Tuesday, May 10, 2005
· Commission Meetings
· Notices
· Subscription Information (Daily Calendar and Agenda)
· Commissioner Office Hours
· Public Meetings and Workshops
· Notice of Draft Resolutions (PU Code § 311(g))
· New Filings
· Petitions for Modification and Applications for Rehearing
· Draft Decisions/Proposed Decisions/Alternates/Presiding Officer's Decisions/ Arbitrator's Reports
· Advice Letter Filings
· Miscellaneous Transportation Items
· Miscellaneous Telecommunication Matters
· Adjournments/Resettings/Hearings Concluded
· Removals from Calendar
· New Settings
· Law and Motion Hearings
· Final Oral Argument
· Hearings
· Notice of Denial of Request for Ex Parte Meeting
· Notice of All-Party Meetings (PU Code §1701.3(c))
· Notice of Ex Parte Communications
The Commission's policy is to schedule hearings (meetings, workshops, etc.) in locations that are accessible to people with disabilities. | ||
The CPUC encourages all Californians to participate in its meetings, hearings, workshops, and proceedings. We try to hold our public meetings only in places that are wheelchair accessible and which can accommodate specialized equipment and other services useful to people with disabilities. Please see the notice of the meeting you wish to attend for more specifics. If you plan to attend and need specialized accommodations for a particular meeting that are not listed in the notice, request them from the Public Advisor's Office at least three business days in advance of the meeting. Contact the Public Advisor's Office by any one of the following: | ||
Email:
public.advisor@cpuc.ca.gov |
FAX: 415-355-5404 (Attn.: Public Advisor) |
May 26, 2005 |
10:00 am |
San Francisco |
June 16, 2005 |
10:00 am |
San Francisco |
June 30, 2005 |
10:00 am |
San Francisco |
Ratesetting Deliberative Meeting dates are reserved as noted but will only be held if there are ratesetting matters to be considered.
May 23, 2005 |
1:30 pm |
San Francisco |
June 13, 2005 |
1:30 pm |
San Francisco |
June 27, 2005 |
1:30 pm |
San Francisco |
NONE
Starting May 24, 2004, the Central Files Office will be open for business from 8 a.m. to 12 noon only.
Unless otherwise directed, all courier-delivered documents submitted for filing as part of the formal record in a proceeding should be taken directly to the Commission's lobby, 505 Van Ness Avenue in San Francisco; Suite 500, 320 West 4th Street in Los Angeles; or Room 4006, 1350 Front Street in San Diego. All documents sent through the mail for formal filing should be addressed ONLY to the Commission's Docket Office, Room 2001, 505 Van Ness Avenue, San Francisco, CA 94102.
To purchase Commission documents, there is a charge of 20 cents a printed page (postage prepaid) with a minimum purchase of $2.00.
The auditorium, hearing rooms and training room at the headquarters of the California Public Utilities Commission, located at 505 Van Ness Avenue, San Francisco, are available for rent. Further information about requirements and fees can be obtained by contacting Colette Kondo at (415) 703-1401.
For information contact: |
California Public Utilities Commission |
May 12, 2005 |
Stonybrook Corp. - Conference Room |
Application of Union Pacific Railroad Company, Keene Water System (0434W), For Authorization to Increase
Rates and For Interim Rate Relief.
The workshop in the above-entitled matter will be held before Administrative Law Judge John E. Thorson.
Equipment Program Advisory Committee (EPAC) |
Deaf and Disabled Telecommunications Program Offices |
The EPAC of the Deaf and Disabled Telecommunications Program will hold a meeting to address the following:
PUBLIC MEETING AGENDA
I. Agenda Modification & Approval and Discussion of Interviews - 10:00 to 10:15; II. Interviews - 10:15 to 2:35;
III. Discussion and Vote - 2:40 to 3:15; IV. Public Input; V. Review of Minutes; VI. Chairs Report; VII. Equipment Program Manager's Report; and VII. CPUC Liaison Report.
Meeting Information: For more information, please contact Jane Elin, DDTP Committee Coordinator at (510) 302-1100 x110 voice or (510) 302-1118 TTY.
Environmental Notice: People with environmental illness or multiple chemical sensitivities must reduce their exposure in order to attend this meeting. Please refrain from wearing perfumes or scents to DDTP meetings.
