All Documents For
Proceeding R0404026
Date Filed: April 22, 2004

Number of Documents: 708

Type: EXPARTE Filing Date: November 16, 2007
Filed By:
San Diego Gas & Electric Company
Description: SUMMARY: On November 13, 2007 Billy Blattner, Manager of Regulatory Relations for San Diego Gas & Electric Company (SDG&E) had a telephone conversation with Jack Stoddard, advisor to Pres. Peevey. Mike McClenahan, Director of Procurement and Portfolio Design for SDG&E; Abby Snyder, Counsel for SDG&E; and Steve Case, Counsel for SDG&E also participated in the phone call. Blattner expressed concern that language pertaining to the Assignment term proposed in the Proposed Decision (PD) could impede consents that resolve concerns about risk. McClenahan explained that language pertaining to the Eligibility term would hinder project financing and could impermissibly subject the utilities to hindsight reasonableness reviews. Contact Person: Trish Rickard; telephone: (415) 202-9986; e-mail: TRickard@SempraUtilities.com.

Type: EXPARTE Filing Date: November 14, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On November 8, 2007 Meredith Allen, Director, Regulatory Relations for Pacific Gas and Electric Company (PG&E) had a telephone conversation with Jackson Stoddard, advisor to Pres. Peevey in San Francisco. Allen explained PG&E's concern that the revised Draft Decision's discussion of the Assignment standard term could limit consents to assignment that a utility would be able to provide creating obstacles for sellers to obtain necessary financing. As a result, such language could harm customers by limiting opportunities for RPS contracting needed to meet the RPS goals and increasing customer costs.

Type: EXPARTE Filing Date: November 8, 2007
Filed By:
Southern California Edison Company
Description: SUMMARY: On November 7, 2007 Michael Hoover, Director of Regulatory Affairs of Southern California Edison Company (SCE) had a telephone call with Jack Stoddard, advisor to Pres. Peevey; J Eric Isken, Senior Attorney of SCE; Dawn Anaiscourt, Attorney for SCE; William Walsh, Attorney of SCE; Ellen LeVine, Legal Division of the CPUC; Paul Douglas, Energy Division of the CPUC; and Adam Umanoff of Chadbourne and Park also participated in the phone call. Written material (attached to this notice) was used. Walsh discussed the need to make the Commission's standard Assignment term in the investor owned utilities' ("IOUs") renewables portfolio standard ("RPS") contracts modifiable. SCE explained that the Commission's November 1, 2007 Proposed Decision (the "PD") incorrectly assumes that the standard language ensures that a lender assignee will be required to be bound by the power purchase agreement, including the assumptions of payment and performance obligations thereunder, in the event of a default. SCE stated that allowing the term to be modifiable provides greater opportunity for the IOUs to be able to negotiate consent to collateral assignment agreements with the renewable developers' lenders that ensure that power purchase agreements remain in place in the event of a foreclosure. SCE also indicated that it was satisfied with the standard Eligibility term identified in the PD, except that SCE would recommend allowing the parties to define "commercially reasonable efforts" elsewhere in the agreement. Contact Person: Henry Romero; telephone: (626) 302-4124; e-mail address: Henry.Romero@sce.com.

Type: EXPARTE Filing Date: November 7, 2007
Filed By:
Independent Energy Producers Association
Description: SUMMARY: On November 2, 2007 Steven Kelly, Policy Director of Independent Energy Producers Association (IEP) met with Nancy Ryan, advisor to Pres. Peevey in San Francisco. Also present were Andrew Schwartz, advisor to Pres. Peevey; and Brian Cragg, outside counsel for IEP. Kelly raised a concern that one of the proposed, non-modifiable standard contract terms mentioned in the Proposed Decision in this proceeding would create an unacceptable risk to project developers for changes in law that are outside the developers' control. Contact Person: Melinda LaJaunie; telephone: (415) 392-7900.

Type: EXPARTE Filing Date: November 5, 2007
Filed By:
Center for Energy Efficiency and Renewable Technologies
Description: SUMMARY: On October 31, 2007 Sara Steck Myers, attorney for the Energy Efficiency and Renewable Technologies (CEERT) had a telephone conversation with F. Jackson Stoddard, advisor to Pres. Peevey. Myers stated that CEERT had filed comments on the Proposed Decision of ALJ Mattson on Amended Petition for Modification of Decision 04-06-014 Regarding Standard Terms and Conditions (Proposed Decision) and had asked that the Proposed Decision be modified to limit the non-modifiable Renewable Portfolio Standard (RPS) standard terms and conditions (STCs) to the three identified in the Amended Petition. Myers indicated that CEERT had supported the original petition filed by Pacific Gas and Electric Company (PG&E) and Southern California Edison Company (SCE). Myers also stated that while CEERT continued to believe that all RPS STCs terms should be modifiable, as an alternative, CEERT did support the amended petition and asked that the Proposed Decision be modified to limit the non-modifiable STCs to just the three terms identified by PG&E and SCE in the Amended Petition. Contact Person: Sara Steck Myers; telephone: (415) 387-1904; e-mail: ssmyers@att.net.

Type: EXPARTE Filing Date: November 2, 2007
Filed By:
San Diego Gas & Electric Company
Description: SUMMARY: On October 30, 2007 Billy Blattner, Manager of Regulatory Relations for San Diego Gas & Electric Company (SDG&E) had a telephone conversation with Jack Stoddard, advisor to Pres. Peevey. Blattner expressed concern regarding the Eligibility term proposed in the Proposed Decision (PD). Blatner noted that a consensus is forming around "commercially reasonable" language offered by SDG&E in its comments on the PD, which would address parties' concerns about the potential impact of the provision on the ability to finance and develop renewable energy projects. Contact Person: Trish Rickard; telephone: (415) 202-9986; e-mail: TRickard@SempraUtilities.com.

