D1104033 Order Granting Ltd Rhrng of D1012055 on the Issue of GHG Compliance Costs
Word Document PDF Document

ATTACHMENT B

Standard Contract for Eligible CHP Facilities with
Net Output not Greater than 5 MW

POWER PURCHASE AND SALE AGREEMENT

between

[BUYER'S NAME]

and

[SELLER'S NAME]

This Power Purchase and Sale Agreement (this "Agreement") by and between [Buyer's name], a California corporation ("Buyer"), and [Seller's name], a [Seller's form of business entity and state of registration] ("Seller"), is dated as of [Date of execution] (the "Effective Date"). Buyer and Seller are sometimes referred to in this Agreement individually as a "Party" and jointly as the "Parties." Unless the context otherwise specifies or requires, initially capitalized terms used in this Agreement have the meanings set forth in Exhibit A. Exhibits A through G inclusive are hereby incorporated into and made a part of this Agreement.

RECITALS

A. On June 26, 2008, the CPUC opened Rulemaking 08-06-024 to implement Assembly Bill 1613 (codified in California Public Utilities Code Section 2840 et. seq.), which establishes the Waste Heat and Carbon Emissions Reductions Act (the "Act").

B. Buyer is required to offer this Agreement to Seller in order to fulfill its obligations under the Act and Decision [___], and Seller desires to accept such offer and enter into this Agreement.

The Parties, intending to be legally bound, agree as follows:

{Buyer Comment: If the Term is greater than or equal to five years and if the Generating Facility provides baseload generation, before executing this Agreement, Seller must provide to Buyer documentation evidencing its compliance with the Greenhouse Gas Emissions Performance Standard set forth in D.07-01-039 and in subsequent CPUC rulings implementing D.07-01-039, and with any subsequent CPUC-established precondition to the execution of this Agreement.}

ARTICLE 1. SPECIAL CONDITIONS

1.01 Term. The term of this Agreement (the "Term") commences on [Date] (the "Term Start Date") and ends on [Date] (the "Term End Date"). The Term Start Date must be on the first day of a calendar month. If the Generating Facility is (a) a New Eligible CHP Facility, the Term Start Date must occur within 18 months of the Effective Date, or (b) an Existing Eligible CHP Facility, the Term Start Date must occur within 6 months of the Effective Date. Subject to the limitation set forth in the immediately preceding sentence, Seller may change the Term Start Date set forth in this Section 1.01 by providing Notice to Buyer at least three months before such Term Start Date. The Term must be no less than one year and no more than 10 years.

1.02 Generating Facility. The name of the Generating Facility is [Generating Facility name], which is [a New Eligible CHP Facility] [an Existing Eligible CHP Facility], and which is further described in Exhibit G. The Generating Facility is located at [Generating Facility address], which must be located within Buyer's service territory.

1.03 As-Available Contract Capacity; Power Rating. The As-Available Contract Capacity equals [___] kW. (The As-Available Contract Capacity must be no greater than 5 MW.) The Power Rating of the Generating Facility must be no more than 20 MW. Seller has no obligation under this Agreement to produce or deliver firm energy or capacity.

1.04 Site Host Load. The Site Host Load is expected to equal, on average, [___] kW. The amount of electric energy to be used to serve the Site Host Load is expected to equal, on average, [___] kWh per Term Year, which amount may change from time to time; provided, however, that Seller shall provide Notice to Buyer at least 30 days, or as soon as otherwise is practicable, before any such change that Seller reasonably anticipates will be greater than 4,380,000 kWh, on an annual basis; and provided further, that the As-Available Contract Capacity shall never exceed 5 MW.

1.05 Expected Term Year Energy Production. The Expected Term Year Energy Production for each Term Year equals [___] kWh. The actual energy production of the Generating Facility may change from time to time; provided, however, that (a) Seller shall provide Buyer with 30 days advance Notice of any change to the actual energy production that Seller reasonably anticipates will be greater than 4,380,000 kWh, on an annual basis, and (b) the Expected Term Year Energy Production may not exceed the As-Available Contract Capacity at 100% capacity factor applied over the Term Year.

1.06 Delivery Point. The delivery point is the point where Seller's facilities connect with facilities owned by Buyer (the "Delivery Point"). Seller shall convey to Buyer and Buyer shall accept all the As-Available Contract Capacity and associated electric energy from the Generating Facility at the Delivery Point. Title to and risk of loss related to the Power Product shall transfer from Seller to Buyer at the Delivery Point. Buyer shall pay any transmission or distribution costs to deliver the power from the Generating Facility's bus bar to the point of interconnection of the Generating Facility to the CAISO-Controlled Grid (Interconnection Point); Seller shall be responsible for interconnection costs, including necessary facility upgrades (consistent with Applicable Laws and the Interconnection Agreement), and line losses from the Delivery Point to the Interconnection Point.

1.07 Power Product Prices. The Monthly Contract Payment for the Power Product is set forth in Exhibit B.

1.08 Scheduling Coordinator. Buyer is the Scheduling Coordinator under this Agreement. Buyer shall take all steps necessary to be authorized as the Scheduling Coordinator during the Term. Seller shall cooperate with Buyer in good faith to assure that Buyer is authorized as the Scheduling Coordinator during the Term. In accordance with Section 4.01, Buyer shall invoice to Seller and set off against future payments to Seller:

ARTICLE 2. SELLER'S SATISFACTION OF OBLIGATIONS; TERMINATION

2.01 Seller's Satisfaction of Obligations before the Term Start Date. Before the Term Start Date, Seller must demonstrate to Buyer that Seller has satisfied all of the requirements necessary for Seller to Operate the Generating Facility in accordance with the terms of this Agreement (including Section 7.10), Applicable Law, the CAISO Tariff (to the extent applicable), and any other applicable tariff, legal, and regulatory requirements.

