Public Utilities Commission of the
State of California
Alice Stebbins, Executive Director
Headquarters 505 Van Ness Avenue San Francisco, CA 94102 (415) 703-2782 |
Southern California Office 320 West 4th Street, Suite 500 Los Angeles, CA 90013 (213) 576-7000 |
Sacramento Office 300 Capitol Mall Sacramento CA 95814 (800) 848-5580 |
Website:� http://www.cpuc.ca.gov
Daily Calendar
Friday, May 08, 2020
� Commission Ratesetting Deliberative Meetings
� Commissioner Committee Meetings
� Commissioner All-Party Meetings
� Other Public Meetings
� Petitions for Modification
� Advice Letters Submissions
� Resolution ALJ 176-3460 regarding ratification of preliminary determinations of category and notice of assignment is included in this calendar.
|
The Commission�s policy is to schedule hearings (meetings, workshops, etc.) in locations that are accessible to people with disabilities. |
|
The CPUC encourages
all Californians to participate in its meetings, hearings, workshops, and
proceedings.� We try to hold our public meetings only in places that are
wheelchair accessible and which can accommodate specialized equipment and
other services useful to people with disabilities.� Please see the notice of
the meeting you wish to attend for more specifics. If you plan to attend and need specialized accommodations for a particular meeting that are not listed in the notice, request them from the Public Advisor�s Office at least three business days in advance of the meeting.� Contact the Public Advisor�s Office by any one of the following: |
||
������������
Email:����� public.advisor@cpuc.ca.gov |
FAX:� 415-355-5404
(Attn.:� Public Advisor) |
|
COMMISSION VOTING MEETINGS
Pursuant to Executive Order N-29-20, paragraph 3, that was issued on March 17, 2020, Commissioners may participate remotely from teleconferencing locations. The public may observe, provide public comments during the public comment period, and otherwise participate remotely pursuant to the Bagley-Keene Open Meeting act as described below.
Link to Executive Order N-29-20: https://www.gov.ca.gov/wp-content/uploads/2020/03/3.17.20-N-29-20-EO.pdf
May 21, 2020 |
10:00 am |
Remotely |
For more information on CPUC Voting Meetings: https://www.cpuc.ca.gov/General.aspx?id=1128 |
||
May 28, 2020 |
10:00 am |
Commission Auditorium, San Francisco |
June 11, 2020 |
10:00 am |
Commission Auditorium, San Francisco |
COMMISSION RATESETTING DELIBERATIVE MEETINGS
(Not Open to the Public)
Ratesetting
Deliberative Meeting dates are reserved as noted
but will only be held if there are ratesetting matters to be considered.
May 11, 2020 |
Noon |
Pursuant to Executive Order N-29-20, paragraph 3, that was issued on March 17, 2020, Commissioners may participate remotely from teleconferencing locations.
Link to Executive Order N-29 20: https://www.gov.ca.gov/wp-content/uploads/2020/03/3.17.20-N-29-20-EO.pdf |
To view Continuation Meeting Agenda: Please use this link to view the published document |
||
May 18, 2020 |
10:00 am |
Commission Room 5305, San Francisco |
May 22, 2020 |
10:00 am |
Commission Room 5305, San Francisco |
COMMISSIONER COMMITTEE MEETINGS
May 22, 2020 |
1:30pm � 4pm |
WebEx Information: https://cpuc.webex.com/cpuc/j.php?MTID=m6bdc8d72e843773d83f02c080fdd28e0 Call-in Information: 415-655-0002 Access number: 963 115 474 / eYwmsDDJ362 Contact: Cristina Rivera, cristina.rivera@cpuc.ca.gov |
COMMISSIONER ALL-PARTY MEETINGS � NONE
A quorum of Commissioners may attend all-party meetings in ratesetting proceedings upon 10 days� notice of the meeting in the Daily Calendar.� Otherwise, all-party meetings are noticed directly to the parties and might not be posted here.