Type: EXPARTE Filing Date: November 2, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On October 30, 2007 Meredith Allen, Director, Regulatory Relations for Pacific Gas and Electric Company (PG&E) met with Jaclyn Marks, advisor to Cmmr. Simon in San Francisco. Also present were Robert Mason, advisor to Cmmr. Simon; and Gary Jeung, Director, Structured Transactions of PG&E. Written materials (attached to the notice) were used. Jeung explained PG&E's concern that the draft decision's proposed change to the Eligibility standard term and its analysis of the Assignment standard term would harm customers by limiting opportunities for RPS contracting needed to meet the RPS goals and increasing customer costs. Allen stated that the draft decision's verification requirement would only create delays in the preparation of filings for contract approval.

Type: EXPARTE Filing Date: October 31, 2007
Filed By:
Southern California Edison Company
Description: SUMMARY: On October 29, 2007 Michael Hoover, Director of Regulatory Affairs, of Southern California Edison Company (SCE) had a telephone conversation with Jack Stoddard, advisor to Cmmr. Peevey. Hoover discussed the need to approve SCE's and Pacific Gas and Electric Company's ("PG&E") petition for modification of the standard terms and conditions decision (D.04-060-14) (the "Petition") based on the reasons outlined in SCE's comments to the Proposed Decision ("PD"). Hoover indicated that the standard non-modifiable Eligibility term, as drafted in the PD, could potentially make it impossible for renewables portfolio standard developers to receive financing for their projects. Contact Person: Henry Romero; telephone: (626) 302-4124; e-mail: Henry.Romero@sce.com.

Type: EXPARTE Filing Date: October 30, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On October 25, 2007 Meredith Allen, Director, Regulatory Relations for Pacific Gas and Electric Company (PG&E) had a telephone conversation with Jackson Stoddard, advisor to Pres. Peevey in San Francisco. Allen explained PG&E's concern that the Draft Decision's proposed change to the Eligibility standard term and its analysis of the Assignment standard term would harm customers by limiting opportunities for RPS contracting needed to meet the RPS goals and increasing customer costs. Allen further stated that the Draft Decision's verification requirement would only create delays in the preparation of filings for contract approval.

Type: EXPARTE Filing Date: October 29, 2007
Filed By:
Independent Energy Producers Association
Description: SUMMARY: On October 24, 2007 Douglas K. Kerner, attorney for the Independent Energy Producers Association ("IEP"), had two separate telephone conversations with Jackson Stoddard, advisor to Pres. Peevey. Kerner expressed IEP's concern with the Proposed Decision of ALJ Mattson, particularly with respect to its proposed, non-modifiable standard contract term. Kerner stated that the proposed provision creates untenable project risk to developers and lenders, and increased customer cost, due to changes in law. Contact Person: Eric Janssen; telephone: (916) 447-2166; e-mail: ericj@eslawfirm.com.

Type: COMMENTS Filing Date: October 29, 2007
Filed By:
Southern California Edison Company
Description: Reply; on Proposed Decision.

Type: COMMENTS Filing Date: October 29, 2007
Filed By:
Pacific Gas and Electric Company
Description: Reply; On the Proposed Decision on Amended Petition for Modification of D.04-06-014 (Standard Terms and Conditions).

Type: COMMENTS Filing Date: October 23, 2007
Filed By:
San Diego Gas & Electric Company
Description: On Proposed Decision Regarding Amended Petition for Modification of Decision 04-06-014.

Type: COMMENTS Filing Date: October 22, 2007
Filed By:
Southern California Edison Company
Description: On Proposed Decision.

Type: COMMENTS Filing Date: October 22, 2007
Filed By:
Independent Energy Producers Association
Description: On Draft Opinion on Amended Petition for Modification of Decision 04-06-014 Regarding Standard Terms and Conditions.

Type: COMMENTS Filing Date: October 22, 2007
Filed By:
Center for Energy Efficiency and Renewable Technologies
Description: On the Proposed Decision of ALJ Mattson On Amended Petition for Modification of Decision 04-06-014.

Type: COMMENTS Filing Date: October 22, 2007
Filed By:
Pacific Gas and Electric Company
Description: On the Proposed Decision on Amended Petition for Modification of D.04-06-014.

Type: COMMENTS Filing Date: October 19, 2007
Filed By:
DRA/OBIORA/CPUC
Description: On the Opinion on Amended Petition for Modification of Decision 04-06-014 Regarding Standard Terms and Conditions.

Type: PROPOSED DECISION Filing Date: October 1, 2007
Filed By:
ALJ/MATTSON/CPUC
Description: Opinion on Amended Petition for Modification of Decision 04-06-014 Regarding Standard Terms and Conditions. Opening Comments, which shall not exceed 15 pages, are due no later than October 21, 2007. Reply Comments are due 5 days after Opening Comments are filed.

Type: COMMENTS Filing Date: September 14, 2007
Filed By:
OBIORA/DRA/CPUC
Description: Reply; On the Proposed Decision on Petition for Modification of D.05-12-042.

Type: COMMENTS Filing Date: September 10, 2007
Filed By:
Southern California Edison Company
Description: On Proposed Decision.

