Word Document PDF Document

PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

ID # 9346

ENERGY DIVISION RESOLUTION E-4322

RESOLUTION

Resolution E-4322. Pacific Gas and Electric Company's (PG&E) Uranium Enrichment Services Contract for Diablo Canyon Power Plant.

PROPOSED OUTCOME:

    (1) Approves PG&E's request for Commission approval of a long-term Uranium Enrichment Services contract for its Diablo Canyon Power Plant (DCPP) with AREVA Enrichment Services, LLC.

    (2) Denies the protest by Californians for Renewable Energy (CARE).

    (3) ESTIMATED COST: Based on comparison to PG&E's approved Nuclear Fuel Procurement Plan, PG&E's new contract with AREVA should not increase PG&E's revenue requirements above what would be expected for procurement of nuclear fuel materials and services during the contract period. The actual contract prices and terms are confidential.

By Advice Letter 3573-E filed on December 10, 2009.

__________________________________________________________

SUMMARY

This Resolution approves PG&E's request for Commission review and approval of a long-term uranium enrichment services contract for Diablo Canyon Power Plant (DCPP) with AREVA Enrichment Services, LLC. This review is in accordance with the process established in the Nuclear Fuel Procurement Plan, a part of PG&E's Conformed 2006 Long-Term Procurement Plan, which was approved by the CPUC in Resolution E-4177, dated June 26, 2008.

The protest by the Californians for Renewable Energy (CARE) is denied.

BACKGROUND

Uranium enrichment is part of the nuclear fuel cycle in a nuclear power plant.

The uranium used in nuclear fuel needs to be enriched in order to produce energy for commercial power generation. Natural uranium, which is mined as an ore, consists primarily of two uranium isotopes, 0.7% U-235 and 99.3% U-238. The concentration of U-235, which is the fissionable isotope of uranium, needs to be increased to 3 to 5 percent in order to sustain a nuclear chain reaction and be used as a nuclear fuel in a commercial nuclear power plant. Enriched uranium can then be manufactured into fuel pellets that are inserted into rods forming a fuel assembly that are inserted into the reactor vessel for subsequent fission and release of energy.

Enrichment can be performed either by gaseous diffusion or gas centrifuge methods.

The principal methods for performing uranium enrichment are by use of gaseous diffusion or gas centrifuges.

The uranium ore is milled and processed into a uranium oxide powder U3O8, which is commonly called yellowcake. The uranium powder is then converted to a gaseous form by combining it with fluorine to create uranium hexafluoride (UF6). In gaseous diffusion, the UF6 is subsequently passed through many stages of barriers that separate the uranium isotopes. This process allows the U-235 isotopic concentration to be increased to the desired enrichment concentration level. In the United States, gaseous diffusion plants have operated in Oak Ridge Tennessee, Paducah Kentucky, and Piketon Ohio. Currently, the only operating enrichment plant in the United States is in Paducah Kentucky.

Another method to enrich uranium is by using gas centrifuges. Gas centrifuges spin the UF6 gas at extremely high speeds, which separate the uranium isotopes by pulling the heavier U-238 further outward because of its greater momentum. Gas centrifuges have been used successfully in Europe and other foreign countries.

In December 2008, AREVA Enrichment Services, LLC (AREVA), submitted an application to the U.S. Nuclear Regulatory Commission (NRC) seeking a license to build and operate a gas centrifuge uranium enrichment facility in the United States.

AREVA has selected a site in Bonneville County Idaho, about 18 miles west of Idaho Falls and near the Idaho Falls National Laboratory for its new facility, which will be known as the Eagle Rock Enrichment Facility (EREF). The application to the NRC, NRC Docket No. 70-7015, was modified to request approval for the EREF to have an enrichment capacity of 6.6 million separative work units (SWU) per year.

The license application is currently under review by the NRC. The NRC licenses uranium plants pursuant to its regulations in 10 CFR 40 and 70. In its review of safety, environmental and other issues, and to issue a license for construction and operation, the NRC will prepare a Safety Evaluation Report and an Environmental Impact Statement. AREVA anticipates approval of a license from the NRC to construct and operate by June 2011, and no later than January 2012. With start of construction by December 2012, AREVA expects to begin operation by 2014, with full production capability by 2019.

There are two other companies that are planning to construct and operate gas centrifuge uranium enrichment facilities in the United States. The U.S. Enrichment Corporation (USEC) intends to have a gas centrifuge facility in Piketon Ohio in proximity to the existing gaseous diffusion plant. Louisiana Energy Services filed an application with the NRC for a 5.7 million SWU per year facility called the National Enrichment Facility (NEF). This facility, which received an NRC license in 2006, is currently under construction near Eunice New Mexico. The NEF will be operated by Louisiana Energy Services, which is owned by URENCO, a German, Dutch, and British conglomerate.

