California Public Utilities Commission
Daily Calendar
Table of Contents
REGULAR COMMISSION BUSINESS MEETINGS
COMMISSION RATESETTING DELIBERATIVE MEETINGS
(Not Open to the Public)
PUBLIC MEETINGS & WORKSHOP NOTICES
NOTICE OF DRAFT RESOLUTIONS
(Pursuant to PU Code § 311(g))
PETITIONS FOR MODIFICATION AND APPLICATIONS FOR REHEARING
PROPOSED DECISIONS * ALTERNATES * PRESIDING OFFICER'S DECISIONS * ARBITRATOR'S REPORTS
MISCELLANEOUS TRANSPORTATION ITEMS
Filings with Consumer Protection and Safety Division
TABLE OF SUBMISSION DATES FOR THE PRECEDING TWO WEEKS - NONE
Public Utilities Commission of the State of California
Paul Clanon, Executive Director
Headquarters |
Southern California Office |
505 Van Ness Avenue |
320 West 4th Street, Suite 500 |
San Francisco, CA 94102 |
Los Angeles, CA 90013 |
(415) 703-2782 |
(213) 576-7000 |
Website:
http://www.cpuc.ca.gov
Calendar Archive:
http://www.cpuc.ca.gov/daily_calendar_archive/
Daily Calendar
· Commission Meetings
· Notices
· Public Meetings and Workshops
· Notice of Draft Resolutions (PU Code § 311(g))
· New Filings
· Petitions for Modification and Applications for Rehearing
· Proposed Decisions/Alternates/Presiding Officer's Decisions/Arbitrator's Reports
· Advice Letter Filings
· Miscellaneous Transportation Items
· Miscellaneous Communications Matters
· Table of Submission Dates for the Preceding Two Weeks
· Changes to Hearing Calendar
· Hearings
· Notice of All-Party Meetings (PU Code §1701.3(c))
The Commission's policy is to schedule hearings (meetings, workshops, etc.) in locations that are accessible to people with disabilities. | ||
The CPUC encourages all Californians to participate in its meetings, hearings, workshops, and proceedings. We try to hold our public meetings only in places that are wheelchair accessible and which can accommodate specialized equipment and other services useful to people with disabilities. Please see the notice of the meeting you wish to attend for more specifics. If you plan to attend and need specialized accommodations for a particular meeting that are not listed in the notice, request them from the Public Advisor's Office at least three business days in advance of the meeting. Contact the Public Advisor's Office by any one of the following: | ||
Email:
public.advisor@cpuc.ca.gov |
FAX: 415-355-5404 (Attn.: Public Advisor) |
March 24, 2011 |
9:00 am |
San Francisco |
April 14, 2011 |
9:00 am |
San Francisco |
May 5, 2011 |
10:00 am |
San Francisco |
Ratesetting Deliberative Meeting dates are reserved as noted but will only be held if there are ratesetting matters to be considered.
March 21, 2011 |
1:30 pm |
San Francisco |
April 11, 2011 |
1:30 pm |
San Francisco |
May 2, 2011 |
1:30 pm |
San Francisco |
March 28, 2011 |
California Public Utilities Commission |
Pursuant to D.10-06-047, the Commission is holding a public meeting on the draft Smart Grid Deployment Plans of PG&E, SCE and SDG&E. D.10-06-047 directed this meeting be held to facilitate the interaction between the CPUC, CEC and CAISO in the creation and review of the Smart Grid Deployment Plans, as directed by Public Utility Code Sec. 8366. Commissioners from the Public Utilities Commission and Energy Commission as well as representatives from the California ISO may attend and participate in the meeting. While a quorum of the CPUC and CEC may attend the meeting, no action will be taken. An agenda will be emailed to the service list of R.08-12-009 by March 24.
Contact: Chris Villarreal at (415) 703-1566, or email:
crv@cpuc.ca.gov.
April 5, 2011 |
San Bruno Senior Center |
Order Instituting Rulemaking on the Commission's Own Motion to Adopt New Safety and Reliability Regulations for Natural Gas Transmission and Distribution Pipelines and Related Ratemaking Mechanisms.
