operator Corporation
Description: Reply; on Proposed Decision of ALJ Halligan.

Type: COMMENTS Filing Date: June 4, 2007
Filed By:
Independent Energy Producers Association
Description: Reply; on the Proposed Decision on Future Policy and Pricing for Qualifying Facilities.

Type: COMMENTS Filing Date: June 4, 2007
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: Reply; on the Proposed Decision of ALJ Halligan.

Type: COMMENTS Filing Date: June 4, 2007
Filed By:
Pacific Gas and Electric Company
Description: Reply; on Proposed Decision of ALJ Halligan.

Type: COMMENTS Filing Date: June 4, 2007
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: Reply; of the California Wind Energy Association on the Proposed Decision on Future Policy and Pricing for Qualifying Facilities.

Type: EXPARTE Filing Date: June 1, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On May 29, 2007, Brian Cherry, Vice President, Regulatory Relations for Pacific Gas and Electric Company (PG&E) met with Nancy Ryan, advisor to Pres. Peevey in San Francisco. Written materials (attached to the notice) were used. Cherry expressed support for the Proposed Decision (PD) and stressed the need for expeditious action on pricing and contract terms for QF contracts not covered by PG&E-IEP Settlement Agreement in 2006. Cherry compared the PD's SRAC prices with market prices; summarized PG&E's position with respect to pricing and policy for non-IEP settling QFs; and stated that the PD's calculation of a Variable O&M adder was in error.

Type: EXPARTE Filing Date: June 1, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On May 29, 2007, Brian Cherry, Vice President, Regulatory Relations for Pacific Gas and Electric Company (PG&E) met with Jaclyn Marks, advisor to Cmmr. Simon in San Francisco. Also present were Robert Kinosian, Deputy Director for the Division of Ratepayer Advocates (DRA) and Marion Peleo, Attorney for DRA. Written materials (attached to the notice) were used. Cherry expressed support for the Proposed Decision (PD) and stressed the need for expeditious action on pricing and contract terms for QF contracts not covered by PG&E-IEP Settlement Agreement in 2006. Cherry compared the PD's SRAC prices with market prices; summarized PG&E's position with respect to pricing and policy for non-IEP settling QFs; and stated that the PD's calculation of a Variable O&M adder was in error.

Type: EXPARTE Filing Date: June 1, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On May 29, 2007, Brian Cherry, Vice President, Regulatory Relations for Pacific Gas and Electric Company (PG&E) met with Stephen St. Marie, advisor to Cmmr. Bohn in San Francisco. Also present were Robert Kinosian, Deputy Director for the Division of Ratepayer Advocates (DRA); Marion Peleo, Attorney for DRA; and Michael Florio, lead counsel for The Utility Reform Network. Written materials (attached to the notice) were used. Cherry expressed support for the Proposed Decision (PD) and stressed the need for expeditious action on pricing and contract terms for QF contracts not covered by PG&E-IEP Settlement Agreement in 2006. Cherry compared the PD's SRAC prices with market prices; summarized PG&E's position with respect to pricing and policy for non-IEP settling QFs; and stated that the PD's calculation of a Variable O&M adder was in error.

Type: EXPARTE Filing Date: May 31, 2007
Filed By:
DRA/PELEO/CPUC
Description: SUMMARY: On May 29, 2007, Robert Kinosian, Policy Advisor for the Division of Ratepayer Advocates (DRA) met with Jaclyn Marks, advisor to Cmmr. Simon in San Francisco. Also present were Brian Cherry, Vice President, Regulatory Relations for Pacific Gas and Electric Company (PG&E) and Marion Peleo, Attorney for DRA. Kinosian expressed support for the Proposed Decision (PD) of ALJ Halligan agreeing that the PD would affect a number of enhanced oil recovery facilities. Kinosian noted that in addition to standard offers, the option of bilateral contracts is also available to qualifying facilities. Contact Person: Sue Muniz, telephone: (415) 703-1858, email: sam@cpuc.ca.gov.

Type: EXPARTE Filing Date: May 31, 2007
Filed By:
DRA/PELEO/CPUC
Description: SUMMARY: On May 29, 2007, Robert Kinosian, Policy Advisor to Division of Ratepayer Advocates (DRA) met with Nancy Ryan, advisor to Pres. Peevey in San Francisco. Also present were Andy Schwartz, advisor to Pres. Peevey; and Michel Florio, counsel for The Utility Reform Network (TURN). Kinosian expressed DRA's overall support for the proposed decision (PD) of ALJ Halligan and stated that the PD should be modified. Florio discussed TURN's comments to the PD. Contact person: Sue Muniz, telephone: (415) 703-1858; email: sam@cpuc.ca.gov.

Type: EXPARTE Filing Date: May 31, 2007
Filed By:
DRA/PELEO/CPUC
Description: SUMMARY: On May 29, 2007, Robert Kinosian, Policy Advisor to Division of Ratepayer Advocates (DRA) met with Stephen St. Marie, advisor to Cmmr. Bohn in San Francisco. Also present were Michel Florio, counsel for The Utility Reform Network and Marion Peleo, counsel for DRA. Kinosian expressed DRA's overall support for the proposed decision (PD) of ALJ Halligan and stated that the PD should be modified. DRA representative discussed DRA's comments filed on May 25, 2007. Contact person: Sue Muniz, telephone: (415) 703-1858; email: sam@cpuc.ca.gov.

Type: COMMENTS Filing Date: May 29, 2007
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: Amended; of the California Cogeneration Council on the Proposed Decision of ALJ Halligan.

Type: EXPARTE Filing Date: May 29, 2007
Filed By:
DRA/PELEO/CPUC
Description: SUMMARY: On May 23, 2007, Robert Kinosian, Policy Advisor to Division of Ratepayer Advocates (DRA) met with Andy Campbell, advisor to Cmmr. Chong in San Francisco. Also present were Michael Florio, counsel for The Utility Reform Network and Marion Peleo, counsel for DRA. Kinosian expressed DRA's overall support for the Proposed Decision of ALJ Halligan, but noted that qualifying facilities (QFs) that are inefficient do not meet the Commission's policy goals and, therefore, should not receive subsidies from the QF program. Contact Person: Sue Muniz, telephone: (415) 703-1858, email: sam@cpuc.ca.gov.

Type: COMMENTS Filing Date: May 25, 2007
Filed By:
Independent Energy Producers Association
Description: on the Proposed Decision on Future Policy and Pricing for Qualifying Facilities.

Type: EXPARTE Filing Date: May 25, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On May 23, 2007, Brian Cherry, Vice President, Regulatory Relations for Pacific Gas and Electric Company (PG&E) met with Andy Campbell, advisor to Cmmr. Chong in San Francisco. Also present were Robert Kinosian, Deputy Director and Marion Peleo, Attorney for the Division of Ratepayer Advocates, and Michael Florio, lead counsel for The Utility Reform Network. Written materials (attached to the notice) were used. Cherry expressed support for the proposed decision and stressed the need for expeditious Commission action on pricing and contract terms for QF contracts not covered by PG&E-IEP Settlement Agreement in 2006. Cherry compared the proposed decision's SRAC prices with market prices and summarized PG&E's position with respect to pricing and policy for non-IEP settling QFs.

Type: COMMENTS Filing Date: May 25, 2007
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: on the Proposed Decision of ALJ Halligan.

Type: COMMENTS Filing Date: May 25, 2007
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: on the Proposed Decision of Future Policy and Pricing for Qualifying Facilities.

Type: COMMENTS Filing Date: May 25, 2007
Filed By:
COUNTY OF LOS ANGELES
Description: Opening; by the County of Los Angeles on the Proposed Decision.

Type: COMMENTS Filing Date: May 25, 2007
Filed By:
San Diego Gas & Electric Company
Description: Opening; on Proposed Decision of ALJ Halligan.

Type: COMMENTS Filing Date: May 25, 2007
Filed By:
Southern California Edison Company
Description: on Proposed Decision of ALJ Halligan.

Type: COMMENTS Filing Date: May 25, 2007
Filed By:
Pacific Gas and Electric Company
Description: Opening; on Proposed Decision of ALJ Halligan.

Type: COMMENTS Filing Date: May 25, 2007
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: Opening; on the Proposed Decision of ALJ Halligan.

Type: COMMENTS Filing Date: May 25, 2007
Filed By:
DRA/PELEO/PUC
Description: Opening; on the Proposed Decision of ALJ Halligan.

Type: COMMENTS Filing Date: May 25, 2007
Filed By:
The Utility Reform Network
Description: on the Proposed Decision of ALJ Halligan.

Type: EXPARTE Filing Date: May 24, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On May 23, 2007, Brian Cherry, Vice President, Regulatory Relations for Pacific Gas and Electric Company (PG&E) met with Andy Campbell, advisor to Pres. Peevey in San Francisco. Also present were Robert Kinosian, Deputy Director and Marion Peleo, Attorney for the Division of Ratepayer Advocates; and Michael Florio, lead counsel for The Utility Reform Network. Written materials (attached to the notice) were used. Cherry expressed support for the proposed decision and stressed the need for expeditious Commission action on pricing and contract terms for QF contracts not covered by PG&E-IEP Settlement Agreement in 2006. Cherry summarized PG&E's position with respect to pricing and policy for non-IEP settling QFs.

Type: EXPARTE Filing Date: May 21, 2007
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On May 16, 2007, R. Thomas Beach, consultant of the California Cogeneration Council (CCC) met with Theresa Cho, advisor to Cmmr. Grueneich in San Francisco. Also present were Shakil Rahman, a member of the CCC employed by Juniper Generation; David Hermanson, a member of the CCC employed by Primary Energy; Barry Lovell, a member of the CCC employed by Berry Petroleum; Dick Thomson, a member of the CCC employed by Procter & Gamble; and Jerry R. Bloom and Joseph M. Karp of Winston & Strawn, LLP, counsel for the CCC. The CCC representatives explained to the advisors their concerns with the Proposed Decision (PD). The CCC representatives stated that the PD would have a significant adverse impact on existing cogenerators; that the NP-15 and SP-15 market prices need to be adjusted to account for the fact that these markets do not reflect avoided costs; and that the PD should be clarified in lieu of the revised SRAC formula.

Type: EXPARTE Filing Date: May 21, 2007
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On May 16, 2007, R. Thomas Beach, consultant of the California Cogeneration Council (CCC) met with Cmmr. Bohn in San Francisco. Also present were Stephen St. Marie, advisor to Cmmr. Bohn; Shakil Rahman, a member of the CCC employed by Juniper Generation; David Hermanson, a member of the CCC employed by Primary Energy; Barry Lovell, a member of the CCC employed by Berry Petroleum; Dick Thomson, a member of the CCC employed by Procter & Gamble; and Jerry R. Bloom and Joseph M. Karp of Winston & Strawn, LLP, counsel for the CCC. The CCC representatives explained to the advisors their concerns with the Proposed Decision (PD). The CCC representatives stated that the PD would have a significant adverse impact on existing cogenerators and that the NP-15 and SP-15 market prices need to be adjusted to account for the fact that these markets do not reflect avoided costs.

Type: EXPARTE Filing Date: May 18, 2007
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On May 15, 2007, R. Thomas Beach, consultant of the California Cogeneration Council (CCC) met with Jaclyn Marks, advisor to Cmmr. Simon in San Francisco. Also present were Pam Nataloni, advisor to Cmmr. Simon; Shakil Rahman, a member of the CCC employed by Juniper Generation; Dick Thomson, a member of the CCC employed by Proctor & Gamble; and Joseph M. Karp of Winston & Strawn, LLP, counsel for the CCC. The CCC representatives explained to the advisors their concerns with the Proposed Decision (PD). The CCC representatives stated that the PD would have a significant adverse impact on existing cogenerators and that the NP-15 and SP-15 market prices need to be adjusted to account for the fact that these markets do not reflect avoided costs.

Type: COMMENTS Filing Date: May 14, 2007
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: on opinion on future policy and pricing for qualifying facilities.

Type: EXPARTE Filing Date: May 11, 2007
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On May 8, 2007, R. Thomas Beach, consultant to California Cogeneration Council (CCC) met with Pres. Peevey in San Francisco. Also present were Rami Kahlon and Nancy Ryan, advisors to Pres. Peevey; and David Hermanson of Primary Energy, Barry Lovell of Berry Petroleum, Shakil Rahman of Juniper Generation, Dick Thomson of Procter & Gamble, and Jerry R. Bloom and Joseph M. Karp of Winston & Strawn, LLP, counsels for CCC. Wade McCartney, Energy Division, also participated in the communication by phone. The CCC representatives explained their concerns with the Proposed Decision (PD) and explained that NP-15 and SP-15 market prices need to be adjusted to reflect avoided costs; the adjustment proposed by the CCC should be adopted; the proposed collar in the PD is unreasonable. The representatives stated that the PD should be clarified in respect of the prospective application of the revised SRAC formula; and that the operations and maintenance adder should be escalated.

Type: EXPARTE Filing Date: May 10, 2007
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On May 7, 2007, R. Thomas Beach, consultant to California Cogeneration Council (CCC) met with Andrew Campbell, advisor to Cmmr. Chong in San Francisco. Also present were David Hermanson of Primary Energy, Barry Lovell of Berry Petroleum, Shakil Rahman of Juniper Generation, and Jerry R. Bloom and Joseph M. Karp of Winston & Strawn, LLP, counsels for CCC. The CCC representatives explained their concerns with the Proposed Decision (PD) and explained that NP-15 and SP-15 market prices need to be adjusted; the adjustment proposed by the CCC should be adopted; and the proposed collar in the PD is unreasonable. The representatives explained that the Commission should clarify the gas prices to be used in the SRAC formula and that forward market prices be used in lieu of historical prices. Subsequent to the meeting, Beach sent an e-mail with attachments (attached to the notice) to the advisor.

Type: EXPARTE Filing Date: May 3, 2007
Filed By:
Energy Producers and Users Coalition
Description: SUMMARY: On May 2, 2007, Nora Sheriff, counsel for Energy Producers and Users Coalition (EPUC) met with Rami Kahlon, advisor to Pres. Peevey in San Francisco. Also present were Donald Schoenbeck of RCS Inc., consultant to EPUC and Mathew Deal of the Commission's Energy Division. Written materials (attached to the notice) were used. The representatives discussed the importance of addressing EPUC's petition to modify D.04-12-048, et seq. and explained the impact the procurement nonbypassable charge has on potential new cogeneration projects. Contact person: Karen Terranova, telephone: (415) 421-4143; email: kt@a-klaw.com

Type: PROPOSED DECISION Filing Date: April 24, 2007
Filed By:
ALJ/HALLIGAN/CPUC
Description: Opinion on Future Policy and Pricing for Qualifying Facilities. Opening Comments which shall not exceed 15 pages are due no later than May 14, 2007. Reply Comments are due 5 days after Opening Comments are filed.

Type: EXPARTE Filing Date: April 10, 2007
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: On April 5, 2007, Michael Alcantar, counsel to Cogeneration Association of California and Energy Producers and Users Coalition (CAC/EPUC) met with Rami Kahlon, advisor to Pres. Peevey in San Francisco. Also present were Nora Sheriff, counsel, and Donald Schoenbeck of RCS Inc., consultant, for CAC/EPUC. Judith Ikle and Robert Strauss of the Commission's Energy Division were also present. Written materials (attached to the notice) were used. The representatives discussed the importance of resolving the Qualifying Facilities (QF) pricings issues and offered an explanation of the four avoided cost QF prices.

Type: COMMENTS Filing Date: April 9, 2007
Filed By:
San Diego Gas & Electric Company
Description: on the Proposed Decision of ALJ Brown. (Late-filing authorized by ALJ Carol Brown)

Type: EXPARTE Filing Date: April 2, 2007
Filed By:
Energy Producers and Users Coalition
Description: SUMMARY: On March 30, 2007, Evelyn Kahl, counsel for Energy Producers and Users Coalition (EPUC) met with Rami Kahlon, advisor to Pres. Peevey in San Francisco. Also present was Nora Sheriff, counsel for EPUC. Written materials (attached to the notice) were used. The meeting was to discuss EPUC's Petition for Modification of D.04-12-048. Kahl stated that the nonbypassable charges (NBC) are now being used to recover ongoing procurement costs in the normal course of utility business, and emphasized that the mounting NBC obligations unnecessarily discourage the development of new combined heat and power systems. Kahl urged that the Commission grant the EPUC petition. Sheriff discussed the more recent NBC problems arising from SCE's petition to modify D.06-07-029 and explained that customer generation departing load should not pay net capacity cost associated with power purchase agreements. Contact person: Karen Terranova, telephone: (415) 421-4143; email: kt@a-klaw.com

Type: COMMENTS Filing Date: March 29, 2007
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: Opening; and objections on Opinion on Petitions for Modification of Decision 04-12-048.

Type: EXPARTE Filing Date: March 27, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On March 23, 2007, Brian Cherry, Vice President, Regulatory Relations, Pacific Gas and Electric Company sent a note (attached to the notice) electronically to Rami Kahlon and Andy Schwartz, advisors to Pres. Peevey; and Wade McCartney, Public Utilities Regulatory Analyst of the Division of Strategic Planning.

Type: EXPARTE Filing Date: March 21, 2007
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: SUMMARY: On March 19, 2007, Rod Aoki, counsel of Cogeneration Association of California and Energy Producers and Users Coalition (CAC/EPUC) met with Rami Kahlon, advisor to Pres. Peevey in San Francisco. Also present were Nora Sheriff, counsel, and Donald Schoenbeck of RCS Inc, consultant, of CAC/EPUC. The representatives discussed the importance of resolving the issue of access to confidential information pursuant to a reasonable protective order. The parties also discussed the need for implementation of a reasonable, long-term policy for CHP and differing avoided cost pricing theories and positions. The parties made reference to opening briefs filed March 3, 2006 by CAC/EPUC and Division of Ratepayer Advocates. Contact person: Karen Terranova, telephone: (415) 421-4143; email: kt@a-klaw.com

Type: EXPARTE Filing Date: March 14, 2007
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: SUMMARY: On March 9, 2007, Michael Alcantar, counsel to Cogeneration Association of California and Energy Producers and Users Coalition (CAC/EPUC) met with Rami Kahlon, advisor to Pres. Peevey in San Francisco. Also present were Rod Aoki, counsel to CAC/EPUC and Donald Schoenbeck of RCS Inc, consultant to CAC/EPUC. Alcantar discussed the importance of resolving the issue of access to confidential information pursuant to a reasonable protective order. The parties discussed the lack of implementation of the state policy on combined heat and power resources. Alcantar explained the uncertainty that delay in issuance of the decision has caused for both existing and new CHP projects. Contact person: Karen Terranova, telephone: (415) 421-4143; email: kt@a-klaw.com

Type: PROPOSED DECISION Filing Date: March 9, 2007
Filed By:
ALJ/BROWN/CPUC
Description: Decision granting in part and denying in part petition by Southern California Edison Company and Pacific Gas and Electric Company to modify Decision 04-12-048. Opening comments, which shall not exceed 15 pages, are due no later than March 29, 2007. Reply comments are due 5 days after the filing of Opening comments.

Type: EXPARTE Filing Date: February 9, 2007
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On February 6, 2007, Maureen Lennon, Executive Director of California Cogeneration Council (CCC) met with Rami Kahlon, advisor to Pres. Peevey in San Francisco. Also present were Jerry Bloom, counsel, and Tom Beach, consultant, to CCC, Shakil Rahman representing Delta Power Company and Barry Lovell representing Berry Petroleum Company. Wade McCartney, Energy Division, participated by phone. Written materials (attached to the notice) were used. Bloom expressed CCC's concern regarding communications during an ex parte meeting between Pres. Peevey¿s staff and representatives of Pacific Gas and Electric Company (PG&E) and Southern California Edison Co. on January 17, 2007. The parties discussed the comparisons between SRAC prices and prices under the PG&E/IEP settlement. Beach stated that the comparison of PG&E's winter SRAC energy prices to NP-15 market prices and PG&E/IEP settlement prices were misleading. The parties also discussed CCC's position in the QF case and CCC's view that cogeneration QFs need to get reasonable options for contract renewals when their existing contracts expire.

Type: REPLY Filing Date: January 31, 2007
Filed By:
Energy Producers and Users Coalition
Description: to Response of SCE and the Opposition of PG&E to Petition for Modification of Decision 04-12-048.

Type: EXPARTE Filing Date: January 22, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On January 17, 2007, Trina Horner, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Andy Schwartz, advisor to Comr. Peevey, in San Francisco. Also present were Frank De Rosa, Director, Renewables Supply, Janos Laszlo, Manager, Power Contracts, PG&E, and Michael Hoover, Director, Regulatory Affairs for Southern California Edison Company (SCE). Molly Sterkel and Wade McCartney, Energy Division, participated by phone. Written materials (attached to the notice) were used. Horner expressed the need for timely Commission guidance on pricing and contract terms for Qualifying Facility (QF) contracts not covered by PG&E-IEP Settlement Agreement in 2006. Laszlo and Hoover summarized the costs for PG&E's and SCE's customers of the existing pricing formula, and emphasized the importance of reducing SRAC prices. De Rosa added that new QFs and QFs with expiring contracts should compete in utility all-source solicitations for long-term contracts.

Type: RESPONSE Filing Date: January 22, 2007
Filed By:
Southern California Edison Company
Description: to the Petition for Modification of Decision 04-12-048 of the Energy Producers and Users Coalition.

Type: RESPONSE Filing Date: January 22, 2007
Filed By:
Pacific Gas and Electric Company
Description: Opposition to the Energy Producers and Users Coalition Petition to Modify Decision 04-12-048.

Type: RESPONSE Filing Date: January 22, 2007
Filed By:
Merced Irrigation District
Modesto Irrigation District
Description: to Petition for Modification of Decision 04-12-048 of the Energy Producers and Users Coalition.

Type: RESPONSE Filing Date: January 22, 2007
Filed By:
California Clean DG Coalition
Description: to Petition for Modification of Decision 04-12-048 of the Energy Producers and Users Coalition.

Type: REHEARING REQUEST Filing Date: January 2, 2007
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: of D06-12-037.

Type: PETITION FOR MODIFICATION Filing Date: December 22, 2006
Filed By:
Energy Producers and Users Coalition
Description: of Decision 04-12-048.

Type: EXPARTE Filing Date: December 21, 2006
Filed By:
Cogeneration Association of California
Energy Producers & Users Coalition
Description: SUMMARY: On December 18, 2006, Michael Alcantar, counsel to the Cogeneration Association of California and the Energy Producers and Users Coalition (CAC/EPUC), met with Rami Kahlon, advisor to Pres. Peevey, in San Francisco. Also present were Rod Aoki, counsel, and Donald Schoenbeck, consultant, to CAC/EPUC, and Kelly Lucas and Rick Williams, representing the Coalinga Cogeneration Company, Sargent Canyon Cogeneration Company and Salinas River Cogeneration Company. Written materials (attached to this notice) were used. Key actions to preserve and encourage combined heat and power (CHP) facilities were discussed. The parties noted that the lack of a clear long term policy for CHP is having a detrimental effect upon both the ability of existing CHP projects to continue operations after their contracts expire; as well as the ability of new projects to come on-line. The parties also discussed critical importance of fair pricing and contractual terms and conditions for CHP facilities. Finally, the parties emphasized the need for the Commission to issue its decision on long term qualifying facilities policy and avoided cost. Contact person: Karen Terranova, telephone: (415) 421-4143; facsimile (415) 989-1263; email: kt@a-klaw.com

Type: COMMENTS Filing Date: December 11, 2006
Filed By:
POWEREX CORP.
Description: reply; on ALJ Wetzell draft decision.

Type: COMMENTS Filing Date: December 11, 2006
Filed By:
Southern California Edison Company
Description: REPLY; ON PROPOSED DECISION ON PETITIONS FOR MODIFICATION OF D05-10-042.

Type: COMMENTS Filing Date: December 11, 2006
Filed By:
Alliance for Retail Energy Markets
Description: Reply; on Proposed Decision - Opinion on Petitions for Modification of Decision 05-10-042.

Type: COMMENTS Filing Date: December 11, 2006
Filed By:
Pacific Gas and Electric Company
Description: Reply; on the Proposed Decision of ALJ Wetzell.

Type: COMMENTS Filing Date: December 11, 2006
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: reply; on opinion on petitions for modification of D05-10-042.

Type: COMMENTS Filing Date: December 4, 2006
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: on opinion on petitions for modification of D05-10-042.

Type: COMMENTS Filing Date: December 4, 2006
Filed By:
Sempra Global
Description: ON PROPOSED OPINION ON PETITIONS FOR MODIFICATION OF D05-10-042.

Type: COMMENTS Filing Date: December 4, 2006
Filed By:
Calpine Corporation
Description: ON PROPOSED DECISION OF ALJ WETZELL ON PETITIONS FOR MODIFICATION OF DECISION 05-10-042.

Type: COMMENTS Filing Date: December 4, 2006
Filed By:
Pacific Gas and Electric Company
Description: ON THE PROPOSED DECISION OF ADMINISTRATIVE LAW JUDGE WETZELL

Type: COMMENTS Filing Date: December 4, 2006
Filed By:
Alliance for Retail Energy Markets
Description: ON PROPOSED DECISION ON PETITIONS FOR MODIFICATION OF D05-10-042.

Type: COMMENTS Filing Date: December 4, 2006
Filed By:
Constellation Energy Commodities Group, Inc.
Constellation NewEnergy, Inc.
Description: TO PROPOSED DECISION OF ALJ WETZELL REGARDING PETITIONS FOR MODIFICATION.

Type: COMMENTS Filing Date: December 4, 2006
Filed By:
The Utility Reform Network
Description: ON THE PROPOSED DECISION OF ALJ WETZELL.

Type: COMMENTS Filing Date: December 4, 2006
Filed By:
POWEREX CORP.
Description: on ALJ Wetzell Draft Decision.

Type: COMMENTS Filing Date: December 4, 2006
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: on Opinion on Petitions for Modification of D05-10-042.

Type: COMMENTS Filing Date: December 4, 2006
Filed By:
POWEREX CORP.
Description: Amended; on ALJ Wetzell Draft Decision.

Type: PROPOSED DECISION Filing Date: November 14, 2006
Filed By:
ALJ/Wetzell/CPUC
Description: OPINION ON PETITIONS FOR MODIFICATION OF D05-10-042. Comments are due December 4, 2006; reply comments - five days after comments are filed.

Type: EXPARTE Filing Date: October 11, 2006
Filed By:
Energy Producers and Users Coalition
Description: SUMMARY: On October 9, 2006, the Energy Producers and Users Coalition (EPUC) mailed via U.S. mail to Pres. Peevey a summary (attached to the notice) of EPUC's position in this proceeding. Contact person: Karen Terranova (415) 421-4143; facsimile (415) 989-1263; email: kt@a-klaw.com

Type: EXPARTE Filing Date: August 28, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On August 23, 2006, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Rami Kahlon, advisor to Cmmr. Peevey, in San Francisco. Also present were Frank De Rosa, Director, Renewables Supply, and Janos Laszlos, Manager, Power Contracts, for PG&E. Jacobson expressed PG&E's appreciation for the Commission's approval of the voluntary contract amendments that PG&E executed with over half of its Qualifying Facilities pursuant to the PG&E-IEPA Settlement Agreement. De Rosa emphasized the importance of reducing SRAC prices so that they reflect PG&E's true avoided cost. Laszlos explained how thermal efficiencies vary with different technologies. De Rosa explained that lower QF prices will not threaten electric reliability or the Commission's GHG emission reduction goals

Type: COMMENTS Filing Date: July 17, 2006
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
PACIFIC GAS AND ELECTRIC COMPANY
Description: joint; reply; on Proposed Decision adopting Settlement Agreement.

Type: EXPARTE Filing Date: July 14, 2006
Filed By:
DRA/PELEO/PUC
Description: On July 12, 2006, Robert Kinosian of the Division of Ratepayer Advocates ("DRA"), met with Rami Kahlon, advisor to President Peevey, and Peter Hanson, advisor to Cmmr. Brown, in two separate meetings in San Francisco. At the meeting with Peter Hanson also present was Belinda Gatti, advisor to Cmmr. Brown. Kinosian explained that DRA supports the proposed decision approving the settlement agreement between Pacific Gas and Electric Company and the Independent Energy Producers Association on qualifying facility ("QF") pricing. However, DRA does not support using the prices in the settlement as a precedent for general pricing for QFs.

Type: EXPARTE Filing Date: July 14, 2006
Filed By:
DRA/PELEO/CPUC
Description: On July 12, 2006, Robert Kinosian of the Division of Ratepayer Advocates ("DRA"), met with Rami Kahlon, advisor to President Peevey, and Peter Hanson, advisor to Cmmr. Brown, in two separate meetings in San Francisco. At the meeting with Peter Hanson also present was Belinda Gatti, advisor to Cmmr. Brown. Kinosian explained that DRA supports the proposed decision approving the settlement agreement between Pacific Gas and Electric Company and the Independent Energy Producers Association on qualifying facility ("QF") pricing. However, DRA does not support using the prices in the settlement as a precedent for general pricing for QFs.

Type: COMMENTS Filing Date: July 11, 2006
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: on the proposed decision of ALJs Brown, DeBerry and Halligan.

Type: EXPARTE Filing Date: July 6, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
Description: THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON JUNE 26, 2006, AND APPEARED IN THE CALENDAR OF JUNE 29, 2006. On June 20, 2006, Lad Lorenz, Vice President of Regulatory Affairs for San Diego Gas & Electric Company (SDG&E) and Southern California Gas Company, met with Nancy Ryan, advisor to Pres. Peevey, at the Snow King Resort in Jackson Hole, Wyoming. The meeting was followed up by an e-mail letter (attached to the notice). Lorenz stated that SDG&E, while generally satisfied with the resource adequacy (RA) proposed decision, requests an elimination of the RA penalty exception, as well as implementation of the transfer payment mechanism, or alternatively penalizing deficient LSEs without regard to whether or not a load pocket is in net surplus.

Type: EXPARTE Filing Date: June 30, 2006
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: On June 29, 2006, Michael Alcantar, counsel to the Cogeneration Association of California and Energy Producers and Users Coalition (CAC/EPUC), met with Cmmr. Grueneich in San Francisco. Also present were Theresa Cho, advisor to Cmmr. Grueneich, and Rod Aoki, counsel to CAC/EPUC. Written material (attached to the notice) was used. Alcantar discussed the fact that yet to be issued proposed decision will be critical to the preservation of existing cogeneration projects and the encouragement of new projects in California. Alcantar explained the necessity for long term, standard offer contracts with reasonable terms and conditions. Alcantar also noted the deleterious impact the loss of existing cogeneration qualifying facilities (QFs) and the failure to encourage new cogeneration QFs would have on Governor Schwarzenegger's Climate Action Team goals for CO2 reductions.

Type: COMMENTS Filing Date: June 28, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: joint; on Proposed Decision Adopting Settlement Agreement.