Worldwide, additional suppliers for uranium enrichment services include the British, German, and Dutch consortium URENCO, which enrich uranium at Grosnau in Germany, Capenhurst in the United Kingdom, and at Almelo in the Netherlands, and the Russian company Techsnabexport (TENEX). Under an agreement between the USEC and its Russian counterpart TENEX, the United States purchases highly enriched (90% U-235) weapons grade uranium from Russia that has been down-blended to low-enriched uranium (3%-5% U-235) for use in U.S. commercial reactors. There are also several small suppliers of uranium enrichment services to supply enriched uranium for domestic use in Japan, China, India, and Iran.

AREVA Uranium Enrichment Services, LLC, is a subsidiary of AREVA, INC., a leading nuclear vendor and supplier in the US electric transmission and distribution sector.

AREVA, INC., with headquarters in Bethesda Maryland, has several thousand US employees associated with the domestic energy sector. The parent organization, AREVA SA is a French public multinational industrial conglomerate that is mainly known for nuclear power. AREVA SA was created in 2001 by the merger of the French nuclear organizations previously known as Framatome, Cogema, and Technicatome. Although the French are the major shareholders owning about 90% of AREVA SA, the German company Siemens retains a minority ownership of one of the subsidiaries. The corporate name AREVA was inspired by the Arevalo Abbey in Spain.

PG&E's approved Nuclear Fuel Procurement Plan includes guidelines for pursuing activities which were outside the scope of the Plan.

In June 2008, the Commission issued Resolution E-4177, which approved PG&E's Conformed 2006 Long-Term Procurement Plan. PG&E's Nuclear Fuel Procurement Plan, which is covered by the approved Procurement Plan, includes guidelines for pursuing activities outside the scope of the plan. The Nuclear Fuel Procurement Plan approved activities and services related to the purchase of uranium ore, conversion to the gaseous UF6, and uranium enrichment for the time period 2007 through 2016. In cases where PG&E pursues a transaction outside the scope of the Nuclear Fuel Procurement Plan, PG&E needs to follow an expedited advice letter process to obtain Commission pre-approval of a specified transaction. Since PG&E is pursuing a long-term uranium enrichment contract with AREVA Uranium Enrichment Services for a time period beyond the scope of its approved Nuclear Fuel Procurement Plan, PG&E filed AL 3573-E.

NOTICE

Notice of AL 3573-E was made by publication in the Commission's Daily Calendar. PG&E states that a copy of the Advice Letter was mailed and distributed in accordance with General Order 96-B.

PROTESTS

Advice Letter 3573-E. was timely protested by Californians for Renewable Energy (CARE) on December 31, 2009. PG&E responded to this protest on January 8, 2010.

In its protest, CARE raises four issues, which it believes are not adequately addressed in PG&E's AL 3573-E. These issues involve formal application review, potentially enormous costs, need for an environmental review, and risk management procedures.

In its response to CARE dated January 8, 2010, PG&E addresses all of CARE's issues, which it finds are without merit.

DISCUSSION

AREVA has a proven track record of providing nuclear fuel services to the nuclear power community both in the US and abroad.

AREVA is an important and leading company in the US nuclear fuel industry. With over 45 locations in the US, AREVA appears to have committed substantial resources and assets to ensure the continuity of nuclear fuel availability. AREVA, Inc., and its subsidiaries, have access to its overseas parent conglomerate, and has worldwide expertise and a presence in over 100 countries worldwide.

The majority of capital invested by AREVA will go into the Idaho region's economy. According to AREVA, its new Eagle Rock uranium enrichment facility is expected to generate about $5 billion in economic activity. It is noted that PG&E is not financing the construction or licensing of the EREF facility, which is located in Idaho. PG&E is merely contracting for uranium enrichment services for the fuel used in its Diablo Canyon Power Plant.

PG&E is pursuing new contracts for uranium fuel, conversion, and enrichment services beyond 2010 to address the limited supply situation in the current nuclear fuel services market.

To ensure a continued supply of nuclear fuel for its DCPP units, PG&E is pursuing new contracts for its uranium ore, conversion, and enrichment services. The licenses for its DCPP units currently expire in 2024 and 2025 for DCPP Units 1 and 2, respectively. On November 23, 2009, PG&E filed a license renewal application (LRA) with the NRC to extend the licenses for both DCPP units for an additional 20 years. If approved by the NRC, which is expected in 2014, DCPP will operate until 2044 and 2045 for Units 1 and 2, respectively. On March 3, 2010, the NRC held public meetings in San Luis Obispo as part of its scoping process to support development of an environmental impact statement related to the LRA for Diablo Canyon Power Plant. 1

The Long-Term Procurement Plan provides guidelines for transactions outside the scope of the Plan. PG&E's AL 3573-E is in accordance with the guidelines of its Nuclear Fuel Procurement Plan for pursuing activities outside the scope of the Plan.

