Public Utilities Commission of the State of California |
|
Timothy J. Sullivan, Executive Director |
|
|
|
Headquarters |
Southern California Office |
505 Van Ness Avenue |
320 West 4th Street, Suite 500 |
San Francisco, CA 94102 |
Los Angeles, CA 90013 |
(415) 703-2782 |
(213) 576-7000 |
|
|
Website: http://www.cpuc.ca.gov |
|
Calendar Archive: prior to year 2000 http://www.cpuc.ca.gov/daily_calendar_archive/ |
|
Daily Calendar
· Commission Meetings
· Notices
· Public Meetings and Workshops
· Notice of Draft Resolutions (PU Code § 311(g))
· New Filings
· Petitions for Modification and Applications for Rehearing
· Proposed Decisions/Alternates/Presiding Officer’s Decisions/Arbitrator’s Reports
· Advice Letter Filings
· Miscellaneous Transportation Items
· Miscellaneous Communications Matters
· Table of Submission Dates for the Preceding Two Weeks
· Changes to Hearing Calendar
· Hearings
· Notice of All-Party Meetings (PU Code §1701.3(c))
|
The Commission’s policy is to schedule hearings (meetings, workshops, etc.) in locations that are accessible to people with disabilities. |
|
The CPUC encourages all Californians to participate in its meetings,
hearings, workshops, and proceedings. We try to hold our public meetings
only in places that are wheelchair accessible and which can accommodate
specialized equipment and other services useful to people with disabilities.
Please see the notice of the meeting you wish to attend for more specifics. If you plan to attend and need specialized accommodations for a particular meeting that are not listed in the notice, request them from the Public Advisor’s Office at least three business days in advance of the meeting. Contact the Public Advisor’s Office by any one of the following: |
||
Email: public.advisor@cpuc.ca.gov |
FAX: 415-355-5404 (Attn.: Public Advisor) |
|
“The below notices having been duly noticed in the Daily Calendar and along with the requisite ruling, scoping memo or other order issued in the specific proceedings satisfy the requirements of the Commission’s Rules of Practice and Procedure Rule 8.1(c) such that no ex parte communication shall be considered to occur should a decisionmaker or an advisor be present at the meeting or workshop.”
August 29, 2016 |
Pacific
Gas and Electric’s |
The
purpose of these workshops is for the Fire Technical and Safety Panel to
prepare the development of the Fire Map 2 Work Plan.
For questions about these workshops, please contact: Koko Tomassian at, (213)
576-7099, koko.tomassian@cpuc.ca.gov;
or Rashid Rashid at (415) 703.2705, rhd@cpuc.ca.gov;
Raffy Stepanian at (213) 576-5772, rst@cpuc.ca.gov;
or Samuel Stonerock, Samuel.Stoerock@sce.com.
Decision-Makers and/or Advisors may attend these Public Workshops.
August 30, 2016 |
California Public
Utilities Commission
|
The purpose of this workshop is to present the final consultant report on marketing education and outreach strategy in R.12-06-013. The consultants will be available to answer questions and provide any clarification. Please note that a decision maker or advisor may be present at this workshop.
For information, please contact Whitney Richardson, whitney.richardson@cpuc.ca.gov or (415) 703-2108.
August 30, 2016 |
California
Public Utilities Commission |
The workshop in the above-entitled matter will be held before Administrative Law Judge Stephen C. Roscow and / or President Michael Picker. The purpose of the workshop is to allow the assigned Commissioner, the assigned Administrative Law Judge, and other interested parties to pose questions to PG&E and other parties regarding the Settlement Agreement that they jointly filed on August 3, 2016. For information or questions about this workshop, please contact ALJ Roscow via e-mail at scr@cpuc.ca.gov. If you have questions about the workshop date, time, or place, call the Calendar Clerk, Ann Hoang at (415) 703-1203.
August 31, 2016 |
California
Public Utilities Commission |
The workshop in the above-entitled matter will be held before Administrative Law Judge Jeanne McKinney and Administrative Law Judge Pat S. Tsen. For information or questions about this workshop, please contact Lola Odunlami via e-mail at lod@cpuc.ca.gov. If you have questions about the workshop date, times, or place, call the Calendar Clerk at (415) 703-1203. The agenda will be provided at a later date.
September 1, 2016 |
Sunset Center – Carpenter
Hall
|
The purpose of this workshop
is to update parties on important elements of the ongoing environmental review
and revised ground water model and the incorporation of test well data. The
workshop in the above entitled matter will be held at the date, time and
location above. Assigned Commissioner Catherine J. K. Sandoval will preside.
There may be a quorum of Commissioners present; however, no voting will occur.