Type: COMMENTS Filing Date: September 10, 2007
Filed By:
California Wind Energy Association
Concentrated Solar Power Alliance
The Green Power Institute
Description: on the Proposed Decision of ALJ Simon on the California Wind Energy Association's and The Green Power Institute's Petition for Modification of Decision 05-12-042.

Type: PROPOSED DECISION Filing Date: August 21, 2007
Filed By:
ALJ/SIMON/CPUC
Description: Opinion on Petition for Modification of Decision 05-12-042. Opening Comments, which shall not exceed 15 pages, are due no later than September 10, 2007. Reply Comments are due 5 days after Opening Comments are filed.

Type: RULING Filing Date: July 30, 2007
Filed By:
ALJ/SIMON/CPUC
Description: ALJ's Ruling on Motion for Party Status.

Type: REPLY Filing Date: July 24, 2007
Filed By:
California Wind Energy Association
The Green Power Institute
Description: to the Petition for Modification of Decision 05-12-042.

Type: RESPONSE Filing Date: July 17, 2007
Filed By:
CALIFORNIA COGENERATION COUNCIL
Description: to the Petition of the California Wind Energy Association and Green Power Institute for Modification of Decision 05-12-042.

Type: RESPONSE Filing Date: July 17, 2007
Filed By:
Pacific Gas and Electric Company
Description: to Petition of the California Wind Energy Association and the Green Power Institute for Modification of Decision 05-12-042: Interim Opinion Adopting Methodology for the 2005 Marketing Price Referent.

Type: RESPONSE Filing Date: July 17, 2007
Filed By:
San Diego Gas & Electric Company
Description: to Petition for Modification of D.05-12-042.

Type: RESPONSE Filing Date: July 17, 2007
Filed By:
Union of Concerned Scientists
Description: to the Petition of the California Wind Energy Association and the Green Power Institute for Modification of Decision 05-12-042: Interim Opinion Adopting Methodology for the 2005 Market Price Referent.

Type: RESPONSE Filing Date: July 17, 2007
Filed By:
Center for Energy Efficiency and Renewable Technologies
Description: to Petition of the California Wind Energy Association and Green Power Institute for Modification of Decision 05-12-042.

Type: COMMENTS Filing Date: July 17, 2007
Filed By:
DRA/OBIORA/CPUC
Description: on Petition of California Wind Energy Association and the Green Power Institute for Modification of Decision 05-12-042.

Type: RESPONSE Filing Date: July 17, 2007
Filed By:
Southern California Edison Company
Description: Opposition to the CALWEA and the Green Power Institute Petition for Modification of Decision 05-12-042.

Type: RESPONSE Filing Date: July 17, 2007
Filed By:
Concentrated Solar Power Alliance
Description: to the Petition of the California Wind Energy Association and Green Power Institute for Modification of Decision 05-12-042.

Type: EXPARTE Filing Date: July 17, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On July 12, 2007, Meredith Allen, Regulatory Relations of Pacific Gas and Electric Company (PG&E) met with Andrew Schwartz, advisor to Pres. Peevey in San Francisco. Also present were Jim Shandalov, Principal, Energy Procurement of PG&E; and Michael Hoover, Director, Regulatory Affairs of Southern California Edison (SCE). Written materials (attached to the notice) were used. Allen stated that the Commission should adopt the modifications to the RPS Standard Terms and Conditions decision (D.04-06-014) proposed in the Joint Amended petition of PG&E and SCE. These proposed modifications promote the RPS and incorporate the lessons learned through experience with the program.

Type: MOTION Filing Date: July 17, 2007
Filed By:
Concentrated Solar Power Alliance
Description: for Party Status by the Concentrated Solar Power Alliance.

Type: REPLY Filing Date: July 9, 2007
Filed By:
Pacific Gas and Electric Company
Southern California Edison Company
Description: to Responses on Amended Petition for Modification of D.04-06-014 regarding standard terms and conditions required for renewables portfolio standard contracts (filing authorized by ALJ Mattson per email ruling dated June 19, 2007).

Type: RESPONSE Filing Date: July 2, 2007
Filed By:
Independent Energy Producers Association
Description: to the Amended Petition for Modification.

Type: RESPONSE Filing Date: July 2, 2007
Filed By:
San Diego Gas & Electric Company
Description: to Amended Petition for Modification of Decision 04-06-014.

Type: RESPONSE Filing Date: June 29, 2007
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: to Amended Petititon for Modification of D.04-06-014.

Type: RULING Filing Date: June 28, 2007
Filed By:
ALJ/SIMON/CPUC
Description: on Motion to Expedite. The time for filing and service of responses to the petition of the California Wind Energy Association (CalWEA) and the Green Power Institute (GPI), for Modification of Decision 05-12-042, is shortened to July 17, 2007. CalWEA and GPI may file and serve a reply to the responses not later than July 24, 2007.

Type: PETITION FOR MODIFICATION Filing Date: June 25, 2007
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
THE GREEN POWER INSTITUTE
Description: of Decision 05-12-042: Interim Opinion Adopting Methodology for the 2005 Market Price Referent.

Type: MOTION Filing Date: June 25, 2007
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
THE GREEN POWER INSTITUTE
Description: for expedited decision and order shortening time related to its concurrently filed Petition for Modification of Decision 05-12-042: Interim Opinion Adopting Methodology for the 2005 Market Price Referent.

