RESOLUTION

Resolution E-4387. Pacific Gas and Electric Company (PG&E) proposes to permanently close the Humboldt Bay Power Plant.

PROPOSED OUTCOME: Authorizes PGE to retire Humboldt Bay Power Plant ("HBPP") Units 1, 2, Mobile Emergency Power Plant (MEPP) 3, and Mobile Emergency Power Plant (MEPP) 4. Any issues that the Commission must address relating to ratemaking, decommissioning, or disposition of the plant and related assets shall be addressed by separate Commission orders.

Estimated Cost: None.

By Advice Letter 3740-E, filed October 12, 2010.

__________________________________________________________

SUMMARY

PG&E's Advice Letter 3740-E, proposing to permanently close its Humboldt Bay Power Plant (HBPP) Units 1, 2, MEPP3, and MEPP 4, is approved. Any issues that the Commission must address relating to ratemaking, decommissioning, or disposition of the plant and related assets shall be addressed by separate Commission orders.

BACKGROUND

By Advice Letter 3740-E, PG&E announces its intent to retire Humboldt Bay Power Plant ("HBPP") Units 1 and 2. PG&E also plans to shut down Mobile Emergency Power Plant (MEPP) Units 3 and 4 at HBPP.1 The Advice Letter does not discuss the 65 megawatt (MW) nuclear unit at the same site, which is already in decommissioning status.

The retiring HBPP includes two fossil-fueled boiler steam turbine generator units of 50 MWs each (Units 1 and 2), and two simple cycle gas turbine generators of 15 MWs each (MEPPs 3 and 4), with a total capacity of 130 MWs. In D.06-11-048, the Commission previously approved the new Humboldt Bay Generating Station ("HBGS" or "replacement units"), which consists of ten diesel engine-powered units with a combined capacity of 165 MWs. PG&E will fuel the replacement units with natural gas as the primary fuel and diesel fuel (distillate) as a backup. HBGS became commercially operational as of September 30, 2010.

In General Order 167, the Commission adopted Operation Standards for Power Plants. Operation Standard 24 requires Generating Asset Owners (GAO's) covered by GO 167 to obtain an affirmative declaration from the Commission prior to closing a generating facility or making any long-term changes in operating status.2 The GAO must also confirm with the Control Area Operator that a generation facility is no longer needed for reliability.

On June 2, 2010, PG&E sent a letter notifying Commission Executive Director Paul Clanon of PG&E's intent to permanently shut down all remaining units at HBPP in the third quarter of 2010. PG&E states that the HBPP closure coincides with the estimated commercial operation date of the new HBGS. PG&E's letter states that HBPP is no longer needed to meet demand in PG&E's service territory, as the HBGS replacement units will perform the same functions as the retiring HBPP.

In D. 06-11-048, Opinion Approving Results of Long-Term Request for Offers (PG&E's Long Term RFO), the Commission granted PG&E's unopposed request for a Certificate of Public Convenience and Necessity (CPCN), a power purchase agreement and a construction contract for the new HBGS facility, to replace the existing HBPP units, now at the end of their useful life3. In September 2008, the California Energy Commission (CEC) approved PG&E's Application and Certificate to construct and operate the new HBGS. 4

On October 12, 2010, PG&E filed Advice Letter 3740-E, which proposes to permanently shut down the retiring HBPP units. The Advice Letter affirms that PG&E's resource planning process has already factored in the closure of HBPP. PG&E also provided correspondence between the utility, the California Independent System Operator (CAISO) and the Federal Energy Regulatory Commission (FERC) regarding the retirement of HBPP. PG&E's June 18, 2010 letter to the CAISO proposes to transfer two agreements, the Interim Dual Fuel Agreement and the Interim Black Start Agreement, from the retiring HBPP to the new HBGS within a late September-early October timeframe. On July 29, 2010, PG&E filed the proposed Agreements with FERC. FERC accepted the revised agreements on September 9, 2010. The CAISO's October 1, 2010 Decision on Conditional Approval to Extend Existing RMR Contracts for 2011 extends the black start and duel fuel contracts to the replacement units, conditional upon the operational start of the replacement units, and the subsequent retirement of the existing units.