2.02 Termination Rights of the Parties.

ARTICLE 3. SELLER'S OBLIGATIONS

3.01 Conveyance of the Product. During the Term, Seller shall provide and convey the Product to Buyer in accordance with the terms of this Agreement, and Buyer shall have the exclusive right to the Product. Seller shall, at its own cost, take all reasonable actions and execute all documents or instruments that are reasonable and necessary to effectuate the use of the Green Attributes, Capacity Attributes and Resource Adequacy Benefits for Buyer's benefit throughout the Term.

3.02 Resource Adequacy. In accordance with Public Utilities Code section 2841(f), Seller grants, pledges, assigns and otherwise commits to Buyer the generating capacity of the Generating Facility to the extent necessary in order for Buyer to count such generating capacity to meet its resource adequacy obligations. Seller shall comply with any demonstration required under Applicable Law in order for Buyer to exercise its rights under this Section 3.02.

3.03 Greenhouse Gas (GHG) Emission Compliance Costs - Buyer shall be responsible for Direct GHG Compliance Costs attributable to the Generating Facility for GHG emissions associated with the Power Product. Buyer shall reimburse Seller for any Direct GHG Compliance Costs attributable to the Generating Facility for GHG emissions associated with the Power Product, within forty-five (45) days of Buyer's receipt from Seller of documentation, in form and substance acceptable to Buyer, establishing: (i) that Seller is actually liable for the Direct GHG Compliance Costs for emissions attributed to the Power Product during the services term of this contract; (ii) that Direct GHG Compliance Costs were imposed upon Seller by an authorized governmental authority with jurisdiction to impose the Direct GHG Compliance Costs where the Unit is located, or which otherwise has jurisdiction over Seller or the Unit.

3.04 Exclusive Rights. Notwithstanding anything to the contrary in this Agreement, as of the Effective Date and until the Term End Date, Seller may not use, provide or convey any of the Product to any Person other than Buyer.

3.05 Site Control. Within 60 days of the Effective Date and until the Term End Date, Seller shall have Site Control.

3.06 Permits. Seller shall obtain and maintain all Permits necessary for the Seller to Operate the Generating Facility and to deliver electric energy from the Generating Facility to the Delivery Point.

3.07 Interconnection. Seller shall, at its own cost, obtain and maintain all interconnection rights and an interconnection agreement and any related Governmental Authority approval(s) required to enable interconnection with Buyer's electric system and Parallel Operation of the Generating Facility.

3.08 CAISO Relationship. Seller shall comply with all applicable provisions of the CAISO Tariff, including securing and maintaining in full force all CAISO agreements, certifications and approvals required in order for the Generating Facility to comply with the CAISO Tariff.

3.09 Generating Facility Modifications. Seller shall provide at least 30 days advance Notice to Buyer before making any material modification to the Generating Facility, which Notice will include a description of any change in actual energy production of the Generating Facility and in the Site Host Load anticipated as a result of the modification. Notwithstanding the foregoing, Seller shall make no modification to the Generating Facility that would prevent Seller from complying with the terms of this Agreement.

3.10 Metering.

3.11 Provision of Information. Seller shall promptly provide to Buyer all documents reasonably requested by Buyer relating to the Generating Facility (including site plan drawings and single-line diagrams), the administration of this Agreement, or in order for Buyer to comply with any discovery or data request for information from the CPUC, CEC, FERC, any court, administrative agency, legislative body or other tribunal.

3.12 Operation. Seller shall:

3.13 Fuel Supply. Seller shall supply all fuel required for the Power Product and any testing of the Generating Facility.

3.14 Power Product Curtailments at Request of Scheduling Coordinator, Transmission Provider, or CAISO. Seller shall promptly curtail the production of the Power Product upon receipt of a notice or instruction from Seller's Scheduling Coordinator, the Transmission Provider, or the CAISO; provided, however, that Buyer, in its role as Scheduling Coordinator, shall issue such an instruction only when Buyer is expressly directed to curtail production of the Power Product by the CAISO or where Buyer reasonably believes that curtailment of the Power Product is required to comply with (a) its maintenance requirements and operating orders, (b) a CAISO Declared Over-Generation Condition, or (c) an Emergency. Whenever practicable, Buyer will use commercially reasonable efforts to provide Seller reasonable advance notice of the possibility that a reduction or interruption of deliveries may be required.

3.15 Eligible CHP Facility Status.

3.16 Notice of Cessation or Termination of Service Agreements. Seller shall provide Notice to Buyer within one Business Day if there is a termination of, or cessation of service under, any agreement required in order for the Generating Facility to (a) interconnect with the Transmission Provider's electric system, (b) transmit and deliver electric energy to the Delivery Point, or (c) own and operate any CAISO-Approved Meter.

3.17 Buyer's Access Rights. Buyer has the right to examine the Site, the Generating Facility and the Operating records for any purpose connected with this Agreement upon providing Seller with reasonable advance Notice under the circumstances.

3.18 Planned Outages. Seller shall schedule and utilize all planned outages in accordance with the procedures and subject to the limitations set forth in Exhibit D.