Type: EXPARTE Filing Date: June 22, 2007
Filed By:
Southern California Edison Company
Description: SUMMARY: On June 19, 2007, Michael Hoover, Director, Regulatory Affairs, Southern California Edison Company (SCE) had a telephone conversation with Andy Schwartz, advisor to Pres. Peevey. Hoover discussed the need to approve SCE's and Pacific Gas and Electric Company's (PG&E) petition for modification of D.04-06-014 (Petition) based on the reasons outlined in the Petition and the recently filed amended petition for modification. Hoover explained that the recent scoping memo for the 2008 renewables portfolio standard procurement plan reinforces the need to grant SCE's and PG&E's Petition. Contact person: Henry Romero, telephone: (626) 302-4124; e-mail: henry.Romero@sce.com

Type: COMMENTS Filing Date: June 19, 2007
Filed By:
Southern California Edison Company
Description: Supplemental; in support of Amended Petition for Modification of Decision 04-06-014 of PG&E and SCE regarding Standard Terms and Conditions Required for Renewables Portfolio Standard Contracts.

Type: COMMENTS Filing Date: June 18, 2007
Filed By:
Independent Energy Producers Association
Description: Reply; on the Proposed Decision.

Type: COMMENTS Filing Date: June 18, 2007
Filed By:
Pacific Gas and Electric Company
Southern California Edison
Description: Reply; on ALJ Mattson's Proposed Decision entitled "Opinion on Petition for Modification of Decision 04-06-014 regarding process for changing, and lifting restrictions on, designated standard terms and conditions"

Type: PETITION FOR MODIFICATION Filing Date: June 15, 2007
Filed By:
Pacific Gas and Electric Company
Southern California Edison Company
Description: Amended; of Decison 04-06-014 regarding Standard Terms and Conditions Required for Renewables Portfolio Standard Contracts.

Type: COMMENTS Filing Date: June 11, 2007
Filed By:
Pacific Gas and Electric Company
Description: on ALJ Mattson's Proposed Decision entitled Opinion on Petition for Modification of D0406014 Regarding Process for Changing, and Lifting Restrictions on, Designated Standard Terms and Conditions.

Type: COMMENTS Filing Date: June 11, 2007
Filed By:
San Diego Gas & Electric Company
Description: on Proposed Decision regarding Petition for Modification of Decision 04-06-014.

Type: COMMENTS Filing Date: June 8, 2007
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: of the Center for Energy Efficiency and Renewable Technologies on the Proposed Decision of ALJ Mattson.

Type: COMPLIANCE FILING Filing Date: May 29, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: pursuant to ALJ Ruling dated April 30, 2007.

Type: MOTION Filing Date: May 29, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: for Reconsideration of ALJ Ruling dated April 30, 2007 and Request for Continued Confidential Treatment of Documents provided under seal.

Type: MOTION Filing Date: May 29, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Supplemental Motion for Confidential Protection pursuant to ALJ Ruling dated April 30, 2007.

Type: NOTICE Filing Date: May 29, 2007
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: of Availability pursuant to ALJ Ruling dated April 30, 2007.

Type: PROPOSED DECISION Filing Date: May 22, 2007
Filed By:
ALJ/MATTSON/CPUC
Description: Opinion on Petition for Modification of Decision 04-06-014 Regarding Process for Changing, and Lifting Restrictions on, Designated Standard Terms and Conditions. Opening Comments, which shall not exceed 15 pages, are due no later than June 11, 2007. Reply Comments are due 5 days after Reply Comments are filed.

Type: RESPONSE Filing Date: May 22, 2007
Filed By:
San Diego Gas & Electric Company
Description: Compliance Filing: Unredacted Version of 2006 Renewable Portfolio Standard Procurement Plan.

Type: REPORT Filing Date: May 22, 2007
Filed By:
Southern California Edison Company
Description: (PUBLIC VERSION) 2006 Renewables Portfolio Standard Procurement Plan.

Type: RULING Filing Date: April 30, 2007
Filed By:
ALJ/MATTSON/CPUC
Description: on Southern California Edison Company motions to file data under seal.

Type: RULING Filing Date: April 30, 2007
Filed By:
ALJ/MATTSON/CPUC
Description: on PG&E' Company's Motions to File Data Under Seal (related to the Commission's Renewables Portfolio Standard Program).

Type: RULING Filing Date: April 30, 2007
Filed By:
ALJ/MATTSON/CPUC
Description: on SDG&E Company's Motions to File Data Under Seal (related to the Commission's Renewables Portfolio Standard Program).

Type: COMMENTS Filing Date: February 28, 2007
Filed By:
Independent Energy Producers Association
Description: on Petition for Modification of Decision 04-06-014 of PG&E and SCE regarding standard terms and conditions required for Renewables Portfolio Standard Contracts.

Type: RESPONSE Filing Date: February 28, 2007
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: to Petition for Modification of Decision 04-06-014 of Pacific Gas and Electric Company and Southern California Edison Company.

Type: PETITION FOR MODIFICATION Filing Date: February 1, 2007
Filed By:
Pacific Gas and Electric Company
Southern California Edison Company
Description: of D04-06-014 regarding standard terms and conditions required for Renewables Portfolio Standard contracts.

Type: PETITION FOR MODIFICATION Filing Date: November 20, 2006
Filed By:
AGLET CONSUMER ALLIANCE
Description: of D06-10-012.

