STATE OF CALIFORNIA

Public Utilities Commission

San Francisco

M e m o r a n d u m

Date:

May 20, 2009

   

To:

The Commission

(Meeting of May 21, 2009)

     

From:

Pamela Loomis, Director

Office of Governmental Affairs (OGA) - Sacramento

   

Subject:

AB 1106 (Fuentes) - Renewable electric generation

facilities: feed-in tariffs.

As amended May 6, 2009

 

LEGISLATIVE SUBCOMMITTEE RECOMMENDATION: SUPPORT IF AMENDED

SUMMARY OF BILL:

This bill adds Section 399.21 to the Public Utilities Code. It would create a new feed-in tariff (FIT) program for projects up to 20 MW. The bill keeps the tariff price at the market price referent (MPR). The bill also allows an existing project on net energy metering to switch to a FIT. Instead of a hard program cap, the bill allows an unlimited amount of must-take fixed-price energy. The bill does not allow third-party ownership of eligible facilities. Lastly, it requires a FIT project to be located on property owned or under the control of the customer. As amended, the provision calling for the CPUC and CEC to jointly develop a "European-style fee-in tariff" for projects over 20MW has been deleted.

SUMMARY OF SUPPORTING ARGUMENTS FOR RECOMMENDATION:

The Commission is currently considering this expansion and may determine that a project size limit of smaller than 20 MW is more appropriate. When considering program design for a FIT program, the cost, risk, and timing need to be carefully balanced with the goals and progress of the overall RPS program. The chief policy argument in California for FITs is to minimize transaction costs for smaller renewable projects whose primary purpose is to serve local energy needs at the distributed generation (typically distribution interconnection) level. Projects larger than 10 MW typically do not interconnect at the distribution level and are likely more complex projects that require detailed project-by-project assessment such as site control, permitting, and transmission access. Thus, they may not be as well suited to a one-size-fits-all FIT approach.

As written, this bill does not change the current MPR price limitation, which to-date has not attracted much program interest. The bill should provide the Commission flexibility in determining the FIT price through an open stakeholder process. In addition, the bill does not have a program capacity cap, which may lead to unneeded procurement. The Commission should have the flexibility to determine the program capacity cap through long-term renewable planning. The bill also restricts a project's location to the property under the generators' control, which limits the program's effectiveness because it shrinks the pool of eligible projects. The bill contradicts Commission decision (D.) 07-07-027 since it would allow existing projects to receive a FIT after they received net-metering and other subsidies from the California Solar Initiative or Self Generation Incentive Program.

SUMMARY OF SUGGESTED AMENDMENTS:

Size of Facility: The bill creates a new FIT program for all renewable projects that are less than or equal to 20 MW. The size limitation is the subject of an open proceeding at the CPUC, and a determination has not been made. CPUC staff is leaning towards FIT projects up to 10 MW. CPUC staff has analyzed the number of megawatts under a 10 MW size limit that could easily interconnect to the existing distribution substations without the need for upgrades and has found that there is enough technical potential to make significant progress in reaching the RPS program goals.

Commission staff believes projects of this size have fewer environmental permitting and viability issues relative to projects greater than 10 MW. In addition, projects under 10 MW are not expected to need new transmission. As a result, these projects should be able to come online in a short period of time compared to larger projects.

Price: This bill keeps the price at the market price referent (MPR), which has not been high enough to attract many new projects. The bill should be amended to allow the CPUC to set the price so that the FIT provides sufficient payment to stimulate untapped markets and build new renewable projects, but not overpay or reduce the ability of competitive solicitations to put downward pressure on price.

Property restrictions: This bill requires that a FIT project be located on property owned or under the control of the customer. This restricts where a project can be located and does not support efficient utilization of the existing grid. Since most rooftops cannot fit

large solar PV projects, many projects above 1 MW will probably not be able to participate in this program.

Program Cap: The proposed cap is until the electrical corporation meets its RPS target. This cap is problematic since it allows for an unlimited amount of fixed-price energy. Currently, the utilities procure the renewables they need to fit their unique portfolios. Since a FIT is a must-take obligation, the utility risks over-procuring energy that it does not need. This trade-off can be managed in small quantities, but the language proposed in this bill risks over-procurement.

