ALJ/DKF/gd2 Date of Issuance 11/24/2010
Decision 10-11-032 November 19, 2010
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA
Application of Pacific Gas and Electric Company for Authority to Increase Revenue Requirements to Recover the Costs to Implement a Program to Improve the Reliability of its Electric Distribution System (U39E). |
Application 08-05-023 (Filed May 15, 2008) |
DECISION GRANTING INTERVENOR COMPENSATION TO
THE UTILITY REFORM NETWORK FOR SUBSTANTIAL CONTRIBUTION
TO DECISION 10-06-048
Claimant: The Utility Reform Network (TURN) |
For contribution to Decision (D.) 10-06-048 |
Claimed: $441,7761 equal to $354,569, plus 25% enhancement of $87,207 |
Awarded: $441,401 |
Assigned Commissioner: Michael R. Peevey |
Assigned ALJ: David Fukutome |
PART I: PROCEDURAL ISSUES
A. Brief Description of Decision: |
The decision addressed Pacific Gas and Electric Company (PG&E)'s proposal for a Distribution Reliability Improvement Program (DRIP), which PG&E gave the moniker "Cornerstone Improvement Project." PG&E proposed spending nearly $2 billion in capital and $60 million in expense over the period 2010 through 2016. In D.10-06-048 the Commission rejected PG&E's proposal in favor of a scaled-back version generally consistent with an alternative recommendation put forward by TURN, with expenditures amounting to $357.4 million in capital and $9.2 million in expense for the period 2010 through 2013. The reduced program approved in D.10-06-048 is estimated to achieve up to 68% of the quantifiable reliability improvement benefits, but at approximately 18% of the cost requested by PG&E. The adopted outcome on nearly all issues is far closer to TURN's position than PG&E's, and the decision cites with favor TURN's analysis throughout its discussion of the various elements of PG&E's proposal and the adopted outcome. |
B. Claimant must satisfy intervenor compensation requirements set forth in Public Utilities Code §§ 1801-1812:
Claimant |
CPUC Verified | |
Timely filing of notice of intent (NOI) to claim compensation (§ 1804(a)): | ||
1. Date of Prehearing Conference: |
January 26, 2009 |
Yes |
2. Other Specified Date for NOI: |
N/A |
|
3. Date NOI Filed: |
February 23, 2009 |
Yes |
4. Was the notice of intent timely filed? |
Yes | |
Showing of customer or customer-related status (§ 1802(b)): | ||
5. Based on ALJ ruling issued in proceeding number: |
A.08-05-023 |
Yes |
6. Date of ALJ ruling: |
April 22, 2009 |
Yes |
7. Based on another CPUC determination (specify): |
||
8. Has the claimant demonstrated customer or customer-related status? |
Yes | |
Showing of "significant financial hardship" (§ 1802(g)): | ||
9. Based on ALJ ruling issued in proceeding number: |
A.08-05-023 |
Yes |
10. Date of ALJ ruling: |
April 22, 2009 |
Yes |
11. Based on another CPUC determination (specify): |
||
12. Has the claimant demonstrated significant financial hardship? |
Yes | |
Timely request for compensation (§ 1804(c)): | ||
13. Identify Final Decision |
D.10-06-048 |
Yes |
14. Date of Issuance of Final Decision: |
June 25, 2010 |
Yes |
15. File date of compensation request: |
August 24, 2010 (amended 10/6/10)2 |
Yes |
16. Was the request for compensation timely? |
Yes | |
PART II: SUBSTANTIAL CONTRIBUTION
A. Claimant's description of its claimed contribution to the final decision
B. Duplication of Effort (§§ 1801.3(f) & 1802.5):
Claimant |
CPUC Verified | |
a. Was DRA a party to the proceeding? |
Yes |
Correct |
b. Were there other parties to the proceeding? |
Yes |
Correct |
c. If so, provide name of other parties: California Farm Bureau Federation (CFBF); California Large Energy Consumers Association (CLECA); City and County of San Francisco (CCSF); Engineers and Scientists of California (ESC); and Coalition of California Utility Employees (CUE). |
Correct | |
d. Claimant's description of how it coordinated with DRA and other parties to avoid duplication or how claimant's participation supplemented, complemented, or contributed to that of another party: TURN took the lead role among the parties opposed to PG&E's application for a distribution reliability improvement program. When PG&E filed its application, TURN was primarily responsible for developing and implementing the strategy of pursuing a motion to dismiss the application. When a prehearing conference was scheduled, TURN again played a lead role in preparing a prehearing conference statement to counter PG&E's, and sought out and obtained the support of a wider array of consumer groups (with CFBF and CLECA joining TURN and DRA on the pleading). Prior to drafting testimony, TURN met with other consumer groups to ensure a minimum of overlap in the issues covered in each party's testimony. TURN submits that the Commission should find that TURN took all reasonable steps to avoid duplication and, to the extent that there was any overlap, TURN's work supplemented and complemented that of DRA and the other parties opposed to the application. This is especially true in light of the repeated favorable references to TURN's advocacy efforts in D.10-06-048. |
Correct | |
PART III: REASONABLENESS OF REQUESTED COMPENSATION
A. General Claim of Reasonableness (§§ 1801 & 1806):
Concise explanation as to how the cost of claimant's participation bore a reasonable relationship with benefits realized through participation (include references to record, where appropriate) |
CPUC Verified |
