Daily Calendar
· Commission Meetings
· Notices
· Public Meetings and Workshops
· Notice of Draft Resolutions (PU Code § 311(g))
· New Filings
· Petitions for Modification and Applications for Rehearing
· Proposed Decisions/Alternates/Presiding Officer’s Decisions/Arbitrator’s Reports
· Advice Letter Filings
· Miscellaneous Transportation Items
· Miscellaneous Communications Matters
· Table of Submission Dates for the Preceding Two Weeks
· Changes to Hearing Calendar
· Hearings
· Notice of All-Party Meetings (PU Code §1701.3(c))
|
The Commission’s policy is to schedule hearings (meetings, workshops, etc.) in locations that are accessible to people with disabilities. |
|
The CPUC encourages all Californians to participate in its meetings,
hearings, workshops, and proceedings. We try to hold our public meetings
only in places that are wheelchair accessible and which can accommodate
specialized equipment and other services useful to people with disabilities.
Please see the notice of the meeting you wish to attend for more specifics. If you plan to attend and need specialized accommodations for a particular meeting that are not listed in the notice, request them from the Public Advisor’s Office at least three business days in advance of the meeting. Contact the Public Advisor’s Office by any one of the following: |
||
Email: public.advisor@cpuc.ca.gov |
FAX: 415-355-5404 (Attn.: Public Advisor) |
|
July 12, 2017 |
Noon |
San Francisco, CA 94102 |
The Continuation of the June 30, 2017 Business Meeting Closed Session to July 12, 2017 at Noon |
|
California Public Utilities Commission – Room 5305 505 Van Ness Ave San Francisco, CA 94102 http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=191597957
|
July 13, 2017 |
9:30 am |
San Francisco, CA |
August 10, 2017 |
9:30 am |
San Francisco, CA |
Ratesetting Deliberative Meeting dates are reserved as noted but will only be held if there are ratesetting matters to be considered.
August 07, 2017 |
10:00 am |
San Francisco, Room 5305 |
August 21, 2017 |
10:00 am |
San Francisco, Room 5305 |
September 11, 2017 |
10:00 am |
San Francisco, Room 5305 |
July 12, 2017 |
California Public
Utilities Commission - Auditorium |
More information on the Committee meeting is available at http://www.cpuc.ca.gov/commissionercommittees/
July 12, 2017 |
California Public
Utilities Commission - Auditorium |
More information on the Committee meeting is available at http://www.cpuc.ca.gov/commissionercommittees/
July 12, 2017 |
California Public
Utilities Commission - Auditorium
|
More information on the Committee meeting is available at http://www.cpuc.ca.gov/commissionercommittees/
To purchase Commission documents, there is a charge of 20 cents a printed page (postage prepaid) with a minimum purchase of $2.00.
The auditorium, hearing rooms, and training room at the headquarters of the California Public Utilities Commission, located at 505 Van Ness Avenue, San Francisco, California, are available for rent. Further information about requirements and fees can be obtained by contacting Scott Finger (415) 703-1641.
“The
below notices having been duly noticed in the Daily Calendar and along with the
requisite ruling, scoping memo or other order issued in the specific
proceedings satisfy the requirements of the Commission’s Rules of Practice and
Procedure Rule 8.1(c) such that no ex parte communication shall be considered
to occur should a decisionmaker or an advisor be present at the meeting or
workshop.”
July 24, 2017 8:30 am – 11:30am |
To Join Web Conference: Click here: https://energy.webex.com Meeting ID : 925 866 516
|
AGENDA
The Vehicle-Grid Integration (VGI) Communication Protocol working
group, which is designed to inform the Commission’s rulemaking under
R.13-11-007 and related proceedings, will meet according to the above schedule.
Any changes to the schedule will be noticed on the Daily Calendar, including updates on locations for the all-day meetings. A current schedule will also be available at www.cpuc.ca.gov/vgi.
Background
The California Public Utilities Commission, California Energy Commission, and other State agencies convened this working group to assess how and whether the adoption of a communications protocol is necessary to enable Plug-In Electric Vehicle-Grid Integration (VGI) resources to more economically participate in electricity markets at scale.
Participants of the working group will identify and assess opportunities in which VGI can create value from multiple market participants’ perspectives, communication protocols needed to deliver that value, and concepts for how utilities, automakers, electric vehicle service providers, aggregators, and others can develop pathways to market for a VGI resource.
The working group will allow participants to review, understand, and discuss the technical details of existing communication protocols. The recommendations of the working group will be considered and incorporated in CPUC’s Rulemaking 13-11-007 (and/or the SB 350 Transportation Electrification applications A.17-01-020, A.17-01-021 and A.17-01-022) and the Energy Commission’s Integrated Energy Policy Report (IEPR) proceeding for future policy decisions. Anyone interested in participating in the VGI Working Group should contact Amy Mesrobian (amy.mesrobian@cpuc.ca.gov or 415-703-3175) or Carrie Sisto (cs8@cpuc.ca.gov or 415-703-2872).
July 26, 2017 10:30 am – 12 noon |
California Public
Utilities Commission – Room# 3204 |
AGENDA
The public meeting of the California High Cost Fund (CHCF) B Administrative Committee (AC) will be held on Wednesday, July 26, 2017, at the above location, on the following items: (1) Introductions; (2) Public Comments; (3) Review and Approval of Minutes of the previous meetings; (4) Liaison Staff Reports: (a) Fiscal report; (b) Legal report; (c) CD Staff ; (5) Other Administrative Matters; (6) Announcements; (7) New Agenda items for next meeting; (8) Date and Time for next meeting. The contact person for this meeting is Richard Maniscalco at (415) 703-2005.
July 27, 2017 |
To Listen by Phone |
AGENDA
this is a monthly telephonic meeting where the co-leads for the Peer
Develop Panel (PDP) will provide to the assigned Commissioner, the
Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff a status report regarding the development of Fire Map 2 in
accordance with the schedule and procedures adopted by Decision 17-01-009. The
agenda for the meeting is for the PDP to provide: (1) A brief summary of
progress to date (first meeting) or since the previous meeting. (2) A succinct
description of the next deliverable(s) and/or milestone(s) the PDP is working
toward, and whether the PDP is on schedule. (3) Opportunity for questions
from the Assigned Commissioner, the Commissioner’s Advisor(s), assigned
Administrative Law Judges, and/or Commission staff.
As stated above, Commission decisionmakers and Advisors may participate in this
telephonic meeting. Parties and the public may listen to the meeting using the
listen-only toll-free number and passcode provided above. For questions
regarding the monthly telephonic status meetings, please contact Martin
Kurtovich at Martin.Kurtovich@cpuc.ca.gov
or (415) 703-2623).
July 27, 2017 |
To Listen by Phone
|
AGENDA
this is a monthly telephonic meeting where the co-leads for the
Fire-Safety Technical Panel (FSTP) will provide to the assigned Commissioner,
the Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff a status report regarding the development of proposed
fire-safety regulations in accordance with the schedule and procedures adopted
by Decision 17-01-009. The agenda for the meeting is for the FSTP to provide:
(1) A brief summary of progress to date (first meeting) or since the previous
meeting. (2) A succinct description of the next deliverable(s) and/or
milestone(s) the FSTP is working toward, and whether the FSTP is on schedule.
(3) Opportunity for questions from the Assigned Commissioner, the
Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff.
As stated above, Commission decisionmakers and Advisors may participate in this
telephonic meeting. Parties and the public may listen to the meeting using the
listen-only toll-free number and passcode provided above. For questions
regarding the monthly telephonic status meetings, please contact Martin
Kurtovich at Martin.Kurtovich@cpuc.ca.gov
or (415) 703-2623).