May 16, 2005 |
California Public Utilities Commission |
The CHCF-B Administrative Committee will hold a public meeting on the following items:
1) Introduction; 2) Public Comments; 3) Review and Approval of the Minutes of the Previous Meeting; 4) Liaison Staff Report; a. Administrative Committee Budget Update; b. Financial Report on the CHCF-B Fund; c. Telecommunications Division's draft expense budget for Fiscal Year 2006-07; d. Liaison Report on what level of support will be available to the Committee in preparing the Annual Report due by October 1, 2005; e. Other Administrative Matters; 5) Budget Development; 6) Presentation from Legal Division regarding conflict of interest concerns and Statement of Economic Interests;
7) Discussion of how to make the Committee's recommendations duly recorded and noted with the Commission; 8) Annual Report; 9) Announcement; 10) New agenda items for next meetings; and 11) Date(s) and time(s) for future meeting(s).
The contact person for this meeting is Ravi Kumra at (415) 703-2112.
May 17, 2005 |
Civic Center Library Community Rooms |
May 17, 2005 |
San Clemente Inn |
Commissioner Geoffrey F. Brown is holding these Town Hall meetings to provide the public an opportunity to comment on Southern California Edison Company's request. Comments from the public can help the Commission reach an informed decision and members of the public are encouraged to attend the Town Hall.
If special arrangements are needed, such as sign and foreign language interpreters, please contact the PUC Public Advisor's Office at 415-703-2074 or toll free 1-866-849-8390 or TTY 415-703-5282 or 1-866-836-7825, or by email at
public.advisor@cpuc.ca.gov at least three days prior to the event.
For those who are unable to attend in person, written comments may be submitted to the following address:
California Public Utilities Commission
David Gamson
505 Van Ness Avenue, Room 5214
San Francisco, CA 94102
Or, comments may be sent via email to
DMG@cpuc.ca.gov. Please refer to proceeding number A.04-02-026.
Payphone Service Providers Advisory Committee |
California Public Utilities Commission |
The Payphone Service Providers Advisory Committee will hold a meeting to address the following:
PUBLIC MEETING AGENDA
1. Meeting Overview; 2. Public Input; 3. Review of Minutes from 02/08/05 Meeting; 4. Unfinished Business: a. Formal replacement ORA PSPC member and alternate, b. PPPP Moratorium Letter, c. Financials: "Indirect Cost" Breakdown,
d. Gina Cortez-Watkins, e. Hiring status of new PSPE Inspectors; 5. PSPE/PPPP/TPIC Program Financials; 6. PPPP Discussion; 7. PSPE Discussion: a. Payphone Inspections Report, b. 2004 Payphone Line Count Report, c. Staffing; 8. New items for future agenda; and 9. Date of next meeting.
Meeting Information: For more information, please contact Moira Simmerson, PSPC liaison at (415) 703-2452 voice or
1 (800) 229-6846 TTY.
Accessibility Notice: If you plan to attend and need specialized accommodations for this meeting, such as Deaf/Hearing Impaired sign language services, contact the Commission's Public Advisor's Office by any of the following:
Email:
Public.advisor@cpuc.ca.gov FAX: 415-355-5404 (Attn.: Public Advisor)
Toll-free: 1-866-849-8390 TTY: 1-866-836-7825 (toll-free)
Voice: 415-703-2074 1-415-703-5282
May 17, 2005 |
California Public Utilities Commission |
At the April 11, 2005 Low Income Oversight Board (LIOB) meeting, a sub-committee on strategic planning was formed consisting of three board members. This will serve as the first meeting of the sub-committee and is open to the public.
Interested parties may attend in person or may teleconference in. Training Room B at the California Public Utilities Commission is wheelchair accessible. Parties who need directions may call Zaida Amaya at (916) 324-8684,
zca@cpuc.ca.gov or Terrie Tannehill at (415) 703-1224
tjt@cpuc.ca.gov.
Teleconference Information: To use this option, please call: 1-866-675-0748 and then dial pass code 554377#. We ask any participants who wish to use this teleconference service to refrain from any additional sounds, such as, music on hold, background noises, as it interferes with the meeting attendees. If necessary, please use the mute function on your phone or disconnect from the call and reconvene at a more convenient time.