Impact on Incentive Programs: This bill would allow existing projects on net-metering to switch to a FIT. The bill would allow a customer electing this tariff to also be eligible to receive ratepayer-funded incentives for the capacity needed to offset part or all of the electrical demand of the customer. This provision of the program would be new and would conflict with D.07-07-027. The Commission's policy has been that customer-side of the meter incentives provided through the Self Generation Incentive Program (SGIP) or the California Solar Initiative (CSI) should not be provided to system-side of the meter wholesale generators since this would effectively allow the same project to receive payments twice. Customers that have taken SGIP and CSI should not be eligible for the feed-in tariff, especially if the price under the feed-in tariff is raised above avoided cost.

DIVISION ANALYSIS (Energy Division):

This bill would require the Commission to create a new code section and thus a new feed-in tariff program in addition to the existing program. It appears that the author's intent maybe to create a FIT focused on larger, potentially wholesale-only, facilities. It would require the Commission to:

PROGRAM BACKGROUND:

Public Utilities Code § 399.14 requires the Commission to establish a competitive process to select renewable contracts based on least cost and best fit. Competitive markets benefit ratepayers by using competitive pressures to lower total costs. Fixed price standard contracts use administrative processes to set the price, which does not benefit from competition. Thus, it is very difficult to determine the right price for a feed-in tariff. If the price is too low, then the project will not attract new investment. If the project is too high, then ratepayers will overpay.

Public Utilities Code § 399.20 requires each electrical corporation to establish a tariff for the purchase of electricity from an eligible renewable, water, or wastewater facility at a market price determined by the Commission.  The Commission implemented § 399.20 by D.07-07-027 on June 26, 2007.  The decision adopted tariffs and standard contracts for the purchase of this electricity up to 1.5 MW from water and wastewater customers, and additionally it made the same program available to all other renewable customer generators in PG&E and SCE territory.  Later, the Commission expanded the program to all customers in SDG&E's territory. The Commission's implementation of § 399.20 is considered phase 1 of the Tariff and Standard Contract Implementation for RPS Generators.  The Commission is currently considering phase 2, which includes consideration of expanding the contract to facilities up to 20 MW under R.08-08-009.

On September 28, 2008, SB 380 amended Public Utilities Code § 399.20 to allow purchase of electricity from any eligible renewable electric facility and increased the statewide cap from 250 MW to 500 MW, and it removed any requirement that the tariff be available to water or wastewater facilities. Comments have been filed with the Commission concerning implementing the changes mandated in SB 380, and the Commission is currently working on a Decision to implement SB 380.

The California Energy Commission (CEC) has been investigating feed-in tariffs.  They held staff workshops on June 30, 2008 and October 1, 2008 in order to discuss policy directions for feed-in tariffs.  Prior to the October 1, 2008 workshop a draft consultant report was issued entitled "California Feed-in Tariff Design and Policy Options".  Based on that report and workshops, the CEC has recommended that the Commission immediately implement a feed-in tariff program for all RPS-eligible generating facilities up to 20 MW in size.  They recommend that such a program should include must-take provisions as well as cost-based technology-specific prices that generally decline over time and are not linked to the MPR.

As a part of R.08-08-009, the Commission is considering expanding the existing FIT program from 1.5 MW up to possibly 20 MW. The ALJ is currently finalizing a ruling that will contain a staff proposal on program design issues and terms and conditions. Staff recommends that the Commission expand the existing program to 10 MW and consider changing the FIT price in the next phase of the proceeding. The Commission issued a ruling in June, and staff issued two data requests in October and January to better understand party positions. Staff also held a workshop in February on FIT program design and terms and conditions. In designing an expanded FIT program, the Commission needs to carefully balance the cost, risk, and timing of the overall RPS program with the cost, risk, and timing of an expanded FIT program.

OTHER STATE OR FEDERAL INFORMATION:

Congress is currently considering proposed feed-in tariff national legislation, in conjunction with national RPS bills. There is currently no federal mandate related to feed-in tariffs.


Several other states are considering feed-in tariffs, and the City of Gainesville, Florida recently enacted a small feed-in tariff in lieu of a program like the California Solar Initiative.