Questions about the work shop date, time or place, call Ken Lewis (415)
703-5595 or kl1@cpuc.ca.gov.
If special arrangements are needed for attendees, such as sign and/or foreign
language interpreters, please contact the CPUC Public Advisor’s Office at
1-866-849-8391 or 1-415-703-2074 or email: public.advisor@cpuc.ca.gov at
least three days prior to the hearing.
Notice of Public Meeting: California Teleconnect Fund (CTF) Administrative Committee
September 8, 2016 |
California Public
Utilities Commission
|
MEETING AGENDA:
1) Introductions, 2) Review and Approve Minutes from Prior Meeting, 3) Review and Approve Agenda, 4) Application / Claim Update, 5) Update on CTF Rulemaking (R.13-01-010), 6) Program Budget Update, 7) Discussion and Input Regarding Program Budget, 8) CTF Information posted on the CPUC’s website , 9) Identify Items for Future Agenda, 10) Set Future CTF-AC Meeting Dates. Questions regarding this meeting should be directed to Lisa Paulo at LP1@cpuc.ca.gov.
Notice of Public Workshops: Fire Safety Technical Panel - (R.-15-05-006)
September 7, 2016 |
California Public
Utilities Commission |
The purpose of this workshop is discuss the workplan for Fire Map 2 for Rulemaking (R.) 15-05-006. Please note that decision makers and/or their advisors may attend these workshops. Questions regarding this meeting should be directed to Rashid Rashid at rhd@cpuc.ca.gov.
September 13, 2016 |
Milton
Marks Conference Center |
AGENDA
Commission Decision 16-06-008
(“the Decision”) resolves issues related to customer enrollment in third party
Demand Response programs including the completion of the Customer Information
Service Request Demand Response Provider Form (CISR-DRP Form).
The Decision also requires the utilities to hold working group meetings with
stakeholders and Energy Division to “develop a consensus proposal to streamline
and simplify the direct participation enrollment process, including adding more
automation, mitigating enrollment fatigue, and resolving any remaining
electronic signature issues.” (See Ordering Paragraph 9,
D.16-06-008).
For questions about this workshop, please contact Katherine Stockton at katherine.stockton@cpuc.gov.
September 15, 2016 |
California Public
Utilities Commission (Corner of Van Ness
Avenue and McAllister Street) |
The intent of this workshop is two-fold. During the first half, interested stakeholders will brainstorm an effective way to establish this new Division of Safety Analysis. During the second half there will be a discussion about opportunities and challenges surrounding the potential participation of other safety intervenors in relevant CPUC proceedings. This workshop is required as part of the CPUC’s 2016 Safety Action Plan – Action Item #7. For questions about this workshop, please contact Terrie Prosper at tdp@cpuc.ca.gov or visit www.cpuc.ca.gov/General.aspx?id=12425.
September 22, 2016 |
California Public
Utilities Commission https://van.webex.com/van/j.php?MTID=mffa7c640dccb1480d14bd4998cfe0c55
|
The purpose of this workshop is to discuss the Societal Cost Test (SCT) as part of the work conducted in the Cost Effectiveness Working Group (CEWG), within the Integrated Distributed Energy Resources (IDER) proceeding (R. 14-10-003). Additional information and a detailed agenda will be provided as it gets closer to the workshop date. For questions about this workshop or the IDER proceeding, please contact Natalie Guishar at natalie.guishar@cpuc.ca.gov.
September 26, 2016 |
California
Public Utilities Commission
|
Purpose
This workshop will be used to explore in more detail the options for
implementing an IRP process, as presented in the CPUC Staff Concept Paper on
Integrated Resource Planning, in addition to the issues raised by parties in
their August 31st
pre-workshop comments. A quorum of Commissioners may attend the workshop, but
no votes will be taken.
For more information, please
contact: Jason Ortego at jason.ortego@cpuc.ca.gov or Forest Kaser forest.kaser@cpuc.ca.gov.
“The below notices having been duly noticed in the Daily Calendar and along with the requisite ruling, scoping memo or other order issued in the specific proceedings satisfy the requirements of the Commission’s Rules of Practice and Procedure Rule 8.1(c) such that no ex parte communication shall be considered to occur should a decisionmaker or an advisor be present at the meeting or workshop.”
August 29, 2016 |
Pacific
Gas and Electric’s |
The
purpose of these workshops is for the Fire Technical and Safety Panel to
prepare the development of the Fire Map 2 Work Plan.
For questions about these workshops, please contact: Koko Tomassian at, (213)
576-7099, koko.tomassian@cpuc.ca.gov;
or Rashid Rashid at (415) 703.2705, rhd@cpuc.ca.gov;
Raffy Stepanian at (213) 576-5772, rst@cpuc.ca.gov;
or Samuel Stonerock, Samuel.Stoerock@sce.com.