A public participation hearing will be held before a quorum of the Commissioners of the California Public Utilities Commission to hear public testimony related to gas pipeline safety and the Commissioner's regulation of natural gas transmission and distribution pipelines.
Parties desiring expedited or daily transcripts should advise the Chief Hearing Reporter by telephone at (415) 703-2288, no later than three days prior to the first day of hearing.
If you have questions about the hearing date, time, or place, call the Calendar Clerk, Ann Hoang at 415-703-1203 or email:
MAILTO:ahg@cpuc.ca.govahg@cpuc.ca.gov.
To purchase Commission documents, there is a charge of 20 cents a printed page (postage prepaid) with a minimum purchase of $2.00.
The auditorium, hearing rooms, and training room at the headquarters of the California Public Utilities Commission, located at 505 Van Ness Avenue, San Francisco, California, are available for rent. Further information about requirements and fees can be obtained by contacting Scott Finger (415) 703-1641.
March 18, 2011 |
Morgan Hill City Hall, City Council Chamber |
These meetings are to provide information to the public and to gather information from the public. The CPUC considers comments made by the public up until a decision is voted on by the CPUC's Commissioners. The public is encouraged to voice their opinion either by:
1) Attending one of the Public Participation Meetings scheduled in March;
2) Telephone to the area code hotline at 866 340-6147;
3) Online form at www.cpuc.ca.gov/408areacode;
4) Email to
public.advisor.la@cpuc.ca.gov; and
5) Letter to CPUC, Public Advisor, 320 W. 4th St., Suite 500, Los Angeles, CA 90013.
If special arrangements are needed for attendees, such as sign and foreign language interpreters, please contact the CPUC Public Advisor's Office at 1-866-849-8391 or 1-213-576-7055, or email:
public.advisor.la@cpuc.ca.gov at least three days prior to the meeting.
More information on the 408 area code is available at www.cpuc.ca.gov/408areacode.
March 21, 2011 |
California Public Utilities Commission |
Phase 4 of R.07-01-041 focuses on developing policies and rules with regard to direct participation of demand response resources in wholesale markets. The investor-owned utilities have been directed to propose by March 15 rules for direct participation including a pro-forma service agreement. The utilities' proposals will be vetted by the parties in a Working Group format. The purpose of this meeting is to establish a schedule and process for the Working Group. A meeting agenda will be emailed to the service list of R.07-01-041 by March 16. For more details please see the attached ruling:
http://docs.cpuc.ca.gov/efile/RULINGS/130878.pdf
Contact: Bob Benjamin at (415) 703-2494 or email:
bkb@cpuc.ca.gov.
March 22, 2011 |
California Public Utilities Commission |
The workshop in the above-entitled matter will be held before Administrative Law Judge (ALJ) Seaneen M. Wilson. Questions on the workshop may be directed to ALJ Wilson via email: smw@cpuc.ca.gov. Questions on the time and location may be directed to the Calendar Clerk, Ann Hoang at 415-703-1203 or ahg@cpuc.ca.gov.
March 23, 2011 |
California Public Utilities Commission |
The workshop in the above entitled matter will be held before Administrative Law Judge (ALJ) Karl J. Bemesderfer. Questions on the workshop may be directed to ALJ Bemesderfer; email: klb@cpuc.ca.gov. Questions on the time and location may be directed to the Calendar Clerk, Ann Hoang at 415-703-1203 or ahg@cpuc.ca.gov.
March 25, 2011 |
California Public Utilities Commission |
D.09-09-047 identified eight tasks that the utilities should address during the 2010 - 2012 Energy Efficiency program cycle. These eight tasks address several strategic planning goals and objectives identified for promoting integrated demand side management in the California Energy Efficiency Strategic Plan. Among these eight tasks is the development of a proposed cost-effectiveness methodology for programs and projects that utilize multiple demand side technology categories such as energy efficiency, demand response, and distributed generation. The purpose of this workshop is to gather public input on a white paper that identifies issues, challenges, and recommendations for development of an integrated demand side cost-effectiveness methodology. The white paper was distributed to the parties of the service lists identified above. A meeting agenda and a list of questions for consideration in preparation for the workshop will be emailed to these same parties prior to the workshop.
