Public Utilities Commission of the
State of California
Alice Stebbins, Executive Director
Headquarters 505 Van Ness Avenue San Francisco, CA 94102 (415) 703-2782 |
Southern California Office 320 West 4th Street, Suite 500 Los Angeles, CA 90013 (213) 576-7000 |
Sacramento Office 300 Capitol Mall Sacramento CA 95814 (800) 848-5580 |
Website: http://www.cpuc.ca.gov
Daily Calendar
Friday, December 28, 2018
· Commission Ratesetting Deliberative Meetings
· Commissioner Committee Meetings
· Commissioner All-Party Meetings
· Filings
· Suspensions
· Protest
|
The Commission’s policy is to schedule hearings (meetings, workshops, etc.) in locations that are accessible to people with disabilities. |
|
The CPUC encourages
all Californians to participate in its meetings, hearings, workshops, and
proceedings. We try to hold our public meetings only in places that are
wheelchair accessible and which can accommodate specialized equipment and
other services useful to people with disabilities. Please see the notice of
the meeting you wish to attend for more specifics. If you plan to attend and need specialized accommodations for a particular meeting that are not listed in the notice, request them from the Public Advisor’s Office at least three business days in advance of the meeting. Contact the Public Advisor’s Office by any one of the following: |
||
Email: public.advisor@cpuc.ca.gov |
FAX: 415-355-5404
(Attn.: Public Advisor) |
|
COMMISSION VOTING MEETINGS
January 10, 2019 |
9:30 am |
Commission Auditorium, San Francisco |
January 31, 2019 |
9:30am |
Sacramento CA |
February 21, 2019 |
9:30am |
Commission Auditorium, San Francisco |
COMMISSION RATESETTING DELIBERATIVE MEETINGS
(Not Open to the Public)
Ratesetting
Deliberative Meeting dates are reserved as noted
but will only be held if there are ratesetting matters to be considered.
January 7, 2019 |
10:00 am |
Commission Room 5305, San Francisco |
January 28, 2019 |
10:00 am |
Commission Room 5305, San Francisco |
February 15, 2019 |
10:00 am |
Commission Room 5305, San Francisco |
COMMISSIONER COMMITTEE MEETINGS
January 9, 2019 |
9:30am |
Commission Auditorium, San Francisco |
For more information: http://www.cpuc.ca.gov/commissionercommittees/ |
||
February 20, 2019 |
9:30 am |
Commission Auditorium, San Francisco |
March 27, 2019 |
9:30 am |
Commission Auditorium, San Francisco |
COMMISSIONER ALL-PARTY MEETINGS
A quorum of Commissioners may attend all-party meetings in ratesetting proceedings upon 10 days’ notice of the meeting in the Daily Calendar. Otherwise, all-party meetings are noticed directly to the parties and might not be posted here.
January 4, 2019 9:30am – 11:00 am
Although a quorum of Commissioners or their Advisors may be in attendance, no official actions will be taken.
|
Commission Headquarters – Auditorium San Francisco, CA 94102
Alternate location: 300 Capitol Mall, Room 502 Sacramento CA 95814
Call In Information 866-564-3624 Participant password: 7032240#
More information: Marina MacLatchie, mmd@cpuc.ca.gov , 916-823-4782 |
HEARING CALENDAR
Dates in parentheses following the word “also” are subject to change without notice. The assigned Commissioner’s name is listed next to the proceedings as matter of record; the assigned Commissioner may or may not be present at the hearing.
