1. Those aspects of D.06-07-029 and D.07-11-051 that are inconsistent with SB 695 should be modified to comply with the requirements of SB 695.
2. Those aspects of D.06-07-029 and D.07-11-051 that are consistent with SB 695 do not need to be modified.
IT IS ORDERED that:
1. The choice of a utility to elect or not elect to use the Cost Allocation Mechanism for a generation resource is eliminated.
2. Cost Allocation Mechanism treatment for utility-owned generation is permitted.
3. The duration of Cost Allocation Mechanism treatment of a generation contract matches the duration of the underlying contract.
4. Rulemaking 10-05-006 remains open.
This order is effective today.
Dated May 5, 2011, at San Francisco, California.
MICHAEL R. PEEVEY
President
TIMOTHY ALAN SIMON
CATHERINE J.K. SANDOVAL
MARK FERRON
Commissioners
I abstain.
/s/ Michel Peter Florio
Commissioner