Type: EXPARTE Filing Date: June 26, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPAN Y
Description: AUGMENTATION REQUIRED. On June 20, 2006, Lad Lorenz, Vice President of Regulatory Affairs for San Diego Gas & Electric Company (SDG&E) and Southern California Gas Company, met with Nancy Ryan, advisor to Pres. Peevey. The meeting was followed up by an e-mail letter (attached to the notice). Lorenz stated that SDG&E, while generally satisfied with the resource adequacy (RA) proposed decision, requests an elimination of the RA penalty exception, as well as implementation of the transfer payment mechanism, or alternatively penalizing deficient LSEs without regard to whether or not a load pocket is in net surplus.

Type: PROPOSED DECISION Filing Date: June 21, 2006
Filed By:
ALJS/BROWN/DEBERRY/HALLIGAN/CPUC
Description: OPINION ADOPTING SETTLEMENT AGREEMENT BETWEEN PACIFIC GAS AND ELECTRIC COMPANY AND THE INDEPENDENT ENERGY PRODUCERS ASSOCIATION REGARDING QUALIFYING FACILITIES. Comments are due July 11, 2006; reply comments - 5 days after comments are filed.

Type: RULING Filing Date: June 21, 2006
Filed By:
ALJ/Halligan/CPUC
Description: ON SHORTENING THE PUBLIC REVIEW PERIOD OFTHE PROPOSED DECISION REGARDING THE JOINT MOTION FOR ADOPTION OF SETTLEMENT AGREEMENT AND ASSOCIATED AMENDMENTS. The ruling asks the parties to stipulate to shortenting the waitng period by one day, as set forth.

Type: REPLY Filing Date: June 9, 2006
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
PACIFIC GAS AND ELECTRIC COMPANY
Description: joint; on the joint motion for adoption of the settlement agreement and associated amendments.

Type: MOTION Filing Date: June 2, 2006
Filed By:
MODESTO IRRIGATION DISTRICT
Description: to file late comments regarding joint motion of PG&E and IEPA for adoption of settlement agreement; comments attached.

Type: COMMENTS Filing Date: June 1, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on RPS Implications of the Settlement Agreement between PG&E and IEPA.

Type: RESPONSE Filing Date: June 1, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to ALJ's ruling providing notice of joint motion for settlement agreement.

Type: RESPONSE Filing Date: June 1, 2006
Filed By:
CENTRAL HYDROELECTRIC COMPANY
MEGA RENEWABLES AKA SHASTA HYRDO
Description: to Invitation to Comment by ALJ Issued May 18, 2006.

Type: COMMENTS Filing Date: June 1, 2006
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: in opposition to the settlement agreement between PG&E and IEPA.

Type: COMMENTS Filing Date: June 1, 2006
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: on the settlement agreement between PG&E and IEPA.

Type: COMMENTS Filing Date: June 1, 2006
Filed By:
THE UTILITY REFORM NETWORK
Description: on the treatment of renewable energy certificates under existing qualifying facilities contracts.

Type: EXPARTE Filing Date: May 25, 2006
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON May 23, 2006, AND APPEARED IN THE CALENDAR OF May 25, 2006. On May 22, 2006, Michael Alcantar, counsel to the Cogeneration Association of California and Energy Producers and Users Coalition (CAC/EPUC), met with Andy Campbell, advisor to Cmmr. Chong, in San Francisco. Also present were Nora Sheriff and Rod Aoki, counsel to CAC/EPUC. Written material (attached to the notice) was used. CAC/EPUC indicated no opposition to the approval of the settlement, but noted that it should not be characterized as precedent for any purpose related to avoided cost pricing or for long term Qualifying Facility (QF) contract policy issues. Alcantar also noted the potential deleterious impact the loss of existing cogeneration QFs and the failure to encourage new cogeneration QFs would have on Governor Schwarzenegger's Climate Action Team goals for CO2 reductions.

Type: AMENDMENT Filing Date: May 24, 2006
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
PACIFIC GAS AND ELECTRIC COMPANY
Description: Second; to Joint Motion for Adoption of Settlement Agreement and Approval of Associated Amendments.

Type: EXPARTE Filing Date: May 23, 2006
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: AUGMENTATION REQUIRED. On May 22, 2006, Michael Alcantar, counsel to the Cogeneration Association of California and Energy Producers and Users Coalition (CAC/EPUC), met with Andy Campbell, advisor to Cmmr. Chong, in San Francisco. Also present were Nora Sheriff and Rod Aoki, counsel to CAC/EPUC. Written material was used. CAC/EPUC indicated no opposition to the approval of the settlement, but noted that it should not be characterized as precedent for any purpose related to avoided cost pricing or for long term Qualifying Facility (QF) contract policy issues. Alcantar also noted the potential deleterious impact the loss of existing cogeneration QFs and the failure to encourage new cogeneration QFs would have on Governor Schwarzenegger's Climate Action Team goals for CO2 reductions.

Type: EXPARTE Filing Date: May 23, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On May 18, 2006, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Theresa Cho, advisor to Cmmr. Grueneich, in San Francisco. Also present were Janos Laszlos, Manager, Power Contracts, PG&E, and Steven Kelly, Policy Director of the Independent Energy Producers Association (IEPA). Jacobson described some of the key terms and conditions of the PG&E-IEPA Settlement Agreement (SA) regarding QF pricing and policy and explained that the SA applied only to QFs that voluntarily execute contract amendments and that it represented a fair compromise of the parties' positions. Kelly described why the SA was strongly supported by IEPA's members. Laszlos explained the litigation surrounding the PX switcher issue and the SA provision that resolves that dispute. Jacobson said that it was critical to obtain Commission approval of the contract amendments prior to the September 1 deadline.

Type: EXPARTE Filing Date: May 22, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On May 17, 2006, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Belinda Gatti, advisor to Cmmr. Brown, in San Francisco. Also present were Janos Laszlos, Manager, Power Contracts, PG&E, and Steven Kelly, Policy Director of the Independent Energy Producers Association (IEPA). Written material (attached to the notice) was used. Jacobson described some of the key terms and conditions of the PG&E-IEPA Settlement Agreement (SA) regarding QF pricing and policy and explained that the SA applied only to QFs that voluntarily execute contract amendments and that it represented a fair compromise of the parties' positions. Kelly described why the SA was strongly supported by IEPA's members. Laszlos explained the litigation surrounding the PX switcher issue and the SA provision that resolves that dispute. Jacobson said that it was critical to obtain Commission approval of the contract amendments prior to the September 1 deadline.

Type: RESPONSE Filing Date: May 22, 2006
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION.
Description: to ALJ's ruling [of May 18, 2006] providing notice of joint motion for settlement agreement.

Type: EXPARTE Filing Date: May 19, 2006
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On May 16, 2006, R. Thomas Beach, a consultant to the California Cogeneration Council (CCC), met with Robert Lane, advisor to Cmmr. Bohn, and Belinda Gatti, advisor to Cmmr. Brown, in two separate meetings in San Francisco. Also present were Jerry R. Bloom and Joseph M. Karp of White & Case, LLP, counsel for the CCC. An excerpt from Mr. Beach's opening testimony (attached to the notice) was sent to Robert Lane after the meeting. Bloom and Karp explained that the joint settlement proposed by Pacific Gas and Electric Company (PG&E) and Independent Energy Producers (IEP) is not a true settlement that aligns with the Commission's traditional understanding of settlements. Bloom and Karp explained that the arrangement between PG&E and IEP is, rather, a set of bilateral agreements that do not resolve any key issues of these proceedings. Bloom and Karp also explained that the bilateral agreements involving a few gas-fired Qualifying Facilities (QFs) for which PG&E and IEP seek approval are not generally applicable to other QFs, and thus should not be considered as a basis for a decision in this proceeding.

Type: COMMENTS Filing Date: May 18, 2006
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: to the joint motion of PG&E and IEPA for adoption of settlement agreement, etc.

Type: RULING Filing Date: May 18, 2006
Filed By:
ALJS/DEBERRY/BROWN/HALLIGAN
Description: Providing Notice of Joint Motion for Settlement Agreement. Comments on the settlement agreement may be filed by June 1, 2006; and reply comments - by June 15, 2006.

Type: EXPARTE Filing Date: May 18, 2006
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On May 16, 2006, R. Thomas Beach, a consultant to the California Cogeneration Council (CCC), met with Robert Lane, advisor to Cmmr. Bohn, and Belinda Gatti, advisor to Cmmr. Brown, in two separate meetings in San Francisco. Also present were Jerry R. Bloom and Joseph M. Karp of White & Case, LLP, counsel for the CCC. An excerpt from Mr. Beach's opening testimony (attached to the notice) was sent to Robert Lane after the meeting. Bloom and Karp explained that the joint settlement proposed by Pacific Gas and Electric Company (PG&E) and Independent Energy Producers (IEP) is not a true settlement that aligns with the Commission's traditional understanding of settlements. Bloom and Karp explained that the arrangement between PG&E and IEP is, rather, a set of bilateral agreements that do not resolve any key issues of these proceedings. Bloom and Karp also explained that the bilateral agreements involving a few gas-fired Qualifying Facilities (QFs) for which PG&E and IEP seek approval are not generally applicable to other QFs, and thus should not be considered as a basis for a decision in this proceeding.

Type: COMMENTS Filing Date: May 18, 2006
Filed By:
RCM BIOTHANE
Description: on the joint motion of PG&E and IEP for adoption of a settlement agreement.

Type: COMMENTS Filing Date: May 18, 2006
Filed By:
THE UTILITY REFORM NETWORK
Description: on the joint motion of PG&E and IEP for adoption of settlement agreement.

Type: COMMENTS Filing Date: May 18, 2006
Filed By:
DRA/PELEO/PUC
Description: on the proposed settlement agreement of PG&E and IEPA.

Type: COMMENTS Filing Date: May 18, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Settlement Agreement between PG&E and IEPA.

Type: COMMENTS Filing Date: May 18, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Opening Answer; on Settlement Agreement between PG&E and IEPA.

Type: EXPARTE Filing Date: May 15, 2006
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On May 10, 2006, R. Thomas Beach, a consultant to the California Cogeneration Council (CCC), met with Pres. Peevey in San Francisco. Also present were Rami Kahlon, advisor to Cmmr. Peevey, David Hermanson, a member of the CCC employed by Primary Energy, Barry Lovell, a member of the CCC employed by Berry Petroleum, Shakil Rahman, a member of the CCC employed by Delta Power, and Jerry R. Bloom and Joseph M. Karp of White & Case, LLP, counsel for the CCC. Bloom and Karp explained that the joint settlement proposed by Pacific Gas and Electric Company (PG&E) and Independent Energy Producers (IEP) is not a true settlement that aligns with the Commission's traditional understanding of settlements. Bloom and Karp explained that the arrangement between PG&E and IEP is, rather, a set of bilateral agreements that do not resolve any key issues of these proceedings. Bloom and Karp also explained that the bilateral agreements involving a few gas-fired Qualifying Facilities (QFs) for which PG&E and IEP seek approval are not generally applicable to other QFs, and thus should not be considered as a basis for a decision in this proceeding.

Type: EXPARTE Filing Date: May 11, 2006
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: On May 10, 2006, Michael Alcantar, counsel to the Cogeneration Association of California (CAC) and the Energy Producers and Users Coalition (EPUC), met with Pres. Peevey in San Francisco. Also present were Rami Kahlon, advisor to Pres. Peevey, and Nora Sheriff and Rod Aoki, counsel to CAC/EPUC. Written material (attached to the notice) was used. CAC/EPUC discussed the Pacific Gas and Electric Company (PG&E) and the Independent Energy Producers Association (IEP) Settlement Agreement. CAC/EPUC indicated no opposition to the approval of the settlement, but noted that it should not be characterized as precedent for any purpose related to avoided cost pricing or for long term Qualifying Facility (QF) contract policy issues. Alcantar and Sheriff explained that the PG&E-IEP settlement did not address the need for a Commission-established long-term policy for cogeneration QFs with appropriate pricing. Alcantar discussed the necessity of long term, standard offer contracts with reasonable terms and conditions to sustain existing and encourage new cogeneration QFs. Alcantar also noted the potential deleterious impact the loss of existing cogeneration QFs and the failure to encourage new cogeneration QFs would have on Governor Schwarzenegger's Climate Action Team goals for CO2 reductions.

Type: AMENDMENT Filing Date: May 10, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Joint Motion of PG&E and IEPA for Adoption of Settlement Agreement and Approval of Associated Amendments.

Type: NOTICE Filing Date: May 10, 2006
Filed By:
CALJ/MINKIN/PUC
Description: of removal of assignment.

Type: EXPARTE Filing Date: May 10, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: LATE FILED. On May 2, 2006, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Cmmr. Peevey in San Francisco. Also present were Rami Kahlon, advisor to Cmmr. Peevey, Roy Kuga, Vice President, Energy Supply, Frank DeRosa, Director, Power Contracts, John Pappas, Manager, Electric Resource Procurement, and William Manheim, Chief Counsel, Generation, for PG&E, and Steven Kelly on behalf of the Independent Energy Producers Association (IEPA). DeRosa described some of the key terms and conditions of the PG&E-IEPA Settlement Agreement (SA) regarding QF pricing and policy. DeRosa explained that the SA applied only to QFs that voluntarily execute contract amendments and that it represented a fair compromise of the parties' positions. DeRosa stated that PG&E anticipates that savings from the SA will range from $100-$200 million annually. Kelly described why the SA was strongly supported by IEPA's members. Jacobson said that it was critical to obtain Commission approval of the contract amendments prior to the September 1 deadline.

Type: EXPARTE Filing Date: May 3, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On April 28, 2006, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Rami Kahlon, advisor to Cmmr. Peevey, in San Francisco. Also present were Paul Clanon, Deputy Executive Director, and Sean Gallagher, Director, Energy Division, of the Commission, Roy Kuga, Vice President, Energy Supply, Frank DeRosa, Director, Power Contracts, John Pappas, Manager, Electric Resource Procurement, Janos Laszlos, Manager, Power Contracts, for PG&E, and Steven Kelly and Doug Kerner, for the Independent Energy Producers Association. DeRosa described some of the key terms and conditions of the PG&E-IEPA Settlement Agreement (SA) regarding QF pricing and policy. DeRosa explained that the SA will range from $100-$200 million annually, depending on how many QFs execute the contract amendments. Kelly described why the SA was strongly supported by IEPA's members. Jacobson said that it was critical to obtain Commission approval of the contract amendments prior to the September 1 deadline.

Type: RESPONSE Filing Date: May 3, 2006
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: to Motion of Edison to clarify the record.

Type: COMMENTS Filing Date: April 28, 2006
Filed By:
DAVIS HYDRO
Description: (on PG&E and IEPA Settlement Agreement).

Type: REQUEST Filing Date: April 28, 2006
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: for Award of Intervenor Compensation.

Type: RULING Filing Date: April 27, 2006
Filed By:
ALJS/BROWN/HALLIGAN/DEBERRY/PUC
Description: Grants the request of PG&E and IEPA to late-file the proposed settlement. Denies the request for order shortening time to respond to the motion. Denies the request to shorten time for comments on Settlement Agreement. Comments on the settlement are due May 18, 2006.

Type: OPPOSITION Filing Date: April 26, 2006
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: to Motion of PG&E and IEPA to shorten Rule 51.4's 30-day comment period and to shorten time for responses to Motion for Leave to File Late-Filed Settlement Agreement.

Type: RESPONSE Filing Date: April 24, 2006
Filed By:
THE UTILITY REFORM NETWORK
Description: to the joint motions of PG&E and the IEPA.

Type: MISCELLANEOUS FILING Filing Date: April 21, 2006
Filed By:
RCM BIOTHANE
Description: Support of the CCC's opposition to the joint motion of PG&E and IEP to shorten the comment period and time for responses to motion for leave to file late-filed Settlement Agreement.

Type: REPLY Filing Date: April 21, 2006
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Opposition of CCC to joint motion to shorten Rule 51.4's comment period and to shorten time for responses to motion for leave to file late-filed settlement agreements.

Type: OPPOSITION Filing Date: April 20, 2006
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: to Joint Motion of PG&E and IEP to Shorten Rule 51.4's 30-Day Comment Period and to Shorten Time for Responses to Motion fo rLeave to File Late-Filed Settlement Agreements.

Type: MOTION Filing Date: April 18, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: joint; for adoption of Settlement Agreement and approval of associated amendments (attached).

Type: REQUEST Filing Date: April 18, 2006
Filed By:
GREEN POWER INSTITUTE
Description: for an Award of Compensation for Substantial Contributions to D.06-02-032.

Type: MOTION Filing Date: April 18, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: joint; for leave to late-file settlement agreements; to shorten Rule 51.4's 30-day comment period and to shorten time for responses to this motion.

Type: REQUEST Filing Date: April 17, 2006
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: for Award of Intervenor Compensation.

Type: MOTION Filing Date: April 13, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Clarify the Record.

Type: SUPPLEMENTAL Filing Date: April 7, 2006
Filed By:
CENTER FOR ENERGY AND ECONOMIC DEVELOPMENT
Description: affidavit in support of Motion to Intervene as related to portions that involve Application for Rehearing.

Type: REPLY Filing Date: April 5, 2006
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: to the petition to modify D05-10-042 of Edison.

Type: REPLY Filing Date: April 4, 2006
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: to Edison's Petition to Modify D05-10-042.

Type: RESPONSE Filing Date: April 4, 2006
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: to Applications for Rehearing of D06-02-032.

Type: REPLY Filing Date: April 3, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: in support of Petition to Modify D05-10-042.

Type: REPLY Filing Date: April 3, 2006
Filed By:
CALPINE CORPORATION
Description: to Edison's petition to modify [D05-10-042].

Type: RESPONSE Filing Date: March 24, 2006
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: to Edison's Petition to Modify Decision D.05-10-042.

Type: RESPONSE Filing Date: March 24, 2006
Filed By:
CAISO
Description: to the Petition to Modify Decision 05-10-042 of Southern California Edison Company

Type: RESPONSE Filing Date: March 24, 2006
Filed By:
TURN
Description: to SCE's Petition For Modification of Decision 05-10-042

Type: RESPONSE Filing Date: March 24, 2006
Filed By:
PACIFIC GAS AND ELECTRIC CO.
Description: to Petition to Modify Decision 05-10-042 of Southern California Edison Co.

Type: RESPONSE Filing Date: March 24, 2006
Filed By:
SEMPRA GLOBAL
Description: to Edison's Petition for Modify D.05-10-042.

Type: BRIEF Filing Date: March 20, 2006
Filed By:
DAVIS HYDRO
Description: Reply

Type: REHEARING REQUEST Filing Date: March 20, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of D06-02-032.

Type: REHEARING REQUEST Filing Date: March 20, 2006
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: of D06-02-032.

Type: BRIEF Filing Date: March 17, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply

Type: REHEARING REQUEST Filing Date: March 17, 2006
Filed By:
CENTER FOR ENERGY AND ECONOMIC DEVELOPMENT
Description: of D06-02-032.

Type: MOTION Filing Date: March 17, 2006
Filed By:
CENTER FOR ENERGY AND ECONOMIC DEVELOPMENT
Description: to intervene.

Type: COMMENTS Filing Date: March 17, 2006
Filed By:
RCM BIOTHANE
Description: reply.

Type: BRIEF Filing Date: March 17, 2006
Filed By:
COUNTY OF LOS ANGELES
Description: reply.

Type: BRIEF Filing Date: March 17, 2006
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: reply.

Type: BRIEF Filing Date: March 17, 2006
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on QF issues.

Type: BRIEF Filing Date: March 17, 2006
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: reply.

Type: BRIEF Filing Date: March 17, 2006
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: reply.

Type: BRIEF Filing Date: March 17, 2006
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: reply.

Type: BRIEF Filing Date: March 17, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply.

Type: BRIEF Filing Date: March 17, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply;

Type: MOTION Filing Date: March 10, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to withdraw Motion dated December 15, 2005, for a ruling authorizing PG&E to purchase and deliver gas, as needed for electric and gas system reliability, etc.

Type: RULING Filing Date: March 10, 2006
Filed By:
ALJ/GOTTSTEIN/PUC
Description: Grants Edison Mission Energy's motion to intervene, filed March 6, 2006.

Type: MOTION Filing Date: March 7, 2006
Filed By:
EDISON MISSION ENERGY
Description: to Intervene.

Type: RULING Filing Date: March 7, 2006
Filed By:
ALJ/BROWN/PUC
Description: on NRDC's supplemental notice of intent to claim compensation. Establishes that NRDC is eligible for an award of intervenor compensation.

Type: BRIEF Filing Date: March 6, 2006
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: concurrent, opening.

Type: BRIEF Filing Date: March 6, 2006
Filed By:
DAVIS HYDRO
Description: Post-Hearing

Type: BRIEF Filing Date: March 3, 2006
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: opening.

Type: BRIEF Filing Date: March 3, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Opening

Type: BRIEF Filing Date: March 3, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Opening;

Type: BRIEF Filing Date: March 3, 2006
Filed By:
RCM BIOTHANE
Description: post-hearing.

Type: BRIEF Filing Date: March 3, 2006
Filed By:
COUNTY OF LOS ANGELES
Description: opening.

Type: BRIEF Filing Date: March 3, 2006
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: opening;

Type: BRIEF Filing Date: March 3, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: opening.

Type: BRIEF Filing Date: March 3, 2006
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: opening.

Type: BRIEF Filing Date: March 3, 2006
Filed By:
RENEWABLES COALITION
Description: opening.

Type: BRIEF Filing Date: March 3, 2006
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: opening.

Type: BRIEF Filing Date: March 3, 2006
Filed By:
THE UTILITY REFORM NETWORK
Description: opening.

Type: BRIEF Filing Date: March 3, 2006
Filed By:
DRA/PELEO/PUC
Description: opening.

Type: RULING Filing Date: March 2, 2006
Filed By:
ALJ/WETZELL/PUC
Description: Dismisses a Motion to Augment Record filed on September 23, 2005, by the CAISO, as moot, as set forth.

Type: RULING Filing Date: February 24, 2006
Filed By:
ALJ/GOTTSTEIN/PUC
Description: Denies, without prejudice, Redefining Progress' motion to intervene, as set forth.

Type: PETITION FOR MODIFICATION Filing Date: February 22, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: for Modification of D.05-10-042.

Type: EXPARTE Filing Date: February 14, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On February 8, 2006, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Rancy Ryan, advisor to Cmmr. Peevey, in San Francisco. Also present were Lainie Motamedi of the Division of Strategic Planning of the Commissions and Hal La Flash, Director, Integrated Resource Planning, for PG&E. Jacobson stated that PG&E supports a comprehensive, market-based national program to reduce greenhouse gas (GHG) emissions. Jacobson expressed concern that the proposed single-state, single-industry GHG program would unfairly discriminate against investor-owned utilities. Jacobson recommended that the Commission defer implementation of the draft decision (DD) at least until there is more certainty over expected GHG legislation. La Flash noted that the Climate Action Team report will be submitted to the Governor and Legislature soon and the Commission should not adopt the DD prior to issuance of that report. Jacobson stated that the Commission should not adopt a penalty-only compliance mechanism and that the DD should be modified so that the incentive mechanism provides a balanced opportunity for reward and risk of penalty. Jacobson and La Flash suggested that the detailed requirements for suppliers to register with the California Climate Action Registry be addressed in the implementation workshops and that offsets not be limited by type or location.

Type: EXPARTE Filing Date: February 14, 2006
Filed By:
ENERGY PRODUCERS AND USERS COALITION
Description: On February 9, 2006, Evelyn Kahl, counsel to the Energy Producers and Users Coalition (EPUC), met with Nancy Ryan, advisor to Cmmr. Peevey, in San Francisco. Kahl urged that the Commission defer its adoption of a carbon cap for electric utility procurement until a broader statewide, regional or federal program is in place. Kahl also summarized three additional points made in the EPUC¿s comments.

Type: MOTION Filing Date: February 10, 2006
Filed By:
REDEFINING PROGRESS
Description: to intervene.

Type: COMMENTS Filing Date: February 7, 2006
Filed By:
CALIFORNIA CLIMATE ACTION REGISTRY
Description: Reply; on the Draft Decision on Procurement Incentives Framework.

Type: COMMENTS Filing Date: February 7, 2006
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
UNION OF CONCERNED SCIENTISTS
Description: reply; on the draft opinion on procurement incentives framework.

Type: COMMENTS Filing Date: February 7, 2006
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: on the draft decision on petition of PG&E for modification of D05-10-042.

Type: COMMENTS Filing Date: February 7, 2006
Filed By:
SEMPRA GLOBAL
Description: Reply; on the Draft Decision on Procurement Incentives Framework.

Type: COMMENTS Filing Date: February 7, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; on the Draft Decision on Procurement Incentives Framework.

Type: COMMENTS Filing Date: February 7, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on the Draft Decision on Procurement Incentives Framework.

Type: COMMENTS Filing Date: February 7, 2006
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: Reply; on the Draft Decision on Procurement Incentives Framework.

Type: EXPARTE Filing Date: February 6, 2006
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: On February 3, 2006, Devra Wang, Director, California Energy Program at the Natural Resources Defense Council (NRDC) met with Belinda Gatti, advisor to Cmmr. Brown, in San Francisco. Also present was Audrey Chang, Staff Scientist at NRDC. Wang stated NRDC's support for the draft decision (DD). Wang also stated NRDC's support for the DD's call for a load-based cap on greenhouse gas (GHG) emissions and NRDC's support for additional elements of the DD. Wang urged the Commission to clarify the difference between offsets and allowances in the DD, and to open a new proceeding to address the implementation issues surrounding this load-based cap on GHG emissions.

Type: EXPARTE Filing Date: February 6, 2006
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: On February 6, 2006, Devra Wang, Director, California Energy Program at the Natural Resources Defense Council (NRDC) met with Brian Prusnek, advisor to Cmmr. Chong, in San Francisco. Also present was Audrey Chang, Staff Scientist at NRDC. Wang stated NRDC's support for the draft decision (DD). Wang also stated NRDC's support for the DD's call for a load-based cap on greenhouse gas (GHG) emissions and NRDC's support for additional elements of the DD. Wang urged the Commission to clarify the difference between offsets and allowances in the DD, and to open a new proceeding to address the implementation issues surrounding this load-based cap on GHG emissions. Wang affirmed that NRDC will continue to work with other parties to develop implementation details of the load-based cap that will maximize the net benefits of such a program while still producing meaningful GHG emission reductions. In addition, Wang reiterated NRDC's ultimate support of a statewide multi-sector cap on GHG emissions, but also emphasized the importance of the Commission's continued process to address a cap.

Type: EXPARTE Filing Date: February 6, 2006
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: On February 3, 2006, Devra Wang, Director, California Energy Program at the Natural Resources Defense Council (NRDC) met with Cmmr. Bohn in San Francisco. Also present were Steve St. Marie and Robert Lane, advisors to Cmmr. Bohn, and Audrey Chang, Staff Scientist at NRDC. Wang stated NRDC's support for the draft decision (DD). Wang also stated NRDC's support for the DD's call for a load-based cap on greenhouse gas (GHG) emissions and NRDC's support for additional elements of the DD. Wang urged the Commission to clarify the difference between offsets and allowances in the DD, and to open a new proceeding to address the implementation issues surrounding this load-based cap on GHG emissions. Wang affirmed that NRDC will continue to work with other parties to develop implementation details of the load-based cap that will maximize the net benefits of such a program while still producing meaningful GHG emission reductions. In addition, Wang reiterated NRDC's ultimate support of a statewide multi-sector cap on GHG emissions, but also emphasized the importance of the Commission's continued process to address a cap.

Type: COMMENTS Filing Date: February 2, 2006
Filed By:
CALIFORNIA CLIMATE ACTION REGISTRY
Description: on Commissioner Peevey's Draft Decision on Procurement Incentives Framework.

Type: REPLY Filing Date: February 2, 2006
Filed By:
COUNTY OF LOS ANGELES
Description: to the response of the Joint Parties to the motion for interlocutory relief.

Type: EXPARTE Filing Date: February 2, 2006
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: On February 1, 2006, Sheryl Carter, Director, Western Energy Program at the Natural Resources Defense Council (NRDC) met with Nancy Ryan, advisor to Cmmr. Peevey, in San Francisco. Also present was Devra Wang, Director, California Energy Program at NRDC. Wang stated NRDC's support for the draft decision (DD) on procurement incentives. Wang stated NRDC's support for the DD's call for a load-based cap on greenhouse gas (GHG) emissions. Wang also stated NRDC's support for additional elements of the DD. Finally, Wang urged the Commission to clarify the difference between offsets and allowances in the DD, and to open a new proceeding to address the implementation issues surrounding this load-based cap on GHG emissions.

Type: COMMENTS Filing Date: February 2, 2006
Filed By:
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
Description: on Draft Opinion on Procurement Incentives Framework.

Type: COMMENTS Filing Date: February 2, 2006
Filed By:
GREEN POWER INSTITUTE
Description: on Draft Opinion of Commissioner Peevey on Procurement Incentives Framework.

Type: COMMENTS Filing Date: February 2, 2006
Filed By:
THE UTILITY REFORM NETWORK
Description: opening; on the draft decision of Cmmr. Peevey on a procurement incentives framework.

Type: COMMENTS Filing Date: February 2, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: opening; on the proposed decision on procurement incentive framework.

Type: COMMENTS Filing Date: February 2, 2006
Filed By:
ENERGY PRODUCERS AND USERS COALITION
Description: on Draft Decision on procurement incentives framework.

Type: COMMENTS Filing Date: February 2, 2006
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on the draft decision of Cmmr. Peevey.

Type: COMMENTS Filing Date: February 2, 2006
Filed By:
DRA/OBIORA/PUC
Description: on the draft decision on procurement incentives framework.

Type: COMMENTS Filing Date: February 2, 2006
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
UNION OF CONCERNED SCIENTISTS
Description: on the draft decision on procurement incentives framework.

Type: COMMENTS Filing Date: February 2, 2006
Filed By:
SEMPRA GLOBAL
Description: on Draft Decision on Procurement Incentives Framework.

Type: COMMENTS Filing Date: February 2, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on Draft Decision on Procurement Incentive Framework.

Type: COMMENTS Filing Date: February 2, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Draft Decision on Procurement Incentives Framework.

Type: EXPARTE Filing Date: January 30, 2006
Filed By:
CALPINE CORPORATION
Description: On January 25, 2006, Avis Kowalewski, Director, Western Regulatory Affairs, Calpine Corporation (Calpine), met with Nancy Ryan, advisor to Cmmr. Peevey, in San Francisco. Also present were Lainie Motamedi of the Division of Strategic Planning, and Peggy Duxbury, Vice President, Governmental and Environmental Affairs of Calpine. Calpine representatives discussed the draft decision and Calpine's general support for the creation of a load-based cap on greenhouse gas emissions. Calpine representatives also expressed support for the imposition of a cap on load serving entities as the best option for addressing issues associated with carbon `leakage' from imported power.