(PHC) = Prehearing Conference |
(WS) = Workshop |
(OA) = Oral Argument |
(PPH) = Public Participation Hearing |
(STC) = Status Conference |
(CA) = Closing Argument |
(EH) = Evidentiary Hearing |
(L&M) = Law & Motion |
(CM) = Community Meeting |
|
|
01/03/19 |
A.18-10-011 (PHC) - Application of Commnet Rural
America, LLC for a Certificate of Public Convenience and Necessity to Provide
Resold Competitive Local Exchange Service, |
|
|
01/03/19 |
A.18-10-012 (TELEPHONIC – PHC) - In the Matter of
the Application of Talkie Communications, Inc. for a Certificate of Public
Convenience and Necessity to Provide Resold and Limited Facilities-Based
Competitive Local Exchange and Interexchange Telecommunications Services
within California, |
|
|
01/04/19 |
A.18-11-013 (PHC) - Application of Pacific Gas and
Electric Company for Approval of its Electric Rate Design Proposals for its
Test Year 2019 Rate Design Window Proceeding (U39E), |
|
|
01/07/19 |
A.18-09-013 (PHC) - Application for Order
Authorizing California-American Water Company (U-210-W) to Purchase
Bellflower Municipal Water System’s Assets and for Related Approvals, |
|
|
01/07/19 |
A.17-12-011, And Related Matters (EH) - Application
of Pacific Gas and Electric Company for Approval of its Residential Rate
Design Window Proposals, including to Implement a Residential Default
Time-Of-Use Rate along with a Menu of Residential Rate Options, followed by
addition of a Fixed Charge Component to Residential Rates (U39E), |
|
|
01/07/19 |
R.16-02-007 (WS) - Order Instituting Rulemaking to
Develop an Electricity Integrated Resource Planning Framework and to
Coordinate and Refine Long-Term Procurement Planning Requirements, |
|
|
01/07/19 |
I.18-09-003 (PHC) - Order Instituting Investigation
on the Commission's Own Motion into the Operations, Practices and Conduct of
the San Jose Water Company (U168W) Regarding Overbilling Practices, |
|
|
01/08/19 |
C.17-11-002 (EH) - California Cable &
Telecommunications Association, Complainant, v. San Diego Gas & Electric
Company (U902E), Defendant [for Relief from the imposition of Unreasonable
Charges for the use of its Utility Poles.], |
|
|
01/08/19 |
A.12-08-007, And Related Matters (WS) - Application
of Pacific Gas and Electric Company for Approval of 2013-2014 Statewide
Marketing, Education and Outreach Program and Budget. (U39M), Meeting Number: 713 007 044 |
|
|
01/08/19 |
R.18-04-019 (WS) - Order Instituting Rulemaking to
Consider Strategies and Guidance for Climate Change Adaptation, |
|
|
01/10/19 |
A.18-10-008, And Related Matters (PHC) - Application
of Pacific Gas and Electric Company in Compliance with Ordering Paragraph 37,
Resolution E-4906. (U39E), |
|
|
01/10/19 |
A.17-01-012, And Related Matters (PHC) - Application
of Pacific Gas and Electric Company (U39E) for Approval of Demand Response
Programs, Pilots and Budgets for Program Years 2018-2022, |
|
|
01/10/19 |
A.17-01-012, And Related Matters (WS) - Application
of Pacific Gas and Electric Company (U39E) for Approval of Demand Response
Programs, Pilots and Budgets for Program Years 2018-2022, |
|
|
01/11/19 |
R.13-11-005 (WS) - Order Instituting Rulemaking
Concerning Energy Efficiency Rolling Portfolios, Policies, Programs,
Evaluation, and Related Issues, |
|
|
01/14/19 |
A.18-06-015 (WS) - Application of Southern
California Edison Company (U338E) for Approval of its Charge Ready 2
Infrastructure and Market Education Programs, More Info: https://apps.cpuc.ca.gov/apex/f?p=401:56:0::NO:RP,57,RIR:P5_ |
|
|
01/14/19 |
R.17-06-024 (WS) - Order Instituting Rulemaking
Evaluating the Commission’s 2010 Water Action Plan Objective of Achieving
Consistency between Class A Water Utilities’ Low-Income Rate Assistance
Programs, Providing Rate Assistance to All Low – Income Customers of
Investor-Owned Water Utilities, and Affordability, |
|
|
01/15/19 |
A.18-06-002 (EH) - Application of San Diego Gas
& Electric Company(U902E) for Approval of: (i) Contract Administration,
Least-Cost Dispatch and Power Procurement Activities in2017, (ii) Costs
Related to those Activities Recorded to the Energy Resource Recovery Account
and Transition Cost Balancing Account in 2017 and (iii) Costs Recorded in
Related Regulatory Accounts in 2017, |
|
|
01/15/19 |
A.18-07-011, And Related Matter (PPH) - In the
Matter of the Joint Application of Sprint Communications Company L.P.
(U-5112) and T-Mobile USA, Inc., a Delaware Corporation, For Approval of
Transfer of Control of Sprint Communications Company L.P. Pursuant to
California Public Utilities Code Section 854(a), |
|
|
01/16/19 |
A.18-07-011, And Related Matter (PPH) - In the
Matter of the Joint Application of Sprint Communications Company L.P.
