A-1a Implement Construction Fugitive Dust Control Plan. SCE shall develop a Fugitive Dust Emission Control Plan (FDECP) for construction work. Measures to be incorporated into the plan include, but are not limited to the following:
· Water the disturbed areas of the active construction sites at least three times per day and more often if uncontrolled fugitive dust is noted.
· Enclose, cover, water twice daily, and/or apply non-toxic soil binders according to manufacturer's specifications to exposed piles with a five percent or greater silt content.
· CARB certified and ANF approved (on NFS lands) non-toxic soil binders shall be applied per manufacturer recommendations to active unpaved roadways, unpaved staging areas, and unpaved parking area(s) throughout construction (as allowed by responsible agencies such as the Forest Service) to reduce fugitive dust emissions. Other non-toxic soil binder products, selected from lists available from EPA's Environmental Technology Verification program or the SCAQMD, may be applied per manufacturer recommendations in place of the CARB certified soil binders if such products can be reasonably demonstrated to be as effective as the CARB certified non-toxic soil binders.
· Maintain unpaved road vehicle travel to the lowest practical speeds, and no greater than 15 mph, to reduce fugitive dust emissions.
· All vehicle tires shall be inspected, are to be free or dirt, and washed as necessary prior to entering paved roadways.
· Install wheel washers or wash the wheels of trucks and other heavy equipment where vehicles exit the site.
· Cover all trucks hauling soil and other loose material, or require at least two feet of freeboard.
· Establish a vegetative ground cover (in compliance with biological resources impact mitigation measures) or otherwise create stabilized surfaces on all unpaved areas at each of the construction sites within 21 days after active construction operations have ceased.
· Increase the frequency of watering, or implement other additional fugitive dust mitigation measures, to all active disturbed fugitive dust emission sources when wind speeds (as instantaneous wind gusts) exceed 25 miles per hour (mph).
· Travel routes to each construction site shall be developed to minimize unpaved road travel.
A-1b Properly Maintain Mechanical Equipment. The construction contractor shall ensure that all mechanical equipment associated with project construction is properly tuned and maintained in accordance with the manufacturer's specifications.
A-1c Use Ultra Low-sulfur Diesel Fuel. CARB-certified ultra low-sulfur diesel (ULSD) fuel containing 15 ppm sulfur or less shall be used in all diesel-powered construction equipment.
A-1d Restrict Engine Idling to 10 Minutes. Diesel engine idle time shall be restricted to no more than 10 minutes.
A-1e Schedule Deliveries Outside of Peak Traffic Hours. All material deliveries to the marshalling yards and from the marshalling yards to the construction sites shall be scheduled outside of peak traffic hours (6:00 to 9:30 am and 3:30 to 6:30 pm) to the extent feasible, and other truck trips during peak traffic hours shall be minimized to the extent feasible.
A-1f Offroad Diesel-fueled Equipment Standards. All offroad construction diesel engines not registered under CARB's Statewide Portable Equipment Registration Program, which have a rating of 50 hp or more, shall meet, at a minimum, the Tier 2 California Emission Standards for Off-Road Compression-Ignition Engines as specified in California Code of Regulations, Title 13, section 2423(b)(1) unless that such engine is not available for a particular item of equipment. In the event a Tier 2 engine is not available for any off-road engine larger than 100 hp, that engine shall be equipped with a Tier 1 engine. In the event a Tier 1 engine is not available for any off-road engine larger than 100 hp, that engine shall be equipped with a catalyzed diesel particulate filter (soot filter), unless certified by engine manufacturers that the use of such devices is not practical for specific engine types. Equipment properly registered under and in compliance with CARB's Statewide Portable Equipment Registration Program are in compliance with this mitigation measure.
A-1g On-road Vehicles Standards. All on-road construction vehicles shall meet all applicable California on-road emission standards. This does not apply to construction worker personal vehicles.
A-1h Offroad Gasoline-fueled Equipment Standards. All offroad stationary and portable gasoline powered equipment shall have EPA Phase 1/Phase 2 compliant engines, where the specific engine requirement shall be based on the new engine standard in affect two years prior to initiating project construction.
A-1i Reduction of Helicopter Emissions. Helicopter use will be limited to the extent feasible and helicopters with low emitting engines shall be used to the extent practical.