CONTACT: Brenda Gettig, SDG&E, (858) 654-8755, or email:
BGettig@semprautilities.com.
March 28, 2011 |
California Public Utilities Commission |
Pursuant to D.10-06-047, the Commission is holding a public meeting on the draft Smart Grid Deployment Plans of PG&E, SCE and SDG&E. D.10-06-047 directed this meeting be held to facilitate the interaction between the CPUC, CEC and CAISO in the creation and review of the Smart Grid Deployment Plans, as directed by Public Utility Code Sec. 8366. Commissioners from the Public Utilities Commission and Energy Commission as well as representatives from the California ISO may attend and participate in the meeting. While a quorum of the CPUC and CEC may attend the meeting, no action will be taken. An agenda will be emailed to the service list of R.08-12-009 by March 24.
Contact: Chris Villarreal at (415) 703-1566, or email:
crv@cpuc.ca.gov.
March 30, 2011 |
California Public Utilities Commission |
AGENDA
1. Introduction; 2. Approval of minutes; 3. Fiscal Report; 4. Contract Reports; 5. CAB Report; 6. Legal Liaison Report; 7. Public comments; 8. Discussion of the Role of the ULTS-AC; 9. Communications Division Liaison Report; 10. ULTS-AC Report; 11. ULTS-AC vacancy update; 12. Future meeting date and location; and 13. Adjournment.
The ALJ Division has prepared Resolution ALJ-267 for the March 24, 2011 Commission Meeting. This resolution adopts Intervenor Rates for 2011 and addresses related matters. This resolution does not adopt a Cost-of-Living Adjustment (COLA) for work performed by intervenors in calendar year 2011 and addresses other related matters. Notice of this draft has been sent to parties on the service lists. Any questions or comments should be directed to ACALJ Michelle Cooke; email: mlc@cpuc.ca.gov.
The web link is http://docs.cpuc.ca.gov/PUBLISHED/COMMENT_RESOLUTION/130946.htm.
The Energy Division has prepared Resolution E-4394 for the March 24, 2011 Commission Meeting. This Resolution approves Southern California Edison Company's request for cost recovery of a renewable energy power purchase agreement (PPA) with Cascade Solar LLC. The PPA is approved without modification. Notice of this draft has been sent to parties in the service list. Any questions or comments should be directed to Amy Baker; email: Amy.baker@cpuc.ca.gov.
The web link is http://docs.cpuc.ca.gov/PUBLISHED/COMMENT_RESOLUTION/131018.htm.
NOTICE OF RESOLUTION AUTHORIZING PUBLIC DISCLOSURE OF
INVESTIGATION RECORDS
Resolution L-412 authorizes disclosure of records concerning the California Public Utilities Commission (Commission) Consumer Protection and Safety Division's investigation of a December 21, 2010 incident involving the Southern California Edison Company underground electrical vault and equipment at Vail and Flotilla, Montebello, California.
On March 14, 2011, the draft resolution was mailed to the service list, pursuant to California Public Utilities Code § 311(g) and Rule 14.2(c)(2) of the Commission's Rules of Practice and Procedure. Comments shall be served no later than April 4, 2011, and reply comments shall be served no later than April 11, 2011.
Resolution L-412 will be on the agenda at the April 14, 2011 Commission meeting. The Commission may then vote on this draft resolution, or it may postpone a vote.
When the Commission acts on the draft resolution, it may adopt all or part of it as written, amend or modify it, or set it aside and prepare its own order. Only when the Commission acts does the resolution become binding on the parties.