May 18, 2005 |
California Public Utilities Commission |
The Universal Lifeline Telephone Service (ULTS) Administrative Committees will hold a meeting to discuss: (1) Review and Approval of June 30, 2004 Meeting Minutes; (2) Updates on RHA Contracts; (3) Review and Approval of Fiscal Year 2006-07 Budget; (4) Briefing on Decision 05-04-024 Including Process for Selection of Third Party Administrator; (5) Future of ULTS Advisory Committee; (6) ULTSAC Member Nominations; (7) Form 700 and; and (8) Approval of Future Meeting Dates and Proposed Next Meeting Agenda.
The contact person for this meeting is Hassan Mirza at (415) 703-1638.
May 19, 2005 |
California Public Utilities Commission |
The CHCF-A Administrative Committee will hold a public meeting on May 19, 2005, on the following items: 1) Introduction ; 2) March 19, 2004 Meeting Minutes: Committee will review and approve March 19, 2004 meeting minutes prepared by TD; 3) Budget for 2005-06 submitted to CPUC Executive Director: Inform the Administrative Committee of the submission to the Executive Director of the TD proposed FY 2005-06 Budget on June 22, 2004 for public comment by the Vice-chairman; 4) Liaison Reports: a) Telecommunications Division (TD): Inform the Committee of the approval of the following: Resolution T-16893 - CHCF-A CY 2005 Support for the 17 small LECs; Resolution T-16876 on the CHCF-A FY 2005-06 Expense Budget; and Resolution T-16916 reducing the CHCF-A surcharge rate from 0.17% to 0.15% effective April 1, 2005; b) Legal Division : Update the Committee on the issue of Conflict of Interest; and Remind Committee members that Conflict of Interest Form 700 was due on April 1, 2005. A copy of Form 700 is available at:
http://www.fppc.ca.gov/forms/Form700-04-05.pdf; c) Information and Management Services Division (IMSD): Financial Report on the CHCF-A Fund 5) Proposed FY 2006-07 Budget: Committee will review and approve the proposed FY 2006-07 Budget for submission to the Executive Director on June 1, 2005; 6) Public Comments; 7) Future Meeting Dates: The Committee will schedule meeting date for next year; 8) Adjournment
The contact person for this meeting is Geraldine V. Carlin at (415) 703-2114.
The Telecommunications Division has prepared Resolution T-16903 for the May 26, 2005, Commission Agenda. This resolution approves Verizon California Inc.'s request to grandfather Caller ID - Number Only, Call waiting, Cancel Call Waiting, In Contact, In Contact Package, Smart ring with PAKS, and Custom Calling Service. The draft resolution of the Telecommunications Division in this matter was mailed to parties in accordance with PUC Code Section 311 (g)(1).
Any questions or comments should be directed to:
Rosalina White
Telecommunications Division
California Public Utilities Commission
505 Van Ness Avenue
San Francisco, CA 94102 or (415) 703-2124
http://www.cpuc.ca.gov/WORD_PDF/COMMENT_RESOLUTION/45688.doc
The Telecommunications Division has prepared Resolution T-16926 for the May 26, 2005, Commission Agenda. This resolution authorizes the Great Valley Center to act as fiscal agent for the Rural Telecommunications Grant Program. The draft resolution of the Telecommunications Division in this matter was mailed to parties in accordance with PUC Code Section 311 (g)(1).