TURN's participation helped to convince the Commission to reject PG&E's proposal for a $2 billion program in the name of distribution reliability improvement in favor of an alternative recommendation put forward by TURN with a price tag of approximately $370 million. This reduction in the same capital spending means PG&E's rate base will be approximately $1.4 billion lower in 2016 than the utility had proposed. Assuming a revenue requirement of 18% of rate base to collect depreciation, tax and return on this amount, PG&E ratepayers avoided an increased revenue requirement of approximately $250 million per year in 2017 and continuing at nearly that level for many years beyond. In considering the reasonableness of TURN's requested amount of compensation, the Commission should also compare the overall benefits with the overall amount TURN is requesting. As described below, TURN's costs of participation sought in this request are approximately $350,000. Even with the requested 25% multiplier, the total request is below $450,000, which is approximately two-tenths of 1% of the $250 million of revenue requirement savings each year from 2017 and for many years thereafter, as described earlier in this subsection. |
We note here that we have momentarily broken from our standard practice of disallowing the attendance of several individuals from the same advocacy group at the same workshop or meeting. Based on TURN's showing here that none of its attorneys or expert witnesses attended meetings (with 3-5 PG&E attorneys) where their presence was not vital to the development and implementation of TURN's strategy, we approve time that we would normally find duplicative. We find in this instance, given these facts, that full compensation is warranted. We will not however, broadly apply this same type of allowance to other intervenor claims absent such a convincible showing. After the disallowances we make to this claim, the remainder of TURN's hours and costs are reasonable and should be compensated. |
B. Specific Claim:
Claimed |
CPUC Award | |||||||||||
ATTORNEY AND ADVOCATE FEES | ||||||||||||
Item |
Year |
Hours |
Rate $ |
Basis for Rate* |
Total $ |
Year |
Hours |
Rate $ |
Total $ | |||
R. Finkelstein |
2008 |
51.7 |
470 |
D.08-08-027 |
24,299 |
2008 |
51.7 |
470 |
24,299 | |||
R. Finkelstein |
2009 |
265.8 |
470 |
D.09-08-025 |
124,926 |
2009 |
265.8 |
470 |
124,926 | |||
R. Finkelstein |
2010 |
15.5 |
470 |
D.10-06-046 |
7,285 |
2010 |
15.5 |
470 |
7,285 | |||
H. Goodson |
2009 |
137.2 |
280 |
D.09-10-051 |
38,416 |
2009 |
137.2 |
280 |
38,416 | |||
H. Goodson |
2010 |
3.5 |
280 |
D.10-07-040 |
980 |
2010 |
3.5 |
280 |
980 | |||
N. Suetake |
2009 |
89.5 |
280 |
Adopted here |
25,060 |
2009 |
89.5 |
280 |
25,060 | |||
N. Suetake |
2010 |
1.5 |
280 |
Adopted here |
420 |
2010 |
1.5 |
280 |
420 | |||
Subtotal: $221,386 |
Subtotal: $221,386 | |||||||||||
EXPERT FEES | ||||||||||||
Item |
Year |
Hours |
Rate $ |
Basis for Rate* |
Total $ |
Year |
Hours |
Rate $ |
Total $ | |||
W. Marcus |
2008 |
4.2 |
250 |
D.08-11-053 |
1,050 |
2008 |
4.2 |
250 |
1,050 | |||
W. Marcus |
2009 |
127.9 |
250 |
D.09-10-051 |
31,975 |
2009 |
127.9 |
250 |
31,975 | |||
W. Marcus |
2010 |
.3 |
250 |
D.10-09-045 |
75 |
2010 |
.3 |
250 |
75 | |||
G. Schilberg |
2008 |
3.4 |
200 |
D.10-02-010 |
680 |
2008 |
3.4 |
200 |
680 | |||
G. Schilberg |
2009 |
151.5 |
200 |
D.09-04-027 |
30,300 |
2009 |
151.5 |
200 |
30,300 | |||
G. Jones |
2008 |
3.0 |
120 |
D.09-04-027 |
360 |
2008 |
3.0 |
120 |
360 | |||
G. Jones |
2009 |
481.5 |
130 |
Adopted here |
62,595 |
2009 |
481.5 |
130 |
62,595 | |||
G. Jones |
2010 |
3.1 |
130 |
Adopted here |
403 |
2010 |
3.1 |
130 |
403 | |||
Subtotal: $127,438 |
Subtotal: $127,438 | |||||||||||
TRAVEL | ||||||||||||
Item |
Year |
Hours |
Rate $ |
Basis for Rate* |
Total $ |
Year |
Hours |
Rate $ |
Total $ | |||
W. Marcus |
2009 |
3.0 |
125 |
½ 2009 rate |
375 |
2009 |
0.00 |
125 |
0 | |||
Subtotal: $3753 |
Subtotal: $04 | |||||||||||
INTERVENOR COMPENSATION CLAIM PREPARATION ** | ||||||||||||
Item |
Year |
Hours |
Rate $ |
Basis for Rate* |
Total $ |
Year |
Hours |
Rate $ |
Total $ | |||
R. Finkelstein |
2009 |
1.25 |
235 |
50% of $470 |
294 |
2009 |
1.25 |
235 |
294 | |||
R. Finkelstein |
2010 |
14.75 |
235 |
50% of $470 |
3,466 |
2010 |
14.75 |
235 |
3,466 | |||
Subtotal: $3,760 |
Subtotal: $3,760 | |||||||||||
COSTS | ||||||||||||
Expense |
Detail |
Total $ |
Total $ | |||||||||
Photocopies |
TURN Pleadings |
1,376 |
1,376 | |||||||||
Lexis/Nexis |
Computerized research |
89 |
89 | |||||||||
Phone and postage |
Proceeding-related phone calls and TURN pleadings |
145 |
145 | |||||||||
Subtotal: $1,610 |
Subtotal: $1,610 | |||||||||||
Request without multiplier: $354,569 |
Award Total: $354,194 | |||||||||||
Request with 25% Multiplier5: $87,207 |
Additional 25% Multiplier: $87,207 | |||||||||||
TOTAL REQUEST: $441,776 |
TOTAL AWARD: $441,401 | |||||||||||
**Reasonable claim preparation time typically compensated at ½ of preparer's normal hourly rate. We remind all intervenors that Commission staff may audit their records related to the award and that intervenors must make and retain adequate accounting and other documentation to support all claims for intervenor compensation. Claimant's records should identify specific issues for which it seeks compensation, the actual time spent by each employee or consultant, the applicable hourly rates, fees paid to consultants and any other costs for which compensation was claimed. The records pertaining to an award of compensation shall be retained for at least three years from the date of the final decision making the award. | ||||||||||||
C. TURN and CPUC Comments Documenting Specific Claim:
TURN Comments |
Description of TURN's Comments | ||||||||
1 |
Reasonableness of TURN Hours: PG&E's distribution reliability improvement proposal warranted a level of effort and resource commitment similar to that which TURN typically devotes to a full-fledged general rate case. The application focused on PG&E's electric distribution operations, both proposing changes to the utility's operation and reliability measurement standards, and seeking to implement those changed standards through very costly measures. Substantial time and effort was required to understand PG&E's proposals sufficiently to challenge them on a technical basis. Furthermore, throughout the proceeding PG&E steadfastly refused to present traditional or typical cost-effectiveness analysis of its proposals, thus requiring TURN to engage in extensive discovery and analysis in order to backfill this omission of material that (in TURN's experience) would typically be included in a utility's initial workpapers supporting such an application. As a result, in order to perform the broad and detailed analysis that a multi-billion dollar proposal warrants, TURN was required to devote substantial attorney and consultant resources to further fleshing out and reviewing the utility's proposal. As just one example, TURN's consultants and at least one of our attorneys made a very substantial effort in order to develop a sufficient grasp of interconnectivity issues and the importance of the number of zones on a feeder. The result is that both TURN's attorneys and consultants recorded a substantial amount of hours. As described below, the number of hours for each TURN representative was reasonable under the circumstances present here. Robert Finkelstein was the sole TURN attorney assigned to this proceeding from its start in mid-2008 through the service of PG&E's updated testimony in March 2009. Soon thereafter, Hayley Goodson and Nina Suetake both began working on the proceeding with Mr. Finkelstein, with Ms. Goodson taking on distribution capacity issues and Ms. Suetake focusing primarily on distribution automation issues, while Mr. Finkelstein continued to address the broad policy issues (including the purported need for the new program) and ratemaking issues, overseeing the work of TURN's other attorneys, and generally coordinating TURN's efforts. Mr. Finkelstein's hours are reasonable. In 2008, he recorded approximately 50 hours, almost entirely related to the very substantial and comprehensive Motion to Dismiss and the ensuing reply pleading. In 2009, he recorded approximately 265 hours associated with serving as the sole TURN attorney on the matter for the first portion of the year, and then TURN's lead attorney (coordinating discovery and review of PG&E's application and updated testimony, and TURN's development of testimony, ongoing coordination with DRA and other intervenors, handling of evidentiary hearings, and drafting of briefs) as well as maintaining primary responsibility for policy and related issues. The hours Ms. Goodson and Ms. Suetake recorded in 2009 (approximately 135 and 90, respectively) reflect a reasonable amount given the effort required to assist with later rounds of discovery, testimony development and review, preparation for cross examination on complex and highly technical issues, and briefing those issues. As noted earlier, the absence of any cost-effectiveness showing in PG&E's application and supporting testimony required a broader focus on technical issues, which in turn led to Ms. Goodson and Ms. Suetake devoting substantial effort to quickly getting up the learning curve on issues related to substation capacity and its effect on system reliability, and feeder lines and connectivity matters. JBS Energy, TURN's consultant for expert witness services in this proceeding, allocated its resources in a manner similar to the approach taken in the most recent SCE GRC (A.07-11-011). The vast majority of the hours billed to TURN for work in this matter were for the review and analysis performed by Garrick Jones, who's billing rate is substantially lower than those of the other firm members. By having Mr. Jones perform the most substantial share of the initial review and analysis of a wide array of issues raised in this application, as well as drafting large portions of the testimony ultimately sponsored by Mr. Marcus, JBS Energy was able to cover a wider array of the disputed issues in this proceeding while still controlling the amounts invoiced to TURN for the work in this proceeding. Furthermore, Mr. Jones took the lead for JBS Energy in terms of getting a handle on the non-cost-effectiveness issues PG&E relied on to support its application. Mr. Jones devoted many hours to reviewing and analyzing PG&E's claims about the purported benefits of adding to its emergency substation capacity and the utility's distribution automation proposal. The number of Mr. Jones's hours (approximately 475 in 2009) makes sense when the far lower figures for Gayatri Schilberg (approximately 150 hours) and Mr. Marcus (approximately 130 hours) are considered. Ms. Schilberg's