Type: EXPARTE Filing Date: August 15, 2006
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: On August 10, 2006, Stacy Aguayo of APS Energy Services, representing the Alliance for Retail Energy Markets (AReM), met with Andrew Campbell, advisor to Cmmr. Chong, Belinda Gatti, advisor to Cmmr. Brown, Robert Lane and Lindsay Brown, advisors to Cmmr. Bohn, Nancy Ryan, advisor to Pres. Peevey, Julie Fitch, Director of Strategic Planning Division, Andrew Schwartz of the Division of Strategic Planning, and Bill Chen of Constellation NewEnergy, and Gregory Klatt of Douglass & Liddell, representing AReM. AReM representatives voiced concern about the timing of the Commission's implementation of the Renewables Portfolio Standard (RPS) for electric service providers (ESPs). AReM representatives expressed the need for interim guidance from the Commission regarding the manner in which ESPs are to participate in the RPS program, particularly for 2006, in the event that formal decisions resolving pending matters relating to ESP compliance are not adopted very soon. AReM representatives reiterated the need for the Commission to address issues relating to the use of unbundled Renewable Energy Credits.

Type: REQUEST Filing Date: July 25, 2006
Filed By:
AGLET CONSUMER ALLIANCE
Description: for Award of Compensation.

Type: REQUEST Filing Date: July 25, 2006
Filed By:
THE GREEN POWER INSTITUTE
Description: for Award of Compensation for Substantial Contribution to D.06-05-039.

Type: REQUEST Filing Date: July 25, 2006
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: for an award of compensation for substantial contributions to D05-07-039, D05-10-014, D05-11-025, D05-12-42, and D06-05-039 and for participation in utility procurement preview groups.

Type: RULING Filing Date: July 12, 2006
Filed By:
ALJ/MATTSON/CPUC
Description: REGARDING FILING OF INTERVENOR COMPENSATION REQUESTS. The requests, if filed, should be filed by July 25, 2006.

Type: COMPLIANCE FILING Filing Date: June 9, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Amended 2006 RFP Protocol.

Type: COMPLIANCE FILING Filing Date: June 9, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: (PUBLIC & CONFIDENTIAL VERSIONS) Amended 2006 Short-Term Renewable Procurement Plan.

Type: RULING Filing Date: May 23, 2006
Filed By:
ALJ/MATTSON/PUC
Description: Grants PG&E's motions of May 15, 2006 for leave to supplement its comments on reporting and compliance issues and for leave to file an appendix to its Supplement under seal.

Type: COMMENTS Filing Date: May 22, 2006
Filed By:
AGLET CONSUMER ALLIANCE
Description: Reply; on Proposed Decision of ALJ Mattson.

Type: COMMENTS Filing Date: May 22, 2006
Filed By:
GREEN POWER INSTITUTE
Description: Reply; on the Draft Decision of ALJ Mattson.

Type: LAW & MOTION Filing Date: May 22, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: motion for leave to file confidential material under seal; confidential materials attached and filed under seal, namely, PG&E's RPS compliance strategy.

Type: COMMENTS Filing Date: May 22, 2006
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: reply; on the proposed decision of ALJ Mattson on 2006 RPS Procurement Plans.

Type: COMMENTS Filing Date: May 22, 2006
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: reply; on the proposed decision of ALJ Mattson.

Type: COMMENTS Filing Date: May 22, 2006
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: reply; on the draft decision of ALJ Mattson.

Type: EXPARTE Filing Date: May 22, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On May 17, 2006, Frank De Rosa, Director, Power Contract, Pacific Gas and Electric Company (PG&E), met with Andrew Campbell, advisor to Cmmr. Chong, in San Francisco. Also present were Meredith Allen, Chief, Regulatory Relations, and Charles Post, Senior Power Contract Specialist, for PG&E. Confidential written materials, submitted under seal along with a motion for leave to file under seal, were used. A redacted version of the written material is attached to the notice. Allen explained that the Commission should adopt the full earmarking proposal. De Rosa stated that the full earmarking accommodates the lead times for developing new renewables projects.

Type: COMMENTS Filing Date: May 22, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on Draft Decision of ALJ Mattson.

Type: COMMENTS Filing Date: May 22, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; on Draft Decision (of ALJ Mattson) adopting 2006 RPS Procurement Plans.

Type: COMMENTS Filing Date: May 22, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on the proposed decision conditionally approving procurement plans for 2006 RPS solicitations.

Type: RULING Filing Date: May 18, 2006
Filed By:
ALJ/MATTSON/PUC
Description: Denies the May 15, 2006 motion of PG&E to shorten time for response, as set forth.

Type: LAW & MOTION Filing Date: May 18, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: motion for leave to file confidential material under seal; confidential material attached and filed under seal, namely, PG&E's RPS compliance strategy.

Type: EXPARTE Filing Date: May 18, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On May 15, 2006, Meredith Allen, Chief, Regulatory Relations, Pacific Gas and Electric Company, met with Peter Hanson, advisor to Cmmr. Brown, in San Francisco. Also present was Belinda Gatti, advisor to Cmmr. Brown. Confidential written materials, submitted under seal along with a motion for leave to file under seal, were used. A redacted version of the written material is attached to the notice. Allen explained that the Commission should adopt the full earmarking proposal.

Type: RULING Filing Date: May 17, 2006
Filed By:
CMMR/PEEVEY/PUC
Description: Adopting 2006 Transmision Ranking Cost Reports.

Type: LAW & MOTION Filing Date: May 16, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: motion for leave to file confidential material under seal; confidential material attached and filed under seal, namely, PG&E's RPS Compliance Strategy.

Type: EXPARTE Filing Date: May 16, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: On May 11, 2006, Meredith Allen, Chief, Regulatory Relations, Pacific Gas and Electric Company, met with Stephen St. Marie, advisor to Cmmr. Bohn, in San Francisco. Confidential written materials, submitted under seal along with a motion for leave to file under seal, were used. A redacted version of the written material is attached to the notice. Allen explained that the Commission should adopt the full earmarking proposal.

