In asserting that there has been no change in control over Wild Goose, and therefore, that § 854 does not apply to this merger, Wild Goose relies on several factors. One, EnCana's shares are widely held and very liquid, as were the shares of AEC when it was publicly traded. Two, the merger has left intact the organizational structure between the gas storage utility and AEC, retaining the same Wild Goose senior management, at least for the present. By analogy to several prior Commission decisions that construe § 854 to apply to a change in actual or working control, and not merely to the power or potential to control, Wild Goose argues that these factors show that no change in control has occurred.2 Consideration of this argument requires a review of these and other Commission decisions, as well as the factual record provided by the Application as a whole.
Historically, as Wild Goose recognizes, the Commission has determined the applicability of § 854 on a case-by-case basis. Several previous Commission decisions explicitly recognize that § 854 does not define "control" and refer to the California Corporations Code for guidance.3 The Commission has not promulgated regulations to define "control" in terms of a percentage of stock ownership or on the basis of some other, clearly identifiable characteristics. While Paging Network of San Francisco and Crico Communications, supra, both held § 854 to be inapplicable on unique facts involving a change in the form of ownership but no change in the actual management or control of the utility, review of the larger pool of Commission decisions establishes no bright line.
For example, under diverse fact situations where a public utility owner has either transferred or proposed to transfer a 50% interest in the utility, or has acquired a 50% interest in another utility, the Commission has asserted jurisdiction to review the transaction under § 854 and has approved or disapproved the transfer.4
In other proceedings concerning merger at the holding company level or internal reorganization via a holding company, the Commission has tended to analyze the proposed transaction and its effect upon the public utility against public interest standards associated with § 854.5 Moreover, in an application under § 852 (which requires any corporation holding a controlling interest in a California public utility to obtain prior Commission authorization before it acquires any part of the capital stock of another California public utility), the Commission expressed concern that blanket authorization for a utility to purchase additional shares in its holding company parent could affect control of the parent, and limited the authorization to five years to avoid conflict with § 854.6
Since the Commission's application of § 854, and the degree to which issues of ownership and control have registered concern, all turn on the specific facts at issue, we return to the facts presented by this application. The instant merger has combined two holding companies and their subsidiaries to form EnCana, which is essentially twice as large as either entity standing alone, with sizeable net assets and shareholders' equity, approximately $22.1 billion dollars (Canadian) and $12.96 billion dollars (Canadian), respectively.
Wild Goose accurately points out that all of its shares are held by the same second-tier entity (EnCana Gas Storage, the new name for AEC Storage and Hub Services Co.), whose shares are all held by the third-tier entity, Alenco, whose shares are all held by the fourth-tier entity, AEC. AEC's shares are no longer publicly traded; instead they are privately held at the new, fifth-tier by EnCana, which is publicly traded. But do these facts, coupled with the fact that EnCana shares are widely held, really mean that no change of control over Wild Goose has occurred?
The Application does state that the retirement of the former Chairman has resulted in one change to the Board of Directors of Wild Goose, though reportedly not as a direct result of the merger. Changes also have occurred on the AEC Board, now that it is wholly owned by EnCana, but the Application states: "it is not anticipated that the changes at the AEC Board of Directors level will impact the manner in which Wild Goose is currently managed." (Application at 14.) Regardless of the corporate expectations held on the date Wild Goose filed this application, EnCana now has the ability to control AES' board and the board of Wild Goose, via its ability to control the appointment of directors of both subsidiaries. This new reality is a result of the merger.
These and subsequent post-merger changes at AEC's Board (and at EnCana's Board of Directors) legally could affect Wild Goose. Changes that affect Wild Goose could affect its service and thereby affect its customers, as well as the natural gas storage industry in California. If AEC was a significant participant in the North American oil and gas industry prior to the merger, the post-merger EnCana is an even more significant presence. D.02-07-036, which approved the Wild Goose expansion, examined the highly concentrated geographic market for storage services (both injection, withdrawal and inventory) in northern California and all California. While D.02-07-036 was unable to definitively conclude whether Wild Goose had market power and could exercise it, that decision underscored the need to closely monitor the evolving gas storage market within the context of changes in the larger natural gas market. If we were to disclaim jurisdiction over this indirect change of control, we would never examine whether the holding company merger raises market power issues for California.
