Commissioner Assigned: Michael R. Peevey on January 25, 2011
ALJ Assigned: Regina DeAngelis on August 24, 2009
|
Filer Requested Category:
Preliminary Category:
Quasi-legislative
Commission Designated Category:
Quasi-legislative
|
Filed By:
CPUC
|
|
|
DOCUMENTS
Number of Documents: 221
(only the most current 100 are displayed)
Display all documents for this proceeding
|
Type:
RULING
|
Filing Date:
January 31, 2012
|
Filed By:
ALJ/DEANGELIS/CPUC
|
|
Description:
ADMINISTRATIVE LAW JUDGE'S RULING - PHASE 3. (1) Responses to questions in Section 3 are due within 20 days of the date of this ruling. (2) Comments on the Roadmap Report are due within 20 days of the date of this ruling. (3) Reply comments are due 10 days following the deadline for comments. (4) Utilities shall file requests for extension of time as needed under Rule 16.6 as a result of the modified deadline initially set forth in Decision 11-12-029.
|
Type:
NOTICE
|
Filing Date:
January 9, 2012
|
Filed By:
Community Environmental Council
|
|
Description:
LATE-FILED NOTICE OF INTENT TO CLAIM INTERVENOR COMPENSATION
|
Type:
COMPLIANCE FILING
|
Filing Date:
January 3, 2012
|
Filed By:
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
Submetering Protocol Roadmap Report (pursuant to Decision 11-07-029)
|
Type:
COMPLIANCE FILING
|
Filing Date:
December 23, 2011
|
Filed By:
Pacific Gas and Electric Company
San Diego Gas & Electric Company
Southern California Edison Company
|
|
Description:
Joint IOU Assessment Report for PEV Notification (pursuant to D.11-07-029)
|
Type:
COMPLIANCE FILING
|
Filing Date:
November 14, 2011
|
Filed By:
PACIFIC GAS AND ELECTRIC COMPANY
SAN DIEGO GAS & ELECTRIC COMPANY
Southern California Edison Company
|
|
Description:
Submetering Protocol Workshop Report (per O.P. 4 of Decision 11-07-029).
|
Type:
MOTION
|
Filing Date:
September 27, 2011
|
Filed By:
Community Environmental Council
|
|
Description:
Motions for Party Status.
|
Type:
REQUEST
|
Filing Date:
September 23, 2011
|
Filed By:
Natural Resources Defense Council
|
|
Description:
for intervenor compensation for contributions to D11-07-029 (allocation of hours by issues in the Correspondence file).
|
Type:
REQUEST
|
Filing Date:
September 21, 2011
|
Filed By:
Green Power Institute
|
|
Description:
for intervenor compensation for contributions to D11-07-029.
|
Type:
REQUEST
|
Filing Date:
September 16, 2011
|
Filed By:
Consumer Federation of California
|
|
Description:
for intervenor compensation for contirbutions to D11-07-029.
|
Type:
REQUEST
|
Filing Date:
September 15, 2011
|
Filed By:
The Utility Reform Network
|
|
Description:
for intervenor compensation for contributions to D10-07-044 and D11-07-029
|
Type:
SCOPING RULING
|
Filing Date:
July 28, 2011
|
Filed By:
CMMR/PEEVEY/CPUC
|
|
Description:
Assigned Commissioner's Scoping Memo Ruling - Phase 3. This Ruling confirms categorization of Phase 3 of this proceeding as quasi-legislative. The scope of and the schedule for this proceeding are as set forth. The schedule does not anticipate evidentiary hearings for Phase 3 of this proceeding.
|
Type:
COMMENTS
|
Filing Date:
May 4, 2011
|
Filed By:
Natural Resources Defense Council
|
|
Description:
Opening; ON PROPOSED INTERVENOR COMPENSATION DECISION
|
Type:
COMMENTS
|
Filing Date:
April 15, 2011
|
Filed By:
Nissan North America, Inc.
