STANDARD PRACTICE

FOR CREATING AND PROCESSING

WATER AND SEWER SYSTEM

ADVICE LETTER FILINGS

AND RESOLUTIONS AND MAINTAINING TARIFFS

UNDER GENERAL ORDER NO. 96-B

Standard Practice U-8-W

San Francisco, California

July, 2007

Table of Contents

A - PURPOSE AND SCOPE 22

B - BACKGROUND 33

C - TARIFFS GENERALLY 33

D - ADVICE LETTERS GENERALLY 44

E - FILED AND EFFECTIVE DATES 99

F - WITHDRAWAL, SUSPENSION, AND REJECTION OF ADVICE LETTERS 99

G - TARIFF CANCELLATIONS BECAUSE OF WITHDRAWALS OF SERVICE 1010

H - CONTRACTS AND DEVIATIONS 1111

I - PROPOSALS 44

J - PROCESSING ADVICE LETTERS 1111

K - RESOLUTIONS 1515

L - APPROVED ADVICE LETTERS 1717

M - RECORDS MAINTAINED BY THE TARIFF CLERK 1818

N - ORDER CORRECTING ERROR 1919

O - EXTENSION OF TIME 2020

A - PURPOSE AND SCOPE

1. The purpose of this standard practice is to provide water or sewer system utilities (Utility or Company) with directions for filing advice letters and Division of Water and Audits (DWA) personnel (Staff) with a detailed description of the steps required to process advice letters and create and process resolutions. It supplements General Order (GO) 96-B, issued January 25, 2007 by Decision (D.)07-01-024 and effective July 1, 2007, as modified by D,07-09-019, September 12, 2007 (Telecommunications Industry Rules) as modified by D.08-05-019, May 19,2008.

2. Definitions:

3. This standard practice includes information explaining how to:

4. In addition to these instructions, the Utility and its employees who prepare the advice letter must be familiar with and follow the requirements of the current version of General Order 96 and other standard practices that apply to the particular type of advice letter being prepared.

5. The Director of the DWA may modify these rules if the situation so requires.

B - BACKGROUND

6. General Order (GO) No. 96 became effective January 1, 1943, and directed all public utilities to follow certain rules in the filings of their rates, rules and contracts.3 This GO superseded a number of other general orders pertaining to specific classes of utilities. GO 96 was revised and issued as GO No. 96-A effective March 1, 1962. GO 96-B was approved by Decision (D.)07-01-024, January 25, 2007. It incorporated interim Decisions D.01-07-026, July 12, 2001, D.02-01-038, January 9, 2002, and D.05-01-032, January 13, 2005. Provisions of GO 96-B adopted in D.07-01-024 become effective July 1, 2007. The rules in the GO provide for the general form and construction of tariff schedules, procedures to be followed in filing and publishing of schedules, and the procedure to authorize departures from the filed schedules under particular circumstances. The original Standard Practice U-8, which contained a set of procedures for filing tariff schedules, was developed by Utilities Division staff to implement GO 96.4

7. This Standard Practice supplements GO 96-B. If any differences arise, the GO will govern.

C - TARIFFS GENERALLY

8. The Utility's tariffs or tariff book includes the entire body of rates, tolls, rentals, charges, classifications and rules of a public Utility.5 No regulated Utility can charge for any utility service that is not described and approved by the Commission in its tariffs.6, 7 A tariff schedule describes and sets rates for a specific utility service. When a Company seeks to render both water and sewer service, it may file a single application to do so, but it will receive separate Certificates of Public Convenience and Necessity and must file a separate tariff book for each type of utility service rendered.

9. A tariff is a legal document.8 This places limitations on when and how it can be changed and who must be noticed before and after the change. It also requires that these documents be created in the correct format, parlance, and vernacular.

10. A water or sewer system tariff book contains the following sections:

11. Each rate schedule contains a schedule number or other designation, an indication as to the class of service, the applicability of the schedule, the territory to which the schedule applies, the rate in tabular form where practicable, and special conditions applicable to the rates. See Appendix A for proper rate schedule numbering. CPUC Document Management #192068 contains a set of sample water utility tariffs. CPUC Document Management #245397 contains a set of sample sewer system tility tariffs. Water and sewer system tariff sheets are numbered consecutively as submitted with -W appended for water tariffs and -SS appended for sewer system tariffs.

D - PROPOSALS

12. A proposal is a request from the Utility to Staff to review an advice letter before the Utility submits it for filing. In form, a proposal is identical to a regular advice letter except:

Class B, C and D utility informal general rate cases and loan approval requests are usually submitted as proposals, but if the Utility is sophisticated enough to calculate the resulting rates, they may be filed by advice letter.9

13. The Tariff Unit of the DWA logs all proposals in the proposal docket list (Doc. Mgmt. #88265) and into the Proposal/Advice Letter (PAL) database in Oracle. Proposals are processed identically to advice letters (see below) except disposition is by a letter from the project manager suggesting changes for the regular advice letter. The project manager's letter doesn't obligate the Commission or Staff as to whether the resulting advice letter itself will be approved or rejected.

E - ADVICE LETTERS GENERALLY

14. The format for the advice letter depends upon the purpose. See the appropriate standard practice for advice letter format. The submitter must be an agent of the Utility, including a consultant, authorized to speak for the Utility. Normally this will be the "Contact Person" listed on the Title Page of the tariffs.10 If a consultant has prepared an advice letter for a Utility, and the consultant is not the Contact Person, the advice letter must be signed by the owner or identified contact person.