focus was primarily on PG&E's proposed changes to reliability measurement, monitoring and reporting, as well as the incentive mechanism PG&E proposed in its application, but then withdrew in the face of the opposition raised by TURN and other intervenors. She sponsored portions of TURN's testimony, and drafted a portion sponsored by Mr. Marcus. In the SCE GRC, the Commission awarded intervenor compensation for approximately 2,000 hours for JBS Energy (the full amount of hours requested), of which approximately 60% were for Mr. Jones's work. Here, TURN seeks compensation for approximately 750 hours for JBS Energy. Mr. Jones's hours represent approximately 62% of the total sought for JBS Energy's work (475/755 =63%). TURN submits that the Commission should find the JBS Energy totals reasonable and award compensation for the full amount of hours requested, consistent with its treatment in D.09-10-051 (in A.07-11-011). A very small number of hourly entries reflect meetings attended by two or more of TURN's attorneys and expert witnesses. In past compensation decisions the Commission has deemed such entries as reflecting internal duplication that is not eligible for an award of intervenor compensation. This is not the case here. These meetings were essential to TURN developing and implementing its strategy for this proceeding. TURN's requested hours do not include any hours for any TURN attorney or expert witness where his or her presence at a meeting was not necessary in order to achieve the meeting's purpose. TURN notes that PG&E had three attorneys handling the proceeding, and those three attorneys worked with at least five PG&E staff or consultants sponsoring testimony. TURN suspects (but does not know for a fact) that those attorneys similarly met among themselves and with one or more of the expert witnesses in order to develop and implement the utility's strategy. TURN submits that such meetings can be part of an intervenor's effective advocacy before the Commission, and that intervenor compensation can and should be awarded for the time of all participants in such meetings where, as here, each participant needed to be in the meeting to advance the intervenor's advocacy efforts. There is also travel time associated with TURN's expert witness's attendance at the evidentiary hearings conducted in this matter. This travel was not "general commuting," as JBS Energy staff members only rarely come to the CPUC for business, and Mr. Marcus would not have traveled to San Francisco on this day but for his need to appear at the hearing. Finally, TURN is requesting compensation for 16.0 hours devoted to compensation-related matters, primarily preparation of this request for compensation. Of this amount, approximately 2.0 hours were devoted to researching and preparing the request for a fee enhancement. While slightly higher than the number of hours TURN tends to seek for compensation-related matters, this is a reasonable figure in light of the fact that TURN's NOI in this proceeding presented its support for the annual finding of financial hardship (resulting in higher-than-normal hours devoted to this task), and given the size and complexity of the request for compensation itself. In D.10-07-012, the Commission awarded compensation for the full 13.0 hours requested for compensation-related work in a somewhat less complex proceeding. | ||||||||
Comment 2 |
Allocation of Hours: TURN has allocated its time entries by the following activity codes: MotDis - Motion to Dismiss: time devoted to preparing the TURN/DRA Motion to Dismiss and the Reply to the responses other parties filed to the Motion to Dismiss. GP - General Participation: time for activities necessary to participate in the docket that typically do not vary by the number of issues addressed, such as initial review of applications and updated applications, participation in prehearing conferences, and similar activities. GH - General Hearing: time spent preparing for and participating in the evidentiary hearings that is not easily allocated to a specific issue category. (Due to a coding error by TURN's attorney, hours designated "HP" in the attachment also fall into this category.) Pol - Policy and Need for Progam: TURN's more generalized critique of PG&E's proposal on policy grounds as well as the broader failure to demonstrate the need for the program. DistCap - Distribution Capacity: Analyzing and critiquing PG&E's proposal for substation emergency transformer capacity and related issues, and developing TURN's proposed alternative recommendation. DA - Distribution Automation: Analyzing and critiquing PG&E's proposal for distribution automation and related issues, and developing TURN's proposed alternative recommendation. RelMonitor - Reliability Monitoring and Incentive Mechanisms: Analyzing and critiquing PG&E's proposals for reliability monitoring and incentive mechanisms, and developing TURN's proposed alternative recommendation. # - Time entries that cover substantive issue work that cannot easily be identified with a specific activity code. The time entries coded # represent approximately 13% of the total hours TURN recorded for work allocated to substantive categories in this proceeding, which TURN believes is a reasonable amount given the simultaneous handling of all substantive categories throughout much of the proceeding. TURN requests compensation