August 1, 2017 |
California Public
Utilities Commission – Courtyard Room
To Listen By Phone Conference phone line: 1-866-859-2737 Participant code: 1682922
Webex information will be available closer to the workshop date
|
AGENDA
In compliance with D. 17-06-015, Ordering Paragraph 6 (d), the Safety and Enforcement Division Staff will be hosting an in-person workshop to discuss development of a template for consistency in Best practices Compliance Plans that will be required as part of Gas Safety Plans, commencing March 15, 2018. In addition Energy Division staff will lead a discussion of cost-recovery provisions of the decision. Detailed agenda to follow. For information, please contact Ed Charkowicz at (415) 703-2421 or eac@cpuc.ca.gov.
August 7, 2017 |
San Francisco CA 94102
To
Join Web Conference: Meeting ID: 925 191 027
|
AGENDA
The Vehicle-Grid Integration (VGI) Communication Protocol working
group, which is designed to inform the Commission’s rulemaking under
R.13-11-007 and related proceedings, will meet according to the above schedule.
Any changes to the schedule will be noticed on the Daily Calendar, including updates on locations for the all-day meetings. A current schedule will also be available at www.cpuc.ca.gov/vgi.
Background
The California Public Utilities Commission, California Energy Commission, and other State agencies convened this working group to assess how and whether the adoption of a communications protocol is necessary to enable Plug-In Electric Vehicle-Grid Integration (VGI) resources to more economically participate in electricity markets at scale.
Participants of the working group will identify and assess opportunities in which VGI can create value from multiple market participants’ perspectives, communication protocols needed to deliver that value, and concepts for how utilities, automakers, electric vehicle service providers, aggregators, and others can develop pathways to market for a VGI resource.
The working group will allow participants to review, understand, and discuss the technical details of existing communication protocols. The recommendations of the working group will be considered and incorporated in CPUC’s Rulemaking 13-11-007 (and/or the SB 350 Transportation Electrification applications A.17-01-020, A.17-01-021 and A.17-01-022) and the Energy Commission’s Integrated Energy Policy Report (IEPR) proceeding for future policy decisions. Anyone interested in participating in the VGI Working Group should contact Amy Mesrobian (amy.mesrobian@cpuc.ca.gov or 415-703-3175) or Carrie Sisto (cs8@cpuc.ca.gov or 415-703-2872).
August 21, 2017 |
To Join the Web Conference: Meeting ID : 925 866 516
|
AGENDA
The Vehicle-Grid Integration (VGI) Communication Protocol working
group, which is designed to inform the Commission’s rulemaking under
R.13-11-007 and related proceedings, will meet according to the above schedule.
Any changes to the schedule will be noticed on the Daily Calendar, including updates on locations for the all-day meetings. A current schedule will also be available at www.cpuc.ca.gov/vgi.
Background
The California Public Utilities Commission, California Energy Commission, and other State agencies convened this working group to assess how and whether the adoption of a communications protocol is necessary to enable Plug-In Electric Vehicle-Grid Integration (VGI) resources to more economically participate in electricity markets at scale.
Participants of the working group will identify and assess opportunities in which VGI can create value from multiple market participants’ perspectives, communication protocols needed to deliver that value, and concepts for how utilities, automakers, electric vehicle service providers, aggregators, and others can develop pathways to market for a VGI resource.
The working group will allow participants to review, understand, and discuss the technical details of existing communication protocols. The recommendations of the working group will be considered and incorporated in CPUC’s Rulemaking 13-11-007 (and/or the SB 350 Transportation Electrification applications A.17-01-020, A.17-01-021 and A.17-01-022) and the Energy Commission’s Integrated Energy Policy Report (IEPR) proceeding for future policy decisions. Anyone interested in participating in the VGI Working Group should contact Amy Mesrobian (amy.mesrobian@cpuc.ca.gov or 415-703-3175) or Carrie Sisto (cs8@cpuc.ca.gov or 415-703-2872).
August 31, 2017 |
To Listen by Phone |
AGENDA
this is a monthly telephonic meeting where the co-leads for the Peer
Develop Panel (PDP) will provide to the assigned Commissioner, the
Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff a status report regarding the development of Fire Map 2 in
accordance with the schedule and procedures adopted by Decision 17-01-009. The
agenda for the meeting is for the PDP to provide: (1) A brief summary of
progress to date (first meeting) or since the previous meeting. (2) A succinct
description of the next deliverable(s) and/or milestone(s) the PDP is working
toward, and whether the PDP is on schedule. (3) Opportunity for questions
from the Assigned Commissioner, the Commissioner’s Advisor(s), assigned
Administrative Law Judges, and/or Commission staff.
As stated above, Commission decisionmakers and Advisors may participate in this
telephonic meeting. Parties and the public may listen to the meeting using the
listen-only toll-free number and passcode provided above. For questions
regarding the monthly telephonic status meetings, please contact Martin
Kurtovich at Martin.Kurtovich@cpuc.ca.gov
or (415) 703-2623).
Telephonic - Public Meeting Notice: R.15-05-006 - Status Report
Regarding Development of Proposed Fire-Safety Regulations
August 31, 2017 |
To Listen by Phone
|
AGENDA
this is a monthly telephonic meeting where the co-leads for the
Fire-Safety Technical Panel (FSTP) will provide to the assigned Commissioner,
the Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff a status report regarding the development of proposed
fire-safety regulations in accordance with the schedule and procedures adopted
by Decision 17-01-009. The agenda for the meeting is for the FSTP to provide:
(1) A brief summary of progress to date (first meeting) or since the
previous meeting. (2) A succinct description of the next deliverable(s) and/or
milestone(s) the FSTP is working toward, and whether the FSTP is on schedule.
(3) Opportunity for questions from the Assigned Commissioner, the
Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff.
As stated above, Commission decisionmakers and Advisors may participate in this
telephonic meeting. Parties and the public may listen to the meeting using the
listen-only toll-free number and passcode provided above. For questions
regarding the monthly telephonic status meetings, please contact Martin
Kurtovich at Martin.Kurtovich@cpuc.ca.gov
or (415) 703-2623).
Webinar - Public Meeting Notice: R.13-11-007 -
Vehicle-Grid Integration Communications Protocol Working Group Meeting Schedule
September 5, 2017 8:30 am – 11:30 am |
To Join Web
Conference: Meeting ID: 925 866
516 Details about location and remote access options for each meeting will be posted in advance at www.cpuc.ca.gov/vgi.
|
AGENDA
The Vehicle-Grid Integration (VGI) Communication Protocol working
group, which is designed to inform the Commission’s rulemaking under
R.13-11-007 and related proceedings, will meet according to the above schedule.
Any changes to the schedule will be noticed on the Daily Calendar, including updates on locations for the all-day meetings. A current schedule will also be available at www.cpuc.ca.gov/vgi.
Background
The California Public Utilities Commission, California Energy Commission, and other State agencies convened this working group to assess how and whether the adoption of a communications protocol is necessary to enable Plug-In Electric Vehicle-Grid Integration (VGI) resources to more economically participate in electricity markets at scale.
Participants of the working group will identify and assess opportunities in which VGI can create value from multiple market participants’ perspectives, communication protocols needed to deliver that value, and concepts for how utilities, automakers, electric vehicle service providers, aggregators, and others can develop pathways to market for a VGI resource.
The working group
will allow participants to review, understand, and discuss the technical
details of existing communication protocols. The recommendations of the working
group will be considered and incorporated in CPUC’s Rulemaking 13-11-007
(and/or the SB 350 Transportation Electrification applications A.17-01-020,
A.17-01-021 and A.17-01-022) and the Energy Commission’s Integrated Energy
Policy Report (IEPR) proceeding for future policy decisions. Anyone interested
in participating in the VGI Working Group should contact Amy Mesrobian (amy.mesrobian@cpuc.ca.gov or
415-703-3175) or Carrie Sisto (cs8@cpuc.ca.gov
or 415-703-2872).