3.19 Seller Ownership and Control of Generating Facility. Seller agrees, that, in accordance with FERC Order No. 697, upon request of Buyer, Seller shall submit a letter of concurrence in support of an affirmative statement by Buyer that the contractual arrangement set forth in this Agreement does not transfer "ownership or control of generation capacity" from Seller to Buyer as the term "ownership or control of generation capacity" is used in 18 CFR Section 35.42. Seller also agrees that it will not, in filings, if any, made subject to Order Nos. 652 and 697, claim that the contractual arrangement set forth in this Agreement conveys ownership or control of generation capacity from Seller to Buyer.

3.20 Regulation of Net Output of the Generating Facility. In its sole discretion, Buyer may require that Seller install, at Seller's sole cost, a device or equipment that will disable the Generating Facility from delivering electric energy at a rate greater than 5,000 kWh per hour of Metered Energy. At Buyer's request, Seller shall install such device before the Term Start Date or within 60 days if Buyer's request is made any time after the Term Start Date. Unless otherwise agreed to by the Parties, Buyer shall own, operate, and maintain such device at Seller's sole cost. Any such device shall be agreed upon by Seller and Buyer and must, in accordance with Prudent Electrical Practices, be suitable to the purpose for which it is installed and meet the Transmission Provider's interconnection requirements.

ARTICLE 4. BUYER'S OBLIGATION TO PAY

4.01 Obligation to Pay.

ARTICLE 5. FORCE MAJEURE

5.01 No Default for Force Majeure. Neither Party will be in default in the performance of any of its obligations set forth in this Agreement, except for obligations to pay money, when and to the extent failure of performance is caused by Force Majeure.

5.02 Requirements Applicable to the Claiming Party. If a Party, because of Force Majeure, is rendered wholly or partly unable to perform its obligations when due under this Agreement, such Party (the "Claiming Party") shall be excused from whatever performance is affected by the Force Majeure to the extent so affected. In order to be excused from its performance obligations under this Agreement by reason of Force Majeure:

5.03 Termination. The Non-Claiming Party may terminate this Agreement on at least five (5) Business Days' prior Notice, in the event of Force Majeure which materially interferes with such Party's ability to perform its obligations under this Agreement and which extends for more than 365 consecutive days, or for more than a total of 365 days in any consecutive 540-day period.

ARTICLE 6. EVENTS OF DEFAULT; REMEDIES

6.01 Events of Default. An "Event of Default" means the occurrence of any of the following:

6.02 Site Host Changes. Notwithstanding Section 6.01 above, with respect to Seller, an Event of Default shall not include (a) cessation of operation by the Site Host, or (b) the inability of Site Host to use the waste heat from the Generating Facility in a manner that is consistent with the requirements of the Act. If the Site Host ceases operation or is unable to use the waste heat from the Generating Facility in a manner that is consistent with the Act for a period of 365 days or more, either Party may terminate this Agreement. If Seller terminates this Agreement pursuant to this Section 6.02, then Seller (or any entity over which Seller or any owner or manager of Seller exercises Control) agrees to waive any right it may have under the Act to enter into any new agreement to sell energy, capacity, or attributes from the Generating Facility to Buyer or any other California investor-owned utility for a period of one following the effective date of such termination.

6.03 Early Termination. If an Event of Default has occurred, there will be no opportunity for cure except as specified in Section 6.01. The Party not in default (the "Non-Defaulting Party") will have the right to (a) designate by no more than twenty (20) days' Notice to the Defaulting Party a date for the early termination of this Agreement (an "Early Termination Date"), (b) immediately suspend performance under this Agreement, and (c) pursue all remedies available at law or in equity against the Defaulting Party (including monetary damages), subject to the terms of this Agreement.

ARTICLE 7. MISCELLANEOUS

7.01 Representations, Warranties and Covenants. On the Effective Date, each Party represents, warrants, and covenants to the other Party that:

7.02 Additional Representations, Warranties, and Covenants by Seller. Seller represents, warrants and covenants to Buyer that:

7.03 Indemnity.

7.04 Assignment. Seller may not assign this Agreement or its rights under this Agreement without the prior written consent of Buyer, which consent may not be unreasonably withheld; provided, however, that Seller may, without the consent of Buyer (and without relieving Seller from liability hereunder), transfer, sell, pledge, encumber or assign this Agreement or the accounts, revenues or proceeds hereof to its Lender(s) in connection with any financing if (a) such Lender(s) assumes the payment and performance obligations provided under this Agreement with respect to Seller, (b) such Lender(s) agree in writing to be bound by the terms and conditions of this Agreement, and (c) Seller delivers such tax and enforceability assurance as Buyer may reasonably request.

7.05 Governing Law and Jury Trial Waiver. THIS AGREEMENT AND THE RIGHTS AND DUTIES OF THE PARTIES HEREUNDER ARE GOVERNED BY AND CONSTRUED, ENFORCED AND PERFORMED IN ACCORDANCE WITH THE LAWS OF THE STATE OF CALIFORNIA, WITHOUT REGARD TO PRINCIPLES OF CONFLICTS OF LAW. TO THE EXTENT ENFORCEABLE AT SUCH TIME, EACH PARTY WAIVES ITS RESPECTIVE RIGHT TO ANY JURY TRIAL WITH RESPECT TO ANY LITIGATION ARISING UNDER OR IN CONNECTION WITH THIS AGREEMENT.