for all of the time included in this request for compensation, and therefore does not believe allocation of the time associated with these entries is necessary. However, if such allocation needs to occur, TURN proposes that the Commission allocate these entries in equal 20% shares to the four issue-specific categories described above (Policy, DistCap, DA, and RelMonitor) and general participation (GP). Settle - Settlement-related matters, including discussions with other parties and development of TURN's settlement position and strategy. PD - Proposed Decision: Time devoted to reviewing and analyzing the Proposed Decision and any modified versions thereof, developing and drafting TURN's comments and reply comments, and reviewing comments and reply comments of other parties. Comp - Time devoted to compensation-related pleadings Travel - Time devoted to travel related exclusively to work in this proceeding. TURN submits that under the circumstances this information should suffice to address the allocation requirement under the Commission's rules. Should the Commission wish to see additional or different information on this point, TURN requests that the Commission so inform TURN and provide a reasonable opportunity for TURN to supplement this showing accordingly. | ||||||||
Comment 3 |
Hourly Rate for TURN attorneys and consultants in 2009 and 2010: 2009 Rates: With two exceptions, TURN's request for compensation uses 2009 hourly rates for its attorneys and consultants at levels previously authorized in prior Commission decisions, as noted in the table above. TURN seeks an increase in the hourly rate for the work of staff attorney Nina Suetake in 2009. Ms. Suetake joined TURN's staff as an attorney in late 2004. Since joining TURN's staff, Ms. Suetake has participated in a wide array of technical and complex matters, including serving as TURN's lead attorney on the array of AMI-related applications before the Commission in recent years. Based on her work at TURN in 2005-2008, she had four years experience on public utilities-related issues in California prior to the start of 2009, and was early in her fifth year as an attorney in this field when 2009 began. In Resolution ALJ-247, the Commission adopted a range of $280-300 (the same as for 2008) for attorneys in their fifth through seventh year of experience. The requested rate of $280 is at the low end of this range. It would also bring Ms. Suetake's 2009 rate to the same level adopted for Ms. Goodson's work in 2008 (in D.08-08-027, at 5), consistent with Ms. Goodson having joined TURN's staff as an attorney in late 2003. TURN's showing in support of this requested increase is based on and consistent with the showing UCAN made in C.08-08-026 in support of the requested increase for its attorney's hourly rate. The Commission approved the requested increase in D.10-08-018 (at 8). For work performed in 2009 by Garrick Jones of JBS Energy, TURN seeks an hourly rate of $130. The Commission has previously adopted a $110 rate for Mr. Jones's work in 2007, and a $120 rate for his work in 2008. TURN had originally requested the $130 rate for Mr. Jones's work in 2008 (the rate JBS Energy invoiced TURN for his work after January 1, 2008), and explained that the requested rate was very near the bottom of the $125-185 range the Commission had adopted for similarly-experienced experts in D.08-04-010. The Commission instead adopted the $120 rate for 2008 work, a figure below the adopted range. (D.09-04-027, at 12 and 15.) For 2009, TURN again seeks adoption of the $130 rate that JBS Energy has charged for Mr. Jones's work since January 1, 2008. The Commission retained the $125-185 range for experts with 0-6 years of experience in 2009. Resolution ALJ-235. It also retained the policy and procedure under which an intervenor could seek an hourly rate increase beyond those generally adopted where a rate is below the range of rates for a given level of experience. Resolution ALJ-235, at 4, citing D.08-04-010 (§4.3.3). Given that his 2008 hourly rate was set below the adopted range for that year (despite TURN's request for a rate within the range), and given that his experience in 2009 would have put him at least in the upper two-thirds of the experience range, an hourly rate of $130 (just above the bottom of the range) is clearly reasonable. Therefore TURN asks the Commission to use the $130 invoiced rate for Mr. Jones's 2009 work for purposes of calculating the compensation award in this proceeding. 2010 Rates: The Commission has not previously authorized an hourly rate for TURN's attorneys or consultants where a substantial portion of the substantive work in the proceeding occurred in 2010. In this proceeding TURN requests compensation using the previously-approved or requested 2009 hourly rates for each attorney's and consultant's 2010 work. TURN reserves the right to seek a higher hourly rate for work performed in 2010 in a future request for compensation. | ||||||||
Comment 4 |
Reasonableness of Expenses: The Commission should find TURN's direct expenses reasonable. The expenses consist of photocopying expenses, including the costs of producing the hard copies of TURN's testimony, expenses for legal research conducted via the Lexis/Nexis database in support of TURN's advocacy in this proceeding, and phone and postage costs for TURN's participation in this proceeding. | ||||||||
Comment 5 |