HEARING CALENDAR
(PHC) = Prehearing Conference |
(WS) = Workshop |
(OA) = Oral Argument |
(PPH) = Public Participation Hearing |
(STC) = Status Conference |
(CA) = Closing Argument |
(EH) = Evidentiary Hearing |
(L&M) = Law & Motion |
(CM) = Community Meeting |
(ECP) = Expedited Complaint Proceeding Hearing |
|
|
|
|
|
|
05/07/20 |
R.12-11-005 (WS) - Order
Instituting Rulemaking Regarding Policies, Procedures and Rules for the
California Solar Initiative, the Self-Generation Incentive Program and Other
Distributed Generation Issues, Toll Call-In: +1-415-655-0002 Meeting passcode: !Energy1 |
|
|
05/07/20 |
R.13-11-005 (WS) - Order Instituting Rulemaking Concerning Energy Efficiency Rolling Portfolios, Policies, Programs, Evaluation, and Related Issues. Call-In Number: 1-408-418-9388 Meeting Number: 298 948 835 Meeting Password: NkKDg49fZp6 Contact: Sasha Merigan, amq@cpuc.ca.gov, (585) 705-7525 |
|
|
05/11/20 ALJ Nojan Comr Shiroma |
A.20-02-006 (TELEPHONIC � PHC) - In the Matter of
the Application of SOUTHWEST GAS CORPORATION (U905G) for authority to: (1)
issue one or more types of debt securities in the principal amount of up to
$700,000,000; (2) refinance previously issued short-term debt securities; (3)
refinance previously authorized securities under the Evergreening Authority
Guidelines; and (4) enter into one or more interest rate risk management
contracts. |
|
|
05/12/20 |
C.19-11-021 (EH) - John Bezis, Complainant vs.
California Water Service Company (U60W), Defendant. [Charging Allegation is
Alleged Violations of Tariff Rules and Decision 14-08-011], Access Code: 969 532 934 Call-in Number: 1-415-655-0002 Access Code: 969 532 934 |
|
|
05/12/20 |
A.20-02-009 (TELEPHONIC � PHC) - PG&E ERRA (Application of PG&E for Compliance Review of Utility Owned Generation Operations, Portfolio Allocation Balancing Account Entries, Energy Resource Recovery Account Entries, Contract Administration, Economic Dispatch of Electric Resources, Utility Owned Generation Fuel Procurement, Diablo Canyon Seismic Studies Balancing Account, and Other Activities for the Record Period January 1 Through December 31, 2019.) Call-In Number: 1-877-937-0554 |
|
|
05/13/20 |
A.19-10-012 (WS) - Application of San Diego Gas
& Electric Company(U902E) to Extend and Modify the Power Your Drive Pilot
Approved by Decision 16-01-045, Contact: Michael Truax, Michael.Truax@cpuc.ca.gov, �or jevdokimoff@sdge.com |
|
|
05/26/20 |
C.20-03-011 (TELEPHONIC � PHC) - Bluebeyond Fisheries LLC, Complainant vs. Southern
California Edison Company (U338E), Defendant. [Charging Allegations: for
reinstatement into the Agricultural and Pumping Interruptible Program.] Link: https://cpuc.webex.com/cpuc/onstage/g.php?MTID=ec8954d0269093198c102f1baa35a1665 Event Number: 965 884 475 |
|
|
05/27/20 |
A.20-03-001 (TELEPHONIC � PHC) - Application of
Suburban Water Systems (U339W) for Authority to Increase Rates Charged for
Water Service by $14,268,446 or 17.33% in 2021, by $5,787,612 or 6.04% in
2022, and by $5,784,955 or 5.70% in 2023, Participant Code: 8423816 |
|
|
06/02/20 10:00 a.m. ALJ Kelly Comr Shiroma |
A.19-07-004 (EH) - Application of California-American Water Company (U210W) for Authorization to Increase its Revenues for Water Service by $25,999,900 or 10.60% in the year 2021, by $9,752,500 or 3.59% in the year 2022, and by $10,754,500 or 3.82% in the year 2023. Commission�s Courtroom, San Francisco (Also June 3 � 5, June 8 � 9, July 20 � 24, July 27 � 28, and August 24 � 28) |
|
|
06/22/20 |
A.10-07-009 et al. (EH) - In
the Matter of the Application of San Diego Gas & Electric Company (U902E)
for Approval of its Proposals for Dynamic Pricing and Recovery of Incremental
Expenditures Required for Implementation. And related matter. |
|
|
07/06/20 |
A.19-08-013 (EH) - Application of Southern
California Edison Company (U338E) for Authority to Increase its Authorized
Revenues for Electric Service in 2021, among other things, and to Reflect
that Increase in Rates, |
|
|
09/10/20 ALJ Zhang Comr Randolph |