Eighteen European countries have FIT programs and Germany leads the world in terms of installed capacity for both photovoltaics (PV) and for wind energy as a result of its feed-in tariff policies. By the end of 2007, Germany had 22,622 MW of wind and 3,800 MW of solar PV capacity installed in the country, with annual additions of 1,667 MW of wind and 1,100 MW of PV added in 2007 alone. The German FIT has been very successful in building new projects, but as mentioned previously, has come at a high price to ratepayers.

Spain also has a feed-in tariff program that has resulted in much development. By the end of 2007, Spain had installed 15,145 MW of wind capacity, and 500 MW of PV capacity. On the other hand, Spain had to freeze and then revise its feed-in tariff program midcourse because of lucrative payments and unexpected interest. This boom and bust hurt the solar market in Spain and has resulted in economic loss and oversupply. Thus, the success of a feed-in tariff is very dependent on the goals of the program and the program's design.

LEGISLATIVE HISTORY:

AB 1969 (Yee, 2006) led to the implementation of P.U. Code Section 399.20. As aforementioned, this Code Section provides California's only feed-in tariff to date.

SB 380 (Kehoe, 2008) altered P.U. Code Section 399.20 to include all renewables and increased the statewide cap to 500 MW.

The implementation of P.U. Code Section 399.11 established the RPS requirement of "generating 20 percent of total retail sales of electricity in California from eligible renewable energy resources by December 31, 2010."

STATUS:

AB 1106 has been referred to the Assembly Appropriations Committee upon passage from both the Assembly Natural Resources Committee and the Assembly Utilities and Commerce Committee.

SUPPORT/OPPOSITION:

Support: Bloom Energy Corporation

Sierra Club California (if amended)

Opposition: California Association of Small and Multi-jurisdictional

Utilities (CASMU) (unless amended)

STAFF CONTACTS:

Davina Flemings, Legislative Liaison, OGA (916) 324-5945

Erin Grizard, Legislative Liaison, OGA (916) 445-1430

Date: May 20, 2009

BILL LANGUAGE:

BILL NUMBER: AB 1106 AMENDED

INTRODUCED BY Assembly Member Fuentes

Members Fuentes and Ruskin

FEBRUARY 27, 2009

An act to add Section 399.21 to the Public Utilities Code,

relating to energy.

AB 1106, as amended, Fuentes. Renewable electric generation

facilities: feed-in tariffs.

Under existing law, the Public Utilities Commission is

vested with has regulatory authority over public

utilities, including electrical corporations , as defined

. The Public Utilities Act imposes various duties and

responsibilities on the commission with respect to the purchase of

electricity by electrical corporations and requires the commission to

review and adopt a procurement plan and a renewable energy

procurement plan for each electrical corporation pursuant to the

California Renewables Portfolio Standard Program (RPS program)

. The program requires that a retail seller of electricity,

including electrical corporations, purchase a specified minimum

percentage of electricity generated by eligible renewable energy

resources, as defined, in any given year as a specified percentage of

total kilowatthours sold to retail end-use customers each calendar

year (renewables portfolio standard).

Existing law requires every electrical corporation to file with

the commission a standard tariff for renewable energy output produced

at an electric generation facility, as defined, that is an eligible

renewable energy resource and meets other size, deliverability, and

interconnection requirements. Existing law requires the electrical

corporation to make this tariff available to public water or

wastewater agencies that own and operate an electric generation

facility within the service territory of the electrical corporation,

upon request, on a first-come, first-served basis, until the combined

statewide cumulative rated generating capacity of those electric

generation facilities equals 250 megawatts. Existing law requires

that the electric generation facility be located on property owned or

under the control of the public water or wastewater agency and be

sized to offset part or all of the generator's electricity demand.

Existing law provides that the renewable energy output of an electric

generation facility counts toward the electrical corporation's

renewables portfolio standard and resource adequacy requirements.