7.06 Arbitration. Except for matters relating to specific performance, injunctive relief or other equitable remedies, the Parties agree to submit to arbitration any and all matters in dispute or controversy among them concerning the terms of this Agreement. Unless the Parties agree to alternative arrangements, the selection of arbitrators and the procedure shall be in accordance with the commercial arbitration rules then in effect of the Judicial Arbitration and Mediation Services, Inc. Any award rendered shall be final and conclusive upon the Parties and a judgment thereon may be entered in the highest court of the forum, state or federal, having jurisdiction. The expenses of the arbitration shall be borne equally by the Parties; provided, however, that each Party shall pay for and bear the costs of its own experts, evidence and counsel's fees. Notwithstanding the rules and procedures that would otherwise apply to the arbitration, and unless the Parties agree to a different arrangement, the place of the arbitration will be in [____], California.

7.07 Notices. All Notices shall be made in accordance with this Section 7.07 and Exhibit F. Notices (other than Forecasts and Scheduling requests) shall, unless otherwise specified in this Agreement, be in writing and may be delivered by hand delivery, first class United States mail, overnight courier service, electronic transmission or facsimile. Notices provided in accordance with this Section 7.07 are deemed given as follows: (a) Notice by facsimile, electronic transmission or hand delivery is deemed given at the close of business on the day actually received, if received during business hours on a Business Day, and otherwise are deemed given at the close of business on the next Business Day; (b) Notice by overnight first class United States mail or overnight courier service is deemed given on the next Business Day after such Notice is sent out; and (c) Notice by first class United States mail is deemed given two Business Days after the postmarked date. Notices are effective on the date deemed given, unless a different date for the Notice to go into effect is stated in another section of this Agreement.

7.08 General.

7.09 Confidentiality. Neither Party may disclose any Confidential Information to a third party, other than: (a) to such Party's employees, Lenders, investors, attorneys, accountants or advisors who have a need to know such information and have agreed to keep such terms confidential; (b) to potential Lenders with the consent of Buyer, which consent will not be unreasonably withheld; (c) to Buyer's Procurement Review Group, as defined in D.02-08-071, subject to any applicable limitations and subject to a protective order applicable to Buyer's Procurement Review Group; (d) with respect to Confidential Information, the CPUC, the CEC or the FERC, under seal for any regulatory purpose, including policymaking, but only provided that the confidentiality protections from the CPUC under Section 583 of the California Public Utilities Code or other statute, order or rule offering comparable confidentiality protection are in place before the communication of such Confidential Information; (e) in order to comply with any Applicable Law or any exchange, Control Area or CAISO rule, or order issued by a court or entity with competent jurisdiction over the disclosing party; and (f) in order to comply with any Applicable Law, including applicable regulation, rule, subpoena, or order of the CPUC, CEC, FERC, any court, administrative agency, legislative body or other tribunal, or any discovery or data request of the CPUC. In connection with requirements, requests or orders to produce documents or information in the circumstances provided in Section 7.09(f), each Party shall use reasonable efforts to (i) notify the other Party before disclosing the Confidential Information, and (ii) prevent or limit such disclosure.

7.10 Insurance.

7.11 Simple Interest Payments. Except as specifically provided in this Agreement, any outstanding and past due amounts owing and unpaid by either Party under the terms of this Agreement shall be eligible to receive a Simple Interest Payment calculated using the Interest Rate for the number of days between the date due and the date paid.

IN WITNESS WHEREOF, the Parties have caused this Agreement to be duly executed by their respective authorized representatives as of the Effective Date.

 

[SELLER'S NAME],

a [Seller's business registration]

 

[BUYER'S NAME],

A California corporation

By:_____________________________

Name:________________________

Title:_________________________

 

By:_____________________________

Name:________________________

Title:_________________________

EXHIBIT A

Definitions

For purposes of this Agreement, the following terms and variations thereof have the meanings specified or referred to in this Exhibit A:

"Act" has the meaning set forth in the Recitals.

"Affiliate" means, with respect to a Party, any Person that, directly or indirectly, through one or more intermediaries, controls, or is controlled by, or is under common control with such Party. For purposes of this definition, "control" means the direct or indirect ownership of 50% or more of the outstanding capital stock or other equity interests having ordinary voting power.

"Agreement" has the meaning set forth in the Preamble.

"Applicable Law" means all constitutions, treaties, laws, ordinances, rules, regulations, interpretations, permits, judgments, decrees, injunctions, writs and orders of any Governmental Authority or arbitrator that apply to any Party, the Generating Facility or the terms of this Agreement.

"As-Available Contract Capacity" means the electric energy generating capacity that Seller provides on an as-available basis for the Power Product, as set forth in Section 1.03, as may be adjusted from time to time.

"Bankrupt" means with respect to any Person, such Person:

"Business Day" means any day except a Saturday, Sunday, the Friday after the United States Thanksgiving holiday, or a Federal Reserve Bank holiday that begins at 8:00 a.m. and ends at 5:00 p.m. local time for the Party sending a Notice or payment or performing a specified action.

"Buyer" has the meaning set forth in the Preamble.

"CAISO" means the California Independent System Operator Corporation.

"CAISO-Approved Meter" means any revenue quality, electric energy measurement meter system(s), including all associated metering transformers and related appurtenances, as required by the CAISO (or, to the extent that the CAISO's metering requirement does not apply, Prudent Electrical Practices) and furnished by Seller, and which (a) is designed, manufactured and installed in accordance with the CAISO's metering requirements, or, to the extent that the CAISO's metering requirements do not apply, Prudent Electrical Practices, and (b) is a time-of-use meter capable of measuring the net electric energy output from the Generating Facility.

"CAISO-Approved Quantity" means the total quantity of electric energy the Buyer Schedules with the CAISO and the CAISO approves in its final schedule which is published in accordance with the CAISO Tariff.

"CAISO Controlled Grid" has the meaning set forth in the CAISO Tariff.