I.19-12-009 (EH) � Order Instituting Investigation on the Commission�s Own Motion into the Operations, Practices, and Conduct of Frontier Communications Corporation, Frontier of America, Inc., (U-5429-C), and Frontier California, Inc., (U-1002-C) to Determine Whether Frontier Violated the Laws, Rules, and Regulations of this State through Service Outages and Interruptions and Disclosing and Publishing Customer Addresses. Commission Courtroom, San Francisco (Also September 11, 2020) |
|
|
OTHER PUBLIC MEETINGS
May 8, 2020 |
Please contact Reina Vazquez at (510) 302-1147, or by email at rvazquez@ddtp.org for meeting call in information. |
May 15, 2020 |
Webcast Information: https://www.cpuc.ca.gov/dacag/
Meeting number: (866) 469 3239 Meeting password: 921 254 527
Contact: Kathleen Yip at ky2@cpuc.ca.gov
More information is available at: https://www.cpuc.ca.gov/dacag/ |
May 18, 2020 |
Webcast Information: https://cpuc.webex.com/cpuc/j.php?MTID=ec6bedaedcb0526916b1bde34597277f6
Meeting number: 961 858 739 Meeting password: RNG2020
Conference Call-in: Dial: +1-415-655-0002 Toll | 1-855-282-6330 Toll Free Access code: 961 858 739
Contact: Karin Sung at Karin.Sung@cpuc.ca.gov or phone at 213-266-4743
More information is available at: https://www.cpuc.ca.gov/renewable_natural_gas/ |
NEW PROCEEDINGS - NONE
PETITIONS FOR MODIFICATION - NONE
DRAFT RESOLUTIONS
Issued for public comment.� Comments are governed by Rule 14.5.
Draft Resolution No. |
W-5220 |
Meeting Date |
May 21, 2020 |
Subject Matter |
The Water Division has prepared Proposed Comment Resolution W-5220 for the May 21, 2020, Commission Meeting. This resolution authorizes Del Oro Water Company to extend its Statewide Lost Revenue Surcharge of $10.54 per month per customer by the earlier of three months or approval of the utility�s General Rate Case. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=333875717 |
Comments Due Date |
May 11, 2020 |
Serve comments on: |
California Public Utilities Commission Water Division 505 Van Ness Avenue San Francisco, CA 94102 |
Draft Resolution No. |
E-5037 |
Meeting Date |
May 28, 2020 |
Subject Matter |
Resolution E-5037. Pacific Gas and Electric Company seeks approval of three power purchase agreements with Qualifying Facilities and associated cost recovery. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=333875634 |
Comments Due Date |
May 11, 2020 |
Serve comments on: |
Draft Resolution No. |
E-5050 |
Meeting Date |
May 28, 2020 |
Subject Matter |
RESOLUTION E-5050: Certification of Redwood Coast Energy Authority�s Energy Efficiency Program Administration Plan |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=333335317 |
Comments Due Date |
May 06, 2020 |
Serve comments on: |
Draft Resolution No. |
E-5061 |
Meeting Date |
May 28, 2020 |
Subject Matter |
Resolution E-5061. San Diego Gas & Electric Company seeks Approval of Modified Standard Power Purchase Agreement with Renewable Qualifying Facility. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=333057028 |
Comments Due Date |
May 05, 2020 |
Serve comments on: |
Draft Resolution No. |
E-5064 |
Meeting Date |
May 28, 2020 |
Subject Matter |
Resolution E-5064.� Denying Sierra View Dairy�s Petition for Modification of Resolution E-4665. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=333000664 |
Comments Due Date |
May 04, 2020 |
Serve comments on: |
Draft Resolution No. |
E-5074 |
Meeting Date |
May 28, 2020 |
Subject Matter |
Resolution E-5074: Ratifies the Executive Director�s letters to direct Investor Owned Utilities to offer a 60-day advance payment to Energy Savings Assistance Contractors. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=334379715 |
Comments Due Date |
May 13, 2020 |
Serve comments on: |
Draft Resolution No. |
G-3564 |
Meeting Date |
May 28, 2020 |
Subject Matter |
Resolution G-3564.� Pacific Gas and Electric Company seeks to revise Gas and Electric Rule 9 to remove the utility�s Bill Relief Program for customers impacted by the 2010 San Bruno gas pipeline incident. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=333067432 |
Comments Due Date |
May 05, 2020 |
Serve comments on: |
Draft Resolution No. |
L-600 |
Meeting Date |
May 28, 2020 |
Subject Matter |