|
|
Description:
OPENING; TO PHASE 2 DECISION ESTABLISHING POLICIES TO OVERCOME BARRIERS TO ELECTRIC VEHICLE DEPLOYMENT AND COMPLYING WITH PUBLIC UTILITIES CODE SECTION 740.2
|
Type:
PROPOSED DECISION
|
Filing Date:
April 14, 2011
|
Filed By:
ALJ/DEANGELIS/CPUC
|
|
Description:
Decision Granting Request of Natural Resources Defense Council and Friends of the Earth for Intervenor Compensation for Substantial Contributions to Decision 10-07-044. Opening comments, which shall not exceed 15 pages, are due no later than May 4, 2011. Reply comments, which shall not exceed 5 pages, are due no later than five days after the last day for filing comments.
|
Type:
COMMENTS
|
Filing Date:
April 12, 2011
|
Filed By:
General Motors
|
|
Description:
REPLY; TO PHASE 2 DECISION ESTABLISHING POLICIES TO OVERCOME BARRIERS TO ELECTRIC VEHICLE DEPLOYMENT AND COMPLYING WITH PUBLIC UTLITIES CODE SECTION 740.2
|
Type:
COMMENTS
|
Filing Date:
April 11, 2011
|
Filed By:
Sam's West, Inc.
Walmart Stores, Inc.
|
|
Description:
REPLY; ON THE PHASE 2 DECISION
|
Type:
COMMENTS
|
Filing Date:
April 11, 2011
|
Filed By:
Clean Energy Fuels Corporation
|
|
Description:
REPLY;
|
Type:
COMMENTS
|
Filing Date:
April 11, 2011
|
Filed By:
Natural Resources Defense Council
|
|
Description:
REPLY; ON PROPOSED DECISION ON PHASE TWO ISSUES
|
Type:
COMMENTS
|
Filing Date:
April 11, 2011
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
REPLY; ON PHASE 2 PROPOSED DECISION
|
Type:
COMMENTS
|
Filing Date:
April 11, 2011
|
Filed By:
Better Place
Coulomb Technologies, Inc.
EV SERVICE PROVIDERS COALITION: ECOTALITY, INC.
|
|
Description:
REPLY; ON PROPOSED PHASE 2 DECISION
|
Type:
COMMENTS
|
Filing Date:
April 11, 2011
|
Filed By:
Green Power Institute
|
|
Description:
REPLY; ON THE PROPOSED DECISION
|
Type:
COMMENTS
|
Filing Date:
April 11, 2011
|
Filed By:
Environmental Defense Fund
|
|
Description:
REPLY; IN RESPONSE TO PROPOSED PHASE 2 DECISION
|
Type:
COMMENTS
|
Filing Date:
April 11, 2011
|
Filed By:
Southern California Edison Company
|
|
Description:
REPLY; ON THE PHASE 2 DECISION ESTABLISHING POLICIES TO OVERCOME BARRIERS TO ELECTRIC VEHICLE DEPLOYMENT AND COMPLYING WITH PUBLIC UTILITIES CODE SECTION 740.2
|
Type:
COMMENTS
|
Filing Date:
April 11, 2011
|
Filed By:
The Utility Reform Network
|
|
Description:
REPLY; TO COMMENTS ISSUED ON THE PROPOSED DECISION OF COMMISSIONER PEEVEY ON PHASE 2
ISSUES
|
Type:
COMMENTS
|
Filing Date:
April 11, 2011
|
Filed By:
Center for Energy Efficiency and Renewable Technologies
|
|
Description:
REPLY; TO OPENING COMMENTS ON THE PHASE 2 PROPOSED DECISION
|
Type:
COMMENTS
|
Filing Date:
April 11, 2011
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
REPLY; ON PROPOSED DECISION
|
Type:
COMMENTS
|
Filing Date:
April 11, 2011
|
Filed By:
DRA/C.LEE/CPUC
|
|
Description:
Reply;
|
Type:
COMMENTS
|
Filing Date:
April 6, 2011
|
Filed By:
Environmental Defense Fund
|
|
Description:
OPENING; IN RESPONSE TO PROPOSED PHASE 2 DECISION
|
Type:
COMMENTS
|
Filing Date:
April 6, 2011
|
Filed By:
Western States Petroleum Association
|
|
Description:
OPENING; ON THE PROPOSED DECISION
|
Type:
COMMENTS
|
Filing Date:
April 6, 2011
|
Filed By:
General Motors
|
|
Description:
OPENING; TO PHASE 2 DECISION ESTABLISHING POLICIES TO OVERCOME BARRIERS TO ELECTRIC VEHICLE DEPLOYMENT AND COMPLYING WITH PUBLIC UTLITIES CODE SECTION 740.2
|
Type:
COMMENTS
|
Filing Date:
April 5, 2011
|
Filed By:
SOUTHERN CALIFORNIA EDISON COMPANY
|
|
Description:
OPENING; ON THE PHASE 2 DECISION ESTABLISHING POLICIES TO OVERCOME
BARRIERS TO ELECTRIC VEHICLE DEPLOYMENT AND COMPLYING WITH
PUBLIC UTILITIES CODE SECTION 740.2
|
Type:
COMMENTS
|
Filing Date:
April 5, 2011
|
Filed By:
Natural Resources Defense Council
|
|
Description:
Opening; ON PROPOSED DECISION ON PHASE TWO ISSUES
|
Type:
COMMENTS
|
Filing Date:
April 5, 2011
|
Filed By:
Clean Energy Fuels Corporation
|
|
Description:
OPENING;
|
Type:
COMMENTS
|
Filing Date:
April 5, 2011
|
Filed By:
The Utility Reform Network
|
|
Description:
Opening; ON THE PROPOSED DECISION OF COMMISSIONER PEEVEY ON PHASE 2 ISSUES
|
Type:
COMMENTS
|
Filing Date:
April 5, 2011
|
Filed By:
DRA/C.LEE/CPUC
|
|
Description:
OPENING:
|
Type:
COMMENTS
|
Filing Date:
April 5, 2011
|
Filed By:
Better Place
Coulomb Technologies
EV Service Providers Coalition: Ecotality, Inc.
|
|
Description:
Opening; ON PROPOSED PHASE 2 DECISION
|
Type:
COMMENTS
|
Filing Date:
April 5, 2011
|
Filed By:
Consumer Federation of California
|
|
Description:
OPENING; ON THE PROPOSED DECISION IN PHASE 2 ESTABLISHING POLICIES TO OVERCOME BARRIERS TO ELECTRIC VEHICHLE DEPLOYMENT AND COMPLYING WITH PUBLIC UTILITIES CODE 740.2
|
Type:
COMMENTS
|
Filing Date:
April 5, 2011
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Opening; ON PROPOSED DECISION
|
Type:
COMMENTS
|
Filing Date:
April 5, 2011
|
Filed By:
The Interstate Renewable Energy Council
|
|
Description:
Opening; ON THE PROPOSED DECISION
|
Type:
COMMENTS
|
Filing Date:
April 5, 2011
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
OPENING; ON PHASE 2 PROPOSED DECISION
|
Type:
COMMENTS
|
Filing Date:
April 4, 2011
|
Filed By:
Sacramento Municipal Utility District
|
|
Description:
OPENING; TO THE PROPOSED DECISION OF COMMISSIONER MICHAEL R. PEEVEY ON PHASE 2 DECISION ESTABLISHING POLICIES TO OVERCOME BARRIERS TO ELECTRIC VEHICLE DEPLOYMENT AND COMPLYING WITH PUBLIC UTILITIES
CODE SECTION 740.2
|
Type:
COMMENTS
|
Filing Date:
April 4, 2011
|
Filed By:
Green Power Institute
|
|
Description:
Opening; ON THE PROPOSED DECISION
|
Type:
PROPOSED DECISION
|
Filing Date:
March 29, 2011
|
Filed By:
ALJ/DEANGELIS/CPUC
|
|
Description:
Decision Granting Request of Californians for Renewable Energy, Inc. for Intervenor Compensation for Substantial Contributions to Decision 10-07-044. Opening comments, which shall not exceed 15 pages, are due no later than April 18, 2011. Reply comments, which shall not exceed 5 pages, are due no later than five days after the last day for filing comments.