Public Meeting Notice: R. 13-11-007 - Vehicle-Grid
Integration Communications Protocol Working Group Meeting Schedule
September 18, 2017 |
Sacramento, CA 94814 Click here: https://energy.webex.com; Meeting ID: 926 148 357
Details about location and remote access options for each meeting will be posted in advance at www.cpuc.ca.gov/vgi
|
AGENDA
The Vehicle-Grid Integration (VGI) Communication Protocol working
group, which is designed to inform the Commission’s rulemaking under
R.13-11-007 and related proceedings, will meet according to the above schedule.
Any changes to the schedule will be noticed on the Daily Calendar, including updates on locations for the all-day meetings. A current schedule will also be available at www.cpuc.ca.gov/vgi.
Background
The California Public Utilities Commission, California Energy Commission, and other State agencies convened this working group to assess how and whether the adoption of a communications protocol is necessary to enable Plug-In Electric Vehicle-Grid Integration (VGI) resources to more economically participate in electricity markets at scale.
Participants of the working group will identify and assess opportunities in which VGI can create value from multiple market participants’ perspectives, communication protocols needed to deliver that value, and concepts for how utilities, automakers, electric vehicle service providers, aggregators, and others can develop pathways to market for a VGI resource.
The working group
will allow participants to review, understand, and discuss the technical
details of existing communication protocols. The recommendations of the working
group will be considered and incorporated in CPUC’s Rulemaking 13-11-007
(and/or the SB 350 Transportation Electrification applications A.17-01-020,
A.17-01-021 and A.17-01-022) and the Energy Commission’s Integrated Energy
Policy Report (IEPR) proceeding for future policy decisions. Anyone interested
in participating in the VGI Working Group should contact Amy Mesrobian (amy.mesrobian@cpuc.ca.gov or 415-703-3175)
or Carrie Sisto (cs8@cpuc.ca.gov or
415-703-2872).
Telephonic - Public Meeting Notice: R.15-05-006 -
Status Report Regarding the Development of Fire-Threat Maps
September 28, 2017 |
To Listen by Phone |
AGENDA
this is a monthly telephonic meeting where the co-leads for the Peer
Develop Panel (PDP) will provide to the assigned Commissioner, the
Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff a status report regarding the development of Fire Map 2 in
accordance with the schedule and procedures adopted by Decision 17-01-009. The
agenda for the meeting is for the PDP to provide: (1) A brief summary of
progress to date (first meeting) or since the previous meeting. (2) A succinct
description of the next deliverable(s) and/or milestone(s) the PDP is working
toward, and whether the PDP is on schedule. (3) Opportunity for questions
from the Assigned Commissioner, the Commissioner’s Advisor(s), assigned
Administrative Law Judges, and/or Commission staff.
As stated above, Commission decisionmakers and Advisors may participate in this telephonic meeting. Parties and the public may listen to the meeting using the listen-only toll-free number and passcode provided above. For questions regarding the monthly telephonic status meetings, please contact Martin Kurtovich at Martin.Kurtovich@cpuc.ca.gov or (415) 703-2623).
Telephonic - Public Meeting Notice: R.15-05-006 -
Status Report Regarding Development of Proposed Fire-Safety Regulations
September 28, 2017 |
To Listen by Phone
|
AGENDA
this is a monthly telephonic meeting where the co-leads for the
Fire-Safety Technical Panel (FSTP) will provide to the assigned Commissioner,
the Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff a status report regarding the development of proposed
fire-safety regulations in accordance with the schedule and procedures adopted
by Decision 17-01-009. The agenda for the meeting is for the FSTP to provide:
(1) A brief summary of progress to date (first meeting) or since the
previous meeting. (2) A succinct description of the next deliverable(s) and/or
milestone(s) the FSTP is working toward, and whether the FSTP is on schedule.
(3) Opportunity for questions from the Assigned Commissioner, the
Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff.
As stated above, Commission decisionmakers and Advisors may participate in this
telephonic meeting. Parties and the public may listen to the meeting using the
listen-only toll-free number and passcode provided above. For questions
regarding the monthly telephonic status meetings, please contact Martin
Kurtovich at Martin.Kurtovich@cpuc.ca.gov
or (415) 703-2623).
Webinar - Public Meeting Notice: R.13-11-007 -
Vehicle-Grid Integration Communications Protocol Working Group Meeting Schedule
October 2, 2017 |
To Join Web Conference: Meeting ID: 925 866 516
Details about location and remote access options for each meeting will be posted in advance at www.cpuc.ca.gov/vgi
|
AGENDA
The Vehicle-Grid Integration (VGI) Communication Protocol working
group, which is designed to inform the Commission’s rulemaking under
R.13-11-007 and related proceedings, will meet according to the above schedule.
Any changes to the schedule will be noticed on the Daily Calendar, including updates on locations for the all-day meetings. A current schedule will also be available at www.cpuc.ca.gov/vgi.
Background
The California Public Utilities Commission, California Energy Commission, and other State agencies convened this working group to assess how and whether the adoption of a communications protocol is necessary to enable Plug-In Electric Vehicle-Grid Integration (VGI) resources to more economically participate in electricity markets at scale.
Participants of the working group will identify and assess opportunities in which VGI can create value from multiple market participants’ perspectives, communication protocols needed to deliver that value, and concepts for how utilities, automakers, electric vehicle service providers, aggregators, and others can develop pathways to market for a VGI resource.
The working group will allow participants to review, understand, and discuss the technical details of existing communication protocols. The recommendations of the working group will be considered and incorporated in CPUC’s Rulemaking 13-11-007 (and/or the SB 350 Transportation Electrification applications A.17-01-020, A.17-01-021 and A.17-01-022) and the Energy Commission’s Integrated Energy Policy Report (IEPR) proceeding for future policy decisions. Anyone interested in participating in the VGI Working Group should contact Amy Mesrobian (amy.mesrobian@cpuc.ca.gov or 415-703-3175) or Carrie Sisto (cs8@cpuc.ca.gov or 415-703-2872).
October 16, 2017 |
San Francisco, CA
94102 Click here: https://energy.webex.com; Meeting ID: 928 215 208
|
AGENDA
The Vehicle-Grid Integration (VGI) Communication Protocol working
group, which is designed to inform the Commission’s rulemaking under
R.13-11-007 and related proceedings, will meet according to the above schedule.
Any changes to the schedule will be noticed on the Daily Calendar, including updates on locations for the all-day meetings. A current schedule will also be available at www.cpuc.ca.gov/vgi.
Background
The California Public Utilities Commission, California Energy Commission, and other State agencies convened this working group to assess how and whether the adoption of a communications protocol is necessary to enable Plug-In Electric Vehicle-Grid Integration (VGI) resources to more economically participate in electricity markets at scale.
Participants of the working group will identify and assess opportunities in which VGI can create value from multiple market participants’ perspectives, communication protocols needed to deliver that value, and concepts for how utilities, automakers, electric vehicle service providers, aggregators, and others can develop pathways to market for a VGI resource.
The working group
will allow participants to review, understand, and discuss the technical
details of existing communication protocols. The recommendations of the working
group will be considered and incorporated in CPUC’s Rulemaking 13-11-007
(and/or the SB 350 Transportation Electrification applications A.17-01-020,
A.17-01-021 and A.17-01-022) and the Energy Commission’s Integrated Energy
Policy Report (IEPR) proceeding for future policy decisions. Anyone interested
in participating in the VGI Working Group should contact Amy Mesrobian (amy.mesrobian@cpuc.ca.gov or
415-703-3175) or Carrie Sisto (cs8@cpuc.ca.gov
or 415-703-2872).
Telephonic - Public Meeting Notice: R.15-05-006 -
Status Report Regarding the Development of Fire-Threat Maps
October 26, 2017 |
To Listen by Phone |
AGENDA
this is a monthly telephonic meeting where the co-leads for the Peer
Develop Panel (PDP) will provide to the assigned Commissioner, the
Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff a status report regarding the development of Fire Map 2 in
accordance with the schedule and procedures adopted by Decision 17-01-009. The
agenda for the meeting is for the PDP to provide: (1) A brief summary of
progress to date (first meeting) or since the previous meeting. (2) A succinct
description of the next deliverable(s) and/or milestone(s) the PDP is working
toward, and whether the PDP is on schedule. (3) Opportunity for questions
from the Assigned Commissioner, the Commissioner’s Advisor(s), assigned
Administrative Law Judges, and/or Commission staff.