"CAISO Declared Over-Generation Condition" means a CAISO-declared condition on the CAISO Controlled Grid where the sum of the desired generation output of all of Scheduling Coordinators in the Control Area, absent mitigation, would be greater than the system load.

"CAISO Charges" means the debits, costs, fees, penalties, sanctions, interest or similar charges, including imbalance energy charges, that are directly assigned by the CAISO to the CAISO Global Resource ID for the Generating Facility for, or attributable to, Scheduling or deliveries from the Generating Facility under this Agreement.

"CAISO Global Resource ID" means the number or name assigned by the CAISO to the CAISO-Approved Meter.

"CAISO Revenues" means the credits, fees, payments, revenues, interest or similar benefits, including imbalance energy payments, that are directly assigned by the CAISO to the CAISO Global Resource ID for the Generating Facility for, or attributable to, Scheduling or deliveries from the Generating Facility under this Agreement.

"CAISO Tariff" means the California Independent System Operator Corporation Operating Agreement and Tariff, including the rules, protocols, procedures and standards attached thereto, as the same may be amended or modified from time to time and approved by the FERC.

"Capacity Attributes" means any and all current or future defined characteristics, certificates, tag, credits, ancillary service attributes, or accounting constructs, howsoever entitled, other than Resource Adequacy Benefits, attributed to or associated with the electricity generating capability of the Generating Facility.

"CEC" means the California Energy Commission.

"Check Meter" means the Buyer revenue-quality meter section or meter(s), which Buyer may require at its discretion, as set forth in Section 3.09(b), and will include those devices normally supplied by Buyer or Seller under the applicable utility electric service requirements.

"Claiming Party" has the meaning set forth in Section 5.02.

"Claims" means all third party claims or actions, threatened or filed and, whether groundless, false, fraudulent or otherwise, that directly or indirectly relate to the subject matter of an indemnity, and the resulting losses, damages, expenses, attorneys' fees and court costs, whether incurred by settlement or otherwise, and whether such claims or actions are threatened or filed before or after the termination of this Agreement.

"Confidential Information" means all oral or written communications exchanged between the Parties on or after the Effective Date relating to the implementation of this Agreement, including information related to Seller's compliance with operating and efficiency standards applicable to an Eligible CHP Facility. Confidential Information does not include (i) information which is in the public domain as of the Effective Date or which comes into the public domain after the Effective Date from a source other than from the other Party, (ii) information which either Party can demonstrate in writing was already known to such Party on a non-confidential basis before the Effective Date, (iii) information which comes to a Party from a bona fide third-party source not under an obligation of confidentiality, or (iv) information which is independently developed by a Party without use of or reference to Confidential Information or information containing Confidential Information.

"Control" means the direct or indirect ownership of 20% or more of the outstanding capital stock or other equity interests having ordinary voting power

"CPUC" means the California Public Utilities Commission.

"Defaulting Party" has the meaning set forth in Section 6.01(a).

"Delivery Point" has the meaning set forth in Section 1.05.

"Direct GHG Compliance Costs" mean any taxes, charges or fees imposed by an authorized Governmental Authority with jurisdiction over the Seller or the Generating Facility, and levied directly on a Generating Facility for GHG emissions attributable to its operations. Direct GHG Compliance Costs do not include emissions allowances freely allocated.

"Early Termination Date" has the meaning set forth in Section 6.03(a).

"Effective Date" has the meaning set forth in the Preamble.

"Eligible CHP Facility" means a facility, as defined by Public Utilities Code § 2840.2, subdivisions (a) and (b) that meet the guidelines established by the CEC pursuant to Public Utilities Code § 2843.

"Emergency" means an actual or imminent condition or situation which (a) is defined and declared by the CAISO or Transmission Provider, (b) jeopardizes the integrity or reliability of the CAISO Controlled Grid or Transmission Provider's electric system, (c) requires automatic or immediate manual action to prevent or limit loss of load or generation supply, or (d) poses a threat to public safety.

"Event of Default" has the meaning set forth in Section 6.01.

"Existing Eligible CHP Facility" means an Eligible CHP Facility that first commenced Operation on or after January 1, 2008 but before the Effective Date.

"Expected Term Year Energy Production" means the Metered Energy quantity expected to be produced by the Generating Facility during each Term Year, as set forth in Section 1.05.

"FERC" means the Federal Energy Regulatory Commission.

"Forced Outage" has the meaning set forth in the CAISO Tariff.

"Force Majeure" means any event or circumstance (that is not anticipated as of the Effective Date) to the extent beyond the control of, and not the result of the negligence of, or caused by, the Party seeking to have its performance obligation excused thereby, which by the exercise of due diligence such Party could not reasonably have been expected to avoid and which by exercise of due diligence it has been unable to overcome. Force Majeure does not include: (a) a failure of performance of any other Person, including any Person providing electric transmission service or fuel transportation to the Generating Facility, except to the extent that such failure was caused by an event that would otherwise qualify as a Force Majeure; (b) failure to timely apply for or obtain Permits or other credits required to Operate the Generating Facility (provided, however, that failure or delay in the granting of permits, to the extent such failure or delay is not caused by action or inaction of Seller, qualifies as a Force Majeure for purposes of this Agreement); (c) breakage or malfunction of equipment (except to the extent that such failure was caused by an event that would otherwise qualify as a Force Majeure); or (d) a lack of fuel of an inherently intermittent nature such as wind, water, solar radiation or waste gas or waste derived fuel.