Type: RESPONSE Filing Date: January 30, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Motion for interlocutory relief of the County of Los Angeles.

Type: EXPARTE Filing Date: January 27, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On January 24, 2006, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), had a telephone conversation with Rami Kahlon, advisor to Cmmr. Peevey. Jacobson discussed PG&E's motion for authorization to purchase gas for Calpine's reliability must-run units. Jacobson emphasized that PG&E still recommends the Commission to adopt the draft decision of ALJ Brown and urged the Commission to act at its January 26th meeting.

Type: DRAFT DECISION Filing Date: January 27, 2006
Filed By:
ALJ/WETZELL/PUC
Description: Opinion on Petition of PG&E for modification of D05-10-042. Comments are due February 7, 2006; no reply comments will be accepted.

Type: COMMENTS Filing Date: January 23, 2006
Filed By:
CALPINE CORPORATION
Description: reply; on Draft Decision of ALJ Brown.

Type: RESPONSE Filing Date: January 23, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
Description: in opposition to QF parties' motion for interlocutory relief.

Type: RESPONSE Filing Date: January 23, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to IEPA Petition for Modification of D.05-10-042.

Type: COMMENTS Filing Date: January 23, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on Draft Decision of ALJ Brown.

Type: COMMENTS Filing Date: January 20, 2006
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: and objections to the draft decision on Petition of PG&E for Modification of D05-10-042.

Type: REQUEST Filing Date: January 20, 2006
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: for award of intervenor compensation for work in the CEC's 2005 IEPR process.

Type: COMMENTS Filing Date: January 20, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on Draft Decision of ALJ Wetzell.

Type: COMMENTS Filing Date: January 20, 2006
Filed By:
POWEREX CORP.
Description: on ALJ Wetzell draft decision.

Type: LAW & MOTION Filing Date: January 19, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: for Leave to File Confidential Material Under Seal; Confidential Materials Attached and Filed Under Seal, namely, Unredacted Attachment 1 to the Prepared Testimony of Michael J. Iammarino, which has been subsequently adopted and modified by Sue Garcia.

Type: RESPONSE Filing Date: January 18, 2006
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: to Applications for Rehearing of D05-12-029.

Type: RULING Filing Date: January 18, 2006
Filed By:
ALJ/BROWN/PUC
Description: Requests reply comments on the January 3, 2006 draft decision from PG&E, Calpine and intervenors, by January 23, 2006.

Type: RESPONSE Filing Date: January 18, 2006
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: to applications for rehearing of D05-12-009.

Type: COMMENTS Filing Date: January 13, 2006
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
Description: reply; to post-workshop comments on Assigned Commissioner's Ruling regarding next steps in procurement proceeding.

Type: DRAFT DECISION Filing Date: January 13, 2006
Filed By:
CMMR/PEEVEY/PUC
Description: Opinion on Procurement Incentives Framework. Comments are due February 2, 2006; reply comments - 5 days after comments are filed.

Type: MOTION Filing Date: January 13, 2006
Filed By:
COUNTY OF LOS ANGELES
Description: for interlocutory relief and request for shortened response time.

Type: EXPARTE Filing Date: January 13, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On January 10, 2006, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), had a telephone conversation with Rami Kahlon, advisor to Cmmr. Peevey. Jacobson discussed PG&E's motion for authorization to purchase gas for Calpine's reliability must-run units. Jacobson stated that PG&E supports the draft decision (DD) of ALJ Brown authorizing PG&E to purchase gas. Jacobson indicated that the significant uncertainties and complexities associated with Calpine's bankruptcy case warranted PG&E's proposal as a contingency plan. Jacobson recommended that the Commission adopt the DD, with minor clarifications, as soon as possible.

Type: COMMENTS Filing Date: January 12, 2006
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: Post Workshop Reply;

Type: DRAFT DECISION Filing Date: January 12, 2006
Filed By:
ALJ/WETZELL/PUC
Description: Opinion on Petition of PG&E for Modification of D05-10-042. Comments are due January 20, 2006; no reply comments will be accepted.

Type: STIPULATION Filing Date: January 12, 2006
Filed By:
MODESTO IRRIGATION DISTRICT
PACIFIC GAS AND ELECTRIC COMPANY
Description: resolving PG&E's motion to strike the reply testimony of Christopher J. Mayer on behalf of the Modesto Irrigation District.

Type: MOTION Filing Date: January 12, 2006
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: to file opening testimony one day out of time.

Type: COMMENTS Filing Date: January 12, 2006
Filed By:
THE UTILITY REFORM NETWORK
Description: post-workshop; reply [in accordance with the December 2, 2006 Ruling].

Type: COMMENTS Filing Date: January 12, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: post-workshop; reply [in accordance with the December 2, 2006 Ruling].

Type: COMMENTS Filing Date: January 12, 2006
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: post-workshop; reply [in accordance with the December 2, 2006 Ruling].

Type: COMMENTS Filing Date: January 12, 2006
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: post-workshop; reply [in accordance with the December 2, 2005 Ruling].

Type: COMMENTS Filing Date: January 12, 2006
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: post-workshop; reply [in accordance with the December 2, 2005 Ruling].

Type: COMMENTS Filing Date: January 12, 2006
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: post-workshop; reply [in accordance with the December 2, 2006 Ruling].

Type: COMMENTS Filing Date: January 12, 2006
Filed By:
DRA/OBIORA/PUC
Description: post-workshop; reply [in accordance with the December 2, 2005 Ruling].

Type: COMMENTS Filing Date: January 12, 2006
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: post-workshop; reply [in accordance with the December 2, 2005 Ruling].

Type: EXPARTE Filing Date: January 10, 2006
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: On January 9, 2006, Marc Joseph, attorney for the Coalition of California Utility Employees (CUE), met with Aaron Johnson, advisor to Cmmr. Grueneich, in San Francisco. Also present was David Marcus, consultant for CUE. Joseph and Marcus explained the comments by CUE on the Capacity Markets White Paper. Joseph and Marcus stated that a capacity market was inconsistent with and would have to replace the resource adequacy requirements, that it would not likely result in 15-17 percent margin, that it would be very complex, that it would require locational markets with many different capacity products and would not result in new generation. Joseph also stated that the current RFO process was resulting in competitive procurement.

Type: MOTION Filing Date: January 10, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to strike the reply testimony of Christopher J. Mayer on behalf of Modesto Irrigation District.

Type: COMMENTS Filing Date: January 9, 2006
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: on the January 3, 2006 Draft Decision.

Type: RULING Filing Date: January 9, 2006
Filed By:
ALJS/BROWN/HALLIGAN/PUC
Description: Denies Motion to Strike Filed by CARE on November 15, 2005.

Type: RULING Filing Date: January 9, 2006
Filed By:
ALJS/BROWN/HALLIGAN/PUC
Description: joint; granting the September 19, 2005 Motion to Strike filed by Edison, PG&E and SDG&E, as set forth.

Type: RULING Filing Date: January 9, 2006
Filed By:
ALJS/BROWN/HALLIGAN/PUC
Description: Denies CAC/EPUC's motion to stirke testimony of PG&E, filed November 16, 2005, without prejudice, as set forth.

Type: RULING Filing Date: January 9, 2006
Filed By:
ALJS/BROWN/HALLIGAN/PUC
Description: Grants Motion to Designate Sponsoring Witness, filed by CAISO on December 7, 2005.

Type: OPPOSITION Filing Date: January 9, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to QF Parties' request for an order shortenting time on their motion for interlocutory relief.

Type: OPPOSITION Filing Date: January 9, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to parties' Request for an Order Shortening Time on their Motion for Interlocutory Relief.

Type: COMMENTS Filing Date: January 9, 2006
Filed By:
CALPINE CORPORATION
Description: on Draft Decision of ALJ Brown.

Type: COMMENTS Filing Date: January 9, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on Draft Decision Authorizing PG&E to Purchase and Deliver Gas to Supply RMR Generating Units.

Type: MOTION Filing Date: January 6, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: for Leave to File Comments One Day Late; ATTACHED - Post Workshop Comments.

Type: MOTION Filing Date: January 6, 2006
Filed By:
CALIFORNIA COGENERATION COUNCIL
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
RENEWABLES COALITION
Description: for Interlocutory Relief of the QF Parties and Request for Shortened Response Time.

Type: COMMENTS Filing Date: January 5, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Post Workshop

Type: RULING Filing Date: January 5, 2006
Filed By:
ALJ/BROWN/PUC
Description: Grants RCM Biothane's request to intervene.

Type: RESPONSE Filing Date: January 5, 2006
Filed By:
POWEREX CORP.
Description: to PG&E's petition to modify D05-10-042.

Type: RESPONSE Filing Date: January 5, 2006
Filed By:
THE UTILITY REFORM NETWORK
Description: to the petitions for modification of D05-10-042 filed by PG&E and CAISO.

Type: RESPONSE Filing Date: January 5, 2006
Filed By:
ORA/PAULL/PUC
Description: to Petitions to Modify D05-12-042 filed by PG&E and the CAISO.

Type: RESPONSE Filing Date: January 5, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Petition of the CAISO to Modify D05-10-042.

Type: RESPONSE Filing Date: January 5, 2006
Filed By:
WESTERN POWER TRADING FORUM
Description: to PG&E Petition to Modify Decision 05-10-042.

Type: RESPONSE Filing Date: January 5, 2006
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: to PG&E Petition to Modify Decision 05-10-042.

Type: RESPONSE Filing Date: January 5, 2006
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: to Cal ISO Petition to Modify Decision 05-10-042.

Type: RESPONSE Filing Date: January 5, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to PG&E and Cal ISO Petition to Modify Decision 05-10-042.

Type: RESPONSE Filing Date: January 5, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to PG&E and Cal ISO Petition to Modify Decision 05-10-042.

Type: COMMENTS Filing Date: January 5, 2006
Filed By:
CALIFORNIA FARM BUREAU FEDERATION
Description: on CPUC, CEC and CAISO Dec 14, 2005 Workshop for Transmission Planning Collabration.

Type: COMMENTS Filing Date: January 5, 2006
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
Description: post-workshop; on Assigned Commissioner's Ruling Regarding Next Steps in Procurement Proceeding.

Type: COMMENTS Filing Date: January 5, 2006
Filed By:
NATIONAL GRID USA
Description: post-workshop.

Type: COMMENTS Filing Date: January 5, 2006
Filed By:
DRA/OBIORA/PUC
Description: post-workshop.

Type: COMMENTS Filing Date: January 5, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: post-workshop.

Type: COMMENTS Filing Date: January 5, 2006
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: post-workshop.

Type: COMMENTS Filing Date: January 5, 2006
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: post-workshop; in response to the December 2, 2005 ruling.

Type: COMMENTS Filing Date: January 5, 2006
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: Post Workshop

Type: RULING Filing Date: January 4, 2006
Filed By:
ALJ/WETZELL/PUC
Description: Regarding Applicability of Interim Protective Order. Determines that data submitted by LSEs in response to the Energy Division's RA Guide, as set forth, shall be subject to the confidentiality projections and procedures set forth in the IPO that was issued June 24, 2005.

Type: NOTICE Filing Date: January 3, 2006
Filed By:
CALJ/MINKIN/PUC
Description: of Prehearing Conference.

Type: DRAFT DECISION Filing Date: January 3, 2006
Filed By:
ALJ/BROWN/PUC
Description: authorizing PG&E to purchase and deliver gas to supply RMR generating units. Comments are due by January 9, 2006, and no reply comments will be accepted.

Type: RESPONSE Filing Date: January 3, 2006
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: and objections to the CAISO and PG&E petitions for modification of D05-10-042.

Type: RESPONSE Filing Date: January 3, 2006
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: to Edison & PG&E Petition for Modification of D.04-12-048.

Type: REHEARING REQUEST Filing Date: January 3, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of D05-12-009.

Type: REHEARING REQUEST Filing Date: December 30, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of D05-12-009.

Type: MOTION Filing Date: December 29, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: for a determination that 'public necessity' within the meaning of Rule 77.7 (f)(9) exists and justifies shortening time for public comment.

Type: REQUEST Filing Date: December 23, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: for Award of Compensation for Substantial Contribution to D05-10-042 and for Participation in Utility Procurement Review Groups.

Type: RULING Filing Date: December 23, 2005
Filed By:
ALJ/WETZELL/PUC
Description: on requests to shorten time for responses to Petitions for Modification of D05-10-042. Responses to the CAISO and PG&E petitions for modification are due January 5, 2006; motions for a determination that public necessity requires reduction or waiver of the 30-day period for public review and comment on a draft decision on these petitions may be filed December 29, 2005. Responses to any such motions are due January 5, 2006 and may be incorporated within the party's response to the petition(s).

Type: PETITION FOR MODIFICATION Filing Date: December 22, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: of D05-10-042.

Type: RESPONSE Filing Date: December 20, 2005
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC. (CARE)
Description: and objections to the December 15, 2005 motion of PG&E to shorten time for responses to PG&E motion for a ruling authorizing PG&E to purchase and deliver gas, etc.

Type: PETITION FOR MODIFICATION Filing Date: December 19, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of D05-10-042 and request to shorten time for responses to January 5, 2006.

Type: RULING Filing Date: December 16, 2005
Filed By:
ALJ/BROWN/PUC
Description: Grants PG&E's motion to shorten time for responses to its motion for authorization to purchase and deliver gas, etc. Responses to the motion are due December 22, 2005.

Type: COMMENTS Filing Date: December 15, 2005
Filed By:
WESTERN POWER TRADING FORUM
Description: on Application for Rehearing of D05-10-042.

Type: RESPONSE Filing Date: December 15, 2005
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
Description: to applications for rehearing [of D05-10-042].

Type: RESPONSE Filing Date: December 15, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Applications for Rehearing of D05-10-042.

Type: RESPONSE Filing Date: December 15, 2005
Filed By:
SEMPRA GLOBAL
Description: to Applications for Rehearing of D05-10-042.

Type: MOTION Filing Date: December 15, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: for a ruling authorizing PG&E to purchase and deliver gas, as needed for electric and gas system reliability purposes, to supply generating units under the CAISO reliability must run contracts with Calpine and its affiliates, and to authorize cost recovery.

Type: MOTION Filing Date: December 15, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to shorten time for responses to PG&E's motion for a ruling authorizing PG&E to purchase and deliver gas, etc.

Type: COMMENTS Filing Date: December 13, 2005
Filed By:
SILICON VALLEY LEADERSHIP GROUP
Description: Pre-Workshop; on Assigned Commissioner's Ruling regarding next steps in procurement proceeding

Type: EXPARTE Filing Date: December 13, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On December 8, 2005, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Rami Kahlon, advisor to Cmmr. Peevey, in San Francisco. Jacobson described PG&E's recommendation to modify D04-12-048 regarding the capital cost cap structure and sharing mechanism for utility-owned generation projects. Jacobson emphasized the importance of allowing traditional cost of service ratemaking for utility-owned generation. Jacobson explained that the cost cap for utility-owned generation should be eliminated. Jacobson noted, that if the cost cap is not eliminated, the Commission has already indicated its intent to reexamine the extent to which there will be customer/shareholder sharing of cost overruns and underruns for utility-owned generation in the 2006 long-term procurement plan proceeding.

Type: COMMENTS Filing Date: December 13, 2005
Filed By:
SAN DIEGO ASSOCIATION OF GOVERNMENTS
Description: Pre-Workshop; on Assigned Commissioner's Ruling regarding next steps in procurement proceeding.

Type: COMMENTS Filing Date: December 12, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Assigned Commissioner's Ruling regarding next steps in procurement proceeding.

Type: COMMENTS Filing Date: December 12, 2005
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: to the December 2, 2005 ruling regarding next steps in procurement proceeding.

Type: COMMENTS Filing Date: December 12, 2005
Filed By:
ORA/OBIORA/PUC
Description: on the Assigned Commissioner's ruling regarding next steps in procurement proceeding.

Type: COMMENTS Filing Date: December 12, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on Assigned Commissioner's Ruling regarding next steps in procurement proceeding.

Type: COMMENTS Filing Date: December 12, 2005
Filed By:
MIRANT CALIFORNIA, LLC
MIRANT DELTA, LLC
MIRANT POTRERO, LLC
Description: on Assigned Commissioner's Ruling regarding next steps in procurement proceeding.

Type: COMMENTS Filing Date: December 12, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: pre-workshop; in response to the December 2, 2005 Assigned Commissioner's Ruling.

Type: COMMENTS Filing Date: December 12, 2005
Filed By:
WEST COAST POWER LLC
Description: on Assigned Commissioner's Ruling regarding next steps in procurement proceeding.

Type: COMMENTS Filing Date: December 12, 2005
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
Description: pre-workshop; on Assigned Commissioner's Ruling regarding next steps in procurement proceeding.

Type: COMMENTS Filing Date: December 12, 2005
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: [on the Assigned Commissioner's Ruling of December 2, 2005].

Type: COMMENTS Filing Date: December 12, 2005
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: pre-workshop; on the Assigned Commissioner's ruling regarding next steps in procurement proceeding.

Type: COMMENTS Filing Date: December 12, 2005
Filed By:
CALIFORNIA CLEAN DG COALITION
Description: on the Assigned Commissioner's ruling regarding the next steps in procurement proceeding.

Type: COMMENTS Filing Date: December 12, 2005
Filed By:
MOUNTAIN UTILITIES
Description: on Assigned Commissioner's Ruling.

Type: COMMENTS Filing Date: December 12, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: on Assigned Commissioner's Ruling regarding next steps in procurement proceeding.

Type: COMMENTS Filing Date: December 12, 2005
Filed By:
SEMPRA GLOBAL
Description: on Assigned Commissioner's Ruling dated 12/02/05.

Type: COMMENTS Filing Date: December 12, 2005
Filed By:
WESTERN POWER TRADING FORUM
Description: on Assigned Commissioner's Ruling.

Type: PETITION FOR MODIFICATION Filing Date: December 8, 2005
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: Amended Petition to Modify D05-10-042.

Type: MOTION Filing Date: December 7, 2005
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: to designate sponsoring witness.

Type: PETITION FOR MODIFICATION Filing Date: December 6, 2005
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: of D05-10-042 on resource adequacy.

Type: COMMENTS Filing Date: December 5, 2005
Filed By:
CALPINE CORPORATION
Description: reply; on the draft decision of ALJ Brown granting in part, and denying in part, petitions for modification of D04-12-048.

Type: PETITION FOR MODIFICATION Filing Date: December 2, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of D04-12-048.

Type: RULING Filing Date: December 2, 2005
Filed By:
CMMR/PEEVEY/PUC
Description: Regarding Next Steps in Procurment Proceeding. Sets the following schedule: 12/12/05 - comments on the ruling; 12/14 - workshop; 1/5/6 - post workshop comments; 1/12/6 - post workshop reply comments.

Type: EXPARTE Filing Date: December 1, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: AUGMENTATION REQUIRED. On November 28, 2005, Colin E. Cushnie, Director of Regulatory Affairs of Southern California Edison Company (SCE), met with Stephen St. Marie, advisor to Cmmr. Bohn, Peter Arth, advisor to Cmmr. Peevey, and Aaron Johnson, advisor to Cmmr. Grueneich, in three separate meetings. Written material (attached to the notice) was used. Cushnie discussed ALJ Brown's draft decision (DD) on the Department of Water Resources (DWR) Contract Reallocation and ALJ Allen's DD on the Allocation of DWR's 2006 Revenue Requirement Determination. Cushnie requested that the Commission adopt ALJ Brown's DD reallocating the Williams Product 'D' contract to SCE's customers. Cushnie also requested that the ALJ Allen's DD be modified to reject Pacific Gas and Electric Company's proposal to calculate the mark-to-market benefits of the Williams gas supply contract and allocate the benefits to all utility customers.

Type: OPPOSITION Filing Date: November 30, 2005
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: to Motion to Strike Reference of CARE.

Type: RESPONSE Filing Date: November 30, 2005
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: to Motion of CARE filed on November 15, 2005.

Type: REHEARING REQUEST Filing Date: November 30, 2005
Filed By:
FPL ENERGY, LLC
Description: of D05-10-042.

Type: REHEARING REQUEST Filing Date: November 30, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: of D05-10-042.

Type: REHEARING REQUEST Filing Date: November 30, 2005
Filed By:
CALPINE CORPORATION
Description: of D05-10-042.

Type: COMMENTS Filing Date: November 29, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the draft decision of ALJ Brown.

Type: RULING Filing Date: November 29, 2005
Filed By:
ALJ/HALLIGAN/BROWN/PUC
Description: Grants Davis Hydro, LLC's motion to intervene, filed on November 8, 2005.

Type: COMMENTS Filing Date: November 29, 2005
Filed By:
CALPINE CORPORATION
Description: on the draft decision of ALJ Brown granting in part, and denying in party, petitions for modification of D04-12-048.

Type: COMMENTS Filing Date: November 29, 2005
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: on the draft decision of ALJ Brown.

Type: COMMENTS Filing Date: November 29, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on Draft Decision of ALJ Brown granting in part, and denying in part, petitions to modify D04-12-048.

Type: COMMENTS Filing Date: November 29, 2005
Filed By:
WESTERN POWER TRADING FORUM
Description: on Opinion granting in part, and denying in party, petitions for modification of D04-12-048.

Type: COMMENTS Filing Date: November 28, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; on Draft Decision of ALJ Brown.

Type: RESPONSE Filing Date: November 28, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to the motion of the CAC/EPUC to strike testimony.

Type: EXPARTE Filing Date: November 28, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
Description: On November 22, 2005, Lad Lorenz, Vice President, Regulatory Affairs - San Francisco, for San Diego Gas & Electric Company (SDG&E) and Southern California Gas Company met with Rami Kahlon, advisor to Pres. Peevey, in San Francisco. Lorenz discussed ALJ Brown's draft decision to reallocate the 1175 MW Williams Product `D' Department of Water Resources contract from SDG&E to Southern California Edison Company. Lorenz urged that the DD be modified, to maintain the status quo allocation of the Department of Water Resources contracts.

Type: COMMENTS Filing Date: November 28, 2005
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: reply; on the draft decision of ALJs Brown and Halligan.

Type: COMMENTS Filing Date: November 28, 2005
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: reply; on the draft decision of ALJs Brown and Halligan.

Type: COMMENTS Filing Date: November 28, 2005
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: reply; on the draft decision of ALJ Brown.

Type: COMMENTS Filing Date: November 28, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on Draft Decision of ALJs Brown & Halligan.

Type: COMMENTS Filing Date: November 28, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on Draft Decision of ALJ Brown.

Type: EXPARTE Filing Date: November 23, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: AUGMENTATION REQUIRED. On November 18, 2005, Colin E. Cushnie, Director of Regulatory Affairs of Southern California Edison Company (SCE), met with Brian Prusnek, advisor to Cmmr. Kennedy. Written material (attached to the notice) was used. Cushnie discussed ALJ Brown's draft decision (DD) on the Department of Water Resources (DWR) Contract Reallocation and ALJ Allen's DD on the Allocation of DWR's 2006 Revenue Requirement Determination. Cushnie requested that the Commission adopt ALJ Brown's DD reallocating the Williams Product 'D' contract to SCE's customers. Cushnie also requested that the ALJ Allen's DD be modified to reject Pacific Gas and Electric Company's (PG&E) proposal to calculate the mark-to-market benefits of the Williams gas supply contract and allocate the benefits to all utility customers. Additionally, Cushnie requested that the DD be modified to adopt SCE's Petition to Modify D05-06-060, which would levelize shift in cost responsibility from San Diego Gas & Electric Company's customers to the customers of SCE and PG&E.

Type: RULING Filing Date: November 22, 2005
Filed By:
ALJ/BROWN/HALLIGAN/PUC
Description: Shortens time to respond to the Cogeneration Association of California, et al.'s motion to stirke of November 16, 2005. Responses to the motion are due November 28, 2005.

Type: COMMENTS Filing Date: November 21, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: (PUBLIC & CONFIDENTIAL VERSIONS) on Draft Decision of ALJ Brown.

Type: MOTION Filing Date: November 21, 2005
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: to file comments on draft decisions of the ALJ one day out of time; [comments included].

Type: EXPARTE Filing Date: November 21, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On November 16, 2005, Colin E. Cushnie, Director of Southern California Edison Company (SCE), spoke on the telephone with David Gamson, advisor to Cmmr. Brown. Written material (attached to the notice) was used. Cushnie requested that the Commission adopt ALJ Brown's draft decision reallocating the Williams Product 'D' contract to SCE's customers. Cushnie also requested that ALJ Allen's draft decision be modified to reject Pacific Gas and Electric Company's proposal to calculate the mark-to-market benefits of the Williams gas supply contract and allocate the benefits to all utility customers.

Type: COMMENTS Filing Date: November 21, 2005
Filed By:
MODESTO IRRIGATION DISTRICT
Description: on Draft Decision of ALJ Brown & Halligan re: Expiring QF contracts.

Type: COMMENTS Filing Date: November 21, 2005
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: on the draft decision of ALJs Brown and Halligan.

Type: COMMENTS Filing Date: November 21, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on Draft Decision of ALJ Brown.

Type: COMMENTS Filing Date: November 21, 2005
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: on the draft decision of ALJs Brown and Halligan.

Type: COMMENTS Filing Date: November 21, 2005
Filed By:
ORA/PELEO/PUC
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
Description: Opening; on Draft Decision re: Expiring QF Contracts.

Type: COMMENTS Filing Date: November 21, 2005
Filed By:
SEMPRA GLOBAL
Description: on Draft Decision re: Reallocation of DWR Contracts.

Type: COMMENTS Filing Date: November 21, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Draft Decision of ALJ Brown.

Type: MOTION Filing Date: November 16, 2005
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: to strike testimony of PG&E and request for shortened response time.

Type: MOTION Filing Date: November 15, 2005
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: to strike reference to the California Energy Commission's Draft 2005 Integrated Energy Policy Report in the Prepared Rebuttal Testimony of R. Thomas Beach on Behalf of the California Cogeneration Council, the Prepared Rebuttal Testimony of James A. Ross and Donald W. Schoenbeck on Behalf of the Cogeneration Association of California and the Energy Producers and Users Coalition, and other parties.

Type: DRAFT DECISION Filing Date: November 9, 2005
Filed By:
ALJ/BROWN/PUC
Description: Opinion Granting in Part, and Denying in Part, Petitions to Modify D04-12-048. Comments are due by November 29, 2005; reply comments - 5 days after comments are filed.

Type: PETITION Filing Date: November 8, 2005
Filed By:
DAVIS HYDRO, LLC
Description: to intervene.

Type: EXPARTE Filing Date: November 3, 2005
Filed By:
SEMPRA GLOBAL
Description: THIS IS AN AUGMENTED NOTICE OF AN EX PARTE COMMUNICATION THAT WAS FILED ON OCTOBER 26, 2005, AND APPEARED IN THE CALENDAR OFOctober 28, 2005. On October 17, 2005, Thomas Corr, Regulatory Policy Manager for Sempra Global (Global), participated in two separate all-party meetings in San Francisco - with Cmmr. Brown, and Cmmr. Peevey. Cmmr. Peevey participated via telecast from Los Angeles. Also present was Greg Bass, Director of Retail Commodity Operations for Sempra Energy Solutions. Copies of the sign-up sheets listing the names of other participants of the meetings are attached to the notice. Bass and Corr discussed resource adequacy requirements (RAR) and the draft decision of September 27, 2005. Bass emphasized that electric service providers should not be subjected to RA capacity allocations for customers that are not under contract.

Type: MOTION Filing Date: November 3, 2005
Filed By:
CALIFORNIA COGENERATION COUNCIL
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
RENEWABLES COALITION
Description: for leave to file reply; reply attached.

Type: DRAFT DECISION Filing Date: October 31, 2005
Filed By:
ALJ/BROWN/PUC
Description: Opening Comments not to exceed 15 pages are due NLT 11/20/05; Reply Comments not to exceed 5 pages are due NLT 11/26/05

Type: DRAFT DECISION Filing Date: October 31, 2005
Filed By:
ALJ/BROWN/HALLIGAN/PUC
Description: Opening Comments not to exceed 15 pages are due NLT 11/20/05; Reply Comments not to exceed 5 pages are due NLT 11/26/05

Type: MOTION Filing Date: October 28, 2005
Filed By:
PACIFIC GAS & ELECTRIC COMPANY
Description: requesting Official Notice of Documents.

Type: EXPARTE Filing Date: October 27, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On October 24, 2005, Colin E. Cushnie, Director, Southern California Edison Company (SCE), met with Nilgun Atamturk, advisor to Cmmr. Grueneich, in San Francisco. Written material (attached to the notice) was used. Cushnie requested that the Commission clarify that Department of Water Resources contracts are excluded from the draft decision's (DD) adopted restrictions on liquidated damages contracts (LDCs) and asked that the Commission increase the proposed five percent phase-out limit on LDCs in 2008 to ten percent. Additionally, SCE's representatives requested that the Commission not incorporate load migration into Load Serving Entities' monthly RA compliance filings, or in the alternative, provide a ninety-day grace period for investor-owned utilities (IOU). Cushnie also said that SCE supports the DD's decision to defer implementation of Local Area requirements (LARs) to 2007, but requested that the DD be changed to allow IOU ninety days to submit LARs proposals.

Type: EXPARTE Filing Date: October 26, 2005
Filed By:
SEMPRA GLOBAL
Description: LATE FILED. AUGMENTATION REQUIRED. On October 17, 2005, Thomas Corr, Regulatory Policy Manager for Sempra Global (Global), participated in two separate all-party meetings in San Francisco - with Cmmr. Brown, and Cmmr. Peevey. Cmmr. Peevey participated via telecast from Los Angeles. Also present was Greg Bass, Director of Retail Commodity Operations for Sempra Energy Solutions. Bass and Corr discussed resource adequacy requirements (RAR) and the draft decision of September 27, 2005. Bass emphasized that electric service providers should not be subjected to RA capacity allocations for customers that are not under contract.

Type: COMMENTS Filing Date: October 25, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: Reply; on Draft Decision of ALJ Wetzell on Resource Adequacy Requirements.

Type: EXPARTE Filing Date: October 25, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On October 20, 2005, Bruce C. Foster, Vice President, Southern California Edison Company (SCE), met with Stephen St. Marie, advisor to Cmmr. Bohn, at 601 Van Ness Avenue in San Francisco. Also present were Gary L. Schoonyan and Colin E. Cushnie, Directors of SCE. Written material (attached to the notice) was used. SCE's representatives discussed ALJ Wetzell's draft decision on Phase II Resource Adequacy proceeding. SCE's representatives requested that the Commission clarify that Department of Water Resources contracts are excluded from the DD's adopted restrictions on liquidated damages contracts (LDCs) and asked that the Commission increase the proposed five percent phase-out limit on LDCs in 2008 to ten percent. Additionally, SCE's representatives requested that the Commission not incorporate load migration into Load Serving Entities' monthly RA compliance filings, or in the alternative, provide a ninety-day grace period for investor-owned utilities.