As stated above, Commission decisionmakers and Advisors may participate in this
telephonic meeting. Parties and the public may listen to the meeting using the
listen-only toll-free number and passcode provided above. For questions
regarding the monthly telephonic status meetings, please contact Martin
Kurtovich at Martin.Kurtovich@cpuc.ca.gov
or (415) 703-2623).
Telephonic - Public Meeting Notice: R.15-05-006 -
Status Report Regarding Development of Proposed Fire-Safety Regulations.
October 26, 2017 |
To Listen by Phone
|
AGENDA
this is a monthly telephonic meeting where the co-leads for the
Fire-Safety Technical Panel (FSTP) will provide to the assigned Commissioner,
the Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff a status report regarding the development of proposed
fire-safety regulations in accordance with the schedule and procedures adopted
by Decision 17-01-009. The agenda for the meeting is for the FSTP to provide:
(1) A brief summary of progress to date (first meeting) or since the
previous meeting. (2) A succinct description of the next deliverable(s) and/or
milestone(s) the FSTP is working toward, and whether the FSTP is on schedule.
(3) Opportunity for questions from the Assigned Commissioner, the
Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff.
As stated above, Commission decisionmakers and Advisors may participate in this
telephonic meeting. Parties and the public may listen to the meeting using the
listen-only toll-free number and passcode provided above. For questions
regarding the monthly telephonic status meetings, please contact Martin
Kurtovich at Martin.Kurtovich@cpuc.ca.gov
or (415) 703-2623).
Telephonic - Public Meeting Notice: R.15-05-006 -
Status Report Regarding the Development of Fire-Threat Maps.
November 30, 2017 |
To Listen by Phone |
AGENDA
this is a monthly telephonic meeting where the co-leads for the Peer
Develop Panel (PDP) will provide to the assigned Commissioner, the
Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff a status report regarding the development of Fire Map 2 in
accordance with the schedule and procedures adopted by Decision 17-01-009. The
agenda for the meeting is for the PDP to provide: (1) A brief summary of
progress to date (first meeting) or since the previous meeting. (2) A succinct
description of the next deliverable(s) and/or milestone(s) the PDP is working
toward, and whether the PDP is on schedule. (3) Opportunity for questions
from the Assigned Commissioner, the Commissioner’s Advisor(s), assigned
Administrative Law Judges, and/or Commission staff.
As stated above, Commission decisionmakers and Advisors may participate in this
telephonic meeting. Parties and the public may listen to the meeting using the
listen-only toll-free number and passcode provided above. For questions
regarding the monthly telephonic status meetings, please contact Martin
Kurtovich at Martin.Kurtovich@cpuc.ca.gov
or (415) 703-2623).
Telephonic - Public Meeting Notice: R.15-05-006 -
Status Report Regarding Development of Proposed Fire-Safety Regulations.
November 30, 2017 |
To Listen by Phone
|
AGENDA
this is a monthly telephonic meeting where the co-leads for the
Fire-Safety Technical Panel (FSTP) will provide to the assigned Commissioner,
the Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff a status report regarding the development of proposed
fire-safety regulations in accordance with the schedule and procedures adopted
by Decision 17-01-009. The agenda for the meeting is for the FSTP to provide:
(1) A brief summary of progress to date (first meeting) or since the
previous meeting. (2) A succinct description of the next deliverable(s) and/or
milestone(s) the FSTP is working toward, and whether the FSTP is on schedule.
(3) Opportunity for questions from the Assigned Commissioner, the
Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff.
As stated above, Commission decisionmakers and Advisors may participate in this
telephonic meeting. Parties and the public may listen to the meeting using the
listen-only toll-free number and passcode provided above. For questions
regarding the monthly telephonic status meetings, please contact Martin
Kurtovich at Martin.Kurtovich@cpuc.ca.gov
or (415) 703-2623).
Telephonic - Public Meeting Notice: R.15-05-006 -
Status Report Regarding the Development of Fire-Threat Maps
December 28, 2017 |
To Listen by Phone |
AGENDA
this is a monthly telephonic meeting where the co-leads for the Peer
Develop Panel (PDP) will provide to the assigned Commissioner, the
Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff a status report regarding the development of Fire Map 2 in
accordance with the schedule and procedures adopted by Decision 17-01-009. The
agenda for the meeting is for the PDP to provide: (1) A brief summary of
progress to date (first meeting) or since the previous meeting. (2) A succinct
description of the next deliverable(s) and/or milestone(s) the PDP is working
toward, and whether the PDP is on schedule. (3) Opportunity for questions
from the Assigned Commissioner, the Commissioner’s Advisor(s), assigned
Administrative Law Judges, and/or Commission staff.
As stated above, Commission decisionmakers and Advisors may participate in this
telephonic meeting. Parties and the public may listen to the meeting using the
listen-only toll-free number and passcode provided above. For questions
regarding the monthly telephonic status meetings, please contact Martin
Kurtovich at Martin.Kurtovich@cpuc.ca.gov
or (415) 703-2623).
December 28, 2017 |
To Listen by Phone
|
AGENDA
this is a monthly telephonic meeting where the co-leads for the
Fire-Safety Technical Panel (FSTP) will provide to the assigned Commissioner,
the Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff a status report regarding the development of proposed
fire-safety regulations in accordance with the schedule and procedures adopted
by Decision 17-01-009. The agenda for the meeting is for the FSTP to provide:
(1) A brief summary of progress to date (first meeting) or since the
previous meeting. (2) A succinct description of the next deliverable(s) and/or
milestone(s) the FSTP is working toward, and whether the FSTP is on schedule.
(3) Opportunity for questions from the Assigned Commissioner, the
Commissioner’s Advisor(s), assigned Administrative Law Judges, and/or
Commission staff.
As stated above, Commission decisionmakers and Advisors may participate in this
telephonic meeting. Parties and the public may listen to the meeting using the
listen-only toll-free number and passcode provided above. For questions
regarding the monthly telephonic status meetings, please contact Martin
Kurtovich at Martin.Kurtovich@cpuc.ca.gov
or (415) 703-2623).
The Energy Division has prepared Draft Resolution E-4859 for the July 13, 2017 Commission Meeting. This Draft Resolution approves Pacific Gas and Electric Company’s request to retain fee title to approximately 112 acres of land in Shasta County commonly known as Kilarc Reservoir. Notice of this Draft Resolution has been sent to parties in the service list. Any questions or comments should be directed to Michael Rosauer at Michael.Rosauer@cpuc.ca.gov and Mary Jo Borak at maryjo.borak@cpuc.ca.gov.
The web link is: http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M189/K786/189786422.PDF
Resolution ESRB-7 ratifies Commission Executive Director Timothy J. Sullivan’s May 31, 2017 health and safety directive granting the Southern California Edison Company (SCE) a temporary deviation from the climbing space requirements in General Order 95, Rule 54.7, due to emergency conditions in the City of Compton, California.
On June 16, 2017, the draft resolution was mailed to the attached service list, pursuant to California Public Utilities Code § 311(g) and Rule 14.5 of the Commission’s Rules of Practice and Procedure. Comments must be filed by July 3, 2017, and reply comments must be filed by July 10, 2017.
Resolution ESRB-7 will be on the agenda at the July 13, 2017 Commission meeting. The Commission may then vote on this draft resolution, or it may postpone a vote.
When the Commission acts on the draft resolution, it may adopt all or part of it as written, amend or modify it, or set it aside and prepare its own order. Only when the Commission acts does the resolution become binding on the parties.