Authorizes disclosure of all Commission records concerning the Commission's investigation of an electrical incident that occurred at 1675 Marion Rd., Redlands, California, on January 8, 2016. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=333000621 |
Comments Due Date |
May 18, 2020; Reply Comments May 25, 2020 |
Serve comments on: |
Garrett Toy and Guillermo Elizondo |
Draft Resolution No. |
SX-138 |
Meeting Date |
May 28, 2020 |
Subject Matter |
The Rail Safety Division has prepared Resolution SX-138 for the May 28, 2020, Commission meeting.� This resolution grants Metro Gold Line Foothill Extension Authority, A temporary deviation from General Order 26-D, Section 2.1, Allowing an overhead clearance of Not Less Than 20 Feet above the top of the highest rail at the proposed Lone Hill Avenue Light Rail Transit Bridge structure in Glendora, Los Angeles County. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=333876134 |
Comments Due Date |
May 21, 2020 |
Serve comments on: |
Draft Resolution No. |
T-17693 |
Meeting Date |
May 28, 2020 |
Subject Matter |
Approval of a streamlined Eligible Telecommunications Carrier designation process for the Federal Communication Commission�s Rural Digital Opportunity Fund recipients, with approved operating authority in California only.. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=334252420 |
Comments Due Date |
May 18, 2020 |
Serve comments on: |
Draft Resolution No. |
W-5218 |
Meeting Date |
May 28, 2020 |
Subject Matter |
The Water Division has prepared Proposed Comment Resolution W-5218 for the May 28, 2020, Commission Meeting. This resolution affirms Water Division�s rejection of Golden State Water Company�s, Suburban Water Systems�, and San Gabriel Valley Water Company�s requests and rejects California Water Service Company�s request to establish memorandum accounts for costs related to polyfluoroalkyl substances. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=333334863 |
Comments Due Date |
May 13, 2020 |
Serve comments on: |
Water.Division@cpuc.ca.gov or California Public Utilities Commission Water Division 505 Van Ness Avenue San Francisco, CA 94102 |
Draft Resolution No. |
E-5071 |
Meeting Date |
June 11, 2020 |
Subject Matter |
Resolution E-5071. San Diego Gas & Electric�s adjustment to reflect the equity rate base exclusion for wildfire mitigation capital expenditures required by Assembly Bill 1054. |
Web Link |
�http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=335833744 |
Comments Due Date |
May 21, 2020 |
Serve comments on: |
Draft Resolution No. |
E-5077 |
Meeting Date |
June 11, 2020 |
Subject Matter |
Resolution E-5077 Adopts updates to the Avoided Cost Calculator for use in demand-side distributed energy resources cost effectiveness analyses |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=335833835 |
Comments Due Date |
May 28, 2020 |
Serve comments on: |
joy.morgenstern@cpuc.ca.gov �and jessica.allison@cpuc.ca.gov |
Draft Resolution No. |
E-5081 |
Meeting Date |
June 11, 2020 |
Subject Matter |
Resolution E-5081 Pacific Gas and Electric Company seeks approval of three power purchase agreements with Qualifying Facilities and associated cost recovery. |
Web Link |
http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=336599655 |
Comments Due Date |
May 27, 2020 |
Serve comments on: |
ADVICE LETTERS SUBMISSIONS
To inquire about filings, suspension or protest, call or email the Energy Division (415-703-1974 or email: EDTariffUnit@cpuc.ca.gov ), Communications Division (415-703-3052) or Water Division (415-703-1133 or email: water.division@cpuc.ca.gov
|
|
|
03/09/20 |
Telecom 12 |
Call One Inc., Performance Bond Renewal in the amount of $25,000 (effective TBD) |
|
|
|
05/04/20 |
Energy 4243G |
Pacific Gas & Electric Company, Modify the Gas Preliminary Statement Part AG - Core Firm Storage Account, in Compliance with PG&E's 2019 Gas Transmission and Storage Decision 19-09-025 (anticipated effective 06/03/20) |
|
|
|
05/05/20 |
Energy 5814E |
Pacific Gas & Electric Company, Revisions to PG&E's Business Electric Vehicle (BEV) Rate Schedule (anticipated effective 05/05/20) |
|
|
|
05/05/20 |
Energy 5820E |