|
Type:
PROPOSED DECISION
|
Filing Date:
March 15, 2011
|
Filed By:
CMMR/PEEVEY/CPUC
|
|
Description:
Phase 2 Decision establishing policies to overcome barriers to electric vehicle deployment and complying with Public Utilities Code Section 740.2. Opening comments, which shall not exceed 15 pages, are due no later than April 4, 2011. (Due date for the opening comments extended from April 4, 2011 to April 5, 2011, per ALJ DeAngelis' email sent to the service list. PCG) Reply comments, which shall not exceed 5 pages, are due 5 days after the last day for filing opening comments.
|
Type:
MOTION
|
Filing Date:
February 1, 2011
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
TO CORRECT THE RECORD
|
Type:
RULING
|
Filing Date:
January 10, 2011
|
Filed By:
ALJ/DeANGELIS/CPUC
|
|
Description:
Regarding Notice of Intent to Claim Compensation
|
Type:
NOTICE
|
Filing Date:
January 4, 2011
|
Filed By:
The Greenlining Institute
|
|
Description:
[AMENDED] OF INTENT TO CLAIM INTERVENOR COMPENSATION
|
Type:
RULING
|
Filing Date:
December 30, 2010
|
Filed By:
ALJ/DeANGELIS/CPUC
|
|
Description:
issuing Workshop Reports and entering staff documents into the record.
|
Type:
COMMENTS
|
Filing Date:
December 7, 2010
|
Filed By:
Southern California Edison Company
|
|
Description:
Amendment to Reply (comments) to responses to ALJ's ruling requesting additional information and setting comment schedule
|
Type:
COMMENTS
|
Filing Date:
December 6, 2010
|
Filed By:
International Council on Clean Transportation
|
|
Description:
on clean transportation in response to Administrative Law Judge's request for additional information (filing was authorized by ALJ DeAngelis per e-mail of 12/10/2010).
|
Type:
COMMENTS
|
Filing Date:
December 6, 2010
|
Filed By:
Southern California Edison Company
|
|
Description:
Reply; to responses to ALJ's ruling requesting additional information and setting comment schedule
|
Type:
COMMENTS
|
Filing Date:
December 3, 2010
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
REPLY; ON ADMINISTRATIVE LAW JUDGE'S RULING
|
Type:
COMMENTS
|
Filing Date:
December 3, 2010
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
REPLY; IN RESPONSE TO OCTOBER 27, 2010, ADMINISTRATIVE LAW JUDGE'S RULING
|
Type:
COMMENTS
|
Filing Date:
December 3, 2010
|
Filed By:
The Utility Reform Network
|
|
Description:
REPLY; IN RESPONSE TO ALJ DEANGELIS' RULING REQUESTING ADDITIONAL INFORMATION
|
Type:
COMMENTS
|
Filing Date:
December 3, 2010
|
Filed By:
Green Power Institute
|
|
Description:
REPLY; ON THE ALJ's RULING REQUESTING ADDITIONAL INFORMATION
|
Type:
COMMENTS
|
Filing Date:
December 3, 2010
|
Filed By:
BETTER PLACE (EVSP COALITION)
COULOMB TECHNOLOGIES, INC. (EVSP COALITION)
ECOTALITY, INC. ( EVSP COALITION)
|
|
Description:
Reply; IN RESPONSE TO OCTOBER 27, 2010 ADMINISTRATIVE LAW JUDGE'S RULING
|
Type:
COMMENTS
|
Filing Date:
December 3, 2010
|
Filed By:
DRA/C.LEE/CPUC
|
|
Description:
Reply;
|
Type:
COMMENTS
|
Filing Date:
December 3, 2010
|
Filed By:
Natural Resources Defense Council
|
|
Description:
REPLY; TO PARTY COMMENTS IN RESPONSE TO
ADMINISTRATIVE LAW JUDGE RULING OF OCTOBER 27, 2010
|
Type:
COMMENTS
|
Filing Date:
December 3, 2010
|
Filed By:
Consumer Federation of California
|
|
Description:
REPLY; IN RESPONSE TO ADMINISTRITATIVE LAW JUDGE'S REQUEST FOR ADDITIONAL INFORMATION
|
Type:
COMMENTS
|
Filing Date:
December 1, 2010
|
Filed By:
General Motors Company
|
|
Description:
on Staff First Issues Paper (filing authorized by ALJ DeAngelis per e-mail of 12/2/2010).