Finally, an original and two copies of the comments, with a certificate of service should be submitted to:
Fred
Harris, Staff Counsel
Legal Division
California Public Utilities Commission
505 Van Ness Avenue, Room 5040
San Francisco, CA 94102-3298
Telephone: 415-703-1557
E-mail: fnh@cpuc.ca.gov; ah4@cpuc.ca.gov
The Safety and Enforcement Division has prepared Draft Resolution ST-204 for the July 13, 2017, Commission meeting. This resolution grants approval of the final report, titled “2016 Triennial Safety Review of the J. Paul Getty Center Tram (Getty)” dated April 19, 2017. The report compiles the results of the Commission Staff’s review of Getty’s fixed guideway (Tram) safety programs. Background information, review procedures, safety review checklists, findings, and recommendations are included in the report. Any questions or comments should be directed to Daniel Kwok: daniel.kwok@cpuc.ca.gov
The web links are:
Cover Letter, Certificate of Service, Service list:
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=190197398
Comment Resolution ST-204:
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=190198433
Resolution ST-204 Attachment A, 2016 Getty Tram Triennial Safety Review Report:
The Communications Division has prepared Draft Resolution T-17572 which will be on the Commission’s July 13, 2017, meeting agenda. Resolution T-17572 approves the Fiscal Year 2017-18 budgets for California’s six telecommunications public purpose programs that the California Public Utilities Commission administers.The Communications Division e-mailed the Notice of Availability letter for this resolution to parties in accordance with P.U. Code Section 311(g)(1). Instructions and timelines for filing comments as well as the service list for this resolution are included in the Notice of Availability. Any questions or comments should be directed to Eric Van Wambeke; email: evw@cpuc.ca.gov
The web link is: http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M190/K074/190074909.doc
The Energy Division has prepared Draft Resolution E-4846 for the August 10, 2017 Commission Meeting. This Draft Resolution adopts PG&E’s residential default time-of-use pricing pilot pursuant to D.15-07-001. Notice of this Draft has been sent to parties in the service lists. Any questions or comments should be directed to Neha Bazaj at neha.bazaj@cpuc.ca.gov and Paul Phillips at paul.phillips@cpuc.ca.gov
The web link is: http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M191/K530/191530523.PDF
The Energy Division has prepared Draft Resolution E-4853 for the August 10, 2017 Commission Meeting. This Resolution addresses San Diego Gas & Electric Company’s request for approval to offer Line Item Billing Service for a Home Protection Plan Service, on a non-tariffed basis. All questions or comments should be addressed to Scarlett Liang-Uejio at scarlett.liang-uejio@cpuc.ca.gov and Jonathan Tom at jonathan.tom@cpuc.ca.gov .
The web link is: http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=191247200
The Energy Division has prepared Draft Resolution E-4858 for the August 10, 2017 Commission Meeting. This Resolution addresses Pacific Gas and Electric Company’s Fall River Valley Land Retained--Request for Approval under Advice Letter 4998-E, and Public Utilities Code Section 851. All questions or comments should be addressed to Michael Rosauer at michael.rosauer@cpuc.ca.gov and Mary Jo Borak at maryjo.borak@cpuc.ca.gov.
The web link is: http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=192021474
The Energy Division has prepared Draft Resolution E-4863 for the August 10, 2017 Commission Meeting. This Resolution addresses Pacific Gas and Electric Company’s request for approval of six new Electric Program Investment Charge projects via Tier 3 Advice Letter 5015-E, as permitted by D.15-09-005. All questions or comments should be addressed to David Huang at David.Huang@cpuc.ca.gov and Melicia Charles at melicia.charles@cpuc.ca.gov.
The web link is: http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=191839388
The Energy Division has prepared Draft Resolution E-4864 for the August 10, 2017 Commission Meeting. This Draft Resolution approves the Southern California Edison (SCE) Power Displacement Agreement with the Bishop Paiute Indian Tribe. Notice of this Draft Resolution has been sent to parties in the service list.Any questions or comments should be directed to Simone Brant at simone.brant@cpuc.ca.gov and Michele Kito at Michele.kito@cpuc.ca.gov
The web link is: http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M191/K846/191846287.PDF
The Energy Division has prepared Draft Resolution E-4865 for the August 10, 2017 Commission Meeting. This Resolution approves two bilateral Resource Adequacy capacity purchase agreements between Southern California Edison Company and AES Alamitos, LLC and AES Huntington Beach, LLC. All questions and/or comments should be addressed to Jaime Rose Gannon at JaimeRose.Gannon@cpuc.ca.gov and Michele Kito atmichele.kito@cpuc.ca.gov.
The web link is: http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=191677586
The Energy Division has prepared Draft Resolution E-4867 for the August 10, 2017 Commission Meeting. This Resolution addresses approval of the Database for Energy-Efficient Resources (DEER) updates for 2019 and, revised versions 2017 and 2018 in Compliance with D.15-10-028, D.16-08-019, and Resolution E-4818. All questions and/or comments should be addressed to Maryam Mozafari at Maryam.Mozafari@cpuc.ca.gov and Bob Strauss at robert.strauss@cpuc.ca.gov.
The web link is: http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=191992754
The Energy Division has prepared Draft Resolution E-4868 for the August 10, 2017 Commission Meeting. This Draft Resolution approves, with modifications, the Click-Through Authorization Process which releases Customer Data to Third-Party Demand Response Providers. Notice of this Draft Resolution has been sent to parties in the service lists. Any questions or comments should be directed to Katherine Stockton at Katherine.stockton@cpuc.ca.gov and Bruce Kaneshiro at bruce.kaneshiro@cpuc.ca.gov
The web link is: http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M191/K996/191996741.PDF
The Energy Division has prepared Draft Resolution E-4870 for the August 10, 2017 Commission Meeting. This Resolution addresses implementation of San Diego Gas & Electric Company’s 2017 residential rate reform glidepath rate changes pursuant to Decision 15-07-001. All questions or comments should be addressed to Neha Bazaj at Neha.Bazaj@cpuc.ca.gov and Paul Phillips at paul.phillips@cpuc.ca.gov.
The web link is: http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=192028474
The Energy Division has prepared Draft Resolution E-4871 for the August 10, 2017 Commission Meeting. This Resolution addresses DDB-San Francisco request for approval of the Five-Year Marketing, Education, and Outreach Strategic Roadmap and the 2017 – 2018 Joint Consumer Action Plan. All questions and/or comments should be addressed to Rory Cox at rory.cox@cpuc.ca.gov and Hal Kane at Hal.Kane@cpuc.ca.gov.