Existing law requires every electrical corporation to file with

the commission a standard tariff for electricity generated by an

electric generation facility, as defined, that is owned and operated

by a retail customer of the electrical corporation. Existing law

requires that the electric generation facility: (1) have an effective

capacity of not more than 1.5 megawatts and be located on property

owned or under the control of the customer, (2) be interconnected and

operate in parallel with the electric transmission and distribution

grid, (3) be strategically located and interconnected to the electric

transmission system in a manner that optimizes the deliverability of

electricity generated at the facility to load centers, and (4) meet

the definition of an eligible renewable energy resource under the RPS

program. Existing law requires that the tariff provide for payment

for every kilowatthour of electricity generated by an electric

generation facility at a market price referent established by the

commission pursuant to the program. Existing law requires the

electrical corporation to make this tariff available to customers

that own and operate an electric generation facility within the

service territory of the electrical corporation, upon request, on a

first-come-first-served basis, until the combined statewide

cumulative rated generating capacity of those electric generation

facilities equals 500 megawatts, or the electrical corporation meets

its proportionate share of the 500 megawatt limit based upon the

ratio of its peak demand to total statewide peak demand of all

electrical corporations. Existing law authorizes the commission to

modify or adjust the above-described requirements for any electrical

corporation with less than 100,000 service connections, as individual

circumstances merit. Existing law provides that the electricity

generated by an electric generation facility counts toward the

electrical corporation's renewables portfolio standard and provides

that the physical generating capacity counts toward meeting the

electrical corporation's resource adequacy requirements.

This bill would require every electrical corporation to file with

the commission a standard feed-in tariff for the electricity

generated by a renewable electric generation facility, as defined,

that is an eligible renewable energy resource and meets other size,

deliverability, and interconnection requirements. The bill would

require the commission to consult with the Energy Commission and the

Independent System Operator in approving feed-in tariffs and rules

for interconnection to the electrical grid. The bill would require

the electrical corporation to make the feed-in tariff available to

any customer of the electrical corporation, upon request, on a

first-come, first-served

first-come-first-served basis, until the electrical corporation

meets its renewables portfolio standard. The bill would require the

commission to ensure that a customer's eligibility to receive service

pursuant to the feed-in tariff is determined in advance so that a

customer can invest in a renewable electric generation facility

knowing that the customer will be eligible to receive service

pursuant to the feed-in tariff and the market price that will be

applicable to that customer. The bill would authorize the commission

to place time limitations upon a customer for completion of the

renewable electric generation facility to remain eligible for the

feed-in tariff at the applicable market price and to establish

reasonable operation and reliability standards for a renewable

electric generation facility to remain eligible for the feed-in

tariff at the applicable market price. The bill would provide that

the electricity generated by the renewable electric generation

facility, including generation used to offset the customer's own

usage of electricity, counts toward the electrical corporation's

renewables portfolio standard and resource adequacy requirements. The

bill would authorize a customer receiving electrical service

pursuant to an alternative net metering program, as defined, to elect

to receive service pursuant to the feed-in tariff filed by an

electrical corporation pursuant to the bill's requirements and would

provide that a customer electing to receive service pursuant to the

feed-in tariff waives any right the customer otherwise has to

thereafter receive service pursuant to an alternative net metering

program.

This bill would require the commission, in consultation

with the Energy Commission, to develop feed-in tariffs for eligible

renewable energy resources of more than 20 megawatts that value a

diverse mix of sources of renewable energy based upon the most

successful feed-in tariffs utilized in Europe. The bill would

require the commission, in consultation with the

Independent System Operator, to establish tariff provisions that

facilitate both the renewables portfolio standard

RPS program and the reliable operation of the electrical

grid.

Under existing law, a violation of the Public Utilities Act or an

order or direction of the commission is a crime. Because this bill

would require an order or other action of the commission to implement

its provisions and a violation of that order or action would be a

crime, the bill would impose a state-mandated local program by

creating a new crime.

The California Constitution requires the state to reimburse local

agencies and school districts for certain costs mandated by the

state. Statutory provisions establish procedures for making that

reimbursement.

This bill would provide that no reimbursement is required by this

act for a specified reason.

Vote: majority. Appropriation: no. Fiscal committee: yes.

State-mandated local program: yes.

THE PEOPLE OF THE STATE OF CALIFORNIA DO ENACT AS FOLLOWS:

SECTION 1. Section 399.21 is added to the Public Utilities Code,

to read:

399.21. (a) It is the policy of this state and the intent of the

Legislature to encourage energy production from renewable resources

in an amount commensurate with electricity demand.