Any questions or comments should be directed to:
Mary Jo Borak
Telecommunications Division
California Public Utilities Commission
505 Van Ness Avenue
San Francisco, CA 94102 or (415) 703-1879
http://www.cpuc.ca.gov/WORD_PDF/COMMENT_RESOLUTION/45889.doc
NONE
4/29/05 |
A.04-11-007 - Application of Pacific Gas and Electric Company (U 39 E) for Rate and Line Extension Incentives for Conversion of Stationary Agricultural Internal Combustion Equipment to Electric Service, and |
5/2/05 |
R.02-11-039 - Rulemaking to implement the provisions of Public Utilities Code § 761.3 enacted by Chapter 19 of the 2001-02 Second Extraordinary Legislative Session. |
5/6/05 |
A.03-10-057 (Phase 2) - In the matter of the Application of the SOUTHERN CALIFORNIA WATER COMPANY (U 133 W) for an order authorizing it to increase rates for water service in 2004 in its Region 1 Customer Service Areas by $179,200 or 2.62% in the Arden-Cordova CSA; $93,400 or 1.98% in the Bay Point CSA; and $115,900 or 4.55% in the Ojai CSA; and various other relief. |
A.04-12-014 - Application of Southern California Edison Company (U 338-E) for Authority to, Among Other Things, Increase Its Authorized Revenues For Electric Service In 2006, And to Reflect That Increase In Rates, | |
ALJ Barnett |
R.01-08-028 - Order Instituting Rulemaking to Examine the Commission's Future Energy Efficiency Policies, Administration and Programs, RE SESCO motion of quash, |
NONE
6/15/05 |
A.05-03-015 (PHC) - Application of San Diego Gas & Electric Company (U-902-E) for Adoption of an Advanced Metering Infrastructure Deployment Scenario and Associated Cost Recovery and Rate Design, |
6/16/05 |
A.05-03-015 (EH) - Application of San Diego Gas & Electric Company (U-902-E) for Adoption of an Advanced Metering Infrastructure Deployment Scenario and Associated Cost Recovery and Rate Design, |
9/6/05 |
A.05-03-015 (EH) - Application of San Diego Gas & Electric Company (U-902-E) for Adoption of an Advanced Metering Infrastructure Deployment Scenario and Associated Cost Recovery and Rate Design, |
9/26/05 |
A.04-12-007 (EH) - In the Matter of the Application of Southern California Edison Company (U 338-E) for a Certificate of Public Convenience and Necessity Concerning the Antelope-Pardee 500 kV (Segment 1) Transmission Project as Required by Decision 04-06-010 and as Modified by Subsequent Assigned Commissioner Ruling, and |
Law and Motion Hearings are held before Administrative Law Judges Hallie Yacknin and John E. Thorson at 10:00 a.m. in one of the Commission's San Francisco Office Hearing Rooms, unless otherwise noted. Law and Motion procedures are governed by Resolution ALJ 164. Copies of Resolution ALJ 164 are available from the Commission's Documents Desk (415) 703-1713 or from Central Files (415) 703-2045.
NONE SCHEDULED | |
5/23/05 |
NONE SCHEDULED |
5/30/05 |
NONE SCHEDULED |
NONE
Dates in parentheses following the word "also" are subject to change without notice. The assigned Commissioner's name is listed next to the proceedings as matter of record; the assigned Commissioner may not be present at the hearing.
(PHC) = Prehearing Conference |
(ECP) = Expedited Complaint Procedure |
(CA) = Closing Argument |
(EH) = Evidentiary Hearing |
(OSC) = Order to Show Cause |
(LM) = Law & Motion |
(PPH) = Public Participation Hearing |
(WS) = Workshop |
(OA) = Oral Argument |
(IAM) = Initial Arbitration Meeting |
(FPH) = Full Panel Hearing |
|
(M) = Mediation |
(AH) = Arbitration Hearing |
5/10/05 |
A.99-05-029 (PHC) - In the Matter of the Application of SOUTHERN CALIFORNIA GAS COMPANY for Authority Pursuant to Public Utilities Code Section 851 to Sell Certain Real Property in Playa del Rey, California. (U 904 G), |
5/10/05 |
A.04-12-014 (PPH) - Application of Southern California Edison Company (U 338-E) for Authority to, Among Other Things, Increase Its Authorized Revenues For Electric Service In 2006, And to Reflect That Increase In Rates, |
5/11/05 |
R.04-03-017 (EH) - Order Instituting Rulemaking Regarding Policies, Procedures and Incentives for Distributed Generation and Distributed Energy Resources, |
5/12/05 |
A.04-11-004 (WS) - Application of Union Pacific Railroad Company, Keene Water System (0434W), For Authorization to Increase Rates and For Interim Rate Relief, |