PG&E's approved Nuclear Fuel Procurement Plan covered targets for each of the nuclear fuel cycle segments for uranium ore, conversion to the gaseous hexafluoride, and uranium enrichment services from 2007 through 2016.

The Procurement Plan also provides guidelines for activities outside the scope of the approved Plan, stipulating that PG&E should submit advice letters to the Commission for expedited review and approval.

PG&E is entering into a contract with AREVA, LLC for uranium enrichment services for a delivery period 2015 through 2024 with a provision for a contract extension to 2029, which is contingent upon PG&E obtaining a license renewal from the NRC for the Diablo Canyon Power Plant. Since these years are beyond the scope of the currently-approved Procurement Plan, PG&E submitted an advice letter AL 3573-E to the CPUC. The filing of this advice letter is appropriately within the guidelines set forth by the approved Procurement Plan.

The terms of the PG&E contract for uranium enrichment services with AREVA, LLC, are just and reasonable.

We have reviewed the contract between PG&E and AREVA, LLC for uranium enrichment services, which was attached as a Confidential Appendix to

AL 3573-E.

PG&E's contract with AREVA addresses multiple operation date scenarios, including the dates of startup, operation, or non-operation of the DCPP units or the EREF with appropriate price adjustments under each scenario. When compared against PG&E's approved Nuclear Fuel Procurement Plan, we find PG&E's contract and its terms and conditions to be just and reasonable.

PG&E has had a long-standing and continuing relationship with AREVA since 1984.

The original nuclear fuel cores and a number of nuclear fuel reloads were supplied with enriched uranium from the U.S. DOE (and later USEC) for the DCPP units. According to PG&E, after 1987 the pattern changed and the front end of the fuel supplies were contracted with companies that are now subsidiaries of AREVA. PG&E has had a long-standing and continuing relationship with AREVA and its subsidiaries over the past 26 years.

In 1984, PG&E entered into negotiations with Cogema, Inc. (later AREVA NC, a current subsidiary of AREVA SA) to contract for enrichment services for Diablo Canyon Power Plant for services from 1987 to 1996. There have been subsequent contracts for enrichment services for DCPP fuel since then.

PG&E had also contracted with Cogema, Inc. (later AREVA NC) for delivery of uranium starting in 1997, with several subsequent contracts. Similarly, PG&E contracted with Comurhex (a subsidiary of Cogema/AREVA) for conversion services throughout this time period starting in 1992 with subsequent contracts in later years.

CARE's protest is denied.

We have reviewed all of the issues raised by CARE in its protest dated December 31, 2009, as well as the response by PG&E dated January 8, 2010.

As explained above, PG&E appropriately complied with the guidelines set forth in the Nuclear Fuel Procurement Plan approved in Resolution E-4177 by filing AL 3573-E rather than a separate application to seek approval of the AREVA contract.

The California Environmental Quality Act is not applicable here. AREVA's Eagle Rock Enrichment Facility (EREF) is located in Idaho, not in California. In its review process of AREVA's application to license the EREF, the NRC will perform the appropriate environmental and safety reviews and prepare a Safety Evaluation Report and an Environmental Impact Statement (EIS). On June 4, 2009, the NRC held a public meeting in Idaho Falls Idaho on the scope of the EIR for the proposed EREF. The NRC will be addressing any chemical and radiological hazards in handling UF6. The NRC will also address the waste depleted uranium, which is about 0.3% U-235, that is generated as a byproduct of the enrichment process. Depleted uranium is generally considered to be of no commercial value. The CPUC is not involved in any safety or environmental review of the EREF.

We have reviewed the Confidential pricing and terms and conditions of PG&E's contract with AREVA for uranium enrichment services, which are just and reasonable. In the terms and conditions of PG&E's contract with AREVA, all possible scenarios with appropriate price adjustments are covered including the dates of startup and operation of the EREF, whether a license extension is approved by the NRC for the DCPP units, and if DCPP became prematurely non-operable or shutdown.

All of the issues raised by CARE are without merit, and CARE's protest is denied.

In AL 3573-E, PG&E requested confidential treatment of the Appendices to the advice letter filing that contain pricing and terms of the contract.

AL 3573-E contains two appendices: Appendix A is a summary of the contract with AREVA, and Appendix B is the contract. PG&E requests that these two appendices be treated and maintained as confidential, under General Order 66-C and Public Utilities Code Section 583.