Type: COMMENTS Filing Date: May 15, 2006
Filed By:
COALITION OF CALIFORNIA UTILITY EMPLOYEES
Description: on the draft decision of ALJ Mattson.

Type: COMMENTS Filing Date: May 15, 2006
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: on the proposed decision adopting 2006 RPS procurement plans.

Type: COMMENTS Filing Date: May 15, 2006
Filed By:
AGLET CONSUMER ALLIANCE
Description: on Proposed Decision of ALJ Mattson.

Type: COMMENTS Filing Date: May 15, 2006
Filed By:
DRA/OBIORA/PUC
Description: opening; on the draft decision conditionally approving procurement plans for 2006 renewable procurement standards solicitations.

Type: COMMENTS Filing Date: May 15, 2006
Filed By:
CALIFORNIA WIND ENERGY ASSOCIATION
Description: on the draft decision of ALJ Mattson.

Type: MOTION Filing Date: May 15, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: for leave to supplement comments on reporting and compliance issues; supplement attached.

Type: MOTION Filing Date: May 15, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: for Order Shortening Time for Reply to Seven Days.

Type: COMMENTS Filing Date: May 15, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: on Draft Decision (of ALJ Mattson).

Type: COMMENTS Filing Date: May 15, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: opening; on the draft decision conditionally approving procurement plans for 2006 renewable procurement standards solicitations. ALJ Mattson conditionally approving procurement plans for 2006 RPS Solicitations, addressing TOD Benchmarking Methodology, and closing proceeding.

Type: COMMENTS Filing Date: May 15, 2006
Filed By:
INDEPENDENT ENERGY PRODUCERS ASSOCIATION
Description: on the draft decision of ALJ Mattson on 2006 RPS procurement plans.

Type: LAW & MOTION Filing Date: May 15, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: motion for leave to file confidential material under seal; confidential materials attached and filed under seal; namely, confidential appendix to Supplement to Comments.

Type: COMMENTS Filing Date: May 15, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: opening; on the proposed decision conditionally approving procurement plans, etc.

Type: COMMENTS Filing Date: May 15, 2006
Filed By:
GREEN POWER INSTITUTE
Description: on the draft decision of ALJ Mattson: Opinion Conditionally Approving Procurement Plans, etc.

Type: LAW & MOTION Filing Date: May 10, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: Motion for leave to file under seal confdidential material under seal; confidential materials attached and filed under seal, namely, PG&E's RPS Compliance Strategy.

Type: EXPARTE Filing Date: May 10, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: LATE FILED. On May 3, 2006, Fong Wan, Vice President, Energy Procurement, Pacific Gas and Electric Company (PG&E), met with Nancy Ryan, advisor to Pres. Peevey, in San Francisco. Also present were Frank De Rosa, Director, Power Contracts, and Meredith Allen, Chief, Regulatory Relations, for PG&E. Confidential written materials, submitted under seal with a motion for leave to file under seal, were used. A redacted version of the written material is attached to the notice. Wan and De Rosa explained that the Commission should adopt the full earmarking proposal. Wan indicated that full earmarking would allow PG&E to sign contracts in the best interests of its customers. De Rosa stated that full earmarking accommodates the lead times for developing new renewables projects, a key policy objective of the RPS.

Type: SUPPLEMENT Filing Date: May 4, 2006
Filed By:
GREEN POWER INSTITUTE
Description: to Request for an Award of Compensation for Substantial Contributions to D.05-07-039, D.05-10-014, D.05-11-025 and D.05-12-042

Type: REQUEST Filing Date: May 2, 2006
Filed By:
AGLET CONSUMER ALLIANCE
Description: for award of compensation.

Type: DRAFT DECISION Filing Date: April 25, 2006
Filed By:
ALJ/MATTSON/PUC
Description: Opinion Conditionally Approving Procurement Plans for 2006 RPS Solicitations, Addressing TOD Benchmarking Methodology, and Closing Proceeding. Comments are due May 15, 2006; reply comments - 5 days after comments are filed.

Type: DRAFT DECISION Filing Date: April 20, 2006
Filed By:
ALJ/SIMON/PUC
Description: Opinion Denying Petition for Modification of D05-07-039.Comments are due May 10, 2006; reply comments - 5 days after comments are filed.

Type: REPORT Filing Date: April 6, 2006
Filed By:
GOLDEN STATE WATER COMPANY
Description: Preliminary Renewable Portfolio Report for Bear Valley Electric Service.

Type: REQUEST Filing Date: April 3, 2006
Filed By:
THE UTILITY REFORM NETWORK
Description: for an award of compensation for substantial contributions to decisions D04-06-014, D04-06-015, D04-07-029, D05-05-011, D05-07-039, D05-10-014, D05-11-025, D05-12-042 and D06-01-046, and for participation in Utility Procurement Review Groups.

Type: RULING Filing Date: March 30, 2006
Filed By:
ALJ/SIMON/PUC
Description: Finds Aglet Consumer Alliance eligible to claim intervenor compensation.

Type: COMPLIANCE FILING Filing Date: March 27, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Transmission Ranking Cost Report for Renewable Portfolio Standard Procurement.

Type: COMMENTS Filing Date: March 22, 2006
Filed By:
GREEN POWER INSTITUTE
Description: Reply; on RPS Reporting and Compliance Issues.