Finally, PG&E states that the Commission need not address any Section 851 issues to approve the HBPP closure, as PG&E retains ownership of the land, and the Commission will address the decommissioning and salvage value in other ratemaking proceedings.5

NOTICE

Notice of AL 3740-E was made by publication in the Commission's Daily Calendar. PG&E states that a copy of the Advice Letter was mailed and distributed in accordance with Section III-G of General Order 96-A. PG&E also served the advice letter to all parties in the G.O. 96-B advice letter service list.

PROTESTS

No protests were filed.

DISCUSSION

By this resolution we authorize PG&E to permanently close the HBPP. In so doing, we note that PG&E is a Generating Asset Owner (GAO) as defined in GO 167, and the filing of this advice letter by PG&E is appropriate in order to ensure compliance with Operation Standard 24, which requires Commission approval before a GAO makes a long term change in the status of HBPP.6 PG&E has provided the requisite notice to the Commission, and taken appropriate steps to consult with the California Independent System Operator (CAISO) regarding the need determination, as set forth in PG&E's Advice Letter and its June 2, 2010 letter to Executive Director Paul Clanon. PG&E's proposed closure of HBPP is also supported by the following actions:

In D. 06-11-048, the Commission granted PG&E's request for a CPCN, approved PG&E's PPA to construct the new HBGS, and acknowledged that "The facility will replace the existing power plant at Humboldt Bay, which is at the end of its useful life."7 The CEC's approval of the HBGS in September 2008 also affirmed that the new Humboldt Bay units were built to replace the old HBPP. 8

The new Humboldt Bay Plant began commercial operation September 30, 2010. PG&E confirms that it no longer relies on the retiring HBPP to meet resource planning needs in its service territory, as the new replacement plant will provide for the same approximate capacity, and therefore fulfills the same reliability functions as the retiring HBPP.

In addition, both the FERC9 and the CAISO10 have reviewed and approved PG&E's request to revise existing contract provisions applicable to HBPP concerning interim blackstart and dual fuel capabilities, such that these provisions would be applicable to HBGS once HBPP retires. Thus, the CAISO has been notified and consulted regarding PG&E's plans to close HBPP and open HBGS. Both CAISO and FERC have approved of the transfer of contract conditions to HBGS. Therefore, it is reasonable for the Commission to conclude that HBPP is no longer needed for reliability once the HBGS is operational.

In its advice letter, PG&E states that it does not contemplate a need for the Commission to address any asset disposition matters pursuant to Public Utilities Code Section (Section) 851. PG&E states that assets that remain useful will be redeployed by PG&E in other areas, and that any remaining assets that are no longer necessary or useful will be disposed of as salvage.

We agree that ratemaking matters associated with closure of HBPP, if any, shall be addressed by the Commission in other appropriate proceedings. By authorizing PG&E to close the HBPP we do not prejudge any ratemaking or decommissioning issues related to the plant. We also do not prejudge any issue associated with disposition of plant assets, including matters addressed pursuant to Section 851. Those issues will be addressed in separate Commission proceedings.

COMMENTS

Public Utilities Code section 311(g) (1) requires that draft resolutions be served on all parties and subject to at least 30 days public review and comment prior to a vote of the Commission. Section 311(g)(2) provides that this 30-day period may be reduced or waived upon the stipulation of all parties in the proceeding.

The 30-day comment period for the draft of this resolution was neither waived nor reduced. Accordingly, this draft resolution was mailed to parties for comments, and will be placed on the Commission's agenda on December 16, 2010.

FINDINGS AND CONCLUSIONS

THEREFORE IT IS ORDERED THAT:

This Resolution is effective today.