Finally, an original and two copies of the comments, with a certificate of service, should be submitted to:
Fred Harris, Staff Counsel
Legal Division
California Public Utilities Commission
505 Van Ness Avenue, Room 5040
San Francisco, CA 94102-3298
Telephone: 415-703-1557
E-mail:
fnh@cpuc.ca.gov;
bwg@cpuc.ca.gov
The Energy Division has prepared Resolution E-4398 which addresses PG&E's Uranium Enrichment Services Contract Amendment with URENCO Ltd. For Diablo Canyon Power Plant. The draft resolution will be on the April 14, 2011 Commission agenda. Any questions or comments should be directed to Eric Greene; email: eg1@cpuc.ca.gov.
The web link is http://docs.cpuc.ca.gov/PUBLISHED/COMMENT_RESOLUTION//132016.htm.
The Consumer Protection and Safety Division (CPSD) has prepared Draft Resolution Rail ST-122 for the April 14, 2011 Commission Meeting. The resolution grants the consumer Protection and Safety Division final report titled, "2010" Triennial On-Site Safety Review of San Francisco International Airport air Train," dated December 29, 2010. Any questions or comments should be directed to Erik Juul; email: E9J@cpuc.ca.gov or (415) 703-2723.
The web link is http://docs.cpuc.ca.gov/PUBLISHED/AGENDA_RESOLUTION/132086.htm.
The Energy Division has prepared Resolution E-4393 for the April 14, 2011 Commission Meeting. This Resolution approves cost recovery for Pacific Gas and Electric Company's renewable power purchase agreement with SGS-1, LLC. The power purchase agreement is approved with conditions. Notice of this draft has been sent to parties in the service lists.
Any questions or comments should be directed to Jason Simon; email:
jason.simon@cpuc.ca.gov.
The web link is http://docs.cpuc.ca.gov/PUBLISHED/COMMENT_RESOLUTION/132101.htm.
NONE
NONE
3/15/11 |
A.07-02-026 - In the Matter of the Application of SOUTHERN CALIFORNIA EDISON COMPANY (U 338-E) for Approval of Results of Fast Track of Its New Generation Request for Offers and for Cost Recovery; and A.08-04-011 - In the Matter of the Application of Southern California Edison Company (U338-E) for Approval of Results of Standard Track of Its New Generation Request for Offers and for Cost Recovery; Proposed Decision of ALJ Yacknin. |
NONE
NONE
Date Filed |
Subject |
March 15, 2011 |
Yolo County for Yolo County, application letter to use the 2-1-1 dialing code to offer information and referral services in all of Yolo County. To request a copy of this filing, contact Patricia Wong, County Librarian, 226 Buckeye Street, Woodland, CA 95695-2600; email: patty.wong@yolocounty.org, or phone at (530) 666-8005. Comments may be submitted. Comments should arrive by April 4, 2011, addressed to Director, Communications Division, California Public Utilities Commission, 505 Van Ness Avenue, San Francisco, CA 94102. A copy of any comment must be sent on the same day to the applicant c/o Patricia Wong, patty.wong@yolocounty.org. Applicant's response to comments shall be filed within 5 business days after receipt, and shall be served on each commenter and the Commission. CPUC contact: Katherine Morehouse (415) 703-5331. |
4/8/11 |
C.11-01-013 (ECP) - Beryl Adelman, Complainant vs. Pacific Bell Telephone Company dba AT&T California (U1001C), Defendant, |
ALJ Barnett |
C.11-01-010 - Payman Ahmadinia, Complainant, vs. Southern California Edison Company, (U338E), Defendant, |
ALJ Yip-Kikugawa |
I.11-02-016 - Order Instituting Investigation on the Commission's Own Motion into the Operations and Practices of Pacific Gas and Electric Company with Respect to Facilities Records for its Natural Gas Transmission System Pipelines, |
Dates in parentheses following the word "also" are subject to change without notice. The assigned Commissioner's name is listed next to the proceedings as matter of record; the assigned Commissioner may not be present at the hearing.