Decision-Makers and/or Advisors may attend these Public Workshops.
August 30, 2016 |
California Public
Utilities Commission
|
The purpose of this workshop is to present the final consultant report on marketing education and outreach strategy in R.12-06-013. The consultants will be available to answer questions and provide any clarification. Please note that a decision maker or advisor may be present at this workshop.
For information, please contact Whitney Richardson, whitney.richardson@cpuc.ca.gov or (415) 703-2108.
August 30, 2016 |
California
Public Utilities Commission |
The workshop in the above-entitled matter will be held before Administrative Law Judge Stephen C. Roscow and / or President Michael Picker. The purpose of the workshop is to allow the assigned Commissioner, the assigned Administrative Law Judge, and other interested parties to pose questions to PG&E and other parties regarding the Settlement Agreement that they jointly filed on August 3, 2016. For information or questions about this workshop, please contact ALJ Roscow via e-mail at scr@cpuc.ca.gov. If you have questions about the workshop date, time, or place, call the Calendar Clerk, Ann Hoang at (415) 703-1203.
August 31, 2016 |
California
Public Utilities Commission |
The workshop in the above-entitled matter will be held before Administrative Law Judge Jeanne McKinney and Administrative Law Judge Pat S. Tsen. For information or questions about this workshop, please contact Lola Odunlami via e-mail at lod@cpuc.ca.gov. If you have questions about the workshop date, times, or place, call the Calendar Clerk at (415) 703-1203. The agenda will be provided at a later date.
September 1, 2016 |
Sunset Center – Carpenter
Hall
|
The purpose of this workshop
is to update parties on important elements of the ongoing environmental review and
revised ground water model and the incorporation of test well data. The
workshop in the above entitled matter will be held at the date, time and
location above. Assigned Commissioner Catherine J. K. Sandoval will preside.
There may be a quorum of Commissioners present; however, no voting will occur.
Questions about the work shop date, time or place, call Ken Lewis (415)
703-5595 or kl1@cpuc.ca.gov.
If special arrangements are needed for attendees, such as sign and/or foreign
language interpreters, please contact the CPUC Public Advisor’s Office at
1-866-849-8391 or 1-415-703-2074 or email: public.advisor@cpuc.ca.gov at
least three days prior to the hearing.
Notice of Public Meeting: California Teleconnect Fund (CTF) Administrative Committee
September 8, 2016 |
California Public
Utilities Commission
|
MEETING AGENDA:
1) Introductions, 2) Review and Approve Minutes from Prior Meeting, 3) Review and Approve Agenda, 4) Application / Claim Update, 5) Update on CTF Rulemaking (R.13-01-010), 6) Program Budget Update, 7) Discussion and Input Regarding Program Budget, 8) CTF Information posted on the CPUC’s website , 9) Identify Items for Future Agenda, 10) Set Future CTF-AC Meeting Dates. Questions regarding this meeting should be directed to Lisa Paulo at LP1@cpuc.ca.gov.
Notice of Public Workshops: Fire Safety Technical Panel - (R.-15-05-006)
September 7, 2016 |
California Public
Utilities Commission |
The purpose of this workshop is discuss the workplan for Fire Map 2 for Rulemaking (R.) 15-05-006. Please note that decision makers and/or their advisors may attend these workshops. Questions regarding this meeting should be directed to Rashid Rashid at rhd@cpuc.ca.gov.
September 13, 2016 |
Milton
Marks Conference Center |
AGENDA
Commission Decision 16-06-008
(“the Decision”) resolves issues related to customer enrollment in third party
Demand Response programs including the completion of the Customer Information
Service Request Demand Response Provider Form (CISR-DRP Form).
The Decision also requires the utilities to hold working group meetings with
stakeholders and Energy Division to “develop a consensus proposal to streamline
and simplify the direct participation enrollment process, including adding more
automation, mitigating enrollment fatigue, and resolving any remaining
electronic signature issues.” (See Ordering Paragraph 9,
D.16-06-008).
For questions about this workshop, please contact Katherine Stockton at katherine.stockton@cpuc.gov.
September 15, 2016 |
California Public
Utilities Commission (Corner of Van Ness
Avenue and McAllister Street) |
The intent of this workshop is two-fold. During the first half, interested stakeholders will brainstorm an effective way to establish this new Division of Safety Analysis. During the second half there will be a discussion about opportunities and challenges surrounding the potential participation of other safety intervenors in relevant CPUC proceedings. This workshop is required as part of the CPUC’s 2016 Safety Action Plan – Action Item #7. For questions about this workshop, please contact Terrie Prosper at tdp@cpuc.ca.gov or visit www.cpuc.ca.gov/General.aspx?id=12425.