I certify that the foregoing resolution was duly introduced, passed and adopted at a conference of the Public Utilities Commission of the State of California held on December 16, 2010, the following Commissioners voting favorably thereon:

STATE OF CALIFORNIA ARNOLD SCHWARZENEGGER, Governor

PUBLIC UTILITIES COMMISSION

505 VAN NESS AVENUE

SAN FRANCISCO, CA 94102-3298

I.D.# 9987

November 16, 2010 Resolution E-4387

Commission Meeting Date: December 16, 2010

TO: SERVICE LIST FOR DRAFT RESOLUTION

E-4387

Enclosed is draft Resolution E-4387 prepared by the Energy Division. It will be on the agenda at the December 16, 2010 Commission meeting. The Commission may then vote on this Resolution or it may postpone a vote until later.

When the Commission votes on a draft Resolution, it may adopt all or part of it as written, amend, modify or set it aside and prepare a different Resolution. Only when the Commission acts does the Resolution become binding on the parties.

Parties may submit comments on the draft Resolution no later than December 6, 2010.

Comments should be submitted to:

Honesto Gatchalian and Maria Salinas

Energy Division

California Public Utilities Commission

505 Van Ness Avenue

San Francisco, CA 94102

jnj@cpuc.ca.gov; mas@cpuc.ca.gov

A copy of the comments should also be submitted to:

Lana Tran and Don Lafrenz

Energy Division

California Public Utilities Commission

505 Van Ness Avenue

San Francisco, CA 94102

Fax: 415-703-5621

Email: ltt@cpuc.ca.gov; dlf@cpuc.ca.gov

Comments may be served by email. Any comments on the draft Resolution must be received by the Energy Division by December 6, 2010. Those submitting comments must serve a copy of their comments on 1) the entire service list attached to the draft Resolution, 2) all Commissioners, and 3) the Director of the Energy Division, the Chief Administrative Law Judge and the General Counsel, on the same date that the comments are submitted to the Energy Division.

Comments shall be limited to fifteen pages in length plus a subject index listing the recommended changes to the draft Resolution, a table of authorities and an appendix setting forth the proposed findings and ordering paragraphs.

Comments shall focus on factual, legal, or technical errors in the proposed draft Resolution. Comments that merely reargue positions taken in the advice letter or protests will be accorded no weight and are not to be submitted.

Late submitted comments will not be considered.

/s/ Gurbux Kahlon

Gurbux Kahlon

Program Manager

Energy Division

Enclosure: Service List

Certificate of Service

Margarita Lezcano

Jane K. Yura, Vice-President, Regulation and Rates

Pacific Gas and Electric Company

77 Beale Street, Mail Code B10B

P.O. Box 770000

San Francisco, CA 94177

PGETariffs@pge.com

   
     

CAISO

LEGAL & REGULATORY DEPT.

151 BLUE RAVINE ROAD

FOLSOM, CA 95630

e-recipient@caiso.com

   
     
     
     
 

Antonio, Sonny

s.antonio@sunshinedesignllc.net

 