(PHC) = Prehearing Conference |
(ECP) = Expedited Complaint Procedure |
(CA) = Closing Argument |
(EH) = Evidentiary Hearing |
(OSC) = Order to Show Cause |
(LM) = Law & Motion |
(PPH) = Public Participation Hearing |
(WS) = Workshop |
(OA) = Oral Argument |
(IAM) = Initial Arbitration Meeting |
(FPH) = Full Panel Hearing |
(STC) = Status Conference |
(AH) = Arbitration Hearing |
(FOA) = Final Oral Argument |
(DC) = Discovery Conference |
(APPEAL) = Appeal Hearing of General Order 156 |
(CITATION) = Appeal Hearing of Citation |
(SCF) = Settlement Conference |
3/18/11 |
A.11-02-002 (DC) - Application of Suburban Water Systems (U339-W) for Authority to Increase Rates Charged for Water Service by $19,234,576 or 35.85% in 2012, by $3,032,827 or 4.18% in 2013, and by $1,973,200 or 2.61% in 2014, |
|
3/21/11 |
C.11-01-007 (PHC) - Setton Pistachio of Terra Bella, Inc., Complainant, v. Pacific Bell Telephone Company d/b/a AT&T California (U1001C), Defendant, | |
3/21/11 |
R.09-06-019 (PPH) - Order Instituting Rulemaking Regarding Revisions to the California High Cost Fund B Program, | |
3/22/11 |
R.10-06-002 (WS) - Order Instituting Rulemaking Regarding Whether to Allow Access to 211 Services in Counties and Localities Without 211 Centers, | |
3/23/11 |
A.10-11-002 (WS) - Application of Pacific Gas and Electric Company for Authority to Increase Electric Rates and Charges to Recover Costs Relating to California Solar Photovoltaic Manufacturing Development Facility. (U39E), | |
3/23/11 |
R.09-06-019 (PPH) - Order Instituting Rulemaking Regarding Revisions to the California High Cost Fund B Program, | |
3/24/11 |
A.11-02-002 (PHC) - Application of Suburban Water Systems (U339W) for Authority to Increase Rates Charged for Water Service by $19,234,576 or 35.85% in 2012, by $3,032,827 or 4.18% in 2013, and by $1,973,200 or 2.61% in 2014, | |
3/24/11 |
A.11-01-021 (PHC) - Joint Application of Central Valley Gas Storage, LLC (U915G), Nicor Inc., and AGL Resources Inc. For Expedited Ex Parte Authorization to Transfer Ownership of Central Valley Gas Storage, LLC to AGL Resources Inc., | |
3/24/11 |
R.09-06-019 (PPH) - Order Instituting Rulemaking Regarding Revisions to the California High Cost Fund B Program, | |
3/28/11 |
R.07-05-025 (EH) - Rulemaking Regarding Whether, or Subject to What Conditions, the Suspension of Direct Access May Be Lifted Consistent with Assembly Bill 1X and Decision 01-09-060, | |
3/28/11 |
A.10-04-026 (EH) - Application of Southern California Edison Company (U338E) for Authorization to Recover Costs Related to the 2007 Southern California Wind and Firestorms Recorded in the Catastrophic Event Memorandum Account (CEMA), | |
3/28/11 |
A.10-10-020 (PHC) - In the Matter of the Application of the City of Emeryville for an order authorizing construction of the South Bayfront Pedestrian Bicycle Bridge over nine rail tracks owned by the Union Pacific Railroad Company in the City of Emeryville in the County of Alameda, | |
4/4/11 |
C.10-08-027 (EH) - Encina Wastewater Authority, Complainant, vs. San Diego Gas & Electric Company, (U902E), Defendant, | |
4/5/11 |
A.10-10-001 (EH) - Application of San Diego Gas & Electric Company (U902E) for Adoption of its 2011 Energy Resource Recovery Account Revenue Requirement and Competitive Transition Charge Revenue Requirement Forecasts, | |
4/5/11 |
R.11-02-019 (EN BANC & PPH) - Order Instituting Rulemaking on the Commission's Own Motion to Adopt New Safety and Reliability Regulations for Natural Gas Transmission and Distribution Pipelines and Related Ratemaking Mechanisms, | |
