· Rearrange 230 kV lines and add circuit breakers
¬ Projects:
· Eight Mile Road Substation 230 kV Loop Project (T091).
· Lockeford-City of Lodi Area Reinforcement (T602, T605).
· Tesla 500/230 kV Transformer Project (T558, T669).
¬ What happens if problem not fixed:
· There will be shortage of generation if the LODI generator or if one of the N-1 outage happens.
_ Stability
¬ Problem
_ None
_ Normal Overloads.
¬ Problem 1:
_ Contractual load obligation between PG&E and NCPA and the city of Lodi to serve 135 MW of load.
¬ Solution
_ Reconductor 4.6 miles of the Lockeford-Lodi No. 3 60 kV line and re-rate the remaining 4.5 miles using 4 feet per second wind speed criteria.
¬ Project
_ Lockeford-Lodi 60 kV Line (T605 & T608).
¬ What happens if problem is not fixed:
_ PG&E can not meet its contract obligation to NCPA and City of Lodi. Also this project eliminates the need for the City of Lodi turbine as a RMR unit and saves $900,000.
¬ Problem 2:
_ Meet electric load increases and reduce RMR cost.
¬ Solution:
_ Rearrange 230 kV lines into a distribution substation and add 3-230 kV circuit breakers and relays.
¬ Project:
_ Eight mile Road 230 kV Loop (T091)
¬ What happens if problem is not fixed:
_ Continued low 230 kV voltage at Stagg Substation with an N-1 outage, and the continued need for the City of Lodi STIG generating unit at a RMR unit.
¬ Problem 3:
_ 100 MW of normal thermal capacity needed at Tracy and transfer constraint to Bay Area of 800 MW under some operations conditions.
¬ Solution:
_ Install a 500/230 kV transformer at Tracy Substation
¬ Project:
_ Tesla 500/230 kV Transformer (T558 & T669)
¬ What happens if problem is not fixed:
_ Can not serve 100 MW of Normal thermal capacity and continue to have an 800 MW transfer constraint to Bay Area under certain operating conditions.
_ Contingency
¬ Problem
_ None