|
Type:
COMMENTS
|
Filing Date:
November 18, 2010
|
Filed By:
California Department of Food and Agriculture
|
|
Description:
to questions presented by the Administrative Law Judge Ruling (late-filed authorized by ALJ DeAngelis per e-mail of 11/19/2010).
|
Type:
COMMENTS
|
Filing Date:
November 12, 2010
|
Filed By:
The Greenlining Institute
|
|
Description:
[Opening Comments] RESPONSES OF THE GREENLINING INSTITUTE TO ADMINISTRATIVE LAW JUDGE'S RULING REQUESTING MORE INFORMATION
|
Type:
COMMENTS
|
Filing Date:
November 12, 2010
|
Filed By:
Better Place
Coulomb Technologies, Inc.
ECOtality, Inc.
|
|
Description:
Opening; REGARDING PHASE 2 ISSUES
|
Type:
COMMENTS
|
Filing Date:
November 12, 2010
|
Filed By:
The Utility Reform Network
|
|
Description:
[Opening Comments] RESPONSES OF THE UTILITY REFORM NETWORK TO QUESTIONS PRESENTED IN THE ALJ'S RULING REQUESTING ADDITIONAL INFORMATION
|
Type:
COMMENTS
|
Filing Date:
November 12, 2010
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Opening; IN RESPONSE TO OCTOBER 27, 2010, ADMINISTRATIVE LAW JUDGE'S RULING
|
Type:
COMMENTS
|
Filing Date:
November 12, 2010
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Opening; ON ADMINISTRATIVE LAW JUDGE'S RULING
|
Type:
COMMENTS
|
Filing Date:
November 12, 2010
|
Filed By:
Southern California Edison Company
|
|
Description:
[Opening Comments] RESPONSE OF SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) TO ADMINISTRATIVE LAW JUDGE'S RULING REQUESTING ADDITIONAL INFORMATION AND SETTING COMMENT SCHEDULE
|
Type:
COMMENTS
|
Filing Date:
November 12, 2010
|
Filed By:
Natural Resources Defense Council
|
|
Description:
Opening; IN RESPONSE TO ADMINISTRATIVE LAW JUDGE RULING OF OCTOBER 27, 2010
|
Type:
COMMENTS
|
Filing Date:
November 12, 2010
|
Filed By:
Green Power Institute
|
|
Description:
Opening; ON THE ALJ's RULING REQUESTING ADDITIONAL INFORMATION
|
Type:
COMMENTS
|
Filing Date:
November 12, 2010
|
Filed By:
Consumer Federation of California
|
|
Description:
Opening; IN RESPONSE TO ADMINISTRITATIVE LAW JUDGE'S REQUEST FOR ADDITIONAL INFORMATION
|
Type:
COMMENTS
|
Filing Date:
November 12, 2010
|
Filed By:
Clean Energy Fuels Corporation
|
|
Description:
Opening; on Administrative Law Judge's Ruling.
|
Type:
COMMENTS
|
Filing Date:
November 12, 2010
|
Filed By:
Sam's West, Inc.
Walmart Stores, Inc.
|
|
Description:
Opening comments to ALJ's Ruling.
|
Type:
COMMENTS
|
Filing Date:
November 10, 2010
|
Filed By:
DRA/C.LEE/CPUC
|
|
Description:
[Opening Comments] RESPONSES OF THE DIVISION OF RATEPAYER ADVOCATES TO QUESTIONS PRESENTED BY
THE ADMINISTRATIVE LAW JUDGE RULING
|
Type:
RULING
|
Filing Date:
November 2, 2010
|
Filed By:
ALJ/DeANGELIS/CPUC
|
|
Description:
regarding notice of intent to claim compensation. Consumer Federation of California is found eligible for compensation in this rulemaking.
|
Type:
COMMENTS
|
Filing Date:
October 28, 2010
|
Filed By:
CALIFORNIA AIR RESOURCES BOARD
|
|
Description:
on staff's first issues paper (filing authorized by ALJ DeAngelis per e-mail of 10/28/2010).