4/6/11 |
A.10-07-019 (PPH) - In the Matter of the Application of San Gabriel Valley Water Company (U337W) for Authority to Increase Rates Charged for Water Service in its Los Angeles County Division by $10,232,700 or 17.8% in July 2011, $1,767,700 or 2.6% in July 2012, and $2,245,800 or 3.2% in July 2013 and in its Fontana Water Company division by $1,252,200 or 2.1% in July 2011, | |
4/7/11 |
R.10-11-014 (PHC) - Order Instituting Rulemaking on the Commission's own Motion to Consider a Comprehensive Policy Framework for Recycled Water, | |
4/8/11 |
C.10-10-010 (PHC) - Michael Hetherington and Janet Hetherington, Complainants, vs. Pacific Gas & Electric Company. (U39E), Defendant, | |
4/8/11 |
C.10-06-011 (ECP) - Mr. Mazen Bahu, Complainant, vs. Southern California Edison Company, (U338E), Defendant, | |
4/8/11 |
C.11-01-013 (ECP) - Beryl Adelman, Complainant vs. Pacific Bell Telephone Company dba AT&T California (U1001C), Defendant, | |
4/8/11 |
C.11-01-017 (ECP) - Corry Watung, Complainant, vs. Southern California Edison Company, (U338E), Defendant, | |
4/8/11 |
C.11-01-012 (ECP) - Gary Rogovin, Complainant, vs Pacific Bell Telephone Company dba AT&T California (U1001C), Defendant, | |
4/11/11 |
A.10-11-012 (EH) - In the Matter of the Application of Southern California Edison Company (U338E) for a Permit to Construct Electrical Facilities: Red Bluff Substation Project, | |
4/11/11 |
A.10-07-009 (EH) - In the Matter of the Application of San Diego Gas & Electric Company (U902E) for Approval of its Proposals for Dynamic Pricing and Recovery of Incremental Expenditures Required for Implementation, | |
4/14/11 |
C.11-02-009 (EH) - Leatherbury & Lowell Family Trusts, Complainant, vs. San Diego Gas & Electric Company (U902E), Defendant, | |
4/15/11 |
R.11-02-018 (PHC) - Order Instituting Rulemaking into Transfer of Master-Meter/Submeter systems at Mobilehome parks and Manufactured Housing Communities to Electric and Gas Corporations, | |
4/18/11 |
A.10-09-019 (EH) - In the Matter of the Application of San Jose Water Company (U168W) for Commission Approval of Cost Recovery for Upgrading the Montevina Water Treatment Plant, | |
4/21/11 |
R.10-12-007 (PHC) - Order Instituting Rulemaking Pursuant to Assembly Bill 2514 to Consider the Adoption of Procurement Targets for Viable and Cost-Effective Energy Storage Systems, | |
4/26/11 |
C.10-07-020 (EH) - Rio Bravo Rocklin, Complainant, v. Pacific Gas and Electric Company (U39E), Defendant, | |
4/27/11 |
A.10-11-009 (PPH) - Application of Southern California Edison Company (U338E) for Authority to, Among Other Things, Increase Its Authorized Revenues For Santa Catalina Island Water Operations, And to Reflect That Increase In Rates, | |
5/2/11 |
A.09-08-003 (EH) - In The Matter of the Application of SAN DIEGO GAS & ELECTRIC COMPANY (U902E) for a Permit to Construct Electrical Facilities With Voltages Between 50 kV and 200 kV and New Substations With High Side Voltages Exceeding 50kV: The East County Substation Project, | |
5/16/11 |
C.10-10-015 (EH) - Calico Solar, LLC, Complainant, vs. BNSF Railway Company, Defendant, | |
5/18/11 |
A.10-07-007 (EH) - Application of California-American Water Company (U210W) for Authorization to increase its Revenues for Water Service by $4,134,600 or 2.55% in the year 2011, by $33,105,800 or 19.68% in the year 2012, by $9,897,200 or 4.92% in the year 2013, and by $10,874,600 or 5.16% in the year 2014, | |
5/23/11 |
A.10-11-010 (EH) - In the Matter of Application of Southern California Edison Company (U338E) for Approval of Agreements to Sell Its Interests in Four Corners Generation Station, | |