(U-5112) and T-Mobile USA, Inc., a Delaware Corporation, For Approval of
Transfer of Control of Sprint Communications Company L.P. Pursuant to
California Public Utilities Code Section 854(a), |
|
|
01/17/19 |
A.18-07-011, And Related Matter (PPH) - In the
Matter of the Joint Application of Sprint Communications Company L.P.
(U-5112) and T-Mobile USA, Inc., a Delaware Corporation, For Approval of
Transfer of Control of Sprint Communications Company L.P. Pursuant to
California Public Utilities Code Section 854(a), |
|
|
01/22/19 |
A.18-11-003 (PHC) - Application for Approval of
Pacific Gas and Electric Company’s Commercial Electric Vehicle Rate. (U39E), |
|
|
01/24/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/04/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/05/19 |
A.18-07-011, And Related Matter (EH) - In the
Matter of the Joint Application of Sprint Communications Company L.P.
(U-5112) and T-Mobile USA, Inc., a Delaware Corporation, For Approval of
Transfer of Control of Sprint Communications Company L.P. Pursuant to
California Public Utilities Code Section 854(a), |
|
|
02/05/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/06/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/07/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/11/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/12/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/13/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/14/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the Commission’s
ratemaking policies, |
|
|
02/19/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/20/19 |
A.18-07-001 (PPH) - In the Matter of the
Application of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California
corporation, for an order (1) authorizing it to increase rates for water
service by $50,673,500 or 7.6% in test year 2020, (2) authorizing it to
increase rates on January 1, 2021 by $31,461,900 or 4.4% and on January 1,
2022 $33,000,700 or 4.4% in accordance with the Rate Case Plan, and (3)
adopting other related rulings and relief necessary to implement the
Commission’s ratemaking policies, |
|
|
02/25/19 |
A.18-07-001 (PPH) - In the Matter of the Application
of CALIFORNIA WATER SERVICE COMPANY (U-60-W), a California corporation, for
an order (1) authorizing it to increase rates for water service by
$50,673,500 or 7.6% in test year 2020, (2) authorizing it to increase rates
on January 1, 2021 by $31,461,900 or 4.4% and on January 1, 2022 $33,000,700
or 4.4% in accordance with the Rate Case Plan, and (3) adopting other related
rulings and relief necessary to implement the Commission’s ratemaking
policies, |
|
|
02/26/19 |
R.18-10-007 (PHC) - Order Instituting Rulemaking to
Implement Electric Utility Wildfire Mitigation Plans Pursuant to Senate Bill
901 (2018), |
|
|
03/18/19 |
K.18-10-001 (EH) - TC Telephone, L.L.C. (U6875C)
Appeal of Citation 1308-1426 issued by the Consumer Protection and
Enforcement Division, |
|
|
08/06/19 |
A.15-04-013 (EH) - In the Matter of the Application
of Southern California Edison Company (U338E) for a Certificate of Public
Convenience and Necessity for the RTRP Transmission Project, |
|
|
OTHER PUBLIC MEETINGS
January 9, 2019 9am – 12:30 pm
Although a quorum of Commissioners or their Advisors may be in attendance, no official actions will be taken. |
Calabasas Founders Hall, 200 Civic Center Way, Calabasas, CA 91302
WebEx: https://bit.ly/2RU9Oef, Call In Information 717 534 465, Participant password: Mitigation;
Listen-only call-in number 1-877-820-7831, Participant access code 479881
More information: http://www.cpuc.ca.gov/calEvent.aspx?id=6442459560 |
January 11, 2019 11:00 am
|
California Energy Commission 1516 Ninth Street First Floor, Art Rosenfeld Hearing Room Sacramento, CA
Call In Information :(866) 469-3239 Participant password: 921 787 731
Webcast Information: https://energy.webex.com/energy/onstage/g.php?MTID=edf3afe6c02bb1263e10b53778d090202
More information: https://www.energy.ca.gov/calendar/index.php?eID=3264 |
March 20, 2019 8 am – 5 pm |
Contact Information: firetechsummit@cpuc.ca.gov
More Information: http://firetechsummit.cpuc.ca.gov |
March 21, 2019 8 am – 12pm |
Contact Information: firetechsummit@cpuc.ca.gov
More Information: http://firetechsummit.cpuc.ca.gov |
NEW PROCEEDINGS
12-24-2018 |
(ECP) C.18-12-018- Virian Sullivan, Complainant vs. Sprint Spectrum L.P. d/b/a Sprint PCS (U3062C), Defendant(s). [For Overcharging The Customer][Hard Copy Filing]. |
|
|
PETITIONS FOR MODIFICATION - NONE
DRAFT RESOLUTIONS
Issued for public comment. Comments are governed by Rule 14.5.