|
Type:
RULING
|
Filing Date:
October 27, 2010
|
Filed By:
ALJ/DeANGELIS/CPUC
|
|
Description:
requesting additional information and setting comment schedule. Parties are requested to respond to questions in the ruling on or before 11/12/2010. Reply comments will be due on or before 12/3/2010.
|
Type:
NOTICE
|
Filing Date:
October 19, 2010
|
Filed By:
The Greenlining Institute
|
|
Description:
OF INTENT TO CLAIM INTERVENOR COMPENSATION
|
Type:
NOTICE
|
Filing Date:
October 8, 2010
|
Filed By:
The Utility Reform Network
|
|
Description:
of Intent to Claim Intervenor Compensation
|
Type:
NOTICE
|
Filing Date:
October 6, 2010
|
Filed By:
Environmental Defense Fund
|
|
Description:
of intent to claim intervenor compensation.
|
Type:
NOTICE
|
Filing Date:
October 4, 2010
|
Filed By:
Consumer Federation of California
|
|
Description:
of intent to claim intervenor compensation (filing authorized by ALJ DeAngelis per e-mail of 10/12/2010).
|
Type:
REQUEST
|
Filing Date:
September 29, 2010
|
Filed By:
CAlifornians for Renewable Energy
|
|
Description:
for intervenor compensation related to D10-07-044.
|
Type:
REQUEST
|
Filing Date:
September 27, 2010
|
Filed By:
Friends of the Earth
Natural Resources Defense Council
|
|
Description:
for intervenor compensation related to D10-07-044.
|
Type:
COMMENTS
|
Filing Date:
September 24, 2010
|
Filed By:
The Utility Reform Network
|
|
Description:
Opening; ON THE STAFF ISSUES PAPER,"REVENUE ALLOCATION AND RATE DESIGN
|
Type:
COMMENTS
|
Filing Date:
September 24, 2010
|
Filed By:
INTERNATIONAL COUNCIL ON CLEAN TRANSPORTATION
|
|
Description:
Opening; ON CLEAN TRANSPORTATION ON REVENUE ALLOCATION AND RATE DESIGN
|
Type:
COMMENTS
|
Filing Date:
September 24, 2010
|
Filed By:
Western States Petroleum Association
|
|
Description:
Opening; ON SECOND STAFF ISSUES PAPER
|
Type:
COMMENTS
|
Filing Date:
September 24, 2010
|
Filed By:
Southern California Edison Company
|
|
Description:
OPENING; ON STAFF ISSUES PAPER ON REVENUE ALLOCATION AND RATE DESIGN FACILITATING PLUG-IN ELECTRIC VEHICLE INTEGRATION (ISSUES PAPER 2)
|
Type:
COMMENTS
|
Filing Date:
September 24, 2010
|
Filed By:
Clean Energy Fuels Corporation
|
|
Description:
OPENING; ON THE ENERGY DIVISION'S SECOND
WORKSHOP ISSUES PAPER
|
Type:
COMMENTS
|
Filing Date:
September 24, 2010
|
Filed By:
Natural Resources Defense Council
|
|
Description:
Opening; ON REVENUE ALLOCATION AND RATE DESIGN
|
Type:
COMMENTS
|
Filing Date:
September 24, 2010
|
Filed By:
DRA/C.LEE/CPUC
|
|
Description:
Opening; RE ATTACHMENT OF THE ADMINISTRATIVE LAW JUDGE RULING, REVENUE ALLOCATION AND RATE DESIGN: FACILITATING PLUG-IN ELECTRIC VEHICLE INTEGRATION
|
Type:
COMMENTS
|
Filing Date:
September 24, 2010
|
Filed By:
Pacific Gas and Electric Company
|
|
Description:
Opening; COMMENTS OF PACIFIC GAS AND ELECTRIC
COMPANY (U 39 E) ON SEPTEMBER 10, 2010, STAFF WORKSHOP ISSUES PAPER
Dated: September
|
Type:
COMMENTS
|
Filing Date:
September 24, 2010
|
Filed By:
Green Power Institute
|
|
Description:
Opening; ON SECOND WORKSHOP ISSUES PAPER
|
Type:
COMMENTS
|
Filing Date:
September 24, 2010
|
Filed By:
Better Place
|
|
Description:
Opening; ON THE REVENUE ALLOCATION AND RATE
DESIGN STAFF ISSUES PAPER
|
Type:
COMMENTS
|
Filing Date:
September 24, 2010
|
Filed By:
San Diego Gas & Electric Company
|
|
Description:
Opening; ON ADMINISTRATIVE LAW JUDGE'S RULING ON SECOND WORKSHOP ISSUES PAPER
Steven
|
Type:
COMMENTS
|
Filing Date:
September 24, 2010
|
Filed By:
Coulomb Technologies, Inc.