Since the PG&E contract with AREVA contains pricing and terms and conditions information, disclosure of this information would not be in the public interest. Accordingly, the Commission notes that Appendices A and B of AL 3573-E shall be maintained as confidential.

PG&E's request in AL 3573-E should not increase PG&E's revenue requirements above what would be expected for procurement of nuclear fuel materials and services during the contract period.

According to PG&E in AL 3573-E, "The pricing terms are favorable, consistent with the pricing approved by the Commission in the Nuclear Fuel Supply (sic Procurement) Plan, and are competitive with the other suppliers of enrichment services, based on the Utility's discussions with others in the industry for long term supplies of enriched uranium."

Further, our review confirms that the pricing of the PG&E contract with AREVA is consistent with what would be expected for procurement of nuclear fuel materials and services during the contract period based upon PG&E's approved Nuclear Fuel Procurement Plan. Thus, the contract should not increase PG&E's revenue requirements above what would be expected for procurement of uranium enrichment services during the contract period.

The actual contract prices and terms are confidential.

COMMENTS

Public Utilities Code section 311(g) (1) provides that this resolution must be served on all parties and subject to at least 30 days public review and comment prior to a vote of the Commission. Accordingly, this draft resolution was mailed to parties for comments, and is placed on the Commission's agenda no earlier than 30 days from the date issued for comment.

FINDINGS AND CONCLUSIONS

THEREFORE IT IS ORDERED THAT:

This resolution is effective today.

I certify that the foregoing resolution was duly introduced, passed and adopted at a conference of the Public Utilities Commission of the State of California held on May 6, 2010; the following Commissioners voting favorably thereon:

STATE OF CALIFORNIA ARNOLD SCHWARZENEGGER, Governor

PUBLIC UTILITIES COMMISSION

505 VAN NESS AVENUE

SAN FRANCISCO, CA 94102-3298

I.D. # 9346

April 5, 2010 Resolution E-4322

Commission Meeting Date: May 6, 2010

TO: PARTIES TO DRAFT RESOLUTION E-4322

Enclosed is draft Resolution E-4322 of the Energy Division. It will be on the agenda at the May 6, 2010 Commission meeting. The Commission may then vote on this Resolution or it may postpone a vote until later.

When the Commission votes on a draft Resolution, it may adopt all or part of it as written, amend, modify or set it aside and prepare a different Resolution. Only when the Commission acts does the Resolution become binding on the parties.

Parties may submit comments on the draft Resolution no later than April 26, 2010.

Comments should be submitted to:

Honesto Gatchalian and Maria Salinas

Energy Division

California Public Utilities Commission

505 Van Ness Avenue

San Francisco, CA 94102

jnj@cpuc.ca.gov; mas@cpuc.ca.gov

A copy of the comments should be submitted to:

Eric Greene

Energy Division

California Public Utilities Commission

505 Van Ness Avenue

San Francisco, CA 94102

Fax: 415-703-2200

Email: eg1@cpuc.ca.gov

Comments may be served by email. Any comments on the draft Resolution must be received by the Energy Division by April 26, 2010. Those submitting comments must serve a copy of their comments on 1) the entire service list attached to the draft Resolution, 2) all Commissioners, and 3) the Director of the Energy Division, the Chief Administrative Law Judge and the General Counsel, on the same date that the comments are submitted to the Energy Division.

Comments shall be limited to fifteen pages in length plus a subject index listing the recommended changes to the draft Resolution, a table of authorities and an appendix setting forth the proposed findings and ordering paragraphs.

Comments shall focus on factual, legal or technical errors in the proposed draft Resolution. Comments that merely reargue positions taken in the advice letter or protests will be accorded no weight and are not to be submitted.

Late submitted comments will not be considered.

Gurbux Kahlon

Program Manager

Energy Division

Enclosure: Service List

Certificate of Service

Eric Greene

Brian K. Cherry

Pacific Gas and Electric Company

Mail Code B10C

P.O.Box 770000

San Francisco, CA 94177

BKC7@pge.com

pgetariffs@pge.com

Olivia Brown

Pacific Gas and Electric Company

P.O. Box 770000

San Francisco, CA 94177

oxb4@pge.com

Stephan Volker

Attorney for CARE

436 14th Street, Suite 1300

Oakland, CA 94612

svolker@volkerlaw.com

1 The LRA is available on the NRC's website at: http://www/nrc.gov/reactors/operating/licensing/renewal/applications/diablo-canyon.html, and in the NRC's Agencywide Document and Management System (ADAMS) under accession numbers ML093340086, ML093350335, ML093340116, and ML093340123.