5/12/05 |
A.05-02-012 (PPH) - In the Matter of the Application of California American Water Company (U 210 W) for an order authorizing it to increase its rates for water service in its Monterey District to increase revenues by $9,456,100 or 32.88% in the year 2006; $1,894,100 or 4.95% in the year 2007; and $1,574,600 or 3.92% in the year 2008; and for an order authorizing sixteen Special Requests with revenue requirements of $3,815,900 in the year 2006, $5,622,300 in the year 2007, and $8,720,500 in the year 2008; the total increase in rates for water service combined with the sixteen Special Requests could increase revenues by $13,272,000 or 46.16% in the year 2006; 7,516,400 or 17.86% in the year 2007; and $10,295,100 or 20.73% in the year 2008, and |
5/16/05 |
A.04-09-028 (EH) - In the Matter of Application of California Water Service Company (U 60 W), a corporation, for an order authorizing it to increase rates charged for water service in the Chico District by $2,614,975 or 24.20% in fiscal 2005-2006, by $603,000 or 4.46% in fiscal 2006-2007, and by $603,000 or 4.27% in fiscal 2007-2008, and |
5/17/05 |
A.04-06-024 (PHC) - Application of Pacific Gas and Electric Company To Revise Its Electric Marginal Costs, Revenue Allocation, and Rate Design U 39 M, |
5/17/05 |
A.05-04-004 (PHC) - Application of Southern California Edison Company (U 338-E) for a Commission Finding that its Procurement-Related and Other Operations for the Record Period January 1 Through December 31, 2004 Complied with its Adopted Procurement Plan; for Verification of its Entries in the Energy Resource Recovery Account and other Regulatory Accounts; for Recovery of a Nuclear Incentive Procedure Reward of $12.6 million; and for Recovery of $6.7 million Recorded in the Electric Energy Transaction Administration Memorandum Account, |
5/17/05 |
A.04-05-002 (PHC) - In the Matter of the Request for Arbitration of XO California, Inc. of an Amendment to an Interconnection Agreement with SBC California pursuant to Section 252(b) of the Communications Act of 1934, as amended, |
5/18/05 |
R.04-04-026 (PHC) - Order Instituting Rulemaking to Implement the California Renewables Portfolio Standard Program, |
5/19/05 |
A.05-01-020 (PHC) - In the Matter of the Application of Citizens Telecommunications Company of California, Inc. (U 1024 C), dba, Frontier Communications of California, to Establish Price Floors for Local Measured Usage, Extended Area Service and Zone Usage Measurement, |
5/19/05 |
A.05-02-020 (PHC) - Application of GLOBAL VALLEY NETWORKS (U-1008-C) pursuant to Public Utilities Code Sections 851 through 854 for authority to sell an office building and related land, |
5/20/05 |
I.05-04-019 (PHC) - In the Matter of the Order Instituting Investigation and Order to Show Cause on the Commission's own motion into the operations and practices of Mr. Move Moving & Storage, Inc., a California corporation, doing business as Load Rock N Roll Moving and Storage, Right Now Moving and Storage, Same Day Moving, Short Notice Moving and Storage, A All-American Relocation, Load Lock N Roll, Long Beach Security Storage, Mister Move, and its president, Eli Galam. Respondents, |
5/20/05 |
C.05-01-022 (PHC) - Richard E. and Joyce A. Kline, Complainants, vs. Pacific Gas and Electric Company, Defendant, |
5/23/05 |
A.04-06-024 (EH) - Application of Pacific Gas and Electric Company To Revise Its Electric Marginal Costs, Revenue Allocation, and Rate Design U 39 M, |
5/23/05 |
A.04-07-033 (EH) - In the Matter of the Application of Silverado Stages, Inc. for authority to operate as a Passenger Stage Corporation Between Points in San Luis Obispo and Santa Barbara Counties and the Los Angeles International Airport and the Ports of San Pedro and Long Beach and to Establish a Zone of Rate Freedom, |
5/23/05 |
C.05-02-011 (PHC) - Jon Gibson Company, Complainant, vs. California-American Water Company, Defendant, |
5/24/05 |
R.05-02-023 (PHC) - Order Instituting Rulemaking to Revise Commission General Order Number 95 Pursuant to Decision 05-01-030, |
5/24/05 |
