3. Request

The utilities seek authority to replace the cost allocation methods currently being used to recover their costs of PP programs with a single, unified equal percent of base revenue (EPBR) cost allocation method beginning

January 1, 2009.5 The utilities also seek authority to recover their costs of all future PP programs, such as the CICS and SWH programs, through the EPBR cost allocation method.

5 Equal percent of base revenue assigns costs to individual customer classes based on the same percentage of base transportation revenue allocated to each customer class. For SoCalGas and SDG&E, EPBR is the sum of customer costs (including service lines and meters), distribution costs, and transmission costs. For PG&E, ECPB is the sum of customer access costs (noncore transmission service connections), distribution costs (including core and noncore service connection), local transmission costs, and backbone transmission costs.

Previous PageTop Of PageNext PageGo To First Page