App. D-p.1

         

APPENDIX D

         

Page 1 of 2

           
       

San Gabriel Valley Water Company

       

Fontana Water Company Division

           
         

Adopted Rates

           
         

Test Year

         

2006-2007

Schedule FO-1

     
 

Quantity Rate

     
   

Per 100 cu. Ft. (Ccf)

$1.4127

 

Service Charges

   
   

Per service per month

 
     

For

5/8 x 3/4-in.

$12.97

     

For

3/4-in.

$19.46

     

For

1-in.

$32.43

     

For

1-1/2-in.

$64.85

     

For

2-in.

$103.80

     

For

3-in.

$194.60

     

For

4-in.

$324.30

     

For

6-in.

$650.00

     

For

8-in.

$1,040.00

     

For

10-in.

$1,490.00

     

For

12-in.

$2,140.00

     

For

2-2-in.

$208.00

     

For

3-2-in.

$311.00

     

For

4-2-in.

$415.00

     

For

2-3-in.

$389.00

     

For

2-4-in.

$649.00

     

For

1-8-in., 2-2-in.

$1,250.00

     

For

2-8-in.

$2,080.00

           

Schedule FO-4

     

Per service per month for each inch of

 
 

diameter of service connection

$7.24

           

Schedule FO-9C

     

sidewalk (per 100 sq. ft.)

 

$0.663

street curb (per 100 lineal ft.)

$1.324

trench settling (per lineal foot)

$0.056

road constuction (per 3000 sq. ft.)

$9.32

fill compaction (per cubic yard)

$0.084

tank truck (per 100 gallons)

$0.219

Minimum charge

   

$33.38

           

Schedule FO-9CL

     

For each lot during construction

$11.42

           

Special Conditions

   

1. A surcredit of $0.0179 per Ccf is to be applied to the quantity rates for a 24-month period from

the effective date of Advice Letter No. ___ to amortize the July 2004 to December 2006 overcollection

of $719,100 related to the gain on sale issue in A.05-08-021.

           
           
           
           
         

(continued)

Previous PageTop Of PageNext PageGo To First Page