15. In addition to submitting the advice letter, Class A and B Water Utilities shall:11

Company Name AL #

Type of Filing

16. For advice letters requesting changes to the tariff book, the Utility shall file three copies of the advice letter with the Tariff Unit. For other advice letters two copies are required. Two of the filed advice letters must have attached adequate workpapers to justify the relief sought (if applicable). The Utility shall include an extra copy of the advice letter if it wants one stamped and returned. A separate copy of each Class A advice letter shall be send to the Division of Ratepayer Advocates

17. Notice: Each advice letter filing must include a copy of the notice provided customers, the date the notice was provided and the justification for that type of notice. Tier 1 advice letters need not be noticed, but if not noticed, the utility shall inform it customers by bill insert, of the change in rates in dollar and percentage terms when the first bill that includes the increase is rendered.15 Each advice letter must contain information about how to file a protest or response and must contain the following language:16

RESPONSE OR PROTEST

Anyone may respond to or protest this advice letter. A response supports the filing and may contain information that proves useful to the Commission in evaluating the advice letter. A protest objects to the advice letter in whole or in part and must set forth the specific grounds on which it is based. These grounds are:

(1) The Utility did not properly serve or give notice of the advice letter;

(2) The relief requested in the advice letter would violate statute or Commission order, or is not authorized by statute or Commission order on which the Utility relies;

(3) The analysis, calculations, or data in the advice letter contain material error or omissions;

(4) The relief requested in the advice letter is pending before the Commission in a formal proceeding; or

(5) The relief requested in the advice letter requires consideration in a formal hearing, or is otherwise inappropriate for the advice letter process; or

(6) The relief requested in the advice letter is unjust, unreasonable, or discriminatory (provided that such a protest may not be made where it would require relitigating a prior order of the Commission.)

A protest shall provide citations or proofs where available to allow Staff to properly consider the protest.

A response or protest must be made in writing or by electronic mail and must be received by the DWA within 20 days of the date this advice letter is filed. The address for mailing or delivering a protest is:

Tariff Unit, DWA, 3rd floor

California Public Utilities Commission,

505 Van Ness Avenue, San Francisco, CA 94102

water_division@cpuc.ca.gov

On the same date the response or protest is submitted to the DWA, the respondent or protestant shall send a copy by mail (or e-mail) to the Utility, addressed to:

(Name and address and electronic mail address of the Utility contact.)

Cities and counties that need Board of Supervisors' or Board of Commissioners' approval to protest should inform the DWA, within the 20 day protest period, so that a late filed protest can be entertained. The informing document should include an estimate of the date the proposed protest might be voted on.

18. If the advice letter requests changes to a prior resolution, it must specify the resolution to which the change is requested and state that the advice letter is:

19. Service: Copies of the advice letter and cover sheet, without workpapers, must be served on a service list, which can be unique for the type of advice letter being filed, but which must always include:

20. The Utility shall provide a copy of the workpapers to customers and parties on the service list upon request. If a business, governmental entity or member of the public so requests, the Utility shall provide a copy of the workpapers within two business days. Non-service list parties and non-customers may be charged a reasonable amount for copying and mailing.20

21. For Class A utilities each service list must be posted to the Utility's web site so that persons may request and receive only those advice letters they are interested in.

22. Replies: The Utility shall reply to each protest and may reply to any response. Each reply must be received by the DWA within five business days after the end of the protest period, and shall be served on the same day to the person who filed the protest or response.21

F - FILED AND EFFECTIVE DATES

23. Advice letters are deemed filed on the date received at the San Francisco office of the DWA.

24. The Utility may request a specific effective date.22

25. If there is already a Commission order authorizing the rate increase or service quality decrease, and the ordering paragraph authorizes the filing, the advice letter is a compliance advice letter, effective upon filing (Tier 1).23 Tier 1 advice letters are "deemed approved," which means that although they are reviewed by staff they do not require staff approval.24 If staff discovers that a Tier 1 advice letter is incorrect or otherwise faulty, the Division Director will inform the Utility by issuing a Notice to Correct Tariffs.25 If appropriate, the Commission may order refunds.26

26. If the advice letter can be approved by staff it is a Tier 2 advice letter. Normally a tier 2 advice letter is deemed approved on 30 days notice, with no specific approval action required by staff unless the advice letter is protested. Staff may approve a Tier 2 filing in less than 30 days if doing so would not be injurious to the public interest. If it discovered, after the effective date, that the tariffs resuling form a Tier 2 filing are incorrect or otherwise faulty, the same Notice to correct Tariffs action would apply.

27. If the advice letter requires approval by Commission resolution it is a Tier 3 filing. The advice letter then becomes effective on the date specified in the resolution, except:

28. The Utility may request that a Tier 1 type of advice letter be processed as Tier 2 or Tier 3 and that a Tier 2 type of advice letter be processed as a Tier 3, at its option.27 The DWA may approve, at its option, a Tier 1 or Tier 2 advice letter even if it was filed requesting a resolution.28

G - WITHDRAWAL, SUSPENSION, AND REJECTION OF ADVICE LETTERS

29. Withdrawal: If the Utility desires to withdraw a filed advice letter, it must inform the DWA by letter or e-mail with service to the service list prior to staff disposition or the issuance of a proposed resolution.29 Withdrawn sheets are stamped "WITHDRAWN" and a copy is returned to the Utility for its files. Withdrawn advice letter numbers and sheet numbers shall not be reused.

30. Suspension: All Tier 2 advice letters will be suspended if Staff requires more than 30 days to review and dispose of the advice letter.30 If not so suspended, and if the advice letter is sublect to Public Utilities Code Section 455, it will become effective on the 30th day. Tier 3 advice letter are automatically suspended, but Staff will still give notice of the suspension.31 Staff will inform the Utility by e-mail and issue a Suspension Notice to the Utility and any protestants (See Appendix D) and post a notice of the suspension on the Commission's web site.

31. The Staff suspension shall be for a period of up to 180 days. If Staff determines that a resolution is required, and the Commission has not acted before the end of that period, the advice letter is automatically suspended for another 180 days. Staff shall notice this suspension to the utility, all parties and the CPUC web site also. If the Commission has not acted by the end of the second suspension period, and the advice letter is subject to Public Utilities Code Section 455, it will become effective at the end of the second suspension period.