A.05-03-005 (PHC) - In the Matter of the Application of SBC California (U 1001 C) for a Surcharge and a Balancing Account to Recover Undergrounding Costs in the City of San Diego, |
5/25/05 |
A.04-12-007 (PHC) - In the Matter of the Application of Southern California Edison Company (U 338-E) for a Certificate of Public Convenience and Necessity Concerning the Antelope-Pardee 500 kV (Segment 1) Transmission Project as Required by Decision 04-06-010 and as Modified by Subsequent Assigned Commissioner Ruling, and |
5/25/05 |
R.03-10-003 (EH) - Order Instituting Rulemaking to Implement Portions of AB 117 Concerning Community Choice Aggregation, |
5/27/05 |
A.04-07-042 (EH) - In the matter of the Application of Hillview Water Company (U 194-W) for authority to increase rates: In 2004 $251, 233, or 28.32% above the revenues generated by present rates, |
6/2/05 |
A.05-03-001 (PHC) - Application of Pacific Gas and Electric Company for Adoption of Policy and Process For Acquisition of Incremental Core Gas Storage in Compliance with Ordering Paragraph 5 of Decision 04-09-022, And for Adoption of a Core Reliability Planning Standard, |
6/6/05 |
A.05-02-005 (EH) - In the Matter of the Application of Apple Valley Ranchos Water Company (U346W) for Authority to Increase Rates Charged for Water Service by $2,748,100 or 18.56% in 2006, $496,580 or 2.69% in 2007, and $1,075,879 or 5.46% in 2008, |
6/6/05 |
A.04-12-014 (PHC) - Application of Southern California Edison Company (U 338-E) for Authority to, Among Other Things, Increase Its Authorized Revenues For Electric Service In 2006, And to Reflect That Increase In Rates, |
6/6/05 |
R.01-08-028 (PHC) - Order Instituting Rulemaking to Examine the Commission's Future Energy Efficiency Policies, Administration and Programs, RE SESCO motion of quash, |
6/7/05 |
A.04-12-014 (EH) - Application of Southern California Edison Company (U 338-E) for Authority to, Among Other Things, Increase Its Authorized Revenues For Electric Service In 2006, And to Reflect That Increase In Rates, |
6/13/05 |
A.04-07-018 (EH) - In the Matter of the Application of SOUTHERN CALIFORNIA WATER COMPANY (U 133-W), for an Order pursuant to Public Utilities Code Section 851 approving a Reallocation Agreement with the City of Folsom, as directed by D.04-04-069, |
6/14/05 |
A.05-02-027 (PPH) - In the Matter of the Joint Application of SBC Communications Inc. ("SBC") and AT&T Corp. ("AT&T") for Authorization to Transfer Control of AT&T Communications of California (U-5002), TCG Los Angeles, Inc. (U-5462), TCG San Diego (U-5389), and TCG San Francisco (U-5454) to SBC, Which Will Occur Indirectly as a Result of AT&T's Merger With a Wholly-Owned Subsidiary of SBC, Tau Merger Sub Corporation, |
6/15/05 |
A.05-03-015 (PHC) - Application of San Diego Gas & Electric Company (U-902-E) for Adoption of an Advanced Metering Infrastructure Deployment Scenario and Associated Cost Recovery and Rate Design, |
6/16/05 |
A.05-03-015 (EH) - Application of San Diego Gas & Electric Company (U-902-E) for Adoption of an Advanced Metering Infrastructure Deployment Scenario and Associated Cost Recovery and Rate Design, |
6/20/05 |
A.04-12-003 (EH) - Application of SOUTHERN CALIFORNIA EDISON (U 338-E) for Authorization to Recover Costs Recorded in the Catastrophic Events Memorandum Account, |
6/21/05 |
A.04-11-013 (EH) - Application of Pacific Gas and Electric Company for an Ex Parte Order Granting Limited Exemptions from the Affiliate Transaction Rules Adopted in D.97-12-088, as Subsequently Modified. (U 39 E), |
6/23/05 |
C.00-05-010 (PHC) - Rita Boppana, Complainant, vs. Southern California Gas Company, Defendant, and |
6/29/05 |
R.04-01-025 (PHC) - Order Instituting Rulemaking to Establish Policies and Rules to Ensure Reliable, Long-Term Supplies of Natural Gas to California, |
6/30/05 |
I.05-03-011 (PHC) - Investigation on the Commission's Own Motion Into the Operations and Practices of Pacific Gas and Electric Company; Notice of Opportunity for Hearing; and Order to Show Cause Why the Commission Should Not Impose Fines and Sanctions For the December 20, 2003 PG&E Mission Substation Fire and Electric Outage Pursuant to Public Utilities Code Section 451, |
7/8/05 |