Given this context, we conclude the Commission would be remiss to disclaim jurisdiction but should examine the parties to the merger and what consequences, if any, the merger has for California and the natural gas market in this state. As we stated in D.03-02-071, our recent decision on the indirect change of control of Lodi Gas Storage, L.L.C. (Lodi), which is the other independent gas storage provider in California:
We think it prudent public policy to review and approve changes in the ownership and control of certificated natural gas storage utilities, whether those changes occur directly, or indirectly through corporate intermediaries. Such review should help to ensure the continued economic viability of such utilities and to prevent market manipulations that may affect not only their own customers but also larger ratepayer groups. (D.03-02-071, mimeo., at 11-12.)
Moreover, were we to accept Wild Goose's argument that jurisdiction over this matter could be reduced to a simplistic, structural assessment to establish whether an actual versus potential change of control has occurred, we would be creating the wrong standard, which could only too easily be misused by those who might seek to similarly structure a transaction to immunize it from Commission review. Therefore, we reiterate the need for case-by-case review of mergers that fit the structural pattern exemplified by this one.
Below, in part B, we review the public interest implications of this merger. In part D, we consider issues which arise because of the timing of this Application, which was filed after the indirect change of control had occurred.
Wild Goose argues that the appropriate standard for analyzing the public interest in a transaction subject to § 854(a) is whether or not the transfer of control is "adverse to the public interest."7 However, Wild Goose then refers to the public interest criteria enumerated in § 854(c) and ties its public interest showing to the specific criterion listed there. This is useful, as the Commission has found that consideration of these criteria ensures assessment of a broad spectrum of important public interest concerns and provides a good gauge of the public interest under § 854(a). Thus, though a transaction, like this one, does not exhibit the financial attributes that mandate application of § 854(c) because no party has gross annual California revenues of $500,000,000 (U.S.), the Commission has used the § 854(c) criteria in its public interest assessment.8
The Application's impact assessment includes the following information. With financial resources approximately double those of AEC, the new EnCana reinforces the financial strength of Wild Goose. This is probably the most significant impact of the merger. Wild Goose and its parent were financially stable before, now they are even more stable. The Application states that the merger has not and will not have any direct impact on Wild Goose's customers, including either the quality of service to them or the quality of Wild Goose's management. Wild Goose asserts:
" . . . the transaction did not result in any changes to the services provided by Wild Goose or to the rates or terms and conditions under which they are provided. Wild Goose will continue to provide unbundled firm and interruptible storage services to the public at market-based rates, exactly as authorized by the Commission." (Application at 12.)
As for impact on employees, Wild Goose has not implemented any lay-offs (it has only three full time employees in Butte County) and it does not plan to do so. Neither has the merger affected its employees' benefits. With respect to shareholder concerns, since the shares of Wild Goose are not publicly traded, the transaction has not affected Wild Goose directly; at the holding company level, the majority of the shareholders of both AEC and PanCanadian voted to support the merger.
The Commission's jurisdiction over Wild Goose has not been affected in any significant way, either--Wild Goose does not ask that we transfer its CPCN to another entity; rather, Wild Goose will continue to hold the CPCN and will continue to offer natural gas storage services at market-based rates pursuant to D.97-06-091 and D.02-07-036, and all subsequent modifications of these decisions. We note that though EnCana, Wild Goose's current, ultimate parent, is a Canadian holding company, the same is true of AEC, Wild Goose's ultimate parent before the merger. Critically, the merger does not change the evidence noted in D.02-07-036, that Wild Goose, through its affiliates, does not control transportation services into California. Moreover, staff of the Commission's Energy Division have reported that Wild Goose has been complying with the various reporting requirements we ordered in D.02-07-036 (§ 583 affiliates' activities report, etc.) by including information for EnCana as well as AEC.9
In sum, then, the record indicates that the merger has resulted in no negative impacts on Wild Goose, its service quality, customers, employees, the local community, or on the ability of this Commission to regulated Wild Goose. The greater financial strength of EnCana appears to result in a net positive impact.
Under the California Environmental Quality Act (CEQA) and Rule 17.1 of the Commission's Rules of Practice and Procedure, we must consider the environmental consequences of projects that are subject to our discretionary approval. (Pub. Resources Code § 21080.) It is possible that a change of ownership and/or control may alter an approved project, result in new projects, or change facility operations, etc. in ways that have an environmental impact.