Request for Fee Enhancement: In past awards of intervenor compensation the Commission has recognized that under certain circumstances an enhancement of the base level of award is warranted. TURN submits that such circumstances are present here, in light of the exceptional results TURN's participation achieved in this proceeding. In decisions addressing requests for enhancement of an intervenor compensation award, the Commission has described two categories of work that might warrant such an enhancement: Commission decisions authorize two different kinds of multipliers, sometimes differentiated as either an "efficiency adder" or a "fee enhancement." Both are applied to the authorized hourly rate. An "efficiency adder" has been approved where a customer's participation involved skills or duties beyond those normally required.... A "fee enhancement" has been approved where the Commission determined the intervenor had achieved exceptional results.6 As the Commission noted in D.04-08-025, a multiplier award is rare in all cases, and particularly rare as a "fee enhancement" for achieving exceptional results.7 TURN's research suggests that the most recent award of a multiplier as a "fee enhancement" occurred in D.00-09-068, awarding intervenor compensation to TURN and other intervenors in PG&E's test year 1999 GRC. In that decision the Commission first reviewed the factors set forth in D.88-02-056 for determining whether an upward adjustment to the base level of compensation is warranted. It went on to quote the earlier decision's recognition that the factors "are not to be applied in a rigid manner."8 The Commission then found that TURN's request for a 25% enhancement for work performed on depreciation-related issues in that GRC was justified, noting that "TURN achieved a remarkable degree of success on these issues" particularly in light of the substantial dollars associated with the depreciation issues in that GRC. TURN submits that the circumstances present here with regard to the entirety of PG&E's distribution reliability incentive program similarly warrant a 25% enhancement. As described in the section on TURN's substantial contribution, TURN achieved remarkable success in this proceeding from the outset through the conclusion of the proceeding. Throughout the decision, the Commission cited with favor TURN's analysis, and generally adopted TURN's recommended outcome on each of the disputed issues. As a result, the utility was authorized to spend approximately 18% of the requested amount on capital and 16% of the requested amount for expense. D.10-06-048, at 2. Even at the final stage of the decision-making process, the Commission adopted the change TURN recommended to prevent the utility from spending on substation emergency transformer capacity amounts authorized for distribution automation or rural reliability improvements. In sum, the Commission should find that the outcomes TURN achieved in this proceeding represent the type of exceptional results that warrant a fee enhancement. In D.04-08-025, the Commission described the fee enhancement as applying to the authorized hourly rate. In the table in Part III.B of the request for compensation, TURN used the regular hourly rates approved (or for which approval is sought) for each TURN staff member or expert witness, and made a single entry to reflect the 25% fee enhancement TURN is requesting. The table below makes the same calculation with the enhancement reflected in the hourly rate used for each staff member or expert witness. (Since TURN seeks a single hourly rate for each attorney's or consultant's work in this proceeding, the following figure shows the total hours for each attorney or consultant from 2008-2010.) Participant Hours Normal Rate 25% of Normal Rate (enhancement) Requested Comp at Normal Rate Requested at Enhancement Rate Total Requested Comp R. Finkelstein 333.0 $470 $117.50 $156,510 $39,128 $195,638 H. Goodson 140.7 $280 $70.0 $39,396 $9,849 $49,245 N. Suetake 91.0 $280 $70.0 $25,480 $6,370 $31,850 W. Marcus 132.4 $250 $62.50 $33,100 $8,275 $41,375 G. Schilberg 154.9 $200 $50.0 $30,980 $7,745 $38,725 G. Jones 3.0 $120 $30.0 $360 $90 $450 G. Jones 484.6 $130 $32.5 $62,998 $15,750 $78,748 Totals $348,824 $87,207 $436,031 |
||||||||
CPUC Comments |
Description of CPUC Comments |
||||||||
Comment 1 |
TURN seeks a 25% enhancement (calculated as $87,207) to its baseline compensation request for its professional hours in this proceeding because of TURN's claim of "remarkable success" with regards to the entirety of PG&E's distribution reliability incentive program. TURN submits that the Commission cited with favor TURN's analysis on each of the disputed issues, and as a result, PG&E was authorized to spend approximately 18% of the requested amount on capital and 16% of the requested amount for expense. See D.10-06-048 at 2. With TURN's participation it alleges that the Commission rejected PG&E's proposal for a $2 billion program in the name of distribution reliability improvement in favor of an alternate recommendation sponsored by TURN at a cost of approximately $370 million. This reduction in capital spending means that PG&E's rate basis will be approximately $1.4 billion lower in 2016 that the utility had proposed. Assuming a revenue requirement of 18% of rate base to collect depreciation, tax and return on this amount, TURN estimates that PG&E ratepayers avoided an increase to revenues of about $250 million per year in 2017 which will continue at nearly the same level for many years beyond through TURN's participation. The Commission has, in certain cases, awarded an enhancement, or upward adjustment to the hourly rate for intervenor participation. In D.88-02-056, at 3-4, the Commission set forth factors that can be considered in making this determination. These factors are: A. Fee level 1. The experience, reputation, and ability of the attorney. 