"Forecast" means the hourly forecast of the total electric energy production of the Generating Facility (in MWh) when the Generating Facility is not PIRP-eligible, net of the Site Host Load and Station Use, or (b) the available total generation capacity of the Generating Facility (in MW) when the Generating Facility is PIRP-eligible, net of the Site Host Load and Station Use.

"Generating Facility" means the Generating Unit(s) comprising Seller's power plant (as more particularly described in Section 1.02 and Exhibit G), including all other materials, equipment, systems, structures, features and improvements necessary to produce electric energy and thermal energy, excluding the Site, land rights and interests in land.

"Generating Unit" means one or more generating equipment combinations typically consisting of prime mover(s), electric generator(s), electric transformer(s), steam generator(s) and air emission control devices.

"Generation Operations Center" means the location of Buyer's real-time operations personnel.

"Governmental Authority" means (a) any federal, state, local, municipal or other government, (b) any governmental, regulatory or administrative agency, commission, or other authority lawfully exercising or entitled to exercise any administrative, executive, judicial, legislative, police, regulatory or taxing authority or power, or (c) any court or governmental tribunal.

"Green Attributes" means any and all credits, benefits, emissions reductions, offsets, and allowances, howsoever entitled, attributable to the generation from the Project, and its avoided emission of pollutants. Green Attributes include but are not limited to Renewable Energy Credits, as well as:

(1) Any avoided emission of pollutants to the air, soil or water such as sulfur oxides (SOx), nitrogen oxides (NOx), carbon monoxide (CO) and other pollutants;

(2) Any avoided emissions of carbon dioxide (CO2), methane (CH4), nitrous oxide, hydrofluorocarbons, perfluorocarbons, sulfur hexafluoride and other greenhouse gases (GHGs) that have been determined by the United Nations Intergovernmental Panel on Climate Change, or otherwise by law, to contribute to the actual or potential threat of altering the Earth's climate by trapping heat in the atmosphere;

(3) The reporting rights to these avoided emissions, such as Green Tag Reporting Rights.

Green Tag Reporting Rights are the right of a Green Tag Purchaser to report the ownership of accumulated Green Tags in compliance with federal or state law, if applicable, and to a federal or state agency or any other party at the Green Tag Purchaser's discretion, and include without limitation those Green Tag Reporting Rights accruing under Section 1605(b) of The Energy Policy Act of 1992 and any present or future federal, state, or local law, regulation or bill, and international or foreign emissions trading program. Green Tags are accumulated on a MWh basis and one Green Tag represents the Green Attributes associated with one (1) MWh of energy.

Green Attributes do not include:

(i) Any energy, capacity, reliability or other power attributes from the Project,

(ii) Production tax credits associated with the construction or operation of the Project and other financial incentives in the form of credits, reductions, or allowances associated with the Project that are applicable to a state or federal income taxation obligation,

(iii) Fuel-related subsidies or "tipping fees" that may be paid to Seller to accept certain fuels, or local subsidies received by the generator for the destruction of particular preexisting pollutants or the promotion of local environmental benefits, or

(iv) Emission reduction credits encumbered or used by the Project for compliance with local, state, or federal operating and/or air quality permits.

If the Project is a biomass or biogas facility and Seller receives any tradable Green Attributes based on the greenhouse gas reduction benefits or other emission offsets attributed to its fuel usage, it shall provide Buyer with sufficient Green Attributes to ensure that there are zero net emissions associated with the production of electricity from the Project.

"Host Site" means the site at which the Site Host Load is consumed, including real property, facilities and equipment owned or operated by the Site Host or its Affiliates located at such site.

"Hour-Ahead Scheduling Deadline" means 30 minutes before the deadline established by the CAISO for the submission of schedules for the applicable hour.

"Interest Rate" means an annual rate equal to the rate published in The Wall Street Journal as the "Prime Rate" (or, if more than one rate is published, the arithmetic mean of such rates) as of the date payment is due plus two percentage points; provided, however, that in no event shall the Interest Rate exceed the maximum interest rate permitted by Applicable Laws.

"Lender" means any financial institutions or successors in interest or assignees that provides development, bridge, construction, permanent debt or tax equity financing or refinancing for the Generating Facility to Seller.

"Metered Energy" means the total electric energy, expressed in kWh, in excess of Station Use and Site Host Load and measured by the CAISO-Approved Meter(s) or Check Meter(s), as applicable, at the Generating Facility for the specified Metering Interval.

"Metering Interval" means the smallest measurement time period over which data are recorded by the CAISO-Approved Meters or Check Meters, as applicable.

"Monthly Contract Payment" has the meaning set forth in Section 4.01(a).

"NERC" means the North American Electric Reliability Corporation.

"New Eligible CHP Facility" means an Eligible CHP Facility that commences Operation after the Effective Date.

"Non-Defaulting Party" has the meaning set forth in Section 6.03.

"Notice" means notices, requests, statements or payments provided in accordance with Section 7.07 and Exhibit F.

"Operate" means to provide all the operation, engineering, purchasing, repair, supervision, training, inspection, testing, protection, use management, improvement, replacement, refurbishment, retirement, and maintenance activities associated with operating the Generating Facility in order to produce the Power Product in accordance with Prudent Electrical Practices.

"Outage Schedule" has the meaning set forth in Section 2(a) of Exhibit D.

"Outage Schedule Submittal Requirements" describes the obligations of Seller to submit maintenance and planned outage schedules (as defined in the CAISO Tariff under WECC rules) to Buyer in accordance with Exhibit D.

"Parallel Operation" means the Generating Facility's electrical apparatus is connected to the Transmission Provider's system and the circuit breaker at the point of common coupling is closed. The Generating Facility may be producing electric energy or consuming electric energy at such time.