By ruling on February 7, 2002, the assigned administrative law judge (ALJ) directed Wild Goose to supplement the record to clarify whether:
EnCana intends to make any changes to Wild Goose's facilities or in its operations, which were not approved in D.02-07-036 and which are not discussed in this application, but which could have potential effects on the environment. (ALJ Ruling at 1.)
On February 20, 2003, Wild Goose filed the required, verified Supplemental Information on Intended Operations, which states that Wild Goose has embarked upon the expansion authorized in D.02-07-036 but has no plans or intentions to make any changes to its facilities or in its operations that have not already been approved as part of D. 02-07-036.
Based upon the record, the transfer of control at issue in this proceeding will have no significant effect on the environment for a number of reasons. The Wild Goose gas storage facilities will continue to be developed and operated as previously authorized by this Commission, all environmental mitigation measures contained in the certified EIRs will continue to apply, and all monitoring requirements and restrictions imposed in D.97-06-091 and D.02-07-036, which certified these EIRs, will continue. Therefore, the proposed project qualifies for an exemption from CEQA pursuant to § 15061(b)(3)(1) of the CEQA guidelines and the Commission need perform no further environmental review. (See CEQA Guidelines § 1506(b)(3)(1).)
We have concluded that the Application is in the public interest and requires no further review under CEQA. Problematically, however, this transaction was finalized prior to our review-EnCana exists and the indirect change of control over Wild Goose has occurred. Essentially, then, we are faced with a request for approval nunc pro tunc.10
The Commission has granted retroactive approval of § 854 (and § 851) applications in the past. However, because such approval is contrary to statute and explicit Commission policy, it has done so only in limited and exceptional circumstances, generally after finding both that the utility's error was inadvertent and that ratepayers remained unharmed. In situations where the unauthorized transaction resulted in ratepayer benefits and where the utility recorded them properly, the Commission has admonished the utility for the error but sometimes has declined to levy penalties.11
As we consider the facts of this Application, we are mindful that the Commission cannot simply look the other way and ignore utility noncompliance with the statutes of this state and with Commission rules and orders. We must act to discourage utilities from avoiding their legal duty, whether intentionally or inadvertently, and bypassing the Commission. The Commission underscored the importance of such action when it issued the Affiliate Enforcement Rulemaking, R. 98-04-009: "It is fundamental to the Commission's exercise of its powers and jurisdiction that the agency take reasonable steps to ensure that the utilities comply with its orders and rules." (Mimeo., at p. 5.)12
Section 2107 sets forth the parameters for maximum and minimum penalties:
Any public utility which violates or fails to comply with any provision of the Constitution of this state or of this part, or which fails or neglects to comply with any part or provision of any order, decision, decree, rule, direction, demand, or requirement of the commission, in a case in which a penalty has not otherwise been provided, is subject to a penalty of not less than five hundred dollars ($500), nor more than twenty thousand dollars ($20,000) for each offense.
Section 2108 provides, in relevant part, that "in case of a continuing violation each day's continuance thereof shall be a separate and distinct offense."
In determining the size of the penalty, where one is levied, the Commission has held that the size of the fine should be proportionate to the severity of the offense and has applied the criteria adopted in D.98-12-075, which issued in the Affiliate Enforcement Rulemaking. These criteria include: (1) the severity of the offense; (2) the conduct of the utility (before, during and after the offense); (3) the financial resources of the utility; (4) the totality of the circumstances related to the violation; and (5) the role of precedent.
Severity of the offense includes a consideration of the physical or economic harm caused to the victims or to the integrity of the regulatory process, unlawful benefits gained by the utility, and the number of violations. The conduct of the utility includes the utility's actions to prevent the violation, detect the violation, and disclose and rectify the violation. With respect to the financial resources of the utility, the Commission considers both the need for deterrence and constitutional limitations on excessive fines. Consideration of the totality of the circumstances requires the Commission to look at the unique facts of each case, which may mitigate or exacerbate the degree of wrongdoing, in the furtherance of the public interest.
When we apply these criteria to the facts presented by this Application, we reach the following assessment. As we explain above, we do not find compelling Wild Goose's argument that the holding company merger did not result in a change of control under § 854(a). Moreover, recognizing, as Wild Goose does, the Commission's history of case-by-case assessment in this area, and given the factual differences that underlie the range of decisions the Commission has reached, Wild Goose acted at its peril when it determined that it did not need Commission authority for the change of control.13 The offense, failure to comply with § 854(a), is serious-so serious that the statute, itself, provides that a transaction pursued without prior Commission authorization is void and of no effect.