32. The suspension process shall not be used to delay the effective date of an advice letter in order to allow the Utility time to negotiate a protest. If Staff cannot dispose of a protested advice letter expeditiously because the Utility needs time to negotiate a protest, the advice letter should be rejected without prejudice.

33. Rejection: Tariff filings will be rejected by Staff where they (1) do not conform to statutory requirements or (2) are not properly processed by advice letter (contain material issues of fact or irresolvable protests).32 Rejected sheets are stamped "REJECTED" and a copy is returned to the Utility for its files. Rejected advice letter numbers and sheet numbers may not be reused. When a Tier 1 advice letter is rejected, it shall be replaced by the Utility by the filing of a new advice letter as directed by Staff.33

34. The legal effect of withdrawal, rejection or suspension is to leave the existing tariff schedules in effect.

35. The Tariff Unit retains the original copy of the withdrawn or rejected tariff sheets in the file of cancelled tariffs. Any revised tariff sheets, submitted by a subsequent advice letter, should show the cancellation of the then-effective tariff sheet, not the sheet number of the rejected or withdrawn sheets since the latter never became effective and therefore cannot be cancelled.

H - TARIFF CANCELLATIONS BECAUSE OF WITHDRAWALS OF SERVICE

36. No Utility may withdraw from service either wholly or in part or discontinue any specific service without authorization from this Commission. When a Utility desires to cancel a schedule for a service which it is either able to render on another schedule or it desires to discontinue offering, including discontinue offering in part of its service territory, it may request approval by Tier 3 advice letter. If the Commission approves the resolution, the Tariff Unit stamps the affected tariff sheets "Sheet Cancelled (Not Superseded) by Advice No. _______, Authority _______." This procedure is used where no substantial withdrawals of service are involved; otherwise a formal application is required.34

I - CONTRACTS AND DEVIATIONS

37. Normally when a contract for Utility service is required, it will be in accordance with a standard form contract filed in the sample forms portion of the tariffs.35 Other contracts or exceptions to tariffed service require Commission approval. When a contract differs from the standard form contract or provides service at other than filed tariff rates (either higher or lower) or at conditions departing from the tariffs, it must be authorized by the Commission before it can become effective.36 Contracts are required to contain a clause indicating the jurisdiction of the Commission.37 Contracts for service with governmental agencies may be entered into by utilities without Commission authorization, provided copies of the contract are filed with the DWA by advice letter.38 The Commission may in an appropriate proceeding determine the reasonableness of all such service at other than filed rates. Utilities shall maintain an up-to-date list of contracts (other than standard form contracts) as part of their tariff schedules.

38. The Commission by an appropriate order or resolution may authorize a deviation from the provisions of General Order No. 96. The Commission may also by order or resolution authorize the utilities to deviate from their filed rates pursuant to Section 532 of the Public Utilities Code. Within 30 days of establishment or cancellation of a deviation, it shall be updated in the List of Contracts and Deviations filed as part of the tariff schedules.

J - PROCESSING ADVICE LETTERS

39. The Utility submits one copy of the cover sheet and advice letter (without workpapers) to the service list and three copies of the cover sheet and advice letter (two copies if no tariffs are being changed) and two copies of workpapers, if any, to the DWA in San Francisco, who forwards them to the Tariff Unit. For a copy of the cover sheet see Appendix B.

40. Utilities may also submit electronically by sending the submittal to water_division@cpuc.ca.gov or by facsimile to (415) 703-2655. Class A utilities shall follow up the electronic filing with the hard-copy filings described above.39

41. The tariff clerk stamps the date and time of receipt of each submittal and reviews the package for:

42. If the Utility has chosen to allow staff to number the new tariff sheets, the tariff clerk checks to see if there are other active advice letters from the same company. If there are, the sheets will not be numbered until the order of approval of all advice letters are known. If there are no other active filings, the tariff clerk fills in the proper numbers by numbering the first non-table of contents tariff sheet with the next available number (one count higher than the existing first table of contents tariff sheet number), the next non-table of contents tariff sheet with the next number and so on. The table of contents tariff sheets are numbered last, with the first table of contents sheet receiving the highest number. The body of the table of contents sheets will have to be modified as well.

43. If the advice letter is not acceptable for filing, the tariff clerk informs the Branch Chief and requests changes/additions from the Utility. After being accepted for filing, the tariff clerk does the following:

44. The tariff clerk prepares the advice letter for review by doing the following:

45. The Tariff Unit forwards the work folder to the Branch Chief, who assigns it to one of the Supervisors who will act as Project Manager. Once the Supervisor decides which analyst to assign the advice letter to, the supervisor will change the PAL entry to show that that analyst has been assigned and inform the Tariff Unit who will change the Advice Letter Docket File. The Supervisor will forward the work folder to the analyst.

46. Every advice letter must be reviewed. Such review encompasses consideration of conformance of the request with the legislation, resolution or decision authorizing the advice letter and any similar resolutions or decisions; the correctness of filed rates or other quantities, compliance with the appropriate division standard practice, including weather normalized or recorded means test, workpapers and attachments; conformance with Commission policy and procedures; and consideration of protests or responses from the Division of Ratepayer Advocates or the public. For advice letters for which the Utility has requested Tier 1 or Tier 2 review (review and approval by Staff because the Commission has already made clear what the standards of review should be), the analyst recommends disposition as follows:

a. If the advice letter is to be approved, check the "No Resolution Required" box on the Cover Sheet, annotate the Route Sheet and include an analysis if appropriate.

b. If the request is not justified in the showing in the advice letter or if the advice letter is protested and Staff cannot resolve the protest, then the advice letter should be rejected without prejudice for refilling as a new advice letter (after the Utility resolves the protest) or as an application. Check the "No Resolution Required" box on the Cover Sheet, annotate the Route Sheet, and include a rejection letter for the Branch Chief's signature that describes the reason for rejection and advises the Utility to file again after it resolves the protest or to file a formal application.

c. If the advice letter is to be rejected without prejudice because there is an active formal proceeding that should address the issue, check the "No Resolution Required" box on the Cover Sheet, annotate the Route Sheet and prepare a cover letter to the Utility describing the reason for rejection.

d. If the advice letter is to be approved in part, approved with modifications, or if the advice letter otherwise requires a resolution, check the "Resolution Required" box on the Cover Sheet, annotate the Route Sheet and attach a draft resolution approving, approving in part or conditionally, or approving with modifications. Draft a cover letter for the project manager's signature informing the Utility that the advice letter has been reclassified as Tier 3 and that a copy of the draft resolution is attached, and inform the Tariff Unit. The Tariff Unit posts this information along with the new expected completion date to the Commission calendar.