Draft Resolution No. |
M-4839 |
Meeting Date |
January 10, 2019 |
Subject Matter |
The draft Resolution M-4839 adopts level of Public Utilities Commission Utilities Reimbursement Account User fees for fiscal year 2019-20. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docfonnat=ALL&DociD=247987444 |
Comments Due Date |
January 8, 2019 |
Serve comments on: |
Draft Resolution No. |
T-17633 |
Meeting Date |
January 10, 2019 |
Subject Matter |
Seeks approval of the transfer of control via a stock purchase agreement of Bright Fiber Inc. (U-7287-C) to Race Telecommunications, Inc. (U-7060-C) submitted by Race Telecommunications, Inc. in Advice Letter No. 6. Additionally, in response to project revisions submitted by Race Telecommunications, Inc., the Resolution seeks approval of modifications to Bright Fiber’s CASF Infrastructure Account grant approved in Resolution T-17495, including revising the project’s alignment from “primarily underground” to a 75 percent aerial on existing utility poles. Bright Fiber, under its parent company, Race Telecommunications, Inc., will remain the grantee. The revised Bright Fiber Project grant, comprising 60 percent of the total project costs, will amount to no more than $16,086,789, a $69,534 reduction from the approved grant. The 1,941 households near Grass Valley in Nevada County will be served at a cost of $8,288 per household. |
Web Link |
http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M235/K428/235428237.PDF |
Comments Due Date |
December 31, 2018 |
Serve comments on: |
Penney Legakis penney.legakis@cpuc.ca.gov |
Draft Resolution No. |
E-4965 |
Meeting Date |
January 31, 2019 |
Subject Matter |
Southern California Edison requests a Commission ruling on the correct treatment for deferred tax amounts not historically included within the revenue requirement. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=251987264 |
Comments Due Date |
January 9, 2019 |
Serve comments on: |
Draft Resolution No. |
E-4967 |
Meeting Date |
January 31, 2019 |
Subject Matter |
Summary of Southern California Edison’s SB 350 Standard Review Medium- and Heavy-Duty Vehicle Charging Infrastructure Program Budget Authorized Pursuant to Decision 18-05-040. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=250881432 |
Comments Due Date |
January 7, 2019 |
Serve comments on: |
Draft Resolution No. |
E-4977 |
Meeting Date |
January 31, 2019 |
Subject Matter |
Commission Motion Amending the Bioenergy Renewable Auction Mechanism (BioRAM) Program and Authorizing the Extension of Certain Contracts pursuant to Senate Bill 901. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=252568675 |
Comments Due Date |
January 11, 2019 |
Serve comments on: |
Draft Resolution No. |
G-3543 |
Meeting Date |
January 31, 2019 |
Subject Matter |
Pacific Gas and Electric Company seeks approval of a one-time deviation to the indemnity clause of Form 62-4527 to perform work requested by the University of California Davis. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=250575292 |
Comments Due Date |
January 7, 2019 |
Serve comments on: |
Draft Resolution No. |
G-3546 |
Meeting Date |
January 31, 2019 |
Subject Matter |
The California Energy Commission requests approval of its 2018-2019 natural gas research budget. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=252033298 |
Comments Due Date |
January 10, 2019 |
Serve comments on: |
Draft Resolution No. |
G-3547 |
Meeting Date |
January 31, 2019 |
Subject Matter |
Rejection of Southern California Gas Company’s Request to Include Greenhouse Gas Costs into Rates and Issue the 2018 California Climate Credit. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=250233305 |
Comments Due Date |
January 3, 2019 |
Serve comments on: |
Draft Resolution No. |
T-17635 |
Meeting Date |
January 31, 2019 |
Subject Matter |
T-17635 seeks to approve AT&T California’s request for a second deviation from Public Utilities Code § 320 to construct an additional 280 feet of overhead (aerial) fiber facilities along State Scenic Highway 1 in San Luis Obispo County. |
Web Link |
http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M250/K859/250859096.PDF |
Comments Due Date |
January 17, 2019 |
Serve comments on: |
danny.tse@cpuc.ca.gov |
Draft Resolution No. |
T-17640 |
Meeting Date |
January 31, 2019 |
Subject Matter |
Approves Cal.net, Inc. to be designated as an Eligible Telecommunications Carrier to obtain federal high-cost and federal Lifeline support. |
Web Link |
http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M252/K563/252563199.PDF |
Comments Due Date |
January 14, 2019 |
Serve comments on: |
Draft Resolution No. |
T-17647 |
Meeting Date |
January 31, 2019 |
Subject Matter |
Approves advice letters setting forth a fine for PAETEC Communications, LLC (U-6097-C) for failure to meet required service quality performance standards in Year 2017, pursuant to General Order 133-D. |
Web Link |
http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M252/K793/252793694.PDF |
Comments Due Date |
January 16, 2019 |
Serve comments on: |