Type: COMMENTS Filing Date: October 25, 2005
Filed By:
WESTERN POWER TRADING FORUM
Description: Reply; on Proposed Decision of ALJ Wetzell Re Resource Adequacy.

Type: COMMENTS Filing Date: October 25, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on Proposed Decision of ALJ Wetzell Re Resource Adequacy.

Type: COMMENTS Filing Date: October 24, 2005
Filed By:
CALIFORNIA ELECTRICITY OVERSIGHT BOARD
Description: reply; to the draft decision.

Type: OPPOSITION Filing Date: October 24, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Motion of the CCC et al. to strike the testimony of Dr. Peter Fox-Penner.

Type: EXPARTE Filing Date: October 24, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On October 19, 2005, Bruce C. Foster, Vice President, Southern California Edison Company, sent a letter (attached to the notice) to Cmmr. Brown. The letter concerned the proposed decision on resource adequacy.

Type: COMMENTS Filing Date: October 24, 2005
Filed By:
ORA/PAULL/PUC
Description: reply; on ALJ Wetzell's draft decision re resource adequacy.

Type: COMMENTS Filing Date: October 24, 2005
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: reply; on the draft decision of ALJ Wetzell regarding resource adequacy requirements.

Type: COMMENTS Filing Date: October 24, 2005
Filed By:
MIRANT CALIFORNIA LLC; MIRANT DELTA LLC; MIRANT POTRERO LLC
WEST COAST POWER
Description: joint reply; on the ALJ draft decision on resource adequacy requirements.

Type: COMMENTS Filing Date: October 24, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on the draft decision on resource adequacy requirements.

Type: COMMENTS Filing Date: October 24, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on the draft decision of ALJ Wetzell on resource adequacy requirements.

Type: COMMENTS Filing Date: October 24, 2005
Filed By:
DUKE ENERGY NORTH AMERICA
Description: reply; on the draft decision of ALJ Wetzell concerning the resource adequacy requirement.

Type: COMMENTS Filing Date: October 24, 2005
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
Description: reply; on ALJ Draft Decision on Resource Adequacy Requirements.

Type: COMMENTS Filing Date: October 24, 2005
Filed By:
POWEREX CORP.
Description: reply; on ALJ Wetzell's Draft Decision Addressing RAR.

Type: COMMENTS Filing Date: October 24, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: reply; on the draft decision on resource adequacy requirements.

Type: COMMENTS Filing Date: October 24, 2005
Filed By:
CALPINE CORPORATION
Description: reply; on the draft decision of ALJ Wetzell on resource adequacy requirement.

Type: COMMENTS Filing Date: October 24, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; on Proposed Decision of ALJ Wetzell on Resource Adequacy Requirements.

Type: COMMENTS Filing Date: October 24, 2005
Filed By:
SEMPRA GLOBAL
Description: Reply; on Draft Decision of ALJ Wetzell on Resource Adequacy Requirements.

Type: EXPARTE Filing Date: October 20, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On October 17, 2005, Bruce C. Foster, Vice President, Southern California Edison Company (SCE), participated in two separate all-party meetings - with Cmmr. Brown, and Cmmr. Peevey, in San Francisco. At the meeting with Cmmr.Brown also present was David Gamson, advisor to Cmmr. Brown, and with Cmmr. Peevey - Julie Fitch, advisor to Cmmr. Peevey. Harold B. Ray, Executive Vice President, Colin E. Cushnie, Director, and Douglas R. Parker, Manager, for SCE, participated in the meetings. Written material (attached to the notice) was used. Foster requested that the Commission clarify that Department of Water Resources contracts are excluded from the draft decision's (DD) adopted restrictions on liquidated damages (LD) contracts and asked that the Commission increase the proposed five percent phase-out limit on LD contracts in 2008 to ten percent. Cushnie requested that the Commission not incorporate load migration into Load Serving Entities' monthly RA compliance filings, or in the alternative, provide a ninety-day grace period for investor-owned utilities (IOUs). Cushnie stated that SCE supports the DD's decision to defer implementation of Local Area requirements (LARs) to 2007, and requested that the DD be changed to allow IOUs ninety days to submit LARs proposals.

Type: EXPARTE Filing Date: October 20, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On October 17, 2005, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), attended two separate all-party meetings - with Cmmr. Peevey and with Cmmr. Brown, in San Francisco. At the meeting with Cmmr. Peevey also present was Julie Fitch, advisor to Cmmr. Peevey, and with Cmmr. Brown - David Gamson, advisor to Cmmr. Brown. Roy Kuga, Vice President, Gas and Electric Supply, for PG&E, participated in both meetings. A list of attendees is attached to the notice. Written material (attached to the notice) was used. Kuga urged the Commission to pursue a multi-year resource adequacy requirement (RAR). Kuga indicated that it was important for the Commission to define the exemptions to the 7x24 availability requirement. Kuga expressed concern that Reliability Must Run Must Offer Obligation and Resource Adequacy payments could potentially duplicate one another. Kuga recommended that the Commission clarify that Department of Water Resources contracts are excluded from the phase out percentages for liquidated damages contracts. Kuga stated that the RAR should extend into real-time. Kuga expressed support for the Commission's decision to defer implementation of local capacity requirements until 2007. Kuga proposed that the draft decision be clarified with respect to the allocation of intertie capacity.

Type: EXPARTE Filing Date: October 20, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
Description: On October 17, 2005, Lad Lorenz, Vice President, Regulatory Affairs - San Francisco, for San Diego Gas & Electric Company (SDG&E) and Southern California Gas Company (SoCalGas) participated in two separate all-party meetings - with Pres. Peevey and with Cmmr. Brown in San Francisco. In the meeting with Cmmr. Peevey, Lorenz participated by video conference from the Commission's Los Angeles office in Los Angeles. Wendy Keilani, Regulatory Case Manager for SDG&E and SoCalGas participated in the meetings. A list of other attendees is attached to the notice. Lorenz discussed SDG&E's overall support for the proposed decision and expressed appreciation for the PD¿s adoption of many SDG&E's positions. Lorenz, however, encouraged caution and the need for flexibility in implementation interpretation.

Type: COMMENTS Filing Date: October 19, 2005
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
Description: on the proposed decision on resource adequacy requirements.

Type: MOTION Filing Date: October 18, 2005
Filed By:
COUNTY OF LOS ANGELES
Description: to Strike portions of the Reply of the Joint Parties.

Type: COMMENTS Filing Date: October 17, 2005
Filed By:
WESTERN POWER TRADING FORUM
Description: on the Proposed Decision of ALJ Wetzell.

Type: COMMENTS Filing Date: October 17, 2005
Filed By:
SILICON VALLEY LEADERSHIP GROUP
Description: on Phase 2 resource adequacy requirement draft decision.

Type: COMMENTS Filing Date: October 17, 2005
Filed By:
POWEREX CORP.
Description: on ALJ Wetzell's draft decision addressing RAR.

Type: COMMENTS Filing Date: October 17, 2005
Filed By:
MORGAN STANLEY CAPITAL GROUP INC.
Description: on the draft decision on Resource Adequacy Requirements.

Type: COMMENTS Filing Date: October 17, 2005
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
Description: on the draft decision on Resource Adequacy Requirements.

Type: COMMENTS Filing Date: October 17, 2005
Filed By:
DUKE ENERGY NORTH AMERICA
Description: on the draft decision on Resource Adequacy Requirements.

Type: COMMENTS Filing Date: October 17, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on the draft decision on Resource Adequacy Requirements.

Type: COMMENTS Filing Date: October 17, 2005
Filed By:
MIRANT CALIFORNIA LLC
MIRANT DELTA LLC
MIRANT PORTERO LLC
WEST COAST POWER
Description: joint; on the draft decision on Resource Adequacy Requirements.

Type: COMMENTS Filing Date: October 17, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: [on the draft decision on Resource Adequacy Requirements.]

Type: COMMENTS Filing Date: October 17, 2005
Filed By:
CALPINE CORPORATION
Description: on the draft decision on Resource Adequacy Requirements.

Type: COMMENTS Filing Date: October 17, 2005
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: on the draft decision on Resource Adequacy Requirements.

Type: COMMENTS Filing Date: October 17, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: on the draft decision on Resource Adequacy Requirements.

Type: COMMENTS Filing Date: October 17, 2005
Filed By:
ORA/PAULL/PUC
Description: opening; on ALJ Wetzell's draft decision on Resource Adequacy Requirements.

Type: COMMENTS Filing Date: October 17, 2005
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
Description: on the Proposed Decision of ALJ Wetzell on Resource Adequacy Requirements.

Type: COMMENTS Filing Date: October 17, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the Proposed Decision of ALJ Wetzell on Resource Adequacy Requirements.

Type: COMMENTS Filing Date: October 17, 2005
Filed By:
SEMPRA GLOBAL
Description: on the Proposed Decision of ALJ Wetzell on Resource Adequacy Requirements.

Type: COMMENTS Filing Date: October 17, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: on Draft Decision of ALJ Wetzell on Resource Adequacy Requirements.

Type: REPLY Filing Date: October 14, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to the Opposition of the County of Los Angeles to the Motion of the Joint Parties to Strike testimony of the County of Los Angeles.

Type: EXPARTE Filing Date: October 12, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On October 7, 2005, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Stephen St. Marie, advisor to Cmmr. Bohn, in San Francisco. Also present were Claudia Greif, Manager, and Joe Lawlor, Principal, Strategic Consulting, for PG&E. Jacobson stated that PG&E strongly recommends that the Commission move expeditiously towards instituting a multi-year Resource Adequacy Requirement (RAR). Lawlor asserted that the proposed decision should be modified to explicitly state that Department of Water Resources contracts are excluded from the adopted portfolio share limitations for liquidated damages contracts. Greif explained that PG&E was concerned over the exception rules that would be applied to determine whether or not an LSE complied with the top-down RAR. Greif explained that reliance on a system peak RAR was inconsistent with the Commission's resource planning requirements.

Type: COMMENTS Filing Date: October 11, 2005
Filed By:
SEMPRA GLOBAL
Description: Reply; on capacity markets white paper.

Type: RESPONSE Filing Date: October 11, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Comments on capacity markets white paper.

Type: COMMENTS Filing Date: October 11, 2005
Filed By:
ORA/PAULL/PUC
Description: reply; on the Energy Division staff capacity markets white paper.

Type: COMMENTS Filing Date: October 11, 2005
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
Description: reply.

Type: COMMENTS Filing Date: October 11, 2005
Filed By:
CALPINE CORPORATION
Description: reply; on capacity markets white paper.

Type: COMMENTS Filing Date: October 11, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: reply; on the staff's capacity markets white paper.

Type: COMMENTS Filing Date: October 11, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on the capacity markets white paper.

Type: COMMENTS Filing Date: October 11, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on the Energy Division's Capacity Markets White Paper.

Type: COMMENTS Filing Date: October 11, 2005
Filed By:
DUKE ENERGY NORTH AMERICA
Description: reply; on Capacity Markets White Paper.

Type: COMMENTS Filing Date: October 11, 2005
Filed By:
MIRANT CALIFORNIA, LLC
MIRANT DELTA, LLC
MIRANT POTRERO, LLC
Description: reply; on Capacity Markets White Paper.

Type: COMMENTS Filing Date: October 11, 2005
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: reply; on the Staff Capaicty Markets White Paper.

Type: COMMENTS Filing Date: October 11, 2005
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
Description: Reply; on Energy Division Capacity Markets White Paper.

Type: MOTION Filing Date: October 7, 2005
Filed By:
CALIFORNIA COGENERATION COUNCIL
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
RENEWABLES COALITION
Description: to strike the testimony of Dr. Peter Fox-Penner submitted on behalf of PG&E and Edison.

Type: RULING Filing Date: October 5, 2005
Filed By:
ALJ/BROWN/HALLIGAN/PUC
Description: Adopts the revised schedule, as follows: evidentiary hearing - 1/18 - 2/3, 2006; concurrent opening briefs - 3/3/06; concurrent responding briefs - 3/17/6.

Type: RULING Filing Date: October 5, 2005
Filed By:
ALJ/BROWN/HALLIGAN/PUC
Description: Denies a motion to strike filed by PG&E and SCE on September 9, 2005.

Type: OPPOSITION Filing Date: October 4, 2005
Filed By:
COUNTY OF LOS ANGELES
Description: to Motion to Strike testimony of the County of Los Angeles.

Type: DRAFT DECISION Filing Date: September 27, 2005
Filed By:
ALJ/WETZELL/PUC
Description: comments not to exceed 15 pages are due 10/17, reply comments are due 5 days after comments are filed.

Type: COMMENTS Filing Date: September 26, 2005
Filed By:
WILLIAMS POWER COMPANY, INC.
Description: on Capacity Markets White Paper.

Type: RESPONSE Filing Date: September 26, 2005
Filed By:
CALIFORNIA COGENERATION COUNCIL
RENEWABLES COALITION
Description: to Motion by PG&E and SoCal Edison Co., to Strike Portions of the Testimony of the California Cogeneration Council, the Cogeneration Association of California and the Renewables Coalition.

Type: COMMENTS Filing Date: September 26, 2005
Filed By:
SILICON VALLEY LEADERSHIP GROUP
Description: concerning Capacity Markets White Paper.

Type: COMMENTS Filing Date: September 23, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Capacity Markets White Paper.

Type: MOTION Filing Date: September 23, 2005
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: to augment the record re: resource Adequacy Phase 2.

Type: EXPARTE Filing Date: September 23, 2005
Filed By:
WEST COAST POWER
Description: On September 20, 2005, Greg Blue, representing West Coast Power, met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Stephen St. Marie, advisor to Cmmr. Bohn, Sean Gallagher, Manuel Ramirez, and Kirk Bracht of the Energy Division, and Brian Cragg, counsel, and Alan Comnes, for West Coast Power. Brian Despard of West Coast Power participated in the meeting by telephone. Written materials (attached to the notice) were used. Blue and Comnes described how recent developments have created a potential for reliability problems in Southern California for next year. Blue and Comnes explained that West Coast Power was concerned that local reliability problems could arise in Southern California during the first five months of 2006, and possibly longer.

Type: COMMENTS Filing Date: September 23, 2005
Filed By:
CALIFORNIA ELECTRICITY OVERSIGHT BOARD
Description: on the CPUC Energy Division Capacity Markets White Paper.

Type: COMMENTS Filing Date: September 23, 2005
Filed By:
ENERNOC
Description: on Capacity Markets White Paper.

Type: COMMENTS Filing Date: September 23, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: on the Energy Division's Capacity Markets White Paper "Don't Rush to Judgement!" [in accordance with August 25, 2005 Ruling].

Type: COMMENTS Filing Date: September 23, 2005
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
Description: on Capacity Markets White Paper.

Type: COMMENTS Filing Date: September 23, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the Energy Division Capacity Markets White Paper [in accordance with the August 25, 2005 ruling].

Type: COMMENTS Filing Date: September 23, 2005
Filed By:
MORGAN STANLEY CAPITAL GROUP INC.
Description: on Staff Capacity Markets White Paper [in accordance with the August 25, 2005 ruling].

Type: COMMENTS Filing Date: September 23, 2005
Filed By:
DUKE ENERGY NORTH AMERICA
Description: on Capacity Markets White Paper [in accordance with the August 25, 2005 ruling].

Type: COMMENTS Filing Date: September 23, 2005
Filed By:
ORA/PAULL/PUC
Description: on the Energy Division Capacity Markets White Paper [in accordance with the August 25, 2005 ruling].

Type: COMMENTS Filing Date: September 23, 2005
Filed By:
WEST COAST POWER LLC
Description: on CPUC Staff Capacity Markets White Paper [in accordance with the August 25, 2005 ruling].

Type: COMMENTS Filing Date: September 23, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on the Staff's Capacity Markets White Paper [in accordance with the August 25, 2005 ruling].

Type: COMMENTS Filing Date: September 23, 2005
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: on the staff Capacity Markets White Paper [in accordance with the August 25, 2005 ruling].

Type: COMMENTS Filing Date: September 23, 2005
Filed By:
MIRANT CALIFORNIA, LLC
MIRANT DELTA, LLC
MIRANT POTRERO, LLC
Description: on Capacity Markets White Paper [in accordance with the August 25, 2005 ruling].

Type: COMMENTS Filing Date: September 23, 2005
Filed By:
POWEREX CORP.
Description: Addressing the Staff "Capacity Markets White Paper."

Type: COMMENTS Filing Date: September 23, 2005
Filed By:
CALPINE CORPORATION
Description: on Capacity Markets White Paper.

Type: COMMENTS Filing Date: September 23, 2005
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: on the CPUC's Capacity Markets White Paper.

Type: COMMENTS Filing Date: September 23, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on the Capacity Markets White Paper.

Type: COMMENTS Filing Date: September 23, 2005
Filed By:
SEMPRA GLOBAL
Description: on the Capacity Markets White Paper.

Type: COMMENTS Filing Date: September 23, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: on the Capacity Market White Paper.

Type: RULING Filing Date: September 21, 2005
Filed By:
ALJ/BROWN/PUC
Description: Finds CARE eligible to claim an award of compensation.

Type: OPPOSITION Filing Date: September 20, 2005
Filed By:
COUNTY OF LOS ANGELES
Description: to Request of Joint Parties to Shorten Time and Allow Replies.

Type: MOTION Filing Date: September 19, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Strike testimony of the County of Los Angeles and portions of the testimony of the Cogeneration Association of California, and the Energy Producers and Users Coalition; and Request for an Order Shortening time.

Type: RULING Filing Date: September 19, 2005
Filed By:
ALJ/BROWN/HALLIGAN/PUC
Description: Grants PG&E's motion for leave to file under seal and SCE's motion for confidential treatment, filed on August 31, 2005, as set forth.

Type: OPPOSITION Filing Date: September 14, 2005
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: to the Joint PG&E and SCE Motion to Shorten Time for Responses to Motion to Strike Testimony.

Type: RESPONSE Filing Date: September 13, 2005
Filed By:
CALIFORNIA COGENERATION COUNCIL
RENEWABLES COALITION
Description: to [PG&E and SCE's] Request for Order Shortening Time (and for Leave to File Third Round Pleading).

Type: COMMENTS Filing Date: September 9, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; re: Year-End Issues

Type: MOTION Filing Date: September 9, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to strike portions of the testimony of the CCC, CAC, and the Renewables Coalition; Request for an Order Shortening Time.

Type: COMMENTS Filing Date: September 9, 2005
Filed By:
MODESTO IRRIGATION DISTRICT
Description: Reply; concerning potential Commission action on extension of QF contracts and new QF contracts.

Type: COMMENTS Filing Date: September 9, 2005
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: reply; re the need for immediate interim relief for cogeneration QFs.

Type: COMMENTS Filing Date: September 9, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on interim measures addressing existing QF contracts expriring in 2006 and new QF contracts.

Type: COMMENTS Filing Date: September 9, 2005
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: reply; on extending the five-year SO1 requirement.

Type: COMMENTS Filing Date: September 9, 2005
Filed By:
ORA/PELEO/PUC
Description: reply; re interim treatment of expiring QF contracts.

Type: RULING Filing Date: September 8, 2005
Filed By:
ALJ/BROWN/HALLIGAN/PUC
Description: Revises schedule for serving Phase 2 rebuttal testimony.

Type: EXPARTE Filing Date: September 7, 2005
Filed By:
CALPINE CORPORATION
Description: LATE FILED. On August 22, 2005, Steven S. Schleimer, Vice President of Market and Regulatory Affairs, Calpine Corporation (Calpine), met with Stephen St. Marie, advisor to Cmmr. Bohn, in San Francisco. Also present was Kenneth E. Abreu, Director of Market Policy for Calpine. Schleimer and Abreu discussed the need for an expeditious decision from the Commission establishing a strong and effective resource adequacy program that addresses the linkage between contractual commitments by load serving entities and corresponding obligations of generators.

Type: RULING Filing Date: September 7, 2005
Filed By:
ALJ/BROWN/PUC
Description: Grants CARE's Motion to Serve Opening Testimony One Day Late, filed on September 1, 2005.

Type: EXPARTE Filing Date: September 7, 2005
Filed By:
CALPINE CORPORATION
Description: On August 29, 2005, Steven S. Schleimer, Vice President of Market and Regulatory Affairs, Calpine Corporation (Calpine), met with Stephen St. Marie, advisor to Cmmr. Bohn, in San Francisco. Also present was Kenneth E. Abreu, Director of Market Policy for Calpine. Schleimer and Abreu discussed the need for an expeditious decision from the Commission establishing a strong and effective resource adequacy program that addresses the linkage between contractual commitments by load serving entities and corresponding obligations of generators.

Type: RESPONSE Filing Date: September 6, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: to Edsion's Motion to Strike.

Type: MOTION Filing Date: September 1, 2005
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: to file opening testimony one day out of time.

Type: LAW & MOTION Filing Date: August 31, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Motion for Confidential Treatment of Data re: Expiring QF Contracts; Confidential Materials Attached and Filed Under Seal, namely, Exhibit 1.

Type: MOTION Filing Date: August 31, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
CONSTELLATION NEWENERGY
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
Description: Joint; to Adopt Revised Protective Order.

Type: LAW & MOTION Filing Date: August 31, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: REDACTED PUBLIC VERSION. [UNREDACTED CONFIDENTIAL VERSION FILED UNDER SEAL] Motion for Leave to File Confidential Information Under Seal, Namely Certain Information Related to the Expiration of QF Contracts (ATTACHED).

Type: MOTION Filing Date: August 26, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Clarify 09/19/05 ALJ Ruling on remaining Discovery Disputes.

Type: RULING Filing Date: August 25, 2005
Filed By:
CALJ/MINKIN/PUC
Description: re: capacity markets White Paper. Comments shall be filed/served by 9/23, reply comments filed/served by 10/10.

Type: COMMENTS Filing Date: August 23, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: re: interim treatment for expiring and new contracts with Qualifying Facilities.

Type: COMMENTS Filing Date: August 23, 2005
Filed By:
MODESTO IRRIGATION DISTRICT
Description: concerning potential commission action on extension of contracts and new QF contracts.

Type: COMMENTS Filing Date: August 23, 2005
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: on extending the 5-year SO1 Requirement.

Type: COMMENTS Filing Date: August 23, 2005
Filed By:
PSACIFIC GAS AND ELECTRIC COMPANY
Description: on Interim Measures addressing existing contracts expiring in 2006 and new QF contracts.

Type: COMMENTS Filing Date: August 23, 2005
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: re: the need for immediate interim relief for cogeneration qualifying facilities.

Type: COMMENTS Filing Date: August 23, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on expiring qualifying facility contracts.

Type: COMMENTS Filing Date: August 23, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: concerning year end issues.

Type: RULING Filing Date: August 19, 2005
Filed By:
ALJ/HALLIGAN/BROWN/PUC
Description: on Remaining Discovery Disputes. Evidentiary hearing is set for October 26, 2005.

Type: RESPONSE Filing Date: August 17, 2005
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: to supplemental comments [of August 12, 2005] regarding DWR gas supply plans.

Type: NOTICE Filing Date: August 16, 2005
Filed By:
MODESTO IRRIGATION DISTRICT
Description: of Association of Counsel.

Type: COMMENTS Filing Date: August 12, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the need to maintain the confidentiality of DWR gas supply plans.

Type: RESPONSE Filing Date: August 12, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: to the motion and supplemental testimony of CMTA.

Type: COMMENTS Filing Date: August 12, 2005
Filed By:
ORA/PAULL/PUC
Description: reply; on supplemental comments of the CAISO on resource adequacy issues.

Type: SUPPLEMENTAL Filing Date: August 11, 2005
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: Notice of Intent to Claim Compensation.

Type: NOTICE Filing Date: August 9, 2005
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: of intent to claim compensation.

Type: MOTION Filing Date: August 8, 2005
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: for leave to file supplemental opening comments on the Commission Staff's Resource Adequacy Workshop Report; Report attached.

Type: MOTION Filing Date: August 3, 2005
Filed By:
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
Description: for Leave to File Supplemental Comments: ATTACHED - Supplemental Comments.

Type: RULING Filing Date: July 29, 2005
Filed By:
ALJ/WETZELL/PUC
Description: modifies Interagency Confidentiality Agreement as set forth in Appendix A.

Type: RULING Filing Date: July 29, 2005
Filed By:
ALJ/HALLIGAN/PUC
Description: setting PHC for 8/9/05 at 10 am.

Type: COMMENTS Filing Date: July 28, 2005
Filed By:
SILICON VALLEY LEADERSHIP GROUP
Description: concerning Phase 2 Resource Adequacy Requirement Workshop Report.

Type: COMMENTS Filing Date: July 26, 2005
Filed By:
ORA/HINES/PUC
Description: reply; on the Resource Adequacy (Phase 2) Workshop Report.

Type: EXPARTE Filing Date: July 26, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: On July 22, 2005, Mona Tierney, Director, Government Affairs, Constellation NewEnergy, representing the Alliance for Retail Energy Markets (AReM), met with Aaron Johnson, advisor to Cmmr. Grueneich, in San Francisco. Also present were Jennifer Chamberlin, Market Manager, Regulatory Affairs, Strategic Energy, L.L.C., and William Chen, Director of Governmental Affairs, Constellation New Energy. The AReM representatives discussed issues related to R04-04-026. Additionally, with regard to procurement-related issues, the top-down and bottom-up methodologies were discussed. AReM urged the Commission to adopt the bottom-up approach to RAR. AReM members also indicated that firm LD contracts are flexible, tradable and provide reliable and economical power to meet LSE loads.

Type: EXPARTE Filing Date: July 26, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: On July 21, 2005, Mona Tierney, Mona Tierney, Director, Government Affairs, Constellation NewEnergy, representing the Alliance for Retail Energy Markets (AReM), met with Julie Fitch, advisor to Cmmr. Peevey, and on July 22, 2005, - with Aaron Johnson, advisor to Cmmr. Grueneich. Both meetings took place in San Francisco. At the meeting with Aaron Johnson also present were Jennifer Chamberlin, Market Manager, Regulatory Affairs, Strategic Energy, L.L.C., and William Chen, Director of Governmental Affairs, Constellation New Energy, representatives of AReM. The AReM representatives discussed issues related to R04-04-026. Additionally, with regard to procurement-related issues, the top-down and bottom-up methodologies were discussed. AReM urged the Commission to adopt the bottom-up approach to RAR. AReM members also indicated that firm LD contracts are flexible, tradable and provide reliable and economical power to meet LSE loads.

Type: COMMENTS Filing Date: July 25, 2005
Filed By:
DUKE ENERGY NORTH AMERICA
Description: reply; on Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 25, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on the Phase Two Resource Adequacy Workshop Report.

Type: COMMENTS Filing Date: July 25, 2005
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: reply; on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 25, 2005
Filed By:
CALPINE CORPORATION
Description: reply; on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 25, 2005
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
Description: reply.

Type: COMMENTS Filing Date: July 25, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: reply; on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 25, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 25, 2005
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: reply; on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 25, 2005
Filed By:
POWEREX CORP.
Description: reply; on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 25, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: Reply; on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 25, 2005
Filed By:
SEMPRA GLOBAL
Description: Reply; on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 25, 2005
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
ORA/
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
Description: Joint; Reply; on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 25, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on the Resource Adequacy Phase 2 Workshop Report.

Type: COMPLIANCE FILING Filing Date: July 15, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: (PUBLIC & CONFIDENTIAL VERSIONS) Resource Adequacy Load Forecast.

Type: COMMENTS Filing Date: July 14, 2005
Filed By:
CALIFORNIA ELECTRICITY OVERSIGHT BOARD
Description: on the Resource Adequacy Phase 2 Workshop.

Type: RULING Filing Date: July 14, 2005
Filed By:
ALJCAREW/PUC
Description: Denies Constellation NewEnergy's Motion for Modification of June 24, 2005 interim protective order.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANYA
Description: (PUBLIC & CONFIDENTIAL VERSIONS) on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS AND TECHNOLOGY ASSOCIATION
Description: on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
ORA/CPUC
Description: on the June 10, 2005 Workshop Report on Phase 2 Resource Adequacy Issues.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
POWEREX CORP.
Description: on the draft Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
MIRANT CALIFORNIA LLC
MIRANT DELTA LLC
MIRANT POTRERO LLC
WEST COAST POWER
Description: joint; on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
FPL ENERGY, LLC
Description: on the Second Resource Adequacy Workshop Report.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on Phase 2 Resource Adequacy Requirements Workshop Report on interim opinion regarding resource adequacy.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
CALPINE CORPORATION
Description: on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
DUKE ENERGY NORTH AMERICA
Description: on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
CONSTELLATION ENERGY COMMODITIES GROUP, INC.
CONSTELLATION NEWENERGY, INC.
Description: on June 10, 2005 Workshop Report.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
SEMPRA GLOBAL
Description: on Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
APS ENERGY SERVICES
Description: on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS AND TECHNOLOGY ASSOCIATION
ORA/
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
Description: on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
STATE WATER CONTRACTORS
STATE WATER PROJECT
Description: on the Resource Adequacy Phase 2 Workshop Report.

Type: COMMENTS Filing Date: July 13, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: on the Resource Adequacy Phase 2 Workshop Report.

Type: RESPONSE Filing Date: July 12, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: in opposition to the motion of Constellation NewEnergy to modify the interim protective order.

Type: RULING Filing Date: July 12, 2005
Filed By:
ALJ/BROWN/PUC
Description: Finds that Aglet Consumer Alliance is eligible for an award of intervenor compensation.

Type: MOTION Filing Date: July 11, 2005
Filed By:
CONSTELLATION NEWENERGY
Description: for modification of June 24, 2005 Interim Protective Order and request for expedited treatment.

Type: COMMENTS Filing Date: July 8, 2005
Filed By:
SOUTHERN CALIFORNIA WATER COMPANY
Description: on Phase 2 RAR Workshop Report.

Type: EXPARTE Filing Date: June 29, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: On June 24, 2005, Katie Kaplan, Manager of State Policy Affairs, Independent Energy Producers Association (IEPA), met with Stephen St. Marie, advisor to Cmmr. Bohn, in San Francisco. Also present were Aaron Johnson, advisor to Cmmr. Grueneich, Maryam Ebke, Acting Director of the Division of Strategic Planning, Philippe Auclair, Advisor, Policy and Planning, who joined in by the telephone, Brian Cragg, attorney for IEPA, and Brian Theaker of Williams, a member of IEPA. Cragg noted that in the context of the Resource Adequacy Requirement, the emphasis on capacity of the "top-down" approach would help ensure that power was available to meet California's needs at times when capacity is tight, while the "bottom-up" approach would be most vulnerable when capacity was in short supply. Kaplan added that in other areas of the country, firm liquidated damages contracts had in fact been liquidated at times of high demand. Theaker noted that the payment of liquidated damages, rather than the actual delivery of energy, was an express contractual remedy under firm liquidated damages contracts, not a breach of these contracts. Theaker and Kaplan stated that the emphasis of the Resource Adequacy Requirement should be on the recovery of the fixed costs of generation resources, and California electricity markets as currently structured would not produce prices that would cover the costs of investing in new generation.