Type: COMMENTS Filing Date: March 22, 2006
Filed By:
THE UTILITY REFORM NETWORK
UNION OF CONCERNED SCIENTISTS
Description: joint, reply; on Renewables Portfolio Standard reporting and compliance issues.

Type: COMMENTS Filing Date: March 22, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; on reporting and compliance issues.

Type: COMMENTS Filing Date: March 22, 2006
Filed By:
DRA/OBIORA/PUC
Description: reply; on the Renewable Portfolio Standards program annual procurement targets reporting and compliance staff White Paper.

Type: COMMENTS Filing Date: March 22, 2006
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: Reply; on Staff White Paper on Annual Procurement Targets and related Reporting and Compliance issues.

Type: COMMENTS Filing Date: March 22, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on Staff White Paper titled 'RPS Annual Procurement Targets: Reporting and Compliance.'

Type: COMMENTS Filing Date: March 22, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; regarding Reporting and Compliance Staff White Paper.

Type: COMMENTS Filing Date: March 22, 2006
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: reply; on Energy Division White Paper on RPS reporting and compliance.

Type: COMPLIANCE FILING Filing Date: March 15, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Transmission Ranking Cost Report for Renewable Portfolio Standard Procurement.

Type: REPORT Filing Date: March 15, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: 2006 Transmission Ranking Cost Report in compliance with the Ruling of November 9, 2005.

Type: COMMENTS Filing Date: March 13, 2006
Filed By:
THE UTILITY REFORM NETWORK
UNION OF CONCERNED SCIENTISTS
Description: joint; on renewables portfolio standard reporting and compliance issues.

Type: COMMENTS Filing Date: March 13, 2006
Filed By:
CENTER FOR ENERGY EFFICIENCY AND RENEWABLE TECHNOLOGIES
Description: on Energy Division White Paper on RPS Reporting and Compliance.

Type: COMMENTS Filing Date: March 13, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: on reporting and compliance issues.

Type: COMMENTS Filing Date: March 13, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: on Staff White Paper titled 'RPS Annual Procurement Targets: Reporting and Compliance.'

Type: COMMENTS Filing Date: March 13, 2006
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
CITY OF CHULA VISTA
Description: regarding reporting and compliance for the renewable portfolio standard.

Type: COMMENTS Filing Date: March 13, 2006
Filed By:
DRA/OBIORA/PUC
Description: opening; on the renewable portfolio standards program annual procurement targets reporting and compliance staff white paper.

Type: COMMENTS Filing Date: March 13, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: re: Reporting and Compliance Staff White Paper.

Type: COMMENTS Filing Date: March 13, 2006
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: on the Staff White Paper on Annual Procurement Targets and related Reporting and Compliance issues.

Type: COMMENTS Filing Date: March 10, 2006
Filed By:
GREEN POWER INSTITUTE
Description: on RPS reporting and compliance issues [pursuant to the February 23, 2006 ruling].

Type: SUPPLEMENT Filing Date: March 6, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: to Compliance Filing of 03/01/06 re: Achievement of 2005 Renewable Portfolio Standard Annual Procurement Target.

Type: COMMENTS Filing Date: March 1, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; to comments on Time of Delivery Factors and Benchmarking Proposal.

Type: COMPLIANCE FILING Filing Date: March 1, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: [in compliance with D03-06-071 and D05-07-039, Ordering Paragraph 17]Reporting Achievement of Annual Procurement Target for Renewable Generation Pursuant to Renewable Portfolio Standard.

Type: SUPPLEMENT Filing Date: March 1, 2006
Filed By:
GREEN POWER INSTITUTE
Description: to June 13, 2005 Request for Intervenor Compensation.

Type: COMPLIANCE FILING Filing Date: March 1, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: March 1, 2006 Renewables Portfolio Standard.

Type: COMMENTS Filing Date: March 1, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; on [its] Time of Delivery Profile Benchmarking and Evaluation Proposal.

Type: COMMENTS Filing Date: March 1, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on [its] proposal for Benchmarking and evaluating Time of Delivery Profiles.

Type: COMPLIANCE FILING Filing Date: March 1, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: re: Achievement of 2005 Renewable Poretfolio Standard Annual Procurement Target.

Type: RULING Filing Date: February 23, 2006
Filed By:
ALJ/MATTSON/SIMON/PUC
Description: Directs parties to file comments on the staff white paper titled "RPS Annual Procurement Targets: Reporting and Compliance", by March 10, 2006, and reply comments by March 17, 2006.

Type: COMPLIANCE FILING Filing Date: February 21, 2006
Filed By:
SIERRA PACIFIC POWER COMPANY
Description: Proposals for Compliance with California's Renewables Portfolio Standards Program.

Type: MISCELLANEOUS FILING Filing Date: February 17, 2006
Filed By:
PACIFICORP
Description: Proposal for RPS Participation; pursuant to ALJ Simon's Ruling of February 3, 2006.

Type: COMPLIANCE FILING Filing Date: February 17, 2006
Filed By:
MOUNTAIN UTILITIES
Description: Proposal.

Type: COMPLIANCE FILING Filing Date: February 17, 2006
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: Proposal for the Participation of Electric Service Providers in the Renewable Portfolio Standard Program under the framework established in Decision 05-11-025.

Type: COMPLIANCE FILING Filing Date: February 17, 2006
Filed By:
CITY AND COUNTY OF SAN FRANCISCO
CITY OF CHULA VISTA
Description: Proposal for Renewable Portfolio Standards Program Participation for Community Choice Aggregators.

