3. Discussion

A review of the documents cited by Complainant and SCE support SCE's position.

A plain reading of the PEA7 shows that the seventh wire was included in SCE's proposed design of the Project. Furthermore, the Draft EIR (at B-33, B.6.1.2, Structures and Associated Equipment) states that "overhead ground wires would be installed on the peaks of the steel poles." Finally, the June 11, 2010 letter attached to the complaint discusses the location of the FRC wire on the poles. This letter does not introduce a seventh wire to the Project.

As this complaint does not state a claim upon which relief may be granted, it should be dismissed.

7 PEA at 2-26.