Type: RULING Filing Date: June 24, 2005
Filed By:
ALJ/WETZELL/PUC
Description: Directs load-serving entities to submit load data and adopts protective order.

Type: RULING Filing Date: June 14, 2005
Filed By:
ALJ/HALLIGAN/PUC
Description: Revises schedule for the filing of testimony and the joint evidentiary hearings in R04-04-003 and R04-04-025 on policy and pricing of QFs: Joint outline for testimony and briefs - August 3, 2005; evidentiary hearings September 19 - October 7, 2005.

Type: REQUEST Filing Date: June 13, 2005
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: for clarification on the allocation of power prucahse agreement of the City and County of San Francisco within the Cal. Dept. of Water Resources.

Type: RESPONSE Filing Date: June 13, 2005
Filed By:
ORA/OBIORA/PUC
Description: to SDG&E's motion for bifurcation.

Type: RULING Filing Date: June 10, 2005
Filed By:
ALJ/WETZELL/PUC
Description: Providing Notice of Availability of Phase 2 Resource Adequacy Requirements Workshop Report and Providing for Comments. Comments are due on July 8, 2005; and replies to the comments - on July 18, 2005.

Type: REPORT Filing Date: June 10, 2005
Filed By:
CALIFORNIA ENERGY COMMISSION
ENERGY/PUC
Description: Resource Adequacy Phase 2 Workshop Report.

Type: PETITION FOR MODIFICATION Filing Date: June 9, 2005
Filed By:
CITY OF CORONA
MODESTO IRRIGATION DISTRICT
Description: of D05-03-013.

Type: OBJECTION Filing Date: June 6, 2005
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: to meeting.

Type: MOTION Filing Date: June 3, 2005
Filed By:
SAN DIEGO GAS & ELECTRC COMPANY
Description: for an Order Shortening Time to Respond to Motion for Bifurcation.

Type: MOTION Filing Date: June 3, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: for Bifurcation.

Type: MISCELLANEOUS FILING Filing Date: May 31, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Recommendations in Response to 04/21/05 ALJ Ruling re: Mohave Study Plan.

Type: EXPARTE Filing Date: May 27, 2005
Filed By:
WEST COAST POWER
Description: On May 24, 2005, Greg Blue, representing West Coast Power, transmitted written materials (attached to the notice) through electronic mail to Julie Fitch and Peter Arth, advisors to Pres. Peevey, David Gamson, advisor to Cmmr. Brown, Aaron Johnson and Therese Cho, advisors to Cmmr. Grueneich, Robert Lane and Stephen St. Marie, advisors to Cmmr. Bohn, and Brian Prusnek, advisor to Cmmr. Kennedy. The written communication concerned the conditions necessary to stimulate private investment in electric generating facilities in California.

Type: EXPARTE Filing Date: May 27, 2005
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On May 24, 2005, R. Thomas Beach, a consultant to the California Cogeneration Council (CCC), met with Cmmr. Peevey in San Francisco. Also present were Julie Fitch, advisor to Cmmr. Peevey, Barry Lovell, a member of the CCC, and Joseph M. Karp of White & Case, LLP, counsel for the CCC. Written materials (attached to the notice) were used. The CCC's representatives discussed the protective order (PO) recently issued in this proceeding and explained that various aspects of the PO are of concern to the CCC. CCC's representatives urged the Commission to adopt long-term contracts for both qualifying facilities (QFs) with expiring contracts and new QFs. CCC's representatives also urged the Commission to consider adopting a fixed-price option for the utilities' energy payments to QFs.

Type: NOTICE Filing Date: May 26, 2005
Filed By:
AGLET CONSUMER ALLIANCE
Description: of Intent to Claim Intervenor Compensation.

Type: EXPARTE Filing Date: May 25, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On May 23, 2005, Colin E. Cushnie, A Director of Regulatory Policy and Affairs of Southern California Edison Company (SCE), met with Bob Lane, advisor to Cmmr. Bohn, in San Francisco. Written materials (attached to the notice) were used. Cushnie stated that all the workshop comments filed by the generation community in support of the `Top Down' Resource Adequacy methodology explicitly or implicitly call for the immediate creation of a bilaterally traded capacity-only product for Load Serving Entities (LSEs) to procure to demonstrate compliance with the Commission's adopted Resource Adequacy requirements. Cushnie indicated that the immediate creation of a capacity-only product without the centrally administered market structure and safeguards found in the Eastern United States' capacity markets would expose customers and LSEs to undue risk. Cushnie stated that SCE is not opposed to capacity markets but urges that the Commission consider the creation of a capacity market in the context of Assigned Commissioner Ruling on this issue.

Type: EXPARTE Filing Date: May 24, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On May 19, 2005, Colin 0, 2005, Colin E. Cushnie, Director of Regulatory Policy and Affairs of Southern California Edison Company (SCE), met with Stephen St. Marie, advisor to Cmmr. Bohn, in San Francisco. Also present were Sean Gallagher, Director, and Judith Ikle, Supervisor, for the Energy Division. Written materials (attached to the notice) were used. Cushnie stated that all the comments filed by the generation community in support of the "Top Down" Resource Adequacy methodology explicitly or implicitly call for the immediate creation of a bilaterally traded capacity-only product for Load Serving Entities (LSEs) to procure to demonstrate compliance with the Commission's adopted Resource Adequacy requirements. Cushnie indicated that the immediate creation of a capacity-only product without the centrally administered market structure and safeguards found in the capacity markets of the Eastern United Stated would expose customers and LSEs to undue risk. Cushnie further identified several unresolved issues surrounding the potential adoption of a capacity-only product.

Type: COMMENTS Filing Date: May 23, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on procurement incentives.

Type: EXPARTE Filing Date: May 23, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: On May 18, 2005, Steven Kelly, representing the Independent Energy Producers Association (IEPA), met with David Gamson, advisor to Cmmr. Brow, in San Francisco. Also present was Brian Cragg, representing IEPA. Written material (attached to the notice) was used. Kelly expressed that IEPA feels the proposed rulemaking to be considered at the Commission's May 26, 2005 meeting would be a good forum to resolve the confidentiality issues. Cragg and Kelly emphasized that there is an urgent need to resolve the confidentiality issues in the procurement context.

Type: EXPARTE Filing Date: May 23, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On May 18, 2005, Colin E. Cushnie, Director of Regulatory Policy and Affairs of Southern California Edison Company (SCE), met with Stephen St. Marie, advisor to Cmmr. Bohn, in San Francisco. Written materials (attached to the notice) were used. Cushnie stated that all the comments filed by the generation community in support of the "Top Down" Resource Adequacy methodology explicitly or implicitly call for the immediate creation of a bilaterally traded capacity-only product for Load Serving Entities (LSEs) to procure to demonstrate compliance with the Commission's adopted Resource Adequacy requirements. Cushnie indicated that the immediate creation of a capacity-only product without the centrally administered market structure and safeguards found in the capacity markets of the Eastern United Stated would expose customers and LSEs to undue risk. Cushnie further identified several unresolved issues surrounding the potential adoption of a capacity-only product. Cushnie also highlighted the numerous mischaracterizations that were expressed by the generation community regarding the merits and mechanics of the "Bottom-Up" methodology that SCE and the Joint Parties sponsored.

Type: COMMENTS Filing Date: May 23, 2005
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: reply; post-workshop.

Type: COMMENTS Filing Date: May 23, 2005
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC. (CARE)
Description: reply; on the procurement incentive framework workshop held on March 7th and 8th 2005.

Type: COMMENTS Filing Date: May 23, 2005
Filed By:
GREEN POWER INSTITUTE
Description: Reply; on a procurement incentive framework for GHG reduction.

Type: COMMENTS Filing Date: May 23, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on the procurement incentive framework workshop report.

Type: COMMENTS Filing Date: May 23, 2005
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: reply, post-workshop; on a procurement incentive framework.

Type: COMMENTS Filing Date: May 23, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply, post-workshop; on procurement incentive frameworks.

Type: EXPARTE Filing Date: May 20, 2005
Filed By:
HOPI TRIBE
Description: On May 19, 2005, James I. Ham of Arnold & Porter LLC, attorneys for the Hopi Tribe, mailed a written a written communication (attached to the notice) to Cmmrs. Peevey, Brown, Kennedy, Grueneich, and Bohn, to ALJ Brown, to Julie Fitch and Rami Kahlon, advisors to Cmmr. Peevey, David Gamson, advisor to Cmmr. Brown, Theresa Cho, advisor to Cmmr. Grueneich, Amy Yip-Kikugawa, and Steve St. Marie, of the Commission.

Type: RULING Filing Date: May 18, 2005
Filed By:
ALJ/WETZELL/PUC
Description: On Second Notice of Intent to Claim Compensation of UCAN. Finds that UCAN remains eligible for an award of intervenor compensation.

Type: RULING Filing Date: May 18, 2005
Filed By:
ALJ/YACKNIN/PUC
Description: Grants withdrawal of Motion to Compel filed by ORA on May 12, 2005.

Type: MOTION Filing Date: May 12, 2005
Filed By:
ORA/OBIORA/PUC
Description: to withdraw the Motion to Compel PG&E to respond to data requests on Adivce Letter 2619-E.

Type: EXPARTE Filing Date: May 9, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On May 4, 2005, Dan Richard, Senior Vice President for Policy and Governmental Affairs, Pacific Gas and Electric Company (PG&E), met with Pres. Peevey in San Francisco. Also present were Rami Kahlon, advisor to Pres. Peevey, Brian Prusnek, advisor to Cmmr. Kennedy, Sean Gallagher, Director, Energy Division, and Fong Wan, Vice President, Power Contracts and Electric Resource Development, Frank De Rosa, Director, Power Contracts, and Erik Jacobson, Chief, Regulatory Relations, for PG&E. Written material (attached to the notice) was used. Richard stated that while qualifying facilities (QFs) are an important part of PG&E's resource mix, their cost exceeds the cost of PG&E's other procurement options. Richard indicated that the Commission's Short-Run Avoided Cost (SRAC) methodology is outdated and not well correlated to PG&E's true avoided cost. Wan said that day-ahead, NP-15 firm market prices are an appropriate measure of PG&E's true SRAC. Richard explained that QFs with expiring contracts should compete in PG&E's all-source solicitations and that this will reduce QF capacity prices to market levels. Wan and De Rosa stated that there is a large amount of existing and proposed electric supply available at competitive prices.

Type: RULING Filing Date: May 9, 2005
Filed By:
ALJ/HALLIGAN/THORSON/PUC
Description: on Protective Order and Remaining Discovery Disputes. Issues the protective order. Sets evidentiary hearings for Phase 2 for August 15, 2005.

Type: COMMENTS Filing Date: May 3, 2005
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC. (CARE)
Description: on the procurement incentive framework workshop held on March 7th and 8th as prepared by the CPUC workshop staff, March 29, 2005.

Type: MOTION Filing Date: May 3, 2005
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: to accept filing of comments one day late; post-workshop opening comments on procurement incentive framework workshop report attached.

Type: COMMENTS Filing Date: May 2, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: post-workshop; on procurement incentives.

Type: COMMENTS Filing Date: May 2, 2005
Filed By:
ORA/OBIORA/PUC
Description: opening; on the workshop report on procurement incentive framework [pursuant to the April 21, 2005 ruling].

Type: COMMENTS Filing Date: May 2, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: post-hearing; on procurement incentive frameworks.

Type: COMMENTS Filing Date: May 2, 2005
Filed By:
GREEN POWER INSTITUTE
Description: on a procurement incentive framework for GHG reduction.

Type: COMMENTS Filing Date: May 2, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: on the procurement incentive framework workshop report.

Type: COMMENTS Filing Date: May 2, 2005
Filed By:
DUKE ENERGY NORTH AMERICA
Description: on the procurement incentive framework workshop report.

Type: COMMENTS Filing Date: May 2, 2005
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: [Joint] on the procurement incentives framework workshop report.

Type: COMMENTS Filing Date: May 2, 2005
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: pre-workshop; on a procurement incentive framework.

Type: COMMENTS Filing Date: May 2, 2005
Filed By:
SOLARGENIX ENERGY, LLC
Description: on the Procurement Incentive Framework Workshop held March 7 - 8, 2005 etc.

Type: COMMENTS Filing Date: May 2, 2005
Filed By:
SEMPRA GLOBAL
Description: on the procurement incentive framework.

Type: COMMENTS Filing Date: May 2, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on Workshop Report and in response to ALJ Ruling.

Type: REPLY Filing Date: April 26, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: to the motion for clarification of the application of D04-12-048 to utility RFOs.

Type: EXPARTE Filing Date: April 25, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On April 20, 2005, Gary L. Schoonyan, Director, Regulatory Policy and Affairs, Southern California Edison Company (SCE), met with Pres. Peevey in San Francisco. Also present were Julie Fitch, advisor to Pres. Peevey, and Colin E. Cushnie, Director of Regulatory Policy and Affairs for SCE. Written material (attached to the notice) was used. SCE representatives discussed Pres. Peevey's January 28, 2005 ruling and indicated that SCE supported the proposed reallocation. Additionally, SCE's representatives explained that the Commission's current cost allocation methodology for the Department of Water Resources (DWR) power charges would ensure that each IOU's customers would continue to receive their allocated share of the above-market costs associated with the DWR contracts. SCE also explained that it would not oppose a reallocation of the Sunrise Power Company contract to SCE's customers. SCE also offered a second alternative proposal in which the Sempra contract would be allocated to San Diego Gas & Electric Company's customers and all of the Williams contract would be allocated to SCE's customers.

Type: MOTION Filing Date: April 25, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: re limited operational responsibility for the California Department of Water Resources' Kings River Conservation District contract.

Type: EXPARTE Filing Date: April 22, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On April 19, 2005, Brian Cherry, Director of Regulatory Relations for Pacific Gas and Electric Company (PG&E), met with Pres. Peevey in San Francisco. Also present were Roy Kuga, Vice President, Gas and Electric Procurement, Policy and Planning, and Erik Jacobson, Chief, Regulatory Relations, for PG&E. Written material (attached to the notice) was used. Cherry stated that PG&E would support a swap of the Williams D and Sempra contracts between Southern California Edison Company and San Diego Gas & Electric Company to the extent there are operational benefits in such a swap and as long as the Sunrise contract is not reallocated to PG&E. Kuga stated that the cost allocation issue has already been resolved and the Commission should not modify its cost allocation approach. Kuga said that PG&E would also support a decision not to reallocate any of the Department of Water Resources contracts.

Type: RESPONSE Filing Date: April 22, 2005
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: to the motion of IEPA for clarification of the application of D04-12-048 to utility RFOs.

Type: MOTION Filing Date: April 22, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Strike Portions of the Reply Comments of Sempra Global.

Type: RULING Filing Date: April 21, 2005
Filed By:
ALJ/CAREW/PUC
Description: Grants extension of time to file post-workshop comments on procurement incentive framework: opening comments are due May 2, 2005, and reply comments are due May 23, 2005.

Type: RULING Filing Date: April 21, 2005
Filed By:
ALJ/BROWN/PUC
Description: Re: Mohave Study Plan.

Type: RESPONSE Filing Date: April 20, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Motion for clarification of D04-12-048.

Type: RESPONSE Filing Date: April 20, 2005
Filed By:
CALPINE CORPORATION
Description: in support of the IEPA's motion for clarification.

Type: RESPONSE Filing Date: April 20, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Motion of IEPA for clarification.

Type: RESPONSE Filing Date: April 20, 2005
Filed By:
WESTERN POWER TRADING FORUM
Description: to Motion for clarification of the application of D04-12-048 to utility RFOs; request to shorten time and for expedited consideration.

Type: EXPARTE Filing Date: April 19, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA GAS COMPANY
Description: On April 14, 2005, Ed Guiles, Chairman and Chief Executive Officer of San Diego Gas & Electric Company (SDG&E) and Southern California Gas Company (SoCalGas), met with Pres. Peevey in San Francisco. Julie Fitch, advisor to Pres. Peevey, attended the meeting via videoconference. Also present were Debbie Reed, President and Chief Operational Officer, and Lee Schavrien, Vice President of Regulatory Affairs, for SDG&E and SoCalGas. Guiles discussed the January 28, 2005 ruling regarding potential reallocation of the existing Department of Water Resources (DWR) contracts, including the possible reallocation of the Sempra Generation contract to Southern California Edison Company. Guiles explained that SDG&E opposes this allocation. Reed described SDG&E's `minimalist' alternative allocation proposal. Schavrien added that SDG&E's minimalist proposal would resolve several issues in this docket as well as the DWR cost allocation proceeding.

Type: REPLY Filing Date: April 18, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: to responses to Petition for Modification of D04-12-048.

Type: COMMENTS Filing Date: April 15, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; on allocation of certain DWR contracts.

Type: RESPONSE Filing Date: April 15, 2005
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: to proposed alternatives on allocation of certain Dept. of Water Resources Contracts [pursuant to January 28th and April 8th rulings].

Type: MOTION Filing Date: April 15, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: for clarification of the application of D04-12-048 to utility RFOs; request to shorten time and for expedited consideration.

Type: COMMENTS Filing Date: April 15, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on reallocation of the Cal. Dept. of Water Resources power contracts.

Type: COMMENTS Filing Date: April 15, 2005
Filed By:
SEMPRA GLOBAL
Description: Reply; on the ACR re: the Sempra, Williams, King River, City and County of S.F. and Sunrise DWR Contracts.

Type: COMMENTS Filing Date: April 15, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on the allocation of certain California DWR contracts.

Type: EXPARTE Filing Date: April 14, 2005
Filed By:
SEMPRA GLOBAL
Description: On April 12, 2005, Mark Snell, President of Sempra Global (Global), met with Pres. Peevey, in San Francisco. Also present were Julie Fitch, advisor to Pres. Peevey, and Alvin S. Pak, Director of State Regulatory Affairs for Global. The representatives of Global discussed the assigned Commissioner's ruling of January 28, 2005. The representatives of Global indicated that reallocation of the SG-CDWR contracts to San Diego Gas & Electric Company (SDG&E) could pose several operational issues and burdens for SDG&E that Edison, because of its much greater size in relation to the scale of the contract, did not face. The representatives of Global explained that while these issues and burdens could potentially be resolved, it did not appear to Global that any economic benefits would accrue to ratepayers, the utilities or the state from reallocation, in any event.

Type: NOTICE Filing Date: April 13, 2005
Filed By:
WOMEN'S ENERGY MATTERS
Description: of intent to claim compensation in CEC's 2005 integrated energy policy report process and CPUC's 2006 procurement proceedings.

Type: NOTICE Filing Date: April 12, 2005
Filed By:
GREEN POWER INSTITUTE
Description: Supplemental; of Intent to Claim Compensation.

Type: NOTICE Filing Date: April 12, 2005
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: Supplemental Notice of Intent to Claim Compensation.

Type: REPLY Filing Date: April 11, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to the response of the Western Power Trading Forum to the Petition for Modification of D04-12-048.

Type: RESPONSE Filing Date: April 11, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: to petition of TURN for modification of D04-10-035

Type: COMMENTS Filing Date: April 8, 2005
Filed By:
ORA/OBIORA/PUC
Description: reply; on the Assigned Commissioner's Ruling placing consideration of certain Department of Water and Power contracts.

Type: NOTICE Filing Date: April 8, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: supplemental; of intent to claim compensation for work in the CEC's 2005 IEPR process.

Type: COMMENTS Filing Date: April 8, 2005
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: reply; on the allocation of the power purchase agreement with the Cal. Dept. of Water Resources to PG&E. [Pursuant to the January 28, 2005 ruling].

Type: RULING Filing Date: April 7, 2005
Filed By:
ALJ/WETZELL/PUC
Description: Sets additional workshops for resource adequacy requirements - Phase 2. Specifies that straw proposals should not be filed with the Docket Office.

Type: RESPONSE Filing Date: April 6, 2005
Filed By:
WESTERN POWER TRADING FORUM
Description: to IEPA Petition for Modification of Decision 04-12-048.

Type: RESPONSE Filing Date: April 6, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to IEPA Petition for Modification of Decision 04-12-048.

Type: RESPONSE Filing Date: April 5, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to the Petition of IEPA for modification of D04-12-048.

Type: EXPARTE Filing Date: April 4, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On March 30, 2005, Glenn Goldbeck, Energy Trading Consultant for Pacific Gas and Electric Company, participated in an all-party meeting with Pres. Peevey in San Francisco. Also present were other attendees listed on the attachment to the notice. Goldbeck stated that the all-hours requirement should be established at 115 percent - 117 percent for each hour. Goldbeck indicated that under the proposal, sufficient resources will be available to assure operational reliability. Goldbeck stated that it was important to recognize that the development of appropriate LSE portfolios is guided by a number of existing Commission orders.

Type: RULING Filing Date: April 4, 2005
Filed By:
ALJ/GOTTSTEIN/PUC
Description: Solicits post-workshop comments on procurement incentive framework. Opening Comments are due April 25, 2005; Reply Comments - May 16, 2005.

Type: MOTION Filing Date: April 4, 2005
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: for leave to file comments out of time; public comments on the limited extension of the Commission's intervenor compensation program to participate in certain proceedings of the California Energy Commission [per the March 14, 2005 ruling] included.

Type: EXPARTE Filing Date: April 4, 2005
Filed By:
CORAL POWER, L.L.C.
Description: On March 30, 2005, John Leslie, an attorney for Coral Power, L.L.C., participated in an all-party meeting with Cmmr. Peevey in San Francisco. A list of the other participants is attached to the notice. Leslie discussed the March 7 draft decision of ALJ Wetzell. Leslie stated that based upon the overview of the joint proposal, Coral generally supports the joint proposal and is interested in working with parties to develop the details of the proposal. Leslie also stated that it is important that the Commission adopt a forward contract obligation for LSEs that recognizes the value and the benefit of firm liquidated damages contracts and limited use resources.

Type: COMMENTS Filing Date: April 1, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on the assigned Commissioner's ruling re coordination with the CEC's 2005 IEPR process.

Type: NOTICE Filing Date: April 1, 2005
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: of Substitution.

Type: COMMENTS Filing Date: March 30, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: reply; on the assigned Commissioner's ruling re coordination with the CEC's 2005 IEPR process.

Type: RESPONSE Filing Date: March 30, 2005
Filed By:
WESTERN POWER TRADING FORUM
Description: to PG&E's Petition for Modification of D.04-12-048.

Type: RESPONSE Filing Date: March 30, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: to PG&E's petition for modification of D04-12-048.

Type: RESPONSE Filing Date: March 30, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: to the petitions for modification of D04-12-048 filed by PG&E and IEP with respect to the treatment of utility-owned generation.

Type: REPLY Filing Date: March 30, 2005
Filed By:
ORA/OBIORA/PUC
Description: to PG&E's response to the motion to compel responses to data requests on Advice Letter 2619-E.

Type: EXPARTE Filing Date: March 29, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: On March 24, 2005, Mona Tierney, Director of Government Affairs of Constellation NewEnergy, Inc., representing the Alliance for Retail Energy Markets (AReM), met with Julie Fitch, advisor to Cmmr. Peevey, in San Francisco. Tierney discussed the assigned Commissioner's Ruling dated March 14, 2005. Tierney articulated AReM's concerns that the Ruling represented an inappropriate expansion of the current application of intervenor funding from CPUC to CEC processes. Tierney stated that CEC has developed the Integrated Energy Policy Report with significant public participation and without the need for intervenor compensation. Tierney noted further that information that is provided in response to CEC requests is considered confidential.

Type: EXPARTE Filing Date: March 29, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On March 24, 2005, Erik Jacobson, Chief of Regulatory Relations of Pacific Gas and Electric Company (PG&E), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Claudia Greif, Manager, GES Strategic Consulting, and Mary Gandesbery, Attorney, for PG&E. Jacobson sated that the planning reserve requirement should be 15-17 percent of the load in each hour of the month and not 15-17 percent of the monthly peak load. Greif explained why a monthly peak load requirement applied to all hours of the month could negatively impact the value of PG&E's hydroelectric resources, exchanges and imports.

Type: MOTION Filing Date: March 28, 2005
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: for leave to file out of time comments on the allocation of power purchase agreement with the Cal. Department of Water Resources; comments included.

Type: RULING Filing Date: March 28, 2005
Filed By:
ALJ/GOTTSTEIN/PUC
Description: denies CARE's Notice of Intent to claim compensation and Motion to Intervene Out of Time.

Type: RESPONSE Filing Date: March 28, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to the March 16, 2005 motion of ORA for an order compelling PG&E to respond to data requests, etc.

Type: COMPLIANCE FILING Filing Date: March 25, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: (PUBLIC & CONFIDENTIAL VERSIONS) Long-term resource plan Compliance Filing.

Type: NOTICE Filing Date: March 25, 2005
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: supplemental notice of intent to claim compensation for work in the CEC's 2005 IEPR Process.

Type: EXPARTE Filing Date: March 25, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On March 22, 2005, Bruce C. Foster, Vice President of Regulatory Operations of Southern California Edison Company (SCE), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Brian Prusnek, advisor to Cmmr. Kennedy, David Gamson, advisor to Cmmr. Brown, Aaron Johnson, advisor to Cmmr. Grueneich, Laura Doll, Sean Gallagher, Kerry Hattevik, Steve St. Marie, Bob Lane, Phillippe Auclair, and Maryam Ebke, of the Commission, and Colin E. Cushnie, Director of Regulatory Affairs, and Gary Schoonyan, Director of Regulatory Policy, for SCE. Written material (attached to the notice) was used. SCE representatives discussed the draft decision and expressed SCE's concern that requiring load serving entities to maintain reserves levels equal to 15-17 percent of the amount required to meet a monthly peak, in every hour of a month, is unnecessary to ensure reliability and is not cost effective. SCE stated further that if the Commission decided that an all-hours resource adequacy requirement was necessary, the appropriate level of reserves would be an amount equal to 15-17 percent of each hour's load.

Type: COMMENTS Filing Date: March 25, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: on Assigned Commissioner's Ruling re: Coordination with the CEC's 2005 IEPR Process.

Type: COMMENTS Filing Date: March 25, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: concerning the Assigned Commissioner's Ruling re: the Integrated Energy Policy Report.

Type: COMMENTS Filing Date: March 25, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Assigned Commissioner's Ruling detailing how the CEC 2005 Integrated Energy Policy Report will be used etc.

Type: REPLY Filing Date: March 24, 2005
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: to Response of Independent Energy Producers Association to C.A.R.E.'s Notice of Intent.

Type: RULING Filing Date: March 23, 2005
Filed By:
ALJ/BROWN/PUC
Description: Re: Schedule for Motions on Mohave Feasibility Final Study Plan (FSP). Sets the following schedule: March 31, 2005 - deadline for any stakeholder motions re: FSP; April 1, 2005 - deadline for any responses to motions filed March 31, 2005.

Type: COMPLIANCE FILING Filing Date: March 21, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Final Study Plan for Mohave Alternatives/Complements Study.

Type: RESPONSE Filing Date: March 21, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: to CARE's notice of intent.

Type: COMMENTS Filing Date: March 18, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Allocation of Certain California Department of Water Resources Contracts.

Type: EXPARTE Filing Date: March 18, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On March 15, 2005, Bruce C. Foster, vice president of regulatory operations of Southern California Edison Company (SCE), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present was Colin E. Cushnie, director of regulatory policy of SCE. Written materials (attached to the notice) were used. SCE¿s representatives discussed the Second Interim Opinion Regarding Resource Adequacy (DD). SCE stated that the DD had not considered the considerable cost involved in requiring load serving entities to acquire and maintain capacity at a level equal to or greater than 115 percent of the peak hour in each month. SCE stated that if an "all hours" requirement is to be adopted, it should be 115 percent to 117 percent of each hour in the month, and not the peak hour in the month. SCE reiterated its position that the DD has not justified a change from the peak resource adequacy requirement adopted in D04-10-035.

Type: EXPARTE Filing Date: March 18, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On March 16, 2005, Bruce C. Foster, vice president of regulatory operations of Southern California Edison Company (SCE), met with Julie Fitch, advisor Pres. Peevey, in San Francisco. Also present was Colin E. Cushnie, director of regulatory policy of SCE. Written materials (attached to the notice) were used. SCE's representatives discussed the Second Interim Opinion Regarding Resource Adequacy (DD). SCE stated that the DD had not considered the considerable cost involved in requiring load serving entities to acquire and maintain capacity at a level equal to or greater than 115 percent of the peak hour in each month. SCE stated that if an "all hours" requirement is to be adopted, it should be 115 percent to 117 percent of each hour in the month, and not the peak hour in the month. SCE reiterated its position that the DD has not justified a change from the peak resource adequacy requirement adopted in D04-10-035.

Type: COMMENTS Filing Date: March 18, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the reallocation of the California Department of Water Resources power contracts [pursuant to the January 28, 2005 ruling].

Type: COMMENTS Filing Date: March 18, 2005
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: on the allocation of its power purchase agreement with the California Department of Water Resources to PG&E [pursuant to the January 28, 2005 ruling].

Type: COMMENTS Filing Date: March 18, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: and Alternative Proposal on Allocation of Certain Department of Water Resources Contracts.

Type: EXPARTE Filing Date: March 17, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On March 14, 2005, Bruce C. Foster, vice president of regulatory operations of Southern California Edison Company (SCE), met with Brian Prusnek, advisor to Cmmr. Kennedy, in San Francisco. Colin E. Cushnie, director of regulatory policy of SCE, participated in the meeting via telephone. Follow-up email note and documents (attached to the notice) were transmitted to Brian Prusnek. SCE's representatives discussed the Second Interim Opinion Regarding Resource Adequacy (DD). SCE stated that the DD had not considered the considerable cost involved in requiring load serving entities to acquire and maintain capacity at a level equal to or greater than 115 percent of the peak hour in each month. SCE stated that if an "all hours" requirement is to be adopted, it should be 115 percent to 117 percent of each hour in the month, and not the peak hour in the month. SCE reiterated its position that the DD has not justified a change from the peak resource adequacy requirement adopted in D04-10-035.

Type: EXPARTE Filing Date: March 16, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On March 11, 2005, Bruce C. Foster, vice president of regulatory operations of Southern California Edison Company (SCE), met with Brian Prusnek, advisor to Cmmr. Kennedy, in San Francisco. Foster discussed the Second Interim Opinion Regarding Resource Adequacy (DD). Foster stated that the DD had not considered the considerable cost involved in requiring load serving entities to acquire and maintain capacity at a level equal to or greater than 115 percent of the peak hour in each month. SCE stated that if an "all hours" requirement is to be adopted, it should be 115 percent to 117 percent of each hour in the month, and not the peak hour in the month. SCE reiterated its position that the DD has not justified a change from the peak resource adequacy requirement adopted in D04-10-035.

