On-Peak Escalators

The utilities, the CEC, and TURN agree that the MCP forecast should be modified to include escalators designed to capture the system value of reduced load on reducing market clearing prices, pursuant to Pub. Util. Code §399.15(b)(8), and as required by the September 14, 2000 ALJ Ruling. The utilities propose the following:

Previous PageTop Of PageNext PageGo To First Page