We are not aware that Wild Goose did anything to bring to the Commission's attention the prospect of a merger at the holding company level. This omission is disturbing, particularly considering that at the time Wild Goose had pending before us an application for amendment of its CPCN and for expansion of its existing facilities. However, when we learned in trade press reports of the pending transaction and, in D.02-07-036, directed Wild Goose to file the instant Application, Wild Goose promptly complied. Furthermore, Wild Goose's compliance with the reporting requirements we ordered in D.02-07-036 exhibits no intent to evade regulatory oversight in that regard since Wild Goose has supplied information about EnCana and its affiliates. Likewise, Wild Goose's customers, ratepayers at large, and the broader public interest all appear unharmed by the transaction. In these respects, this matter resembles Koch Pipeline Co. and NetMoves Corp., supra, where we imposed penalties, respectively, of $8,000 and $5,000.
The financial resources of Wild Goose and its parent corporations are substantial and Wild Goose touts the increased financial stability of the company as a whole as the primary benefit of the merger. Though the financial statements of Wild Goose are not public, they have been filed under seal with the Application; the financial statements of AEC, PanCanadian and EnCana are all part of the public filing. As we have already seen above, EnCana, the new, multi-billion dollar holding company, has international economic interests that extend beyond the United States and Canada. This strong and wide-reaching financial picture militates for a more substantial penalty than imposed in either Koch Pipeline Co., which concerned a small part of a multi-million dollar, multi-state sale of assets, or NetMoves Corp., where the penalty reflected the utility's reduced financial straits.14
We turn next to §§ 2107 and 2108, which prescribe how a penalty shall be calculated. For illustrative purposes, we will compute both the lowest possible penalty (at $500 per day) and the highest (at $20,000 per day). Since the merger was approved in Canada on April 5, 2002 and Wild Goose filed its Application on September 3, 2002, Wild Goose was in violation of the Public Utilities Code for 151 days. However, since D.02-07-036, which issued on July 17, 2002, allowed Wild Goose 45 days to prepare and file this Application, we will reduce the violation period accordingly. Since the 45th day was the Saturday of a three-day holiday weekend, the filing actually was not due until 48 days later, on Tuesday, September 3, 2002. The resulting penalty period is 103 days and the penalty range is $51,500 to $2,060,000 (U.S.).
D.98-12-075 cautions that the size of a penalty should be adjusted to achieve the objective of deterrence without becoming excessive. Accordingly, considering the size of the penalties assessed in Koch Pipeline Co. and NetMoves Corp., and the similar facts here, we will levy a penalty of $51,500, which is at the low end of the range. We stress that we are strongly influenced by the lack of economic harm to customers and by Wild Goose's compliance with D.02-07-036's reporting requirements. Considering that Wild Goose has no history of violations, we will suspend one half of the penalty, or $25, 750. We believe that under all of the circumstances, including the mitigating factors present, the remaining penalty of $25, 750 is an equitable outcome, which serves our purpose to deter future violations without being excessive.
The penalty shall be paid to the General Fund as detailed in the ordering paragraphs. We reiterate that unless and until modified, all terms and conditions of D.97-06-091 and D.02-07-036 will continue to apply to Wild Goose. Likewise, Wild Goose must continue to operate in conformance with its filed tariff and with any subsequent amendments of that tariff. We may consider reinstating the suspended portion of the penalty we order today should Wild Goose actively violate D.97-06-091, D.02-07-036, or its tariff.