Pacific Gas & Electric Company, Submits Notice of Construction, Pursuant to General Order 131-D,for the Construction of FMC- Traction Power Station #2 115 kV Power Line Intertie (Peninsula Corridor Electrification Project) in the City of San Jose (anticipated effective 06/04/20) |
|
|
|
05/05/20 |
Energy 4206E |
Southern California Edison Company, Southern California Edison Company's Self-Generation Incentive Program Marketing, Education, and Outreach Plan (anticipated effective 06/04/20) |
|
|
|
05/05/20 |
Telecom 155 |
Affinity Network Incorporated, Notice of compliance with Res. M-4842 (COVID-19 Disaster Relief) (effective TBD) |
|
|
|
05/05/20 |
Telecom 180 |
Nos Communications, Inc., Notice of compliance with Res. M-4842 (COVID-19 Disaster Relief) (effective TBD) |
|
|
|
05/05/20 |
Telecom 9 |
Nosva Limited Partnership, Notice of compliance with Res. M-4842 (COVID-19 Disaster Relief) (effective TBD) |
|
|
|
05/05/20 |
Telecom 123 |
Nosva, Limited Partnership, Notice of compliance with Res. M-4842 (COVID-19 Disaster Relief) (effective TBD) |
|
|
|
05/06/20 |
Energy 4207E |
Southern California Edison Company, Request by Southern California Edison Company for Approval to Grant (a) Easements to Sun Life Assurance Company of Canada, a Canadian Corporation, and (b) an Easement to the County of San Bernardino (anticipated effective 06/05/20) |
|
|
|
05/06/20 |
Energy 4208E |
Southern California Edison Company, Southern California Edison Company's Updates to its 2020 Distribution Investment Deferral Framework Request for Offer Projects (anticipated effective 06/05/20) |
|
|
|
05/06/20 |
Energy 542G |
West Coast Gas Company, Increase in rates in Mather Field (anticipated effective 05/06/20) |
|
|
|
05/06/20 |
Energy 543G |
West Coast Gas Company, Increase in Rates at Castle (anticipated effective 05/06/20) |
|
|
|
05/06/20 |
Telecom 13 |
Call One Inc., COVID-19 (effective TBD) |
|
|
|
05/06/20 |
Telecom 7-A |
EXCESS TELECOM, Supplements A.L.No.7, Annual Performance Bond (effective TBD) |
|
|
|
05/06/20 |
Telecom 48337 |
Pacific Bell, Contract (effective TBD) |
|
|
|
05/06/20 |
Telecom 48338 |
Pacific Bell, Contract (effective TBD) |
|
|
|
05/06/20 |
Telecom 48339 |
Pacific Bell, Contract (effective TBD) |
|
|
|
05/06/20 |
Telecom 48340 |
Pacific Bell, Contract (effective TBD) |
|
|
|
05/06/20 |
Telecom 48341 |
Pacific Bell, Contract (effective TBD) |
|
|
|
05/06/20 |
Telecom 48342 |
Pacific Bell, Contract (effective TBD) |
|
|
|
05/06/20 |
Telecom 48343 |
Pacific Bell, Contract (effective TBD) |
|
|
|
05/06/20 |
Telecom 48344 |
Pacific Bell, Contract (effective TBD) |
|
|
|
05/06/20 |
Telecom 48345 |
Pacific Bell, Contract (effective TBD) |
|
|
|
05/06/20 |
Telecom 48346 |
Pacific Bell, Contract (effective TBD) |
|
|
|
05/06/20 |
Telecom 42 |
Tracfone Wireless, Service/Rate Changes to Walmart Family Mobile Plan (effective TBD) |
|
|
|
05/06/20 |
Water 522 |
Del Oro Water Co., Inc., [Stirling Bluffs District and Strawberry District] Update 2019-2020 LIRA (effective TBD) |
|
|
|
05/06/20 |
Water 36 |
Live Oak Springs Water & Power Co., Purchase and Acquisition (anticipated effective 05/06/20) |
|
|
|
05/07/20 |
Telecom 56-A |
TC Telephone, LLC, Supplements A.L.No.56, Administrative changes to rules, definitions and terms not changing rates (effective TBD) |
|
|
|
05/07/20 |
Water 550 |
San Jose Water Company, Tariff rule revisions and written policy on discontinuation of service in response to Public Advocates' protests regardin compliance Senate Bill 998 implementation (anticipated effective 02/01/20) |
|
|
|
|
||
04/28/20 |
Energy 3522E |
San Diego Gas & Electric Company. Initial suspension on the following grounds: resolution is needed. Date suspension ends: 08/25/20. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
05/01/20 |
Energy 4182E |
Southern California Edison Company. Initial suspension on the following grounds: resolution is needed. Date suspension ends: 08/28/20. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
05/06/20 |
Energy 231G |
Southern California Edison Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 09/02/20. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
05/07/20 |
Water 1285 |