Type: LAW & MOTION Filing Date: March 16, 2005
Filed By:
ORA/OBIORA/PUC
Description: Motion for an order compelling PG&E to respond to data requests on Advice Letter 2619-E.

Type: EXPARTE Filing Date: March 15, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: On March 10, 2005, Jennifer Chamberlin, Market Manager, Regulatory Affairs, Strategic Energy, L.L.C., representing the Alliance for Retail Energy Markets (AReM), met with Julie Fitch, advisor to Cmmr. Peevey, in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, and Bill Chen, Director of Governmental Affairs, Constellation NewEnergy, Inc., and Sue Mara, Principal, RTO Advisors, APS Energy Services, Inc., on behalf of AReM. The AReM representatives discussed the draft decision (DD) of ALJ Wetzell modifying the Order Instituting Rulemaking to name electric service providers (ESPs) and community choice aggregators (CCAs) as respondents. AReM representatives stated that it would be filing comments recommending that the Commission reject the DD and administer resource adequacy requirements for ESPs through the existing ESP registration/licensing framework. AReM representatives stated that, in the event the Commission determines that ESPs and CCAs should be named as respondents, AReM recommends that the Commission open a separate, narrowly defined proceeding for that purpose. AReM representatives also stressed the need for protection of confidential data submitted by ESPs. AReM representatives discussed the Draft Second Interim Opinion Regarding Resource Adequacy, stating that an all-hours resource adequacy requirement is not needed. AReM also stated that it should be made clear that LSEs are not required to procure resources beyond what is needed to serve their loads plus 15 percent to 17 percent reserves.

Type: COMMENTS Filing Date: March 14, 2005
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: on Edison's Initial Sturdy Plan for Mohave Alternatives Study/Complements Study.

Type: RULING Filing Date: March 14, 2005
Filed By:
COMR/PEEVEY/PUC
Description: comments on the CEC 2005 IEPR issues due 3/25; replies due 3/31. Notice of intent to claim compensation due 4/13 to be served on parties & CEC. Responses are subject to Section 1804(a).

Type: NOTICE Filing Date: March 14, 2005
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: of Intent to Claim Compensation.

Type: MOTION Filing Date: March 14, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: to Accept Comments one day late: ATTACHED - Comments on the Draft Decision of ALJ Wetzell.

Type: COMMENTS Filing Date: March 11, 2005
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
CITY OF CHULA VISTA
COUNTY OF LOS ANGELES
LOCAL GOVERNMENT COMMISSION COALITION
Description: on Draft Decision.

Type: COMMENTS Filing Date: March 11, 2005
Filed By:
ORA/PAULL/PUC
Description: Supplemental; on ALJ Wetzell's March 7 Draft Decision.

Type: COMMENTS Filing Date: March 11, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: on ALJ Wetzell's March 7 Draft Decision.

Type: COMMENTS Filing Date: March 11, 2005
Filed By:
WEST COAST POWER
Description: on ALJ Wetzell's March 7 Draft Decision.

Type: COMMENTS Filing Date: March 11, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on ALJ Wetzell's March 7 Draft Decision.

Type: COMMENTS Filing Date: March 11, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on Draft Decision modifying OIR.

Type: COMMENTS Filing Date: March 11, 2005
Filed By:
BP ENERGY COMPANY
Description: on Draft Decision modifying OIR.

Type: COMMENTS Filing Date: March 11, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: on Draft Decision modifying OIR.

Type: COMMENTS Filing Date: March 11, 2005
Filed By:
DUKE ENERGY NORTH AMERICA
Description: on Draft Second Interim Opinion re: Resource Adequacy.

Type: COMMENTS Filing Date: March 11, 2005
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: on Second Interim Opinion re: Resource adequacy.

Type: COMMENTS Filing Date: March 11, 2005
Filed By:
SEMPRA GLOBAL ENTERPRISES
Description: on Draft Decision of ALJ Wetzell.

Type: COMMENTS Filing Date: March 11, 2005
Filed By:
SEMPRA GLOBAL ENTERPRISES
Description: on the Draft Decision of ALJ Wetzell - Second Interim Opinion re: Resource Adequacy.

Type: COMMENTS Filing Date: March 11, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETING
CALIFORNIA AMANUFACTURERS & TECHNOLOGY ASSOCIATION
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
ORA
PACIFIC GAS AND ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
Description: Opening; on Draft Second Interim Opinion re: Resource Adequacy.

Type: COMMENTS Filing Date: March 11, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Draft opinion modifying OIR.

Type: PETITION FOR MODIFICATION Filing Date: March 10, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: of D04-10-035.

Type: RULING Filing Date: March 10, 2005
Filed By:
ALJ/GOTTSTEIN/PUC
Description: on scope and agenda for procurement incentive framework workshops.

Type: COMMENTS Filing Date: March 8, 2005
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: in support of the draft opinion modifying OIR.

Type: COMPLIANCE FILING Filing Date: March 7, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Initial study plan for Mohave Alternatives/Complements Study.

Type: DRAFT DECISION Filing Date: March 7, 2005
Filed By:
ALJ/WETZELL/PUC
Description: Second Interim Opinion Regarding Resource Adequacy. Comments are due March 11, 2005; no reply comments will be entertained.

Type: PETITION FOR MODIFICATION Filing Date: March 7, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: of D04-12-048.

Type: MOTION Filing Date: March 7, 2005
Filed By:
CALIFORNIANS FOR RENEWABLE ENERGY, INC.
Description: to intervene out of time.

Type: REPLY Filing Date: March 4, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Responses to Petition for Modification of Decision 04-12-048.

Type: DRAFT DECISION Filing Date: March 2, 2005
Filed By:
ALJ/WETZELL/PUC
Description: Opinion Modifying Order Instituting Rulemaking. Comments are due March 11, 2005; no reply comments willl be entertained.

Type: COMMENTS Filing Date: February 28, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS AND TECHNOLOGY ASSOCIATION
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
Description: Joint; Reply on ACR

Type: RULING Filing Date: February 28, 2005
Filed By:
CMMR/PEEVEY/PUC
Description: Providing Guidance on Next Steps for Potential Capacity Market Development.

Type: REPLY Filing Date: February 28, 2005
Filed By:
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
Description: to opposition of PG&E to petition for modification of D04-12-048.

Type: PETITION FOR MODIFICATION Filing Date: February 28, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: for modification of D04-12-048.

Type: COMMENTS Filing Date: February 28, 2005
Filed By:
ORA/OBIORA/PUC
Description: reply; on the February 8, 2005 ruling re forward commitment obligations for resource adequacy requirement.

Type: COMMENTS Filing Date: February 28, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply;

Type: COMMENTS Filing Date: February 28, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: reply; on the assigned Commissioner's ruling re modification to the interim resource adequacy requirements decision D04-10-035.

Type: COMMENTS Filing Date: February 28, 2005
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: reply; on modification to the interim resource adequacy requirements decision D04-10-035.

Type: COMMENTS Filing Date: February 28, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: supplemental; reply; re the February 8th ACR.

Type: COMMENTS Filing Date: February 25, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: reply; on procurement incentive mechanisms.

Type: COMMENTS Filing Date: February 25, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; pre-workshop; on procurement incentive frameworks.

Type: COMMENTS Filing Date: February 25, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; pre-workshop; on procurement incentive frameworks.

Type: COMMENTS Filing Date: February 25, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: reply; pre-workshop; on procurement incentive frameworks.

Type: COMMENTS Filing Date: February 18, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS AND TECHNOLOGY ASSOCIATION
SOUTHERN CALIFORNIA EDISON COMPANY
THE UTILITY REFORM NETWORK
Description: Joint; on ACR regarding Modification to the Interim Resource Adequacy Requirements of Decision 04-10-035.

Type: SCOPING RULING Filing Date: February 18, 2005
Filed By:
CMMR/PEEVEY/KENNEDY/PUC
Description: Consolidates R04-04-003 and R04-04-025 for the limited purpose of joint evidentiary hearing on policy and pricing of QFs. Sets the evidentiary hearing for May 2-20, 2005.

Type: RESPONSE Filing Date: February 18, 2005
Filed By:
CALIFORNIA RETAILERS ASSOCIATION
Description: to Edison's petition for modification of D04-12-048.

Type: RESPONSE Filing Date: February 18, 2005
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS AND TECHNOLOGY ASSOCIATION
Description: joint; in oppositition to Edison's petition for modification of D04-12-048.

Type: RESPONSE Filing Date: February 18, 2005
Filed By:
ORA/OBIORA/PUC
Description: to the petition for modification of D04-12-048 filed by Edison.

Type: RESPONSE Filing Date: February 18, 2005
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: to Edison's petition for modification of D04-12-048.

Type: RESPONSE Filing Date: February 18, 2005
Filed By:
SEMPRA GLOBAL
Description: to ACR on Modification to the Interim Resource Adequacy Requirements Decision D04-10-035.

Type: RESPONSE Filing Date: February 18, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
WESTERN POWER TRADING FORUM
Description: Joint; to Edison's Petition for Modification of Decision 04-12-048.

Type: REQUEST Filing Date: February 18, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: for award of compensation for substantial contribution to D04-07-038, D04-10-035, D04-12-048, D04-12-051, Resolutions E-3902 and E-3896, and participation in utility procurement review groups.

Type: COMMENTS Filing Date: February 18, 2005
Filed By:
POWEREX CORP.
Description: re the forward commitment obligation and related modification of D04-10-035 [in accordance with Feb. 8, 2005 ruling].

Type: COMMENTS Filing Date: February 18, 2005
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: on modification to the interim resource adequacy requirements decision D04-10-035.

Type: COMMENTS Filing Date: February 18, 2005
Filed By:
ORA/OBIORA/PUC
Description: on the February 8, 2005 Assigned Commissioner's ruling.

Type: COMMENTS Filing Date: February 18, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: opening; [in response to the ruling issued Feb. 8, 2005].

Type: COMMENTS Filing Date: February 18, 2005
Filed By:
DUKE ENERGY NORTH AMERICA
Description: in response to Cmmr.'s ruling re interim resource adequacy obligation.

Type: COMMENTS Filing Date: February 18, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: opening; to the interim resource adequacy requirements decision D04-10-035 [pursuant to the February 8, 2005 ruling].

Type: COMMENTS Filing Date: February 18, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on ACR proposing to clarify the Interim Resource Adequacy Requirements Decision.

Type: OPPOSITION Filing Date: February 17, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to petition of South San Joaquin Irrigation District for modification of D04-12-048.

Type: REQUEST Filing Date: February 15, 2005
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: for award of intervenor compensation.

Type: EXPARTE Filing Date: February 14, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: On February 9, 2005, Mona Tierney, Director, Government Affairs, Constellation NewEnergy, representing the Alliance for Retail Energy Markets (AREM), met with Pres. Peevey in San Francisco. Also present were Julie Fitch, advisor to Pres. Peevey, Vicki Sandler of APS Energy Services, and Andrea Weller of Strategic Energy. AREM representatives discussed Pacific Gas and Electric Company's upcoming request for proposals. AREM representatives urged the Commission to reject Southern California Edison Company's petition for modification of D04-12-048, noting that there is no valid reason to hold existing direct access customers responsible for utility procurement decisions.

Type: EXPARTE Filing Date: February 14, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: On February 9, 2005, Steven Kelly, representing the Independent Energy Producers Association (IEP), met with Pres. Peevey in San Francisco. Also present were Julie Fitch, advisor to Pres. Peevey, and Brian Cragg, representing IEP. Written material (attached to the notice) was used. Kelly urged support for the key principles that were adopted in the recent procurement decision. Kelly stated that the principles include an open, transparent, competitive bidding, all-source solicitations, bidders held to bids, and an independent evaluator. Kelly and Cragg noted that independent generators face a wide array of asymmetrical incentives that work against them in procurement. Kelly and Cragg urged the Commission to correct procurement incentives so that all projects, whether sponsored by utilities or generators, can compete on a fair basis.

Type: COMMENTS Filing Date: February 11, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on a generation procurement incentive framework.

Type: COMMENTS Filing Date: February 11, 2005
Filed By:
ORA/OBIORA/PUC
Description: on ALJ Gottstein's ruling on procurement incentive framework.

Type: COMMENTS Filing Date: February 11, 2005
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: pre-workshop; on a procurement incentive framework.

Type: COMMENTS Filing Date: February 11, 2005
Filed By:
THE UTILITY REFORM NETWORK
Description: opening; pre-workshop; on staff's proposed procurement incentive framework.

Type: COMMENTS Filing Date: February 11, 2005
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: pre-workshop; opening; on proposed procurement incentive framework.

Type: COMMENTS Filing Date: February 11, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: pre-workshop; on procurement incentive framework.

Type: COMMENTS Filing Date: February 11, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: pre-workshop, opening; on procurement incentive framework.

Type: COMMENTS Filing Date: February 11, 2005
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: pre-workshop; on a procurement incentive framework.

Type: RULING Filing Date: February 8, 2005
Filed By:
CMMR/PEEVEY/PUC
Description: Providing for Comments and Replies on Modification to the Interim Resource Adequacy Requirements Decision D04-10-035. Opening comments are due February 18, 2005; reply comments - February 23, 2005.

Type: RESPONSE Filing Date: February 4, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: to Edison's application for rehearing of D04-12-048.

Type: RESPONSE Filing Date: February 4, 2005
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: to Edison's petition for modification of D04-12-048.

Type: EXPARTE Filing Date: February 3, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On January 31, 2005, Fong Wan, Vice President, Power Contracts and Electric Resource Development, Pacific Gas and Electric Company (PG&E), met with Cmmr. Brown in San Francisco. Also present was Eric Jacobson, Chief, Regulatory Relations, for PG&E. Wan stated that PG&E expects to resume its long-term request for offers (RFO) soon. Wan described the bids PG&E has received in its intermediate RFO, indicating that there is a large amount of existing electric supply available at low prices. Wan also stated that PG&E expects good participation in its long-term RFO. Jacobson explained PG&E's concerns with the asymmetrical initial cost cap mechanism adopted for utility-owned generation in the Commission's recent long-term procurement decision.

Type: RESPONSE Filing Date: February 3, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to SCE Application for Rehearing of Decision 04-12-048.

Type: RESPONSE Filing Date: February 3, 2005
Filed By:
DUKE ENERGY NORTH AMERICA
Description: in opposition to the application for rehearing of Edison.

Type: RESPONSE Filing Date: February 3, 2005
Filed By:
CALPINE CORPORATION
Description: to Edison's application for rehearing of D04-12-048.

Type: RESPONSE Filing Date: February 3, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to applications for rehearing of D04-12-048.

Type: NOTICE Filing Date: February 2, 2005
Filed By:
UTILITY CONSUMERS' ACTION NETWORK
Description: of Intent to Claim Compensation.

Type: RESPONSE Filing Date: February 2, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Applications of Rehearing of Decision 0410-048.

Type: EXPARTE Filing Date: January 28, 2005
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On January 25, 2005, Dan Richard, Senior Vice President, Public Affairs, Pacific Gas and Electric Company (PG&E), met with Pres. Peevey in San Francisco. Also present were Julie Fitch, advisor to Pres. Peevey, and Fong Wan, Vice President, Power Contracts and Electric Resource Development, and Erik Jacobson, Chief, Regulatory Relations, for PG&E. Richard stated that PG&E expects to resume its long-term request for offers (RFO) soon. Wan described the bids PG&E has received in its intermediate RFO, indicating that there is a large amount of existing electric supply available at low prices. Richard explained PG&E's concerns with the asymmetrical initial cost cap mechanism adopted for utility-owned generation (UOG) in the Commission's recent long-term procurement decision. Richard said that PG&E would prefer cost-of-service ratemaking for UOG. Richard indicated that price adjustments should be permitted for force majeure events for both PPAs and utility-owned resources.

Type: RULING Filing Date: January 28, 2005
Filed By:
CMMR/PEEVEY/PUC
Description: Places consideration of the Sempra, Williams, King River, City and County of San Francisco and Sunrise DWR contracts in R04-04-003, requests comments and alternative proposals for the allocation of these contracts, by March 18, 2005, and responses to comments and proposed alternatives by April 8, 2005; and sets a prehearing conference for April 26, 2005.

Type: EXPARTE Filing Date: January 27, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: On January 24, 2005, Mona Tierney, Director, Government Affairs, Constellation NewEnergy, representing the Alliance for Retail Energy Markets (AREM), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, and Sue Mara, TRO Advisors, LLC, on behalf of Strategic Energy and APS Energy Services. Tierney and Mara indicated that AREM will oppose Southern California Edison Company's request that D04-12-048 be modified so as to authorize the utilities to recover so-called "stranded costs" of new generation resource commitments from all customers, and to remove the ten-year limitation on the recovery of stranded costs of new fossil-fuel resources from currently bundled customers that depart utility service in the future.

Type: RULING Filing Date: January 21, 2005
Filed By:
ALJ/WETZELL/PUC
Description: Regarding Workshops for Resource Adequacy Requirements - Phase 2.

Type: PETITION FOR MODIFICATION Filing Date: January 20, 2005
Filed By:
SOUTH SAN JOAQUIN IRRIGATION DISTRTICT
Description: of D04-12-048.

Type: PETITION FOR MODIFICATION Filing Date: January 19, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of D04-12-048.

Type: REHEARING REQUEST Filing Date: January 19, 2005
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: of D04-12-048.

Type: REHEARING REQUEST Filing Date: January 19, 2005
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
CONSTELLATION NEWENERGY, INC.
STRATEGIC ENERGY, L.L.C.
Description: od S04-12-048.

Type: REHEARING REQUEST Filing Date: January 18, 2005
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: of D04-12-048.

Type: RULING Filing Date: January 18, 2005
Filed By:
ALJ/WETZELL/PUC
Description: Finds that CEERT is eligible to file a request for an award of compensation, as set forth.

Type: RULING Filing Date: January 7, 2005
Filed By:
ALJ/WETZELL/PUC
Description: Revises and updates workshop schedule and adopts overall procedural schedule - resource adequacy requirements (RAR) - phase 2. Workshop report due 3/11/05; comments - 3/30/05; reply comments - 4/08/05; final decision - 6/30/05.

Type: REQUEST Filing Date: January 6, 2005
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: for an award of compensation for substantial contribution to R04-04-003.

Type: RULING Filing Date: January 4, 2005
Filed By:
ALJ/BROWN/PUC
Description: Schedules prehearing conference, as set forth, for January 24, 2005.

Type: REQUEST Filing Date: December 30, 2004
Filed By:
UTILITY CONSUMERS' ACTION NETWORK
Description: for Intervenor Compensation.

Type: RULING Filing Date: December 30, 2004
Filed By:
ALJ/WETZELL/BROWN/PUC
Description: Grants requests to intervene of the Cal. Biomass Energy Alliance, Cal. Landfill Gas Coalition, and the Solar Thermal Electric Alliance; Morgan Stanley Capital Group; and the San Diego Assoc. of Governments.

Type: NOTICE Filing Date: December 23, 2004
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: of substitution.

Type: RULING Filing Date: December 20, 2004
Filed By:
ALJ/WETZELL/PUC
Description: Adopts protective order to facilitate deliverability baseline analysis. Grants CAISO's motion for adoption of a "deliverability" protective order.

Type: EXPARTE Filing Date: December 17, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On December 14, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), had a telephone conversation with David Gamson, advisor to Cmmr. Brown. Jacobson described some of PG&E's recommended modifications to the proposed decision of ALJ Brown.

Type: EXPARTE Filing Date: December 15, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On December 10, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), had a telephone conversation with Trina Horner, advisor to Cmmr. Lynch. Jacobson described some of PG&E's recommended modifications to the proposed decision of ALJ Brown.

Type: EXPARTE Filing Date: December 15, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: On December 10, 2004, Lad Lorenz, Vice President - Regulatory Affairs for San Diego Gas & Electric Company (SDG&E), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Lorenz expressed overall support for the proposed decision (PD). Lorenz then described the issues of concern to SDG&E in the PD, including the Debt Equivalence Risk Factor, the cost cap for utility owned turnkey resources, and the recovery of potential stranded costs from CCA departing load.

Type: EXPARTE Filing Date: December 15, 2004
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: On December 15, 2004, Devra Bachrach, Staff Scientist at the Natural Resources Defense Council (NRDC), met with Brian Prusnek, advisor to Cmmr. Kennedy, in San Francisco. Bachrach discussed NRDC's support for the draft decision's (DD) proposed "greenhouse gas (GHG) adder." Bachrach requested that the Commission clarify that the "HG adder" represents the financial risk associated with carbon emissions, and is not an externality value. Bachrach noted that many parties are interpreting the renewables provisions of the in very different ways and urged the Commission to clarify the DD's intent to fully implement the Renewable Portfolio Standard (RPS). Bachrach requested hat the Commission provide additional guidance in the DD to ensure that future long-term plans are truly comprehensive, integrated long-term plans.

Type: EXPARTE Filing Date: December 14, 2004
Filed By:
CONSTELLATION NEWENERGY, INC.
STRATEGIC ENERGY, L.L.C.
Description: LATE FILED. On December 2, 2004, Mona Tierney, Director of Government Affairs of Constellation NewEnergy, Inc. (CNE), also representing Strategic Energy, L.L.C. (Strategic), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present was Mary Lynch of Constellation Energy Commodities Group formerly known as Constellation Power Source (CPS). Tierney discussed the proposed decision (PD) of ALJ Brown. Tierney articulated Strategic and CNE's concerns that the utilities have "under-forecasted" potential load migration due to the development of community choice aggregation and re-opening of the direct access market, that the utilities will overprocure as a result, and that the PD authorizes the utilities to impose exit fees on departing customers to recover their stranded costs. Tierney also discussed CPS' "slice of load" proposal as a means of addressing future stranded costs concerns.

Type: REPLY Filing Date: December 14, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to responses to CA ISO's motion for protective order.

Type: REPLY Filing Date: December 14, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: to the motion for a protective order.

Type: EXPARTE Filing Date: December 14, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: LATE FILED. On December 6, 2004, Bruce C. Foster, Vice President, Regulatory Affairs of Southern California Edison Company (SCE), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Colin E. Cushnie, Director of Regulatory Affairs of SCE, and Sheryl Carter, Director of Western Energy Programs of the Natural Resources Defense Council (NRDC). Written material (attached to the notice) was used. SCE's representatives expressed concern regarding the proposed decision's (PD) adoption of a greenhouse gas (GHG) bid evaluation adder for all of SCE's procurement activity. SCE expressed that with a change in the decision to the application of the GHG adder, it will support the PD's GHG adder policy. SCE stated that SCE and NRDC now support a change to the PD that would apply the GHG adder to evaluation of new utility commitments or contracts with terms greater than five years. SCE encouraged a revision to the PD to indicate that the Commission was going to seek a much broader application of GHG considerations. SCE expressed a willingness to work at the legislature to develop a more board-based carbon policy. SCE's representatives expressed concern that the final decision on SCE's long-term procurement plan not preclude the continuation of SCE's current solicitation for multi-year electrical capacity. SCE's representatives stated that all utility customers should be responsible for stranded costs through a non-bypassable wires charge for contracts that SCE enters into for the benefit of all customers or for grid reliability.

Type: COMMENTS Filing Date: December 13, 2004
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: reply; on utility long-term procurement plans.

Type: EXPARTE Filing Date: December 13, 2004
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: On December 8, 2004, Marc Joseph, attorney for the Coalition of California Utility Employees, had a telephone conversation with Bill Julian, advisor to Cmmr. Wood. Joseph stated that utilities should be able to develop utility owned generation on a separate track from contracts with independent generation, and that utilities should be able to develop local reliability generation separately, and charge the costs to all customers.

Type: COMMENTS Filing Date: December 13, 2004
Filed By:
CALPINE CORPORATION
Description: reply; on Proposed Decision of ALJ Brown.

Type: COMMENTS Filing Date: December 13, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on the proposed decision of ALJ Brown.

Type: COMMENTS Filing Date: December 13, 2004
Filed By:
MODESTO IRRIGATION DISTRICT
Description: reply.

Type: COMMENTS Filing Date: December 13, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on Proposed Decision of ALJ Brown.

Type: COMMENTS Filing Date: December 13, 2004
Filed By:
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
Description: reply; on Proposed Decision.

Type: COMMENTS Filing Date: December 13, 2004
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: reply; on the ALJ's draft decision adopting long term procurement plans.

Type: COMMENTS Filing Date: December 13, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: reply;.

Type: COMMENTS Filing Date: December 13, 2004
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: on the proposed decision of ALJ Brown.

Type: COMMENTS Filing Date: December 13, 2004
Filed By:
ORA/OBIORA/PUC
Description: reply; on the opinion adopting utilities' long term procurement plans.

Type: COMMENTS Filing Date: December 13, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on Proposed Decision of ALJ Brown.

Type: COMMENTS Filing Date: December 13, 2004
Filed By:
SEMPRA ENERGY GLOBAL ENTERPRISES
Description: Reply; on Proposed Decision of ALJ Brown.

Type: COMMENTS Filing Date: December 13, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; on Proposed Decision of ALJ Brown.

Type: COMMENTS Filing Date: December 13, 2004
Filed By:
STRATEGIC ENERGY AND CONSTELLATION NEWENERGY
Description: Reply; on Proposed Decision of ALJ Brown.

Type: COMMENTS Filing Date: December 13, 2004
Filed By:
CITY OF CHULA VISTA
Description: Reply; on Proposed Decision of ALJ Brown.

Type: EXPARTE Filing Date: December 10, 2004
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: On December 9, 2004, Devra Bachrach, Staff Scientist at the Natural Resources Defense Council (NRDC), met with Trina Horner, advisor to Cmmr. Lynch, in San Francisco. Bachrach discussed NRDC's support for the draft decision's (DD) proposed "greenhouse gas (GHG) adder," because it will help protect customers from financial risk associated with GHG emissions. Bachrach requested that the Commission clarify that the "GHG adder" represents the financial risk associated with carbon emissions, and is not an externality value. Bachrach recommended that the DD require the utilities to use the GHG adder both in procurement and in future long-term plans. Bachrach noted that many parties are interpreting the renewables provisions of the DD in very different ways and urged the Commission to clarify the DD's intent to fully implement the Renewable Portfolio Standard (RPS). Bachrach stated that the RPS solicitations should be the main vehicle to procure renewables. Bachrach requested that the Commission provide additional guidance in the DD to ensure that future long-term plans are truly comprehensive, integrated long-term plans.

Type: RESPONSE Filing Date: December 10, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: in opposition to Motion of CA ISO for a protective order.

Type: RESPONSE Filing Date: December 10, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to CAL ISO Motion for Protective Order.

Type: EXPARTE Filing Date: December 10, 2004
Filed By:
WEST COAST POWER
Description: On December 7, 2004, Greg Blue, Senior Director, Government Affairs, Dynegy, Inc., met with Julie Fitch, advisor to Pres. Peevey, and David Gamson, advisor to Cmmr. Brown, in two separate meetings in San Francisco. Also present was Brian Cragg of Goodin, MacBride, Squeri, Ritchie and Day, attorneys for West Coast Power (WCP). Written materials (attached to the notice) were used. Blue and Cragg expressed support for the proposed decision (PD) of ALJ Brown. Blue stated WCP would like to see more discussion to support the findings and conclusions on repowering and a clarification of the terminology related to repowering and brownfield development. WCP recommended that the PD should include a consideration of the conclusions and policy recommendations of the Energy Commission's 2004 Update to the Intergrated Energy Policy Report.

Type: EXPARTE Filing Date: December 10, 2004
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: On December 7, 2004, Sheryl Carter, Director, Western Energy Programs at the Natural Resources Defense Council (NRDC), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Colin E. Cushnie, Director, Regulatory Affairs, and Bruce C. Foster, Vice President, for Southern California Edison Company (SCE). Carter indicated that, with SCE's change of position to support the greenhouse gas (GHG) adder policy in the proposed decision (PD) of ALJ Brown, NRDC supported the revised application of a GHG adder to apply to long-term resource commitments that would require Commission pre-approval. Carter noted that applying it to these long-term resource commitments also simplifies implementation and would allow quicker application of the GHG adder. Carter emphasized that the PD justified the application of a GHG adder because of the financial risk associated with carbon emissions and not as an externality value, and recommended that the PD language be clarified to reflect this.

Type: EXPARTE Filing Date: December 10, 2004
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: On December 9, 2004, Sheryl Carter, Director, Western Energy Program at the Natural Resources Defense Council (NRDC), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present was Devra Bachrach, Staff Scientist at NRDC. Bachrach noted that many parties are interpreting the renewables provisions of the draft decision (DD) in very different ways and urged the Commission to clarify the DD's intent to fully implement the Renewable Portfolio Standard (RPS). Bachrach stated that the RPS solicitations should be the main vehicle to procure renewables. Bachrach requested that the Commission provide additional guidance in the DD to ensure that future long-term plans are truly comprehensive, integrated long-term plans. Carter noted that while NRDC would have preferred that the Commission approve funding for the procurement of additional energy efficiency resources in this decision, NRDC does not object to the DD's proposed process of having the administrators file program and funding applications.

Type: EXPARTE Filing Date: December 9, 2004
Filed By:
CONSTELLATION NEWENERGY, INC.
STRATEGIC ENERGY, L.L.C.
Description: On December 8, 2004, Mona Tierney, Director of Government Affairs of Constellation New Energy, Inc. (CNE), also representing Strategic Energy, L.L.C. (Strategic), met with Julie Fitch, advisor to Cmmr. Peevey, in San Francisco. Tierney discussed the proposed decision (PD) of ALJ Brown. Tierney articulated Strategic and CNE's concerns that the utilities have "under-forecasted" potential load migration due to the development of community choice aggregation and re-opening of the direct access market, that the utilities will overprocure as a result, and that the PD authorizes the utilities to impose exit fees on departing customers to recover their stranded costs. Tierney also discussed Constellation Power Source's "slice of load" proposal as a means of addressing future stranded costs concerns.

Type: RULING Filing Date: December 9, 2004
Filed By:
ALJ/THORSON/PUC
Description: Grants the Cal. ISO's motion to shorten time to respond to its motion for a protective order. Responses to the motion must be filed by December 10, 2004. Any replies to responses must be filed by December 14, 2004.

Type: EXPARTE Filing Date: December 9, 2004
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: On December 7, 2004, Devra Bachrach, Staff Scientists at the Natural Resources Defense Council (NRDC), met with David Gamson, advisor to Cmmr. Brown, and Steven Weissman, advisor to Cmmr. Wood, in two separate meetings in San Francisco. Bachrach discussed NRDC's support for the draft decision's (DD) proposed `greenhouse gas (GHG) adder'. Bachrach requested that the Commission clarify that the `GHG adder' represents the financial risk associated with carbon emissions, and is not an externality value. Further, Bachrach recommended that the DD require the utilities to use the GHG adder both in procurement and in future long-term plans. Bachrach also noted that many parties are interpreting the renewables provisions of the DD in very different ways and urged the Commission to clarify the DD's intent to fully implement the Renewable Portfolio Standard (RPS). Bachrach stated that RPS solicitations should be the main vehicle to procure renewables. Finally, Bachrach requested hat the Commission provide additional guidance in the DD to ensure that future long-term plans are truly comprehensive, integrated long-term plans.