The web link is: http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=191992152
The Energy Division has prepared Draft Resolution G-3525 for the August 10, 2017 Commission Meeting. This Draft Resolution approves the costs of the procurement activities undertaken to maintain Southern System reliability during the period from September 1, 2015 through August 31, 2016. Notice of this Draft Resolution has been sent to parties in the service lists. Any questions or comments should be directed to Jamie Ormond at Jamie.ormond@cpuc.ca.gov and Franz Cheng at franz.cheng@cpuc.ca.gov
The web link is: http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M190/K576/190576349.PDF
The Safety and Enforcement Division has prepared Draft Resolution ST-205 for the August 10, 2017, Commission meeting. This Resolution grants the San Francisco International Airport AirTrain (AirTrain) request for approval of its Safety Certification Plan for the AirTrain Extension and Improvements Program. Any questions or comments should be directed to Jamie Lau at jamie.lau@cpuc.ca.gov
The web link is: http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=191445049
The Safety and Enforcement Division has prepared Draft Resolution SX-125 for the August 10, 2017, Commission Meeting. This resolution recommends to the California Transportation Commission for increasing funding under the California Public Utilities Code section 1231.1 to an amount of $3,750,000 to be set aside in fiscal year 2018-19 for maintaining automatic grade crossing protection devices. Notice of this proposed resolution has been sent to parties in the service lists. Any questions or comments should be directed to Maria E. Cardenas at mc1@cpuc.ca.gov
The web link is: (http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=190737708)
The Communications Division has prepared Draft Resolution T-17547 which will be on the Commission’s August 10, 2017 meeting agenda. Resolution T-17547 approves the Temporary Support Service Agreement filed by Frontier Communications of America, Inc. in Advice Letter No. 119 as an Interconnection Agreement pursuant to §§ 252 and 252 of the Federal Telecommunications Act. The Communications Division e-mailed the Notice of Availability letter for this resolution to parties in accordance with P.U. Code Section 311(g) (1). Instructions and timelines for filing comments as well as the service list for this resolution are included in the Notice of Availability. Any questions or comments should be directed to Geraldine Carlin; email: geraldine.carlin@cpuc.ca.gov
The web link is: http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=191872057
06/28/2017 |
C.17-06-022 – In re The Matter of the Grievance of Roadrunner Management Services, Inc. doing business as California Shuttle and Limousine for Reinstatement of Operating Authority for TCP – 28858A. |
|
|
06/30/2017 |
A.17-07-004 - (PUBLIC VERSION) Application of Synergem Technologies, Inc. for a Certificate of Public Convenience and Necessity to Provide Resold and Limited Facilities-Based Competitive Local Exchange and 911 Call Transport Telecommunications Services within California. |
07/10/2017 |
A.17-07-003 - Application of Yuba Bus, LLC for authority to operate as a Scheduled Passenger Stage Corporation between Points in Nevada City, and49 Crossing South Yuba River State Park, Nevada City, in the State of California. |
|
|
NONE
7/11/17 |
C.12-03-017 - Fred Coleman, Steven Wallace, Larry L. Vaughn and Ruth Dargitz, Complainants vs. Odd Fellows Sierra Recreation Association, Defendant [for a Finding and Order that Defendant is a Water Public Utility and is therefore within the jurisdiction, control and regulation of the Public Utilities Commission. And related matter -A.13-09-023, Proposed Decision of ALJ Wildgrube.. |
|
|
7/11/17 |
R.11-03-013 - Order Instituting Rulemaking Regarding Revisions to the California Universal Telephone Service (LifeLine) Program; Proposed Decision of Commissioner Guzman Aceves. |
|
|
ADVICE LETTER FILINGSTo inquire
about a filing, call the Energy Division (703-1093), Communications Division
(703-3052) or Water Division (703-1133).
|
|||
07/06/17 |
Telecom 3 |
Ezetop Unlimited Company, DBA subbmission (effective TBD) |
|
|
|
|
|
07/07/17 |
Energy 3865G/5111E |
Pacific Gas & Electric Company, Sale and Conveyance of Two Parcels of Land in the City of Antioch in Contra Costa County Request for Approval under Public Utilities Code Section 851 and General Order 173 (anticipated effective 08/06/17) |
|
|
|
|
|
07/07/17 |
Energy 3866G |
Pacific Gas & Electric Company, California Encroachments Identified through PG&E's Community Pipeline Safety Initiative (CPSI) - Request for Approval under PUC Section 851 and G.O. 173. (anticipated effective 08/06/17) |
|
|
|
|
|
07/07/17 |
Energy 2592G |
San Diego Gas & Electric Company, Revision of Cross-Over Rate Effective July 10, 2017. (anticipated effective 07/10/17) |
|
|
|
|
|
07/07/17 |
Energy 453G |
West Coast Gas Company, Decrease in Rates at Mather Field (anticipated effective 07/07/17) |
|
|
|
|
|
07/07/17 |
Energy 454G |
West Coast Gas Company, Decrease in Rates at Castle (anticipated effective 07/07/17) |
|
|
|
|
|
07/07/17 |
Telecom 1508-A |
Cox California Telcom, LLC, Supplements A.L.No.1508, Change in Lifeline Income Limitations (effective TBD) |
|
|
|
|
|
07/07/17 |
Telecom 88 |
Extenet Systems (California) LLC, ICB customer contract (effective TBD) |
|
|
|
|
|
07/07/17 |
Telecom 89 |
Extenet Systems (California) LLC, ICB Contract (effective TBD) |
|
|
|
|
|
07/07/17 |
Telecom 90 |
Extenet Systems (California) LLC, ICB Customer Contract (effective TBD) |
|
|
|
|
|
07/07/17 |
Telecom 1 |
Lycamobile USA Inc., Compliance with performance bond filing requirement of Decision (effective TBD) |
|
|
|
|
|
07/07/17 |
Water 2267 |
California Water Service Company, [Redwood Valley] increase in the monthly SDWSRF surcharge rate for the DWR loan payment (anticipated effective 08/07/17) |
|
|
|
|
|
07/10/17 |
Energy 3598E-A |
Southern California Edison Company, Supplements A.L.No.3598E, Proposed Revisions to Schedule NEM-ST, and Associated Filed Forms to Streamline the Process for Residential and Small Commercial Customers to Elect the Monthly Billing Option. (anticipated effective 07/01/17) |
|
|
|
|
|
07/10/17 |
Energy 3630E |
Southern California Edison Company, Information Only AL - SCE's Report on Progress Towards the NEM Transition Trigger Level as of June 30, 2017. (anticipated effective 07/10/17) |
|
|
|
|
|
07/10/17 |
Energy 5163G |
Southern California Gas Company, Quarterly Summary of Maintenance Related Curtailments - April 1, 2017 through June 30, 2017. (anticipated effective 07/10/17) |
|
|
|
|
|
07/10/17 |
Telecom 13 |
Global Connection Inc of America, Modifications to California LifeLine Wireless Terms & Conditions (effective TBD) |
|
|
|
|
|
07/10/17 |
Water 1711-W |
Golden State Water Company, [All] Balancing Account and Memorandum Account Amortizations-Tier 2 treatment (anticipated effective 08/09/17) |
|
|
|
|
|
ADVICE LETTER SUSPENSIONS (Pursuant to M-4801, 04/19/01)
|
|||
08/05/17 |
Energy 5110E/3864G |
Pacific Gas & Electric Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 12/04/17. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
|
|
08/05/17 |
Energy 3097E/2591G |
San Diego Gas & Electric Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 12/04/17. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
|
|
08/05/17 |
Energy 3628E |
Southern California Edison Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 12/04/17. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
|
|
08/05/17 |
Energy 5160G |
Southern California Gas Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 12/04/17. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
|
|
ADVICE LETTER PROTESTS
|
|||
04/25/17 |
Energy 1E |
DDB San Francisco, Submission of DDB's Five-Year Marketing, Education and Outreach Strategic Roadmap Protest by CforAT. |
|
|
|
|
|
04/25/17 |
Energy 2E |
DDB San Francisco, Submission of DDB's 2017-2018 Joint Consumer Action Plan Protest by CforAT. |
|
|
|
|
|
07/10/17 |
Water 2267 |
California Water Service Company, [Redwood Valley] increase in the monthly SDWSRF surcharge rate for the DWR loan payment Protest by Craig Bach. |
|
|
|
|
|
07/10/17 |
Water 2267 |
California Water Service Company, [Redwood Valley] increase in the monthly SDWSRF surcharge rate for the DWR loan payment Protest by Charles Moton. |
|
|
|
|
|
06/28/2017 |
C.17-06-022 – In re the Matter of the Grievance of Roadrunner Management Services, Inc., doing business as California Shuttle and Limousine for Reinstatement of Operating Authority for TCP – 28858A. |
|
|
07/10/2017 |
A.17-07-003 - Application of Yuba Bus, LLC for authority to operate as a Scheduled Passenger Stage Corporation between Points in Nevada City, and49 Crossing South Yuba River State Park, Nevada City, in the State of California. |
|
|
NONE
NONE
|
|
07/20/17 |
A.17-05-011 (TELEPHONIC –
PHC) - In the Matter of the Joint Application of SCRS Acquisition
Corporation, Securus Investment Holdings, Llc, And Securus Technologies, INC.