September 22, 2016 |
California Public
Utilities Commission https://van.webex.com/van/j.php?MTID=mffa7c640dccb1480d14bd4998cfe0c55
|
The purpose of this workshop is to discuss the Societal Cost Test (SCT) as part of the work conducted in the Cost Effectiveness Working Group (CEWG), within the Integrated Distributed Energy Resources (IDER) proceeding (R. 14-10-003). Additional information and a detailed agenda will be provided as it gets closer to the workshop date. For questions about this workshop or the IDER proceeding, please contact Natalie Guishar at natalie.guishar@cpuc.ca.gov.
September 26, 2016 |
California
Public Utilities Commission
|
Purpose
This workshop will be used to explore in more detail the options for
implementing an IRP process, as presented in the CPUC Staff Concept Paper on
Integrated Resource Planning, in addition to the issues raised by parties in
their August 31st
pre-workshop comments. A quorum of Commissioners may attend the workshop, but
no votes will be taken.
For more information, please
contact: Jason Ortego at jason.ortego@cpuc.ca.gov or Forest Kaser forest.kaser@cpuc.ca.gov.
The ALJ Division has prepared Resolution
ALJ-333 for the September 15, 2016, Commission Meeting. The
resolution resolves the appeal of Citation No. CPED FC-788 issued to Miguel A.
Duenas, an individual doing business as (dba) VIP Transportation Services (VIP)
by the California Public Utilities Commission’s (Commission) Consumer Protection
and Enforcement Division (CPED) Citation No. CPED FC-788 issues a fine of
$5,000 for six violations (16 counts) of the Public Utilities Code and the
Commission’s General Orders 115-F and 157-D during the period of November 19,
2015 through January 19, 2016. The citation is affirmed. Any comments should
be directed to ALJ Kelly via email: gk1@cpuc.ca.gov
or phone 1-415-703-5506.
The web link is http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=165835774
The Energy Division has prepared Draft Resolution E-4790 for the September 15, 2016, Commission Meeting. This Resolution grants Southern California Edison Company’s request for Commission approval of three renewable power purchase agreements with Rosamond Solar, Willow Springs Solar, and Sunshine Valley Solar. All questions and/or comments should be addressed to Robert Blackney at robert.blackney@cpuc.ca.gov and Cheryl Lee at cheryl.lee@cpuc.ca.gov.
The web link is http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=166019023
The Energy Division has prepared Draft Resolution G-3498 for the September 15, 2016, Commission Meeting. This Resolution addresses Pacific Gas and Electric Company, Southern California Edison Company, and Southern California Gas Company’s request for approval of agreements with the California High-Speed Rail Authority for utility facility relocation work along the rail corridor right-of-way. All questions or comments should be addressed to Robert Peterson at Robert.Peterson@cpuc.ca.gov and Mary Jo Borak at maryjo.borak@cpuc.ca.gov.
The web link is http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=165371638
NOTICE OF RESOLUTION AUTHORIZING PUBLIC DISCLOSURE OF
INVESTIGATION RECORDS
Resolution L-509
authorizes disclosure of records concerning the California Public Utilities
Commission (Commission) Safety and Enforcement Division’s investigation of an
electric incident that occurred on June 19, 2012, at Pacific Gas and Electric’s
Kern Power Plant.
On August 12, 2016, the draft resolution was mailed to the service list,
pursuant to California Public Utilities Code § 311(g) and Rule 14.5 of the
Commission’s Rules of Practice and Procedure. Comments shall be served on all
parties no later than September 2, 2016, and reply comments shall be served no
later than September 12, 2016.
Resolution L-509 will be on the agenda at the September 15, 2016,
Commission Meeting. The Commission may then vote on this draft resolution, or
it may postpone a vote.
When the Commission acts on the draft resolution, it may adopt all or part of
it as written, amend or modify it, or set it aside and prepare its own order.
Only when the Commission acts does the resolution become binding on the
parties.
Finally, an original and two copies of the comments, with a certificate of
service should be submitted to:
Fred Harris,
Staff Counsel
Legal Division
California Public Utilities Commission
505 Van Ness Avenue, Room 5040
San Francisco, CA 94102-3298
Telephone: 415-703-1557
E-mail: fnh@cpuc.ca.gov;
dw2@cpuc.ca.gov
The Communications Division
has prepared Resolution T-17519 for the September 15, 2016,
Commission meeting date. The resolution revises the California Lifeline
Program Surcharge from 5.50% to 4.75%, effective on November 1, 2016, and
thereafter until further revised by the Commission. Any questions or comments
should be directed to Kim Hua at Kim.hua@cpuc.ca.gov.