47. Advice Letters will be processed as provided in the appropriate Standard Practice. Advice letters must include all information required by relevant statutes and Commission orders, including provisions requiring an adequate showing and justification of the proposed tariffs. If the filing is deficient, Staff should request information in detail, as soon as possible, so that the Utility may provide the required information before the initial default effective date. The Utility must provide the requested information within five days of Staff's request, or at least one day prior to the initial effective date, whichever is earlier.

48. Letters from Customers: Although letters from customers that complain about rate increases are sometimes called protests, they are not. A protest is defined in Rule 8.1 of the Commission Rules of Practice and Procedure and in G.O. 96, and must be served on the Utility, and responded to by the Utility within 5 days. Nevertheless letters to the Commission that object to the advice letter are important indicators of the ratepayer's attitude and must be answered immediately. If service or noncompliance is not an issue, the assigned staff shall reply to the customers using the form letter in Appendix E. However, if the customer's letter includes specific questions or complaints, the letter should be modified to include an informed response to each specific item (service, billing or other problems). Additionally, letters of this type should be forwarded to the Consumer Affairs Branch for logging-in (and possibly for handling).

49. Disposition: The Project Manager is responsible for the disposition of all Tier 1 and Tier 2 advice letters. Tier 1 advice letters are effective upon filing, but still require review and Staff disposition. Tier 2 advice letter require Staff review and disposition before becoming effective. In both cases, this review will usually occur after the 20-day protest period and before the 30-day deadline. If Staff has not suspended the advice letter by the end of the initial review period (see General Rule 7.5.2), the advice letter is considered accepted and the Tier 2 advice letter will become effective 30 days after the date of filing.40

50. If the Project Manager identifies the need to modify or reject a Tier 1 advice letter, he or she will draft a letter for the Director's signature explaining the reason for modification or rejection and directing the Utility how to correct the error.41 The Utility shall perform whatever actions the Director requires. The replacement tariff sheets will have the same effective date as the original Tier 1 sheets. The Utility is responsible for taking appropriate action remediate any problems caused by the erroneous tariffs. Whenever a Utility fails to submit a timely or satisfactory revision after notice by the Industry Division, as prescribed in the procedures, the Commission may impose a penalty and/or take such other actions as may be appropriate to protect consumers and ensure compliance with law.42

51. If the Project Manager plans to approve a protested advice letter, he or she will inform the protestant prior to approval. In this case, the Project Manager will issue a disposition letter explaining why the advice letter was approved and the protest was rejected.43 If the protestant informs the project manager that he or she will request Commission review of the approval (under Rule 7.7.1) the Project Manager will prepare a resolution for Commission consideration approving the advice letter and rejecting the protest.

52. If an approved Tier 1 or Tier 2 advice letter is appealed by the protestant or any other party, the analyst will prepare a resolution for the Commission's consideration explaining why the advice letter was approved.44

53. If a Tier 3 advice letter is filed, Staff will still issue a letter of suspension prior to 30 days of review.45 Disposition of a Tier 3 advice letter requires a resolution. This should occur within 150 days of filing, but if disposition will take longer, the analyst must draft a letter for the project manager's signature, delaying disposition for up to an additional 180 days, and send a copy to the Utility, and to the Tariff Unit, which will notice the delay on the Commission's Daily Calendar.46 Informal general rate case advice letters are processed in accordance with the Service Guarantee Plan (see Standard Practice U-9-SM) and don't require suspension. Requests for loan approval are processed in accordance with Appendix F.

K - RESOLUTIONS

54. Resolutions are required for Tier 3 advice letters or for advice letters that were submitted as Tier 1 or 2, but which require Commission disposition based on interpretation of policy. The analyst drafts the resolution using the resolution style in Word (available from the Tariff Unit). The contents of the resolution depend on the situation and what the advice letter is requesting, but there are certain elements that all resolutions must contain:

55. The analyst forwards the draft resolution to the Supervisor or other designated project manager. The project manager reviews the resolution for correctness and checks that all calculations are properly done, and then forwards it to the Tariff Unit. The Tariff Unit reviews and finalizes the resolution for grammar, format and style, and sends it, with the blue and green cover sheets (Appendix G), to the Branch Chief and the Division Director for review. After review is complete and any changes are made, the Tariff Unit makes the requisite number of copies of the proposed resolution and sends them to the Process Office.

56. Any subsequent changes to the proposed resolution ("starred" versions) are finalized by the Tariff Unit and undergo review using the blue cover sheet. The Tariff Unit makes the requisite number of copies of starred revisions for the Process Office. If the changes are major, the analyst prepares a cover letter (Appendix H) for the Division Director's signature.

57. If the resolution is contested, it must be sent out for comment. Not later than 30 days before the Commission meeting send the letter to all concerned parties using the cover letter in Appendix I. Also, not later than 21 days prior to the Commission meeting, the Tariff Unit sends an electronic copy of all draft resolutions that will be mailed with the agenda to the support staff of the Chief of the Water Branch. The support staff saves a copy of each resolution to the WEBPUB database by importing the document using CPUC Document Management and the naming conventions in Appendix J. The Chief or other designated approver reviews the resolution by logging into the WEBPUB database and viewing the document to make sure it matches the printed resolution. If it matches, the approver changes the status on the document profile to "approved" and the resolution is automatically published to the Commission web site. If disapproved, after corrections are made, the resolution is published to the site.