(U6888C) for Approval to Transfer Indirect Control of Securus Technologies,
Inc., |
|
|
07/20/17 |
A.17-04-005 (TELEPHONIC –
PHC) - In the Matter of the Application of Pacific Bell Telephone Co.
(U1001C) dba AT&T California to withdraw from the Centralized Credit
Check System, |
|
|
07/24/17 |
A.17-05-004 (PHC) - In
the Matter of the Application of Golden State Water Company, on Behalf of its
Bear Valley Electric Service Division (U913E), for Approval and Recovery of
Costs, and Authority to Increase Rates and Other Charges, (Including a
Requested Total Operating Revenue Requirement of $37,240,204 (decrease of
4.4%) for TY2O18 and $38,969,869, $41,309,234, and $43,593,202 (Increases of
4.6%, 6.0% and 5.5%) for TY 2019, 2020 and 2021, Respectively) Related to
Electric Service by Its Bear Valley Electric Service Division, |
|
|
07/25/17 |
A.17-05-017 (PHC) - In
the Matter of the Joint Application of West Corporation, Transferor And
Olympus Holdings II, LLC, Transferee To Authorize the Transfer of Control of
West Safety Communications Inc. f/k/a Intrado Communications, Inc. (U6579C)
and West Telecom Services, LLC f/k/a Hypercube Telecom, LLC (U6592C), |
|
|
08/01/17 |
A.17-06-006 (PHC) - Application
of San Diego Gas & Electric Company (U902E) for Approval of: (i) Contract
Administration, Least-Cost Dispatch and Power Procurement Activities in 2016,
(ii) Costs Related to those Activities Recorded to the Energy Resource
Recovery Account and Transition Cost Balancing Account in 2016 and (iii)
Costs Recorded in Related Regulatory Accounts in 2016, |
|
|
08/21/17 |
A.17-06-003 (PHC) - Application
of the San Francisco Bay Area Rapid Transit District to Construct a
Grade-Separated Rail Over Crossings and Under Crossings at Twelve (12)
Intersections in the Cities of Pittsburg and Antioch, County of Contra Costa,
State of California, |
|
|
08/21/17 |
A.17-06-004 (PHC) - Application
of the San Francisco Bay Area Rapid Transit District (Bart) for an order to
Construct one new grade-separated Crossing for the West access Bridge and
Plaza Project for Pedestrian and Bicycle access to the Warm Springs/South
Fremont BART Station, across and over the tracks of the Union Pacific
Railroad Warm Springs Subdivision near Mile Post 5.15 in the City of Fremont,
County of Alameda, State of California, |
|
|
|
|
|
|
ALJ Kersten |
A.15-09-013 – In The
Matter of the Application of San Diego Gas & Electric Company (U902G) and
Southern California Gas Company (U904G) for a Certificate of Public
Convenience and Necessity for the Pipeline Safety & Reliability Project, |
|
|
ALJ Houck |
R.15-03-010 - Order
Instituting Rulemaking to Identify Disadvantaged Communities in the San
Joaquin Valley and Analyze Economically Feasible Options to Increase Access
to Affordable Energy in those Disadvantaged Communities, |
|
|
ALJ Bemesderfer |
A.14-10-015 - In the
Matter of the Application of AVALON FREIGHT SERVICES, LLC, a limited
liability company, for a certificate of public convenience and necessity
authorizing service to transport freight by vessel on a scheduled basis
between Port of Los Angeles, California on the one hand, and the Santa
Catalina Island location of Avalon, on the other hand; and on a nonscheduled
charter basis between Port of Los Angeles, California and Avalon, Two Harbors
and all points on Santa Catalina Island, and between any points on Santa
Catalina Island, |
|
|
Dates in parentheses following the word “also” are subject to change without notice. The assigned Commissioner’s name is listed next to the proceedings as matter of record; the assigned Commissioner may not be present at the hearing.
(PHC) = Prehearing Conference |
(WS) = Workshop |
(OA) = Oral Argument |
(PPH) = Public Participation Hearing |
(STC) = Status Conference |
(SEC) = Settlement Conference |
(EH) = Evidentiary Hearing |
(L&M) = Law & Motion |
(CA) = Closing Argument |
|
|
07/12/17 |
A.15-09-013 (EH) – In
The Matter of the Application of San Diego Gas & Electric Company (U902G)
and Southern California Gas Company (U904G) for a Certificate of Public
Convenience and Necessity for the Pipeline Safety & Reliability Project, (Also July 13 – 14) |
|
|
07/12/17 |
A.17-06-005 (PHC) - Application
of Pacific Gas and Electric Company for Adoption of Electric Revenue
Requirements and Rates Associated with its 2018 Energy Resource Recovery
Account (ERRA) and Generation Non-Bypassable Charges Forecast and Greenhouse
Gas Forecast Revenue and Reconciliation .(U39E), |
|
|
07/12/17 |
A.17-04-028 (PHC) - In
the Matter of the Application of Pacific Gas and Electric Company for
Approval of its 2018-2020 Electric Program Investment Charge Investment
Plan. (U39E), A.17-05-003 |
|
|
07/13/17 |
A.16-09-001 (EH) - Application
of Southern California Edison Company (U338E) for Authority to Increase its
Authorized Revenues for Electric Service in 2018, among other things, and to
Reflect that increase in Rates, |
|
|
07/13/17 |
ECP – C.17-03-015 (EH) - Joe
Bustard, Complainant vs Verizon Wireless (U3029C), Defendant [for Relief from
Call Block Services], |
|
|
07/13/17 |
ECP – C.17-04-014 (EH) - Karla
Swanson and Chim Chimney, Complainants vs U.S. Telepacific Corporations, dba
Telepacific Communications (U5721C), Defendant [for Relief from in
appropriate porting and reassignment of telephone number.] |
|
|
07/17/17 |
A.16-09-001 (EH) - Application
of Southern California Edison Company (U338E) for Authority to Increase its
Authorized Revenues for Electric Service in 2018, among other things, and to
Reflect that increase in Rates, |
|
|
07/17/17 |
A.17-04-027 (PHC) - Application
of San Diego Gas & Electric Company (U902M) for Authority to Implement
the Customer Information System Replacement Program, |
|
|
07/17/17 |
A.17-05-015 (PHC) - Application
of City Communications, Inc. for Registration as an Interexchange Carrier
Telephone Corporation pursuant to the Provisions of Public Utilities Code
Section 1013, |
|
|
07/19/17 |
A.07-12-026 (PHC) - Application
of Calaveras Telephone Company (U1004C), Cal-Ore Telephone Co. (U1006C),
Ducor Telephone Company (U1007C), Happy Valley Telephone Company (U1010C),
Hornitos Telephone Company (U1011C), Kerman Telephone Co. (U1012C), The
Ponderosa Telephone Co. (U1014C), Sierra Telephone Company, Inc. (U1016C),
The Siskiyou Telephone Company (U1017C), Volcano Telephone Company (U1019C),
and Winterhaven Telephone Company (U1021C) for Ratemaking Determination
regarding Dissolution of Rural Telephone Bank, |
|
|
07/19/17 |
A.17-04-012 (TELEPHONIC –
PHC) - Application of Proper Sightseeing Corporation, a California
corporation, for Authority to Operate as a Scheduled Passenger Stage
Corporation with Hop On/Hop Off Service on Fixed Routes Between Points in
Hollywood, California and Santa Monica, California; and to Establish a Zone
of Rate Freedom, |
|
|
07/19/17 |
A.17-01-011 (TELEPHONIC –
PHC) - Application of XYN Communications of California, LLC (U7207C) and
XYN Holdings International, Inc. and XYN Holdings, LLC for Approval of an
Indirect Transfer of Control of XYN Communications of California, LLC
(U7207C), |
|
|
07/20/17 |
A.17-05-011 (PHC) - In
the Matter of the Joint Application of SCRS Acquisition Corporation, Securus
Investment Holdings, Llc, And Securus Technologies, INC. (U6888C) for
Approval to Transfer Indirect Control of Securus Technologies, Inc., |
|
|
07/20/17 |
A.17-04-005 (TELEPHONIC –
PHC) - In the Matter of the Application of Pacific Bell Telephone Co.