2. The skill required to perform the legal service properly. 3. Customary fee. B. Compensable Hours 4. The time and labor required (reasonable number of hours to present case). 5. Efficiency of presentation. 6. Novelty and difficulty of the issues. 7. Duplication of effort. C. Degree of Success 8. Dollar amount involved 9. Degree of importance of the issue. 10. The results obtained (partial or complete success on the issue). Past Commission decisions have authorized two different kinds of multipliers, sometimes differentiated as either an "efficiency adder" or a "fee enhancement." Both are applied to the authorized hourly rate. An "efficiency adder" has been approved where a customer's participation involved skills or duties beyond those normally required. An example is when an attorney develops and sponsors necessary technical testimony, performing the dual roles of counsel and expert not only with a very high degree of professionalism but also at a lower total cost than the hourly fees of two individuals. A "fee enhancement" has been approved where the Commission determined the intervenor had achieved exceptional results. The Commission has awarded TURN an enhancement to all or part of its base compensation on many occasions. The most recent award of a multiplier as a "fee enhancement occurred in D.00-09-068 for TURN's claim filed in PG&E's test year 1999 GRC, see D.00-09-068 (25% enhancement based on the dollar amount involved and TURN's success associated with depreciation issues in that GRC. In addition, TURN has received enhancements in D.88-02-056 [25% enhancement based on the dollar amount involved and TURN's level of success]; D.93-04-048 20% enhancement based on TURN's degree of success, the novel and complex issues, TURN's efficiency and skill, and the contingent nature of the litigation]; D.94-09-022 [35% enhancement based on the substantial dollars involved, TURN's degree of success, the complexity and risks involved, the contingent nature of the litigation, and the exceptional skill of TURN's attorney]; D.96-09-024, 67 CPUC2d 678, 690-91 [25% enhancement for TURN's 1995 work on Phase 1 issues based on the substantial dollars involved, TURN's degree of success, the difficulty and complexity of the litigation, TURN's efficiency, and the contingent nature of the litigation.]) TURN's requested 25% enhancement for its work performed on PG&E's distribution reliability incentive program is justified. TURN's work was efficient and achieved a remarkable degree of success, resulting in large savings to ratepayers for many years to come. For these reasons, we grant TURN a 25% enhancement for both its attorney and experts work in this proceeding. |
||||||||
D. CPUC Adoptions, Disallowances & Adjustments:
Adoptions | |
2009-Suetake hourly rate |
TURN requests an hourly rate of $280 for Suetake's 2009 work. Suetake joined TURN's staff as an attorney in late 2004. As TURN's attorney, Suetake has participated in a wide array of technical and complex matters before the Commission, and has served as TURN's lead attorney in several AMI-related applications. Based on her work at TURN in 2005-2008, Suetake had four years experience on California related public utilities issues. In 2009 Suetake moved into the range of $280-$300 for attorneys with 5-7 years of experience adopted by the Commission in D.08-04-010. We find the hourly rate of $280 for Suetake to be reasonable and adopt it here. |
2010-Suetake hourly rate |
Resolution ALJ 247 disallows cost-of-living (COLA) increases for 2010 intervenor work. As such, we apply the same 2009 hourly rate adopted here to Suetake's 2010 work. |
2009-Jones hourly rate |
TURN requests an hourly rate of $130 for Jones's 2009 work. The Commission has previously adopted a $110 rate for Mr. Jones's work in 2007, and a $120 rate for his work in 2008. The rate requested here is equal to the rate JBS Energy invoiced TURN for Jones work after January 1, 2008, and is at lower end of the $125-$185 range the Commission adopted for similarly-experienced experts in D.08-04-010. We find the hourly rate of $130 for Jones to be reasonable and adopt it here. |
2010-Jones hourly rate |
Resolution ALJ 247 disallows cost-of-living (COLA) increases for 2010 intervenor work. As such, we apply the same 2009 hourly rate adopted here to Jones's 2010 work. |
Disallowances & Adjustments | |
2009-Marcus travel hours |
We disallow 3.0 hrs of Marcus' round trip travel time from Sacramento to San Francisco. Marcus is a staff expert for the JBS Energy group whose main office is in Sacramento. Marcus participates frequently before the Commission as an expert for several ratepayer advocate groups. We consider travel time and costs incurred by attorneys, consultants and other experts participating in Commission proceedings to be non-compensable "routine travel" when the one way travel distance is 120 miles or less. |