The web link is http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M165/K666/165666697.docx
The Division of Water and
Audits has prepared Proposed Comment Resolution W-5104 for the September
15, 2016, Commission Meeting. Proposed Comment Resolution W-5104
authorizes a surcharge of $3.31 per month per customer for twelve months in the
Johnson Park District and a surcharge of $4.71 per month per customer for
eighteen months in the River Island District to recover the statewide Lost
Revenue Recovery Memorandum Accounts. Please contact water.division@cpuc.ca.gov, and
reference “Proposed Comment Resolution W-5104” if you have any questions.
The web link is http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=163919847
The Energy Division has prepared Draft Resolution E-4801 for the September 29, 2016, Commission Meeting. This resolution adopts updates to the Avoided Cost Calculator for use in demand-side distributed energy resources cost-effectiveness analyses. All questions and/or comments should be addressed to Pierre Bull at Pierre.Bull@cpuc.ca.gov and Bruce Kaneshiro at bruce.kaneshiro@cpuc.ca.gov..
The web link is http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=166470556
The Energy Division has prepared Draft Resolution G-3519 for the September 29, 2016, Commission Meeting. This resolution addresses: “The California Energy Commission (CEC) requests approval of its 2016-2017 natural gas research budget.” All questions or comments should be directed to Maria Sotero at Maria.Sotero@cpuc.ca.gov and Melicia Charles at Melicia.Charles@cpuc.ca.gov.
The web link is http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=166401524
08/23/16 |
(ECP) C.16-08-013 – Matthew J. Kuhlman, Complainant vs. San Diego Gas & Electric Company (U902E), Defendant [for relief from incorrect billing seeking bill adjustment and refund.] |
|
|
08/23/16 |
(ECP) C.16-08-014 – Calmada Investment & Management LLC, Complainant vs. Southern California Edison Company (U338E), Defendant [for bill adjustment due to overcharges resulting from improper rate and inaccurate meter readings.] |
NONE
08/25/2016 |
A.09-11-015 - In the Matter of the Application of PacifiCorp (U901E), an Oregon Company, for an Order Authorizing a General Rate Increase Effective January 1, 2011; Proposed Decision of ALJ Park.
|
ADVICE LETTER FILINGS
To protest a filing, mail
the original letter/telegram to the Chief of the appropriate division (i.e.,
"Chief, [Energy, Communications or Water] Division"), to be
received no later than 20 days after the date the Advice Letter was filed. "Effective TBD"
means that the date is to be determined by further Commission action. A date
listed as "anticipated effective" may be subject to change. An
Advice Letter Supplement is not a new filing, and there is no protest period
unless indicated. |
||
08/22/16 |
Energy 317E |
Golden State Water Company, Tariff Revisions to Recover Renewables Portfolio Standard Memorandum Account (RPSMA) (anticipated effective 09/21/16) |
|
|
|
08/22/16 |
Energy 2945E |
San Diego Gas & Electric Company, Modifications to San Diego Gas and Electric Company's Rule 21 Tariff and Associated Interconnection Applications and Agreements to Establish the Cost Envelope Option Pilot Pursuant to Decision 16-06-052 (anticipated effective 09/21/16) |
|
|
|
08/23/16 |
Energy 5018G |
Southern California Gas Company, July 2016 Standby Procurement Charges (anticipated effective 08/23/16) |
|
|
|
08/23/16 |
Telecom 4 |
Netzero Wireless, Inc., Cancellation of authority (effective TBD) |
|
|
|
08/24/16 |
Energy 2946E |
San Diego Gas & Electric Company, San Diego Gas & Electric Company's Update to Electric Tariffs in Compliance with Decision (D) 16-06-029 (anticipated effective 09/23/16) |
|
|
|
08/25/16 |
Energy 4896E |
Pacific Gas & Electric Company, North Fork Mokelumne River Land Donation - Request for Approval under Decision (D.) 08-11-043, D.10-08-004 and Public Utilities Code Section 851 (effective TBD) |
|
|
|
08/25/16 |
Energy 4897E |
Pacific Gas & Electric Company, Clean-Up of Electric Schedules E-TOUPP and EL-TOUPP (anticipated effective 08/25/16) |
|
|
|
08/25/16 |
Water 40 |
Agate Bay Water Company, Comply with Audits to seek authorization for the long term debt incurred (anticipated effective 09/25/16) |
|
|
|
08/25/16 |
Water 41-A |
Cobb Mountain Water Company, Supplements A.L.No.41, General Rate Case (anticipated effective ) |
|
|
|
08/25/16 |
Water 477-A |
San Gabriel Valley Water Company, Supplements A.L.No.477, [Fontana Water Company] Rate base offset to increase rates for the capped construction costs of the Plant F21 Project. (effective TBD) |
|
|
|
08/25/16 |
Water 485 |
San Gabriel Valley Water Company, [Fontana Water Company Division] Reduce Rate Base (and Rates) to reflect the collection and application of the amount of the Facilities Fees recorded in the Facilities Fees Memorandum Account (anticipated effective 08/30/16) |
|
|
|
ADVICE LETTER SUSPENSIONS (Pursuant to M-4801, 04/19/01)
|
||
ADVICE LETTER PROTESTS
|
NONE
NONE
|
|
NONE
|
|
|
|
|
|
ALJ Kelly |
A.16-04-018 -
Application of SAN DIEGO GAS & ELECTRIC COMPANY (U902E) for Approval of
its 2017 Electric Procurement Revenue Requirement Forecasts and GHG-Related
Forecasts, |
|
|
ALJ Farrar |
C.16-06-006 – City Of
Lancaster, Complainant, V. Southern California Edison Company (U338e),
Defendant, |
|
|
|
|
|
|
Dates in parentheses following the word “also” are subject to change without notice. The assigned Commissioner’s name is listed next to the proceedings as matter of record; the assigned Commissioner may not be present at the hearing.