California American Water Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 09/03/20. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
05/07/20 |
Water 1286 |
California American Water Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 09/03/20. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
05/07/20 |
Water 1287 |
California American Water Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 09/03/20. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
05/07/20 |
Water 1288 |
California American Water Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 09/03/20. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
05/08/20 |
Energy 4185E |
Southern California Edison Company. Initial suspension on the following grounds: additional time is needed. Date suspension ends: 09/04/20. Note: Initial suspensions will be automatically extended for an additional 180 days if the Commission has not issued an order regarding the advice letter by the date the first suspension period ends. |
|
|
|
|
||
04/28/20 |
Energy 4185E |
Southern California Edison Company, 2019 Recorded Costs for the Decommissioning of San Onofre Nuclear Generating Station Unit Nos. 2&3 Protest by Public watch Dog. |
|
|
|
05/05/20 |
Energy 5799E |
Pacific Gas & Electric Company, PG&E's Mid-Cycle Review Compliance Submittal for its 2018-2022 Demand Response funding Application Late filed protest by CLECA. |
|
|
|
05/05/20 |
Energy 4192E |
Southern California Edison Company, Proposed Revisions to the Self-Generation Incentive Program Handbook to Further Incorporate Requirements Pursuant to Decision (D.)20-01-021 Protest by Tesla. |
|
|
|
05/05/20 |
Energy 5619G |
Southern California Gas Company, Proposed Revisions to the Self-Generation Incentive Program Handbook to Further Incorporate Requirements Pursuant to Decision (D.)20-01-021 Protest by Tesla. |
|
|
|
05/05/20 |
Energy 4237G/5808E |
Pacific Gas & Electric Company, Proposed Revisions to the Self-Generation Incentive Program Handbook to Further Incorporate Requirements Pursuant to Decision (D.)20-01-021 Protest by Tesla. |
|
|
|
05/05/20 |
Energy 110E |
The California Center For Sustainable Energy(CCSE), Proposed Revisions to the Self-Generation Incentive Program Handbook to Further Incorporate Requirements Pursuant to Decision (D.)20-01-021 Protest by CSEA. |
|
|
|
05/05/20 |
Energy 110E |
The California Center For Sustainable Energy(CCSE), Proposed Revisions to the Self-Generation Incentive Program Handbook to Further Incorporate Requirements Pursuant to Decision (D.)20-01-021 Protest by Tesla. |
|
|
|
05/05/20 |
Energy 3522E |
San Diego Gas & Electric Company, Mid-Cycle Update in Compliance with Decision 16-09-056 Ordering Paragraph 9 Late filed protest by PAO. |
|
|
|
05/05/20 |
Energy 5799E |
Pacific Gas & Electric Company, PG&E's Mid-Cycle Review Compliance Submittal for its 2018-2022 Demand Response funding Application Late filed protest by PAO. |
|
|
|
05/05/20 |
Energy 4182E |
Southern California Edison Company, Southern California Edison Company's Demand Response 2018-2022 Mid-Cycle Status Report Advice Letter Pursuant to Decision 16-09-056 Late filed protest by PAO. |
|
|
|
05/05/20 |
Energy 4192E |
Southern California Edison Company, Proposed Revisions to the Self-Generation Incentive Program Handbook to Further Incorporate Requirements Pursuant to Decision (D.)20-01-021 Protest by CSEA. |
|
|
|
05/05/20 |
Energy 4192E |
Southern California Edison Company, Proposed Revisions to the Self-Generation Incentive Program Handbook to Further Incorporate Requirements Pursuant to Decision (D.)20-01-021 Protest by CALSSA. |
|
|
|
05/05/20 |
Energy 5619G |
Southern California Gas Company, Proposed Revisions to the Self-Generation Incentive Program Handbook to Further Incorporate Requirements Pursuant to Decision (D.)20-01-021 Protest by CSEA. |
|
|
|
05/05/20 |
Energy 5619G |
Southern California Gas Company, Proposed Revisions to the Self-Generation Incentive Program Handbook to Further Incorporate Requirements Pursuant to Decision (D.)20-01-021 Protest by CALSSA. |
|
|
|
05/05/20 |
Energy 4237G/5808E |
Pacific Gas & Electric Company, Proposed Revisions to the Self-Generation Incentive Program Handbook to Further Incorporate Requirements Pursuant to Decision (D.)20-01-021 Protest by CSEA. |