ADVICE LETTERS SUBMISSIONS
To inquire about filings, suspension or protest, call or email the Energy Division (415-703-1974 or email: EDTariffUnit@cpuc.ca.gov), Communications Division (415-703-3052) or Water Division (415-703-1133 or email: water.division@cpuc.ca.gov)
|
|
|
12/19/18 |
Energy 108E |
Liberty Utilities (CalPeco Electric) LLC, Luning Solar Project Performance Report (anticipated effective 12/19/18) |
|
|
|
12/20/18 |
Energy 33 |
NRG Energy Center San Francisco, LLC, Name Change (anticipated effective 12/20/18) |
|
|
|
12/20/18 |
Energy 3313E |
San Diego Gas & Electric Company, Notification of SDG&E's Load Analysis for its Test Year 2016 GRC Phase 2 Pursuant to D.17-08-030. (anticipated effective 01/19/19) |
|
|
|
12/20/18 |
Energy 3321E |
San Diego Gas & Electric Company, SDG&E's Request for Demand Response Program Enhancements. (anticipated effective 01/22/19) |
|
|
|
12/20/18 |
Energy 3923E |
Southern California Edison Company, Modification of Various Electric Tariffs (anticipated effective 01/19/19) |
|
|
|
12/20/18 |
Energy 1089G |
Southwest Gas Corporation, To Establish the Officer Compensation Memo Account to Track Compensation Paid to Investor-Owned Utilities Pursuant to O.P.'s 1 & 2 in Res. E-4963 Implementing CPU Code 706, as Enacted by SB 901 (2018, Dodd). (anticipated effective 01/01/19) |
|
|
|
12/20/18 |
Energy 1090G |
Southwest Gas Corporation, Modification of the GHGBA in the Preliminary Statement. (anticipated effective 01/01/19) |
|
|
|
12/20/18 |
Water 102 |
East Pasadena Water Company, UF Surcharge change from 1.40% to 1.23% (anticipated effective 01/01/19) |
|
|
|
12/21/18 |
Energy 4051G |
Pacific Gas & Electric Company, January 2019 G-SUR Rate Change (anticipated effective 01/01/19) |
|
|
|
12/21/18 |
Energy 4052G |
Pacific Gas & Electric Company, January 1, 2019 Gas Core Procurement and Transportation Rate Tariff Changes (anticipated effective 01/01/19) |
|
|
|
12/21/18 |
Energy 4053G |
Pacific Gas & Electric Company, Annual Gas True-Up of Gas Transportation Balancing Accounts for Rates Effective January 1, 2019 (anticipated effective 01/01/19) |
|
|
|
12/21/18 |
Energy 4054G/5453E |
Pacific Gas & Electric Company, Pacific Gas and Electric Company's Residential Disconnections Goal in Compliance with Decision (D.) 18-12-013 (anticipated effective 01/01/19) |
|
|
|
12/21/18 |
Energy 5413E-A |
Pacific Gas & Electric Company, Supplements A.L.No.5413E, Notice of FERC Rate Increase Submittal (TO20). (effective TBD) |
|
|
|
12/21/18 |
Energy 5448E |
Pacific Gas & Electric Company, Update to Pacific Gas and Electric Company's Bundled Procurement Plan Greenhouse Gas Procurement Limits (anticipated effective 12/21/18) |
|
|
|
12/21/18 |
Energy 5450E |
Pacific Gas & Electric Company, Confirmation of Fast Charge Program Electric Vehicle Service Equipment (EVSE) Rebate and Definition of Disadvantaged Community (DAC) Adjacent Pursuant to Decision 18-05-040 (anticipated effective 12/21/18) |
|
|
|
12/21/18 |
Energy 5451E |
Pacific Gas & Electric Company, Confirmation of Fleetready Electric Vehicle Service Equipment (EVSE) Rebate, Infrastructure Incentive, and Definition of Financially Fit Pursuant to Decision 18-05-040 (anticipated effective 12/21/18) |
|
|
|
12/21/18 |
Energy 2729G |
San Diego Gas & Electric Company, November 2018 Standby Procurement Rate (anticipated effective 12/21/18) |
|
|
|
12/21/18 |
Energy 3324E/2728G |
San Diego Gas & Electric Company, Establishment of the Gas and Electric Officer Compensation Memorandum Accounts 2019 (OCMA2019) Pursuant to Resolution E-4963 (anticipated effective 01/01/19) |
|
|
|
12/21/18 |
Energy 3325E |
San Diego Gas & Electric Company, Implementation of San Diego Gas & Electric Company's Residential Default and Optional Time-of-Use Rates Pursuant to Decision 18-12-004 (anticipated effective 01/01/19) |
|
|
|
12/21/18 |
Energy 3327E |
San Diego Gas & Electric Company, San Diego Gas and Electric Company's Modifications to the Bioenergy Market Adjusting Tariff Pursuant to Decision 18-11-004. (anticipated effective 01/01/19) |
|
|
|
12/21/18 |
Energy 3328E |
San Diego Gas & Electric Company, San Diego Gas & Electric Provided Clarity to Rule 21 Technical Requirements for Smart Inverter Phase 3 Functions 4 and 7 Pursuant to Resolution E-4898. (anticipated effective 01/22/19) |
|
|
|
12/21/18 |
Energy 3924E |
Southern California Edison Company, Recovery of the 2018 Balance in the Mobilehome Park Master Meter Balancing Account in Accordance with Decision 14-03-021 (anticipated effective 12/21/18) |
|
|
|
12/21/18 |
Energy 3925E |
Southern California Edison Company, Update of San Onofre Nuclear Generating Station Unit No. 1 Decommissioning Cost Estimate for Reactor Pressure Vessel and Offshore Conduits Removal Costs, and Update of Palo Verde Nuclear Generating Station Decommissioning Cost (anticipated effective 01/20/19) |
|
|
|
12/21/18 |
Energy 3926E |
Southern California Edison Company, Summary of Consensus and Clarity Provided to Rule 21 Technical Requirements for Functions 4 and 7 Pursuant to Resolution E-4898 (anticipated effective 01/20/19) |