Type: REQUEST Filing Date: February 16, 2006
Filed By:
GREEN POWER INSTITUTE
Description: for an Award of Compensation for Substantial Contributions to D.05-07-039, D.05-10-014, D.05-11-025 and D.05-12-042.

Type: COMMENTS Filing Date: February 15, 2006
Filed By:
GREEN POWER INSTITUTE
Description: on the TOD benchmark proposals of PG&E, SCE and SDG&E.

Type: COMMENTS Filing Date: February 15, 2006
Filed By:
SOLEL INC.
Description: on the large utility proposals for benchamarking and evaluating Time of Delivery profiles.

Type: COMMENTS Filing Date: February 15, 2006
Filed By:
DRA/OBIORA/PUC
Description: on the large utility proposals for benchamarking and evaluating Time of Delivery profiles.

Type: COMMENTS Filing Date: February 15, 2006
Filed By:
AGLET CONSUMER ALLIANCE
Description: on IOU Proposals for Benchmarking TOD Profiles.

Type: REPORT Filing Date: February 14, 2006
Filed By:
PILOT POWER GROUP, INC.
Description: (REDACTED VERSION) Preliminary Renewable Portfolio.

Type: LAW & MOTION Filing Date: February 14, 2006
Filed By:
PILOT POWER GROUP, INC.
Description: for Leave to File Confidential Material Under Seal and for Protective Order; Confidential Materials Attached and Filed Under Seal, namely, Unredacted Version of Preliminary Renewable Portfolio Report.

Type: SUPPLEMENT Filing Date: February 8, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: to the Draft 2006 Renewables Portfolio Standard Solicitation Protocol filed December 22, 2005, and TOD Factors Benchmarking Study.

Type: SUPPLEMENT Filing Date: February 8, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: to Proposal for Benchmarking and Evaluating Time-of-Delivery Profiles.

Type: RULING Filing Date: February 3, 2006
Filed By:
ALJ/SIMON/PUC
Description: Extends time to file proposals for RPS participation, to February 17, 2006. Comments on such proposals are due by March 7, 2006; reply comments - March 15, 2006.

Type: LAW & MOTION Filing Date: February 1, 2006
Filed By:
CONSTELLATION NEWENERGY, INC.
Description: motion for leave to file confidential material under seal and for protective order.

Type: LAW & MOTION Filing Date: February 1, 2006
Filed By:
PRAXAIR PLAINFIELD, INC.
Description: motion for leave to file confidential material under seal and for protective order.

Type: LAW & MOTION Filing Date: February 1, 2006
Filed By:
COMMERCE ENERGY, INC.
Description: for leave file unredacted version of Preliminary Renewable Portfolio Report under seal.

Type: LAW & MOTION Filing Date: February 1, 2006
Filed By:
STRATEGIC ENERGY, LLC
Description: for leave to file unredacted version of Preliminary Renewable Portfolio Report under seal.

Type: LAW & MOTION Filing Date: February 1, 2006
Filed By:
CALPINEPOWERAMERICA-CA, LLC
Description: for leave to file Exhibit A to Preliminary Renewable Portfolio Report under seal.

Type: LAW & MOTION Filing Date: February 1, 2006
Filed By:
APS ENERGY SERVICES
Description: for leave to file unredacted version of Preliminary Renewable Portfolio Report under seal.

Type: LAW & MOTION Filing Date: February 1, 2006
Filed By:
SEMPRA ENERGY SOLUTIONS
Description: Motion for Leave to File Confidential Information Under Seal and for Adoption of Protective Order, namely, Preliminary Report in compliance with the Renewable Portfolio Standards.

Type: COMMENTS Filing Date: January 31, 2006
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
Description: reply; to comments on 2006 RPS Plan.

Type: COMMENTS Filing Date: January 31, 2006
Filed By:
UNION OF CONCERNED SCIENTISTS
Description: reply; on 2006 RPS procurement plans and draft requests for offers.

Type: COMMENTS Filing Date: January 31, 2006
Filed By:
ALLIANCE FOR RETAIL ENERGY MARKETS
Description: Reply; on 2006 RPS Procurement Plans of PG&E, SDG&E and SCE.

Type: COMMENTS Filing Date: January 31, 2006
Filed By:
SAN DIEGO GAS & ELECTRIC COMPANY
Description: Reply; concerning 2006 Short-Term Renewable Procurement Plan and Draft RFO.

Type: COMMENTS Filing Date: January 31, 2006
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
Description: Reply; on 2006 RPS Procurement Plan.

Type: COMMENTS Filing Date: January 31, 2006
Filed By:
DRA/OBIORA/PUC
Description: reply; on the 2006 renewable energy procurement plans of Edison, PG&E, and SDG&E.

Type: COMMENTS Filing Date: January 30, 2006
Filed By:
AGLET CONSUMER ALLIANCE
Description: Reply; to Comments of Green Power Institute.

Type: RESPONSE Filing Date: January 27, 2006
Filed By:
AGLET CONSUMER ALLIANCE
Description: in Opposition to Motion of CCSF and City of Chula Vista.

Type: COMPLIANCE FILING Filing Date: January 26, 2006
Filed By:
CORAL POWER, LLC
Description: Preliminary Renewable Portfolio Report.

Type: REPORT Filing Date: January 26, 2006
Filed By:
CONSTELLATION NEWENERGY, INC.
Description: PUBLIC VERSION; preliminary renewable portfolio report.

Type: REPORT Filing Date: January 26, 2006
Filed By:
CALP