|
|
|
05/05/20 |
Energy 4237G/5808E |
Pacific Gas & Electric Company, Proposed Revisions to the Self-Generation Incentive Program Handbook to Further Incorporate Requirements Pursuant to Decision (D.)20-01-021 Protest by CALSSA. |
|
|
|
05/05/20 |
Energy 110E |
The California Center For Sustainable Energy(CCSE), Proposed Revisions to the Self-Generation Incentive Program Handbook to Further Incorporate Requirements Pursuant to Decision (D.)20-01-021 Protest by CALSSA. |
|
|
|
05/05/20 |
Energy 5799E |
Pacific Gas & Electric Company, PG&E's Mid-Cycle Review Compliance Submittal for its 2018-2022 Demand Response funding Application Late filed protest by Joint Parties Protest. |
|
|
|
05/05/20 |
Energy 4182E |
Southern California Edison Company, Southern California Edison Company's Demand Response 2018-2022 Mid-Cycle Status Report Advice Letter Pursuant to Decision 16-09-056 Late filed protest by Joint parties. |
|
|
|
05/05/20 |
Energy 3522E |
San Diego Gas & Electric Company, Mid-Cycle Update in Compliance with Decision 16-09-056 Ordering Paragraph 9 Late filed protest by Joint finilig. |
|
|
|
05/05/20 |
Energy 5799E |
Pacific Gas & Electric Company, PG&E's Mid-Cycle Review Compliance Submittal for its 2018-2022 Demand Response funding Application Late filed protest by CLECA. |
|
|
|
05/06/20 |
Energy 4244G/5816E |
Pacific Gas & Electric Company, Pacific Gas and Electric Company's Emergency Consumer Protection Plan to Support Customers During the COVID-19 Pandemic Pursuant to Resolution M-4842 Protest by Just Energy. |
|
|
|
05/06/20 |
Energy 3516E/2854G |
San Diego Gas & Electric Company, Implementation of Emergency Disaster Relief Program for COVID-19 Pursuant to Ordering Paragraph 1 of Decision 19-07-015 Late filed protest by Just Energy. |
|
|
|
05/07/20 |
Energy 28E |
Shell Energy North America, 2020 June Local RA Waiver Request Protest by PAO. |
|
|
|
05/07/20 |
Energy 60E |
Just Energy Solutions Inc., Tier 2 Advice Letter Requesting Waiver of a Portion of Its Local Resource Adequacy Procurement Requirement for the June 2020 Month Ahead Submission and Request for Confidentiality Protest by PAO. |
|
|
|
OTHER NOTICES � NONE
Return to Table of Contents
RESOLUTION REGARDING RATIFICATION OF PRELIMINARY DETERMINATIONS OF CATEGORY
For purposes of Rule 9.2(c), notice of the assignment is the day the assignments associated with this preliminary categorization document appears in the Daily Calendar following the Commission business meeting.
(05/07/2020) |
ALJ 176-3460 |
Ratification of preliminary
determinations of category for proceedings initiated by application.� The
preliminary determinations are pursuant to |
PRELIMINARY DETERMINATION SCHEDULES |
|
ASSIGNMENTS |
||||
|
|
|
||||
NUMBER
TITLE |
PROPOSED CATEGORY |
PRELIM. |
HEARING |
|
COMR |
ALJ |
|
||||||
|
||||||
A20-03-016 �������������Pacific Gas and Electric Company, Application of Pacific Gas and Electric Company for Approval of Gas Demand Pilot Program. (U39G) |
Ratesetting |
Ratesetting |
NO |
|
Guzman Aceves |
Ayoade* |
|
||||||
A20-03-017 �������������Southern California Gas Company, Application of SOUTHERN CALIFORNIA GAS COMPANY (U904G) for Authorization to (1) issue debt securities in an aggregate principal amount of up to $1,730,000,000; (2) include certain features in debt securities or enter into certain derivative transactions; (3) hedge issuances of debt securities; and (4) take all other necessary, related actions. |
Ratesetting |
Ratesetting |
YES |
|
Batjer |
Nojan |
|
||||||
A20-04-001 �������������Bear Valley Electric Service, Application of Golden State Water Company on Behalf of its Bear Valley Electric Service Division (U913E), for Approval of Recorded CEMA Costs and Recovery of the Costs in Rates. |
Ratesetting |
Ratesetting |
YES |
|
Shiroma |
Watts-Zagha |
*The Administrative Law Judge assignment of Application 20-03-016 was made by a Chief Administrative Law Judge�s Ruling dated April 23, 2020.� Therefore, the 10 days requirement pursuant to Article 9 of the Commission�s Rules of Practice and Procedure, applied to the April 23, 2020 date.