A.05-01-033 (EH) - Application of Hillview Water Company, Inc. to borrow $1,800,000 and issue a note under Sections 816-830 of the Public Utilities Code, |
7/11/05 |
R.04-01-025 (EH) - Order Instituting Rulemaking to Establish Policies and Rules to Ensure Reliable, Long-Term Supplies of Natural Gas to California, |
7/12/05 |
A.04-11-004 (TELEPHONIC - PHC) - Application of Union Pacific Railroad Company, Keene Water System (0434W), For Authorization to Increase Rates and For Interim Rate Relief, |
7/18/05 |
A.05-02-019 (EH) - In the Matter of the Application of San Diego Gas & Electric Company (U 902-E) for Authority to Make Various Electric Rate Design Changes, Close Certain Rates, and Revise Cost Allocation Among Customer Classes Effective, January 1, 2006, |
7/20/05 |
A.04-11-004 (EH) - Application of Union Pacific Railroad Company, Keene Water System (0434W), For Authorization to Increase Rates and For Interim Rate Relief, |
7/25/05 |
A.05-02-019 (EH) - In the Matter of the Application of San Diego Gas & Electric Company (U 902-E) for Authority to Make Various Electric Rate Design Changes, Close Certain Rates, and Revise Cost Allocation Among Customer Classes Effective, January 1, 2006, |
7/25/05 |
I.04-04-024 (PPH) - Order Instituting Investigation into the Proposal of Sound Energy Solutions to Construct and Operate a Liquefied Natural Gas Terminal at the Port of Long Beach, |
7/27/05 |
A.05-02-012 (EH) - In the Matter of the Application of California American Water Company (U 210 W) for an order authorizing it to increase its rates for water service in its Monterey District to increase revenues by $9,456,100 or 32.88% in the year 2006; $1,894,100 or 4.95% in the year 2007; and $1,574,600 or 3.92% in the year 2008; and for an order authorizing sixteen Special Requests with revenue requirements of $3,815,900 in the year 2006, $5,622,300 in the year 2007, and $8,720,500 in the year 2008; the total increase in rates for water service combined with the sixteen Special Requests could increase revenues by $13,272,000 or 46.16% in the year 2006; 7,516,400 or 17.86% in the year 2007; and $10,295,100 or 20.73% in the year 2008, and |
7/29/05 |
A.05-02-027 (PHC) - In the Matter of the Joint Application of SBC Communications Inc. ("SBC") and AT&T Corp. ("AT&T") for Authorization to Transfer Control of AT&T Communications of California (U-5002), TCG Los Angeles, Inc. (U-5462), TCG San Diego (U-5389), and TCG San Francisco (U-5454) to SBC, Which Will Occur Indirectly as a Result of AT&T's Merger With a Wholly-Owned Subsidiary of SBC, Tau Merger Sub Corporation, |
8/4/05 |
I.04-04-024 (EH) - Order Instituting Investigation into the Proposal of Sound Energy Solutions to Construct and Operate a Liquefied Natural Gas Terminal at the Port of Long Beach, |
8/8/05 |
A.05-02-027 (EH) - In the Matter of the Joint Application of SBC Communications Inc. ("SBC") and AT&T Corp. ("AT&T") for Authorization to Transfer Control of AT&T Communications of California (U-5002), TCG Los Angeles, Inc. (U-5462), TCG San Diego (U-5389), and TCG San Francisco (U-5454) to SBC, Which Will Occur Indirectly as a Result of AT&T's Merger With a Wholly-Owned Subsidiary of SBC, Tau Merger Sub Corporation, |
8/15/05 |
A.05-02-014 (EH) - Application of Pacific Gas and Electric Company for Review of Entries to the Energy Resources Recovery Account (ERRA) And Compliance Review of Electric Contract Administration, Economic Dispatch of Electric Resources, and Utility-Retained Generation Fuel Procurement Activities, (U 39 E), |
8/15/05 |
R.04-04-003 (EH) - Order Instituting Rulemaking to Promote Policy and Program Coordination and Integration in Electric Utility Resource Planning, and |
9/6/05 |
A.05-03-015 (EH) - Application of San Diego Gas & Electric Company (U-902-E) for Adoption of an Advanced Metering Infrastructure Deployment Scenario and Associated Cost Recovery and Rate Design, |
9/7/05 |
I.05-03-011 (EH) - Investigation on the Commission's Own Motion Into the Operations and Practices of Pacific Gas and Electric Company; Notice of Opportunity for Hearing; and Order to Show Cause Why the Commission Should Not Impose Fines and Sanctions For the December 20, 2003 PG&E Mission Substation Fire and Electric Outage Pursuant to Public Utilities Code Section 451, |