(PHC) = Prehearing Conference |
(WS) = Workshop |
(OA) = Oral Argument |
(PPH) = Public Participation Hearing |
(STC) = Status Conference |
(SEC) = Settlement Conference |
(EH) = Evidentiary Hearing |
(L&M) = Law & Motion |
(CA) = Closing Argument |
08/30/16 |
A.15-09-001 (WS) -
Application of Pacific Gas and Electric Company for Authority, Among Other
Things, to Increase Rates and Charges for Electric and Gas Service Effective
on January 1, 2017. (U39M), |
|
|
08/31/16 |
A.15-09-001 (EH) -
Application of Pacific Gas and Electric Company for Authority, Among Other
Things, to Increase Rates and Charges for Electric and Gas Service Effective
on January 1, 2017. (U39M), |
|
|
09/01/16 |
A.15-11-009 (PHC) -
Application of Liberty Utilities (CalPeco Electric) LLC (U933E) for Exemption
from the Affiliate Transaction Rules for Its Transactions with Liberty
Utilities Service Corp., or, in the Alternative, for a Waiver from Affiliate
Transaction Rules V.C., V.G.1., and V.G.2.c., |
|
|
09/01/16 |
A.12-04-019 (PPH) -
Application of California-American Water Company (U210W) for Approval of the
Monterey Peninsula Water Supply Project and Authorization to Recover All
Present and Future Costs in Rates, |
|
|
09/02/16 |
C.16-06-011 (PHC) -
Otay Landfill Gas, LLC, Complainant, vs. San Diego Gas & Electric Company
(U902M), Defendant, |
|
|
09/06/16 |
I.16-07-007 (PHC) -
Order Instituting investigation on the Commission’s Own Motion into the
Operations and Practices of Southern California Edison Company; Notice of
Opportunity for Hearing; and Order to Show Cause Why the Commission Should
not Impose Fines and Sanctions for Major Power Outages in the City of Long
Beach on July 15, 2015 to July 20, 2015, and on July 30 to August 3, 2015, |
|
|
09/06/16 |
R.11-03-013 (PPH) –
Order Instituting Rulemaking Regarding Revisions to the California Universal
Telephone Service (LifeLine) Program, |
|
|
09/06/16 |
A.15-07-015 (PPH) –
In the Matter of the Application of California Water Service Company (U60W),
a California corporation, for an order (1) authorizing it to increase rates
for water service by $94,838,100 or 16.5% in test year 2017, (2) authorizing
it to increase rates by $22,959,600 or 3.4% on January 1, 2018, and
$22,588,200 or 3.3% on January 1, 2019, in accordance with the Rate Case
Plan, and (3) adopting other related rulings and relief necessary to implement
the Commission’s ratemaking policies, |
|
|
09/07/16 |
C.16-06-019 (PHC) -
J. Boggeri & Co., also known as (aka) Boggeri Sales & Marketing,
Complainant vs. AT&T Corp. (U5002C), Defendant, |
|
|
09/07/16 |
A.15-07-015 (PPH) –
In the Matter of the Application of California Water Service Company (U60W),
a California corporation, for an order (1) authorizing it to increase rates
for water service by $94,838,100 or 16.5% in test year 2017, (2) authorizing
it to increase rates by $22,959,600 or 3.4% on January 1, 2018, and
$22,588,200 or 3.3% on January 1, 2019, in accordance with the Rate Case
Plan, and (3) adopting other related rulings and relief necessary to
implement the Commission’s ratemaking policies, |
|
|
09/08/16 |
A.16-06-005 (PHC) -
Application of SP LICENSES, INC. for Registration as an Interexchange Carrier
Telephone Corporation pursuant to the Provisions of Public Utilities Code
Section 1013, |
|
|
09/08/16 |
A.15-07-015 (PPH) –
In the Matter of the Application of California Water Service Company (U60W),
a California corporation, for an order (1) authorizing it to increase rates
for water service by $94,838,100 or 16.5% in test year 2017, (2) authorizing
it to increase rates by $22,959,600 or 3.4% on January 1, 2018, and
$22,588,200 or 3.3% on January 1, 2019, in accordance with the Rate Case
Plan, and (3) adopting other related rulings and relief necessary to
