5. Discussion

3 In response to a request from the Commission's Energy Division, SoCalGas submitted additional information on November 10, 2005 about its proposal to rework and/or redrill wells at its Aliso Canyon and La Goleta storage fields. This additional information included maps showing the location of the wells to be redrilled or reworked. SoCalGas' response noted that the reworked/redrilled wells will be at the same approximate depth as the old wells, and that the work is expected to commence in the near future and will be completed by March 31, 2006. The work will use drilling rigs and other equipment similar to what is used for routine well maintenance. SoCalGas' response also states that the proposed work will occur under permit by, and under the oversight of the Division of Oil and Gas and Geothermal Resources of the California Department of Conservation (DOGGR). The proposed work is expected to include minor installation and alteration of piping within the storage fields on previously disturbed soil, as well as some minor leveling of previously graded well pads to accommodate the rigs. The above information was summarized in a November 14, 2005 letter from SoCalGas' attorney to Jensen Uchida of the Energy Division, and served on the service list in this proceeding.

4 The "CEQA Guidelines" are set forth in Chapter 3 of Division 6 of Title 14.

Previous PageTop Of PageNext PageGo To First Page