(b) As used in this section the following terms have the following

meanings:

(1) "Alternative net metering program" means any program that

requires an electrical corporation to purchase or credit electricity

generated by a subscriber pursuant to Article 3 (commencing with

Section 2821) of Chapter 7 of Part 2.

(2) "Renewable electric generation facility" means a facility for

the generation of electricity that is owned and operated by a

customer of an electrical corporation and that meets all of the

following criteria:

(A) Has an effective generating capacity of not more than 20

megawatts and is located on property owned or under the control of

the customer.

(B) Is interconnected and operates in parallel with the electric

transmission and distribution grid.

(C) Is strategically located and interconnected to the electric

transmission system in a manner that optimizes the deliverability of

electricity generated at the facility to load centers.

(D) Is an eligible renewable energy resource pursuant to this

article.

(c) Every electrical corporation shall file with the commission a

standard feed-in tariff for the electricity generated by a renewable

electric generation facility. The commission shall consult with the

Energy Commission and the Independent System Operator in approving

feed-in tariffs and rules for interconnection.

(d) The feed-in tariff shall provide for payment for every

kilowatthour of electricity generated at a renewable electric

generation facility at the market price as determined by the

commission pursuant to Section 399.15 for a period of 10, 15, or 20

years, as authorized by the commission.

(e) Every electrical corporation shall make the feed-in tariff

available to customers that own and operate a renewable electric

generation facility within the service territory of the electrical

corporation, upon request, on a first-come, first-served

first-come-first-served basis, until the

electrical corporation meets its renewables portfolio standard. An

electrical corporation may make the terms of the feed-in tariff

available to customers in the form of a standard contract subject to

commission approval. An electrical corporation shall only be required

to offer service or contracts under this section until that

electrical corporation meets its renewables portfolio standard, as

determined by the commission.

(f) The commission shall ensure that a customer's eligibility to

receive service pursuant to the feed-in tariff is determined in

advance so that a customer can invest in a renewable electric

generation facility knowing that the customer will be eligible to

receive service pursuant to the feed-in tariff and the market price

that will be applicable to that customer. The commission may place

time limitations upon a customer for completion of the renewable

electric generation facility to remain eligible for the feed-in

tariff at the applicable market price. The commission may establish

reasonable operation and reliability standards for a renewable

electric generation facility to remain eligible for the feed-in

tariff at the applicable market price.

(g) Every kilowatthour of the electricity generated by the

renewable electric generation facility, including generation used to

offset the customer's own usage of electricity, shall count toward

the electrical corporation's renewables portfolio standard annual

procurement targets for purposes of paragraph (1) of subdivision (b)

of Section 399.15.

(h) The physical generating capacity of a renewable electric

generation facility shall count toward the electrical corporation's

resource adequacy requirement for purposes of Section 380.

(i) (1) A customer receiving electrical service pursuant to an

alternative net metering program may elect to receive service

pursuant to the feed-in tariff filed by an electrical corporation

pursuant to this section.

(2) A customer that elects to receive electrical service pursuant

to the feed-in tariff filed by an electrical corporation pursuant to

this section waives any right that the customer otherwise has to

thereafter receive service pursuant to an alternative net metering

program.

(j) The commission, in consultation with the Energy Commission,

shall develop feed-in tariffs for eligible renewable energy resources

of more than 20 megawatts that value a diverse mix of sources of

renewable energy based upon the most successful feed-in tariffs

utilized in Europe.

(k)

(j) The commission shall, in consultation with the

Independent System Operator, establish tariff provisions that

facilitate both the provisions of this section and the reliable

operation of the grid.

SEC. 2. No reimbursement is required by this act pursuant to

Section 6 of Article XIII B of the California Constitution because

the only costs that may be incurred by a local agency or school

district will be incurred because this act creates a new crime or

infraction, eliminates a crime or infraction, or changes the penalty

for a crime or infraction, within the meaning of Section 17556 of the

Government Code, or changes the definition of a crime within the

meaning of Section 6 of Article XIII B of the California

Constitution.