(U1001C) dba AT&T California to withdraw from the Centralized Credit
Check System, |
|
|
07/24/17 |
A.17-05-004 (PHC) - In
the Matter of the Application of Golden State Water Company, on Behalf of its
Bear Valley Electric Service Division (U913E), for Approval and Recovery of
Costs, and Authority to Increase Rates and Other Charges, (Including a
Requested Total Operating Revenue Requirement of $37,240,204 (decrease of
4.4%) for TY2O18 and $38,969,869, $41,309,234, and $43,593,202 (Increases of
4.6%, 6.0% and 5.5%) for TY 2019, 2020 and 2021, Respectively) Related to
Electric Service by Its Bear Valley Electric Service Division, |
|
|
07/25/17 |
A.17-05-017 (PHC) - In
the Matter of the Joint Application of West Corporation, Transferor And
Olympus Holdings II, LLC, Transferee To Authorize the Transfer of Control of
West Safety Communications Inc. f/k/a Intrado Communications, Inc. (U6579C)
and West Telecom Services, LLC f/k/a Hypercube Telecom, LLC (U6592C), |
|
|
07/25/17 |
A.17-05-008 (PHC) - Application
of San Diego Gas & Electric Company (U902M) for Approval to Extend the Mobilehome
Park Utility Upgrade Program, A.17-05-007 |
|
|
07/27/17 |
R.16-02-007 (WS) - Order
Instituting Rulemaking to Develop an Electricity Integrated Resource Planning
Framework and to Coordinate and Refine Long-Term Procurement Planning
Requirements, |
|
|
07/27/17 |
A.16-06-013 (PPH) - Application
of Pacific Gas and Electric Company to Revise its Electric Marginal Costs,
Revenue Allocation and Rate Design. (U39M), |
|
|
07/28/17 |
A.17-04-024 (PHC) - In
the Matter of the Application of Mesa-Crest Water Company (U333W) and Liberty
Utilities (Park Water) Corp. (U314W) for an Order Authorizing Mesa-Crest
Water Company to Sell and Liberty Utilities (Park Water) Corp. to Purchase
the Utility Assets of Mesa-Crest Water Company, |
|
|
08/01/17 |
A.17-06-006 (PHC) - Application
of San Diego Gas & Electric Company (U902E) for Approval of: (i)
Contract Administration, Least-Cost Dispatch and Power Procurement Activities
in 2016, (ii) Costs Related to those Activities Recorded to the Energy
Resource Recovery Account and Transition Cost Balancing Account in 2016 and (iii)
Costs Recorded in Related Regulatory Accounts in 2016, |
|
|
08/02/17 |
I.17-04-019 (PHC) - Order
Instituting Investigation to determine whether PacifiCorp (U901-E) engages in
least-cost planning on a control area basis and whether PacifiCorp's
Inter-Jurisdictional Cost Allocation Protocol results in just and reasonable
rates in California, |
|
|
08/03/17 |
A.17-02-003 (EH) - Joint
Application of Gill Ranch Storage, LLC, Northwest Natural Gas Company, NW
Natural Energy, LLC, and NW Natural Gas Storage, LLC for Change of Legal
Ownership and Control of Gill Ranch Storage, LLC Through a Corporate
Reorganization (U914G), |
|
|
08/03/17 |
A.16-10-020 (EH) - Application
of San Pablo Bay Pipeline Company LLC (PLC29) for authority, pursuant to
Public Utilities Code Section 455.3, to increase its rates for pipeline
transportation services within California, |
|
|
08/07/17 |
A.16-09-003 (EH) - Application
of Southern California Edison Company (U338E) for Approval of its 2016 Rate
Design Window Proposals, |
|
|
08/08/17 |
R.14-10-003 (WS) - Order
Instituting Rulemaking to Create a Consistent Regulatory Framework for the
Guidance, Planning and Evaluation of Integrated Distributed Energy Resources, |
|
|
08/09/17 |
A.16-12-002 (EH) - Joint
Application of Southern California Edison Company (U338E) and San Diego Gas
& Electric Company (U902E) For Cost Recovery Of The Wheeler North Reef
Expansion Project Marine Mitigation Costs, |
|
|
08/14/17 |
A.17-01-005 (EH) -
Application of the San Diego Association of Governments for an order
authorizing construction of two light-rail vehicle tracks grade separated
above I-5 (South), I-5 (North) and grade separated below I-8, SR-52 in the
City of San Diego, San Diego County, California, |
|
|
08/14/17 |
A.16-06-013 (PPH) - Application
of Pacific Gas and Electric Company to Revise its Electric Marginal Costs,
Revenue Allocation and Rate Design. (U39M), |
|
|
08/15/17 |
A.16-06-013 (PPH) - Application
of Pacific Gas and Electric Company to Revise its Electric Marginal Costs,
Revenue Allocation and Rate Design. (U39M), |
|
|
08/17/17 |
A.15-07-019 (EH) - Application
of California-American Water Company (U210W) for Authorization to Modify
Conservation and Rationing Rules, Rate Design, and Other Related Issues for
the Monterey District, |
|
|
08/21/17 |
A.17-06-003 (PHC) - Application
of the San Francisco Bay Area Rapid Transit District to Construct a
Grade-Separated Rail Over Crossings and Under Crossings at Twelve (12)
Intersections in the Cities of Pittsburg and Antioch, County of Contra Costa,
State of California, |
|
|
08/21/17 |
A.17-06-004 (PHC) - Application
of the San Francisco Bay Area Rapid Transit District (Bart) for an order to
Construct one new grade-separated Crossing for the West access Bridge and
Plaza Project for Pedestrian and Bicycle access to the Warm Springs/South
Fremont BART Station, across and over the tracks of the Union Pacific
Railroad Warm Springs Subdivision near Mile Post 5.15 in the City of Fremont,
County of Alameda, State of California, |
|
|
09/06/17 |
A.17-02-005 (EH) - Application
of Pacific Gas and Electric Company for Compliance Review of Utility Owned
Generation Operations, Electric Energy Resource Recovery Account Entries,
Contract Administration, Economic Dispatch of Electric Resources, Utility
Owned Generation Fuel Procurement, Diablo Canyon Seismic Studies Balancing
Account, and Other Activities for the Period January 1 through December 31,
2016 (U39E), |
|
|
09/12/17 |
A.16-10-019 (EH) - Order
Instituting Rulemaking to Implement Portions of AB 117 Concerning Community
Choice Aggregation |
|
|
09/18/17 |
A.16-03-004 (EH) - Joint
Application of Southern California Edison Company (U338E) and San Diego Gas
& Electric Company (U902E) For the 2015 Nuclear Decommissioning Cost
Triennial Proceedings, A.15-01-014 |
|
|
09/25/17 |
A.17-01-020 (EH) - Application
of San Diego Gas & Electric Company (U902E) for Approval of SB 350
Transportation Electrification Proposals, |
|
|
10/17/17 |
A.07-01-031 (EH) - In
the Matter of the Application of Southern California Edison Company (U338E)
for a Permit to Construct Electrical Facilities with Voltages between 50kV
and 200 kV: Valley-Ivyglen 115 kV Subtransmission Line Project, |
|
|
10/24/17 |
A.16-03-004 (STC) - Joint
Application of Southern California Edison Company (U338E) and San Diego Gas
& Electric Company (U902E) For the 2015 Nuclear Decommissioning Cost
Triennial Proceedings, |
|
|
11/06/17 |
A.16-10-019 (EH) -
Application of Pacific Gas and Electric Company to Recover Costs Recorded in
the Catastrophic Event Memorandum Account Pursuant to Public Utilities Code
Section 454.9(U39E), |
|
|
(A quorum of Commissioners and/or their staff may attend All-Party Meetings noticed on the Daily Calendar.)
NONE