9/12/05 |
A.04-12-014 (EH) - Application of Southern California Edison Company (U 338-E) For Authority to, Among Other Things, Increase Its Authorized Revenues For Electric Service in 2006, And to Reflect That Increase in Rates, |
9/26/05 |
A.04-12-007 (EH) - In the Matter of the Application of Southern California Edison Company (U 338-E) for a Certificate of Public Convenience and Necessity Concerning the Antelope-Pardee 500 kV (Segment 1) Transmission Project as Required by Decision 04-06-010 and as Modified by Subsequent Assigned Commissioner Ruling, and |
10/11/05 |
A.04-12-014 (EH) - Application of Southern California Edison Company (U 338-E) For Authority to, Among Other Things, Increase Its Authorized Revenues For Electric Service in 2006, And to Reflect That Increase in Rates, |
NONE
Copies of tendered notices are available in the Central Files Office for review and/or reproduction under existing procedures. They are also available from the filing party who is under the obligation to provide copies of the notice without delay.
5/6/05 |
R95-04-043 |
Rulemaking on the Commission's own motion into competition for local exchange service and |
I95-04-044 |
Investigation on the Commission's own motion into competition for local exchange service. |
Summary: On May 3, 2005, Eric Batongbacal, Executive Director-Regulatory Matters of Pacific Bell Telephone Company dba SBC California (SBC CA), met with Timothy Sullivan, advisor to Cmmr. Kennedy, in San Francisco. Also present were Joe Kieren, Director-Regulatory, and Ed Kolto, General Attorney State Regulatory, for SBC CA. SBC CA representatives discussed the manner in which to resolve the change of law issues relating to the Federal Communications Commission's Triennial Review Order and Triennial Review Remand Order. In particular, SBC CA's representatives discussed the possibility of initiating a consolidated change of law proceeding, either as part of the TRO proceeding or in a separate proceeding. | |
Filer: Pacific Bell Telephone Company dba SBC California | |
Contact: Gina Lee |
Phone: (415) 542-2633 |
5/6/05 |
A02-03-047 |
Southern California Gas Company and San Diego Gas and Electric Company, for Authority to Continue Funding of LEV Programs. |
A02-03-048 |
Southern California Edison Company, to Extend the Operation of its Electric Vehicle Adjustment Clause Mechanism and Related Accounts until the date of the Commission's Final Decision in Edison's Test Year 2003 General Rate Case Proceeding. | |
A02-03-049 |
Pacific Gas and Electric Company (U 39-E), for Review of and Authorization for Recovery of Costs relating to its Low Emission Vehicle (LEV) Program for 2002 through 2005. |
Summary: On May 3, 2005, Sabrina Chaw, Manager, Regulatory Relations, Pacific Gas and Electric Company (PG&E), met with David Gamson, advisor to Cmmr. Brown, and Julie Fitch, advisor to Pres. Peevey, in two separate meetings in San Francisco. At the meeting with Julie Fitch also present was Rami Kahlon, advisor to Pres. Peevey. Gail Slocum, Attorney, PG&E, also participated in these meetings. Chaw stated that PG&E supports the alternate decision, sponsored by Cmmr. Kennedy. Slocum stated that Public Utilities Code Section 451 supports Commission consideration of air quality benefits in determining whether Low Emissions Vehicles (LEV) programs should be approved. Slocum emphasized that all LEV programs have been found to provide safety, reliability, and cost reduction benefit. However, Slocum noted that if air quality benefits are found in an LEV program, the Commission should not use air quality benefits as a reason to deny funding for that particular program. During the meeting with Julie Fitch, Slocum added that PG&E does not oppose eliminating the NGV balancing account, once the LEV costs begin to be recovered in PG&E's distribution revenue requirement in its General Rate Case. However, Slocum noted that PG&E assumes that the balancing account remains in place, unless the decision orders the elimination of the account. | |
Filer: Pacific Gas and Electric Company | |
Contact: Michelle Brown |
Phone: (415) 973-4662 |