58. For a detailed description of how to post resolutions to the Web site, see Document Management #234752.

59. The Agenda Review meeting is normally held the Tuesday afternoon before the Commission meeting. It is chaired by the Chief ALJ and attended by advisors and the Division Director or designate. At that meeting resolutions may be held, withdrawn or moved to the regular agenda. If a resolution is not complete (including receipt of supplemental advice letters) it will be held at that meeting. Resolutions may be held and agenda blurbs changed if approved by the Chief ALJ at other times. After approval, the final resolution should be mailed to the service list of the advice letter and, if the resolution modifies actions taken by another resolution or decision, the service list of that proceeding or resolution.

L - EFFECTIVE ADVICE LETTERS

60. When the advice letter is effective, the Tariff Unit does the following:

M - RECORDS MAINTAINED BY THE TARIFF CLERK

61. The tariff clerk is responsible for the following: Tariff book files, Proposal Docket List, Advice Letter Docket List, Contract Files, Advice Letter Files, Resolution Files, Work Files, the Cancelled Tariffs File and Exemptions of General Order 96 File.

N - ORDER CORRECTING ERROR

62. In the event that an error, typo or omission is discovered after the resolution has been approved, such inadvertent/minor error(s) may be corrected by writing an "Order Correcting Error" to be signed by the Executive Director (See Appendix L). The Executive Director Order shall include the following:

a. Statement of the error.

b. "Resolution A-4661, dated March 19, 1977, authorizes the Executive Director to sign orders involving correction of inadvertent errors."

c. The correction being authorized.

O - EXTENSION OF TIME

63. If a Utility needs an extension of time to file an advice letter or perform a Commission order, it can request it from the Executive Director in accordance with Commission's Rule of Practice and Procedure No. 48 (b). Appendix L contains an example of a letter authorizing such delay.

References

There are several court decisions that hold that tariffs have the force and effect of law:

There are also decisions of the Public Utilities Commission that charge the Utility with the responsibility to enforce their tariffs pursuant to sections 532 and 453 of the Public Utility Code.

      WATERCOMPANY

            Original

Cal. P.U.C. Sheet No. 1-W

      LOCATION

    Cancelling

Cal. P.U.C. Sheet No.

      (To be inserted by utility)

Issued by

(To be inserted by Cal. P.U.C.)

Advice Letter No. 1-W

Dec. No. DECISIONNO.

OWNER

Name

TITLE

Title

Date Filed

Effective

Resolution No.

GUIDE TO NUMBERING RATE SCHEDULES

1. The rate schedule number will indicate the class of service as shown in the following tabulation. (These numbers have been selected to correspond generally to the revenue classes in the present uniform system of accounts for water utilities.)

Schedule

    No . Class of Service

    1. Metered service.

    2. Flat rate service.

    3. Irrigation service.

    4. Private fire protection service.

    5. Public fire hydrant service.

    6. Resale service.

    7. Service to governmental agencies.

    8. Interdepartmental service.

    9. Other water service (such as construction service).

    10. Service to company employees.

2. Where appropriate, the number indicating the class of service will be followed by one or more of the suffixes shown below to further define the type of service covered by the schedule in those situation when the service rendered may be somewhat different than might be expected for the particular type of service.

Suffix. Type of Service

    A Annual service.

    C Construction service under Schedule 9.

    E Special Charges.

    F Flat rate service for other than service under Schedule 9.

    I Industrial service, under Schedule 9.

    L Limited service, as to area or customers.

    M Measured service for other than service under Schedule 1.

    O Optional service.

    R Residential service.

    S Seasonal service.

    T Treated water (other than service under Schedule 1 or 2) utilized for human consumption.

    U Untreated water for other than irrigation service.

    W Off season or winter irrigation service.

    X Temporary service.

    Z Surplus water sales.

3. When a tariff area has more than one rate zone (such as a lower and an upper elevation zone) each rate zone will be designated by a single identifying capital letter prefix followed by a hyphen placed ahead of the rate schedule number indicating the class of service. For example, the zone prefixes for the Valley Rate Zone and the Hill Rate Zone could be V- and H-, respectively, followed by the class of service number and, where appropriate, the type of service suffix. If the Utility has more than one system, the zone prefix will follow the system prefix.

4. For a water Utility which has different rates established for its separately operated systems (such as districts or divisions of a multi-system Utility) the rate schedule numbers applicable to each system will be further codified by use of a system prefix comprising the first two letters of the system's name (tariff area), both capitalized. This prefix will be separated from the remainder of the schedule number designation by a hyphen. If the names of two systems have the same first two letters, the second letters should be changed to other distinguishing letters that will maintain the alphabetical sequence of the full names. For example, the designations for Normandy and Norwalk could be NM and NW.

