Autos |
Freight Trains |
||
School Buses |
Passenger Trains |
||
Passenger Buses |
Light Rail Trains |
||
Hazmat Trucks |
|||
TOTAL VEHICLE COUNT |
TOTAL TRAIN COUNT |
||
Date of Count(s) |
Date of Count (s) | ||
D. Costs and Contributions
Please fill in the following worksheet to determine the total project costs.
Right-of Way allowance............................$________________
Preliminary Engineering............................$________________
Construction Engineering..........................$________________
Total Engineering ............................ $_______________________
Bridge Construction.................................. $________________
Railroad Work........................................... $________________
Highway Approaches & Connections.....$________________
Utility Relocation....................................... $________________
Contingencies............................................ $________________
Removing Existing Crossing................... $________________
Total Construction Costs.................. $_______________________
TOTAL PROJECT COST $______________________
ALLOCATED SHARE FROM STATE FUND: $______________________
Contributions:
City |
$ |
County |
$ |
Railroad |
$ |
Other (specify) |
$ |
E. Accident History Data
Total Number of Trains vs. Vehicle and Pedestrian Accidents * | |||
Source |
Date |
Killed |
Injured |
Source |
Date |
Killed |
Injured |
Source |
Date |
Killed |
Injured |
Source |
Date |
Killed |
Injured |
* List all accidents from October 21, 1997 to October 21, 2007. For each accident specify the accident date, the number of fatalities and injuries.
F. Blocking Delay and Speed Limits
Total Blocking Delay |
min. |
Number of Observed Delays |
|
Information Provided by: |
Railroad [ ] Observation [ ] |
Date Delays Verified |
|
Posted Vehicle Speed Limit |
mph |
Train Speed Limit at Crossing |
mph |