2 Wild Goose discusses, in particular, Paging Network of San Francisco, D.93-11-063, 52 CPUC 2d 127, 1993 Cal. PUC LEXIS 794 [dismissal appropriate because § 854 inapplicable to distribution of shares of utility's parent corporation from a limited partnership investment fund directly to its partners where no effect on actual or working control of utility's service or operations] and Crico Communications, D.92-05-006, 1992 Cal. PUC LEXIS 487 [dismissal appropriate because § 854 inapplicable to public stock offering where original owners retain 20% of utility and no other person or entity acquires control]. 3 Corp. Code § 160 defines "control" to mean, alternatively: a) Except as provided in subdivision (b), "control" means the possession, direct or indirect, of the power to direct or cause the direction of the management and policies of a corporation. b) "Control" in Sections 181, 1001, and 1200 means the ownership directly or indirectly of shares or equity securities possessing more than 50 percent of the voting power of a domestic corporation, a foreign corporation, or an other business entity. 4 See Application of PacTel Cellular for control of Bay Area Cellular Telephone through Bay Area Cellular Telephone Company, D.87-09-028, 25 CPUC2d 350, 1987 Cal. PUC LEXIS 197 [definitions of term "control" in the Corporations Code are instructive for purposes of § 854]; Gale v. Teel, D. 87478, 81 CPUC 817, 1977 Cal. PUC LEXIS 152 [public policy implication of transfer warrants review of acquisition of 50% interest in public utility for purposes of § 854]; Dana Point Marin Telephone Co., D. 83493, 77 CPUC 347, 1974 Cal. PUC LEXIS 829 [Pub. Util. § 854 requires Commission authorization of relinquishment of positive control (100% ownership) for negative control (50% ownership)]. 5 See California-American Water Company, D.02-12-068, 2002 Cal. PUC LEXIS 909 [authority granted under § 854 for RWE Aktiengesellschaft (RWE) to purchase the stock of Cal-Am's parent, American Water Works Co., resulting in the indirect transfer of control of Cal-Am]; Pacific Pipeline System, D.02-06-069, 2002 Cal. PUC LEXIS 309 [authority granted under § 854 for internal reorganization resulting in indirect change of control of Pacific Pipeline]. But see PacificCorp., D.01-12-013, 2001 Cal. PUC LEXIS 1070 [pursuant to §853, transfer of all the stock of PacifiCorp to a new subsidiary of the ultimate parent exempt from §854 review because no change in California operations, etc.]. 6 San Jose Water Co., D.94-01-025, 53 CPUC 2d 37, 1994 Cal. PUC LEXIS 43 [re. San Jose Water's request to invest in dividend reinvestment plan of its parent, California Water Service Co.]. 7 See, for example, Quest Communications Corp., D.00-06-079, 2000 Cal. PUC LEXIS 645, *16. 8 Ibid. 9 D.02-07-036 also prohibits Wild Goose from engaging in any storage or hub services transactions with AEC or any affiliate owned or controlled by AEC and extends these bans to include any successor to AEC. 10 The phrase "nunc pro tunc," meaning "now for then," refers to those acts which are allowed to be done at a later time "with the same effect as if regularly done." (Blacks Law Dictionary (5th Revised ed. (1979), p. 964.) 11 See, for example, Application of PG&E, D.99-02-062, 1999 Cal. PUC LEXIS 59 [where sales of customer facilities to those customers without preapproval attributed to utility's mistaken belief that § 851 did not apply to the sales and utility properly credited ratebase with all after-tax gains from the sales, approval granted nunc pro tunc and no penalty levied, consistent with ORA's recommendations]. Compare, for example, Koch Pipeline Co., D.99-08-007, 1999 Cal. PUC LEXIS 498 [where utility failure to seek prior approval under § 851 was inadvertent and sale was one very small part of multi-jurisdiction transaction, approval granted nunc pro tunc and $8,000 penalty levied considering lack of mitigating factors, such as benefit to ratepayers]; NetMoves Corp., D.00-12-053, 2000 Cal. PUC LEXIS 1055 [where no harm to the public, utility failure to obtain preapproval under § 854 deemed serious, warranting a $5,000 penalty, considering utility's modest and declining financial resources]. 12 Rulemaking to Establish Rules for Enforcement of the Standards of Conduct Governing Relationships Between Energy Utilities and Their Affiliates Adopted By the Commission In Decision 97-12-088, issued April 9, 1998. 13 On the other hand, under a different set of facts that nonetheless caused it to question where § 854 was applicable, Lodi appropriately chose to file for Commission review. We approved that indirect change of control in D.03-02-071. 14 In addition, Koch Pipeline Co., which issued before the Affiliate Enforcement Rulemaking's D.98-12-075, and NetMoves Corp., which issued after, both appear to assume single, non-continuing violations. Koch Pipeline Co. does not apply § 2108 (which requires each day's continuing violation to count in the penalty calculation) to violation of § 851 in the sale of the pipeline at issue in that proceeding and NetMoves Corp. does not discuss § 2108.