|
|
|
12/21/18 |
Energy 3927E |
Southern California Edison Company, Establishment of the Officer Compensation Memorandum Account pursuant to Resolution E-4963 (anticipated effective 01/01/19) |
|
|
|
12/21/18 |
Energy 3928E |
Southern California Edison Company, Submission of Revisions to Schedule BioMAT BioEnergy Market Adjusting Tariff to Comply with Decision 18-11-004 (anticipated effective 01/20/19) |
|
|
|
12/21/18 |
Energy 5399 |
Southern California Gas Company, Establishment of the Officer Compensation Memorandum Account 2019 (OCMA2019) Pursuant to Resolution E-4963 (anticipated effective 01/01/19) |
|
|
|
12/21/18 |
Energy 5400G |
Southern California Gas Company, November 2018 Standby Procurement Charges. (anticipated effective 12/21/18) |
|
|
|
12/21/18 |
Energy 5401 |
Southern California Gas Company, Proposed Revisions to Master Services Contract and Master Services Contract - Schedule A (anticipated effective 01/20/19) |
|
|
|
12/21/18 |
Water 103 |
East Pasadena Water Company, Expense offset for pumping assessments & purchased water (effective TBD) |
|
|
|
12/21/18 |
Water 72-W |
Fulton Water Company, Update PUCURA User Fees per Res. M-4839 (anticipated effective 01/01/19) |
|
|
|
12/21/18 |
Water 18 |
Keene Water System, CPI Increase for Year 2017 (2.1%) (anticipated effective 12/20/18) |
|
|
|
12/21/18 |
Water 528-A |
San Jose Water Company, Supplements A.L.No.528, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. (anticipated effective 01/01/19) |
|
|
|
12/24/18 |
Energy 357E |
Golden State Water Company, Officer Compensation Memorandum Account (OCMA) (anticipated effective 01/01/19) |
|
|
|
12/24/18 |
Energy 4050G/5452E |
Pacific Gas & Electric Company, Officer Compensation Memorandum Accounts Pursuant to Senate Bill 901 and Resolution E-4963 (anticipated effective 01/01/19) |
|
|
|
12/24/18 |
Energy 5454E |
Pacific Gas & Electric Company, Implementation of Adjustments to PG&E's Bioenergy Market Adjusting Tariff Program as Required by Decision 18-11-004 (anticipated effective 01/23/19) |
|
|
|
12/24/18 |
Energy 5456E |
Pacific Gas & Electric Company, Notice of Federal Energy Regulatory Commission Rate Filing for Annual Updates to the Transmission Revenue Balancing Acct Adjustment, the Reliability Service Rtae, the End-Use Customer Refund Balancing Acct Adjustment, and the Transmission (anticipated effective 03/01/19) |
|
|
|
12/24/18 |
Energy 578E |
Pacificorp, Request to Establish a Memorandum Account for Costs Associated with Pension Liabilities. (anticipated effective 12/31/18) |
|
|
|
12/24/18 |
Energy 579E |
Pacificorp, Establish Officer Compensation Memorandum Account Effective January 1, 2019. (anticipated effective 01/01/19) |
|
|
|
12/24/18 |
Water 2324-A |
California Water Service Company, Supplements A.L.No.2324, [All Districts except Grand Oaks] 2019 Escalation Increase and Sales Reconciliation Mechanism (SRM) Adjustments (anticipated effective 01/01/19) |
|
|
|
12/24/18 |
Water 2332-A |
California Water Service Company, Supplements A.L.No.2332, [All Class A service areas - Not Grand Oaks] Request authorization to consolidate revenue changes in ALs 2319 through 2324 (anticipated effective 01/01/19) |
|
|
|
12/24/18 |
Water 108-W |
Southern California Edison Company, Modifications to the Income Tax Component of Contribution Provision of its Water Preliminary Statement Part F (anticipated effective 01/01/18) |
|
|
|
12/26/18 |
Energy 5455E |
Pacific Gas & Electric Company, Submits Notice of Construction, Pursuant to General Order 131-D, for the Construction of Cordelia #2 60kV Power Line Tap Switch Replacement Project. (anticipated effective 01/25/19) |
|
|
|
12/27/18 |
Energy 5402G |
Southern California Gas Company, Revision to Schedule No. G-BTS Pursuant to Decision (D.) 11-04-032. (anticipated effective 01/01/19) |
|
|
|
|
||
12/17/18 |
Water 2325 |
California Water Service Company. Initial suspension on the following grounds: additional information is needed. Date suspension ends: 04/15/19. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
12/21/18 |
Water 2326 |
California Water Service Company. Initial suspension on the following grounds: additional information is needed. Date suspension ends: 04/19/19. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
12/22/18 |
Water 2327 |
California Water Service Company. Initial suspension on the following grounds: additional information is needed. Date suspension ends: 04/22/19. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
12/22/18 |
Water 2328 |
California Water Service Company. Initial suspension on the following grounds: additional information is needed. Date suspension ends: 04/22/19. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
12/26/18 |
Energy 3891E |
Southern California Edison Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 04/24/19. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
12/28/18 |
Energy 5341E |
Pacific Gas & Electric Company. Automatic suspension extension. Date suspension ends: 06/25/19. |
|
|
|
12/28/18 |
Energy 3254E |