5. Where a rate schedule is universally applicable throughout all of the systems of a multi-system or district Utility, the schedule number should have the prefix AA (applicable all areas), and the schedule heading should show that it is of general application, as follows:

Schedule No. AA-9FC

All Tariff Areas

CONSTRUCTION AND OTHER TEMPORARY FLAT RATE SERVICE

Schedule No. BAC - 3ML

Bakersfield Tariff Area

Crest Zone

LIMITED MEASURED IRRIGATION SERVICE

7. Some examples of rate schedule numbers are:

ADVICE LETTER REVIEW ROUTE SHEET

***REVIEW AND ROUTE AS INDICATED***

NAME OF UTILITY DATE FILED

FILING No. 20th DAY

PURPOSE 30th DAY

EFFECTIVE DATE Resolution due date:

IN COMPLIANCE WITH: CPUC Meeting date:

AMOUNT REQUESTED: APPROVED:

I. TARIFF UNIT

II. WTS INFORMATION:

Charge To: Staff Hours Estimated:

III. BRANCH & STAFF REVIEW. Please note findings, recommendations and/or instructions.

Date Recipient's Date

Forwarded Name Comments Received Phone

FINAL RECOMMENDATION: [ ] Approve [ ] Approve Conditionally [ ] Reject

COMMENTS:

SIGNATURE: DATE:

PLEASE RETURN TO JOSIE BABARAN FOR FINAL PROCESSING

CALIFORNIA PUBLIC UTILITIES COMMISSION

Advice Letter Filing Summary Sheet

(Date Filed / Received Stamp by CPUC)

Company Name:

CPUC Utility Number U - ________

Address:

City, State, Zip:

AL #: ____________ Requested Effective Date: __________________

Resolution Required?

Contact Name:

Email Address:

Phone No.:

Fax No.:

    Filer

       

Alternate

     

No. Tariff

Sheets: ______

(Name, email address & Phone and FAX numbers are required for "Filer")

Annual Revenue Change: $____________ %____________

Date Filed with the CPUC ____________________ Date Served to the Service List __________________

Tariff Schedule Nos: ____________________________________________________________

Subject of filing: ______________________________________________________________

(Service(s) included)

Authorization for filing: __________________________________________________________

(Resolution #, Decision #, etc.)

Related Advice Letter(s): __________________________________________________________

(Similar service, replacement filing)

Notes/Comments: _______________________________________________________________

(Other information & reference to advice letter, etc.)

Send Protest and/or Correspondence within 20 days to:

and if you have email capability, also email to:

Protest also must be served on Utility:

Director, Division of Water and Audits

505 Van Ness Ave., San Francisco, CA 94102

water_division@cpuc.ca.gov

(see attached advice letter for more information)

(FOR CPUC USE ONLY)

¨ WTS Program/Activity/Type

____________/_________________/________

¨ Resolution Required

¨ WD Suspension on: ____ / ____ / _____

¨ Comm. Suspension on: ___ / ___ / ____

Resolution No.: W - ______________

Rev. 04/01/05

Supv. / Analyst _________________ / _______________

Due Date to Supv.: _______________________________

Analyst Completion Date: _________________________

Supervisor Approval Date: ________________________

AL / Tariff Effective Date: _________________________

Notes: ___________________________________________

STATE OF CALIFORNIA ARNOLD SCHWARZENEGGER, Governor

PUBLIC UTILITIES COMMISSION

505 VAN NESS AVENUE

SAN FRANCISCO, CA 94102-3298

I am replying to your recent letter of ____________ concerning Any Water Company's Notice of Rate Increase.

The Commission staff is now in the process of thoroughly reviewing Any Water Company's request for this offset rate increase. The purpose of this type of increase is to permit a Utility to recover, on a dollar-for-dollar basis, increases in (power, water, etc.) costs that are beyond its control. Commission procedures in authorizing offset increases ensure that the Utility receives no profit from the increase.

Thank you for your time and concern.

Very truly yours,

_____________, (Analyst, Utilities Engineer)

Water and Sewer Advisory Branch

Division of Water and Audits

PROCESSING FINANCING APPLICATION/ADVICE LETTER

TIME SCHEDULE

WATER ADVISORY BRANCH

DRAFT RESOLUTION ROUTE SHEET

Resolution No. _______________________ Meeting Date _______________

Utility Name _________________________ Adv. Ltr. No. _______________

Process Deadline ______________________

---------------------------------------------------------------------------------------------------------------

(Pls. attach the AL workfolder with the draft resolution.)

A. PROJECT TEAM REVIEW & APPROVAL

B. ADMINISTRATIVE REVIEW & APPROVAL

C. FINAL DRAFTING AND PROCESSING FOR COMMISSION AGENDA

031099

jlj

PROPOSED RESOLUTION

THIS SHEET MUST ACCOMPANY THE ORGINAL COPY OF THE PROPOSED RESOLUTION, BE PROPERLY FILED OUT, AND BE SIGNED BY THE DIVISION BEFORE IT WILL BE CONSIDERED FOR THE COMMISSION AGENDA

ADVICE LETTER: ____________________ ASSIGNED BRANCH: ___________

FILED BY: ____________________

DATE FILED: ____________________ COMMISSION MEETING: _________

 

NAME

INITIAL

DATE

BRANCH CHIEF

     

DIRECTOR

     

ASSIGNED COMMISSIONER

     
       

PROTESTS? YES □ NO □

CONTROVERSIAL YES □ NO □

REQUIRES DISCUSSION YES □ NO □

READY FOR DISTRIBUTION DATE _____________________________

CONSENT CALENDAR YES □ NO □

SUBJECT TO PUBLIC COMMENT? YES □ NO □

RESOLUTION SUMMARY






Date signed: .

W-2

9/7/2000

State of California

Public Utilities Commission

San Francisco

MEMORANDUM

Date: September 5, 2000

To: The Commission

From: Director Smith

File No: W-XXXX, Any Water Company Loan Approval

Subject: Agenda item W-2 for September 7, 2000 Meeting

As a result of the City of Any meeting on August 31, 2000, I have revised the resolution to deny the Utility's request for loan approval at this time. This resolution does approve a $100,000 planning loan that will have no immediate rate impact, and orders the Utility to pursue approval of the filtration project easement appeal.

STATE OF CALIFORNIA ARNOLD SCHWARZENEGGER, Governor

PUBLIC UTILITIES COMMISSION

505 VAN NESS AVENUE

SAN FRANCISCO, CA 94102-3298

December 19, 2006 Draft Resolution No. W- 4630

Agenda ID # 6254

TO: Parties to California Water Service Water Company's Appeal to Alco's Advice Letter No. 107-W.