|
|
Description:
Opening; ON THE SECOND WORKSHOP ISSUES PAPER ON PHASE 2: REVENUE ALLOCATION AND RATE DESIGN: FACILITATING PLUG-IN ELECTRIC VEHICLE INTEGRATION
|
Type:
COMMENTS
|
Filing Date:
September 20, 2010
|
Filed By:
Interstate Renewable Energy Council
|
|
Description:
on the Workshop Issue Paper "The Utility Role in Supporting Plug-in Electric Vehicle Charging"
|
Type:
MOTION
|
Filing Date:
September 20, 2010
|
Filed By:
Sam's West, Inc.
Walmart Stores, Inc.
|
|
Description:
FOR PARTY STATUS
|
Type:
COMMENTS
|
Filing Date:
September 20, 2010
|
Filed By:
The Utility Reform Network
|
|
Description:
Opening; ON THE STAFF ISSUES PAPER, THE UTILITY ROLE IN SUPPORITNG PLUG-IN ELECTRIC VEHICLE CHARING
|
Type:
COMMENTS
|
Filing Date:
September 20, 2010
|
Filed By:
Sacramento Municipal Utility District
|
|
Description:
Opening; TO CALIFORNIA PUBLIC UTILITIES COMMISION WHITEPAPER ON THE UTILITY ROLE IN SUPPORTING PLUG-IN ELECTRIC VEHICLE CHARGING
|
Type:
COMMENTS
|
Filing Date:
September 20, 2010
|
Filed By:
Natural Resources Defense Council
|
|
Description:
Opening; ON THE UTILITY ROLE IN SUPPORTING PLUG-IN ELECTRIC VEHICLE CHARGING
|
Type:
COMMENTS
|
Filing Date:
September 20, 2010
|
Filed By:
Clean Energy Fuels Corporation
|
|
Description:
OPENING; ON THE ENERGY DIVISION'S FIRST ISSUES WORKSHOP PAPER
|
DECISIONS
Number of Decisions: 5
|
Decision Number:
D1112055
|
Rendered Date:
December 15, 2011
Effective Date:
December 15, 2011
|
|
Description:
Dismisses rehearing applications of Decision 10-07-044 as moot. Commissioner Michel Peter Florio abstains.
|
Decision Number:
D1107029
|
Rendered Date:
July 14, 2011
Effective Date:
July 14, 2011
|
|
Description:
Phase 2 Decision that establishes policies to overcome barriers to electric vehicle deployment and compliance with PU Code 740.2. Commissioner Michel Peter Florio concurs. Commissioner Timothy Alan Simon reserves the right to file a concurrence. Commissioner Mark J. Ferron reserves the right to file a concurrence.
|
Decision Number:
D1106013
|
Rendered Date:
June 9, 2011
Effective Date:
June 9, 2011
|
|
Description:
Grants intervenor compensation to Natural Resources Defense Council for substantial contributions to Decision 10-07-044. Commissioner Michel Peter Florio abstained.
|
Decision Number:
D1105016
|
Rendered Date:
May 5, 2011
Effective Date:
May 5, 2011
|
|
Description:
Grants intervenor compensation to CAlifornians for Renewable Energy Inc. for substantial contribution to Decision 10-07-044. Commissioner Michel Peter Florio abstained.
|
Decision Number:
D1007044
|
Rendered Date:
July 29, 2010
Effective Date:
July 29, 2010
|
|
Description:
Phase 1 decision, addresses the nature of Commission's regulatory authority over entities that sell electric vehicle charging services to the public.
|