Type: COMMENTS Filing Date: December 8, 2004
Filed By:
COUNTY OF LOS ANGELES
Description: on Proposals for Long-Term Policy for Expiring QF Contracts.

Type: REPLY Filing Date: December 8, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to proposals and comments on the development of a long-term policy for expiring QF contracts.

Type: PETITION Filing Date: December 8, 2004
Filed By:
MORGAN STANLEY CAPITAL GROUP INC.
Description: to Intervene;

Type: COMMENTS Filing Date: December 8, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on the development of a long-term policy for expiring QFs contracts [Pursuant to the Sept. 29, 2004 ruling.]

Type: COMMENTS Filing Date: December 8, 2004
Filed By:
ORA/DEANGELIS/PUC
Description: reply; on the development of long-term policy for expiring QF contract.

Type: COMMENTS Filing Date: December 8, 2004
Filed By:
GREEN POWER INSTITUTE
Description: on policy Proposals for Expiring QF Contracts.

Type: COMMENTS Filing Date: December 8, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on proposals for development of a long-term policy for expiring QF contracts.

Type: COMMENTS Filing Date: December 8, 2004
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE, L.L.C.
CALIFORNIA LANDFILL GAS COALITION
CALIFORNIA WIND ENERGY ASSOCIATION
SOLAR THERMAL ELECTRIC ALLIANCE
Description: on proposals for a long-term policy for expiring QF contracts.

Type: COMMENTS Filing Date: December 8, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: on proposals for the development of a long-term policy for expiring and new QF contracts.

Type: COMMENTS Filing Date: December 8, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: on proposals for a long-term policy for QF contracts.

Type: COMMENTS Filing Date: December 8, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; on the Development of a Long-Term Policy for Expiring QF Contracts.

Type: COMMENTS Filing Date: December 8, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Proposals for a Long-Term Policy for Expiring QF Contracts and new QFs..

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: opening; on utility long-term procurement plans.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
MODESTO IRRIGATION DISTRICT
Description: on proposed decision.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS AND TECHNOLOGY ASSOCIATION
Description: on ALJ Brown's Proposed Decision.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
CONSTELLATION POWER SOURCE, INC.
Description: on the proposed decision of ALJ Brown re utility long term procurement plans.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: on the proposed decision of ALJ Brown re utility long term procurement plans.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
DUKE ENERGY NORTH AMERICA
Description: on the proposed decision of ALJ Brown re utility long term procurement plans.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on the proposed decision of ALJ Brown re utility long term procurement plans.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
WEST COAST POWER
Description: on the proposed decision of ALJ Brown re utility long term procurement plans.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
Description: on the proposed decision of ALJ Brown re utility long term procurement plans.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: on the proposed decision of ALJ Brown.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: on the ALJ's draft opinion adopting utlities' long term procurement plans.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: on the proposed decision of ALJ Brown re long term procurement plans.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: on the proposed decision of ALJ Brown on utility long term procurement plans.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
SILICON VALLEY MANUFACTURING GROUP
Description: on the proposed decision of ALJ Brown re long term procurement plans.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
CALPINE CORPORATION
Description: on the proposed decision of ALJ Brown re long term procurement plans.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: on the proposed decision of ALJ Brown re long term procurement plans.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the proposed decision of ALJ Brown.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
ORA/OBIORA/PUC
Description: opening; on the opinion adopting utility long-term procurement plans.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: [on the Proposed Decision of ALJ Brown.]

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
UTILITY CONSUMERS ACTION NETWORK
Description: Opening; on Proposed Decision of ALJ Brown.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
CITY OF CHULA VISTA
Description: Opening; on Proposed Decision of ALJ Brown.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Opening; on Proposed Decision of ALJ Brown.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Opening; on Proposed Decision of ALJ Brown.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
STRATEGIC ENERGY AND CONSTELLATION NEWENERGY
Description: Opening; on Proposed Decision of ALJ Brown.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
WESTERN POWER TRADING FORUM
Description: Opening; on Proposed Decision of ALJ Brown.

Type: COMMENTS Filing Date: December 6, 2004
Filed By:
SEMPRA ENERGY GLOBAL ENTERPRISES
Description: on Proposed Decision of ALJ Brown.

Type: EXPARTE Filing Date: December 3, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On November 30, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Brian Prusnek, advisor to Cmmr. Kennedy, in San Francisco. Also present was Sabrina Chaw, Regulatory Representative, Regulatory Relations, PG&E. Written material (attached to the notice) was used. Jacobson described some of PG&E's recommended modifications to the proposed decision of ALJ Brown.

Type: MOTION Filing Date: December 3, 2004
Filed By:
SAN DIEGO ASSOCIATION OF GOVERNMENTS
Description: to Intervene; ATTACHED - Comments on ALJ Brown's Proposed Decision.

Type: EXPARTE Filing Date: December 2, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On November 29, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, Roy Kuga, Vice President, Gas and Electric Procurement, Policy and Planning, Ray Williams, Director, Power Contracts and Resource Development, and William Manheim, Chief Counsel, for PG&E; and Bruce Foster, Vice President, and Colin Cushnie, Director, Regulatory Operations, for Southern California Edison Company. Written material (attached to the notice) was used. Kuga and Manheim described some of PG&E's recommended modifications to the proposed decision of ALJ Brown.

Type: RULING Filing Date: December 2, 2004
Filed By:
ALJ/BROWN/PUC
Description: Schedules final oral argument for December 13, 2004.

Type: MOTION Filing Date: December 2, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: for a protective order concerning data used to develop a deliverability baseline analysis and to shorten time.

Type: RESPONSE Filing Date: December 1, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to ALJ's ruling re final oral argument.

Type: EXPARTE Filing Date: November 30, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On November 29, 2004, Bruce C. Foster, Vice President, Regulatory Affairs of Southern California Edison Company (SCE), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, Colin E. Cushnie, Director, Regulatory Affairs of SCE, and Roy Kuga, William Manheim, Ray Williams, and Erik Jacobson, Pacific Gas and Electric Company (PG&E). Written material (attached to the notice) was used. SCE representatives expressed general support for ALJ Brown's proposed decision (PD). However, SCE requested that the PD be modified to explicitly permit CPCN applications for certain utility projects. SCE requested that the PD be modified to state that stranded costs incurred as the result of utility commitments that benefit all customers be assessed to all customers, and not just departing bundled load. SCE expressed concern that the PD's adoption of a carbon adder could unnecessarily add costs to SCE's bundled customers without any associated benefits. SCE requested that the Commission clarify what is meant by the requirement that utilities procure the maximum feasible amount of renewable energy. SCE also requested to change the requirement that pre-approval be sought for all contracts with terms of three years or greater. Finally, SCE agreed with PG&E that the PD should be modified to reflect a 30% debt equivalence factor.

Type: REQUEST Filing Date: November 30, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: for Final Oral Argument.

Type: EXPARTE Filing Date: November 29, 2004
Filed By:
CENTER FOR ENERGY EFFICIENCY/RENEWABLE TECHNOLOGIES
Description: On November 22, 2004, Sara Steck Myers, attorney for the Center for Energy Efficiency and Renewable Technologies (CEERT), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Paul Clanon, Director, Paul Douglas, and Lisa Paulo, of the Energy Division, Dan Adler of the Division of Strategic Planning, and James H. Caldwell, Jr., Director of Renewable Policy for PPM Energy, LLP. Written material (attached to the notice) was used. Myers stated that CEERT fully supports the proposed decision's (PD) policy statements that reflected the environmental and diversity value of renewables procurement to the utilities¿ LTPPs and general electric generation procurement. Myers expressed concern that the findings made by the PD did not adequately address the shortcomings of the renewable procurement plans of Southern California Edison Company and Pacific Gas and Electric Company. Myers stated that CEERT believed that the PD had inappropriately deferred revisions to the utilities' renewable plans to another proceeding. Myers noted that an endless deferral of needed revisions of utility renewable procurement plans would undermine good faith reliance on Commission's directives, as well as effective regulation, and would place at risk the state's accelerated target of 20% renewable generation by 2010. Myers emphasized the need for integrated renewables procurement and transmission planning.

Type: RULING Filing Date: November 23, 2004
Filed By:
ALJ/GOTTSTEIN/PUC
Description: Schedules workshops on procurement incentive framework. Pre-workshop opening comments on procurement incentive framework are due February 11, 2005; reply comments - February 25, 2004; workshop report - 3/21/05; post-workshop opening comments on workshop report - 4/8/05; post-workshop reply comments - 4/18/05.

Type: RULING Filing Date: November 22, 2004
Filed By:
ALJ/BROWN/PUC
Description: Regarding Final Oral Argument. Any request for the final oral argument must be received by December 1, 2004.

Type: RULING Filing Date: November 19, 2004
Filed By:
ALJ/WETZELL/PUC
Description: Sets workshops to address Phase 2 Resource Adequacy topics.

Type: PROPOSED DECISION Filing Date: November 16, 2004
Filed By:
ALJ/BROWN/PUC
Description: Opinion adopting PG&E, Edison and SDG&E's long term procurement plans. Comments are due December 6, 2004; reply comments - 5 days after comments are filed.

Type: EXPARTE Filing Date: November 15, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On November 10, 2004, Erik Jacobson, Chief of Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were David Gamson, advisor to Cmmr. Brown, Brian Prusnek, advisor to Cmmr. Kennedy, Paul Clanon, Clayton Tang, Bob Lane and Philippe Auclair on behalf of the Energy Division and Executive Division, and Roy Kuga, Vice President of Gas and Electric Procurement, Policy and Planning, Hal LaFlash, Strategy Director of Gas and Electric Supply, and Wan Fong, Vice President, Ray Williams, Director, and Kevin Butler, Senior Director, of Power Contracts and Electric Resource Development, for PG&E. Written material (attached to the notice) was used. Kuga and Fong explained the need for the Commission to authorize a non-bypassable charge from bundled customers to ensure full cost recovery of long-term commitments made by PG&E on behalf of those customers. Kuga recommended that the Commission extend the ERRA 5 percent trigger mechanism. Fong explained the rationale for PG&E's recommended target to procure 50% of new long-term commitments as utility-owned generation. Fong also explained the need for adoption of a debt equivalence policy that allows PG&E to evaluate the debt equivalence impacts of long-term power purchase contracts.

Type: COMPLIANCE FILING Filing Date: November 10, 2004
Filed By:
COUNTY OF LOS ANGELES
Description: Proposal for a Long-Term Policy for Expiring QF Contracts.

Type: RESPONSE Filing Date: November 10, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to ALJ's ruling requesting Proposals and Comments on the development of a long-term policy for expiring QF contracts.

Type: PETITION Filing Date: November 10, 2004
Filed By:
CALIFORNIA BIOMASS ENERGY ALLIANCE, L.L.C.
CALIFORNIA LANDFILL GAS COALITION
SOLAR THERMAL ELECTRIC ALLIANCE
Description: to intervene; proposal for a long-term QF policy attached.

Type: MISCELLANEOUS FILING Filing Date: November 10, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: Proposal for a Long-Term Qualifying Facility Policy.

Type: MISCELLANEOUS FILING Filing Date: November 10, 2004
Filed By:
COGENERTION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: Proposal for the development of a long-term policy for expiring and new QF contracts.

Type: MISCELLANEOUS FILING Filing Date: November 10, 2004
Filed By:
MODESTO IRRIGATION DISTRICT
Description: on the development of a long-term policy for expiring QF contracts.

Type: COMMENTS Filing Date: November 10, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: on the development of a long-term policy for expiring QF contracts.

Type: COMMENTS Filing Date: November 10, 2004
Filed By:
ORA/SCARFF/PUC
Description: on the development of a long-term policy for expiring QF contracts.

Type: COMMENTS Filing Date: November 10, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on the development of a long-term policy for expiring QF contracts.

Type: COMPLIANCE FILING Filing Date: November 10, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Proposal for a Long-Term Policy for Expiring QF Contracts and New QFs.

Type: COMMENTS Filing Date: November 9, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: pre-workshop comments concerning scope and schedule of Phase 2 of the Resource Adequacy.

Type: RULING Filing Date: November 4, 2004
Filed By:
ALJ/WETZELL/PUC
Description: Sets the following schedule: workshop on resource adequacy requirements issues - Phase 2 - November 16, 2004; workshop report - 3/11/2005; comments 3/23/05; replies to comments - 4/06/05.

Type: BRIEF Filing Date: November 1, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: reply; on long-term plans of the investor owned utilities.

Type: BRIEF Filing Date: November 1, 2004
Filed By:
MODESTO IRRIGATION DISTRICT
Description: reply.

Type: BRIEF Filing Date: November 1, 2004
Filed By:
ORA/OBIORA/PUC
Description: reply [in accordance with September 28, 2004 ruling].

Type: BRIEF Filing Date: November 1, 2004
Filed By:
WEST COAST POWER
Description: reply.

Type: BRIEF Filing Date: November 1, 2004
Filed By:
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
Description: reply.

Type: BRIEF Filing Date: November 1, 2004
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: reply.

Type: BRIEF Filing Date: November 1, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: reply.

Type: BRIEF Filing Date: November 1, 2004
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: reply.

Type: BRIEF Filing Date: November 1, 2004
Filed By:
SILICON VALLEY MANUFACTURING GROUP
Description: reply.

Type: BRIEF Filing Date: November 1, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on electric utiliyt long-term resource plans.

Type: BRIEF Filing Date: November 1, 2004
Filed By:
CALPINE CORPORATION
Description: reply.

Type: BRIEF Filing Date: November 1, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: reply.

Type: BRIEF Filing Date: November 1, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply.

Type: BRIEF Filing Date: November 1, 2004
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: reply; in the long term procurement plan phase.

Type: BRIEF Filing Date: November 1, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: reply.

Type: BRIEF Filing Date: November 1, 2004
Filed By:
DUKE ENERGY NORTH AMERICA
Description: reply.

Type: BRIEF Filing Date: November 1, 2004
Filed By:
CONSTELLATION POWER SOURCE, INC.
Description: reply.

Type: BRIEF Filing Date: November 1, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on procurement plan issues.

Type: BRIEF Filing Date: November 1, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply;

Type: BRIEF Filing Date: November 1, 2004
Filed By:
STRATEGIC ENERGY AND CONSTELLATION NEWENERGY
Description: Reply;

Type: BRIEF Filing Date: November 1, 2004
Filed By:
CITY OF CHULA VISTA
Description: Reply;

Type: EXPARTE Filing Date: October 28, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: LATE FILED. On October 21, 2004, Bruce C. Foster, Vice President, Regulatory Affairs of Southern California Edison Company (SCE), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present was Colin E. Cushnie, Director, Regulatory Affairs, of SCE. SCE representatives discussed ALJ Fukutome's proposed decision (FPD) in SCE's Energy Resource Recovery Account (ERRA) proceeding. Additionally, SCE's representatives discussed SCE's concerns with ALJ Wetzell's proposed decision (WPD) on resource adequacy issues (R04-04-003). SCE's representatives expressed concern that FPD improperly expands the scope of the least-cost dispatch compliance showing that the Commission previously ordered in its adoption of Standard of Conduct No. 4 in each IOU's procurement plan. SCE's representatives also noted that FPD is inconsistent with AB 57. SCE¿s representatives also expressed concern with WPD on resource adequacy because it would accelerate the 15%-17% planning reserve requirement from 2008 to 2006, without providing any market power mitigation measures to protect customers. Further, SCE's representatives described why liquidated damages contracts and DWR long-term power contracts should continue to be allowed to count toward each IOU's planning reserve requirement.

Type: REPLY Filing Date: October 27, 2004
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: to the response of Edison to CEERT's notice of intent to claim compensation.

Type: EXPARTE Filing Date: October 22, 2004
Filed By:
SEMPRA ENERGY SOLUTIONS
Description: On October 19, 2004, Alvin S. Pak, Director, State Regulatory Affairs of Sempra Energy Global Enterprises (SEGE), met on behalf of Sempra Energy Solutions with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present was Thomas P. Corr, SEGE Regulatory Policy Manager. Written material (attached to the notice) was used. Pak and Corr explained that eliminating Firm LD contracts from Resource Adequacy (RA) accounting eligibility prior to the availability of a replacement product or market would hinder the ability of non-utility LSEs to comply with the Commission's proposed RA counting protocols; will certainly increase costs to those providing DA service; and may threaten the ability of some non-utility LSEs to continue to provide DA service, or to expand such service. Pak and Corr proposed that the Firm LD contract issue be deferred to Phase 2 of the RA proceeding.

Type: EXPARTE Filing Date: October 22, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On October 19, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with David Gamson, advisor to Cmmr. Brown, and Trina Horner, advisor to Cmmr. Lynch, in two separate meetings in San Francisco. Also present were Gary Jeung, Director, Gas and Electric Procurement, and Joe Lawlor, Energy Trading Consultant, Gas and Electric Supply Strategic Consulting, PG&E. Written material (attached to the notice) was used. Lawlor and Jeung stated that system contracts with liquidated damage provisions should be eligible to count as qualified capacity, as long as they are limited to no more than 25 percent of a LSE's total MW need. Lawlor and Jeung explained why it is not feasible to require a demonstration that the generator's asset portfolio is not oversold. Jacobson emphasized that the Department of Water Resources contracts should be provided full value and should not be subject to a deliverability test. Lawlor explained PG&E's concern with both ALJ Wetzell's proposed decision and Cmmr. Lynch's alternate.

Type: EXPARTE Filing Date: October 22, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On October 19, 2004, Colin E. Cushnie, Director, Regulatory Affairs of Southern California Edison Company (SCE), met with Trina Horner, advisor to Cmmr. Lynch, in San Francisco. Cushnie advised the Commission of SCE's concerns about suppliers exercising market power in the event that the Commission adopts a 15%-17% planning reserve margin for 2006. Cushnie recommended that the Commission address this concern by providing appropriate market power mitigation language in its adopted decision. Specifically, Cushnie asked the Commission to reiterate and augment the market power concerns expressed in D04-07-028.

Type: EXPARTE Filing Date: October 20, 2004
Filed By:
WEST COAST POWER
Description: On October 15, 2004, Greg Blue, Senior Director, Government Affairs, Dynegy, Inc., met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present was Brian Cragg, representing West Coast Power. Blue indicated West Coast Power's support of the ALJ's draft decision on the Resource Adequacy Requirement (RAR) and the acceleration of the implementation of the RAR. Blue and Cragg discussed the concerns about locational market power and offered suggestions on how to mitigate market power. Blue and Cragg also discussed the current structure of the California electricity market and the prospects for the electric supply shortages next summer. Blue also suggested that there are three elements necessary for the improved operation of electricity markets: RAR, a capacity market, and deliverability standards.

Type: EXPARTE Filing Date: October 20, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On October 15, 2004, Colin E. Cushnie, Director, Regulatory Affairs of Southern California Edison Company (SCE), met with Trina Horner, advisor to Cmmr. Lynch, in San Francisco. Cushnie advised the Commission that SCE supports a phase-in of the planning reserve margin between 2006 and 2008, encouraged the Commission to state in its decision that the Commission may temporarily relax its planning reserve margin requirements for the investor-owned utilities if it becomes apparent that market participants are seeking noncompetitive prices for electrical capacity, and supported a continuation of liquidated damages contracts until the issue could be further examined.

Type: EXPARTE Filing Date: October 19, 2004
Filed By:
ORA/OBIORA/PUC
Description: On October 15, 2004, Scott Cauchois, Manager with the Office of Ratepayer Advocates, met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Written material (attached to the notice) was used. Cauchois noted that some accounting of resources available in California to meet resource adequacy requirements is necessary and that imminent plant retirement could be deferred with contracts between the owners and utilities, but some framework has to be devised to address that issue.

Type: BRIEF Filing Date: October 18, 2004
Filed By:
WEST COAST POWER
Description: opening.

Type: BRIEF Filing Date: October 18, 2004
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
Description: Opening;

Type: BRIEF Filing Date: October 18, 2004
Filed By:
MODESTO IRRIGATION DISTRICT
Description: opening.

Type: BRIEF Filing Date: October 18, 2004
Filed By:
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
Description: opening.

Type: BRIEF Filing Date: October 18, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: opening.

Type: BRIEF Filing Date: October 18, 2004
Filed By:
DUKE ENERGY NORTH AMERICA
Description: opening.

Type: BRIEF Filing Date: October 18, 2004
Filed By:
CONSTELLATION POWER SOURCE, INC.
Description: opening.

Type: BRIEF Filing Date: October 18, 2004
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: opening.

Type: BRIEF Filing Date: October 18, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: opening.

Type: BRIEF Filing Date: October 18, 2004
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: opening.

Type: BRIEF Filing Date: October 18, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: opening; on electric utility long-term resource plans.

Type: BRIEF Filing Date: October 18, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: opening.

Type: BRIEF Filing Date: October 18, 2004
Filed By:
CALPINE CORPORATION
Description: opening.

Type: BRIEF Filing Date: October 18, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: opening; on long-term plans of the investor owned utilities.

Type: BRIEF Filing Date: October 18, 2004
Filed By:
ORA/OBIORA/PUC
Description: opening; on long-term plans of the investor owned utilities.

Type: BRIEF Filing Date: October 18, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: opening.

Type: BRIEF Filing Date: October 18, 2004
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: opening; in the long term procurement plan phase.

Type: BRIEF Filing Date: October 18, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Opening; on procurement plan issues.

Type: BRIEF Filing Date: October 18, 2004
Filed By:
SEMPRA ENERGY GLOBAL ENTERPRISES
Description: Post-Hearing Opening;

Type: BRIEF Filing Date: October 18, 2004
Filed By:
WESTERN POWER TRADING FORUM
Description: Opening;

Type: BRIEF Filing Date: October 18, 2004
Filed By:
UTILITY CONSUMERS' ACTION NETWORK
Description: Opening;

Type: BRIEF Filing Date: October 18, 2004
Filed By:
BORDER GENERATION GROUP
Description: Concurrent Opening;

Type: BRIEF Filing Date: October 18, 2004
Filed By:
CITY OF SAN DIEGO
Description: Opening;

Type: BRIEF Filing Date: October 18, 2004
Filed By:
CITY OF CHULA VISTA
Description: Concurrent Opening;

Type: BRIEF Filing Date: October 18, 2004
Filed By:
STRATEGIC ENERGY AND CONSTELLATION NEWENERGY
Description: Opening;

Type: BRIEF Filing Date: October 18, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Opening;

Type: COMPLIANCE FILING Filing Date: October 13, 2004
Filed By:
BORGER GENERATION GROUP
Description: Transcript Corrections.

Type: RESPONSE Filing Date: October 12, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Notice of Intent to Claim Compensation of Center for Energy Efficiency and Renewable Technologies.

Type: SUPPLEMENT Filing Date: October 12, 2004
Filed By:
WEST COAST POWER
Description: to Motion for Official Notice.

Type: MOTION Filing Date: October 8, 2004
Filed By:
WEST COAST POWER
Description: For Official Notice

Type: EXPARTE Filing Date: October 7, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On October 5, 2004, Southern California Edison Company provided a document (copy attached to the notice) to Pres. Peevey, Cmmrs. Brown, Kennedy, and Lynch and to their respective energy advisors via email.

Type: COMMENTS ON ALTERNATE Filing Date: October 5, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: reply; on alternate draft decision on resource adequacy.

Type: COMMENTS ON ALTERNATE Filing Date: October 5, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: reply; on the alternate of Cmmr. Lynch re resource adequacy.

Type: COMMENTS ON ALTERNATE Filing Date: October 5, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on the alternate of Cmmr. Lynch re resource adequacy.

Type: COMMENTS ON ALTERNATE Filing Date: October 5, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on the alternate of Cmmr. Lynch re resource adequacy.

Type: EXPARTE Filing Date: October 1, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: On September 29, 2004, Bruce C. Foster, Vice President, Regulatory Operations for Southern California Edison Company (SCE), met with Steven Weissman, advisor to Cmmr. Wood, in San Francisco. Also present were Trina Horner, advisor to Cmmr. Lynch, and Colin Cushnie, Director of Regulatory Affairs of SCE. Foster and Cushnie indicated SCE's support for the continuation of system sales ("LD") contracts, or at a minimum, to defer consideration of this issue to Phase 2. SCE expressed its support for a 2008 start for the resource adequacy requirement (RAR), or alternatively, a phase-in of RAR. SCE also indicated its support for grandfathering the Department of Water Resources contracts to count towards meeting a RAR.

Type: COMMENTS ON ALTERNATE Filing Date: September 30, 2004
Filed By:
SEMPRA ENERGY GLOBAL ENTERPRISES
Description: Draft Decision of Commissioner Lynch.

Type: RULING Filing Date: September 30, 2004
Filed By:
ALJ/WETZELL/PUC
Description: Requests proposals and comments on the development of a long-term policy for expiring QF contracts. Proposals are due November 10, 2004; comments on the proposals - November 24, 2004.

Type: COMMENTS ON ALTERNATE Filing Date: September 30, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: of Cmmr. Lynch on Resource Adequacy Issues.

Type: COMMENTS ON ALTERNATE Filing Date: September 30, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: of Cmmr. Lynch on Resource Adequacy Issues.

Type: COMMENTS ON ALTERNATE Filing Date: September 30, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: of Cmmr. Lynch on Resource Adequacy Issues.

Type: COMMENTS ON ALTERNATE Filing Date: September 30, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: of Cmmr. Lynch on Resource Adequacy Issues.

Type: COMMENTS ON ALTERNATE Filing Date: September 30, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of Cmmr. Lynch on Resource Adequacy Issues.

Type: COMMENTS ON ALTERNATE Filing Date: September 30, 2004
Filed By:
DUKE ENERGY NORTH AMERICA
Description: of Cmmr. Lynch on Resource Adequacy Issues.

Type: COMMENTS ON ALTERNATE Filing Date: September 30, 2004
Filed By:
ORA/OBIORA/PUC
Description: of Cmmr. Lynch on Resource Adequacy Issues.

Type: COMMENTS ON ALTERNATE Filing Date: September 30, 2004
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: Draft Decision of Commissioner Lynch.

Type: COMMENTS ON ALTERNATE Filing Date: September 30, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Draft Decision.

Type: EXPARTE Filing Date: September 29, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On September 24, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Trina Horner, advisor to Cmmr. Lynch, in San Francisco. Also present were Julie Fitch, advisor to Cmmr. Peevey, and Antonio Alvarez, Manager, Gas and Electric Supply, and Joe Lawlor, Energy Trading Consultant, Gas and Electric Supply Strategic Consulting, PG&E. Jacobson stated that the proposed decision should be modified to provide the utilities with authority to procure resources for terms up to five years. Alvarez explained PG&E's recommendation that minimum monthly energy requirements should be satisfied on a portfolio basis rather than an individual unit basis. Alvarez noted that the draft decision's 0.89 percent cap on demand response limited PG&E to about 150 MW of demand response and contradicted previous demand response targets provided by the Commission. Lawlor stated that system contracts with liquidated damage provisions should be eligible to count as qualified capacity, as long as they are limited to no more than 25 percent of a LSE's total MW need. Lawlor also said that the Department of Water Resources contracts that are not unit specific should not be subject to a deliverability test.

Type: RULING Filing Date: September 28, 2004
Filed By:
ALJ/BROWN/PUC
Description: Establishes a briefing outline and sets briefing schedule. Concurrent opening briefs are due October 18, 2004; concurrent reply briefs (limited to 20 pages) - November 1, 2004.

Type: COMMENTS Filing Date: September 27, 2004
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: Reply; on Draft Decision of ALJ Wetzell.

Type: TRANSCRIPT Filing Date: September 27, 2004
Filed By:
REPORTING DIVISION
Description: Submitted; Volume 17.

Type: REPLY Filing Date: September 27, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Comments on the Draft Decision regarding Resource Adequacy.

Type: COMMENTS Filing Date: September 27, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: reply; on the draft decision of ALJ Wetzell regarding resource adequacy.

Type: COMMENTS Filing Date: September 27, 2004
Filed By:
POWEREX CORP.
Description: reply; on ALJ's proposed decision.

Type: COMMENTS Filing Date: September 27, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: reply; concerning Draft Decision regarding resource adequacy.

Type: COMMENTS Filing Date: September 27, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on interim opinion regarding resource adequacy.

Type: COMMENTS Filing Date: September 27, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on the draft decision on resource adequacy requirements.

Type: COMMENTS Filing Date: September 27, 2004
Filed By:
ORA/OBIORA/PUC
Description: reply; on the draft decision regarding resource adequacy.

Type: COMMENTS Filing Date: September 27, 2004
Filed By:
WESTERN POWER TRADING FORUM
Description: Reply; on Resource Adequacy Draft Decision.

Type: NOTICE Filing Date: September 24, 2004
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: of intent to claim compensation.

Type: ALTERNATE Filing Date: September 23, 2004
Filed By:
CMMR/LYNCH/PUC
Description: Interim Opinion Regarding Resource Adequacy. Comments are due September 30, 2004; reply comments - October 5, 2004.

Type: COMMENTS Filing Date: September 22, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: opening; on the draft decision of ALJ Wetzell re resource adequacy.

Type: COMMENTS Filing Date: September 20, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on Draft Interim Opinion regarding Resource Adequacy.

Type: REPLY Filing Date: September 20, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: in support of [its] Motion to Strike Portions of the testimony of the California Cogeneration Council and the Cogeneration Association of California.

Type: COMMENTS Filing Date: September 20, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: on the draft decision of ALJ Wetzell on resource adequacy requirements.

Type: COMMENTS Filing Date: September 20, 2004
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: opening; on the draft decision of ALJ Wetzell.

Type: COMMENTS Filing Date: September 20, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on draft interim opinion regarding resource adequacy.

Type: COMMENTS Filing Date: September 20, 2004
Filed By:
CALPINE CORPORATION
Description: on draft interim opinion regarding resource adequacy.

Type: COMMENTS Filing Date: September 20, 2004
Filed By:
DUKE ENERGY NORTH AMERICA
Description: on draft interim opinion regarding resource adequacy.

Type: COMMENTS Filing Date: September 20, 2004
Filed By:
ORA/OBIORA/PUC
Description: on draft interim opinion regarding resource adequacy.

Type: COMMENTS Filing Date: September 20, 2004
Filed By:
POWEREX CORP.
Description: on ALJ's proposed decision.

Type: COMMENTS Filing Date: September 20, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: on the draft decision of ALJ Wetzell on resource adequacy issues.

Type: COMMENTS Filing Date: September 20, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on the draft decision of ALJ Wetzell on resource adequacy issues.