This is the draft Resolution of the Division of Water and Audits (DWA). This draft Resolution will not appear on the Commission's agenda for at least 30 days after the date it is mailed. The Commission may act then, or it may postpone action until later.

When the Commission acts on a draft Resolution, it may adopt all or part of it as written, amend or modify it, or set it aside and prepare a different Resolution. Only when the Commission acts does the Resolution become binding on the parties.

Parties may submit comments on the draft Resolution. An original and two copies of the comments, with a certificate of service, should be submitted to:

Fred L. Curry

Division of Water and Audits

California Public Utilities Commission

505 Van Ness Avenue

San Francisco, CA 94102

Fax: 415-703-4426

Any comments on the draft Resolution must be received by the DWA by January 18, 2007. Those submitting comments must serve a copy of their comments on 1) the service list attached to the draft Resolution, 2) all Commissioners, and 3) the Director of the DWA, on the same date that the comments are submitted to the DWA.

Comments shall be limited to five pages in length plus a subject index listing the recommended changes to the draft Resolution, a table of authorities, and an appendix setting forth the proposed findings and ordering paragraphs.

Comments shall focus on factual, legal, or technical errors in the draft Resolution. Comments that merely reargue positions taken in the advice letter or protests will be accorded no weight and are not to be submitted.

Late submitted comments will not be considered.

Thomas Doubting, Director

Enclosures: Draft Resolution W-4630

Certificate of Service

Service List

Parties should notify the Division of Water and Audits, Public Utilities Commission, 505 Van Ness Avenue, Room 3106, San Francisco, CA 94102, of any change of address to insure that they continue to receive documents. You must indicate the Resolution number of the service list on which your name appears.

CPUC01

WEBPUB

NAMING CONVENTIONS

NAMING CONVENTIONS

 

 

 

 

 

 

Agenda Resolutions (Res-A)

Agenda Resolutions (Res-A)

 

   

 

 

 

Res. W-4310

 

Agenda Resolution W-4310

(Rate Increase for Bakman)

(Rate Increase for Bakman)

 

 

 

 

 

 

 

 

 

 

 

 

Final Resolution (Res-F)

Final Resolution (Res-F)

 

   

 

 

 

Resolution W-4310

 

Resolution W-4310

 

(Rate increase for Bakman Water Company)

(Rate increase for Bakman Water Company)

 

 

 

 

 

 

           
           

Each proposed agenda item that our process office mails to the public

is to be posted on the "Agenda Mailed Date" (10 days before the Commission Meeting)

           

Each time an agenda item is held over it needs a new CPUC01 number.

           

Finalize signed agenda items prior to the close of business the following day.

           

Approver: The Branch Chief or whomever is designated.

   
           
           

NOTE: Each time an agenda item is held over to a new commission meeting date,

the held item is to have a new CPUC01 number.

   

         

STATE OF CALIFORNIA ARNOLD SCHWARZENEGGER, Governor

PUBLIC UTILITIES COMMISSION

505 VAN NESS AVENUE

SAN FRANCISCO, CA 94102-3298

September 5, 20XX File No. 602-9

I. M. Regulated, Owner

Regulated Small Water System

100 Harms Way

GAMMA, CA 96075

Dear Mr. Regulated:

The Commission has received and filed the Utility's Advice Letter No. 15-W, together with the following revised Cal. P.U.C. Tariff Sheets, that were submitted for processing:

Cal. P.U.C.

Sheet No. Title of Sheet

140-W Schedule No. 1A, Annual Metered Service

141-W Schedule No. 2RA, Annual Residential Flat Rate Service

142-W Table of Contents

We are returning a copy of the approved advice letter and tariff sheets, with the filing and effective dates shown, for the Utility's files.

Very truly yours,

R. D. WORKER

Program Technician III

Water Branch

Enclosures

cc: Sam Pler, Consultant

August 7, 20XX File No. 602-19

Dan Sharpe

Director, Rates and Revenues

Regulated Water Company

123 Main St

P O Box 100

DELTA, CA 99000-0100

Dear Mr. Sharpe:

The Commission passed Resolution No. W-4XXX on August 3, 2000, which authorized the tariff revisions proposed in the Utility's Advice Letter No. 100. We have thus processed the advice letter and the following revised Cal. P.U.C. Tariff Sheets, applicable to its Los Angeles County Division, that were submitted:

Cal. P.U.C.

Sheet No. Title of Sheet

1525-W, 1526-W Schedule No. 1, General Metered Service

1527-W, 1528-W Schedule No. 3L, Limited Irrigation Service

1529-W, 1530-W Schedule No. 6, Reclaimed Water Metered Service

1531-W, 1532-W Table of Contents

Enclosed is a copy of the approved resolution, advice letter, and tariff sheets with the filing and effective dates shown, for the Utility's files.

Very truly yours,

R. D. WORKER

Program Technician III

Water Branch

Enclosures

PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

DIVISION OF WATER AND AUDITS RESOLUTION NO. W-XXXX

Water and Sewer Advisory Branch March 10, 2000

R E S O L U T I O N

(RES. W-XXXX), ANY WATER COMPANY. ORDER CORRECTING NONSUBSTANTIVE ERRORS IN RES. W-XXXX____________________

SUMMARY

The commission has been informed of nonsubstantive errors in Res. W-XXXX which was passed on December 16, 20XX. The resolution did not include reference to modification of other rule and form pertaining to customer deposits. To correct this, attached are Rule No. 5, Special Information Required on Forms, and Form No. 2, Customer Deposit Receipt

Pursuant to Resolution A-4661.