"Party" has the meaning set forth in the Preamble.

"Peak Months" means [___].

{Buyer Comment: For SCE and PG&E, the Peak Months are June, July, August and September. For SDG&E, the Peak Months are May, June, July, August and September.}

"Permits" means all applications, approvals, authorizations, consents, filings, licenses, orders, permits or similar requirements imposed by any Governmental Authority, or the CAISO, in order to develop, construct, Operate, maintain, improve, refurbish or retire the Generating Facility or to Forecast or deliver the electric energy produced by the Generating Facility to Buyer.

"Person" means an individual, partnership, corporation, business trust, limited liability company, limited liability partnership, joint stock company, trust, unincorporated association, joint venture or other entity or a Governmental Authority.

"PIRP" (i.e., Participating Intermittent Resource Program) means the CAISO's intermittent resource program initially established pursuant to Amendment No. 42 of the CAISO Tariff in Docket No. ER02-922-000, or any successor program that Buyer determines accomplishes a similar purpose.

"Power Product" means (a) the As-Available Contract Capacity and (b) all electric energy produced by the Generating Facility, net of all Station Use and any and all of the Site Host Load.

"Power Rating" means the electrical power output value indicated on the generating equipment nameplate.

"Product" means the Power Product, Green Attributes, Capacity Attributes and Resource Adequacy Benefits.

"Project" means the Generating Facility.

"Prudent Electrical Practices" means those practices, methods and acts that would be implemented and followed by prudent operators of electric generating facilities in the Western United States, similar to the Generating Facility, during the relevant time period, which practices, methods and acts, in the exercise of prudent and responsible professional judgment in the light of the facts known at the time a decision was made, could reasonably have been expected to accomplish the desired result consistent with good business practices, reliability and safety. Prudent Electrical Practices includes, at a minimum, those professionally responsible practices, methods and acts described in the preceding sentence that comply with the manufacturer's warranties, restrictions in this Agreement, and the requirement of Governmental Authorities, WECC standards, the CAISO and Applicable Laws. Prudent Electrical Practices shall include taking reasonable steps to ensure that: (a) equipment, materials, resources and supplies, including spare parts inventories, are available to meet the Generating Facility's needs; (b) sufficient operating personnel are available at all times and are adequately experienced, trained and licensed as necessary to Operate the Generating Facility properly and efficiently, and are capable of responding to reasonably foreseeable emergency conditions at the Generating Facility and Emergencies whether caused by events on or off the Site; (c) preventative, routine, and non-routine maintenance and repairs are performed on a basis that ensures reliable, long term and safe operation of the Generating Facility, and are performed by knowledgeable, trained and experienced personnel utilizing proper equipment and tools; (d) appropriate monitoring and testing are performed to ensure equipment is functioning as designed; (e) equipment is not operated in a reckless manner, in violation of manufacturer's guidelines or in a manner unsafe to workers, the general public or the Transmission Provider's electric system, or contrary to environmental laws, permits or regulations or without regard to defined limitations, such as flood conditions, safety inspection requirements, operating voltage, current, volt ampere reactive (VAR) loading, frequency, rotational speed, polarity, synchronization, and control system limits; and (f) equipment and components designed and manufactured to meet or exceed the standard of durability that is generally used for electric energy generation operations in the Western United States and will function properly over the full range of ambient temperature and weather conditions reasonably expected to occur at the Site and under both normal and emergency conditions.

"PPT" means Pacific Daylight time when California observes Daylight Savings Time and Pacific Standard Time otherwise.

"Real-Time Forced Outage" means a Forced Outage which occurs only after 5:00 p.m. PPT on the day before the Trading Day.

"Renewable Energy Credit" has the meaning set forth in Public Utilities Code Section 399.12(g), as may be amended from time to time or as further defined or supplemented by Applicable Law.

"Resource Adequacy Benefits" means the rights and privileges attached to the generating capacity of the Generating Facility that, in accordance with Public Utilities Code Section 2841(f), count toward satisfying Buyer's resource adequacy obligations.

"Schedule" means the action of the Scheduling Coordinator, or its designated representatives, of preparing a schedule based on Seller's forecast and notifying, requesting, and confirming the CAISO-Approved Quantity with the CAISO, the electric energy delivered from the Generating Facility.

"Scheduling Coordinator" means an entity certified by the CAISO for the purposes of undertaking the functions specified by CAISO Tariff Section 2.2.6, as amended by FERC from time-to-time.

"SC Set-Up Fee" has the meaning set forth in Section 1.07.

"Seller" has the meaning set forth in the Preamble.

"Simple Interest Payment" means a dollar amount calculated by multiplying the: (a) dollar amount on which the Simple Interest Payment is based; by (b) the Interest Rate; by (c) the result of dividing the number of days in the calculation period by 360.

"Site" means the real property on which the Generating Facility is located, as further described in Section 1.02 and Exhibit G.

"Site Control" means that Seller (a) owns the Site, (b) is the lessee of the Site under a lease, the term of which begins on or before the Term Start Date and extends at least through the Term End Date, (c) is the holder of a right-of-way grant or similar instrument with respect to the Site, or (d) is managing partner or other Person authorized to act in all matters relating to the control and Operation of the Site and Generating Facility.

"Site Host" means any Person purchasing or otherwise using the Site Host Load or thermal energy output from the Generating Facility.

"Site Host Load" means the electric energy and capacity produced by or associated with the Generating Facility that serves electrical loads (that are not Station Use) of Seller or one or more third parties pursuant to California Public Utilities Code Section 218(b).