Ardison, Candice

cardison@mercedid.org

Barkovich, Barbara

brbarkovich@earthlink.com

Bateman, Dean

dbateman@recsolar.com

Beach, Tom

tomb@crossborderenergy.com

Bergmann, Dan

dbergmann@igservice.com

Black, Andy

andy@ongrid.net

Blaising, Scott

blaising@braunlegal.com

Bloch, Lan

enfile@csc.com

Booth, William

wbooth@booth-law.com

CAISO

e-recipient@caiso.com

Cameron, Doug

dcameron@cleanenergyfuels.com

Carroll, Dan

dcarroll@downeybrand.com

Casner, Steve

casner@acm.org

Caulson, Megan

mcaulson@semprautilities.com

Clark, Avis

aclark@calpine.com

Clark, Marshall

mclark@dgs.ca.gov

Conte, Cliff

Cliff_Conte@oxy.com

Cunningham, Mark

mac_lighting@bak.rr.com

Day, Michael

hpatrick@gmssr.com

Dey, Sheila

sheila@wma.org

DiAlto, Gretchen

GDiAlto@semprautilities.com

Doan, Chi

chi@water.ca.gov

Dodson, David

david_dodson@transcanada.com

Douglas & Liddell

liddell@energyattorney.com

Douglass, Dan

douglass@energyattorney.com

Eisdorfer, Ken

keisdorfer@ameresco.com

Fellman, Diane

diane.fellman@nrgenergy.com

Fic, Bob

bobfic@verizon.net

Finne, Larry

lfinne@unitedcogen.com

Fisher, Greg

gfisher@caiso.com

Gansecki, Karyn

karyn.gansecki@sce.com

Gillette, Melanie

mlgillette@duke-energy.com

Greene, Phillip

greenep@fosterfarms.com

Hanschen, Peter

phanschen@mofo.com

Hilen, Christopher

chilen@sppc.com

Hines, Brian

brian@ncsr.com

House, Lon

lwhouse@innercite.com

Huard, David

dhuard@manatt.com

Huhman, Steve

steve.huhman@mirant.com

Hunter, Randy

Randy_Hunter@transcanada.com

Isom, Roger

roger@ccgga.org

Jansen, Eric

ericj@eslawfirm.com

Jaske, Mike

mjaske@energy.state.ca.us

Keen, Randall

PUCService@manatt.com

Keniston, Eric

eric.keniston@cityofpaloalto.org

Kerkorian, Michael

mk@utilitycostmanagement.com

King, Chris

ckingaei@yahoo.com

Kjosnes, Ole

ole.kjosnes@seattle.gov

Lara, Vanessa

vlara@mercedid.org

Lawrence, Scott

scottlawrence@earthlink.net

Leslie, John

jleslie@luce.com

Lloyd, Connie

clloyd@bart.gov

Lloyd, Debra

debra.lloyd@cityofpaloalto.org

Lower, C.

clower@earthlink.net

McCoy, Patrick

robert.mccoy@dgs.ca.gov

McCrea, Keith

kmccrea@sablaw.com

McFeron, Sue

suem@calpine.com

McGuire, Patrick

patrickm@crossborderenergy.com

McKenzie, Steve

steve@mckenzie-associates.com

Minchin, Lori

glj@gljpublications.com

Monier, Wes

fwmonier@tid.org

Morris, Gregory

gmorris@emf.net

Muller, Phillip

philm@scdenergy.com

Neenan, Rob

rob@clfp.com

Newsom, Sid

SNewsom@SempraUtilities.com

Noger, Rick

rick_noger@praxair.com

Norris, Paul

w6bd@msn.com

O'Brien, Ed

EdO@mid.org

O'Neill, Edward

edwardoneill@dwt.com

Pau, Judy

pauj@dwt.com

Pedersen, Norman

npedersen@hanmor.com

Perry, Ron

ron.perry@commercialenergy.net

Poole, Edward

epoole@adplaw.com

Porter, Douglas

porterdk@sce.com

Raymer, Bob

rraymer@cbia.org

Rochman, Michael

rochmanm@spurr.org

SCE

AdviceTariffManager@sce.com

Scheuerman, Paul

pgs@ieee.org

Schmidt, Reed

rschmidt@bartlewells.com

Schoenbeck, Donald

dws@r-c-s-inc.com

Sims, Ken

ksims@siliconvalleypower.com

Squeri, James

jsqueri@gmssr.com

Stange, Annie

sas@a-klaw.com

Stewart, Michael

michael@santafejets.com

Tornoe, Gini

g.tornoe@intpower.com

Toyama, Nathan

ntoyama@smud.org

Trowbridge, Ann

atrowbridge@daycartermurphy.com

Ubavich, Nina

Nevenka.Ubavich@ladwp.com

Valeri, J.