|
||||||
A20-04-002 �������������Southern California Edison
Company, Application of Southern California Edison Company (U338E) for a
Commission Finding that its Procurement-Related and Other Operations for the Record
Period |
Ratesetting |
Ratesetting |
YES |
|
Guzman Aceves |
Kline |
|
||||||
A20-04-003 �������������California-American Water Company, East Pasadena Water Company, Joint Application of California-American Water Company (U210W) and East Pasadena Water Company (U331W) for an Order Authorizing East Pasadena Water Company to Sell and California-American Water to Purchase the Water Utility Assets of East Pasadena Water Company. |
Ratesetting |
Ratesetting |
YES |
|
Shiroma |
Watts-Zagha |
|
||||||
A20-04-008 �������������NEVADA COUNTY FIBER, INC., Application of Nevada County Fiber, Inc. for Registration as an Interexchange Carrier Telephone Corporation Pursuant to the Provisions of Public Utilities Code Section 1013. |
�NDIEC Registration Application |
Ratesetting |
NO |
|
Not Assigned |
Examiner Osborn |
|
||||||
A20-04-009 �������������San Jose Water Company, Application of SAN JOSE WATER COMPANY (U168W), a California corporation, for an order to issue and sell additional debt and equity securities not exceeding the aggregate amount of $350,000,000 and other related requests. |
Ratesetting |
Ratesetting |
YES |
|
Guzman Aceves |
Nojan |
|
||||||
A20-04-010 �������������Southern California Edison Company, Application of Southern California Edison Company (U338E) to Establish a Memorandum Account to Record and Track System-Wide Pipeline Assessment Costs for the Catalina Water Utility. |
Ratesetting |
Ratesetting |
YES |
|
Guzman Aceves |
Poirier |
|
||||||
A20-04-011 �������������TC Telephone, LLC, TC Telephone LLC (U6875C) Application for Rehearing of Resolution T-17687. |
Adjudicatory |
* |
* |
|
Not Assigned |
Legal Division |
|
||||||
A20-04-013 �������������PACIFIC GAS AND ELECTRIC COMPANY, Application of Pacific Gas and Electric Company (U39E) for Approval and Recovery of Oakland Clean Energy Initiative Preferred Portfolio Procurement Costs. |
Ratesetting |
Ratesetting |
YES |
|
Shiroma |
Fogel*** |
|
||||||
Ratesetting |
Ratesetting |
YES |
|
Guzman Aceves |
Wercinski |
**Application for Rehearing of Resolution is assigned to Legal Division.� Categorization/Need for Hearing will be addressed as necessary if the Commission subsequently grants rehearing.
***The Administrative Law Judge assignment of Application 20-04-013 was made by a Chief Administrative Law Judge�s Ruling dated April 23, 2020.� Therefore, the 10 days requirement pursuant to Article 9 of the Commission�s Rules of Practice and Procedure, applied to the April 23, 2020 date.
|
||||||
A20-04-023 �������������Pacific Gas and Electric Company, In the Matter of the Application of Pacific Gas and Electric Company for (1) Administration of Stress Test Methodology Developed Pursuant to Public Utilities Code Section 451.2(b) and (2) Determination That $7.5 Billion of 2017 Catastrophic Wildfire Costs and Expenses Are Stress Test Costs That May Be Financed Through Issuance of Recovery Bonds Pursuant to Section 451.2(c) and Section 850 et seq.(U39E). |
�Ratesetting |
Ratesetting |
YES |
|
Batjer |
Haga |
Return to Table of Contents