Type: COMMENTS Filing Date: September 20, 2004
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: on the draft decision of ALJ Wetzell on resource adequacy issues.

Type: COMMENTS Filing Date: September 20, 2004
Filed By:
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
Description: on draft interim opinion regarding resource adequacy.

Type: COMMENTS Filing Date: September 20, 2004
Filed By:
WESTERN POWER TRADING FORUM
Description: on the Resource Adequacy Draft Decision.

Type: COMMENTS Filing Date: September 20, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Draft Decision of ALJ Wetzell.

Type: COMMENTS Filing Date: September 20, 2004
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: on the Draft Decision of ALJ Wetzell.

Type: COMMENTS Filing Date: September 20, 2004
Filed By:
SEMPRA ENERGY GLOBAL ENTERPRISES
Description: on Draft Decision of ALJ Wetzell.

Type: RULING Filing Date: September 16, 2004
Filed By:
ASSIGNED COMM. PEEVEY/CPUC
Description: On Interaction Between the CPUC-Long-Term Planning Process and the California Energy Commission (CEC) Integrated Energy Policy Report (IEPR) Process

Type: RULING Filing Date: September 16, 2004
Filed By:
ALJ/WETZELL/CPUC
Description: on UCAN's Notice of Intent to claim intervenor compensation

Type: RESPONSE Filing Date: September 13, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: to motion of Edison to strike portions of the testimony of CAC.

Type: RESPONSE Filing Date: September 13, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: to Edison's motion to strike and PG&E's joinder.

Type: RESPONSE Filing Date: September 13, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to Reply to Motion of PG&E to strike testimony of Western Power Trading Forum on Diablo Canyon refurbishment

Type: RESPONSE Filing Date: September 13, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
ENERGY PRODUCERS AND USERS COALITION
Description: to motion of Edison to strike portions of the testimony of CAC.

Type: NOTICE Filing Date: September 8, 2004
Filed By:
UTILITY CONSUMERS' ACTION NETWORK
Description: of Intent to Claim Compensation.

Type: EXPARTE Filing Date: September 7, 2004
Filed By:
WEST COAST POWER
Description: On September 1, 2004, Greg Blue, Senior Director, Government Affairs, Dynegy, Inc., met with Brian Prusnek, advisor to Cmmr. Kennedy, in San Francisco. Also present was Brian Cragg, representing West Coast Power. Blue and Cragg described the challenges West Coast faces at its Long Beach and El Segundo plants after the expiration of West Coast Power's contracts with the California Department of Water Resources at the end of the year. Blue recounted recent meetings with the California Independent System Operator concerning the role West Coast Power's plants play in promoting local grid reliability and energy deliverability in the congested west Los Angeles area and described West Coast Power's unsuccessful attempts to negotiate bilateral contracts with Southern California Edison Company.

Type: EXPARTE Filing Date: September 7, 2004
Filed By:
WEST COAST POWER
Description: On September 1, 2004, Ershel Redd, Executive Vice-President of Commercial Operations and President of West Coast Operations for NRG Energy Inc., met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Ben Trammell, Managing Director, and Greg Blue, Senior Director of Government Affairs, of Dynegy, Inc., and Brian Cragg of Goodin, MacBride, Squeri, Ritchie and Day, attorneys for West Coast Power. Written material (attached to the notice) was used. Redd and Blue described the challenges West Coast faces at its Long Beach and El Segundo plants after the expiration of West Coast Power's contracts with the California Department of Water Resources at the end of the year. Trammell recounted recent meetings with the California Independent System Operator concerning the role West Coast Power's plants play in promoting local grid reliability and energy deliverability in the congested west Los Angeles area. Trammell described West Coast Power's unsuccessful attempts to negotiate bilateral contracts with Southern California Edison Company. Cragg presented a written analysis of the authority the Commission had granted in D04-07-028.

Type: MOTION Filing Date: September 1, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Strike Portions of the Testimony of the California Cogeneration Council and the Cogeneration Association of California and request for Order Shortening Time.

Type: DRAFT DECISION Filing Date: August 31, 2004
Filed By:
ALJ/WETZELL/PUC
Description: Interim opinion re resource adequacy. Comments are due September 20, 2004; reply comments - 5 days after comments are filed.

Type: OPPOSITION Filing Date: August 27, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: To Motion of Strategic Energy and Constellation NewEnergy To Strike Testimony of Edison and TURN

Type: RESPONSE Filing Date: August 27, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: In Opposition to the Motion of Strategic Energy and Constellation NewEnergy to Strike Portions of the Prepared Testimony of TURN Witness Kevin Woodruff

Type: RESPONSE Filing Date: August 27, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Motion of Strategic Energy/Constellation New Energy to strike testimony

Type: EXPARTE Filing Date: August 26, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On August 23, 2004, Lisa Cottle of White & Case LLP, attorneys for the California Cogeneration Council (CCC), spoke on the telephone with Julie Fitch, advisor to Cmmr. Peevey. Cottle communicated the CCC's interest in determining the scope of the qualifying facility issues and explained that, if the Commission defers a decision on long-term QF policy issues, all three utilities must be required to reserve a place for QF capacity in their resource plans.

Type: REPLY Filing Date: August 20, 2004
Filed By:
WESTERN POWER TRADING FORUM
Description: to Motion of PG&E to Strike Testimony of Weatern Power Trading Forum on Diablo Canyon Refurbishment.

Type: MOTION Filing Date: August 19, 2004
Filed By:
CONSTELLATION NEW ENERGY, INC.
STRATEGIC ENERGY, L.L.C.
Description: to Intervene; ATTACHED: Motion to Strike Testimony of SoCal Edison Co., and TURN; ATTACHED: Motion for Order Shortening Time for Filing and Serving Responses to Motion to Strike Testimony of SoCal Edison Co., and TURN.

Type: MOTION Filing Date: August 18, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to strike testimony of Western Power Trading Forum on Diablo Canyon refurbishment.

Type: RULING Filing Date: August 16, 2004
Filed By:
ALJ/WETZELL/PUC
Description: Dismisses PG&E's motion to sever (August 11, 2004) as moot.

Type: RULING Filing Date: August 13, 2004
Filed By:
ALJ/WETZELL/PUC
Description: Grants the motion of UCAN to intervene.

Type: MOTION Filing Date: August 11, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to sever long-term policy for expiring QF issues and request for order shortening time for responses.

Type: RESPONSE Filing Date: August 6, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to an emergency motion of Calpine for a ruling establishine appropriate guidelines governing the scope of information to be considered confidential.

Type: PETITION Filing Date: August 5, 2004
Filed By:
UTILITY CONSUMERS' ACTION NETWORK
Description: to Intervene.

Type: COMMENTS Filing Date: July 29, 2004
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: Reply; on additional Resource Adequacy issues.

Type: RULING Filing Date: July 29, 2004
Filed By:
ALJ/WETZELL/PUC
Description: Grants the motion of South San Joaquin Irrigation District to intervene.

Type: RULING Filing Date: July 29, 2004
Filed By:
ALJ/WETZELL/PUC
Description: Grants the July 9, 2004 motion of PG&E for a protective order, as set forth.

Type: COMMENTS Filing Date: July 29, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; in response to ALJ Ruling requesting additional comments on resource adequacy issues.

Type: COMMENTS Filing Date: July 29, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on ALJ Ruling re acceleration of resource adequacy requirements.

Type: COMMENTS Filing Date: July 29, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: reply; to ALJ's Ruling requesting additonal comments on resource adequacy issues.

Type: COMMENTS Filing Date: July 29, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on ALJ Wetzell Ruling regarding Resource Adequacy Issues.

Type: COMMENTS Filing Date: July 27, 2004
Filed By:
CALIFORNIA CONSUMER EMPOWERMENT ALLIANCE
Description: reply; on resource adequacy workshop.

Type: RULING Filing Date: July 27, 2004
Filed By:
ALJ/WETZELL/PUC
Description: Finds that the Green Power Institute, Natural Resources Defense Council, Union of Concerned Scientists and TURN are each eligible for an award of intervenor compensation. Grants the requests of UCS, Constellation Power, FPL Energy, and Cal. Dept. of Water Resources State Water Project/State Water Contractors to intervene.

Type: REPLY Filing Date: July 27, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Comments on Resource Adequacy Workshop Report.

Type: MOTION Filing Date: July 27, 2004
Filed By:
SOUTH SAN JOAQUIN IRRIGATION DISTRICT
Description: to intervene.

Type: COMMENTS Filing Date: July 27, 2004
Filed By:
ORA/OBIORA/PUC
Description: reply; on the workshop report on resource adequacy issues.

Type: COMMENTS Filing Date: July 27, 2004
Filed By:
DUKE ENERGY NORTH AMERICA
Description: reply; on the workshop report on resource adequacy issues.

Type: COMMENTS Filing Date: July 27, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on the workshop report on resource adequacy issues.

Type: COMMENTS Filing Date: July 27, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; on the workshop report on resource adequacy issues.

Type: COMMENTS Filing Date: July 27, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: reply; on workshop report on resource adequacy issues.

Type: COMMENTS Filing Date: July 27, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: reply; on workshop report on resource adequacy issues.

Type: COMMENTS Filing Date: July 27, 2004
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: Reply; on Resource Adequacy Workshop Report.

Type: COMMENTS Filing Date: July 27, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; on Resource Adequacy Workshop Report.

Type: COMMENTS Filing Date: July 27, 2004
Filed By:
POWEREX CORP.
Description: Reply; on Workshop Report addressing Resource Adequacy issues.

Type: COMMENTS Filing Date: July 27, 2004
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: Reply; on the Resource Adequacy Workshop Report.

Type: RESPONSE Filing Date: July 26, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Emergency Motion of Calpine Corporation for a Ruling establishing confidentiality guidelines.

Type: RESPONSE Filing Date: July 26, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to PG&E's motion for protective order.

Type: RESPONSE Filing Date: July 26, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: in support of the July 22, 2004 Calpine motions re confidentiality.

Type: COMMENTS Filing Date: July 23, 2004
Filed By:
SILICON VALLEY MANUFACTURING GROUP
Description: concerning ALJ Cooke's Report regarding Workshops on Resource Adequacy Issues: SVMG Capacity Tagging Proposal..

Type: COMMENTS Filing Date: July 22, 2004
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
Description: in response to July 8, 2004 ruling on resource adequacy issues.

Type: RESPONSE Filing Date: July 22, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: to ALJ's ruling requesting additional comments on resource adequacy issues.

Type: MOTION Filing Date: July 22, 2004
Filed By:
CALPINE CORPORATION
Description: for an order shortening time to respond to emergency motion for a ruling establishing appropriate guidelines governing the scope of information to be considered confidential.

Type: LAW & MOTION Filing Date: July 22, 2004
Filed By:
CALPINE CORPORATION
Description: Emergency motion for a ruling establishing appropriate guidelines governing the scope of information to be considered confidential.

Type: EXPARTE Filing Date: July 22, 2004
Filed By:
DYNEGY, INC.
Description: LATE FILED. On June 28, 2004, Bruce A. Williamson, Chairman and Chief Executive Officer of Dynegy Inc. (Dynegy), met with Cmmr. Kennedy in San Francisco, and on July 20, 2004, sent a follow-up letter (copy attached to the notice) to Cmmr. Kennedy. Also present were Brian Prusnek, advisor to Cmmr. Kennedy, and Pete Wilt, Vice-President, Investor Relations, Greg Blue and Jennifer Rosser, Senior Directors, Government Affairs, and Brian Cragg, representing Dynegy. Dynegy's executives discussed Dynegy's new corporate policies and goals. Dynegy executives discussed the need for an accelerated Resource Adequacy timeline and for Deliverability Standards.

Type: COMMENTS Filing Date: July 22, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the Ruling of ALJ Wetzell regarding resource adequacy issues.

Type: COMMENTS Filing Date: July 22, 2004
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: on additional resource adequacy issues.

Type: COMMENTS Filing Date: July 22, 2004
Filed By:
WESTERN POWER TRADING FORUM
Description: on the Ruling requesting additional comments on resource adequacy issues and phase-in schedule adopted in Decision 04-01-050.

Type: COMMENTS Filing Date: July 22, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on additional resource adequacy issues.

Type: COMMENTS Filing Date: July 22, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: on ALJ Ruling re acceleration of resource adequacy requirements.

Type: COMMENTS Filing Date: July 22, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: in response to ALJ's ruling requesting additional comments on resource adequacy issues.

Type: COMMENTS Filing Date: July 22, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on proposed accelaration of the phase-in of full resource adequacy.

Type: COMMENTS Filing Date: July 22, 2004
Filed By:
ORA/OBIORA/PUC
Description: additional; on resource adequacy issues.

Type: EXPARTE Filing Date: July 15, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On July 13, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Julie Fitch, advisor to Cmmr. Peevey, in San Francisco. Also present were Barbara Hale, Robert Lane, Stephen St. Marie, Maryam Ebke, Jeanette Lo, Clayton Tang, and Shannon Eddy of the Commission; Constance Leni and Dave Vidaver of the California Energy Commission; and Roy Kuga, Vice President, Hal La Flash and Ray Williams, Directors, Gas and Electric Supply, Fong Wan, Vice President, Power Contracts & Electric Resource Development, Valerie Winn, Manager, Electric Revenue Requirements, and John Bogy, Attorney, for PG&E. Written material (attached to the notice) was used. Kuga described PG&E's proposal to implement the Energy Action Plan loading order. Wan reviewed PG&E's plan to conduct two separate and simultaneous long-term solicitations - one for resources that would be purchased under long-term contracts and one for new utility-owned generation facilities. Wan explained the benefits of PG&E's target for long-term commitments. Jacobson emphasized PG&E's need for immediate authority to conduct mid-term solicitations.

Type: COMMENTS Filing Date: July 14, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: on Workshop Report on Resource Adequacy Issues (REVISED). [Pursuant to the June 4, 2004 ruling].

Type: COMMENTS Filing Date: July 13, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Resource Adequacy Issues Workshop Report.

Type: PETITION Filing Date: July 13, 2004
Filed By:
CALIFORNIA DEPARTMENT OF WATER RESOURCES
STATE WATER PROJECTS
THE STATE WATER CONTRACTORS
Description: Joint Late; to Intervene; COMMENTS included.

Type: MOTION Filing Date: July 13, 2004
Filed By:
FPL ENERGY, LLC
Description: to Intervene & included COMMENTS on the Workshop Report on Resource Adequacy Issues.

Type: COMMENTS Filing Date: July 13, 2004
Filed By:
CALIFORNIA MANUFACTURERS & TECHNOLOGY ASSOCIATION
Description: on the Workshop Report on Resource Adequacy Issues.

Type: COMMENTS Filing Date: July 13, 2004
Filed By:
CALIFORNIA MUNICIPAL UTILITIES ASSOCIATION
Description: on the Workshop Report on Resource Adequacy Issues.

Type: COMMENTS Filing Date: July 13, 2004
Filed By:
ORA/OBIORA/PUC
Description: Opening; on the Workshop Report on Resource Adequacy Issues.

Type: COMMENTS Filing Date: July 13, 2004
Filed By:
POWEREX CORP.
Description: on Workshop Report addressing Resource Adequacy Issues.

Type: COMMENTS Filing Date: July 13, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: Opening; on the Workshop Report on Resource Adequacy Issues.

Type: COMMENTS Filing Date: July 13, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the Workshop Report on Resource Adequacy Issues.

Type: COMMENTS Filing Date: July 13, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on the Workshop Report on Resource Adequacy Issues.

Type: COMMENTS Filing Date: July 13, 2004
Filed By:
CALIFORNIA LARGE ENERGY CONSUMERS ASSOCIATION
Description: on ALJ Cooke's Workshop Report on Resource Adequacy Issues.

Type: COMMENTS Filing Date: July 13, 2004
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: Opening; on the Workshop Report on Resource Adequacy Issues.

Type: COMMENTS Filing Date: July 13, 2004
Filed By:
NORTHERN CALIFORNIA POWER AGENCY
Description: on the Workshop Report on Resource Adequacy Issues.

Type: COMMENTS Filing Date: July 13, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: on the Workshop Report on Resource Adequacy Issues.

Type: COMMENTS Filing Date: July 13, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: on the Workshop Report on Resource Adequacy Issues.

Type: COMMENTS Filing Date: July 13, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on Resource Adequacy Workshop Report.

Type: COMMENTS Filing Date: July 13, 2004
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: on the Workshop Report on Resource Adequacy Issues.

Type: COMMENTS Filing Date: July 13, 2004
Filed By:
SEMPRA ENERGY GLOBAL ENTERPRISES
Description: on Workshop Report on Resource Adequacy Issues.

Type: EXPARTE Filing Date: July 12, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: LATE FILED. On July 2, 2004, Bruce C. Foster, Vice President, Regulatory Operations for Southern California Edison Company (SCE), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Also present were Sean Gallagher of the Legal Division, Stephen St. Marie of the Energy Division, Gary Schoonyan, Director, Regulatory Policy and Affairs for SCE, and Robert Lane. Written material (copy attached to the notice) was used. SCE representatives discussed SCE's concerns regarding proposed interim order regarding electricity reliability issues.

Type: EXPARTE Filing Date: July 9, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: LATE FILED. On July 2, 2004, Erik Jacobson, Chief, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with Trina Horner, advisor to Cmmr. Lynch, and Julie Fitch, advisor to Cmmr. Peevey, in two separate meetings in San Francisco, and had a telephone conversation with Peter Hanson, advisor to Cmmr. Brown. At the meetings with Trina Horner and Julie Fitch also present were Claudia Greif, Manager, and Joe Lawlor, Energy Trading Consultant, Gas and Electric Supply Strategic Consulting, PG&E. Written material (attached to the notice) was used. Jacobson stated that the proposed decision should be modified to apply only to 2004. Jacobson also emphasized the importance of full cost recovery and getting clear guidance from the ISO regarding the nature of reliability problems. Greif explained that PG&E has a merchant role and its access to information regarding congestion is limited. Lawlor sated that there are no known reliability situations in PG&E's service territory that are not being addressed through RMR contracts.

Type: RULING Filing Date: July 9, 2004
Filed By:
ALJ/CAREW/PUC
Description: Concerns access of collaborative staff to long-term plans and supporting testimony.

Type: MOTION Filing Date: July 9, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: for protective order pursuant to Rule 74.7.

Type: EXPARTE Filing Date: July 9, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: On July 7, 2004, Robin Smutny-Jones of the California Independent System Operator (ISO) had a telephone conversation with Julie Fitch, advisor to Pres. Peevey. Jim Detmers of the ISO also participated in the communication. The ISO discussed the proposed Commission order regarding electricity reliability issues. The ISO explained that the order is a positive step in the right direction to help direct utility procurement and planning to better align with the limitations of the transmission grid. The ISO discussed the need for close coordination with appropriate parties in the event the order is approved.

Type: EXPARTE Filing Date: July 9, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: On July 6, 2004, Robin Smutny-Jones of the California Independent System Operator (ISO), met with Brian Prusnek, advisor to Cmmr. Kennedy, in San Francisco. Also present was Jim Detmers of the ISO. The ISO discussed ISO real time operational issues that arise as a result of utility procurement and dispatch practices. The ISO noted that real time congestion management has increased dramatically during the past couple of years. The ISO urged that the Commission procurement rules as well as cost recovery rules be aligned with efficient scheduling and dispatch to enable the ISO to reliably operate the grid.

Type: EXPARTE Filing Date: July 9, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: On July 6, 2004, Robin Smutny-Jones of the California Independent System Operator (ISO), met with David Gamson, advisor to Cmmr. Brown, in San Francisco. Also present was Jim Detmers of the ISO. The ISO discussed the pending Commission order regarding electricity reliability issues. The ISO stated that the order would be beneficial for California by helping to direct utility procurement and dispatch to better reflect the physical limitations of the transmission grid. The ISO also discussed the impact of this order on total overall costs and whether the order would be effective in changing utility procurement and scheduling behavior.

Type: EXPARTE Filing Date: July 9, 2004
Filed By:
WEST COAST POWER
Description: On July 6, 2004, Greg Blue, representing West Coast Power, an interested person, as defined by Rule 5(h)(2), had two separate telephone conversations: with David Gamson, advisor to Cmmr. Brown, and Brian Prusnek, advisor to Cmmr. Kennedy; and later the same day, he emailed to David Gamson and Brian Prusnek a document (copy attached to the notice). Blue urged support for the proposed decision of Pres. Peevey.

Type: RULING Filing Date: July 8, 2004
Filed By:
ALJ/WETZELL/PUC
Description: Requests additional comments on resource adequacy issues. Comments are due July 22, 2004; replies - July 29, 2004.

Type: COMMENTS Filing Date: July 1, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on Draft Decision regarding Electricity Reliability.

Type: COMMENTS Filing Date: July 1, 2004
Filed By:
ORA/OBIORA/PUC
Description: on the interim draft order re electricity reliability issues.

Type: COMMENTS Filing Date: July 1, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on interim order re electricity reliability issues.

Type: COMMENTS Filing Date: July 1, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: on the draft decision re reliability issues.

Type: COMMENTS Filing Date: July 1, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on proposed interim order re electricity reliability issues.

Type: COMMENTS Filing Date: July 1, 2004
Filed By:
CALPINE CORPORATION
Description: on ALJ's draft decision re electricity reliability issues.

Type: COMMENTS Filing Date: July 1, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR
Description: on the draft decision mailed June 28, 2004.

Type: COMMENTS Filing Date: July 1, 2004
Filed By:
WESTERN POWER TRADING FORUM
Description: in support of the Draft Interim Order regarding Reliability issues.

Type: COMMENTS Filing Date: July 1, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Interim Order regarding Electricity Reliability Issues.

Type: MOTION Filing Date: June 30, 2004
Filed By:
CONSTELLATION POWER SOURCE
Description: to intervene.

Type: RULING Filing Date: June 29, 2004
Filed By:
ALJ/WETZELL/PUC
Description: Supplements requirements for long-term plan filings.

Type: DRAFT DECISION Filing Date: June 28, 2004
Filed By:
ALJ/CPUC
Description: Interim order re electricity reliability issues. Comments are due July 1, 2004; no reply comments will be entertained.

Type: COMMENTS Filing Date: June 21, 2004
Filed By:
CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION
Description: reply; on Ruling re reliability issues.

Type: COMMENTS Filing Date: June 21, 2004
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: reply; in response to the June 10, 2004 ruling re reliability issues [pursuant to the June 17th ruling].

Type: COMMENTS Filing Date: June 21, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: reply; in response to the June 10, 2004 ruling.

Type: COMMENTS Filing Date: June 21, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: reply; concerning ruling re reliability issues.

Type: COMMENTS Filing Date: June 21, 2004
Filed By:
ORA/OBIORA/PUC
Description: reply; on the ruling re reliability issues.

Type: COMMENTS Filing Date: June 21, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on Ruling re reliability issues.

Type: COMMENTS Filing Date: June 21, 2004
Filed By:
TERMOELECTRICA DE MEXICALI S. DE R.L. DE C.V.
Description: Reply;

Type: COMMENTS Filing Date: June 21, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Assigned Commissioner's Ruling regarding Reliability Issues.

Type: COMMENTS Filing Date: June 17, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Assigned Commissioner's Ruling regarding Reliability Issues.

Type: RULING Filing Date: June 17, 2004
Filed By:
ALJ/MINKIN/PUC
Description: Concerns reply comments on reliability issues. Reply comments are due June 21, 2004.

Type: COMMENTS Filing Date: June 17, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: in response to the June 10, 2004 Assigned Commissioner's Ruling.

Type: COMMENTS Filing Date: June 17, 2004
Filed By:
NORTHERN CALIFORNIA POWER AGENCY
Description: on the Assigned Commissioner's Ruling re Reliability Issues.

Type: COMMENTS Filing Date: June 17, 2004
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: concerning the Assigned Commissioner's Ruling re reliability issues.

Type: COMMENTS Filing Date: June 17, 2004
Filed By:
CALPINE CORPORATION
Description: on the Assigned Commissioner's Ruling re reliability issues.

Type: COMMENTS Filing Date: June 17, 2004
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: concerning the Assigned Commissioner's Ruling re reliability issues.

Type: COMMENTS Filing Date: June 17, 2004
Filed By:
CALIFORNIA MUNICIPAL UTILITIES ASSOCIATION
Description: on the Assigned Commissioner's Ruling re reliability issues.

Type: COMMENTS Filing Date: June 17, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on Assigned Commissioner's Ruling re Reliability Isuses.

Type: COMMENTS Filing Date: June 17, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on Assigned Commissioner's Ruling regarding Reliability Issues.

Type: RULING Filing Date: June 16, 2004
Filed By:
ALJ/WETZELL/PUC
Description: Clarifies instructions on long-term plan filings set in Appendix A to the June 4, 2004 Ruling and Scoping Memo.

Type: REPORT Filing Date: June 15, 2004
Filed By:
ALJ/COOKE/PUC
Description: Workshop Report on Resource Adequacy Issues.

Type: RULING Filing Date: June 10, 2004
Filed By:
CMMR/PEEVEY/PUC
Description: Re: Reliability Issues. Comments on the issues raised in the ruling shall be filed by June 17, 2004.

Type: EXPARTE Filing Date: June 8, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: On June 3, 2004, Evelyn Kahl, counsel to the Cogeneration Association of California (CAC), met with Julie Fitch, advisor to Pres. Peevey, in San Francisco. Kahl raised CAC's concern over the possibility of loosing 1100 MW of existing cogeneration resources in Southern California Edison Company's (SCE) portfolio. Kahl explained that four existing qualifying facility contracts will be expiring beginning in 2005. Kahl emphasized that currently there are no rules or guidelines governing renewal of these contracts and encouraged the Commission to take an active role to avoid loss of SCE existing resource base in light of the state's evident need for generation.

Type: EXPARTE Filing Date: June 7, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: On June 3, 2004, Jerry Bloom of White & Case LLP, attorneys for the California Cogeneration Council (CCC), met with Julie Fitch, advisor to Cmmr. Peevey, in San Francisco. Also present was Lisa Cottle of White & Case LLP. Bloom and Cottle discussed the status of CCC member companies' efforts to obtain five-year Standard Offer 1 (SO1) contracts from California's investor-owned utilities (Utilities). Bloom and Cottle explained that CCC members have not been able to obtain a five-year SO1 contracts from any Utility, despite their repeated requests. Bloom and Cottle discussed the CCC's concerns that the Utilities are likely to impose unreasonable terms on qualifying facilities (QFs) once they do finally make the five-year SO1 contracts available. Bloom and Cottle discussed the need for long-term contracts for existing and new QFs, explaining that companies are making decisions now about whether to make investments in their facilities. Bloom and Cottle noted that companies are interested in investing in new cogeneration facilities, and are paying close attention to California's QF policies in deciding whether to make those investments.

Type: SCOPING RULING Filing Date: June 4, 2004
Filed By:
CMMR/PEEVEY/PUC
Description: Determines that this is a ratesetting proceeding. Sets the following schedule: 2nd prehearing conference - 8/25/4; evidentiary hearing - 8/30/4; Long Term Procurement: concurrent opening briefs - 9/27, concurrent reply briefs/submission - 10/8/4, final order - 12/16/4; Resource Adequacy: workshop report - June 2004, comments on workshop report due 21 days after report - July 2004, reply to comments/submission due 14 days after comments - July 2004; final order - 9/23/4.

Type: MOTION Filing Date: June 1, 2004
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: to intervene.

Type: NOTICE Filing Date: June 1, 2004
Filed By:
THE UTILITY REFORM NETWORK
Description: of intent to claim compensation.

Type: NOTICE Filing Date: June 1, 2004
Filed By:
NATURAL RESOURCES DEFENSE COUNCIL
Description: of intent to claim compensation.

Type: NOTICE Filing Date: June 1, 2004
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: of intent to claim intervenor compensation.

Type: NOTICE Filing Date: May 28, 2004
Filed By:
GREEN POWER INSTITUTE
Description: of intent to claim compensation.

Type: EXPARTE Filing Date: May 17, 2004
Filed By:
COGENERATION ASSOCIATION OF CALIFORNIA
Description: On May 12, 2004, Michael Alcantar representing the Cogeneration Association of California (Cogen) met with Pres. Peevey in San Francisco. Also present were Julie Fitch, advisor to Pres. Peevey, and Neil Burgess, Tom Lu, and Kelly Lucas, on behalf of Cogen. Cogen representatives discussed the benefits of cogeneration resources for multiple state policy interests; the contract termination dates for several of the existing Cogen project contracts; the need to secure a clear indication of the desire and need to retain the firm capacity from these resources quickly and decisively from the Commission; and possible procedures to seek prompt Commission review of utility and cogeneration contact extension filings.

Type: COMMENTS Filing Date: May 14, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on the allocation of Kings River Conservation District and City and County of San Francisco Power Purchase Agreement.

Type: COMMENTS Filing Date: May 14, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: [per ALJ Ruling dated May 4, 2004].

Type: COMMENTS Filing Date: May 14, 2004
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
Description: on the CDWR's letter dated April 14, 2004 [pursuant to May 4, 2004 ruling].

Type: COMMENTS Filing Date: May 14, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on the request of the CDWR to allocate peakers [pursuant to the May 4, 2004 ruling].

Type: MISCELLANEOUS FILING Filing Date: May 7, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Joint Outline for the 2004 Resource Plan.

Type: RULING Filing Date: May 4, 2004
Filed By:
ALJ/WETZELL/PUC
Description: Confirms and clarifies bench ruling. Comments on the DWR request set forth in the attached letter may be filed by May 14, 2004, in this proceeding. Comments should not be filed in R01-10-024.

Type: COMMENTS Filing Date: April 26, 2004
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: and prehearing conference statement, pursuant to the OIR.

Type: PREHEARING CONFERENCE STATEMENT Filing Date: April 26, 2004
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Prehearing Conference Statement.

Type: PREHEARING CONFERENCE STATEMENT Filing Date: April 26, 2004
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Prehearing Conference Statement.

Type: PREHEARING CONFERENCE STATEMENT Filing Date: April 26, 2004
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: [pursuant to the OIR].

Type: PREHEARING CONFERENCE STATEMENT Filing Date: April 26, 2004
Filed By:
CALPINE CORPORATION
Description: [pursuant to Ordering Paragraph 8 of the OIR].

Type: COMMISSION RULEMAKING Filing Date: April 1, 2004
Filed By:
CPUC - PG&E, EDISON, SDG&E
Description: Order Instituting Rulemaking to promote policy and program coordination and integration in electric utility resource planning. [Preliminary determines that this is a ratesetting proceeding. Sets the following preliminary schedule: Interested parties comments on utilitiies' working outlines - April 15, 2004; prehearing conference statements - April 26; prehearing conference - April 30, 2004.]

Top of Page   
  Back to Top of Page
2000 State of California. Gray Davis, Governor. Conditions of Use | Privacy Policy | E-mail Webmaster