implement the Commission’s ratemaking policies, |
|
|
09/09/16 |
A.16-05-015 (EH) -
Application by Webpass Telecommunications, LLC (U7278C) pursuant to Decision
98-10-058 for Arbitration of Dispute over Denial by Pacific Bell Telephone
Company (UI00IC) of Nondiscriminatory Access to Utility Support Structures, |
|
|
09/09/16 |
C.16-05-010 (PHC) -
Rebecca White, Fred Avalos, Jason Sullivan, Uel Furnas, Jeff Charist, Steve
& Teresa Poole, John Rosh, Jeff Sindlinger, Leroy Chism, Jesus Gallardo
and Todd Tenhet, Complainants vs. California Water Service Company (U60W),
Defendant, |
|
|
09/09/16 |
I.14-05-012 (PPH) -
Order Instituting Investigation to Address Intrastate Rural Call Completion
Issues, |
|
|
09/12/16 |
A.16-02-012 (PHC) -
Application of M5 Networks, LLC for Registration as an Interexchange Carrier
Telephone Corporation pursuant to the Provisions of Public Utilities Code
Section 1013, |
|
|
09/12/16 |
A.16-06-013 (PHC) -
Application of Pacific Gas and Electric Company to Revise its Electric
Marginal Costs, Revenue Allocation and Rate Design. (U39M), |
|
|
09/12/16 |
A.16-07-002 (PHC) -
Application of California-American Water Company (U210W) for Authorization to
Increase its Revenues for Water Service by $34,559,200 or 16.29% in the year
2018, by $8,478,500 or 3.43% in the year 2019, and by $7,742,600 or 3.03% in
the year 2020, |
|
|
09/13/16 |
A.16-07-001 (PHC) -
Application of Liberty Utilities (CalPeco Electric) LLC (U933E) for Authority
to Update Rates Pursuant to Its Energy Cost Adjustment Clause Effective
January 1, 2017, |
|
|
09/13/16 |
A.16-06-003 (EH) -
Application of Pacific Gas and Electric Company for Adoption of Electric
Revenue Requirements and Rates Associated with its 2017 Energy Resource
Recovery Account (ERRA) and Generation Non-Bypassable Charges Forecast and
Greenhouse Gas Forecast Revenue and Reconciliation. (U39E), |
|
|
09/14/16 |
A.15-04-012 (PPH) -
Application of San Diego Gas & Electric Company (U902E) for Authority to
Update Marginal Costs, Cost Allocation and Electric Rate Design, |
|
|
09/14/16 |
R.11-03-013 (PPH) –
Order Instituting Rulemaking Regarding Revisions to the California Universal
Telephone Service (LifeLine) Program, |
|
|
09/14/16 |
A.15-07-015 (PPH) –
In the Matter of the Application of California Water Service Company (U60W),
a California corporation, for an order (1) authorizing it to increase rates
for water service by $94,838,100 or 16.5% in test year 2017, (2) authorizing
it to increase rates by $22,959,600 or 3.4% on January 1, 2018, and
$22,588,200 or 3.3% on January 1, 2019, in accordance with the Rate Case
Plan, and (3) adopting other related rulings and relief necessary to
implement the Commission’s ratemaking policies, |
|
|
09/19/16 |
A.16-03-006 (EH) -
Application of Pacific Gas and Electric Company in its 2015 Nuclear
Decommissioning Cost Triennial Proceeding (U39E), |
|
|
09/20/16 |
I.14-05-012 (PPH) -
Order Instituting Investigation to Address Intrastate Rural Call Completion
Issues, |
|
|
09/20/16 |
R.11-03-013 (PPH) –
Order Instituting Rulemaking Regarding Revisions to the California Universal
Telephone Service (LifeLine) Program, |
|
|
09/21/16 |
A.15-08-025 (EH) - In
the Matter of the Application of Cypress Ridge Sewer Co. for a Certificate of
Public Convenience and Necessity to Provide Sewer Utility Service to the
Cypress Ridge Development in San Luis Obispo County, California, |
|
|
09/22/16 |
A.15-09-013 (PHC) -
In The Matter of the Application of San Diego Gas & Electric Company
(U902G) and Southern California Gas Company (U904G) for a Certificate of
Public Convenience and Necessity for the Pipeline Safety & Reliability
Project, |
|
|
09/27/16 |
A.16-07-017 (PHC) -
Application of West Coast Gas Company to Revise its Gas Rates and Tariffs.