jvaleri@semprautilities.com

Villanueva, Danny

Villanueva_Danny@lacoe.edu

Weisenmiller, Robert

mrw@mrwassoc.com

White, David

david_white@transcanada.com

Williams, Gene

gwilliams@sppc.com

Williams, Shyletha

shyletha.williams@dla.mil

Wodtke, Alexis

lex@consumercal.org

Wood, William

bwood@energy.state.ca.us

Yap, Catherine

ceyap@earthlink.com

Austin, Steve

saustin@bostonproperties.com

Bell, Michael

wwwmbell@mbellmc.com

Blake, Nicole

blake@consumercal.org

Bohn, Ken

ken@in-houseenergy.com

Burkom, Jack

jack.burkom@brookfieldpower.com

Cade, Mike

wmc@a-klaw.com

Castracane, Steve

steven.castracane@linde.com

Chediak, Mark

mchediak@bloomberg.net

Colvin, Steven

scolvin@bostonproperties.com

Connolly, Ipek

Ipek.Connolly@CityofPaloAlto.org

Davie, Doug

ddavie@wellhead.com

Fang, Cynthia

cfang@semprautilities.com

Flory, John

jflory@necclear.com

Goossens, Ehren

egoossens1@bloomberg.net

Hamlin, Corey

CHamlin@ghirardelli.lindt.com

Helen ?

helen@econsci.net

Huhman, Steven

steven.huhman@morganstanley.com

Jones, Sunita

skjones@sfwater.org

Keele, Dustin

utilities@photonenergyservices.com

Kingerski, Harry

hkingerski@sparkenergy.com

Martini, William

william.martini@tecogen.com

Maye, Shelly-Ann

smaye@nappartners.com

Miller, Matt

matthew.miller@recurrentenergy.com

Nalley, Lori

lnalley@tigernaturalgas.com

Nanjo, Henry

henry.nanjo@dgs.ca.gov

PG&E Regulation & Rates

PGETariffs@pge.com

Prabhakaran, Vid

vprabhakaran@goodinmacbride.com

Reid, Jan

janreid@coastecon.com

Reinero, Paula

preinero@mercedid.org

Roberts, Bill

bill@econsci.com

Roesser, Randy

rroesser@energy.state.ca.us

Ross, Jim

jimross@r-c-s-inc.com

Rutherford, Reid

reidrutherford@gmail.com

Salazar, Julie

julie.salazar@ge.com

Schenk, Jenine

eslight@apsc.com

Seperas, Danielle

dmatthews@calpine.com

Sharma, Ravi

ravis@siloenergy.com

Shaw, Tim

opudmgr@opud.org

Sheriff, Nora

nes@a-klaw.com

Smith, Allison

afsmith@semprautilities.com

Soares, Brian

pgeadvice@wellhead.com

Srinivasan, Seema

sls@a-klaw.com

Swindle, Matthew

mswindle@nlineenergy.com

Terranova, Karen

filings@a-klaw.com

Watson, David

dwatson@lbl.gov

Welch, Ray

ray.welch@navigantconsulting.com

Yura, Jane K., Vice-President

PG&E Regulation and Rates

pgetariffs@pge.com

   
   

1 PG&E's June 2, 2010 letter to the Executive Director.

2 Operating Standard 24 reads as follows: OS 24 - Approval of changes in Long-Term Status of a Unit. The GAO maintains a unit in readiness for service in conformance with Standard 22 unless the Commission, after consultation with the Control Area Operator, affirmatively declares that a generation facility is unneeded during a specified period of time. This standard is applicable only to the extent that the regulatory body with relevant ratemaking authority has instituted a mechanism to compensate the GAO for readiness services provided.

3 CPUC D.06-11-048, Opinion Approving Results of Long-Term Request for Offers (Nov.30, 2006), Ordering Paragraphs 1 and 2, p.45 and Finding of Fact 29.

4 CEC Order No.08-0924-5, CMF.PDF. http://www.energy.ca.gov/2008publications/ CEC-800-2008-005/CEC-800-2008-005-CMF.PDF, pg.17.

5 PG&E filed a separate Advice Letter, AL 3734-E on September 16, 2010 regarding the new Humboldt Bay revenue requirement.

6 Under GO 167, the term Generating Asset Owner (GAO) refers to any person or entity owning, controlling, operating or managing electric generating facilities located in California or owned by an electrical corporation. (GO 167 §§ 2.8, 2.9.)

7 CPUC D.06-11-048, p. 32.

8 CEC Order No.08-0924-5, p.17.

9 FERC Docket Nos: ER10-2054-000 and ER 10-2055-000 (September 9, 2010).

10 CAISO's Memorandum Re: Decision on Conditional Approval to Extend Existing RMR Contracts for 2011 (September 1, 2010).