5/23/11 |
R.10-05-006 (EH) - Order Instituting Rulemaking to Integrate and Refine Procurement Policies and Consider Long-Term Procurement Plans, | |
6/6/11 |
A.08-05-019 (PHC) - Application of California Water Service Company (U60W) for an order confirming its discontinuance of the ESP program as provided in D.07-12-055, Ordering Paragraph 19, approving accounting for the residual affiliate transaction, and confirming under D.07-12-055, Ordering Paragraph 16 that Applicant's residual services to its affiliate CWS Utility Services comply with applicable law, | |
6/7/11 |
A.10-09-017 (PHC) - Application of California-American Water Company (U210W), California Water Service Company (U60W), Golden State Water Company (U133W), Park Water Company (U314W) and Apple Valley Ranchos Water Company (U346W) to Modify D.08-02-036, D.08-06-002, D.08-08-030, D.08-09-026, D.08-11-023, D.09-05-005, D.09-07-021, and D.10-06-038 regarding the Amortization of WRAM-related Accounts, | |
6/8/11 |
A.10-09-018 (EH) - Application of California-American Water Company (U210W) for Authorization to Implement the Carmel River reroute and San Clemente Dam Removal Project and to Recover the Costs Associated with the Project in Rates, | |
6/20/11 |
A.08-05-019 (EH) - Application of California Water Service Company (U60W) for an order confirming its discontinuance of the ESP program as provided in D.07-12-055, Ordering Paragraph 19, approving accounting for the residual affiliate transaction, and confirming under D.07-12-055, Ordering Paragraph 16 that Applicant's residual services to its affiliate CWS Utility Services comply with applicable law, | |
6/27/11 |
A.10-12-012 (EH) - In the Matter of Application of Foresthill Telephone Company (U1009C) dba Sebastian, to Review Intrastate Rates and Charges and Rate of Return for Telephone Service Furnished within the State of California, and Increase Selected Rates, | |
7/18/11 |
C.09-11-019 (EH) - Lucas D. Hernandez, Janette Sandoval, Martha Amezquita, Daniel Gonzalez, Gabriel Cabrera, Severo Rosa, Celia Ruiz, Martha Alvarado, Maria Palma, Federico Garcia, Luis Morales, Complainants, vs. Sunbird Mobile Home Park, Hawkeye Asset Management, James Martin and Betty Martin, Defendants, | |
7/25/11 |
A.10-11-015 (EH) - Application of Southern California Edison Company (U338E) for Authority to, Among Other Things, Increase Its Authorized Revenues For Electric Service In 2012, And to Reflect That Increase In Rates, | |
7/28/11 |
A.10-11-015 (EH) - Application of Southern California Edison Company (U338E) for Authority to, Among Other Things, Increase Its Authorized Revenues For Electric Service In 2012, And to Reflect That Increase In Rates, | |
8/1/11 |
R.10-05-006 (EH) - Order Instituting Rulemaking to Integrate and Refine Procurement Policies and Consider Long-Term Procurement Plans, | |
11/30/11 |
A.10-12-005 (EH) - Application of San Diego Gas & Electric Company (U902M) for Authority, Among Other Things, to Increase Rates and Charges for Electric and Gas Service Effective on January 1, 2012, and | |
March 25, 2011 |
California Public Utilities Commission |
Commissioner Mike Florio will hold an All-Party Meeting on the Proposed Decision approving IOU 2011 Renewable Portfolio Standard Procurement Plans. A detailed agenda will be shared in advance of the meeting. Parties wishing to attend the All-Party Meeting should contact Ernesto Melendez ; email: mel@cpuc.ca.gov or 415-703-2440 no later than Thursday, March 24, 2011.