San Diego Gas & Electric Company. Automatic suspension extension. Date suspension ends: 06/25/19. |
|
|
|
12/28/18 |
Energy 3830E |
Southern California Edison Company. Automatic suspension extension. Date suspension ends: 06/25/19. |
|
|
|
01/08/19 |
Energy 3910E |
Southern California Edison Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 05/07/19. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
01/08/19 |
Energy 3919E |
Southern California Edison Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 05/07/19. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
|
||
12/21/18 |
Water 107-W |
Southern California Edison Company, (Santa Catalina Island) Sales Forecast Update with Rate Increase to eliminate Further Accumulation of Lost Revenues Protest by Catalina Island Conservancy. |
|
|
|
12/21/18 |
Water 107-W |
Southern California Edison Company, (Santa Catalina Island) Sales Forecast Update with Rate Increase to eliminate Further Accumulation of Lost Revenues Protest by City of Avalon. |
|
|
|
12/23/18 |
Water 107-W |
Southern California Edison Company, (Santa Catalina Island) Sales Forecast Update with Rate Increase to eliminate Further Accumulation of Lost Revenues Protest by Catalina Island Chamber of Commerce. |
|
|
|
12/24/18 |
Water 107-W |
Southern California Edison Company, (Santa Catalina Island) Sales Forecast Update with Rate Increase to eliminate Further Accumulation of Lost Revenues Protest by Catalina Island Camps. |
|
|
|
12/24/18 |
Water 107-W |
Southern California Edison Company, (Santa Catalina Island) Sales Forecast Update with Rate Increase to eliminate Further Accumulation of Lost Revenues Protest by Catalina Island Medical Center. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Martha Elliott. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Ray Froess. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Betty Froess. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by ali djabbari. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Alex Goldberger. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Sondra Goldberger. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Byron Fan. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Sujatha Bodapati. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Diane Douglass. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Dory Albert. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Vasudeva Patchava. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Daniel Onn. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Ann Malmuth-Onn. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Charles Onn. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Lori Lytle. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Vin Pasari. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Sergei Perfilov. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Kanaka Sriram. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Natalia Vassilieva. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Martin Yu. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Raluca Abrahami. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Sandeep chaparala. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Keith Andre. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Naresh Kapoor. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Reg Ricket. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Ben Connors. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Michael Mo. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Chuck Cheng. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Shivaram Mysore. |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Priya Shastri. |
|
|
|
12/25/18 |
Water 107-W |
Southern California Edison Company, (Santa Catalina Island) Sales Forecast Update with Rate Increase to eliminate Further Accumulation of Lost Revenues Protest by Elyse Filderman (La Paloma Hotel owner). |
|
|
|
12/25/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Don Albert. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Michael Kaluzhinsky. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Yue Min Wong. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Bill Bradley. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Diane Carter. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Bent Meier. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Anne Bachtold. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Melinda Ghavi. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Jim Renalds. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Amro Sirhan. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Lisa Enquist. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Krishna Saraswat. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Lenny Rosenthal. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Nancy Rosenthal. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Cheriel Jensen. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Jay Jayanth. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by David Kalmus. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Sandhya Narayan. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Tina Chen. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Tina and Andy. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by ling chiao. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Torsten Rohlfing. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Vicky Huang. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Diane. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Maria Gong. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Pat Neargarder. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Val Neargarder. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Barbara DeZur. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Jack Griswold. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Rich Boberg. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Peter. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Pete Godbole. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Matt. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Angela Ling. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Amy Berliner. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Kent Dozier. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Hemant Kirpekar. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Diana Shih. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Tricia Chu. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Sweta Teriar. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Awinash Sinha. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Fred Tatar. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Julian Hu. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Polly Yap. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Joyce Ray. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Anshul Chhabra. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Ling Chiao. |
|
|
|
12/26/18 |
Water 107-W |
Southern California Edison Company, (Santa Catalina Island) Sales Forecast Update with Rate Increase to eliminate Further Accumulation of Lost Revenues Late filed protest by Hal Hill, Campus by Sea. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Create Joy. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Soumya Ananthanarayanan. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Balaji Venkataraman. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Min-Hwa Jeng. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Howard Lew. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Judy Chang. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Vasu Subbiah. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Ravikumar Chandrasekaran. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Sam Roza. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Kenneth Brock. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Glenn Darragh. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Pattie Darragh. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by George Powers. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by David Scott. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Kannan Varadhan. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Shanthi Ranganathan. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Mr. and Mrs. Larry Mehringer. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Robert A. Lee. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Theodore Wu. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Jim Burkhart. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Gerda Story. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Ronald Schoengold. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Chandru Idnani. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Helen Idnani. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Anand Hirekatur. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Harry Oberhelman. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Leslie Oberhelman. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Ludmilla Bobroff. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Dimitry Bobroff. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Padmashri Srinivasa. |
|
|
|
12/26/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Protest by Jay Berryhill. |
|
|
|
12/27/18 |
Energy 3919E |
Southern California Edison Company, Information Only AL - SCE's Methodology to Calculate Rebates Related to the Medium-and Heavy-Duty Vehicle Charging Infrastructure Program. Protest by PAO. |
|
|
|
12/27/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Late filed protest by Asha Singh. |
|
|
|
12/27/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Late filed protest by Dhanaseker Kandhasamy. |
|
|
|
12/27/18 |
Water 528 |
San Jose Water Company, Implement authorized rates and conditions as established in Decision No. (D) 18-11-025 dated November 29, 2018, which are designed to increase revenue in Test Year 2019. Late filed protest by Bob Goedjen. |
|
|
|
OTHER NOTICES - NONE