Before hearings were completed in this matter, the Authority requested interim authorization to proceed with construction of the project including construction of tracks across various public roads, highways, or streets, either grade separated or at-grade as the case may be, as proposed in each of the applications. The interim authorization was to be entirely at the Authority's risk and was to be effective only until the Commission reached its final decision.