(U910G), |
|
|
09/28/16 |
K.16-04-003 (EH) - Notice
of Appeal by TeleUno, Inc. (U6444C) from Citation No.588-729 issued by the
Safety and Enforcement Division, |
|
|
09/29/16 |
K.16-04-004 (EH) - Notice
of Appeal by TeleDias Communications, Inc. (U6725C) from Citation No.189-587
issued by the Safety and Enforcement Division, |
|
|
10/04/16 |
A.15-07-015 (PPH) –
In the Matter of the Application of California Water Service Company (U60W),
a California corporation, for an order (1) authorizing it to increase rates
for water service by $94,838,100 or 16.5% in test year 2017, (2) authorizing
it to increase rates by $22,959,600 or 3.4% on January 1, 2018, and
$22,588,200 or 3.3% on January 1, 2019, in accordance with the Rate Case
Plan, and (3) adopting other related rulings and relief necessary to
implement the Commission’s ratemaking policies, |
|
|
10/06/16 |
C.16-05-003 (EH) -
California Stat Laboratories, Complainant vs. Southern California Edison
Company (U338E), Defendant, |
|
|
10/19/16 |
A.16-02-019 (EH) -
Application of Pacific Gas and Electric Company for Compliance Review of
Utility Owned Generation Operations, Electric Energy Resource Recovery
Account Entries, Contract Administration, Economic Dispatch of Electric
Resources, Utility Owned Generation Fuel Procurement, Diablo Canyon Seismic
Studies Balancing Account, and Other Activities for the Period January 1
through December 31, 2015 (U39E), |
|
|
11/01/16 |
A.14-11-016 (EH) -
Application of Southern California Edison Company (U338E) for Approval of the
Results of Its 2013 Local Capacity Requirements Request for Offers for the
Moorpark Sub-Area, |
|
|
11/08/16 |
A.16-06-002 (EH) -
Application of San Diego Gas & Electric Company (U902E) for Approval of:
(i) Contract Administration, Least-Cost Dispatch and Power Procurement
Activities in 2015, (ii) Costs Related to those Activities Recorded to the
Energy Resource Recovery Account and Transition Cost Balancing Account in
2015 and (iii) Costs Recorded in Related Regulatory Accounts in 2015, |
|
|
11/14/16 |
A.14-02-008 (EH) -
Application of Pacific Gas and Electric Company for Compliance Review of
Utility Owned Generation Operations, Electric Energy Resource Recovery
Account Entries, Contract Administration, Economic Dispatch of Electric
Resources, Utility Retained Generation Fuel Procurement, and Other Activities
for the Period January 1 through December 31, 2013. (U39E), |
|
|
01/23/17 |
A.15-09-010 (EH) -
Application of San Diego Gas & Electric Company (U902E) for Authorization
to Recover Costs Related to the 2007 Southern California Wildfires Recorded
in the Wildfire Expense Memorandum Account (WEMA), |
|
|
03/06/17 |
A.16-03-009 (EH) - In
the Matter of the Application of Crimson California Pipeline L.P. (PLC-26)
for Authority to Increase Rates for Its Crude Oil Pipeline Services, |
(A quorum of Commissioners and/or their staff may attend All-Party Meetings noticed on the Daily Calendar.)
August 31, 2016 |
California Public
Utilities Commission
|
NOTICE IS HEREBY
GIVEN that Commissioner Catherine J. K. Sandoval will hold an All-Party
Meeting regarding Application 14-11-007 et al. The meeting will take place on
Wednesday, August 31, 2016 from 9:30 a.m. to 11:30 a.m.. Parties who wish to
attend and speak at the All-Party Meeting must send an RSVP to Commissioner
Sandoval’s office by emailing with the name of the party or representative
along with a contact phone number and email address. RSVP must be
received by noon on Monday, August 29, 2016.
An agenda will be distributed to everyone on the service list next week. If
you have any questions, please contact Michael Colvin, Energy and Safety
Advisor to Commissioner Sandoval, by electronic mail at michael.colvin@cpuc.ca.gov
or at (415) 355-5484.