PART IV: OPPOSITIONS AND COMMENTS
A. Opposition: Did any party oppose the claim? |
No |
B. Comment Period: Was the 30-day comment period waived (see Rule 14.6(c)(6))? |
Yes |
FINDINGS OF FACT
1. Claimant has made a substantial contribution to Decision (D.)10-06-048.
2. The claimed fees and costs, as adjusted herein, are comparable to market rates paid to experts and advocates having comparable training and experience and offering similar services.
3. The total of reasonable contribution is $441,401.
CONCLUSION OF LAW
1. The claim, with any adjustment set forth above, satisfies all requirements of Public Utilities Code §§ 1801-1812.
ORDER
1. Claimant is awarded $441,401.
2. Within 30 days of the effective date of this decision, Pacific Gas and Electric Company shall pay claimant the total award. Payment of the award shall include interest at the rate earned on prime, three-month commercial paper as reported in Federal Reserve Statistical Release H.15, beginning December 21, 2010, the 75th day after the filing of TURN's amended claim for compensation, and continuing until full payment is made.
3. The comment period for today's decision is waived.
This decision is effective today.
Dated November 19, 2010, at San Francisco, California.
MICHAEL R. PEEVEY
President
DIAN M. GRUENEICH
JOHN A. BOHN
TIMOTHY ALAN SIMON
NANCY E. RYAN
Commissioners
APPENDIX
Compensation Decision Summary Information
Compensation Decision: |
D1011032 |
Modifies Decision? No |
Contribution Decision(s): |
D1006048 | |
Proceeding(s): |
A0805023 | |
Author: |
ALJ David Fukutome | |
Payer(s): |
Pacific Gas and Electric Company | |
Intervenor Information
Intervenor |
Claim Date |
Amount Requested |
Amount Awarded |
Multiplier? |
Reason Change/Disallowance |
The Utility Reform Network |
08/24/10 amended on 10/07/10 |
$354,569 (w/o multiplier) $441,776 (w/ multiplier) |
$441,401 |
Yes |
minor miscalculation and the disallowance of hours related to "routine travel" |
Advocate Information
First Name |
Last Name |
Type |
Intervenor |
Hourly Fee Requested |
Year Hourly Fee Requested |
Hourly Fee Adopted |
Robert |
Finkelstein |
Attorney |
The Utility Reform Network |
$470 |
2008-2010 |
$470 |
Hayley |
Goodson |
Attorney |
The Utility Reform Network |
$280 |
2009-2010 |
$280 |
Nina |
Suetake |
Attorney |
The Utility Reform Network |
$280 |
2009-2010 |
$280 |
William |
Marcus |
Expert |
The Utility Reform Network |
$250 |
2008-2010 |
$250 |
Gayatri |
Schilberg |
Expert |
The Utility Reform Network |
$200 |
2008-2009 |
$200 |
Garrick |
Jones |
Expert |
The Utility Reform Network |
$120 |
2008 |
$120 |
Garrick |
Jones |
Expert |
The Utility Reform Network |
$130 |
2009-2010 |
$130 |
(END OF APPENDIX)
1 TURN makes a minor miscalculation error, see Footnote 3 at 11, corrected in this claim.
2 In early October 2010, TURN became aware that it had inadvertently used an incorrect hourly rate for the 2009 and 2010 work for one of its consultants, Garrick Jones. The Amended Request for Compensation, filed on October 6, 2010 corrects the 2009-2010 hourly rates for work performed by Jones, a consultant of JBS Energy ($130 rather than $120), made associated changes to TURN's subtotals and recalculates TURN's request (an increase of $4,846 to the base amount, and $1,212 to the requested enhancement, as reflected in the tables in Part III.B. and Comment 5). In addition, TURN includes a justification for Jones 2009 rate and corrects the date of its amended filing in Part I.B. In all other ways, TURN submits that the two requests are identical.
3 TURN incorrectly calculates Marcus's requested travel time at $475. The correct amount is $375. The amounts we reflect above correct this error and re-calculate TURN's totals.
4 See disallowances Section III-Part D at 16.
5 The multiplier excludes travel time, costs and compensation preparation.
6 D.04-08-025 (I.02-04-026 -- PG&E Bankruptcy) at 46.
7 Id., and Footnote 17, at 46-47.
8 D.00-09-068 at 27-28.