"Station Use" means the electric energy produced by the Generating Facility that is used within the Generating Facility to power the lights, motors, control systems and other electrical loads that are necessary for Operation, including transformation losses to power such equipment and other necessary loads.

"Telemetry System" means a system of electronic components that interconnects the CAISO and the Generating Facility, all in accordance with the CAISO Tariff.

"Term" has the meaning set forth in Section 1.01.

"Term End Date" has the meaning set forth in Section 1.01.

"Term Start Date" has the meaning set forth in Section 1.01.

"Term Year" means a 12-month period beginning on the first day of the Term and each successive 12-month period thereafter.

"Trading Day" means the day in which Day-Ahead (as defined in the CAISO Tariff) trading occurs in accordance with the WECC Preschedule Calendar (as found on the WECC's website).

"Transmission Provider" means any Person responsible for the interconnection of the Generating Facility with the interconnecting utility's electrical system or the CAISO Controlled Grid or transmitting the Metered Energy on behalf of Seller from the Generating Facility to the Delivery Point.

"Web Client" has the meaning set forth in Section 2(a) of Exhibit D.

"WECC" means the Western Electricity Coordinating Council.

*** End of Exhibit A ***

EXHIBIT B

1. Monthly Contract Payment

2. TOD Period Payment Calculation

3. Fixed Price Component

4. Variable Price Component Calculation

5. Time of Delivery Periods and Allocation Factors.

6. Location Bonus.

*** End of Exhibit B ***

EXHIBIT C

Seller's Forecasting Submittal and Accuracy Requirements

1. General Requirements. The Parties shall abide by the Forecasting requirements and procedures described below and shall agree upon reasonable changes to these requirements and procedures from time to time as necessary to:

2. Seller's Forecasting Submittal Requirements.

*** End of Exhibit C ***

EXHIBIT D

Outage Schedule Submittal Requirements

1. General Requirements. The Parties shall abide by the Outage Schedule Submittal Requirements described below and shall agree upon reasonable changes to these requirements and procedures from time to time, as necessary to (a) comply with the CAISO Tariff, (b) accommodate changes to their respective generation technology and organizational structure, and (c) address changes in the operating and Scheduling procedures of Seller, Buyer and the CAISO, including automated forecast and outage submissions.

2. Seller's Availability Forecasting Submittal Requirements. Seller shall submit maintenance and planned outage schedules in accordance with the following schedule:

3. Restriction on Planned Outages. During the Peak Months, Seller may schedule and utilize no more than 12 hours of outages per Peak Month, and only during the non-peak hours of the Peak Months.

*** End of Exhibit D **

EXHIBIT E

CAISO Charges

Subject to section 4.01(g), Buyer shall pay all CAISO Charges and receive all CAISO Revenues; provided, however, if, on or after the Term Start Date:

1. The CAISO implements or has implemented any sanction or penalty related to Scheduling, outage reporting or generator Operation, and any such sanctions or penalties are imposed on the Generating Facility or to Buyer as Scheduling Coordinator for the Generating Facility due solely to the actions or inactions of Seller in violation of this Agreement, then such sanctions or penalties will be Seller's responsibility;

2. Seller or any third party dispatches any portion of the As-Available Contract Capacity for the benefit of any party other than Buyer or a Site Host in respect of the Host Site, then Seller shall indemnify, defend, and hold Buyer harmless against any CAISO Charges; or

3. There is a CAISO or Transmission Provider declared Emergency and Seller fails to meet Seller's obligations associated with any CAISO or Transmission Provider instruction or request (as may be communicated by Buyer as Scheduling Coordinator), as the case may be, to curtail output or reschedule a planned outage set to occur during an Emergency, then, in each case, Seller shall indemnify, defend, and hold Buyer harmless against any CAISO Charges associated with the failure to respond to such Emergency.

*** End of Exhibit E ***

EXHIBIT F

Notice List

[SELLER'S NAME]

[BUYER'S NAME]

All Notices are deemed provided in accordance with Section 7.07 if made to the address, facsimile numbers or e-mail addresses provided below:

All Notices are deemed provided in accordance with Section 7.07 if made to the address, facsimile numbers or e-mail addresses provided below:

Contract Sponsor:

Attn:

Street:

City:

Phone:

Facsimile:

E-mail:

 

Reference Numbers:

Duns:

Federal Tax ID Number:

 

Contract Administration:

Attn:

Phone:

Facsimile:

E-mail:

 

Forecasting:

Attn: Control Room

Phone:

Facsimile:

E-mail:

 

Day-Ahead Forecasting:

Phone:

Facsimile:

E-mail:

 

Real-Time Forecasting:

Phone:

Facsimile:

E-mail:

 

Payment Statements:

Attn:

Phone:

Facsimile:

E-mail:

 

CAISO Charges and CAISO Sanctions:

Attn:

Phone:

Facsimile:

E-mail:

 

Payments:

Attn:

Phone:

Facsimile:

E-mail:

 

Wire Transfer:

BNK:

ABA:

ACCT:

 

Credit and Collections:

Attn:

Phone:

Facsimile:

E-mail:

 

With additional Notices of an Event of Default or Potential Event of Default to:

Attn:

Phone:

Facsimile:

E-mail:

 

Lender:

Attn:

Phone:

Facsimile:

E-mail:

 

*** End of Exhibit F ***

EXHIBIT G

Generating Facility and Site Description

1. Generating Facility Description.

2. Site Description.

*** End of Exhibit G ***

(END OF ATTACHMENT B)