IT IS ORDERED that:

1. Page 2 of Resolution W-XXXX is hereby replaced. Pages 3 through 6 of Appendix B. are hereby added.

2. This order is effective today.

Signed and dated in San Francisco, California on March 10, 20XX

X. L. Lent

Executive Director

STATE OF CALIFORNIA ARNOLD SCHWARZENEGGER, Governor

PUBLIC UTILITIES COMMISSION

505 VAN NESS AVENUE

SAN FRANCISCO, CA 94102-3298

June 23, 2005

Mr. Roger Any

Chairman & Chief Executive Officer

Any Water Company

P.O.Box 12345

ANYWHERE CA 95123

Dear Mr. Any:

On June 21, 2005, you requested via electronic mail an extension of time for Any Water Company to submit its General Rate Case application required by Decision 04-01-001. You stated that Any Water currently has pending before the Commission Advice Letter 17 requesting Commission authorization to use the Advice Letter process for this General Rate Case, rather than the application process. You requested an extension of time to comply with the application filing requirement in D.04-01-001 until 20 days after the Commission rules on your Advice Letter filing request. You also informed me that the Office of Ratepayer Advocates objects to any extension beyond the current application due date of July 1, 2005.

For good cause shown, your request is granted. Any Water Company's General Rate Case application shall be filed no later than 20 days after the Commission acts on Advice Letter 17, but no later than September 16, 2005. 

In accordance with Rule 48(b), you are instructed to provide copies of this letter to the Service List in R.03-09-005.

Very truly yours,

X. L. Lent

Executive Director

Cc: ALJ Karen Aboutcha

Thomas Doubting, Director, Division of Water and Audits

1 GO 96-B, Rule 3-1

2 The first water resolution, dated May 2, 1934, allowed the Monterey County Water Works to decrease its rates on less than 30 days notice. Doc Mgmt. #290101

3 Decision No. 35817, Case No. 4626, September 29, 1942

4 CALIFORNIA RAILROAD COMMISSION, Public Utilities Department, PROCEDURE FOR FILING OF TARIFF SCHEDULES Under GENERAL ORDER NO. 96, Special Study No. S-105, U-8, San Francisco, California, Effective January 1, 1943, Dec. Mgmt.#264217.

5 Public Utilities Code Section 489 requires that every public Utility file with the California Public Utilities Commission, schedules (i.e., tariffs) showing all rates, tolls charges, classifications, or services, to be collected or enforced, along with all rules and contracts that affect or relate to these rates and charges.

6 This does not mean that the Utility, acting as a business, may not charge a customer under other provisions of the law. For example California Civil Code §1714(a) and §3333 allow the Utility to charge a customer for damaging Utility property. See also Section 7951 and 7952 of the Public Utilities Code.

7 A regulated water or sewer service utility can also provide non-tariffed services in competition with other providers. See Standard Practice U-21-W.

8 See References at the end of this document.

9 D.92-03-093, March 31, 1992, Ordering Paragraph 9

10 GO 96-B, Water Industry Rule 1.4

11 Letter to All Class A Water Companies, May 1, 1995, Subject: New Procedures for Filing Step Increase, Attrition and Offset Advice Letters, Doc. Mgmt. #269358.

12 Class A utilities are encouraged to determine a distinct color for each Utility.

13 GO 96-B, Rule 4.6

14 The contents of the workpapers depend upon the purpose of the Advice Letter. See the other Standard Practices for descriptions of the content of the specific Advice Letters and Workpapers.

15 Res. No. W-4664, November 1, 2007

16 GO 96-B, Rules 4.1, 4.2 and 7.4.2

17 GO 96B, Rule 2.2 (9)

18 GO 96B, Water Industry Rule 4.1

19 Resolution M-4818, March 15, 2007

20 Typically 10-25 cents per page. Charging the actual cost of copying done by a professional copy house and actual postage costs is encouraged.

21 GO 96B, Rule 4.3

22 GO 96B, General Rule 7.3.2

23 GO 96B, Water Industry Rule 1.3

24 D.08-05-019 at 4 and General Rule 7.5.2, paragraph 3

25 GO 96 B, General Rule 8.3

26 GO 96B, General Rule 7.3.3, paragraph 2

27 GO 96B, General Rules 7.3.3

28 GO 96B, General Rule 7.3.5

29 GO 96-B, Rule 5.3

30 GO 96-B, Rule 7.5.2

31 GO 96-B, Rule 7.5.2, paragraph 1, last sentence.

32 GO 96-B, Rule 7.61, paragraph 2

33 GO 96-B, Rule 8.3

34 See Res. No. W-714, July 20, 1960, Order authorizing Pacific Gas and Electric Company to cancel Schedule No. SA-2, Residential Flat Rate Service, and to revise Rule No. T-12, Rates and Optional Rates, applicable in the Salinas Tariff Area. Doc. Mgmt. #289848.

35 See Standard Practice U-17-W, CONTRACTS AND MAIN EXTENSION AGREEMENTS

36 GO 96-B, Rule 8.2.1

37 "This agreement shall at all times be subject to such changes or modifications by the Commission as the Commission may from time to time direct in the exercise of its jurisdiction."

38 GO 96-B, Rule 8.2.3

39 Resolution No. M-4809, June 19, 2003 delegates to the Executive Director the authority to allow for electronic filing of advice letters.

40 GO 96-B, Rule 7.3.4

41 GO 96-B, Rule 8.3

42 GO 96-B, Rule 7.5.3

43 GO 96-B, Rule 7.6.1

44 GO 96-B, Rule 7.7.1

45 GO 96-B, Rule 7.5.2

46 GO 96-B, Rule 7.5.2

47 Letter from Fred L. Curry to All Commission Regulated Water and Sewer System Utilities, April 11, 2001

48 Memorandum from Wes Franklin to All Hydraulic Supervisors and Seniors, August 3, 1983, Subject: Customer Protests in Advice Letter Proceedings

49 Memorandum from Mary C. Carlos, Chief Administrative Law Judge to All Administrative Law Judges, November 24, 1982, Subject: Water Rate Case Decisions

50 Letter from Wesley Franklin, Chief of the Hydraulic Branch to Supervisors and Seniors, dated August 31, 1983

Top Of Page